ITEM 1A. RISK FACTORSCurrent report: 10-K
Period ended 2025-01-31; filed 2025-03-27.
0001558370-25-003819
ITEM 1A. RISK FACTORSThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 124 previous paragraphs and 118 current paragraphs.
66 unchanged; 42 reworded; 5 added; 7 removed; 9 previous and 5 current paragraphs rearranged.
Tables are not compared: 27 previous and 28 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (5)
Current report
Artificial intelligence poses risks that could adversely affect our business, results of operations, and financial condition.
Current report
The use of artificial intelligence, machine learning, data science, and similar technologies (collectively, “AI”) in our business presents risks and challenges that could have a material adverse effect on our business, results of operations, and financial condition. Currently, our use of AI is limited, but we may expand its integration into our business processes and solutions in the future. AI, including third-party AI tools, may be used in areas such as knowledge retention, risk detection, and virtual assistance. While these technologies have the potential to enhance efficiency and decision-making, they also pose significant risks, including reliability issues, data security concerns, regulatory challenges, and unintended consequences. AI algorithms may be flawed or biased. As a result, the content, analysis, or recommendations generated by these tools may be inaccurate, incomplete, or misleading. Unauthorized or improper use of AI tools—whether by employees, vendors, or third parties—could lead to breaches of confidentiality, data privacy violations, or the loss of proprietary information, potentially resulting in competitive harm, reputational damage, regulatory investigations, and legal liability. Additionally, we may have limited control or visibility into how third-party AI tools and AI-powered features in third-party products process and protect our data, even where we have sought contractual protections. As our reliance on AI evolves, we will continue to assess and mitigate these risks accordingly.
Current report
Finally, our competitors may adopt and implement AI technologies more effectively or rapidly than we do, potentially giving them a competitive advantage. If we are unable to adopt and integrate AI tools in a cost-effective and timely manner, our business, financial condition, and results of operations could be materially and adversely affected.
Current report
The imposition of tariffs by the Trump Administration may impact the construction of power plants or other construction projects of our subsidiaries.
Current report
President Trump has proposed heavy tariffs on imports from several nations, including a significant levy on imports from Canada, Mexico and China. These measures are expected to increase the cost of essential construction materials, such as steel and aluminum, which are critical components in power plant construction and often integral components to the industrial construction projects we build. Tariff measures may also cause import delays, increasing lead times necessary for materials to arrive at our construction sites. The resulting rise in material costs and delivery delays could lead to higher overall project expenses and changes to project timelines, as companies may need to seek alternative suppliers or renegotiate contracts. The uncertainty surrounding trade policies may deter investment in new power plant or industrial construction projects, as stakeholders assess the financial viability amid fluctuating costs. As trade negotiations continue and new policies are introduced, the tariff situation remains fluid, adding to the unpredictability of material costs and supply chain stability. These factors collectively pose a risk to our business operations, potentially affecting project timelines, budgets, and profitability.
Removed paragraphs (7)
Previous report
EPC services provided to three power industry services customers. During Fiscal 2023 and Fiscal 2022, a majority portion of consolidated revenues related to EPC services provided to a single power industry services customer on a project that achieved substantial completion during the early part of Fiscal 2024.
Previous report
The growth of our power business has been substantially based on the number of combined cycle gas-fired power plants built by us, as many coal-fired plants have been shut down. In 2010, coal-fired power plants accounted for about 45% of total electricity generation in the U.S. For 2023, coal accounted for approximately 17% of net electricity generation. On the other hand, natural-gas fired power plants provided approximately 42% of the electricity generated by utility-scale power plants in the U.S. in 2023, representing an increase of 70% in the amount of electrical power generated by natural gas-fired power plants, which provided approximately 24% of net electricity generation for 2010.
Previous report
The Biden Administration poses additional regulatory hurdles for fossil-fuel energy facilities.
Previous report
The Biden Administration’s approach to environmental regulation poses significant risks to the development and operation of fossil-fuel energy facilities. Central to the administration’s energy policy is the ambitious goal to achieve a carbon-free electricity sector by 2035 and to position the U.S. to reach net-zero carbon emissions by 2050.
Previous report
Since taking office, President Biden has taken several actions that underscore his commitment to these goals. He led the U.S. to re-enter the Paris Climate Agreement. Additionally, the administration revoked the Keystone Pipeline permit, effectively halting its construction, and temporarily suspended new oil and gas leasing on federal lands, despite legal challenges. Although oil and gas leasing on federal lands has resumed, there is a notable reduction in the scale of these activities compared to previous administrations. The Environmental Protection Agency (“EPA”) has proposed rules that would require coal and gas-fired power plants to limit greenhouse gas emissions by processes that may include the potential installation of carbon capture technology or co-firing with hydrogen to meet the standards.
Previous report
The administration’s actions and policy goals reflect a shift away from fossil fuel energy. This shift increases the regulatory and operational hurdles for companies involved in the development and management of fossil-fuel energy facilities. Developers may face challenges in obtaining necessary permits, meeting new environmental standards, and adapting to a rapidly evolving regulatory landscape. These factors could significantly impact the feasibility, costs, and timelines of new fossil-fuel projects, affecting our future operations and financial condition.
Previous report
Higher corporate taxes for us could result from the Global Minimum Tax, a global agreement to ensure that certain large corporations pay income tax at a minimum rate of 15% that many countries have begun to incorporate into law. Under this scheme, governments could still set whatever corporate tax rate they want, but if companies pay lower rates in a particular country, their home governments could “top-off” their taxes to the 15% minimum. Although the rules for the Global Minimum Tax provide a framework for its application, countries may incorporate the rules into their laws differently.
Reworded paragraphs (42)
Previous wording
Our business is challenged by a changing environment that involves many known and unknown risks and uncertainties. The risks described below discuss factors that have affected and/or could affect us in the future. There may be others. We may be affected by risks that are currently unknown to us or are immaterial at this time. If any such events did occur, our business, financial condition and results of operations could be adversely affected in a material manner. Our future results may also be impacted by other risk factors listed from time to time in our future filings with the SEC, including, but not limited to, our Annual Reports on Form 10-K and our Quarterly Reports on Form 10-Q. As the most significant portion of our consolidated entity is represented by the power industry services reportable business segment, the risk factor discussions included below are focused on that business. However, as a large number of these same risks exist for our other reportable segments, (1) industrial construction services, and (2) telecommunications infrastructure services, a review and assessment of the following risk factors should be performed with that in mind.
Current wording
Our business is challenged by a changing environment that involves many known and unknown risks and uncertainties. The risks described below discuss factors that have affected and/or could affect us in the future. There may be others. We may be affected by risks that are currently unknown to us or are immaterial at this time. If any such events did occur, our business, financial condition and results of operations could be adversely affected in a material manner. Our future results may also be impacted by other risk factors listed from time to time in our future filings with the SEC, including, but not limited to, our Annual Reports on Form 10-K and our Quarterly Reports on Form 10-Q. As the most significant portion of our consolidated entity is represented by the power industry services reportable business segment, the risk factor discussions included below are focused on that business. However, as a large number of these same risks exist for our other reportable segments, the industrial construction services segment and the telecommunications infrastructure services segment, a review and assessment of the following risk factors should be performed with those similarities in mind.
