Skip to main content

SOUTHERN COPPER CORP

For the period ended Dec 31, 2024. Filed Mar 3, 2025.

View on SEC.gov

About this filing

A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.

FY2024 · Filed Mar 3, 2025

SCCO$167.27+1.1%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-K

Period ended 2023-12-31; filed 2024-02-29.

0001558370-24-002119

Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations

Current report: 10-K

Period ended 2024-12-31; filed 2025-03-03.

0001558370-25-002017

Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 212 previous paragraphs and 212 current paragraphs.

104 unchanged; 61 reworded; 45 added; 42 removed; 5 previous and 2 current paragraphs rearranged.

Tables are not compared: 47 previous and 47 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (45)

Current report

For 2025, we expect demand to grow around 4%, driven by economic measures announced in China to promote economic expansion; resilient consumption in the U.S. economy; and new demand on the back of the energy

Current report

transition and growth in artificial intelligence technologies. This positive outlook for demand may be impacted by U.S. import duties on China and other countries and by slow growth or even a recession in several European countries and emerging markets.

Current report

On the supply side, we expect growth to stand at about 3.0%. As of the beginning of 2025, we expect a market deficit for the year of approximately 250,000 tonnes. We estimate that inventories will cover about one week of world demand. In summary, even though we see some risks, particularly for demand in 2025, we are optimistic about the strong support copper market prices will have this year.

Current report

Net sales in 2024 totaled a record high of $11,433.4 million, reflecting a 15.5% increase compared to 2023. This performance was driven by higher prices for copper (+7.8% - LME), silver (+20.7%), and zinc (+5.0%), combined with increased sales volumes of copper (+5.5%), molybdenum (+7.9%), silver (+15.7%), and zinc (+44.6%). The significant rise in zinc sales volumes was primarily attributed to the Buenavista Zinc concentrator, which is operating at full capacity. These gains were partially offset by a decline in molybdenum prices (-10.6%), and by a downward adjustment of $77.6 million related to provisionally priced sales, reflecting a variance in open sales value at the end of 2024.

Current report

Mined zinc production rose 98.5% in 2024, mainly driven by increases in production at our Buenavista Zinc concentrator. This facility started operating at full capacity in the second quarter of 2024 and contributed around 141.8 million pounds of zinc over the year.

Current report

Mined silver production for 2024 rose 14.0% compared to the previous year. This growth was fueled by higher production across all our operations, driven primarily by improved ore grades, growth in recoveries, and a larger volume of processed mineral.

Current report

For the year 2024, our per pound operating cash cost before by-product revenues was $2.13, reflecting a 2.5% decrease compared to 2023. This improvement was primarily due to the unit cost effect of a 6.3% increase in production and a reduction of 2.2 cents in treatment and refining charges.

Current report

Operating cash cost per pound net of by-product revenues fell 13.9%, from $1.03 in 2023 to $0.89 in 2024. This reduction was mainly driven by a 4-cent decrease in production costs and by a unit cost effect that was generated by both an increase in pounds of copper produced and a 9-cent increase in by-product revenue credits.

Current report

Minera Mexico is planning to invest more than $600 million in 2025 at its open pit, metallurgical facilities and underground mines. 50% of this investment will be used to guarantee the viability of long-term operations by actively modernizing and updating assets. About 43% of the investment will target improvements in water usage and tailings management to ensure safety and efficiency at our operations. The remaining funds will be invested in efforts to bolster optimization and growth.

Current report

The Company has several projects in its Mexican pipeline that may boost organic growth if they are found to be of value for both stakeholders and the communities in which we operate. These projects are Angangueo, Chalchihuites and the Empalme Smelter, which could bolster our position as a fully integrated copper producer.

Current report

Tia Maria will generate significant revenues for the Arequipa region from day one of its operations. At current copper prices, we expect to export $17.5 billion and contribute $3.4 billion in taxes and royalties during the first 20 years of operation. After a thoughtful and detailed review, the new project budget has been set at $1,802 million.

Current report

Project update: As of December 31, 2024, the Company had generated more than 614 jobs, 492 of which were filled with local applicants. To the fullest extent possible, we intend to fill the 3,500 jobs estimated to be required during Tia Maria’s construction phase prioritizing workers from the Islay province. When we start operations in 2027, the project will generate 764 direct jobs and 4,800 indirect jobs.

Current report

This year, we expect construction to begin. Work will initiate with construction of roads and access points to the project as well as railways; installation of a temporary camp; massive earthmoving efforts; and mine clearing activities. We have made progress in our efforts to delimit the property and have installed a live fence covering 59 kilometers to date.

Current report

Project update: The Company has completed the environmental baseline study for the mine. Currently, more detailed engineering is being conducted for the concentrator, SX-EW plant as well as for water desalination, logistics infrastructure and power delivery.

Current report

Project update: As of December 31, 2024, total progress for exploration on the project was 35%. We had drilled 140,130 meters and obtained 45,762 core samples for chemical analysis. Diamond drilling will continue to provide information to interpret geological sections related to mineralization; conduct geological modeling; and evaluate mineral resources. Geo-metallurgical studies are currently underway, and hydrological and hydrogeological studies have also begun; the geotechnical study is scheduled to begin shortly.

Current report

Southern Copper Corporation, among the top 10 mining companies with the highest ratings for sustainability in 2024. Corporate Sustainability Assessment (CSA) of S&P Global, which publishes an annual performance review of the sustainability practices of 13,000 companies from across the globe, situated Southern Copper Corporation among the best-rated companies of 248 companies in the Mining and Metals sector in 2024. With a score that is twice the average of our peers in the mining industry, SCC’s sustainability rating rose 9 points year-over-year. This marks our sixth consecutive year on the Dow Jones’s Sustainability Index, and we have also been included in the Sustainability Emerging Markets Index.

Current report

Occupational safety and health of our workforce. Operating discipline and the strength of our preventive safety culture led to a 28% reduction in the number of employee accidents involving lost-time injuries in 2024. These results compare favorably with the rates reported by other companies in the mining sector.

