EX-99.1 · Processing and Infrastructure:

Processing and Infrastructure:

●As processing feed begins to reduce over the next couple of years, there is the potential at times for the mill load to fluctuate and potentially run low. The lifter angle of the SAG mill should be reviewed to ensure that it is not overly aggressive with the reduced total load. The cost of such a review will be assessed internally by Roxgold technical staff.
●Metallurgical behavior should continue to be monitored especially when there are major changes to the proposed mine plan and mine development. Additional on-site testing should be completed from time to time in accordance with an updated mine plan during production, to identify any potential issues, especially in the comminution circuit. This testwork should be completed during operations. Such costs will be included in the operating costs for the mine.