FUELCELL ENERGY INC

For the period ended Jan 31, 2025. Filed Mar 11, 2025.

View on SEC.gov

About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Jan 31, 2025 · Filed Mar 11, 2025

FCEL$9.96+11.5%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-Q

Period ended 2024-07-31; filed 2024-09-05.

0001558370-24-012598

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

Current report: 10-Q

Period ended 2025-01-31; filed 2025-03-11.

0001558370-25-002637

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 256 previous paragraphs and 209 current paragraphs.

96 unchanged; 76 reworded; 27 added; 60 removed; 24 previous and 10 current paragraphs rearranged.

Tables are not compared: 38 previous and 32 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (27)

Current report

We target a range of markets and applications with our products, including utilities and independent power producers, data centers, wastewater treatment, commercial and hospitality, food and beverage, and microgrids, among others. We market our products primarily in the United States, Europe and Korea, and we are also pursuing opportunities in other countries around the world. We target for expansion and development markets and geographic regions that benefit from and value clean distributed generation; are located where there are high energy costs, poor grid reliability, and/or challenged transmission and distribution lines; can leverage the multiple value streams delivered by our platforms (electricity, hydrogen, thermal, water, and carbon recovery); are aligned with regulatory frameworks that harmonize energy, economic and environmental policies; and are committed to reducing their Scope 1 and Scope 2 emissions.

Current report

Joint Development Agreement with Malaysia Marine and Heavy Engineering Sdn Bhd

Current report

Subsequent to January 31, 2025, the Company and Malaysia Marine and Heavy Engineering Sdn Bhd (“MMHE”), a wholly owned subsidiary of Malaysia Marine and Heavy Engineering Holdings Berhad, announced the signing of a Joint Development Agreement (“JDA”) to collaborate on the co-development of large-scale hydrogen production electrolysis systems and technologies across Asia, New Zealand, and Australia.

Current report

Under the terms of the JDA, the Company and MMHE intend to bring together the Company’s solid oxide technology and MMHE’s expertise in large-scale fabrication to develop modular solutions that would support rapid deployment of commercial hydrogen production. In conjunction with the JDA, the Company and MMHE are collaborating to support a contract awarded to the Company for a Detailed Feasibility Study (“DFS”) of a low-carbon fuel production facility in Malaysia. The DFS will evaluate the production of low-carbon fuel utilizing solid oxide electrolysis cell technology with carbon dioxide and water as feedstocks.

Current report

Strategic Partnership with Diversified Energy Co. PLC and TESIAC

Current report

Subsequent to January 31, 2025, the Company, Diversified Energy Co. PLC (“DEC”) and TESIAC Corp. (“TESIAC”) announced a strategic partnership whereby these parties intend to form, capitalize, manage, and build together an acquisition development company (“ADC”) as a limited liability company entity, the primary purpose of which is to acquire, develop, own, and operate integrated fuel cell energy assets and related infrastructure. The parties intend to consider, as an initial phase of the partnership, three initial fuel cell projects totaling up to 360 megawatts of electric power generation with the goal of providing power to data centers or other high-volume electric off-take customers.

Current report

The parties are structuring the terms of agreements which will be necessary to the functioning of the ADC and/or project companies owned by the ADC in the future to include natural gas and coal mine methane, or captured waste methane from DEC’s coal mines from its Appalachian Basin production as the base fuel to supply fuel cell energy platforms to be provided by the Company for future projects. TESIAC intends to leverage its investment and development expertise to secure competitive financing options to accelerate deployment of fuel cells.

Current report

Total revenues for the three months ended January 31, 2025 of $19.0 million reflects an increase of $2.3 million from $16.7 million for the same period in the prior year. Cost of revenues for the three months ended January 31, 2025 of $24.2

Current report

Service agreements revenues for the three months ended January 31, 2025 increased $0.2 million to $1.8 million from $1.6 million for the three months ended January 31, 2024. The increase in service agreements revenues during the three months ended January 31, 2025 was primarily driven by revenue recognized under the Company’s long-term service agreement (“LTSA”) with Gyeonggi Green Energy Co., Ltd. (“GGE”) for GGE’s 58.8 MW fuel cell power plant platform in Hwasong-si, Korea. There were no module exchanges during the three months ended January 31, 2025 or during the three months ended January 31, 2024.

Current report

Restructuring expense of $1.5 million for the three months ended January 31, 2025 was a result of the Company’s workforce reductions in November 2024, which represented approximately 13% of the Company’s global workforce and were intended to reduce costs and align production levels with current levels of demand in a manner that is consistent with the Company’s long-term strategic plan. The workforce was reduced across our global operations including Calgary, Canada and at our North American production facility in Torrington, Connecticut, at our corporate offices in Danbury, Connecticut and at other remote locations.

Current report

On December 27, 2024, the Company filed Post-Effective Amendment No. 1 and Post-Effective Amendment No. 2 to the Registration Statement on Form S-3 (File No. 333-274971) (the “Registration Statement”), each including a base prospectus covering the offering, issuance and sale by the Company of up to $405,000,000 of common stock, warrants and units (or any combination thereof) from time to time in one or more offerings and a prospectus supplement covering the offering, issuance and sale by the Company from time to time of up to $204,922,876.65 of the Company’s common stock, which was the amount remaining under the Amended Sales Agreement as of December 27, 2024. On March 5, 2025, the Company filed Post-Effective Amendment No. 3 to the Registration Statement to update certain information, to provide an updated consent of its independent registered public accounting firm, and to provide an update about the amount of shares remaining available for offer and sale by the Company under the Amended Sales Agreement. In the event that the Amended Sales Agreement is terminated, any portion of the aggregate amount of shares of common stock included in the prospectus supplement that is not sold pursuant to the Amended Sales Agreement will be available for sale in other offerings pursuant to the base prospectus and a corresponding prospectus supplement.

Current report

In January 2025, we entered into a PPA with Eversource and United Illuminating in Hartford, Connecticut, for a 7.4 MW solid oxide fuel cell power generation system. Power from these solid oxide fuel cells will be sold to Eversource and United Illuminating through the 20-year term of the PPA. The current expectation is that we will complete construction in calendar year 2026 and commence commercial operations in December 2026, subject in each case to completing customary development steps and obtaining financing for the project.

Current report

In November 2024, we announced a global restructuring of our operations in the U.S., Canada, and Germany that aims to reduce operating costs, realign resources toward advancing the Company’s core technologies, and protect the Company’s competitive position amid slower-than-expected-investments in clean energy. This restructuring plan also includes the deferment and cancelation of certain previously planned capital and project expenditures. As a result of the restructuring plan and the slowdown in the adoption of clean energy technology for the production of zero-carbon hydrogen and other energy transition solutions, we have deferred the spending required to complete the Trinity and UConn projects. This decision allows us to make further enhancements to stack life as well as other platform improvements. We do not currently have estimated completion dates for these projects. The Company is currently in discussions with these customers regarding changes to the previously scheduled installation dates. There can be no assurance that schedule changes can be mutually agreed upon with these customers, which may result in termination of these projects. For more information about our restructuring plan, please see Note 5 — Restructuring to our Consolidated Financial Statements.

Current report

as “Other assets”), respectively. Unbilled accounts receivable represent revenue that has been recognized in advance of billing the customer under the terms of the underlying contracts. Such costs have been funded with working capital and the unbilled amounts are expected to be billed and collected from customers once we meet the billing criteria under the contracts. Our accounts receivable balances may fluctuate as of any balance sheet date depending on the timing of individual contract milestones and progress on completion of our projects.

Current report

During the three months ended January 31, 2025, we utilized short term cash to build our inventory of modules to be shipped to Korea under our LTSA with GGE. We expect to recognize revenue from these module shipments during fiscal years 2025 and 2026. In the fourth quarter of fiscal year 2024, we were able to arrange working capital financing from the Export-Import Bank of the United States to support the Company’s obligations under the LTSA with GGE. We remain focused on attracting similar supportive capital structures as we execute on our growth strategy. We also built project inventory as part of our safe harbor strategy for certain U.S. projects.

Current report

As a result of our restructuring plan, we have deferred spending required to complete the build out of the Trinity and UConn projects, which together represent 1.3 MW of the projects under development and, as a result, we do not currently have estimated completion dates for such projects. The Company is currently in discussions with Trinity and UConn regarding changes to the previously scheduled installation dates. There can be no assurance that schedule changes can be mutually agreed upon with these customers, which may result in termination of these projects. For more information about our restructuring plan, please see Note 5 —Restructuringto our Consolidated Financial Statements.

Current report

For the three months ended January 31, 2025, capitalized project asset expenditures were $0.3 million. Beyond the projects under development and construction, the Company estimates investments in long-term project assets to be in the range of $3.0 million to $6.0 million in fiscal year 2025.

Current report

BioMAT project, the initial seven years of the twenty year PPA for our LIPA Yaphank Project (through September 2028), six years of the twenty year PPA for our 14.0 MW and 2.8 MW Derby Projects (through October 2029), and the initial two years of the twenty year hydrogen power purchase agreement for our Toyota Project (through May of 2025); and (iii) potentially entering into future financial hedges with investment grade counterparties to offset potential negative market fluctuations. The Company does not take a fundamental view on natural gas or other commodity pricing and seeks commercially available means to reduce commodity exposure. If the Company is unable to secure fuel on favorable economic terms, it may result in impairment charges.

Current report

June 1, 2023 after certain leasehold improvements were made to support increased manufacturing. In addition, long-lead process equipment has been ordered to facilitate the expansion of manufacturing capacity for the solid oxide platforms in Calgary. Upon the completion of the Calgary capacity expansion, we believe that the total annualized solid oxide electrolysis cell (“SOEC”) manufacturing capacity could potentially be increased to up to 80 MW per year. However, in November 2024, we announced a global restructuring of our operations in the U.S., Canada, and Germany that aims to reduce operating costs, realign resources toward advancing the Company’s core technologies, and protect the Company’s competitive position amid slower-than-expected-investments in clean energy. This restructuring plan also includes the deferment and cancelation of certain previously planned capital and project expenditures. As a result of this restructuring plan, we have deferred the capital spending required to complete the Calgary expansion and do not currently have an estimated completion date for this project. For more information about our restructuring plan, please see Note 5 —Restructuringto our Consolidated Financial Statements*.*

Current report

On October 31, 2024, the Company closed on a project debt financing transaction with the Export-Import Bank of the United States (“EXIM”) to support the Company’s obligations under the LTSA with GGE, pursuant to which the Company is to supply GGE with forty-two 1.4-megawatt upgraded carbonate fuel cell modules to replace existing units at GGE’s Hwaseong Baran Industrial Complex. In conjunction with this financing, the Company entered into a promissory note and related security agreements securing the loan with equipment liens, resulting in gross proceeds of approximately $10.1 million. Interest accrues at a fixed interest rate of 5.81%, and the note is repayable in monthly installments consisting of interest and principal over 7 years from the date of the first debt payment, which was due in January of 2025. After payment of customary fees and transaction costs, net proceeds were approximately $9.2 million.