Previous wording
The majority of our consolidated revenues relate to performance by the power industry services segment which represented 73%, 76% and 78% of consolidated revenues for Fiscal 2024, Fiscal 2023 and Fiscal 2022, respectively. GPS, the major business component of this segment, earns the substantial portion of its revenues from execution on long-term natural gas-fired EPC services contracts with project owners. For Fiscal 2024, a majority portion of consolidated revenues related to
Current wording
The majority of our consolidated revenues relate to performance by the power industry services segment, which represented 79%, 73% and 76% of consolidated revenues for Fiscal 2025, Fiscal 2024 and Fiscal 2023, respectively. GPS, the major business component of this segment, earns the substantial portion of its revenues from execution on long-term natural gas-fired EPC services contracts with project owners. A significant portion of our consolidated revenues each year is generally derived from EPC services provided to a small number of customers, which can vary from year to year(see Note 16 to the accompanying consolidated financial statements).
Previous wording
We are directing a meaningful portion of our business development efforts to winning projects for the construction of renewable energy projects. We have successfully built utility-scale solar and wind farms, biomass-fueled power plants and biodiesel energy facilities in the past, and we have renewed the pursuit of renewable energy projects that will complement our natural gas-fired EPC services projects, which will remain the core business development focus going forward. Failure to obtain future awards for the construction of utility-scale energy facilities and the corresponding notices to proceed with contract activities, as well as any failure to successfully complete such projects, would have adverse effects on our future revenues, profits and cash flows.
Current wording
We have successfully built utility-scale solar and wind farms, biomass-fueled power plants and biodiesel energy facilities in the past, and we have renewed the pursuit of renewable energy projects that will complement our natural gas-fired EPC services projects, which will remain the core business development focus going forward.
Previous wording
At times, we may be awarded contracts for which commencement of project activities are delayed or cancelled. Our ability to sustain revenues depends on many factors including the ability of the power industry services business to not only win the awards of significant new EPC projects, but to obtain the corresponding full notices-to-proceed and to complete its projects successfully.
Current wording
At times, we may be awarded contracts for which commencement of project activities are delayed or canceled. Our ability to sustain revenues depends on many factors including the ability of the power industry services business to not only win the awards of significant new EPC projects, but to obtain the corresponding full notices-to-proceed and to complete its projects successfully. Failure to obtain future awards for the construction of utility-scale energy facilities and the corresponding notices to proceed with contract activities, as well as any failure to successfully complete such projects, would have adverse effects on our future revenues, profits and cash flows.
Previous wording
Our power industry services activities in any one fiscal reporting period are concentrated on a limited number of large construction projects for which we recognize revenues over time as we transfer control of the project asset to the customer. To a substantial extent, our contract revenues are based on the amounts of costs incurred. As the timing of equipment purchases, subcontractor services and other contract events may not be evenly distributed over the terms of our contracts, the amount of total contract costs may vary from quarter to quarter, creating uneven amounts of quarterly and/or annual consolidated revenues. In addition, the timing of contract commencements and completions may exacerbate the uneven pattern. As a result of the foregoing, future reported amounts of consolidated revenues, cash flow from operations, net income and earnings per share may vary in uneven patterns and may not be indicative of the operating results expected for any other fiscal period, thus rendering consecutive quarter comparisons of our consolidated operating results a less meaningful way to assess the growth of our business.
Current wording
Our power industry services activities in any one fiscal reporting period are concentrated on a limited number of large construction projects for which we recognize revenues over time as we transfer control of the project asset to the customer. To a substantial extent, our contract revenues are based on the related amounts of costs incurred. As the timing of equipment purchases, subcontractor services and other contract events may not be evenly distributed over the terms of our contracts, the amount of total contract costs may vary from quarter to quarter, creating uneven amounts of quarterly and/or annual consolidated revenues. In addition, the timing of contract commencements and completions may exacerbate the uneven pattern. As a result of the foregoing, future reported amounts of consolidated revenues, cash flow from operations, net income and earnings per share may vary in uneven patterns and may not be indicative of the operating results expected for any other fiscal period; thus, rendering consecutive quarter comparisons of our consolidated operating results a less meaningful way to assess the growth of our business.
Previous wording
To prepare consolidated financial statements in conformity with accounting principles generally accepted in the U.S., we are required to make estimates, assumptions and judgments as of the date of such financial statements, which affect the reported values of assets and liabilities, revenues and expenses, and disclosures of contingent assets and liabilities. For each of our fixed price customer contracts, we recognize revenues over the life of the contract as performance obligations are completed by us based on the proportion of costs incurred to date compared with the total costs estimated to be incurred for the entire project, and by using the resulting percentage to update the recorded amounts of project-to-date revenues. We review and make necessary revisions to the amounts of estimated future costs on a monthly basis. In addition, contract results may be impacted by our estimates of the amounts of change orders that we expect to receive and our assessment of any contract disputes that may arise.
Current wording
For each of our fixed-price customer contracts, we recognize revenues over the life of the contract as performance obligations are completed by us based on the proportion of costs incurred to date compared with the total costs estimated to be incurred for the entire project, and by using the resulting percentage to update the recorded amounts of project-to-date revenues. We review and make necessary revisions to the amounts of estimated future costs on a monthly basis. In addition, contract results may be impacted by our estimates of the amounts of change orders that we expect to receive and our assessment of any contract disputes that may arise. The effects on revenues of changes to the amounts of contract values and estimated costs are recorded as catch-up adjustments when the amounts are known and can be reasonably estimated. These revisions can occur at any time and could be material. Given the uncertainties associated with the types of customer contracts that we are awarded, it is possible for contract values and actual costs to vary from estimates previously made, which may result in reductions or reversals of previously recorded revenues and profits. Our disclosures of Critical Accounting Policies and Estimates (see Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations) include an expanded discussion of the estimates, judgments and assumptions that our revenue recognition accounting may require.
Previous wording
At January 31, 2024, the total value of our project backlog for all of our business units was $0.8 billion. Project cancellations or scope modifications may occur that could reduce the amount of our project backlog and the associated revenues and profits that we actually earn. Our projects generally provide our customers the right to terminate the existing contract unilaterally at their convenience as long as they compensate us for work already completed and the additional costs incurred by us to terminate corresponding subcontract and equipment orders, demobilize and vacate construction sites. These costs would most likely be meaningful. Projects that were awarded to us in the past remained in our backlog for extended periods of time as customers experienced project delays.