Current report

Tía María: support for agriculture benefits communities. In the area around our Tía María mining project in Arequipa, Peru, we are implementing the “Technology for Agriculture” program with the participation of 28 out of 38 organizations

Current report

from the Tambo Valley. With a 14% increase in crop productivity, nearly 95% of the families of the valley have benefited from this program.

Current report

Our current social programs in Islay help reduce the costs of agricultural production by improving productivity with cutting-edge technology. Additionally, we are working to provide internet access to 4,600 school students. On top of this, we are committed to developing health facilities, high performance schools, research centers and roads in the Arequipa region via the “works for taxes” mechanism.

Current report

Best international practices for tailings management. With a preventive focus and an eye on minimizing risks, we are making progress in our efforts to implement the Global Industry Standard on Tailings Management of the International Council on Mining and Metals (ICMM) at our main operations. We have completed a gap analysis of our open pit mining operations and continue efforts to establish that all of SCC’s facilities comply with this standard.

Current report

The safety, health and well-being of our employees are the bedrock of SCC’s value system and our top priorities. We are committed to creating a safe and healthy work environment for our employees, contractors and suppliers, whether they work at our facilities or in surrounding areas. Workplace safety is of utmost importance to SCC and is a shared responsibility; all employees are required to comply with established policies and procedures to safeguard their integrity and that of our facilities. For more details on our health and safety performance, please refer to Grupo Mexico's Sustainability Report at https://www.gmexico.com/en/Pages/development.aspx. We are referring our investors to Grupo Mexico's website for informative purposes only. We do not intend for this internet link to be an active link or to otherwise incorporate the contents of the website into this Report on Form 10-K.

Current report

Operating discipline and the strength of our preventive safety culture led to a reduction in the number of employee accidents involving lost-time injuries in 2024 by more than a quarter than those in in 2023. These results compare favorably with the rates reported by other companies in the mining sector.

Current report

In 2024, in the field of Health, SPCC was recognized by Peru’s Ministry of Labor (Ministerio de Trabajo del Perú) with first place in the 2024 Good Practices Contest. The Company was recognized in the category of Promotion and Care of Mental Health, which awards companies that make outstanding efforts to identify and address issues such as depression and anxiety.

Current report

Another significant advance is the Behavioral Safety Program, which is being implemented across SCC’s units. This program focuses on promoting safe practices among employees so that the human factor can be leveraged to ensure

Current report

compliance and drive proactive behaviors. This fosters an environment of mutual assistance and collective vigilance among workers. This program aims to strengthen safe behaviors at our operations and reduce accident rates.

Current report

We continue implementing the Critical Risk Registry within SCC. This tool helps us manage environmental and safety risks in our operations, enabling us to identify, prevent, mitigate, and remediate undesirable events that could affect the integrity of our personnel and our relationships with communities.

Current report

We continue to prioritize collaboration with the Peruvian government to close gaps in educational infrastructure through the Works for Taxes investment model. As part of our commitment, we finished the “Colegios de Alto Rendimiento” (“COAR”) or schools of excellence in Tacna and Moquegua and began studies for the COAR Apurímac. In 2025, the Arequipa and Cajamarca COAR projects are also expected to begin. Once these projects are complete, we will have built fiveColegios de Alto Rendimiento to benefit 1,500 outstanding students from vulnerable areas. With these investments, SCC remains the main private investor in Peru in national educational infrastructure.

Current report

We also consolidated The Youth Orchestras and Choirs program promoted by SCC, benefiting 1,825 students in 14 communities in Mexico and Peru. In 2024, 65 artistic performances were held, including a concert at thePalacio de Minería featuring the Mining Symphony Orchestra and 68 student performers. Additionally, in collaboration with the Sonoran Institute of Culture, the Museum of Art of Sonora (MUSAS) is hosting the photographic exhibitionLearning to Look. This exhibition, which showcases the results of three years of portraits from the Traveling Photography Workshop, highlights traditions, landscapes and daily lives of mining communities.

Current report

As part of our emission reduction efforts, the Company started receiving renewable energy from theFenicias wind park, operated byGrupo Mexico Infraestructura, in August 2024. Once this wind park supplies its full capacity to our mining operations, SCC will reduce its CO 2 emissions approximately 250,000 tonnes per year, which is equivalent to 7% of our carbon footprint. Additionally, in the first quarter of 2024, we received clean energy certificates from one of our electricity suppliers in Peru. With this, all the electrical energy we consumed in Peru in 2023 came from renewable sources. Measurements indicate that consumption of renewable electrical energy at SCC increased from 23% to 36% in

Current report

2023, which means we have already hit our 2027 target to ensure that 25% of our electricity supply is derived from renewable sources. Over the same period, greenhouse gas emissions dropped 7.5% in 2023 compared to 2022.

Current report

In the first quarter of 2024, members of the World Economic Forum's climate governance initiative, which is known as Chapter Zero, gave SCC board members and executives a briefing about the roles and responsibilities that senior executives need to consider when managing the risks and opportunities generated by climate emergency.

Current report

Net sales in 2024 totaled a record high of $11,433.4 million, reflecting a 15.5% increase compared to 2023. This performance was driven by higher prices for copper (+7.8% - LME), silver (+20.7%), and zinc (+5.0%), combined with increased sales volumes of copper (+5.5%), molybdenum (+7.9%), silver (+15.7%), and zinc (+44.6%). The significant rise in zinc sales volumes was primarily attributed to Buenavista Zinc concentrator, which is operating at full capacity. However, these gains were partially offset by a decline in molybdenum prices (-10.6%). Additionally, net sales in 2024 were negatively impacted by downward adjustments of $77.6 million related to provisionally priced sales, reflecting the increase in metal prices.

Current report

2024-2023: Operating costs and expenses were $5,878.7 million in 2024 compared to $5,703.5 million in the same period of 2023. The increase of $175.2 million was primarily due to:

Current report

Net income attributable to SCC in 2024 amounted to $3,376.8 million, a 39.2% increase from the $2,425.2 million reported in 2023. The rise in net income for 2024 was largely driven by higher metal prices and increased sales volumes for our main products.