Current report

The credit agreement between the Company and EXIM contains certain reporting requirements and other affirmative and negative covenants which are customary for transactions of this type. In addition, the Company is required to maintain, throughout the term of the credit agreement, a minimum cash balance of $100.0 million. For the purposes of this credit agreement, cash is defined as the sum of unrestricted cash plus all short-term (but no longer than three months), marketable United States Treasury instruments (as measured based on the maturity amount of each instrument).

Current report

Several of the Company’s project subsidiaries previously entered into sale-leaseback agreements with PNC and Crestmark for commissioned projects where the Company had entered into a PPA with the site host/end-user of produced power. The Company did not recognize as revenue any of the proceeds received from the lessor that contractually constitute payments to acquire the assets subject to these arrangements. Instead, the sale proceeds received were accounted for as finance obligations. The outstanding finance obligation balance as of both January 31, 2025 and October 31, 2024 was $18.8 million. The outstanding finance obligation for the remaining leases as of January 31, 2025 includes $10.9 million in excess of future required payments which represents imputed interest, not including amounts for the potential repurchase price of the project assets which is based on fair value. The sale-leaseback arrangements with Crestmark include a purchase right for the greater of fair market value or 31% of the purchase price.

Current report

A Job Audit was to be performed within 90 days of the Target Date of October 31, 2024. Because the Company did not meet the amended Employment Obligation, an accelerated payment penalty will be assessed in an amount equal to $14,225.00 multiplied by the number of full-time employment positions below the number of positions required by the amended Employment Obligation. Such penalty will be immediately payable upon the determination by the Commissioner that the Company has failed to meet the amended Employment Obligation and will be applied first to accelerate the payment of any outstanding fees, penalties or interest due and then to accelerate the payment of the outstanding principal balance of the loan. The Company estimates that it had an average of 389 employees over the applicable 24 consecutive month period. As a result, the Company has calculated a $2.1 million repayment obligation in connection with the loan, which has been reclassified to current and represents the expected accelerated payment penalty amount. As of January 31, 2025, the Company had not been formally assessed a penalty, but since there are no fees, penalties or interest due, any accelerated payment penalty assessed will be applied to the outstanding principal balance of the loan and will not result in any charges to the Statement of Operations. As of January 31, 2025, the Company was in discussions with the State of Connecticut regarding a potential amendment to the terms of the Third Amendment to the Assistance Agreement. There can be no assurance that an amendment agreement will be reached with the State of Connecticut or that the terms of any such amendment would include more favorable repayment terms than those to which the Company is subject under the Third Amendment as a result of the failure to meet the Employment Obligation.
Removed paragraphs (60)

Previous report

FuelCell Energy is focused on advancing sustainable clean energy technologies that address some of the world’s most critical challenges around energy access, security, resilience, reliability, affordability, safety and environmental stewardship. As a leading global manufacturer of proprietary fuel cell technology platforms, FuelCell Energy is uniquely positioned to serve customers worldwide with sustainable products and solutions for industrial and commercial businesses, utilities, governments, municipalities, and communities.

Previous report

Subsequent to July 31, 2024, the Company sold approximately 2.2 million shares of its common stock under the Amended Sales Agreement (as defined below) at an average price of $0.51 per share, resulting in gross proceeds of approximately $1.1 million before deducting sales commissions and fees, and net proceeds to the Company of approximately $1.1 million

Previous report

Service agreements revenues for the three months ended July 31, 2024 decreased $8.4 million to $1.4 million from $9.8 million for the three months ended July 31, 2023. The decrease in service agreements revenues during the three months ended July 31, 2024 was primarily driven by the fact that there were no module exchanges during the quarter. During the three months ended July 31, 2023, there were two new module exchanges at the plants owned by Korea Southern Power Company in Korea, which achieved commercial operations in fiscal year 2018, and a module exchange at the plant at Trinity College.

Previous report

mark-to-market net loss of $0.9 million related to natural gas purchase contracts. There was no comparable loss in the comparable quarter of the prior year as the Company changed its designation from normal purchase normal sale in the fourth quarter of fiscal year 2023 for one contract, and in the second quarter of fiscal year 2024 for other contracts, as a result of net settling certain natural gas purchases under previous normal purchase normal sale contract designations, which resulted in a change to mark-to-market accounting. Cost of generation revenues included depreciation and amortization of approximately $7.3 million and $5.4 million for the three months ended July 31, 2024 and 2023, respectively. Cost of generation revenues for the three months ended July 31, 2024 also includes an impairment charge of $1.1 million relating to project assets under construction relating to the PPAs for Trinity College and for UConn (as defined elsewhere herein). The units to be installed at Trinity College and UConn are first article units of our solid oxide fuel cell (“SOFC”) product. In reviewing our project cost estimates for these PPAs during the third quarter of fiscal year 2024, it was determined that the expected project costs for these contracts would exceed the expected cash flows and therefore an impairment charge was required. The impairment charge of $1.1 million represents the unrecoverable costs incurred through July 31, 2024 for the Trinity College and UConn projects.

Previous report

Gain on extinguishment of finance obligations and debt, net

Previous report

The gain on extinguishment of finance obligations and debt, net was $15.3 million for the three months ended July 31, 2023 and represents the gain on the payoff of certain finance obligations of the Company to PNC Energy Capital, LLC (“PNC”) (which occurred in May 2023), partially offset by the write-off of debt issuance costs. There was no gain on extinguishment of finance obligations and debt, net for the three months ended July 31, 2024.

Previous report

Total revenues for the nine months ended July 31, 2024 of $62.8 million reflects a decrease of $38.1 million from $100.9 million for the same period in the prior year. Cost of revenues for the nine months ended July 31, 2024 of $87.8 million reflects a decrease of $22.2 million from $110.0 million for the same period in the prior year. A discussion of the changes in product revenues, service agreements revenues, generation revenues and Advanced Technologies contract revenues follows.

Previous report

Product revenues for the nine months ended July 31, 2024 was $0.3 million compared to $9.1 million for the nine months ended July 31, 2023. Our December 2021 Settlement Agreement with POSCO Energy Co., Ltd. and its subsidiary, Korea Fuel Cell Co., Ltd. (“KFC”), included an option to purchase an additional 14 modules (in addition to the 20 modules that were purchased by KFC during fiscal year 2022). This option included a material right related to an extended warranty obligation for the modules. The option was not exercised by KFC as of the expiration date of December 31, 2022 and, as a result, the Company recognized $9.1 million of product revenues for the nine months ended July 31, 2023, which represents the consideration allocated to the material right if the option had been exercised.

Previous report

Cost of product revenues increased $2.1 million for the nine months ended July 31, 2024 to $9.5 million, compared to $7.4 million in the same period in the prior year. Manufacturing variances, primarily related to production volumes and unabsorbed overhead costs, increased to approximately $8.6 million for the nine months ended July 31, 2024, compared to approximately $6.8 million for the nine months ended July 31, 2023.

Previous report

Service agreements revenues and related costs for the nine months ended July 31, 2024 and 2023 were as follows:

Previous report

Service agreements revenues for the nine months ended July 31, 2024 decreased $45.5 million to $4.4 million from $49.9 million for the nine months ended July 31, 2023. The decrease in service agreements revenues during the nine months ended July 31, 2024 was primarily driven by the fact that there were no module exchanges during the period. During the nine months ended July 31, 2023, there were one new module exchange at the plant at Trinity College, two new module exchanges at the plant in Woodbridge, CT, which originally achieved commercial operations in fiscal year 2017, and 12 new module exchanges at the plants owned by Korea Southern Power Company in Korea, which achieved commercial operations in fiscal year 2018.

Previous report

Cost of service agreements revenues decreased $36.3 million to $4.3 million for the nine months ended July 31, 2024 from $40.6 million for the nine months ended July 31, 2023. Cost of service agreements revenues includes maintenance and operating costs and costs of module exchanges. The decrease in costs is primarily due to the fact that there were no module exchanges during the nine months ended July 31, 2024, compared to fifteen module exchanges during the nine months ended July 31, 2023.

Previous report

Overall gross profit from service agreements revenues was $0.1 million for the nine months ended July 31, 2024, which reflects a decrease from a gross profit of $9.3 million for the nine months ended July 31, 2023. The overall gross margin was 2.2% for the nine months ended July 31, 2024 compared to a gross margin of 18.6% in the comparable prior year period. Gross margin was lower during the nine months ended July 31, 2024 primarily due to the lack of module exchanges during the nine months ended July 31, 2024 and the fact that the comparable prior year period included module exchanges that were performed pursuant to service agreements with higher margins.

Previous report

Generation revenues and related costs for the nine months ended July 31, 2024 and 2023 were as follows:

Previous report

Cost of generation revenues totaled $61.1 million in the nine months ended July 31, 2024, compared to $51.2 million in the nine months ended July 31, 2023. The overall increase in cost of generation revenues is primarily related to the increased size of the installed fleet with the Toyota Project and Derby Projects achieving commercial operations in the first quarter of fiscal year 2024, as well as maintenance activities performed at the Tulare BioMAT and Groton projects during the first quarter of fiscal year 2024. Both nine month periods include expensed construction and gas costs related to the Toyota Project, which were $6.3 million in the nine months ended July 31, 2024, compared to $17.8 million in the

Previous report

nine months ended July 31, 2023. During the nine months ended July 31, 2024, the Company incurred a mark-to-market net loss of $5.1 million related to natural gas purchase contracts. There was no comparable loss in the comparable prior year period as the Company changed its designation from normal purchase normal sale in the fourth quarter of fiscal year 2023 for one contract, and in the second quarter of fiscal year 2024 for other contracts, as a result of net settling certain natural gas purchases under previous normal purchase normal sale contract designations, which resulted in a change to mark-to-market accounting. Cost of generation revenues included depreciation and amortization of approximately $21.3 million and $14.9 million for the nine months ended July 31, 2024 and 2023, respectively. Cost of generation revenues for the nine months ended July 31, 2024 also includes an impairment charge of $1.1 million relating to project assets under construction relating to the PPAs for Trinity College and for UConn (as defined elsewhere herein). The units to be installed at Trinity College and UConn are first article units of our SOFC product. In reviewing our project cost estimates for these PPAs during the third quarter of fiscal year 2024, it was determined that the expected project costs for these contracts would exceed the expected cash flows and therefore an impairment charge was required. The impairment charge of $1.1 million represents the unrecoverable costs incurred through July 31, 2024 for the Trinity College and UConn projects. Cost of generation revenues for the nine months ended July 31, 2023 includes an impairment charge of $2.4 million relating to a project asset for which a PPA was ultimately not awarded.

