Skip to main content

Trilogy Metals Inc.

For the period ended Feb 28, 2025. Filed Apr 2, 2025.

View on SEC.gov

About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Feb 28, 2025 · Filed Apr 2, 2025

TMQ$2.15+6.4%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-Q

Period ended 2024-08-31; filed 2024-10-08.

0001558370-24-013186

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

Current report: 10-Q

Period ended 2025-02-28; filed 2025-04-02.

0001558370-25-004293

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 52 previous paragraphs and 54 current paragraphs.

30 unchanged; 13 reworded; 10 added; 8 removed; 1 previous and 1 current paragraphs rearranged.

Tables are not compared: 55 previous and 57 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (10)

Current report

On January 15, 2025, the Company announced the positive results of its Preliminary Economic Assessment Study (“Bornite PEA”) for the Bornite copper project. Highlights of the Bornite PEA include the following:

Current report

The Bornite PEA describes the technical and economic viability of establishing an underground mining operation for a 6,000 tonne-per-day operation with a 17-year mine life. The Bornite PEA assumes re-purposing the infrastructure described in the Company’s current Feasibility Study for the Arctic Project for the use with the Bornite Project once the Arctic deposit has been depleted. More information on the Arctic Feasibility Study and the Bornite PEA can be accessed on the Company’s website at www.trilogymetals.com.

Current report

As at February 28, 2025, we had $25.2 million in cash and cash equivalents and working capital (current assets less current liabilities) of $24.6 million. There is sufficient cash on hand to fund the approved fiscal 2025 budget of $3.1 million.

Current report

In November 2023, the FASB issued Accounting Standards Update (“ASU”) 2023-07 “Segment Reporting (Topic 280): Improvements to Reportable Segment Disclosures”. AUS 2023-07 expands public entities’ segment disclosures by requiring disclosure of significant segment expenses that are regularly provided to the chief operating decision maker and included within each reported measure of segment profit or loss and interim disclosures of a reportable segment’s profit or loss and assets. The standard is effective for the Company’s Annual Report on Form 10-K for the fiscal year ended November 30, 2025, and subsequent interim periods, with early adoption permitted. The Company is evaluating the impact of the guidance on the consolidated financial statements or disclosures.

Current report

In December 2023, the FASB issued ASU 2023-09 “Income Taxes (Topic 740): Improvements to Income Tax Disclosures.” ASU 2023-09 enhances the transparency and decision usefulness of income tax disclosures through changes to the rate reconciliation and income taxes paid information. The standard is effective beginning with the Company’s Annual Report on Form 10-K for the fiscal year ended November 30, 2026, and subsequent interim periods, with early adoption permitted. The Company is evaluating the impact of the guidance on the consolidated financial statements.
Removed paragraphs (8)

Previous report

The board of Ambler Metals also approved a 2024 fiscal year budget totaling $2.5 million to support the AAP. During the nine-month period ended August 31, 2024, Ambler Metals funded $1.4 million to the Alaska Industrial Development and Export Authority (“AIDEA”) in support of the AAP compared with the budget of $1.9 million.

Previous report

During the third quarter of 2024, we received additional cash from Ambler Metals. In total, Ambler Metals returned $50 million to Trilogy and South32 as at August 31, 2024.

Previous report

On April 22, 2024, the Company announced that the United States Bureau of Land Management (“BLM”) had filed the Final Supplemental Environmental Impact Statement (“SEIS”) for the AAP on its website. The Final SEIS identifies “No Action” as the BLM’s preferred alternative. The proponent for the AAP is AIDEA which is a public corporation of the State of Alaska. AIDEA’s purpose is to promote, develop, and advance general prosperity and economic welfare of the people of Alaska. AIDEA strongly objected to both the process used by the BLM to reach a “No Build” decision and the effect of the decision which AIDEA believes illegally blocks access to statehood lands, minerals, and federally patented mining claims. On May 8, 2024, NANA announced its withdrawal from further involvement with the AAP and stated its intentions to not renew the surface access permit with AIDEA upon the permit’s expiry this year.