Current report

2024-2023: Net sales in 2024 increased by $750.3 million compared to 2023. This growth was primarily driven by higher copper (+7.8% LME) and silver (+20.7%) prices, as well as increased sales volumes of copper (+10.5%), molybdenum (+33.4%), and silver (+27.4%). However, this was slightly offset by a decline in molybdenum (-10.6%) prices. Additionally, net sales in 2024 were negatively impacted by downward adjustments of $13.7 million related to provisionally priced sales, reflecting the rise in metal prices.

Current report

2024-2023: Operating costs and expenses were $2,512.1 million in 2024 compared to $2,380.9 million in the same period of 2023. The increase of $131.2 million was primarily due to:

Current report

2024-2023: Net sales in 2024 increased by $754.7 million compared to 2023. This growth was primarily driven by higher copper (+9.3% - COMEX) and silver (+20.7%) prices; higher sales volumes of copper (+3.4%), silver (+19.7%); and the $137.3 million in zinc sales contributed by startup at the Buenavista zinc concentrator in the first quarter of 2024. This was slightly offset by a decline in molybdenum prices (-10.6%) and volumes sold (-7.2%).

Current report

2024-2023: Operating costs and expenses were $2,932.9 million in 2024 compared to $2,787.5 million in the same period of 2023. The increase of $145.4 million was primarily due to:

Showing the first 40 of 45 passages. Open the source sections for the rest.

Removed paragraphs (42)

Previous report

copper production was announced by some producers, market expectations for a surplus ceased and were replaced with concerns about potential deficits due to the extremely low available inventories.

Previous report

Even though significant uncertainty continues to exist regarding global GDP growth, which will be impacted by a slow recovery of the Chinese economy, a recession in Europe and a soft landing or minor recession in the US, we believe copper prices should remain stable through 2024.

Previous report

Net sales in 2023 totaled $9,895.8 million, which represented a slight decrease compared to net sales in 2022. This decrease was influenced by lower copper (-3.8% - LME) and zinc (-24.1%) prices, along with a reduction in the sales volumes of silver (-4.3%) and zinc (-1.4%). The aforementioned was partially offset by higher sales volumes for copper (+2.2%) and molybdenum (+2.3%) and an uptick in prices for molybdenum (+27.5%) and silver (+7.6%). Additionally, net sales in 2023 were negatively impacted by downward adjustments of $406.0 million arising from provisionally priced sales due to decreases in metal prices. Our estimates indicate that 2023 sales were also affected by a larger copper anode inventory in process at year-end. Net sales in 2022 of $10.0 billion were close to our historical high in 2021 of $10.9 million.

Previous report

In the second half of 2023, we experienced a reduction of fresh water at our Buenavista operation, which was generated by inadequate rainfall and a lack in the reception of permits to build a pipeline (approximately 20 km) to transport water from the wells to the operations and nearby townsites. For 2024, the Company has decided to transport water through other means to secure the supplies required to ensure that Buenavista can operate at full capacity for copper production and the ramp up of new zinc concentrator operations.

Previous report

Mined zinc production rose 9.2 % in 2023, driven by increases in production at our Santa Barbara (+29.0%) and Charcas (+9.0%) mines due to higher grades.

Previous report

Mined silver production fell 0.8 % in 2023 in YoY terms; this was mainly due to lower production at our Mexican operations, which was partially offset by an increase in production at our Peruvian operations.

Previous report

As seen in the table above, our per pound cash cost before by-product revenues in 2023 was 8.4% higher than the figure in 2022. This result was mainly attributable to an increase in production costs. Our cash cost per pound net of by-product

Previous report

revenues for 2023 was 32.6% above the figure for the same period of 2022 and was mainly attributable to an increase in the production cost of 16.2 cents per pound and a reduction of 8 cents in by-product revenue credits.

Previous report

Buenavista Zinc - Sonora: This project is located within the Buenavista deposit, where we have built a new concentrator plant. This facility has a production capacity of 100,000 tonnes of zinc and 20,000 tonnes of copper per year. When operating, the concentrator will double the Company’s zinc production capacity and will provide more than 2,000 jobs on the operating front.

Previous report

Project update: the capital budget for the project is $439 million, most of which has already been invested. Progress is 99%; we have initiated the commissioning process. The ramping up of the plant began in the first quarter of 2024 after technical adjustments to the concentrator. We expect to produce 54,500 tonnes of zinc and 11,900 tonnes of copper in 2024 and an average of 90,200 tonnes of zinc and 20,700 of copper per year in the next five years.

Previous report

Pilares - Sonora: Located six kilometers from La Caridad, this is currently an open-pit mine operation with an annual production capacity of 35,000 tonnes of copper in concentrate. This project will significantly improve the overall mineral ore grade (considering the 0.78% expected from Pilares with 0.29% from La Caridad).

Previous report

Project update: The budget for Pilares is $176 million, of which $145 million has been invested. Pilares is fully integrated in our operations and is delivering copper ore to the La Caridad concentrator according to plans. Consequently, this will be the last time that we report on Pilares as a project.

Previous report

We reiterate our view that the initiation of construction activities at Tia Maria will generate significant economic opportunities for the Islay province and the Arequipa region. Given the current Peruvian economic situation, it is crucial to move ahead on projects that will stimulate a sustainable growth cycle. We expect to begin the construction phase of the project in the near future. We will make it a priority to hire local labor to fill the 9,000 jobs that we expect to generate during Tia Maria’s construction. Additionally, from day one of our operations, we will generate significant contributions to revenues in the Arequipa region.

Previous report

Project update: The Company has completed the environmental baseline study for the mine, concentrator and industrial facilities and will proceed to submit the Environmental Impact Statement (Manifestacion de Impacto Ambiental “MIA”) to the Secretary of Environment and Natural Resources “SEMARNAT” to request the respective environmental impact permits. The Company is currently preparing studies for the port, power lines, townsites and auxiliary facilities.

Previous report

Project update: As of December 31, 2023, we had drilled 63,000 meters and obtained 20,137 core samples for chemichal analysis. Geological modeling, cross section interpretation, and drilling logging are currently underway. For 2024, the Company expects to complete the diamond drilling program; geological modeling; and resource evaluation. We will also begin hydrogeological and geotechnical studies and assess the results of metallurgical testing at the deposit.