Previous report

Advanced Technologies contract revenues and related costs for the nine months ended July 31, 2024 and 2023 were as follows:

Previous report

Cost of Advanced Technologies contract revenues increased to $12.9 million for the nine months ended July 31, 2024, compared to $10.8 million for the same period in the prior year as a result of the higher activity discussed above.

Previous report

Advanced Technologies contracts for the nine months ended July 31, 2024 generated a gross profit of $7.2 million, compared to a gross profit of $2.2 million for the nine months ended July 31, 2023. The increase in gross profit was due primarily to the higher revenues and lower costs recognized under government and other contracts during the nine months ended July 31, 2024 compared to the nine months ended July 31, 2023.

Previous report

Administrative and selling expenses were $48.7 million and $47.6 million for the nine months ended July 31, 2024 and 2023, respectively. Administrative and selling expenses were higher during the nine months ended July 31, 2024 than

Previous report

during the nine months ended July 31, 2023 primarily due to an increase in compensation expense resulting from an increase in headcount in support of sales, marketing and business expansion, partially offset by lower legal, consulting and shareholder relations expenses.

Previous report

Loss from operations for the nine months ended July 31, 2024 was $117.5 million compared to $99.7 million for the nine months ended July 31, 2023. This increase was driven primarily by a $15.9 million increase in gross loss and a $1.8 million increase in operating expenses for the nine months ended July 31, 2024.

Previous report

Interest expense for the nine months ended July 31, 2024 and 2023 was $7.2 million and $4.9 million, respectively. Interest expense for the nine months ended July 31, 2024 includes interest on: the Derby Senior Back Leverage Loan Facility and the Derby Subordinated Back Leverage Loan Facility (in each case as defined elsewhere herein), which were entered into in April 2024; the OpCo Financing Facility (as defined elsewhere herein), which was entered into in May 2023; the Groton Senior Back Leverage Loan Facility and the Groton Subordinated Back Leverage Loan Facility (in each case as defined elsewhere herein), which were entered into in August 2023; and the Crestmark sale-leaseback transactions. Interest expense for the nine months ended July 31, 2023 includes interest associated with finance obligations for failed sale-leaseback transactions and interest on the loans associated with the Bridgeport Fuel Cell Project, which were terminated in May 2023.

Previous report

Gain on extinguishment of finance obligations and debt, net

Previous report

The gain on extinguishment of finance obligations and debt, net was $15.3 million for the nine months ended July 31, 2023 and represents the gain on the payoff of certain finance obligations of the Company to PNC (as defined elsewhere herein) (which occurred in May 2023), partially offset by the write-off of debt issuance costs. There was no gain on extinguishment of finance obligations and debt, net for the nine months ended July 31, 2024.

Previous report

Other (expense) income, net was ($3.3) million and $0.2 million for the nine months ended July 31, 2024 and 2023, respectively. Other expense, net for the nine months ended July 31, 2024 primarily relates to a loss on the OpCo Financing Facility interest rate swap derivative of $3.2 million. There was no comparable loss or gain in the comparable prior year period as the OpCo Financing Facility was drawn down in the third quarter of fiscal year 2023. Other income, net for the nine months ended July 31, 2023 relates primarily to foreign currency exchange gains.

Showing the first 40 of 60 passages. Open the source sections for the rest.

Reworded paragraphs (76)

Previous wording

This Quarterly Report on Form 10-Q contains statements that the Company believes to be “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995 (the “PSLRA”). All statements other than statements of historical fact included in this Form 10-K, including statements regarding the Company’s future financial condition, results of operations, plans, objectives, expectations, future performance, business operations and business prospects, are forward-looking statements. Words such as “expects,” “anticipates,” “estimates,” “goals,” “projects,” “intends,” “plans,” “believes,” “predicts,” “should,” “seeks,” “will,” “could,” “would,” “may,” “forecast,” and similar expressions and variations of such words are intended to identify forward-looking statements and are included, along with this statement, for purposes of complying with the safe harbor provisions of the PSLRA. Forward-looking statements are neither historical facts, nor assurances of future performance. Instead, such statements are based only on our beliefs, expectations, and assumptions regarding the future. As such, the realization of matters expressed in forward-looking statements involves inherent risks and uncertainties. Such statements relate to, among other things, the following: (i) the development and commercialization by FuelCell Energy, Inc. and its subsidiaries of fuel cell technology and products and the market for such products; (ii)the expected timing of completion of our ongoing projects; (iii) our business plans and strategies; (iv) the markets in which we expect to operate; (v)expected operating results such as revenue growth and earnings; (vi) our belief that we have sufficient liquidity to fund our business operations for the next 12 months; (vii) future funding under Advanced Technologies contracts; (viii) future financing for projects, including equity and debt investments by investors and commercial bank financing, as well as overall financial market conditions; (ix) the expected cost competitiveness of our technology; and (x) our ability to achieve our sales plans, manufacturing capacity expansion plans, market access and market expansion goals, and cost reduction targets.

Current wording

This Quarterly Report on Form 10-Q contains statements that the Company believes to be “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995 (the “PSLRA”). All statements other than statements of historical fact included in this Form 10-K, including statements regarding the Company’s future financial condition, results of operations, plans, objectives, expectations, future performance, business operations and business prospects, are forward-looking statements. Words such as “expects,” “anticipates,” “estimates,” “goals,” “projects,” “intends,” “plans,” “believes,” “predicts,” “should,” “seeks,” “will,” “could,” “would,” “may,” “forecast,” and similar expressions and variations of such words are intended to identify forward-looking statements and are included, along with this statement, for purposes of complying with the safe harbor provisions of the PSLRA. Forward-looking statements are neither historical facts, nor assurances of future performance. Instead, such statements are based only on our beliefs, expectations, and assumptions regarding the future. As such, the realization of matters expressed in forward-looking statements involves inherent risks and uncertainties. Such statements relate to, among other things, the following: (i) the development and commercialization by FuelCell Energy, Inc. and its subsidiaries of fuel cell technology and products and the market for such products; (ii)the expected timing of completion of our ongoing projects; (iii) our business plans and strategies; (iv) the markets in which we expect to operate; (v)expected operating results such as revenue growth and earnings; (vi) our belief that we have sufficient liquidity to fund our business operations for the next 12 months; (vii) future funding under Advanced Technologies contracts; (viii) future financing for projects, including equity and debt investments by investors and commercial bank financing, as well as overall financial market conditions; (ix) the expected cost competitiveness of our technology; (x) our ability to successfully implement our restructuring plan during the expected timeframe and the expected effects and impacts of the Company’s restructuring plan; and (xi) our ability to achieve our sales plans, manufacturing capacity expansion plans, market access and market expansion goals, and cost reduction targets.

Previous wording

The forward-looking statements contained in this report are subject to risks and uncertainties, known and unknown, that could cause actual results and future events to differ materially from those set forth in or contemplated by the forward-looking statements, including, without limitation, the risks described in our Annual Report on Form 10-K for the fiscal year ended October 31, 2023 and in the section below entitled “Item 1A. Risk Factors,” and the following risks and uncertainties: general risks associated with product development and manufacturing; general economic conditions; changes in interest rates, which may impact project financing; supply chain disruptions; changes in the utility regulatory environment; changes in the utility industry and the markets for distributed generation, distributed hydrogen, and fuel cell power plants configured for carbon capture or carbon separation; potential volatility of commodity prices that may adversely affect our projects; availability of government subsidies and economic incentives for alternative energy technologies; our ability to remain in compliance with U.S. federal and state and foreign government laws and regulations; our ability to regain and maintain compliance with the listing rules of The Nasdaq Stock Market; our ability to implement a reverse stock split and the impacts of a reverse stock split, if implemented; rapid technological change; competition; the risk that our bid awards will not convert to contracts or that our contracts will not convert to revenue; market acceptance of our products; changes in accounting policies or practices adopted voluntarily or as required by accounting principles generally accepted in the United States (“GAAP”); factors affecting our liquidity position and financial condition; government appropriations; the ability of the government and third parties to terminate their development contracts at any time; the ability of the government to exercise “march-in” rights with respect to certain of our patents; our ability to successfully market and sell our products internationally; our ability to develop new products to achieve our long-term revenue targets; our ability to implement our strategy; our ability to reduce our levelized cost of energy and deliver on our cost reduction strategy generally; our ability to protect our intellectual property; litigation and other proceedings; the risk that commercialization of our new products will not occur when anticipated or, if it does, that we will not have adequate capacity to satisfy demand; our need for and the availability of additional financing; our ability to generate positive cash flow from operations; our ability to service our long-term debt; our ability to increase the output and longevity of our platforms and to meet the performance requirements of our contracts; our ability to expand our customer base and maintain relationships with our largest customers and strategic business allies; and concerns with, thr…

Excerpt shortened here; the source contains the full paragraph.

Current wording

The forward-looking statements contained in this report are subject to risks and uncertainties, known and unknown, that could cause actual results and future events to differ materially from those set forth in or contemplated by the forward-looking statements, including, without limitation, the risks described in our Annual Report on Form 10-K for the fiscal year ended October 31, 2024 and in the section below entitled “Item 1A. Risk Factors,” and the following risks and uncertainties: general risks associated with product development and manufacturing; general economic conditions; changes in interest rates, which may impact project financing; supply chain disruptions; changes in the utility regulatory environment; changes in the utility industry and the markets for distributed generation, distributed hydrogen, and fuel cell power plants configured for carbon capture or carbon separation; potential volatility of commodity prices that may adversely affect our projects; availability of government subsidies and economic incentives for alternative energy technologies; risks that our restructuring plan will not result in the intended benefits or savings or will result in unanticipated costs, including but not limited to additional charges and/or higher than expected costs; our ability to remain in compliance with U.S. federal and state and foreign government laws and regulations; our ability to maintain compliance with the listing rules of The Nasdaq Stock Market; rapid technological change; competition; the risk that our bid awards will not convert to contracts or that our contracts will not convert to revenue; market acceptance of our products; changes in accounting policies or practices adopted voluntarily or as required by accounting principles generally accepted in the United States (“GAAP”); factors affecting our liquidity position and financial condition; government appropriations; the ability of the government and third parties to terminate their development contracts at any time; the ability of the government to exercise “march-in” rights with respect to certain of our patents; our ability to successfully market and sell our products internationally; our ability to develop additional commercially viable products; our ability to implement our strategy; our ability to reduce our levelized cost of energy and deliver on our cost reduction strategy generally; our ability to protect our intellectual property; litigation and other proceedings; the risk that commercialization of our new products will not occur when anticipated or, if it does, that we will not have adequate capacity to satisfy demand; our need for and the availability of additional financing; our ability to generate positive cash flow from operations; our ability to service our long-term debt; our ability to increase the output and longevity of our platforms and to meet the performance requirements of our contracts; and our ability to expand our customer base and maintain relationship…

Excerpt shortened here; the source contains the full paragraph.