Previous report

On June 28, 2024, the BLM issued the Record of Decision confirming their selection of the No Action alternative and thus denied AIDEA’s application for a right-of-way grant (“ROW Grant”) across BLM-managed lands which terminated the BLM ROW Grant issued to AIDEA on January 5, 2021.

Previous report

For the nine-month period ended August 31, 2024, we reported a net loss of $7.0 million compared to a net loss of $11.9 million for the nine-month period ended August 31, 2023. The decrease for the nine-month period ended August 31, 2024, when compared to the same period in 2023, is primarily due to the decrease in our share of losses of Ambler Metals, professional fees and stock-based compensation and salaries. The decrease of our share of losses of Ambler Metals is mainly due to the decrease in corporate wages due to a reduction in staffing and a reduction in mineral property expenses due to a reduction in project activities which was partially offset by the increase in professional fees related to part-time contractors engaged to assist with management of Ambler Metals, along with consultants engaged in government and external affairs.

Previous report

As at August 31, 2024, we had cash and cash equivalents and working capital of $25.7 million. During the nine months ended August 31, 2024, Trilogy received a total of $25.0 million from Ambler Metals as a return of excess cash to the owners. Although the Company has a strong cash position, management continues with cash preservation strategies to reduce cash expenditures where feasible, including but not limited to reductions in marketing and investor conferences and office expenses. In addition, the Company’s board of directors continue to take all of their fees in deferred share units in an effort to preserve cash. The Company’s senior management team is also continuing to take a portion of their base salaries and all of their short and long term compensation in shares of the Company to preserve cash.

Previous report

There are no new accounting pronouncements affecting the Company.
Reworded paragraphs (13)

Previous wording

This Management’s Discussion and Analysis (“MD&A”) contains “forward-looking information” and “forward-looking statements” within the meaning of Section 27A of the U.S. Securities Act of 1933, as amended, Section 21E of the U.S. Securities Exchange Act of 1934, as amended (the “Exchange Act”), and other applicable securities laws. These forward-looking statements may include statements regarding the Company’s work programs and budgets; perceived merit of properties, exploration results and budgets, the impact of the Bureau of Land Management’s (“BLM”) suspension of permits on the right-of-way with the Alaska Industrial Development and Export Authority (“AIDEA”) relating to the Ambler Road Project, the Company and Ambler Metals’ funding requirements, the Company’s cash preservation strategies, the Company’s future funding of Ambler Metals, mineral reserves and resource estimates, work programs, capital expenditures, operating costs, cash flow estimates, production estimates and similar statements relating to the economic viability of a project, timelines, strategic plans, statements regarding Ambler Metals’ plans and expectations relating to its Upper Kobuk Mineral Projects (the “UKMP”, as defined below), sufficiency of the Ambler Metals’ cash to fund the UKMP, impact of COVID-19 on the Company’s operations, market prices for precious and base metals, statements regarding the Ambler Access Project (also known as the Ambler Mining District Industrial Access Project), or other statements that are not statements of fact. These statements relate to analyses and other information that are based on forecasts of future results, estimates of amounts not yet determinable and assumptions of management. Statements concerning mineral resource estimates may also be deemed to constitute “forward-looking statements” to the extent that they involve estimates of the mineralization that will be encountered if the property is developed.

Current wording

This Management’s Discussion and Analysis (“MD&A”) contains “forward-looking information” and “forward-looking statements” within the meaning of Section 27A of the U.S. Securities Act of 1933, as amended, Section 21E of the U.S. Securities Exchange Act of 1934, as amended (the “Exchange Act”), and other applicable securities laws. These forward-looking statements may include statements regarding the Company’s work programs and budgets; perceived merit of properties, exploration results and budgets, the Company and Ambler Metals’ funding requirements, mineral reserves and resource estimates, work programs, capital expenditures, operating costs, cash flow estimates, production estimates and similar statements relating to the economic viability of a project, timelines, strategic plans, statements regarding Ambler Metals’ plans and expectations relating to its Upper Kobuk Mineral Projects (the “UKMP”, as defined below), sufficiency of the Ambler Metals’ cash to fund the UKMP, market prices for precious and base metals, statements regarding the Ambler Access Project (also known as the Ambler Mining District Industrial Access Project, “AMDIAP”), or other statements that are not statements of fact. These statements relate to analyses and other information that are based on forecasts of future results, estimates of amounts not yet determinable and assumptions of management. Statements concerning mineral resource estimates may also be deemed to constitute “forward-looking statements” to the extent that they involve estimates of the mineralization that will be encountered if the property is developed.