Previous report

Our Special ESG Committee, named in 2022, has continued to roll out efforts to implement and promote best ESG practices at the Company.

Previous report

In April 2023, Grupo Mexico issued its 2022 Sustainability Development Annual Report, which includes detailed information about Southern Copper’s efforts on the social, environmental, and corporate governance fronts. To provide more clarity regarding Southern Copper's performance on ESG issues, we have published a supplement to the 2022

Previous report

Sustainable Development Report and have also incorporated new topics on our sustainable development web-page to address biodiversity, our people, human rights and the supply chain.

Previous report

In 2023, we continued to make progress in our sustainability ratings. The results registered by S&P Global in its Corporate Sustainability Assessment (CSA) indicate that Southern Copper Corporation had achieved a place among the top 10% of performers in the mining sector with a rating that exceeded the industry average by 100%. These results reflect our ongoing commitment to improving our sustainability practices and maintaining the Company's inclusion in the Dow Jones Sustainability Index (DJSI) for the Latin American region. This year marks our fifth consecutive year in the DJSI. In 2023, SCC achieved some of the highest scores in the sector for key CSA indicators, including transparency and disclosure, occupational safety and health, operations closure, and human capital development.

Previous report

Regarding the Climate Disclosure Project (CDP), we maintained a B score for the “Climate change” and “Water security” questionnaires. At the behest of our investors, we expanded our responses to include the “Forests” questionnaire, however as of the date of publication of this report, the score was not available.

Previous report

The implementation and promotion of best practices has helped SCC secure and maintain a place on the S&P/BVL Peru General ESG Sustainability Index of the Stock Exchange of Lima.

Previous report

The health and safety of our employees is our priority. Therefore, respecting human rights and preserving the health, safety and wellbeing of our employees and contractors constitute core values at SCC and are embedded in all of our activities. Safety at work is of paramount importance to SCC and is everyone’s responsibility. All employees are aware of this fact and are expected to follow policies and procedures to ensure physical integrity and preserve our installations. Please consult Grupo Mexico Sustainability Report at https://www.gmexico.com/en/Pages/development.aspx for further information on SCC’s performance with regard to health and safety.

Previous report

In 2023, our unit in Ilo, located in Moquegua, Peru, achieved the first place in the Smelter and Refinery category of the XXVI Concurso Nacional de Seguridad Minera (National Competition for Mining Safety) organized by Instituto de Seguridad Minera (the Institute of Mining Safety). This distinction recognizes SCC’s performance with regard to indicators of our employees’ occupational safety and health and is a reflection of our on-going commitment to ensuring the sustainability of our operations.

Previous report

Additionally, our Buenavista del Cobre unit in Sonora received “Safe and Healthy Work Environments” (“ELSSA”) recognition from the Mexican government after successfully passing an audit conducted by the Mexican Social Security Institute. All of our other Mexican units also hold this recognition, which is awarded to companies that implement effective strategies and preventive actions for occupational health and safety. We continue to make progress with our Critical Risk Registry and the performance levels of the controls in place to prevent or mitigate undesirable events have improved. To achieve this, we have involved the heads of each operating unit in the process to establish and continuously monitor controls. All results are reported to managing executives on a monthly basis to facilitate supervision and subsequent monitoring by the Board of Directors.

Previous report

Regarding risk prevention and management, all of SCC’s operating units hit a milestone set in 2018 to obtain ISO 45001 for occupational health and safety management. Our efforts to prevent security risks are supported by our ISO systems

Previous report

We continue to make progress in the development of our Critical Risk Registry. This tool strengthens environmental and safety risk management by increasing the visibility of these components at all levels of the organization. The registry creates a knowledge base for informed decision making and ensures rigorous follow-up on controls for prevention and mitigation to avoid or respond to unwanted events.

Previous report

In 2023, we reforested three times the area impacted in the same period (1,437 hectares replanted versus 446 hectares impacted) and implemented works to retain 10,722 tons of soil that would have otherwise been lost to erosion in the state of Sonora, Mexico. For the third consecutive year, we have reforested an area larger than the area impacted. These actions are within the framework of our strategy to achieve zero net deforestation and generate a net positive impact on biodiversity, particularly in areas close to our operations.

Previous report

The Company also prioritized educational infrastructure development in Peru and will invest in it upon successful previous initiatives in Moquegua and Tacna. As part of our on-going commitment, the Company is actively expanding educational infrastructure to benefit the community under the Works for Taxes modality. This effort includes setting up five high-performance schools (Colegios de Alto Rendimiento - COAR) for 1,500 students to strengthen the capacities of outstanding students in the state educational circuit. Two schools are currently under construction in the Moquegua and Tacna regions. These investments have made SCC the primary private investor in Peru in national educational infrastructure.

Previous report

In Mexico, we recently renovated two community centers (called Casa Grande) in Santa Barbara, Chihuahua and Charcas, San Luis Potosi. These facilities allow us to double our capacity and improve the quality of our services. Both centers are equipped with a library, recreational area, audiovisual room, computer centers, physical activaty spaces, areas for temporary exhibits, and green spaces. We currently operate 29 community centers that provided services to 286,000 people during 2023, in Mexico and Peru, with social programs. We believe these efforts positively impact the human development and quality of life of the residents in the communities where we work.

Previous report

In 2023, we served more than 900 women from communities close to our operations in Southern Peru via our Community Wellbeing Program, by which we conducted a mobile health campaign to prevent breast and uterine cancer.

Previous report

Furthermore, the Youth Orchestras promoted by SCC were recognized at the Mexican Polymetallic Seminar in 2023. These orchestras support 1,646 students in Mexico and Peru. Additionally, in collaboration with the Instituto de Cultura del Estado, we held our first exhibition of the Traveling Workshop for Documentary Film at the Cineteca in the State of Sonora, Mexico. During this event, 17 original short films, which were produced by some of the 747 students from communities that participated in the workshop, were screened.