Current wording
Project cancellations or scope modifications may occur that could reduce the amount of our project backlog and the associated revenues and profits that we actually earn. Our projects generally provide our customers the right to terminate existing contracts unilaterally at their convenience as long as they compensate us for work already completed and compensate us for the additional costs incurred by us to terminate corresponding subcontract, terminate equipment orders, and demobilize and vacate construction sites. These costs would most likely be meaningful. Should any unexpected delay, suspension or termination of the work under such projects occur, our results of operations may be materially and adversely affected. Although we believe that the customer commitments represented by project backlog are firm, we cannot guarantee that amounts in project backlog will be recognized as future revenues or will result in profitable operating results.
Previous wording
The development of a power plant construction project is expensive with a total cost that could approximate or exceed $10 million. The developers of power projects may form single purpose entities, such as limited liability companies, limited partnerships or joint ventures, to perform the development activities, which are often funded by outside sources. Periodically, we provide financial support to new projects during their development phase. This aims to enhance the success of the phase and increase our chances of ultimately securing the EPC contract to build the plant.
Current wording
The development of a power plant construction project is expensive. The developers of power projects may form single purpose entities, such as limited liability companies, limited partnerships or joint ventures, to perform the development activities, which are typically funded by external sources. Periodically, we provide financial support to new projects during their development phase to improve their viability and enhance our likelihood of securing the EPC contract for power plant construction.
Previous wording
In the past, we have provided funding to special-purpose entities for gas-fired power plant projects during the development phase, leading to the return of our initial investment, the awarding of EPC contracts with authorization to start construction, and the receipt of success fees. While some of these initiatives have yielded positive results, others have not, resulting in the write-off of loan and interest balances and the loss of potential construction projects. As of January 31, 2024, we do not have any financial statement exposure related to outstanding power plant project development financing arrangements.
Current wording
We have provided funding to special-purpose entities for gas-fired power plant projects during the development phase, leading to the return of our initial investment, the awarding of EPC contracts with authorization to start construction, and the receipt of success fees. While some of these initiatives have yielded positive results, others have not, resulting in the write-off of loan and interest balances and the loss of potential construction projects. In Fiscal 2025, we funded a loan to a special purpose entity in the amount of $5.0 million to support the development phase of a natural gas-fired power plant project (see Note 18 to the accompanying consolidated financial statements).
Previous wording
Our construction contracts frequently require that we obtain payment and/or performance bonds from surety companies on behalf of project owners as a condition to the contract award. Historically, we have had a strong bonding capacity. Under standard terms, surety companies issue bonds on a project-by-project basis and can decline to issue bonds at any time or require the posting of additional collateral as a condition to issuing any bonds. Not all of our projects require bonding. As of January 31, 2024, the estimated value of future work covered by outstanding performance bonds was approximately $0.5 billion.
Current wording
Our construction contracts frequently require that we obtain payment and/or performance bonds from surety companies on behalf of project owners as a condition to the contract award. Historically, we have had a strong bonding capacity. Under standard terms, surety companies issue bonds on a project-by-project basis and can decline to issue bonds at any time or require the posting of additional collateral as a condition to issuing any bonds. Not all of our projects require bonding.
Previous wording
Natural disasters, such as hurricanes, tornadoes, blizzards, floods and other adverse weather conditions; or other catastrophic events such as public health crises, geopolitical conflicts, terrorism and civil disturbances could disrupt our operations or the operations of one or more of our vendors or customers. In particular, these types of events could shut down our construction job sites or fabrication facility for indefinite periods of time, disrupt our product supply chain or
Current wording
Natural disasters, such as hurricanes, tornadoes, blizzards, floods and other adverse weather conditions; or other catastrophic events such as fires, public health crises, pandemics, geopolitical conflicts, terrorism and civil disturbances could disrupt our operations or the operations of one or more of our vendors or customers. In particular, these types of events could shut down our construction job sites or fabrication facility for indefinite periods of time, disrupt our product supply chain or could cause our customers to delay or cancel projects. To the extent any of these events occur, our operations and financial results could be adversely affected.
Previous wording
The adverse effects of the war in Ukraine have spread globally. The prolonged disruption by Russia of the supply and prices of oil and natural gas provided to Western European nations adversely affected the economies of those countries. Western European nations in search of alternative supplies of oil and natural gas may find them at higher prices or through more complicated transit routes, further disrupting global supply chains. More recently, activities conducted by terrorists based in the country of Yemen have endangered the key shipping route between the Red Sea and the Indian Ocean. Also the recent bridge collapse in Baltimore has closed temporarily ship access to its major port facilities. Such unfavorable effects may adversely impact our business going forward by altering materials and equipment delivery schedules.
Current wording
The adverse effects of the war in Ukraine spread globally. The prolonged disruption by Russia of the supply and prices of oil and natural gas provided to Western European nations adversely affected the economies of those countries. Western European nations were forced to search for alternative supplies of oil and natural gas at higher prices or through more complicated transit routes, further disrupting global supply chains. Many resorted to seeking alternative energy sources, such as liquefied natural gas (“LNG”), which involves infrastructure challenges and elevated costs. In addition to energy supply disruptions, activities conducted by Yemen-based terrorist groups significantly endangered the key shipping route between the Red Sea and the Indian Ocean. These actions led to rerouting shipping vessels, longer transit times, and increased freight costs, compounding global supply chain challenges.
Previous wording
Continuing disruptions to capacity auctions and corresponding prices could reduce the demand for power plants in our primary business region.
Current wording
Continuing disruptions to capacity auctions and corresponding prices could reduce the demand for power plants in a primary business region.
Previous wording
Most of our recently completed and awarded EPC service contracts relate to the construction of natural gas-fired power plants located within the Mid-Atlantic geographic footprint of the electric power system operated by PJM, which includes all or part of thirteen states and the District of Columbia. This entity operates a capacity market which is a process to ensure long-term grid reliability by securing the appropriate amount of power supply resources needed to meet predicted future energy demands. Capacity payments represent meaningful portions of the revenue streams of qualifying power plants. Annual capacity auctions since 2021 have suffered delays that, once held, resulted in lower prices than previous auctions. In June 2023, the Federal Energy Regulatory Commission (“FERC”) issued an order accepting delays in future capacity auctions so that market design rule changes proposed by stakeholders might be implemented for all future auctions. In January 2024, FERC approved only one component of PJM’s two-part proposal for its capacity auction reform.
Current wording
Historically, a number of our EPC service contracts related to the construction of natural gas-fired power plants located within the Mid-Atlantic geographic footprint of the electric power system operated by PJM Interconnection LLC (“PJM”). This entity operates a capacity market to ensure long-term grid reliability by securing the appropriate amount of power supply resources needed to meet forecasted energy demands. Capacity payments represent meaningful portions of the revenue streams of qualifying power plants. As a result of delays and changes to the capacity auction process, energy prices resulting from the auctions have fluctuated. The PJM capacity auction process continues to change due to inputs from various stakeholders and the Federal Energy Regulatory Commission (“FERC”). Uncertainty in this market, including the difficulties experienced by PJM in implementing a capacity auction design that all of its stakeholders consider to be fair, may discourage potential power plant owners from commencing the development of new power plants in this area, thereby reducing potential new business opportunities for us.