Previous wording

Richard Gosse, P.Geo., Vice President, Exploration of the Company, is a Qualified Person under National Instrument 43-101 - Standards of Disclosure for Mineral Projects (“NI 43-101”), and has approved the scientific and technical information in this MD&A.

Current wording

Richard Gosse, P.Geo., Vice President, Exploration of the Company, is a Qualified Person under National Instrument 43-101 - Standards of Disclosure for Mineral Projects (“NI 43-101”) and S-K 1300, and has approved the scientific and technical information in this MD&A.

Previous wording

Trilogy’s shares are listed on the Toronto Stock Exchange (“TSX”) and the NYSE American Stock Exchange (“NYSE American”) under the symbol “TMQ”. Additional information related to Trilogy, including our annual report on Form 10-K for the fiscal year ended November 30, 2023, is available on SEDAR+ at www.sedarplus.com and on EDGAR at www.sec.gov.

Current wording

Trilogy’s shares are listed on the TSX and the NYSE American under the symbol “TMQ”. Additional information related to Trilogy, including our annual report on Form 10-K for the fiscal year ended November 30, 2024, is available on SEDAR+ at www.sedarplus.ca and on EDGAR at www.sec.gov.

Previous wording

We are a base metals exploration company focused on the exploration and development of mineral properties, through our equity investee, in the Ambler mining district located in Alaska, U.S.A. We conduct our operations through a wholly owned subsidiary, NovaCopper US Inc. which is doing business as Trilogy Metals US (“Trilogy Metals US”). Our Upper Kobuk Mineral Projects (“UKMP” or “UKMP Projects”) were contributed into a 50/50 joint venture named Ambler Metals LLC (“Ambler Metals”) between Trilogy and South32 Limited (“South32”) on February 11, 2020 (see below). The projects contributed to Ambler Metals consist of: i) the Ambler lands which host the Arctic copper-zinc-lead-gold-silver project (the “Arctic Project”); and ii) the Bornite lands being explored under a collaborative long-term agreement with NANA Regional Corporation, Inc. (“NANA”), a regional Alaska Native Corporation, which hosts the Bornite carbonate-hosted copper project (the “Bornite Project”) and related assets. The Company may also conduct early-stage exploration through a wholly owned subsidiary, 995 Exploration Inc.

Current wording

We are a base metals exploration company focused on the exploration and development of mineral properties, through our equity investee, in the Ambler mining district located in Alaska, U.S.A. We conduct our operations through a wholly owned subsidiary, NovaCopper US Inc. which is doing business as Trilogy Metals US (“Trilogy Metals US”). The UKMP were contributed into a 50/50 joint venture named Ambler Metals LLC (“Ambler Metals”) between Trilogy and South32 Limited (“South32”) on February 11, 2020 (see below). The projects contributed to Ambler Metals consist of: i) the Ambler lands which host the Arctic copper-zinc-lead-gold-silver project (the “Arctic Project”); and ii) the Bornite lands being explored under a collaborative long-term agreement with NANA Regional Corporation, Inc., a regional Alaska

Previous wording

The Company has a 2024 fiscal year cash budget totaling $2.8 million. For the nine-month period ended August 31, 2024, we used $1.9 million in operating activities mainly for personnel costs, professional fees, regulatory and office expenses compared with budgeted cash expenditures totaling $2.1 million.

Current wording

The Company has a 2025 fiscal year cash budget totaling $3.1 million. For the three-month period ended February 28, 2025, we used $0.8 million in operating activities mainly for personnel costs, professional fees, regulatory and office expenses compared with budgeted cash expenditures totaling $1.0 million.