Previous report

As part of the CDP evaluation, in 2023 we calculated for the first time the increased revenues resulting from the increasing demand of copper in the medium and in the long term, partly as a result of the energy transition. The International Copper Association (ICA) highlights that the copper industry will be essential in the transition towards a low-carbon economy, since it produces an essential metal for the manufacture of clean technologies that will be used intensively to reduce greenhouse gas emissions globally. In this context, the ICA expects the demand of copper will practically double by 2050. For this reason, we consider our business activities as the main transition opportunity for SCC, as copper sales will translate into greater development for the sector and our company.

Previous report

2023-2022: Net sales in 2023 totaled $9,895.8 million, which represents a slight decrease compared to 2022 net sales of $10,047.9 million. This decrease was driven by lower copper (-3.8% - LME) and zinc (-24.1%) prices, along with a reduction in the sales volumes of silver (-4.3%) and zinc (-1.4%). This impact was partially offset by increased sales volumes for copper (+2.2%) and molybdenum (+2.3%) and by better prices for molybdenum (+27.5%) and silver (+7.6%). Net sales in 2023 were adversely affectedby downward adjustments of $406.0 million arising from provisionally priced sales due to decreases in metal prices.

Previous report

2023-2022: Operating costs and expenses in 2023 increased $91.4 million, compared to 2022, primarily due to:

Previous report

Our net income attributable to SCC in 2023 was $2,425.2 million, compared to $2,638.5 million in 2022. The decrease in net income attributable to SCC in 2023 was mainly fueled by a drop in copper prices.

Previous report

2023-2022: Net sales in 2023 fell $54.2 million versus the figure in 2022. This decrease was primarily influenced by a reduction in copper prices (-3.8% - LME) and lower sales volumes for molybdenum (-11.5%) and silver (-3.3%). The impact of these factors was partially mitigated by an uptick in sales volumes for copper (+1.6%) and higher prices for molybdenum (+27.5%) and silver (+7.6%). Net sales in 2023 were also adversely affected by an annual accounting adjustment of $185.2 million, which reflects the impact of lower metal prices on sales.

Previous report

2023-2022: Operating costs and expenses in 2023 decreased by $59.8 million compared to 2022, which was primarily due to:

Previous report

2023-2022: Net sales in 2023 dropped $210.3 million compared to the figure reported at the end of 2022. This decrease was primarily driven by reduced sales volumes for copper (-1.3%) and silver (-11.2%), as well as a decrease in copper prices (-3.8% – LME). However, this impact was partially offset by increased sales volumes for molybdenum (+12.8%) and higher prices for both molybdenum (+27.5%) and silver (+7.6%). In addition, the net sales in 2023 were adversely affected by an annual accounting adjustment of $220.8 million, reflecting the impact of lower metal prices on sales.

Previous report

2023-2022: Operating costs and expenses in 2023 decreased by $30.4 million compared to 2022, which was mainly attributable to:

Showing the first 40 of 42 passages. Open the source sections for the rest.

Reworded paragraphs (61)

Previous wording

We believe we hold one of the world’s largest copper reserves and resources positions. As of December 31, 2023, our copper mineral reserves, calculated at a copper price of $3.30 per pound, totaled 97,082 million pounds of contained copper, at the following locations:

Current wording

We believe we hold one of the world’s largest copper reserves and resources positions. As of December 31, 2024, our copper mineral reserves, estimated at a copper price of $3.30 per pound, totaled 112,668 million pounds of contained copper, distributed in the following locations:

Previous wording

For 2024, we believe that prices will hold at the current level of about $19.00 per moly pound reflecting the supply/demand dynamics in a context of lower Asian production.

Current wording

For 2025, we believe that prices will hold at the current level of about $21.00 per pound due to a balanced market.

Previous wording

We also expect to produce 25,500 tonnes of molybdenum, which represents a decrease of 4.9% compared to 2023 production levels. In 2024, we expect to produce 20.7 million ounces of silver, and increase of 12.2% compared with 2023 production. Additionally, we expect to produce 117,800 tonnes of zinc from our mines, up 79.8% from 2023´s production level. This growth will be driven by start-up at the Buenavista Zinc concentrator (+54,400 tonnes). For 2025 and the coming years, we expect to produce over 170,000 tons of zinc per year on average.

Current wording

Regarding by products, we expect to produce 171,700 tonnes of zinc from our mines, up 32.0% from 2024 production level. This growth will be driven by the Buenavista Zinc concentrator (+40,700 tonnes). For 2025 and the coming years, we expect to produce over 170,000 tons of zinc per year on average. We expect to produce 26,200 tonnes of molybdenum, which represents a decrease of 9.7% compared to 2024 production levels. For silver, we expect to produce 23.1 million ounces of this metal, an increase of 10.1% compared to last year’s production.

Previous wording

For 2024, the Board of Directors approved a capital investment program of $1,103.7 million.

Current wording

For 2025, the Board of Directors approved a capital investment program of $1,598.0 million.

Previous wording

The slight increase in costs of sales in 2023 was driven primarily by higher expenses in various areas. While there was a slight increase in labor costs, contributing to a modest upward trend, the main sources of variation in costs came from higher expenses related to operating contractors and a slight increase in fuel costs, along with additional expenditures in sales expenses and inventory consumption. These results were mitigated by a drop in expenses, diven primarily by a decrease in copper purchased from third parties and a reduction in worker participation. In this context, the overall impact on the costs of sales was relatively moderate, with opposing factors balancing out variations.

Current wording

Costs of sales (exclusive of depreciation, amortization and depletion) increased slightly in 2024 driven primarily by upticks in various areas. The main sources of variation in costs came from higher expenses related to repair materials, labor and fuel costs. These results were partially mitigated by a decrease in copper purchased from third parties, energy costs and inventory variance. In this context, the overall impact on the cost of sales was relatively moderate, as opposing factors largely balanced out fluctuations, resulting in a 3.3% increase compared to the figures recorded in 2023.

Previous wording

In 2023, the net income attributable to SCC was $2,425.2 million, reflecting a 8.1% decrease from the 2022 net income. This decline was primarily driven by increased costs of sales and a minor reduction in sales volumes toward year-end. Net income attributable to SCC in 2022 was 22.3% below 2021’s net income; this was mainly due to higher costs of sales and a slight reduction in sales volumes.