Previous wording
The use of coal as a power source has been adversely affected significantly by the plentiful supply of inexpensive natural gas that is available through the combined use of fracturing and horizontal drilling. However, the share of electricity generation provided by natural gas is particularly reactive in the short term to changing natural gas prices. Even though current natural gas prices are extremely low, higher than expected natural gas prices in the future, even for just the short term, could have adverse effects on the ability of independent power producers to obtain construction and permanent financing for new natural gas-fired power plants.
Current wording
The growth of our power business has been substantially based on the number of combined cycle gas-fired power plants built by us, as many coal-fired plants have been shut down. The use of coal as a power source has been adversely affected significantly by the plentiful supply of inexpensive natural gas that is available through the combined use of hydraulic fracturing and horizontal drilling. However, the share of electricity generated by natural gas is particularly reactive in the short term to changing natural gas prices. Even though current natural gas prices are generally low, higher than expected natural gas prices in the future, even for just the short term, could have adverse effects on the ability of independent power producers to obtain construction and permanent financing for new natural gas-fired power plants. Additionally, the increasing exports of LNG from the U.S. to global markets may impact the overall price of natural gas domestically. As LNG exports grow to meet international demand, the domestic supply of natural gas could tighten, potentially driving up prices and increasing market volatility. Such price increases could further affect the economic feasibility of new domestic natural gas-fired power plants.
Previous wording
The most recent Annual Energy Outlook published by the Energy Information Administration (“EIA”) in March 2023 projected steady increases to utility-scale electricity generation through 2050. However, future softness in the demand for electrical power in the U.S. could result in the delay, curtailment or cancellation of future gas-fired power plant projects,
Current wording
Forecasts generally indicate a significant surge in electricity demand in the United States for the foreseeable future, driven largely by the expansion in the number of data centers, the increase in electric vehicle sales, and the onshoring of manufacturing facilities. We believe that these trends have resulted in increased demands for our EPC contract services. However, future softness in the demand for electrical power in the U.S. could result in the delay, curtailment or cancellation of future gas-fired power plant projects, thus decreasing the overall demand for our EPC services and adversely impacting the financial outlook for our power industry services business.
Previous wording
The competitive landscape in the EPC services market for natural gas-fired power plants was altered several years ago as several significant competitors announced their exit from the market for a variety of reasons. Others have announced intentions to avoid entering into fixed-price contracts citing the disproportionate financial risks borne by contractors. However, the market remains dynamic, and remaining competitors include committed multi-billion-dollar companies with thousands of employees. Competing effectively in our market requires substantial financial resources, the availability of skilled personnel and equipment when needed and the effective use of technology. Meaningful competition is expected to continue in the domestic market, and could increase in the Irish and U.K markets, presenting us with significant challenges to our achieving strong growth rates and acceptable profit margins. If we are unable to meet these competitive challenges and to win the awards of new projects that provide desirable margins, we could lose market share to our competitors, experience overall reductions in future revenues and profits or incur losses.
Current wording
Competing effectively in our market requires substantial financial resources, the availability of skilled personnel and equipment when needed and the effective use of technology. Meaningful competition is expected to continue in the domestic market, and could increase in the Irish and U.K markets, presenting us with significant challenges to our achieving strong growth rates and acceptable profit margins. If we are unable to meet these competitive challenges and to win the awards of new projects that provide desirable margins, we could lose market share to our competitors, experience overall reductions in future revenues and profits or incur losses.
Previous wording
The net amount of electricity generation in the U.S. provided by utility-scale solar and wind facilities continues to rise. Together, such power facilities provided approximately 12%, 13%, and 15% of the net amount of electricity generated by utility-scale power facilities in 2021, 2022 and 2023 respectively. In the reference case of the EIA Energy Outlook for 2023, net electricity generation from all renewable power sources is expected to represent approximately 63% of such generation by 2050. Impetus for this growth has been provided by various factors including laws and regulations that discourage new fossil-fuel burning power plants, federal support for new carbon-reduction technologies, environmental activism, income tax advantages that promote the growth of solar and wind power, the decline in the costs of renewable power plant components and power storage, and the increase in the scale of energy storage capacity. The reference case in the 2023 Energy Outlook report projected that the share of natural gas-fired electricity generation will decrease from 42% in 2023 to approximately 22% in 2050. Should the pace of development for renewable energy facilities, including solar and wind power plants, accelerate at faster rates than projected or drive a faster migration from base load to peak load power plants, the number and/or value of future natural gas-fired construction project opportunities for us may fall, which could adversely affect our future revenues, profits and cash flows.
Current wording
The net amount of electricity generation in the U.S. provided by utility-scale solar and wind facilities continues to rise. Impetus for this growth has been provided by various factors including laws and regulations that discourage new fossil-fuel burning power plants, federal support for new carbon-reduction technologies, environmental activism, income tax advantages that promote the growth of solar and wind power, the decline in the costs of renewable power plant components and power storage, and the increase in the scale of energy storage capacity. Should the pace of development for renewable energy facilities, including solar and wind power plants, accelerate at faster rates than projected or drive a faster migration from base load to peak load power plants, the number and/or value of future natural gas-fired construction project opportunities for us may fall, which could adversely affect our future revenues, profits and cash flows.
Previous wording
Our business is subject to overseas economic and political conditions that change for reasons which are beyond our control (i.e., “Brexit”). Such changes may have unfavorable consequences for us. Operating in the European marketplace, which for us exists primarily in Ireland and the U.K., may expose us to a number of risks including:
Current wording
Our business is subject to overseas economic and political conditions that change for reasons which are beyond our control. Such changes may have unfavorable consequences for us. Operating in the European marketplace, which for us exists primarily in Ireland and the U.K., may expose us to a number of risks including:
Previous wording
Our operations are subject to compliance with federal, state and local environmental laws and regulations, including those relating to discharges to air, water and land, the handling and disposal of solid and hazardous waste, and the cleanup of properties affected by hazardous substances. Certain environmental laws impose substantial penalties for non-compliance and others, such as the federal Comprehensive Environmental Response, Compensation and Liability Act, impose strict, retroactive, and joint and several liability upon persons responsible for releases of hazardous substances. We continually evaluate whether we must take additional steps to ensure compliance with environmental laws, however, there can be no assurance that these requirements will not change and that compliance will not add costs to our projects that could adversely affect our operating results in the future.
Current wording
Our operations are subject to compliance with federal, state and local environmental laws and regulations, including those relating to discharges to air, water and land, the handling and disposal of solid and hazardous waste, and the cleanup of properties affected by hazardous substances. Certain environmental laws impose substantial penalties for non-compliance and others, such as the U.S. Comprehensive Environmental Response, Compensation and Liability Act (“CERCLA”), impose strict, retroactive, and joint and several liability upon persons responsible for releases of hazardous substances. We continually evaluate whether we must take additional steps to ensure compliance with environmental laws; however, there can be no assurance that these requirements will not change and that compliance will not add costs to our projects that could adversely affect our operating results in the future.