Previous wording

The board of Ambler Metals approved a 2024 fiscal year budget totaling $5.5 million to support external and community affairs, to maintain the State of Alaska mineral claims in good standing, and for the maintenance of physical assets. During the nine-month period ended August 31, 2024, Ambler Metals expended $3.5 million on salaries and wages, professional fees, engineering, project support costs and mineral property expenses, excluding the Ambler Access Project (the “AAP”) costs, compared with the budget of $4.5 million.

Current wording

The board of Ambler Metals approved a 2025 fiscal year budget totaling $5.8 million to support external and community affairs, to maintain the State of Alaska mineral claims in good standing, and for the maintenance of physical assets. During the three-month period ended February 28, 2025, Ambler Metals expended $1.2 million on salaries and wages, professional fees, engineering, project support costs and mineral property expenses, and the Ambler Access Project costs mainly for subsistence committee meetings and community relations, compared with the budget of $1.0 million.

Previous wording

For the three-month period ended August 31, 2024, we reported a net loss of $1.6 million compared to a net loss of $4.1 million for the three-month period ended August 31, 2023. The decrease in comprehensive loss in the third quarter of 2024 compared to the same quarter in 2023 is primarily due to the decrease in our share of loss of Ambler Metals. The decrease of our share of losses of Ambler Metals is mainly due to the decrease in corporate wages and in mineral property expenses partially offset from the increase in professional fees. The primary drivers in decrease in mineral property expenses over the comparative quarter in the prior year were from a reduction in activities both at the project level and at the AAP.

Current wording

For the three-month period ended February 28, 2025, we reported a net loss of $3.6 million comparable to a net loss of $3.6 million for the three-month period ended February 29, 2024. Comparing the first quarter of 2025 to first quarter of 2024, there was an increase of $0.2 million in professional fees due to increased consulting and legal fees related to the Bornite PEA and the Company’s Base Shelf Prospectus filing, offset by a decrease of $0.2 million in our share of losses of Ambler Metals due to reduction in activities at the Ambler Access Project.

Previous wording

We expended $1.9 million on operating activities during the nine-month period ending August 31, 2024 with the majority of cash spent on professional fees and American and Canadian securities commission fees related to our annual regulatory filings, annual fees paid to the Toronto Stock Exchange and the NYSE American Exchange and corporate salaries.

Current wording

We expended $0.7 million on operating activities during the three-month period ending February 28, 2025 with the majority of cash spent on professional fees to complete the Bornite preliminary economic assessment and related technical reports and American and Canadian securities commission fees related to our annual regulatory filings, annual fees paid to the Toronto Stock Exchange and the NYSE American Exchange and corporate salaries.

Previous wording

All project related costs are funded by Ambler Metals. Ambler Metals had $9.8 million in cash and cash equivalents and $8.7 million in working capital as at August 31, 2024. There are sufficient funds at Ambler Metals to fund this fiscal year’s budget for the UKMP and the AAP.

Current wording

All project related costs are funded by Ambler Metals. Ambler Metals had $6.5 million in cash and cash equivalents and $6.4 million in working capital as at February 28, 2025. There are sufficient funds at Ambler Metals to fund this fiscal year’s approved budget of $5.8 million.

Previous wording

As at October 8, 2024, we had 160,902,814 common shares issued and outstanding. As at October 8, 2024, we had 14,316,900 stock options outstanding with a weighted-average exercise price of CDN$1.78, 3,133,412 Deferred Share Units (“DSUs”), and 2,818,339** **Restricted Share Units (“RSUs”) outstanding. As at October 8, 2024 we hold 5,144 NovaGold Resources Inc. (“NovaGold”) DSUs for which the NovaGold director is entitled to receive one common share of Trilogy for every six NovaGold shares to be received upon their retirement from the NovaGold board. A total of 859 common shares will be issued upon redemption of the NovaGold DSUs. Upon the exercise of all the foregoing convertible securities, the Company would be required to issue an aggregate of 20,268,651 common shares.