Current wording

In 2024, net income attributable to SCC was $3,376.8 million, reflecting a 39.2% increase from the 2023 net income. This increase was primarily driven by increased sales volumes and a minor increase in interest income. Net income attributable to SCC in 2023 was 8.1% below 2022’s net income; this was mainly due to a reduction in sales volumes and a slight increase in costs of sales.

Previous wording

Copper mine production in 2023 increased 1.8% to 2,008.4 million pounds. This increase was primarily driven by an uptick in production levels at Toquepala (+11.6%; higher ore grades), Cuajone (+6.4%; higher ore grades) and IMMSA (+4.7%; higher ore grades). This was partially offset by reduction in production at the Buenavista and La Caridad mines which was mainly driven by a drop in ore grades, mineral processing and recovery.

Current wording

Copper mine production in 2024 increased 6.9% to 2,147.0 million pounds. This increase was primarily driven by an uptick in production levels at all our operations: Toquepala (+10.8%; higher ore grades and recoveries), Cuajone (+10.5%; higher volume of mineral processed), La Caridad (+5.6%; higher ore grades), Buenavista (+4.0%; higher ore grades and the contribution of Buenavista Zinc operations) and IMMSA (+2.0%; higher ore grades).

Previous wording

Molybdenum production increased 2.3 % to 59.2 million pounds, up from 57.8 million pounds in 2022. This increase was due to higher production at all our mines, with the exception of Toquepala mine (-17.8%), where grades and recoveries dropped.

Current wording

Molybdenum production increased 8.1% to 63.9 million pounds, up from 59.2 million pounds in 2023. This increase was due to higher production at all our mines, with the exception of La Caridad mine (-14.5%), where grades and recoveries dropped.

Previous wording

In our calculation of operating cash cost per pound of copper produced, we exclude depreciation, amortization and depletion, which are considered non-cash expenses. Exploration is considered a discretionary expenditure and is also excluded. Workers’ participation provisions are determined on the basis of pre-tax earnings and are also excluded. Additional exclusions from operating cash costs are items of a non-recurring nature and the mining royalty charge as it is based on various calculations of taxable income, depending on which jurisdiction, Peru or Mexico, is imposing the

Current wording

In our calculation of operating cash cost per pound of copper produced, we exclude depreciation, amortization and depletion, which are considered non-cash expenses. Exploration is considered a discretionary expenditure and is also excluded. Workers’ participation provisions are determined on the basis of pre-tax earnings and are also excluded. Additional exclusions from operating cash costs are items of a non-recurring nature and the mining royalty charge as it is based on various calculations of taxable income, depending on which jurisdiction, Peru or Mexico, is imposing the charge. We believe these adjustments will allow our management and stakeholders to see a presentation of our controllable cash cost, which we believe is one of the lowest of all copper-producing companies of similar size.

Previous wording

We are subject to market risks arising from the volatility of copper and other metals prices. For instance, during the period from January 2014 through December 2023, the London Metal Exchange (LME) copper settlement price varied from a low of $1.96 per pound in 2016 to a record high of $4.87 per pound in 2022, and the Metals Week Molybdenum Dealer Oxide weekly average price ranged from a low of $4.30 per pound in 2015 to a high of $38.50 per pound in 2023. Metal prices historically have been subject to wide fluctuations and are affected by numerous factors beyond our control, as described further in Item 1ARisk Factors. These factors, which affect each commodity to varying degrees, include international economic and political conditions, levels of supply and demand, the availability and cost of substitutes, inventory levels maintained by producers and others and, to a lesser degree, inventory carrying costs and currency exchange rates. In addition, the market prices of certain metals have on occasion been subject to rapid short-term changes due to economic concerns and financial investments.

Current wording

We are subject to market risks arising from the volatility of copper and other metals prices. For instance, during the period from January 2015 through December 2024, the London Metal Exchange (LME) copper settlement price varied from a low of $1.96 per pound in 2016 to a record high of $4.92 per pound in 2024, and the Metals Week Molybdenum Dealer Oxide weekly average price ranged from a low of $4.30 per pound in 2015 to a high of $38.50 per pound in 2023. Metal prices historically have been subject to wide fluctuations and are affected by numerous factors beyond our control, as described further in Item 1ARisk Factors. These factors, which affect each commodity to varying degrees, include international economic and political conditions, levels of supply and demand, the availability and cost of substitutes, inventory levels maintained by producers and others and, to a lesser degree, inventory carrying costs and currency exchange rates. In addition, the market prices of certain metals have on occasion been subject to rapid short-term changes due to economic concerns and financial investments.

Previous wording

For 2024, assuming that expected metal production and sales are achieved; 2023 tax rates are unchanged and giving no effects relative to potential hedging programs, metal price sensitivity factors indicate the following change in estimated annual net income attributable to SCC resulting from metal price changes:

Current wording

For 2025, assuming that expected metal production and sales are achieved; 2024 tax rates are unchanged and giving no effects relative to potential cost changes, metal price sensitivity factors indicate the following change in estimated annual net income attributable to SCC resulting from metal price changes:

Previous wording

Capital Investment Program: We made capital investments of $1,008.6 million in 2023 and $948.5 million in 2022. In general, the capital investments and projects described below are intended to increase production, decrease costs or address social and environmental commitments.

Current wording

Capital Investment Program: We made capital investments of $1,027.3 million in 2024 and $1,008.6 million in 2023. In general, the capital investments and projects described below are intended to increase production, decrease costs or address social and environmental commitments.

Previous wording

In 2024, we plan to invest $1,103.7 million in capital projects. In addition to our ongoing capital maintenance and replacement spending, our principal capital programs include the following:

Current wording

In 2025, we plan to invest $1,598.0 million in capital projects. In addition to our ongoing capital maintenance and replacement spending, our principal capital programs include the following:

Previous wording

El Pilar - Sonora: This low-capital intensity copper greenfield project is strategically located in Sonora, Mexico, approximately 45 kilometers from our Buenavista mine. Its copper oxide mineralization contains estimated proven and probable reserves of 317 million tonnes of ore with an average copper grade of 0.249%. We anticipate that El Pilar will operate as a conventional open-pit mine with an annual production capacity of 36,000 tonnes of copper cathodes. This operation will use highly cost efficient and environmentally friendly SX-EW technology. The budget for El Pilar is $310 million.