Previous wording

We cannot assure you that: we will be able to meet any of our development or commercialization schedules; any of our new products or technologies, once developed, will be commercially successful; our power plants will be commercially successful; we will be able to obtain financing or raise capital to achieve our business plans; the government will

Current wording

We cannot assure you that: we will be able to meet any of our development or commercialization schedules; any of our new products or technologies, once developed, will be commercially successful; our power plants will be commercially successful; we will be able to obtain financing or raise capital to achieve our business plans; the government will appropriate the funds anticipated by us under our government contracts; the government will not exercise its right to

Previous wording

appropriate the funds anticipated by us under our government contracts; the government will not exercise its right to terminate any or all of our government contracts; or we will be able to achieve any other result anticipated in any other forward-looking statement contained herein.

Current wording

terminate any or all of our government contracts; or we will be able to achieve any other result anticipated in any other forward-looking statement contained herein.

Previous wording

Management’s Discussion and Analysis of Financial Condition and Results of Operations is provided as a supplement to the accompanying financial statements and footnotes to help provide an understanding of our financial condition, changes in our financial condition and results of operations. The preparation of financial statements and related disclosures requires management to make estimates and assumptions that affect the reported amounts of assets, liabilities, revenues and expenses and the disclosure of contingent assets and liabilities, as well as management’s assessment of the Company’s ability to meet its obligations as they come due over the next twelve months. Actual results could differ from those estimates. Estimates are used in accounting for, among other things, revenue recognition, lease right-of-use assets and liabilities, loss accruals on service agreements, excess, slow-moving and obsolete inventories, product warranty accruals, loss accruals on service agreements, share-based compensation expense, allowance for doubtful accounts, depreciation and amortization, impairment of goodwill and in-process research and development intangible assets, impairment of long-lived assets (including project assets), valuation of derivatives, and contingencies. Estimates and assumptions are reviewed periodically, and the effects of revisions are reflected in the consolidated financial statements in the period they are determined to be necessary. Due to the inherent uncertainty involved in making estimates, actual results in future periods may differ from those estimates. The following discussion should be read in conjunction with information included in our Annual Report on Form 10-K for the fiscal year ended October 31, 2023 filed with the Securities and Exchange Commission (“SEC”). Unless otherwise indicated, the terms “Company”, “FuelCell Energy”, “we”, “us”, and “our” refer to FuelCell Energy, Inc. and its subsidiaries. All tabular dollar amounts are in thousands.

Current wording

Management’s Discussion and Analysis of Financial Condition and Results of Operations is provided as a supplement to the accompanying financial statements and footnotes to help provide an understanding of our financial condition, changes in our financial condition and results of operations. The preparation of financial statements and related disclosures requires management to make estimates and assumptions that affect the reported amounts of assets, liabilities, revenues and expenses and the disclosure of contingent assets and liabilities, as well as management’s assessment of the Company’s ability to meet its obligations as they come due over the next twelve months. Actual results could differ from those estimates. Estimates are used in accounting for, among other things, revenue recognition, lease right-of-use assets and liabilities, loss accruals on service agreements, excess, slow-moving and obsolete inventories, product warranty accruals, loss accruals on service agreements, share-based compensation expense, allowance for credit losses, depreciation and amortization, impairment of goodwill and in-process research and development intangible assets, impairment of long-lived assets (including project assets), valuation of derivatives, and contingencies. Estimates and assumptions are reviewed periodically, and the effects of revisions are reflected in the consolidated financial statements in the period they are determined to be necessary. Due to the inherent uncertainty involved in making estimates, actual results in future periods may differ from those estimates. The following discussion should be read in conjunction with information included in our Annual Report on Form 10-K for the fiscal year ended October 31, 2024 filed with the Securities and Exchange Commission (“SEC”). Unless otherwise indicated, the terms “Company”, “FuelCell Energy”, “we”, “us”, and “our” refer to FuelCell Energy, Inc. and its subsidiaries. All tabular dollar amounts are in thousands.

Previous wording

Headquartered in Danbury, Connecticut, FuelCell Energy is a global leader in delivering environmentally responsible distributed baseload energy platform solutions through our proprietary fuel cell technology. Today, we offer commercial technology that produces clean electricity, heat, clean hydrogen, and water and is also capable of recovering and capturing carbon for utilization and/or sequestration, depending on product configuration and application. We also continue to invest in product development and commercializing technologies that are expected to add new capabilities to our platforms’ abilities to deliver hydrogen and long duration hydrogen-based energy storage through our solid oxide technologies, as well as further enhance our existing platforms’ carbon capture solutions.

Current wording

At FuelCell Energy, our purpose is to enable a world powered by clean energy. We are a global leader in delivering a variety of clean energy solutions to address some of the world’s most critical challenges around energy access, resilience, reliability, affordability, safety and security. Since our inception, FuelCell Energy has been innovating and developing commercial technologies that produce clean electricity, heat, clean hydrogen, and water. We are also proud to be at the forefront of what we believe to be one of the most critical technologies required to achieve the world’s overall emissions objectives: carbon capture. Today, we offer commercial technology that produces clean electricity, heat, clean hydrogen, and water and is also capable of recovering and capturing carbon for utilization and/or sequestration, depending on product configuration and application. We also continue to invest in product development and commercializing technologies that are expected to add new capabilities to our platforms’ abilities to deliver hydrogen and long duration hydrogen-based energy storage through our solid oxide technologies, as well as further enhance our existing platforms’ carbon capture solutions.

Previous wording

FuelCell Energy, based in Connecticut, was founded in 1969 as a New York corporation to provide applied research and development services on a contract basis. We completed our initial public offering in 1992 and reincorporated in Delaware in 1999. We began selling stationary fuel cell power plants commercially in 2003.

Current wording

FuelCell Energy, headquartered in Danbury, Connecticut, was founded in 1969 as a New York corporation to provide applied research and development services on a contract basis. We completed our initial public offering in 1992 and reincorporated in Delaware in 1999. We began selling stationary fuel cell power plants commercially in 2003.

Previous wording

Total revenues for the three months ended July 31, 2024 of $23.7 million reflects a decrease of $1.8 million from $25.5 million for the same period in the prior year. Cost of revenues for the three months ended July 31, 2024 of $29.9 million reflects a decrease of $3.8 million from $33.7 million for the same period in the prior year. A discussion of the changes in product revenues, service agreements revenues, generation revenues and Advanced Technologies contract revenues follows.

Current wording

million reflects a decrease of $4.2 million from $28.4 million for the same period in the prior year. A discussion of the changes in product revenues, service agreements revenues, generation revenues and Advanced Technologies contract revenues follows.

Previous wording

Product revenues were $0.3 million during the three months ended July 31, 2024 and there were no product revenues in the comparable prior year period. The product revenues during the three months ended July 31, 2024 were recognized under the Company’s new sales contract with Ameresco, Inc., which was entered into during the second quarter of fiscal year 2024, pursuant to which the Company is to provide a 2.8 MW platform to the Sacramento Sewer District.

Current wording

Product revenues were $0.1 million during the three months ended January 31, 2025 and there were no product revenues in the comparable prior year period. The product revenues during the three months ended January 31, 2025 were recognized under the Company’s sales contract with Ameresco, Inc., which was entered into during the second quarter of fiscal year 2024, pursuant to which the Company is to provide a 2.8 MW platform to the Sacramento Sewer District.

Previous wording

Cost of product revenues increased $1.3 million for the three months ended July 31, 2024 to $4.2 million, compared to $2.9 million in the same period in the prior year. Manufacturing variances, primarily related to production volumes and unabsorbed overhead costs, totaled approximately $3.5 million for the three months ended July 31, 2024, compared to approximately $2.4 million for the three months ended July 31, 2023.

Current wording

Cost of product revenues increased $0.6 million for the three months ended January 31, 2025 to $3.0 million, compared to $2.4 million in the same period in the prior year. Manufacturing variances, primarily related to production volumes and unabsorbed overhead costs, totaled approximately $2.7 million for the three months ended January 31, 2025, compared to approximately $2.2 million for the three months ended January 31, 2024.

Previous wording

For the three months ended July 31, 2024, we operated at an annualized production rate of approximately 29.3 MW in our Torrington, CT manufacturing facility, compared to an annualized production rate of 28.9 MW for the three months ended July 31, 2023.

Current wording

For the three months ended January 31, 2025, we operated at an annualized production rate of approximately 31.2 MW in our Torrington, CT manufacturing facility, compared to an annualized production rate of 33.2 MW for the three months ended January 31, 2024.

Previous wording

Cost of service agreements revenues decreased $8.4 million to $1.1 million for the three months ended July 31, 2024 from $9.6 million for the three months ended July 31, 2023. Cost of service agreements revenues includes maintenance and operating costs and costs of module exchanges. The decrease in costs is primarily due to the fact that there were no module exchanges during the three months ended July 31, 2024, compared to three module exchanges during the three months ended July 31, 2023.

Current wording

Cost of service agreements revenues decreased $0.2 million to $1.7 million for the three months ended January 31, 2025 from $1.9 million for the three months ended January 31, 2024. Cost of service agreements revenues includes maintenance and operating costs and costs of module exchanges.

Previous wording

Overall gross profit from service agreements revenues was $0.3 million for the three months ended July 31, 2024, which remains unchanged from a gross profit of $0.3 million for the three months ended July 31, 2023. The overall gross margin was 18.8% for the three months ended July 31, 2024 compared to a gross margin of 2.7% in the comparable prior year period. Gross margin was higher during the three months ended July 31, 2024 primarily due to the fact that the comparable prior year quarter included a reserve established for obsolete inventory of approximately $0.8 million, while there was no comparable reserve established during the three months ended July 31, 2024.

Current wording

Overall gross profit from service agreements revenues was $0.2 million for the three months ended January 31, 2025, compared to a gross loss of $ (0.3) million for the three months ended January 31, 2024. The overall gross margin was 9.7% for the three months ended January 31, 2025 compared to a gross margin of (16.8)% in the comparable prior year period.