Current wording

As at April 2, 2025, we had 164,216,410 common shares issued and outstanding. As at April 2, 2025, we had 14,085,234 stock options outstanding with a weighted-average exercise price of CDN$1.63, 3,443,888 Deferred Share Units (“DSUs”), and 1,798,338** **Restricted Share Units (“RSUs”) outstanding. As at April 2, 2025we hold 5,144 NovaGold Resources Inc. (“NovaGold”) DSUs for which the NovaGold director is entitled to receive one common share of Trilogy for every six NovaGold shares to be received upon their retirement from the NovaGold board. A total of 859 common shares will be issued upon redemption of the NovaGold DSUs. Upon the exercise of all the foregoing convertible securities, the Company would be required to issue an aggregate of 19,328,319 common shares.

Previous wording

Management assesses the possibility of impairment in the carrying value of its equity method investment in Ambler Metals whenever events or circumstances indicate that the carrying amount of the investment may not be recoverable. Ambler Metals is a non-publicly traded equity investment owning exploration and development projects. Significant judgments are made in assessing the possibility of impairment. The Company assesses whether there has been a potential triggering event for other-than-temporary impairment by assessing the underlying assets of Ambler Metals for recoverability and assessing whether there has been a change in the development plan or strategy for the projects. If the Company concludes there is sufficient evidence for an other-than-temporary impairment, an assessment of fair value is performed. If the underlying assets are not recoverable, the Company will record an impairment charge equal to the difference between the carrying amount of the equity investment and its fair value. This assessment is subjective and require consideration at each period end.

Current wording

Management assesses the possibility of impairment in the carrying value of its equity method investment in Ambler Metals whenever events or circumstances indicate that the carrying amount of the investment may not be recoverable. Ambler Metals is a non-publicly traded equity investment owning exploration and development projects. Significant judgments are made in assessing the possibility of impairment. The Company assesses whether there has been a potential triggering event for other-than-temporary impairment by assessing the underlying assets of Ambler Metals for recoverability and assessing whether there has been a change in the development plan or strategy for the projects. If the Company concludes there is sufficient evidence for an other-than-temporary impairment, an assessment of fair value is performed. If the underlying assets are not recoverable, the Company will record an impairment charge equal to the difference between the carrying amount of the equity investment and its fair value. This assessment is subjective and requires consideration at each period end.

Previous wording

Compensation expense for options granted to employees, directors and certain service providers is determined based on estimated fair values of the options at the time of grant using the Black-Scholes option pricing model, which takes into account, as of the grant date, the fair market value of the shares, expected volatility, expected life, expected forfeiture rate, expected dividend yield and the risk-free interest rate over the expected life of the option. The use of the Black-Scholes option pricing model requires input estimation of the expected life of the option, volatility, and forfeiture rate which can have a significant impact on the valuation model, and resulting expense recorded.

Current wording

Compensation expense for stock options granted to employees, directors and certain service providers is determined based on estimated fair values of the stock options at the time of grant using the Black-Scholes option pricing model, which takes into account, as of the grant date, the fair market value of the shares, expected volatility, expected life, expected forfeiture rate, expected dividend yield and the risk-free interest rate over the expected life of the option. The use of the Black-Scholes option pricing model requires input estimation of the expected life of the option, volatility, and forfeiture rate which can have a significant impact on the valuation model, and resulting expense recorded.

Previous wording

Additional information regarding the Company, including our annual report on Form 10-K for the fiscal year ended November 30, 2023, is available on SEDAR+ at www.sedarplus.com and EDGAR at www.sec.gov and on our website at www.trilogymetals.com. Information contained on our website is not incorporated by reference.

Current wording

Additional information regarding the Company, including our annual report on Form 10-K for the fiscal year ended November 30, 2024, is available on SEDAR+ at www.sedarplus.ca and EDGAR at www.sec.gov and on our website at www.trilogymetals.com. Information contained on our website is not incorporated by reference.
Rearranged current paragraphs (1)

Current report — wording carried from elsewhere

Native Corporation, which hosts the Bornite carbonate-hosted copper project (the “Bornite Project”) and related assets. The Company may also conduct early-stage exploration through a wholly owned subsidiary, 995 Exploration Inc.
Rearranged previous paragraphs (1)

Previous report — wording carried elsewhere

Ambler Mining District Industrial Access Project (“AMDIAP” or “Ambler Access Project”)