Previous wording
Furthermore, we expect increased regulations related to greenhouse gas emissions disclosures and other ESG reporting matters whose compliance efforts may vary based on the jurisdiction. For example, the European Union adopted the Corporate Sustainability Reporting Directive (“CSRD”) at the end of 2022 that requires comprehensive disclosures on a broad spectrum of topics, and in October 2023, the governor of California signed into law emissions and climate risks bills that provide different and extensive reporting requirements. Additionally, the SEC’s new regulations adopted in March 2024 mandate public companies to integrate extensive climate risk disclosures in their annual reports and registration statements, where certain disclosures will be subject to phased-in assurance requirements. At this time, it is uncertain whether the SEC’s new climate disclosure rules will withstand pending and future legal challenges. Notably, in April 2024, the SEC issued an order staying implementation of the new disclosure regulations pending the resolution of certain challenges. Nonetheless, we may incur additional expenses implementing and maintaining compliance with such regulations and may divert management’s attention from other important operational or financial matters.
Current wording
Regulations surrounding greenhouse gas emissions disclosures and sustainability reporting continue to evolve rapidly, with compliance requirements varying by jurisdiction. In the jurisdictions we operate, governments and regulatory bodies vary in their support of or opposition to sustainability matters, leading to rapid shifts in reporting obligations. For instance, the European Union adopted the Corporate Sustainability Reporting Directive (“CSRD”) in late 2022, requiring comprehensive disclosures on a broad spectrum of sustainability topics. Similarly, in October 2023, California enacted emissions and climate risk legislation with distinct and comprehensive reporting mandates. In March 2024, the SEC introduced regulations requiring public companies to incorporate detailed climate risk disclosures in their annual reports and registration statements, with certain disclosures subject to phased-in assurance requirements. However, the future of these rules remains uncertain due to ongoing legal challenges. Notably, in April 2024, the SEC issued an order staying implementation of the new disclosure regulations pending the resolution of certain challenges. Compliance with and monitoring of these evolving requirements may result in additional costs and resource allocation, potentially diverting management’s focus from other critical operational and financial priorities.
Previous wording
Customer and investor standards, which are ever-evolving, have become increasingly focused on environmental, social and governance practices of the companies with which they work or in which they invest. Customers may require that we meet their standards before granting us projects, which may create additional costs to us. If our sustainability practices do not ultimately meet customer expectations, we may not win projects. Investors, who may become wary of funding power services ventures with sustainability practices unacceptable to them, may decide to reallocate capital to other enterprises. Investors and lenders may be generally unwilling to provide capital for energy projects to increase the domestic production and transmission of oil and natural gas.
Current wording
Customer and investor standards, which are ever-evolving, may include a focus on environmental, social and governance practices of the companies with which they work or in which they invest. Customers may require that we meet their standards before granting us projects, which may create additional costs to us. If our sustainability practices do not ultimately meet customer expectations, we may not win projects. Investors, who may become wary of funding power services ventures with sustainability practices unacceptable to them, may decide to reallocate capital to other enterprises.
Previous wording
The viability of the gas-fired power plants that we build is based substantially on the availability of inexpensive natural gas supplies provided through the use of fracking combined with horizontal drilling techniques. The new supplies of natural gas generally lowered the price of natural gas in the U.S. and reduced its volatility. However, the process of fracking is controversial due to concerns about the disposal of the waste water, the possible contamination of nearby water supplies and the risk of potential seismic events. Should future evidence confirm the concerns, the use of fracking may be suspended, limited, or curtailed by additional state and/or federal authorities. As a result, the supply of inexpensive natural gas may not be available in the future and the economic viability of gas-fired power plants that we build may be jeopardized.
Current wording
The viability of the gas-fired power plants that we build is based substantially on the availability of inexpensive natural gas supplies provided through the use of hydraulic fracturing combined with horizontal drilling techniques. The increased supply of natural gas generally lowered the price of natural gas in the U.S. and reduced its volatility. However, the process of hydraulic fracturing is controversial due to concerns about wastewater disposal, the possible contamination of nearby water supplies and the risk of seismic activity. Should future evidence confirm these concerns, the use of hydraulic fracturing may be suspended, limited, or curtailed by additional state and/or federal authorities. As a result, the supply of inexpensive natural gas may not be available in the future and the economic viability of gas-fired power plants that we build may be jeopardized.
Previous wording
The viability of new natural gas-fired power plants depends on the availability of nearby sources of natural gas for fuel which may require the construction of new pipelines for the delivery of natural gas to a power plant location. Approval delays and public opposition to new oil and gas pipelines have become major potential hurdles for the developers of gas-fired power plants and other fossil-fuel facilities. In particular, pipeline projects may be delayed by onsite protest demonstrations, indecision by local officials and lawsuits.
Current wording
The viability of new natural gas-fired power plants depends on the availability of nearby sources of natural gas for fuel which may require the construction of new pipelines for the delivery of natural gas to a power plant location. Approval delays and public opposition to new oil and gas pipelines have been major potential hurdles for the developers of gas-fired power plants and other fossil-fuel facilities. In particular, pipeline projects have been delayed by onsite protest demonstrations, indecision by local officials and lawsuits. Failure to commence or complete construction work as anticipated by fossil-fuel project owners could have material adverse impacts on our future revenues, profits and cash flows.
Previous wording
The performance of certain large-scale construction contracts results in the hiring of employees in the U.S. and overseas who are represented by labor unions. We make sincere efforts to maintain favorable relationships and conduct good-faith negotiations with union officials. However, there can be no assurances that such efforts will eliminate the possibilities of unfavorable conflicts in the future. A lengthy strike or the occurrence of other work disputes, slowdowns or stoppages at any of our current or future construction project sites could have an adverse effect on us, resulting in cost overruns, schedule delays or even lawsuits that could be significant. In addition, labor incidents could result in negative publicity for us thereby damaging our business reputation and perhaps harming our prospects for the receipt of future construction contract awards in certain locales.
Current wording
The performance of certain large-scale construction contracts results in the hiring of employees in the U.S. and overseas who are represented by labor unions. We make sincere efforts to maintain favorable relationships and conduct good-faith negotiations with union officials. However, there can be no assurances that such efforts will eliminate the possibilities of unfavorable conflicts in the future. A lengthy strike or the occurrence of other work disputes, slowdowns or stoppages at any of our current or future construction project sites could have an adverse effect on us, resulting in cost overruns,
Previous wording
Factors not specifically discussed in these risk factors that could result in contract cost overruns, project delays or other problems for us may include:
Current wording
Factors that could result in contract cost overruns, project delays or other problems for us may include:
Previous wording
These risks tend to be exacerbated for longer-term contracts because there is increased risk that the circumstances under which we based our original cost estimates or project schedules will change with a resulting increase in costs or delays in achieving scheduled milestones. In such events, our financial condition and results of operations could be negatively impacted.
Current wording
These risks tend to be exacerbated for longer-term contracts because there is increased risk that the circumstances under which we based our original cost estimates or project schedules will change. In such events, our financial condition and results of operations could be negatively impacted.