Previous wording

Revenues from generation for the three months ended July 31, 2024 totaled $13.4 million, which represents an increase of $2.4 million from the $11.0 million of revenue recognized for the three months ended July 31, 2023. The increase reflects revenue of $0.9 million generated by the Toyota Project, which became operational during the first quarter of fiscal year 2024, and revenue of $4.7 million generated by the 14.0 MW Derby Fuel Cell Project and the 2.8 MW SCEF Fuel Cell Project, both located in Derby, Connecticut (collectively, the “Derby Projects”), both of which became operational in December 2023, partially offset by lower revenue from other plants due to lower output resulting from routine maintenance activities. Generation revenues for the three months ended July 31, 2024 and 2023 reflect revenue from electricity generated under our power purchase agreements (“PPAs”), the sale of renewable energy credits, and additionally for the three months ended July 31, 2024, the sale of hydrogen from the Toyota Project.

Current wording

Revenues from generation for the three months ended January 31, 2025 totaled $11.3 million, which represents an increase of $0.9 million from the $10.5 million of revenue recognized for the three months ended January 31, 2024. The increase reflects an increase in revenue of $1.7 million generated by the 14.0 MW Derby Fuel Cell Project and the 2.8 MW SCEF Fuel Cell Project, both located in Derby, Connecticut (collectively, the “Derby Projects”) and both of which became operational in December 2023, partially offset by lower revenue from other plants due to lower output resulting from routine maintenance activities. Generation revenues for the three months ended January 31, 2025 and 2024 reflect revenue from electricity generated under our power purchase agreements (“PPAs”), the sale of renewable energy credits, and additionally for the three months ended January 31, 2025, the sale of hydrogen from the Toyota Project.

Previous wording

Cost of generation revenues totaled $18.8 million in the three months ended July 31, 2024, compared to $17.5 million in the three months ended July 31, 2023. The overall increase in cost of generation revenues is primarily related to the increased size of the installed fleet with the Toyota Project and Derby Projects achieving commercial operations in the first quarter of fiscal year 2024. Both periods include expensed construction costs related to the Toyota Project, which were $0.2 million in the three months ended July 31, 2024, compared to $6.2 million in the three months ended July 31, 2023 (which also included expensed gas costs). During the three months ended July 31, 2024, the Company incurred a

Current wording

Cost of generation revenues totaled $15.3 million in the three months ended January 31, 2025, compared to $20.9 million in the three months ended January 31, 2024. The overall decrease in cost of generation revenues is primarily related to a reduction in the expensed construction costs related to the Toyota Project, which were $0.3 million in the three months ended January 31, 2025, compared to $3.5 million in the three months ended January 31, 2024 (which also included expensed gas costs). During the three months ended January 31, 2025, the Company incurred a mark-to-market net gain of $1.8 million related to natural gas purchase contracts, compared to a mark-to-market net loss of $1.9 million during the three months ended January 31, 2024. Cost of generation revenues included depreciation and amortization of approximately $8.0 million and $6.8 million for the three months ended January 31, 2025 and 2024, respectively.

Previous wording

We had 62.8 MW of operating power plants in our generation operating portfolio as of July 31, 2024, which increased from 43.7 MW as of July 31, 2023 and which includes the Derby Projects and the Toyota Project, all of which became operational in December 2023.

Current wording

We had 62.8 MW of operating power plants in our generation operating portfolio as of January 31, 2025, which was unchanged from January 31, 2024.

Previous wording

Advanced Technologies contract revenues increased to $8.6 million from $4.7 million. Advanced Technologies contract revenues recognized under our Joint Development Agreement with ExxonMobil Technology and Engineering Company (“EMTEC”) were approximately $1.8 million, revenues arising from the purchase order received from Esso Nederland B.V. (“Esso”), an affiliate of EMTEC and Exxon Mobil Corporation, related to the Rotterdam project were approximately $3.5 million and revenue recognized under government contracts and other contracts were approximately $3.3 million for the three months ended July 31, 2024. This compares to Advanced Technologies contract revenues recognized under our Joint Development Agreement with EMTEC of approximately $2.8 million and revenue recognized under government contracts and other contracts of approximately $1.9 million for the three months ended July 31, 2023.

Current wording

Advanced Technologies contract revenues for the three months ended January 31, 2025 increased to $5.7 million from $4.6 million for the three months ended January 31, 2024. Advanced Technologies contract revenues recognized under our Joint Development Agreement with ExxonMobil Technology and Engineering Company (“EMTEC”) were approximately $1.2 million, revenues arising from the purchase order received from Esso Nederland B.V. (“Esso”), an

Previous wording

Advanced Technologies contract revenues increased to $20.1 million from $12.9 million. Advanced Technologies contract revenues recognized under our Joint Development Agreement with EMTEC were approximately $7.0 million, revenues arising from the purchase order received from Esso, an affiliate of EMTEC and Exxon Mobil Corporation, related to the Rotterdam project were approximately $7.2 million and revenue recognized under government contracts and other contracts were approximately $6.0 million for the nine months ended July 31, 2024. This compares to contract revenues recognized under our Joint Development Agreement with EMTEC of approximately $7.9 million, and revenue recognized under government contracts and other contracts of approximately $5.1 million for the nine months ended July 31, 2023.

Current wording

affiliate of EMTEC and Exxon Mobil Corporation, related to the Rotterdam project were approximately $3.5 million and revenue recognized under government contracts and other contracts were approximately $1.0 million for the three months ended January 31, 2025. This compares to Advanced Technologies contract revenues recognized under our Joint Development Agreement with EMTEC of approximately $2.5 million, revenue recognized under the Esso purchase order of approximately $1.0 million and revenue recognized under government contracts and other contracts of approximately $1.1 million for the three months ended January 31, 2024.

Previous wording

Cost of Advanced Technologies contract revenues increased to $5.8 million for the three months ended July 31, 2024, compared to $3.8 million for the same period in the prior year as a result of the higher activity discussed above.

Current wording

Cost of Advanced Technologies contract revenues increased to $4.2 million for the three months ended January 31, 2025, compared to $3.2 million for the same period in the prior year, primarily as a result of the additional costs incurred relating to the Esso purchase order.

Previous wording

Advanced Technologies contracts for the three months ended July 31, 2024 generated a gross profit of $2.8 million, compared to a gross profit of $0.9 million for the same period in the prior year. The increase was due primarily to the higher revenues and lower costs recognized under government and other contracts during the three months ended July 31, 2024 compared to the three months ended July 31, 2023.

Current wording

Advanced Technologies contracts for the three months ended January 31, 2025 generated a gross profit of $1.5 million, compared to a gross profit of $1.3 million for the same period in the prior year. The increase was due primarily to the higher revenues recognized during the three months ended January 31, 2025 compared to the three months ended January 31, 2024.

Previous wording

Administrative and selling expenses were $14.6 million and $17.6 million for the three months ended July 31, 2024 and 2023, respectively. Administrative and selling expenses were lower during the three months ended July 31, 2024 than during the three months ended July 31, 2023 primarily due to lower legal, consulting and shareholder relations expenses and lower compensation expense.

Current wording

Administrative and selling expenses were $15.0 million and $16.4 million for the three months ended January 31, 2025 and 2024, respectively. Administrative and selling expenses were lower during the three months ended January 31, 2025 than during the three months ended January 31, 2024 primarily due to lower compensation expense as a result of the recent restructuring actions.

Previous wording

Research and development expenses decreased to $12.8 million for the three months ended July 31, 2024 compared to $15.6 million for the three months ended July 31, 2023. The decrease is primarily due to a decrease in spending on the Company’s ongoing commercial development efforts related to our solid oxide power generation and electrolysis platforms and carbon separation and carbon recovery solutions compared to the comparable prior year period, as well as a shift in engineering resource allocation toward supporting the increase in funded Advanced Technologies activities described above.

Current wording

Research and development expenses decreased to $11.1 million for the three months ended January 31, 2025 compared to $14.4 million for the three months ended January 31, 2024. The decrease is primarily due to a decrease in spending on the Company’s ongoing commercial development efforts related to our solid oxide power generation and electrolysis platforms and carbon separation and carbon recovery solutions compared to the comparable prior year period, as well as a shift in engineering resource allocation toward supporting an increase in funded Advanced Technologies activities.

Previous wording

Loss from operations for the three months ended July 31, 2024 was $33.6 million compared to $41.4 million for the three months ended July 31, 2023. This decrease was driven primarily by a $5.8 million decrease in operating expenses and a $2.0 million decrease in gross loss.

Current wording

Loss from operations for the three months ended January 31, 2025 was $32.9 million compared to $42.5 million for the three months ended January 31, 2024. This decrease was driven primarily by a $3.1 million decrease in operating expenses and a $6.5 million decrease in gross loss.

Previous wording

Interest expense for the three months ended July 31, 2024 and 2023 was $2.6 million and $1.9 million, respectively. Interest expense for the three months ended July 31, 2024 includes interest on: the Derby Senior Back Leverage Loan Facility and the Derby Subordinated Back Leverage Loan Facility (in each case as defined elsewhere herein), which were entered into in April 2024; the OpCo Financing Facility (as defined elsewhere herein), which was entered into in May 2023; the Groton Senior Back Leverage Loan Facility and the Groton Subordinated Back Leverage Loan Facility (in each case as defined elsewhere herein), which were entered into in August 2023; and the Crestmark sale-leaseback transactions. Interest expense for the three months ended July 31, 2023 includes interest associated with finance obligations for failed sale-leaseback transactions and interest on the loans associated with the Bridgeport Fuel Cell Project, which were terminated in May 2023.

Current wording

Interest expense for the three months ended January 31, 2025 and 2024 was $2.6 million and $2.3 million, respectively. Interest expense for both periods includes interest on the OpCo Financing Facility (as defined elsewhere herein), which was entered into in May 2023, and interest on the Groton Senior Back Leverage Loan Facility and the Groton Subordinated Back Leverage Loan Facility (in each case, as defined elsewhere herein), which were entered into in August 2023. Interest expense increased for the three months ended January 31, 2025, as this period also includes interest on the Derby Senior Back Leverage Loan Facility and the Derby Subordinated Back Leverage Loan Facility (in each case, as defined elsewhere herein), which were entered into in April 2024, and on the facility with EXIM (as defined elsewhere herein), which was entered into in October 2024.