Current wording

El Pilar - Sonora: This low-capital intensity copper greenfield project is strategically located in Sonora, Mexico, approximately 45 kilometers from our Buenavista mine. Its copper oxide mineralization contains estimated proven and probable reserves of 317 million tonnes of ore with an average copper grade of 0.249%. We anticipate that El Pilar will

Previous wording

Project update: The results from experimental pads in the leaching process have confirmed adequate levels of copper recovery and we are evaluating different options to drive optimization. The basic engineering study has been completed and the Company is engaging in project development and onsite environmental activities. Project engineering is being developed by an external engineering and technology company. Mine life is estimated at 13 years.

Current wording

The results from experimental pads in the leaching process have confirmed adequate levels of copper recovery and we are evaluating different options for optimization. The Company is engaging in project development and on-site environmental activities. Mine life is estimated at 13 years.

Previous wording

Tia Maria - Arequipa: This greenfield project, located in Arequipa, Peru, will use state of the art SX-EW technology with the highest international environmental standards to produce 120,000 tonnes of SX- EW copper cathodes per year. The estimated capital budget for the project is $1.4 billion.

Current wording

Tia Maria - Arequipa: This greenfield project, located in Arequipa, Peru, will use state of the art SX-EW technology with the highest international environmental standards with a capacity of 120,000 tons of SX- EW copper cathodes per year.

Previous wording

Quebrada Honda dam expansion – Tacna: This project aims to enlarge the main and lateral dams in Quebrada Honda and includes the relocation and repowered of some facilities due to dam growth and implementation of other facilities for water recovery, among other factors. As of December 31, 2023, the drainage works and removal of Eolic material for the main and lateral dam, as well as complementary operational workshad been completed. We have also installed two cyclone nests for the main dam, which are currently operating. Additionally, purchases are pending for equipment for tailings hauling. We intend to build administrative facilities down the line. This project has a total budget of $165.0 million, of which we have invested $152.3 million as of December 31, 2023.

Current wording

Quebrada Honda dam expansion – Tacna: This project aims to enlarge the main and lateral dams in Quebrada Honda and includes the relocation and repowering of some facilities due to dam growth and development of other facilities for water recovery, among other factors. As of December 31, 2023, drainage works, removal of Eolic material for the main and lateral dam, and complementary operational workhad been completed. We have also installed two cyclone nests for the main dam, which are currently operating. Additionally, in 2024, equipment purchased to haul tailings arrived on site for operational use. To align with the increase in size of the tailings dam, we intend to build newadministrative facilities down the line. As of December 31, 2024, this project had been completed with an investment of $154.3 million, out of a total budget of $165.0 million.

Previous wording

We have a number of other projects that we may develop in the future. We continuously evaluate new projects on the basis of our long-term corporate objectives, strategic and operating fit, expected return on investment, required investment, estimated production, estimated cash-flow profile, social and environmental considerations, among other

Current wording

We have a number of other projects that we may develop in the future. We continuously evaluate new projects on the basis of our long-term corporate objectives, strategic and operating fit, expected return on investment, required investment, estimated production, estimated cash-flow profile, social and environmental considerations, among other factors. All capital spending plans will continue to be reviewed and adjusted to respond to changes in the economy and market conditions.

Previous wording

El Arco - Baja California: This is a world-class copper deposit located in the central part of the Baja California peninsula with ore reserves of over 1,230 million tonnes with an average ore grade of 0.40% and 141 million tonnes of leach material with an average ore grade of 0.27%. The project includes an open-pit mine with a combined concentrator and SX-EW operations. Annual production is expected to total 190,000 tonnes of copper and 105,000 ounces of gold.

Current wording

El Arco - Baja California: This is a world-class copper deposit located in the central part of the Baja California peninsula with ore reserves of over 1,230 million tonnes with an average ore grade of 0.40% and 141 million tonnes of leach material with an average ore grade of 0.27%. The project includes an open-pit mine with a combined 120 ktpd concentrator and 28 ktpa SX-EW operations.

Previous wording

Los Chancas—Apurimac: This greenfield project, located in Apurimac, Peru, is a copper and molybdenum porphyry deposit. Current estimates of indicated copper mineral resources are 98 million tonnes of oxides with a copper content of 0.45% and 52 million tonnes of sulfides with a copper content of 0.59%. The Los Chancas project envisions an open-pit mine with a combined operation of concentrator and SX-EW processes to produce 130,000 tonnes of copper and 7,500 tonnes of molybdenum annually. The estimated capital investment is $2,600 million and the project is expected to be in operation in 2030. We continue to engage in social and environmental improvements for the local communities and work on the project´s environmental impact assessment.

Current wording

Los Chancas—Apurimac: This greenfield project, located in Apurimac, Peru, is a copper and molybdenum porphyry deposit. Current estimates of indicated copper mineral resources are 98 million tons of oxides with a copper content of 0.45% and 52 million tons of sulfides with a copper content of 0.59%. The Los Chancas project envisions an open-pit mine with a combined operation of concentrator and SX-EW processes to produce 130,000 tons of copper and 7,500 tons of molybdenum annually. The estimated capital investment is $2,600 million and operations are expected to begin in 2031. We continue to engage in social and environmental improvements for the local communities and are working on the project’s environmental impact assessment.

Previous wording

Project update: In a coordinated effort with the Peruvian authorities the Company has made significant progress in eradicating illegal mining activities at our concession. Once this process is completed, we will restart environmental impact assessment; conduct a diamond drilling campaign for 40,000 meters; and initiate hydrogeological and geotechnical studies to gather additional information on the characteristics of the Los Chancas deposit.

Current wording

Project update: In coordination with the Peruvian authorities, efforts continue to eradicate illegal mining activities. Once this process has concluded, we will resume our environmental impact study and begin hydrogeological and geotechnical studies. We will also begin a resource verification drilling campaign of a 40,000-meter in-fill to gather additional information on the geological characteristics of the Los Chancas deposit.