Previous wording
We build large and complex energy plants where design, construction or systems failures can result in substantial injury or damage to third parties. In addition, the nature of our business results in project owners, subcontractors and vendors occasionally presenting claims against us for recovery of costs for which they believe they are not contractually liable. In other cases, project owners may withhold retention and/or contract payments they believe they do not contractually owe us, or they believe offset amounts owed to them by us. They may even terminate the contract. We have been, and may be in the future, named as a defendant in legal proceedings where parties may allege breach of contract and seek recovery for damages or other remedies with respect to our projects or other matters (see Legal Proceedings in Item 3). These legal matters generally arise in the normal course of our business. In addition, from time to time, we and/or certain of our current or former directors, officers or employees could be named as parties to other types of lawsuits.
Current wording
We build large and complex energy plants where design, construction or systems failures can result in substantial injury or damage to third parties. In addition, the nature of our business results in project owners, subcontractors and vendors occasionally presenting claims against us for recovery of costs for which they believe they are not contractually liable. In other cases, project owners may withhold retention and/or contract payments that they believe they do not contractually owe us, or they believe offset amounts owed to them by us. They may even terminate the contract. We have been, and may be in the future, named as a defendant in legal proceedings where parties may allege breach of contract and seek recovery for damages or other remedies with respect to our projects or other matters (see Item 3, Legal Proceedings). These legal matters generally arise in the normal course of our business. In addition, from time to time, we and/or certain of our current or former directors, officers or employees could be named as parties to other types of lawsuits.
Previous wording
Further, we may elect not to carry insurance related to particular risks if our management believes that the cost of available insurance is excessive relative to the risks presented. In addition, we cannot insure fully against pollution and environmental risks. Our management liability insurance policies are on a “claims-made” basis covering only claims actually made during the policy period currently in effect. In addition, even where insurance is maintained for such exposures, the policies have deductibles resulting in our assuming exposure for a layer of coverage with respect to any such claims. Any liability not covered by our insurance, in excess of our insurance limits and self-insurance reserves or, if covered by insurance but subject to a high deductible, could result in a significant loss for us, which claims may reduce our future profits and cash available for operations.
Current wording
In accordance with customary industry practices, we maintain insurance coverage against some, but not all, potential losses in order to protect against the risks we face. When it is determined that we have liability, we may not be covered by insurance or, if covered, the dollar amount of any liability may exceed our policy limits or self-insurance reserves. Further, we may elect not to carry insurance related to particular risks if our management believes that the cost of available insurance is excessive relative to the risks presented. In addition, we cannot insure fully against pollution and environmental risks. Our management liability insurance policies are on a “claims-made” basis covering only claims actually made during the policy period currently in effect. In addition, even where insurance is maintained for such exposures, the policies have deductibles resulting in our assuming exposure for a layer of coverage with respect to any such claims. Any liability not covered by our insurance, in excess of our insurance limits and self-insurance reserves or, if covered by insurance but subject to a high deductible, could result in a significant loss for us, which claims may reduce our future profits and cash available for operations.
Previous wording
We may submit contract variations to project owners for additional costs exceeding the contract price or for amounts not included in the original contract price. Variations occur due to matters such as owner-caused delays or changes from the initial project scope, both of which may result in additional costs. At times, contract variation submissions can be the subject of lengthy arbitration or litigation proceedings, and it is difficult to accurately predict when these differences will be fully resolved. When these types of events occur and unresolved matters are pending, we have used existing liquidity to cover cost overruns pending their resolution. The aggregate amounts of contract variations included in the transaction prices that were still pending customer acceptance at January 31, 2024 and 2023 were $8.4 million and $11.6 million, respectively. A failure to promptly recover on these types of customer submissions could have a negative impact on our revenues, liquidity and profitability in the future.
Current wording
We may submit contract variations to project owners for additional amounts exceeding the contract price or for amounts not included in the original contract price. Variations occur due to matters such as owner-caused delays or changes from the initial project scope, both of which may result in additional costs. At times, contract variation submissions can be the subject of lengthy negotiation, arbitration or litigation proceedings, and it is difficult to accurately predict when these differences will be fully resolved. When these types of events occur and unresolved matters are pending, we have used existing liquidity to cover cost overruns pending their resolution. The aggregate amount of contract variations included in the transaction prices that were still pending customer acceptance at January 31, 2025 was $8.0 million. A failure to promptly recover on these types of customer submissions could have a negative impact on our revenues, liquidity and profitability in the future.
Previous wording
Increased infrastructure spending and general economic expansion may increase the demand for employees with the types of skills needed for the completion of our projects. There is a risk that our construction project schedules become unachievable or that labor expenses will increase unexpectedly as a result of a shortage in the supply of skilled personnel available to us. Increased labor costs may influence our customers’ decisions regarding the feasibility or scheduling of specific projects, potentially leading to delays or cancellations that could materially affect our business adversely. Labor shortages, productivity decreases or increased labor costs could impair our ability to maintain our business or grow our revenues. The inability to hire and retain qualified skilled employees in the future, including workers in the construction crafts, could negatively impact our ability to complete our long-term construction contracts successfully.
Current wording
Increased infrastructure spending and general economic expansion may increase the demand for employees with the types of skills needed for the completion of our projects. There is a risk that our construction project schedules become unachievable or that labor expenses will increase unexpectedly as a result of a shortage in the supply of skilled personnel available to us. Increased labor costs may influence our customers’ decisions regarding the feasibility or scheduling of specific projects, potentially leading to delays or cancellations that could materially affect our business adversely. Labor shortages, productivity decreases or increased labor costs could impair our ability to maintain our business or grow our revenues. In general, we have been effective in staffing our projects with the necessary resources and managing labor costs. However, the inability to hire and retain qualified skilled employees in the future, including workers in the construction crafts, could negatively impact our ability to complete our long-term construction contracts successfully.
Previous wording
Certain of the work performed under our energy plant construction contracts is actually performed by third-party subcontractors we hire. We also rely on third-party manufacturers or suppliers to provide much of the equipment and most of the materials (such as copper, concrete and steel) needed to complete our construction projects. If we are unable to hire qualified subcontractors or to find qualified equipment manufacturers or suppliers, our ability to successfully complete a project could be adversely impacted. If the price we are required to pay for subcontractors or equipment and supplies exceeds the corresponding amount that we have estimated, we may suffer a reduction in the anticipated amount of gross profit or even a loss on the contract. If a supplier, manufacturer or subcontractor fails to provide supplies, equipment or services as required under a negotiated contract for any reason, we may be required to self-perform unexpected work or obtain these supplies, equipment or services on an expedited basis or at a higher price than anticipated from a substitute source, which could impact contract profitability in an adverse manner. Unresolved disputes with a subcontractor or supplier regarding the scope of work or performance may escalate, resulting in arbitration proceedings or legal actions.