Previous wording

Interest income was $3.3 million and $4.0 million for the three months ended July 31, 2024 and 2023, respectively. The decrease in interest income during the three months ended July 31, 2024 was primarily driven by lower investible cash balances compared to the three months ended July 31, 2023. Interest income for the three months ended July 31, 2024 and 2023 represents interest earned on money market investments and investments in U.S. Treasury Securities.

Current wording

Interest income was $2.4 million and $4.1 million for the three months ended January 31, 2025 and 2024, respectively. The decrease in interest income during the three months ended January 31, 2025 was primarily driven by lower money market investments compared to the three months ended January 31, 2024. Interest income for the three months ended January 31, 2025 and 2024 represents interest earned on money market investments and investments in U.S. Treasury Securities.

Previous wording

Other (expense) income, net was ($2.2) million and $0.4 million for the three months ended July 31, 2024 and 2023, respectively. Other expense, net for the three months ended July 31, 2024 relates primarily to an unrealized loss of $2.4 million on the OpCo Financing Facility interest rate swap derivative. Other income, net for the three months ended July 31, 2023 relates primarily to foreign currency exchange gains.

Current wording

Other income (expense), net was $0.7 million and $(3.7) million for the three months ended January 31, 2025 and 2024, respectively. Other income, net for the three months ended January 31, 2025 relates primarily to an unrealized gain of $0.9 million on the OpCo Financing Facility interest rate swap derivative. Other expense, net for the three months ended January 31, 2024 relates primarily to a loss on the OpCo Financing Facility interest rate swap derivative of $3.5 million as a result of a decrease of approximately 100 basis points in the Secured Overnight Financing Rate (“SOFR”).

Previous wording

For the three months ended July 31, 2024 and 2023, net (loss) income attributable to noncontrolling interest totaled $(0.2) million and $0.1 million, respectively, for the Groton Project tax equity financing transaction with East West Bank.

Current wording

For the three months ended January 31, 2025 and 2024, net loss attributable to noncontrolling interest totaled $3.5 million and $3.6 million, respectively, for the Groton Project tax equity financing transaction with East West Bank.

Previous wording

For the three months ended July 31, 2024 and 2023, net (loss) income attributable to noncontrolling interest totaled $(0.4) million and $0.6 million, respectively, for the LIPA Yaphank Project tax equity financing transaction with REI.

Current wording

For the three months ended January 31, 2025 and 2024, net loss attributable to noncontrolling interest totaled $1.0 million and $0.3 million, respectively, for the LIPA Yaphank Project tax equity financing transaction with REI.

Previous wording

For the three months ended July 31, 2024, net loss attributable to noncontrolling interest totaled $(1.8) million for the Derby Projects tax equity financing transaction with Franklin Park. The loss was primarily a result of accelerated depreciation allocated to the noncontrolling interest under the HLBV method. There was no comparable net loss for the three months ended July 31, 2023, as the Derby Projects began operations in the first quarter of fiscal year 2024.

Current wording

For the three months ended January 31, 2025 and 2024, net income (loss) attributable to noncontrolling interest totaled $0.4 million and $(20.7) million, respectively, for the Derby Projects tax equity financing transaction with Franklin Park. The loss in the three months ended January 31, 2024 was primarily a result of accelerated depreciation allocated to the noncontrolling interest under the HLBV method.

Previous wording

Net loss attributable to common stockholders represents the net loss for the period less the preferred stock dividends on the Series B Preferred Stock. For the three month periods ended July 31, 2024 and 2023, net loss attributable to common stockholders was $33.5 million and $25.1 million, respectively, and net loss per common share was $0.07 and $0.06, respectively. The increase is primarily due to the lack of gain on extinguishment of finance obligations and debt, net during the three months ended July 31, 2024 (compared to the gain that benefitted the comparable prior year period), partially offset by a decrease in loss from operations and the increased net loss attributable to noncontrolling interests for the three months ended July 31, 2024 compared to the three months ended July 31, 2023. The net loss per common share for the three months ended July 31, 2024 benefited from the higher number of weighted average shares outstanding due to share issuances since July 31, 2023.

Current wording

Net loss attributable to common stockholders represents the net loss for the period less the preferred stock dividends on the Series B Preferred Stock. For the three month periods ended January 31, 2025 and 2024, net loss attributable to common stockholders was $29.1 million and $20.6 million, respectively, and net loss per common share was $1.42 and $1.37, respectively. The increase in net loss per common share is primarily due to the decreased net loss attributable to noncontrolling interest during the three months ended January 31, 2025 (compared to the net loss attributable to noncontrolling interest that benefitted the comparable prior year period), partially offset by a decrease in loss from operations. The net loss per common share for the three months ended January 31, 2025 benefited from the higher number of weighted average shares outstanding due to share issuances since January 31, 2024.

Previous wording

As of July 31, 2024, unrestricted cash and cash equivalents totaled $159.3 million compared to $250.0 million as of October 31, 2023. During the year ended October 31, 2023 and the nine months ended July 31, 2024, the Company invested in United States (U.S.) Treasury Securities. The amortized cost of the U.S. Treasury Securities outstanding totaled $107.8 million as of July 31, 2024 compared to $103.8 million as of October 31, 2023 and is classified as Investments - short-term on the Consolidated Balance Sheets.

Current wording

As of January 31, 2025, unrestricted cash and cash equivalents totaled $98.1 million compared to $148.1 million as of October 31, 2024. During the year ended October 31, 2024 and the three months ended January 31, 2025, the Company invested in United States (U.S.) Treasury Securities. The amortized cost of the U.S. Treasury Securities outstanding totaled $110.3 million as of January 31, 2025 compared to $109.1 million as of October 31, 2024 and is classified as Investments - short-term on the Consolidated Balance Sheets.

Previous wording

During the first quarter of fiscal year 2024, the Company completed the Technical Improvement Plan to bring the Groton Project (defined elsewhere herein) to its rated capacity and the Groton Project reached its design rated output of 7.4 MW. The Company achieved all conditions precedent required for the first annual funding from East West Bank under the tax equity financing transaction between the Company and East West Bank and, as a result, the Company received a $4.0 million contribution during the nine months ended July 31, 2024 which is recorded as noncontrolling interest on the Consolidated Balance Sheets.

Current wording

During the first quarter of fiscal year 2025, the Company received the second annual funding from East West Bancorp, Inc. (“East West Bank”) under the tax equity financing transaction between the Company and East West Bank and, as a result, the Company received a $4.0 million contribution during the three months ended January 31, 2025 which is recorded as noncontrolling interest on the Consolidated Balance Sheets.

Current wording

On April 10, 2024, the Company entered into Amendment No. 1 to the Open Market Sale Agreement, dated July 12, 2022 (the “2022 Sales Agreement”), with Jefferies LLC, B. Riley Securities, Inc., Barclays Capital Inc., BMO Capital Markets Corp., BofA Securities, Inc., Canaccord Genuity LLC, Citigroup Global Markets Inc., J.P. Morgan Securities LLC and Loop Capital Markets LLC (each, an “Agent” and together, the “Agents”) (the 2022 Sales Agreement as amended, the “Amended Sales Agreement”), with respect to an at the market offering program under which the Company may, from time to time, offer and sell shares of its common stock having an aggregate offering price of up to $300,000,000 (exclusive of any amounts previously sold under the 2022 Sales Agreement prior to its amendment). On December 27, 2024, the Company entered into Amendment No. 2 to the Amended Sales Agreement, which removed certain representations and warranties relating to the Company’s status as a well-known seasoned issuer. During the first quarter of fiscal year 2025, approximately 0.7 million shares of the Company’s common stock were sold under the Amended Sales Agreement at an average sale price of $9.19 per share, resulting in gross proceeds of approximately $6.3 million before deducting sales commissions and fees, and net proceeds to the Company of approximately $5.9 million after deducting sales commissions totaling approximately $0.1 million and fees totaling approximately $0.3 million. As of January 31, 2025, approximately $198.6 million of shares remained available for sale under the Amended Sales Agreement. See Note 12. “Stockholders’ Equity” for additional information regarding the 2022 Sales Agreement and the Amended Sales Agreement.

Previous wording

financing for its projects once constructed, (v) increase order and contract volumes, which would lead to additional product sales, service agreements and generation revenues, (vi) obtain funding for and receive payment for research and development under current and future Advanced Technologies contracts, (vii) successfully commercialize its solid oxide, hydrogen and carbon capture platforms, (viii) implement capacity expansion for solid oxide product manufacturing, (ix) implement the product cost reductions necessary to achieve profitable operations, (x) manage working capital and the Company’s unrestricted cash balance and (xi) access the capital markets to raise funds through the sale of debt and equity securities, convertible notes, and other equity-linked instruments.

Current wording

To date, we have not achieved profitable operations or sustained positive cash flow from operations. The Company’s future liquidity, for the remainder of fiscal year 2025 and in the long-term, will depend on its ability to (i) timely complete current projects in process within budget, (ii) increase cash flows from its generation operating portfolio, including by meeting conditions required to timely commence operation of new projects, operating its generation operating portfolio in compliance with minimum performance guarantees and operating its generation operating portfolio in accordance with revenue expectations, (iii) obtain financing for project construction and manufacturing expansion, (iv) obtain permanent financing for its projects once constructed, (v) increase order and contract volumes, which would lead to additional product sales, service agreements and generation revenues, (vi) obtain funding for and receive payment for research and development under current and future Advanced Technologies contracts, (vii) successfully commercialize its solid oxide and hydrogen platforms (which may involve partnerships with third parties) and its carbon capture platforms, (viii) implement capacity expansion and potentially attract partnerships for solid oxide product manufacturing, (ix) implement the product cost reductions necessary to achieve profitable operations, (x) manage working capital and the Company’s unrestricted cash balance and (xi) access the capital markets to raise funds through the sale of debt and equity securities, convertible notes, and other equity-linked instruments.

Previous wording

Our business model requires substantial outside financing arrangements and satisfaction of the conditions of such arrangements to construct and deploy our projects to facilitate the growth of our business. The Company has invested capital raised from sales of its common stock to build out its project portfolio. The Company has also utilized and expects to continue to utilize a combination of long-term debt and tax equity financing (e.g., sale-leaseback transactions, partnership flip transactions and the monetization and/or transfer of eligible investment and production tax credits) to finance its project asset portfolio as these projects commence commercial operations, particularly in light of the passage of the Inflation Reduction Act in August 2022. The Company may also seek to undertake private placements of debt securities to finance its project asset portfolio. The Company is also pursuing financing to support its commercial efforts which includes deployment of modules to the repowering opportunities in the Korean market including the GGE project (as defined elsewhere herein). The proceeds of any such financing, if obtained, may allow the Company to reinvest capital back into the business and to fund other projects. We may also seek to obtain additional financing in both the debt and equity markets in the future. If financing is not available to us on acceptable terms if and when needed, or on terms acceptable to us or our lenders, if we do not satisfy the conditions of our financing arrangements, if we spend more than the financing approved for projects, if project costs exceed an amount that the Company can finance, or if we do not generate sufficient revenues or obtain capital sufficient for our corporate needs, we may be required to further reduce or slow planned spending, further reduce staffing, sell assets, seek alternative financing and take other measures, any of which could have a material adverse effect on our financial condition and operations.

Current wording

Our business model requires substantial outside financing arrangements and satisfaction of the conditions of such arrangements to construct and deploy our projects to facilitate the growth of our business. The Company has invested capital raised from sales of its common stock to build out its project portfolio. The Company has also utilized and expects to continue to utilize a combination of long-term debt and tax equity financing (e.g., sale-leaseback transactions, partnership flip transactions and the monetization and/or transfer of eligible investment and production tax credits) to finance its project asset portfolio as these projects commence commercial operations. The Company may also seek to undertake private placements of debt securities to finance its project asset portfolio. The Company is also pursuing financing to support its commercial efforts, which include deployment of modules to the repowering opportunities in the Korean market including the GGE project (as defined elsewhere herein). The proceeds of any such financing, if obtained, may allow the Company to reinvest capital back into the business and to fund other projects. We also expect to seek additional financing in both the debt and equity markets in the future. If financing is not available to us on acceptable terms if and when needed, or on terms acceptable to us or our lenders, if we do not satisfy the conditions of our financing arrangements, if we spend more than the financing approved for projects, if project costs exceed an amount that the Company can finance, or if we do not generate sufficient revenues or obtain capital sufficient for our corporate needs, we may be required to further reduce or slow planned spending, further reduce staffing, sell assets, seek alternative financing and take other measures, any of which could have a material adverse effect on our financial condition and operations.

Previous wording

We believe our generation operating portfolio generally contributes to higher long-term cash flows to the Company than if these projects had been sold. Our generation operating portfolio totaled 62.8 MW as of July 31, 2024. We expect generation revenue to continue to grow as additional projects achieve commercial operation, but this revenue amount may also fluctuate from year to year depending on platform output, operational performance and management and site conditions. The Company actively markets its products in order to grow this portfolio; however, the Company may also sell certain projects to investors from time to time. As of July 31, 2024, the Company had two projects representing an additional 1.3 MW in development, which projects are expected to generate operating cash flows in future periods, if completed. We have worked with and are continuing to work with lenders and financial institutions to secure construction

Current wording

31, 2025. We expect generation revenue to continue to grow as additional projects achieve commercial operation, but this revenue amount may also fluctuate from year to year depending on platform output, operational performance and management and site conditions. The Company actively markets its products in order to grow this portfolio; however, the Company may also sell certain projects to investors from time to time. As of January 31, 2025, the Company had three projects representing an additional 8.7 MW in development, which projects are expected to generate operating cash flows in future periods, if completed. We have worked with and are continuing to work with lenders and financial institutions to secure construction financing, long-term debt, tax equity and sale-leasebacks for our project asset portfolio, but there can be no assurance that such financing can be attained, or that, if attained, it will be retained and sufficient.

Previous wording

As of July 31, 2024, net debt outstanding related to project assets was $118.7 million. Future required payments, inclusive of principal and interest, totaled $144.2 million as of July 31, 2024. The outstanding finance obligations under our sale-leaseback transactions totaled $18.8 million as of July 31, 2024, of which $10.2 million represents the current carrying value of finance obligations less future required payments.

Current wording

As of January 31, 2025, net debt outstanding related to project assets was $114.3 million. Future required payments, inclusive of principal and interest, totaled $135.4 million as of January 31, 2025. The outstanding finance obligations under our sale-leaseback transactions totaled $18.8 million as of January 31, 2025, of which $10.9 million represents the current carrying value of finance obligations less future required payments.

Previous wording

In March 2024, we entered into a PPA with the University of Connecticut (“UConn”), in Storrs, Connecticut, for four 250 kW solid oxide fuel cell power generation systems totaling 1 MW. Power from these solid oxide fuel cells will be used by UConn’s new Innovation Partnership Building. Any unused power will be exported to the grid under the fuel cell net metering tariffs. This project is currently under development and the solid oxide fuel cell power generation system is expected to be installed in phases, with the first phase beginning in calendar year 2025 and construction concluding with installation of the last phase in calendar year 2026. Fuel cell stacks for our solid oxide platform are manufactured at our manufacturing and research and development facility in Calgary, Alberta, Canada, and this project will be fully assembled and integrated at our facilities in Connecticut.

Current wording

During fiscal year 2022, we entered into a PPA with Trinity College in Hartford, Connecticut, for our 250 kW solid oxide fuel cell power generation system. Power and heat produced from the platform is expected to be used at Trinity’s campus in Hartford, Connecticut to lower energy cost and enhance energy reliability and security. In March 2024, we entered into a PPA with the University of Connecticut (“UConn”), in Storrs, Connecticut, for four 250 kW solid oxide fuel cell power generation systems totaling 1 MW. Power from these solid oxide fuel cells is expected to be used by UConn’s new Innovation Partnership Building. Any unused power is expected to be exported to the grid under the fuel cell net metering tariffs. Fuel cell stacks for our solid oxide platform are manufactured at our manufacturing and research and development facility in Calgary, Alberta, Canada, and the Trinity and UConn projects will be fully assembled and integrated at our facilities in Connecticut.

Previous wording

Overall, backlog increased by approximately 12.6% to $1.20 billion as of July 31, 2024, compared to $1.06 billion as of July 31, 2023, primarily as a result of the LTSA with GGE with respect to the GGE Platform. The GGE Platform is comprised of 21 SureSource 3000 molten carbonate fuel cells (each a “Plant”). Each Plant is comprised of two 1.4-MW carbonate fuel cell modules. Pursuant to the LTSA, GGE and the Company have agreed that (i) GGE will purchase from the Company 42 1.4-MW carbonate fuel cell modules to replace existing fuel cell modules at the GGE Platform, (ii) the Company will provide certain balance of plant replacement components if and to the extent the parties reasonably determine existing components should be replaced, and (iii) the Company will provide long term operations and maintenance services for the GGE Platform. The total amount payable by GGE under the LTSA for the 42 replacement fuel cell modules, balance of plant replacement components, and service is $159.6 million USD, with payments to be made over time as such replacement fuel cell modules are commissioned and the service obligations under the LTSA for such Plants commence. This amount was recorded as backlog concurrent with the execution of the LTSA on May 28, 2024.

Current wording

As discussed above, backlog also increased due to the LTSA with GGE with respect to the GGE Platform. The GGE Platform is comprised of 21 SureSource 3000 molten carbonate fuel cells (each a “Plant”). Each Plant is comprised of two 1.4-MW carbonate fuel cell modules. Pursuant to the LTSA, GGE and the Company have agreed that (i) GGE will purchase from the Company 42 1.4-MW carbonate fuel cell modules to replace existing fuel cell modules at the GGE Platform, (ii) the Company will provide certain balance of plant replacement components if and to the extent the parties reasonably determine existing components should be replaced, and (iii) the Company will provide long term operations and maintenance services for the GGE Platform. The total amount payable by GGE under the LTSA for the 42 replacement fuel cell modules, balance of plant replacement components, and service was $159.6 million USD, with payments being made and to be made over time as such replacement fuel cell modules are commissioned and the service obligations under the LTSA for such Plants commence. This amount was recorded as backlog concurrent with the execution of the LTSA on May 28, 2024, and has since been reduced as revenue has been recognized under the LTSA which commenced in the fourth quarter of fiscal year 2024.

Previous wording

Backlog represents definitive agreements executed by the Company and our customers. Projects for which we have an executed PPA are included in generation backlog, which represents future revenue under long-term PPAs. The Company’s ability to recognize revenue in the future under a PPA is subject to the Company’s completion of construction of the project covered by such PPA. Should the Company not complete the construction of the project covered by a PPA, it will forgo future revenues with respect to the project and may incur penalties and/or impairment charges related to the project. Projects sold to customers (and not retained by the Company) are included in product sales and service agreements backlog, and the related generation backlog is removed upon sale. Together, the service and generation portion of backlog had a weighted average term of approximately 17 years as of July 31, 2024, with weighting based on the dollar amount of backlog and utility service contracts of up to 20 years in duration at inception.

Current wording

Backlog represents definitive agreements executed by the Company and our customers. Projects for which we have an executed PPA are included in generation backlog, which represents future revenue under long-term PPAs. The Company’s ability to recognize revenue in the future under a PPA is subject to the Company’s completion of construction of the project covered by such PPA. Should the Company not complete the construction of the project covered by a PPA, it will forgo future revenues with respect to the project and may incur penalties and/or impairment charges related to the project. Projects sold to customers (and not retained by the Company) are included in product sales and service agreements backlog, and the related generation backlog is removed upon sale. Together, the service and generation portion of backlog had a weighted average term of approximately 16 years as of January 31, 2025, with weighting based on the dollar amount of backlog and utility service contracts of up to 20 years in duration at inception.

Showing the first 40 of 76 pairs. Open the source sections for the rest.

Rearranged current paragraphs (10)

Current report — wording carried from elsewhere

We believe retaining ownership of our generation operating portfolio generally contributes to higher long-term cash flows to the Company than if these projects had been sold. Our generation operating portfolio totaled 62.8 MW as of January

Current report — wording carried from elsewhere

Overall, backlog increased by approximately 28.0% to $1.31 billion as of January 31, 2025, compared to $1.03 billion as of January 31, 2024, primarily as a result of the Hartford Project.

Current report — wording carried from elsewhere

31, 2025 and 2024, respectively, relate to depreciation of project assets in our generation operating portfolio and amortization of a generation intangible asset).

Current report — wording carried from elsewhere

to net share settlement of equity awards of $0.5 million, payment of $0.8 million in preferred dividends, distribution to noncontrolling interest of $0.6 million and payment of debt issuance costs of $0.2 million.