Current wording
Certain of the work performed under our energy plant construction contracts is actually performed by third-party subcontractors we hire. We also rely on third-party manufacturers or suppliers to provide much of the equipment and most of the materials (such as copper, concrete and steel) needed to complete our construction projects. If we are unable to hire qualified subcontractors or to find qualified equipment manufacturers or suppliers, our ability to successfully complete a project could be adversely impacted. If the price we are required to pay for subcontractors or equipment and supplies exceeds the corresponding amount that we have estimated, we may suffer a reduction in the anticipated amount of gross profit or even a loss on the contract. If a supplier, manufacturer or subcontractor fails to provide supplies, equipment or services as required under a negotiated contract for any reason, we may be required to self-perform unexpected work or obtain these supplies, equipment or services on an expedited basis or at a higher price than anticipated from a substitute source, which could impact contract profitability in an adverse manner. Unresolved disputes with a subcontractor or supplier regarding the scope of work or performance may escalate, resulting in arbitration proceedings or legal actions. Unfavorable outcomes of such disputes may also impact contract profitability in an adverse manner. In addition, if a subcontractor fails to pay its subcontractors, suppliers or employees, liens may be placed on our project requiring us to incur the costs of reimbursing such parties in order to have the liens removed or to commence litigation.
Previous wording
Our project sites can place our employees and others near large and/or mechanized equipment, high voltage electrical equipment, moving vehicles, dangerous processes or highly regulated materials, and in challenging environments. Safety is a primary focus of our business and is critical to our reputation. Many of our customers require that we meet certain safety criteria to be eligible to bid on contracts. Further, regulatory changes implemented by OSHA or similar government agencies could impose additional costs on us. We maintain programs with the primary purpose of implementing effective health, safety and environmental procedures throughout our Company. If we fail to implement appropriate safety procedures and/or if our procedures fail, our employees or others may suffer injuries or illness. The failure to comply with such procedures, client contracts or applicable regulations could subject us to losses and liability, and adversely impact our ability to complete awarded projects as planned or to obtain projects in the future. Our OSHA reportable incident rates, weighted by hours worked for all of our subsidiaries, were 0.43, 0.60, 0.48, 0.55 and 0.40 for the calendar years 2023, 2022, 2021, 2020 and 2019, respectively. Our actual rates were significantly better than the national average rates in our industry (NAICS – 2379) for those years.
Current wording
Our project sites can place our employees and others near large and/or mechanized equipment, high voltage electrical equipment, moving vehicles, dangerous processes or highly regulated materials, and in challenging environments. Consequently, safety is a primary focus of our business and is critical to our reputation. Many of our customers require that we meet certain safety criteria to be eligible to bid on contracts. Further, regulatory changes implemented by OSHA or similar government agencies could impose additional costs on us. We maintain programs with the primary purpose of implementing effective health, safety and environmental procedures throughout our Company. If we fail to implement appropriate safety procedures and/or if our procedures fail, our employees or others may suffer injuries or illness. The failure to comply with such procedures, client contracts or applicable regulations could subject us to losses and liability, and adversely impact our ability to complete awarded projects as planned or to obtain projects in the future.
Previous wording
Future acquisitions could result in issuances of equity securities that would reduce our stockholders’ ownership interests, the issuance of sizable amounts of debt and the incurrence of contingent liabilities. Further, we may conclude that the divestiture of a troubled or unrelated business will satisfy the best interests of our stockholders. There is risk that we would be unable to complete such a transaction with terms and timing that are acceptable for us, or at all. Any divesting transaction could also result in a material loss for us.
Current wording
Further, we may conclude that the divestiture of a troubled or unrelated business will satisfy the best interests of our stockholders. There is risk that we would be unable to complete such a transaction with terms and timing that are acceptable for us, or at all. Any divesting transaction could also result in a material loss for us.
Previous wording
Our information systems face the threat of unauthorized access, computer hackers, viruses, malicious code, cyberattacks, phishing and other security incursions and system disruptions, including attempts to improperly access our confidential and proprietary information as well as the confidential and proprietary information of our customers and other business partners. Techniques used to attempt to obtain unauthorized access to information systems change frequently, and the rapid development of artificial intelligence poses new cybersecurity risks that we may not timely anticipate. A party who circumvents our security measures, or those of our clients, contractors or other vendors, could misappropriate confidential or proprietary information, improperly manipulate data, or cause damage or interruptions to systems.
Current wording
Our information systems face the threat of unauthorized access, computer hackers, viruses, malicious code, cyberattacks, phishing and other security incursions and system disruptions, including attempts to improperly access our confidential and proprietary information as well as the confidential and proprietary information of our customers and other business partners. Techniques used to attempt to obtain unauthorized access to information systems change frequently, and the rapid development of AI poses new cybersecurity risks that we may not timely anticipate. A party who circumvents our security measures, or those of our clients, contractors or other vendors, could misappropriate confidential or proprietary information, improperly manipulate data, or cause damage or interruptions to systems.
Previous wording
Various privacy and security laws in the U.S. and abroad, including the General Data Protection Regulation (“GDPR”) in the European Union, require us to protect sensitive and confidential information and data from disclosure and we are bound by our client and other contracts, as well as our own business practices, to protect confidential and proprietary information and data from unauthorized disclosure. We believe that we have deployed industry-accepted security measures and technologies to securely maintain confidential and proprietary information retained within our information systems, including compliance with GDPR specifically at APC. However, these measures and technologies may not adequately prevent unanticipated security breaches. There can be no assurance that our efforts will prevent these threats. Further, as these security threats continue to evolve, we may be required to devote additional resources to protect, prevent, detect and respond against such threats. We believe that our business represents a low value target for cyberextortionists as we are not a company in the high technology space and we do not maintain large files of sensitive or confidential personal information. However, we are a company with large balances of cash that could encourage bad actors to attempt to breach the security of our systems, possibly by using social engineering schemes. We do maintain a cybersecurity insurance policy to help protect ourselves from various types of losses relating to computer security breaches.
Current wording
Various privacy and security laws in the U.S. and abroad, including the General Data Protection Regulation (“GDPR”) in the European Union, require us to protect sensitive and confidential information and data from disclosure and we are bound by our client and other contracts, as well as our own business practices, to protect confidential and proprietary information and data from unauthorized disclosure. We believe that we have deployed industry-accepted security measures and technologies to securely maintain confidential and proprietary information retained within our information systems, including compliance with GDPR, specifically at APC. However, these measures and technologies may not adequately prevent unanticipated security breaches. There can be no assurance that our efforts will prevent these intrusions. Further, as these security threats continue to evolve, we may be required to devote additional resources to protect, prevent, detect and respond against such threats. We believe that our business represents a low value target for cyberextortionists as we are not a company in the high technology space and we do not maintain large files of sensitive or confidential personal information. However, we are a company with large balances of cash that could encourage bad actors to attempt to breach the security of our systems, particularly by using social engineering schemes. We do maintain a cybersecurity insurance policy to help protect ourselves from various types of losses relating to computer security breaches; however, it may not cover all types of breaches or a meaningful portion of any loss incurred.