Current report — wording carried from elsewhere

At the closing (the “Derby Closing”) of each of the Derby Senior Back Leverage Loan Facility and the Derby Subordinated Back Leverage Loan Facility, which occurred simultaneously on April 25, 2024 (the “Derby Closing Date”), the entire amount of each of the Derby Senior Back Leverage Loan Facility and the Derby Subordinated Back Leverage Loan Facility was drawn down in the aggregate amount of $13.0 million. After payment of fees and transaction costs (including fees to the Derby Back Leverage Lenders and legal costs) of approximately $0.2 million in the aggregate, the remaining proceeds

Current report — wording carried from elsewhere

million was used to repay a portion of Parent’s long-term indebtedness to Connecticut Green Bank; (iv) $14.5 million was used to fund a capital expenditure reserve account required to be maintained pursuant to the terms and conditions of the Financing Agreement (which is classified as restricted cash on the Company’s Consolidated Balance Sheets); and (v) approximately $34.9 million was distributed to Parent for use as Parent determines in its sole discretion. In addition, in connection with the extinguishment of the Company’s indebtedness to Liberty Bank and Fifth Third Bank referred to above, approximately $11.2 million of restricted cash was released to the Company from Liberty Bank and Fifth Third Bank. Taking into consideration the release of such funds, the total net proceeds to the Company from these transactions were approximately $46.1 million.

Current report — wording carried from elsewhere

be remeasured to fair value quarterly, with the resulting gains/losses recorded to other income/expense. The fair value adjustments for the three months ended January 31, 2025 and 2024 resulted in a gain (loss) of $0.9 million and $(3.5) million, respectively.

Current report — wording carried from elsewhere

addition to customary events of default for transactions of this kind, the events of default include if a Change of Control occurs (meaning Parent no longer directly or indirectly owns Groton Holdco Borrower), a cross default (meaning that a default under the Groton Senior Back Leverage Loan Facility shall be deemed a default under the Groton Subordinated Back Leverage Loan Facility and vice versa) or if CMEEC should become insolvent, is in bankruptcy or commits a specified number of payment defaults with regard to its payment obligations to the Groton Project Company.

Current report — wording carried from elsewhere

also required the Company to furnish a job audit (the “Job Audit”) to the Commissioner of Economic and Community Development (the “Commissioner”) no later than 90 days following the 24-month period described above.

Current report — wording carried from elsewhere

under certain agreements, we are required to produce minimum amounts of power under our PPAs and we have the right to terminate PPAs by giving written notice to the customer, subject to certain exit costs. As of January 31, 2025, our generation operating portfolio was 62.8 MW.
Rearranged previous paragraphs (24)

Previous report — wording carried elsewhere

after deducting sales commissions and fees totaling approximately $21.9 thousand. As of the date of this report, approximately $225.3 million of shares remained available for sale under the Amended Sales Agreement.

Previous report — wording carried elsewhere

Our revenues and cost of revenues for the nine months ended July 31, 2024 and 2023 were as follows:

Previous report — wording carried elsewhere

Our product revenues and related costs for the nine months ended July 31, 2024 and 2023 were as follows:

Previous report — wording carried elsewhere

For the nine months ended July 31, 2024, we operated at an annualized production rate of approximately 31.1 MW in our Torrington, CT manufacturing facility, compared to an annualized production rate of 31.9 MW for the nine months ended July 31, 2023.

Previous report — wording carried elsewhere

Revenues from generation for the nine months ended July 31, 2024 totaled $38.0 million, which represents an increase of $9.0 million from revenue recognized of $29.0 million for the nine months ended July 31, 2023. The increase reflects revenue of $2.2 million generated by the Toyota Project, which became operational during the first quarter of fiscal year 2024, and revenue of $11.4 million generated by the Derby Projects, both of which became operational in December 2023, partially offset by lower revenue from other plants due to lower output resulting from routine maintenance activities. Generation revenues for the nine months ended July 31, 2024 and 2023 reflect revenue from electricity generated under our PPAs, the sale of renewable energy credits, and additionally for the nine months ended July 31, 2024, the sale of hydrogen from the Toyota Project.

Previous report — wording carried elsewhere

We currently have four projects with fuel sourcing risk, which are the Toyota Project, which requires procurement of RNG, and our 14.0 MW and 2.8 MW Derby Projects, and our 7.4 MW Yaphank Project, which require natural gas for which there is no pass-through mechanism. A two-year (through May of 2025) fuel supply contract has been executed for the Toyota Project. Six-year (through October 2029) fuel supply contracts have been executed for the 14.0 MW and 2.8 MW Derby Projects. We are currently in the midst of a seven-year contract (through September 2028) for our 7.4 MW Yaphank Project. The Company will look to extend the duration of these contracts should market and credit conditions allow. If the Company is unable to secure fuel on favorable economic terms, it may result in impairment charges to the Derby Project assets or the Yaphank Project asset and further impairment charges for the Toyota Project asset.

Previous report — wording carried elsewhere

Research and development expenses increased to $43.8 million for the nine months ended July 31, 2024 compared to $43.0 million for the nine months ended July 31, 2023. The increase is primarily due to an increase in spending, including spending for labor (including increased headcount) and materials, on the Company’s ongoing commercial development efforts related to our solid oxide power generation and electrolysis platforms and carbon separation and carbon recovery solutions compared to the comparable prior year period, partially offset by a shift in engineering resource allocation toward supporting the increase in funded Advanced Technologies activities described above.

Previous report — wording carried elsewhere

Interest income was $10.7 million and $11.1 million for the nine months ended July 31, 2024 and 2023, respectively. The decrease in interest income during the nine months ended July 31, 2024 was primary driven by lower investible cash balances compared to the nine months ended July 31, 2023. Interest income for the nine months ended July 31, 2024 and 2023 represents interest earned on money market investments and investments in U.S. Treasury Securities.

Previous report — wording carried elsewhere

We have not paid federal or state income taxes in several years due to our history of net operating losses, although we have paid foreign income and withholding taxes in Korea. Provision for income tax recorded for the nine months ended

Previous report — wording carried elsewhere

Net loss attributable to noncontrolling interests

Previous report — wording carried elsewhere

Net loss attributable to common stockholders and net loss per common share

Previous report — wording carried elsewhere

Net loss attributable to common stockholders represents the net loss for the period less the preferred stock dividends on the Series B Preferred Stock. For the nine months ended July 31, 2024 and 2023, net loss attributable to common stockholders was $87.0 million and $79.6 million, respectively, and net loss per common share for each of the periods presented was $0.19. The increase in net loss attributable to common stockholders is primarily due to the increased loss from operations, offset by the increased loss attributable to noncontrolling interests. The net loss per common share for the nine months ended July 31, 2024 benefited from the higher number of weighted average shares outstanding due to share issuances since July 31, 2023.

Previous report — wording carried elsewhere

On April 10, 2024, the Company entered into Amendment No. 1 (the “Amendment”) to the Open Market Sale Agreement, dated July 12, 2022 (the “2022 Sales Agreement”), with Jefferies LLC, B. Riley Securities, Inc., Barclays Capital Inc., BMO Capital Markets Corp., BofA Securities, Inc., Canaccord Genuity LLC, Citigroup Global Markets Inc., J.P. Morgan Securities LLC and Loop Capital Markets LLC (each, an “Agent” and together, the “Agents”) (the 2022 Sales Agreement

Previous report — wording carried elsewhere

as amended by the Amendment, the “Amended Sales Agreement”), with respect to an at the market offering program under which the Company may, from time to time, offer and sell shares of its common stock having an aggregate offering price of up to $300.0 million(exclusive of any amounts previously sold under the 2022 Sales Agreement prior to its amendment).

Previous report — wording carried elsewhere

During the three months ended July 31, 2024, approximately 95.2 million shares of the Company’s common stock were sold under the Amended Sales Agreement at an average sale price of $0.71 per share, resulting in gross proceeds of approximately $67.3 million before deducting sales commissions and fees, and net proceeds to the Company of approximately $65.9 million after deducting sales commissions totaling approximately $1.3 million and fees totaling approximately $0.1 million.

Previous report — wording carried elsewhere

To date, we have not achieved profitable operations or sustained positive cash flow from operations. The Company’s future liquidity, for the remainder of fiscal year 2024 and in the long-term, will depend on its ability to (i) timely complete current projects in process within budget, (ii) increase cash flows from its generation operating portfolio, including by meeting conditions required to timely commence operation of new projects, operating its generation operating portfolio in compliance with minimum performance guarantees and operating its generation operating portfolio in accordance with revenue expectations, (iii) obtain financing for project construction and manufacturing expansion, (iv) obtain permanent

Previous report — wording carried elsewhere

financing, long-term debt, tax equity and sale-leasebacks for our project asset portfolio, but there can be no assurance that such financing can be attained, or that, if attained, it will be retained and sufficient.

Previous report — wording carried elsewhere

During fiscal year 2022, we entered into a PPA with Trinity College in Hartford, Connecticut, for our 250 kW solid oxide fuel cell power generation system. Power and heat produced from the platform will be used at Trinity’s campus in Hartford, Connecticut to lower energy cost and enhance energy reliability and security. This project is currently under development and the solid oxide fuel cell power generation system is expected to be installed in fiscal year 2025. Modules for our solid oxide platform are manufactured at our manufacturing and research and development facility in Calgary, Alberta, Canada, and this project will be fully assembled and integrated at our facilities in Connecticut.

Previous report — wording carried elsewhere

Lenders. Additionally, the Company incurred legal fees of approximately $0.2 million in relation to the financing that was not deducted from the debt proceeds.

Previous report — wording carried elsewhere

arranger; and each of Liberty Bank, Amalgamated Bank and Connecticut Green Bank as lenders (collectively with Investec Lender and BMO Lender, the “Lenders”) for a term loan facility in an amount not to exceed $80.5 million (the “Term Loan Facility” and such term loan, the “Term Loan”) and a letter of credit facility in an amount not to exceed $6.5 million (the “LC Facility” and together with the Term Loan Facility, the “OpCo Financing Facility”).

Previous report — wording carried elsewhere

Bank. Taking into consideration the release of such funds, the total net proceeds to the Company from these transactions were approximately $46.1 million.

Previous report — wording carried elsewhere

The Financing Agreement contains certain reporting requirements and other affirmative and negative covenants which are customary for transactions of this type. Included in the covenants are covenants that: (i) the Yaphank Project Company

Previous report — wording carried elsewhere

On August 18, 2023, FuelCell Energy Finance Holdco, LLC (“Groton Holdco Borrower”), a wholly owned subsidiary of FCEF, which, in turn, is a wholly owned subsidiary of Parent, entered into: (i) a Credit Agreement (the “Groton Senior Back Leverage Credit Agreement”) with, by and among Liberty Bank, in its capacities as a lender (“Liberty Lender”),

Previous report — wording carried elsewhere

The preparation of financial statements and related disclosures in conformity with GAAP requires management to make estimates and assumptions that affect the reported amounts of assets, liabilities, revenues and expenses and the disclosure of contingent assets and liabilities. Estimates are used in accounting for, among other things, revenue recognition, lease