Previous wording
As previously disclosed, we were targeted by a complex criminal scheme in March 2023, which resulted in fraudulently-induced outbound wire transfers to a third-party account (see Note 18 to the accompanying consolidated financial statements). As a result of the fraud loss, net of funds recovered, and professional fees incurred related to an independent forensic investigation and efforts to recover the funds, we recognized $2.7 million of loss. We are unaware of any other significant security breaches at any of our business locations. That does not suggest that we may not be victimized by an additional breach in the future. Any significant future breach of our information security could damage our reputation, result in litigation and/or regulatory fines and penalties, or have other material adverse effects on our business, financial condition, results of operations or cash flows.
Current wording
As previously disclosed, we were targeted by a complex criminal scheme in Fiscal 2024, which resulted in fraudulently-induced outbound wire transfers to a third-party account (see Note 18 to the accompanying consolidated financial statements). We are unaware of any other significant security breaches at any of our business locations. That does not
Previous wording
We award stock options, time-based restricted stock units, market-based restricted stock units and performance-based restricted stock units to executives and other key employees (see Note 11 to the accompanying consolidated financial statements). Future exercises of options to purchase shares of common stock at prices below prevailing market prices will result in ownership dilution for current stockholders. Additionally, the number of shares of our common stock that will ultimately be issued in connection with the restricted stock unit awards is not known. Any issuance will result in the dilution of the stock ownership of current stockholders.
Current wording
We award stock options and restricted stock units to directors, executives and other key employees (see Note 11 to the accompanying consolidated financial statements). Future exercises of options to purchase shares of common stock at prices below prevailing market prices will result in ownership dilution for current stockholders. Additionally, the number of shares of our common stock that will ultimately be issued in connection with the restricted stock unit awards is not known. Any issuance will result in the dilution of the stock ownership of current stockholders.
Previous wording
Our officers, directors and certain unaffiliated stockholders have substantial control over the Company.
Current wording
Our officers, directors and certain unaffiliated stockholders have meaningful control over the Company.
Previous wording
As of January 31, 2024, our executive officers and directors as a group directly owned approximately 7.3% of our voting shares. In addition, four other stockholders owned approximately 30.6% of our shares in total as of December 31, 2023. These groups of stockholders may have significant influence over corporate actions such as the election of directors, amendments to our certificate of incorporation, the consummation of any merger, the sale of all or substantially all of our assets or other actions requiring stockholder approval.
Current wording
As of January 31, 2025, our executive officers and directors as a group directly owned approximately 4.1% of our voting shares. In addition, two other stockholders owned approximately 13.5% of our shares in total as of December 31, 2024. These groups of stockholders may have meaningful influence over corporate actions such as the election of directors, amendments to our certificate of incorporation, the consummation of any merger, the sale of all or substantially all of our assets or other actions requiring stockholder approval.
Showing the first 40 of 42 pairs. Open the source sections for the rest.
Rearranged current paragraphs (5)
Current report — wording carried from elsewhere
To prepare consolidated financial statements in conformity with accounting principles generally accepted in the U.S., we are required to make estimates, assumptions and judgments as of the date of such financial statements, which affect the reported values of assets and liabilities, revenues and expenses, and disclosures of contingent assets and liabilities.
Current report — wording carried from elsewhere
The competitive landscape in the EPC services market for natural gas-fired power plants was altered several years ago as certain significant competitors announced their exit from the market for a variety of reasons. Others have announced intentions to avoid entering into fixed-price contracts citing the disproportionate financial risks borne by contractors. However, the market remains dynamic, and remaining competitors include committed multi-billion-dollar companies with thousands of employees. As utilities and developers seek to expand generation capacity, more firms may re-enter the market, either by restarting their EPC operations, expanding their capabilities, or shifting their contracting strategies to re-engage in bidding.
Current report — wording carried from elsewhere
Investors and lenders may be generally unwilling to provide capital for energy projects to increase the domestic production and transmission of oil and natural gas.
Current report — wording carried from elsewhere
schedule delays or even lawsuits that could be significant. In addition, labor incidents could result in negative publicity for us thereby damaging our business reputation and perhaps harming our prospects for the receipt of future construction contract awards in certain locales.
Current report — wording carried from elsewhere
suggest that we may not be victimized by an additional breach in the future. Any significant future breach of our information security could damage our reputation, result in litigation and/or regulatory fines and penalties, or have other material adverse effects on our business, financial condition, results of operations or cash flows.
Rearranged previous paragraphs (9)
Previous report — wording carried elsewhere
The effects on revenues of changes to the amounts of contract values and estimated costs are recorded as catch-up adjustments when the amounts are known and can be reasonably estimated. These revisions can occur at any time and could be material. Given the uncertainties associated with the types of customer contracts that we are awarded, it is possible for contract values and actual costs to vary from estimates previously made, which may result in reductions or reversals of previously recorded revenues and profits. Our disclosures of Critical Accounting Policies and Estimates (see Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations) include an expanded discussion of the estimates, judgements and assumptions that our revenue recognition accounting may require.
Previous report — wording carried elsewhere
Should any unexpected delay, suspension or termination of the work under such projects occur, our results of operations may be materially and adversely affected. Although we believe that the customer commitments represented by project backlog are firm, we cannot guarantee that revenues projected by us based on our project backlog will be recognized or will result in profitable operating results.
Previous report — wording carried elsewhere
could cause our customers to delay or cancel projects. To the extent any of these events occur, our operations and financial results could be adversely affected.
Previous report — wording carried elsewhere
Uncertainty in this market, including the difficulties experienced by PJM in implementing a capacity auction design that all of its stakeholders consider to be fair, the repeated capacity auction delays, and the shrinking annual capacity auction prices, may discourage potential power plant owners from commencing the development of new power plants in this area thereby reducing potential new business opportunities for us.
Previous report — wording carried elsewhere
thus decreasing the overall demand for our EPC services and adversely impacting the financial outlook for our power industry services business.
Previous report — wording carried elsewhere
Failure to commence or complete construction work as anticipated by fossil-fuel project owners could have material adverse impacts on our future revenues, profits and cash flows.
Previous report — wording carried elsewhere
In accordance with customary industry practices, we maintain insurance coverage against some, but not all, potential losses in order to protect against the risks we face. When it is determined that we have liability, we may not be covered by insurance or, if covered, the dollar amount of any liability may exceed our policy limits or self-insurance reserves.
Previous report — wording carried elsewhere
Unfavorable outcomes of such disputes may also impact contract profitability in an adverse manner. In addition, if a subcontractor fails to pay its subcontractors, suppliers or employees, liens may be placed on our project requiring us to incur the costs of reimbursing such parties in order to have the liens removed or to commence litigation.
Previous report — wording carried elsewhere
Under our share repurchase program, our board of directors has authorized us to repurchase shares of our common stock in the open market or through investment banking institutions, privately-negotiated transactions, or direct purchases. We began to repurchase shares of our common stock in November 2021, and we have repurchased shares of our common stock during each fiscal year since. Subsequent to January 31, 2024, we have continued to make open market purchases pursuant to the approvals of our board of directors.