Previous wording

Michiquillay Project—Cajamarca: In June 2018, Southern Copper signed a contract for the acquisition of the Michiquillay project in Cajamarca, Peru. Michiquillay is a world class mining project with inferred mineral resources of 2,288 million tonnes with an estimated copper grade of 0.43%. When developed, we expect Michiquillay to produce 225,000 tonnes of copper per year (along with by-products of molybdenum, gold and silver) for an initial mine life of more than 25 years and at a competitive cash-cost. We estimate an investment of approximately $2.5 billion will be required and expect production start-up by 2032. Michiquillay will become one of Peru´s largest copper mines and will create significant business opportunities in the Cajamarca region; generate new jobs for the local communities; and contribute with taxes and royalties to the local, regional and national governments.

Current wording

Michiquillay Project—Cajamarca: In June 2018, Southern Copper signed a contract for the acquisition of the Michiquillay project in Cajamarca, Peru. Michiquillay is a world-class greenfield mining project with inferred mineral resources of 2,288 million tons and an estimated copper grade of 0.43%. When developed, we expect Michiquillay to produce 225,000 tons of copper per year (along with by-products of molybdenum, gold and silver) at a competitive cash-cost for an initial mine life of more than 25 years. We estimate an investment of approximately $2.5 billion will be required and expect production start-up by 2032. Michiquillay will become one of Peru´s largest copper mines and will create significant business opportunities in the Cajamarca region; generate new jobs for the local communities; and contribute taxes and royalties to the local, regional and national governments

Previous wording

The Company has been consistently working to promote the welfare of the population of the Islay province. As part of these efforts, we have implemented successful social programs in education, healthcare and productive development to improve the quality-of-life in the region. We have also promoted agricultural and livestock activities in the Tambo Valley and supported growth in manufacturing, fishing and tourism in Islay.

Current wording

The company has consistently promoted the welfare of the population of the Islay province and the Arequipa region. As part of these efforts, we have also implemented several successful social programs in education, healthcare and productive development to improve the quality of life in the region.

Previous wording

and reflect our alignment with best international practices. The represents a significant step in our quest to obtain accreditation for responsible copper production in the framework of The Copper Mark certification.

Current wording

We have reaffirmed our commitment to maintain ISO-certified occupational health and safety management systems, and all units at SCC successfully passed follow-up audits for ISO 45001 and retained their certification in 2024. This represents a significant step in our quest to obtain accreditation for responsible copper production under The Copper Mark certification.

Previous wording

Southern Copper Corporation aims to fulfill the needs of future generations by promoting development that benefits all, both today and down the line. We are committed to continuously improving our environmental performance and to promoting the adoption of the best environmental practices at our operations to contribute to the transition to a green economy. To this end, we have certified all our operations environmental management systems in ISO 14001. We are also committed to preserving and improving the environment by implementing actions to generate a positive impact on biodiversity through our operations. To fulfil this commitment, which is outlined in the Company’s Environmental Policy, we have developed action plans for biodiversity management that are aligned with the guide for Good Practice Guidance for Mining and Biodiversity published by the International Council on Mining and Metals (ICMM). We believe these plans further improve the Company’s capacity to implement effective mitigation measures and contribute to the preservation and improvement of the environment at our operations.

Current wording

Southern Copper Corporation aims to fulfill the needs of future generations by promoting development that benefits all, both today and in the long-term. We are committed to continuously improving our environmental performance and to promoting the adoption of the best environmental practices at our operations to contribute to the transition to a green economy. To this end, we have achieved ISO 14001 certification for the environmental management systems at all our operations. We are also committed to preserving the environment by implementing actions to generate a positive impact on biodiversity through our operations. To fulfill this commitment, which is outlined in the Company’s Environmental Policy, we have developed action plans for biodiversity management that are aligned with the Good Practice Guidance for Mining and Biodiversity guide published by the International Council on Mining and Metals (ICMM). We believe these plans further improve the Company’s capacity to implement effective mitigation measures and contribute to the preservation and improvement of the environment at our operations.

Previous wording

Regarding our environmental risk management, we are aligning our tailings systems to the recently published ICMM's (International Council on Mining and Metals) Global Standard on Tailings Management and have improved our governance framework by implementing a brand-new Internal Committee for Review of Tailings Systems to bolster safety management and communication between operations and top management.

Current wording

Regarding our environmental risk management, we are aligning our tailings systems to the ICMM’s Global Standard on Tailings Management and have improved our governance framework by implementing an Internal Committee for Review of Tailings Systems to bolster safety management and communication between operations and top management.

Previous wording

With the purpose of increasing our water efficiency, we are currently recovering about six thousand cubic meters of water per day through the new tailings filtering plant in Quebrada Honda, Peru, which is equivalent to 0.6 m3 of water per ton of tailings. With a design capacity of 10,000 tons/day and an investment to date of $27 million, this dam filter is the largest tailings processing unit of its kind in the market.

Current wording

To increase our water efficiency, we are currently recovering about six thousand cubic meters of water per day through the new tailings filtering plant in Quebrada Honda, Peru, equivalent to 0.6 m3 of water per ton of tailings. With a design capacity of 10,000 tons/day and an investment to date of $27 million, this dam filter is the largest tailings processing unit of its kind in the market

Previous wording

Furthermore, in order to reduce our dependency on underground water, the Company is working to identify new sources of water to use in its processes, including recycling wastewater from urban areas. This constitutes a win-win scenario that generates sanitation solution for urban areas while reducing competition for water.

Current wording

Furthermore, to reduce our dependency on underground water, we are exploring new water sources for our processes, including recycling wastewater from urban areas. This approach offers a win-win scenario that generates sanitation solutions for urban areas while reducing competition for water.

Previous wording

In terms of biodiversity, in March 2023, the Environmental Management Unit at Buenavista del Cobre obtained certification from the Wildlife Habitat Council in recognition of our contributions to efforts to prevent the extinction of the Mexican grey wolf. Thanks to these actions, populations of this species, which was on the brink of extinction in the wild, have multiplied in their natural habitat in Mexico. Going forward, we will continue to work side-by-side with institutions and authorities to serve the common good in the regions in which we operate.

Current wording

We have also made progress in our commitment to protect biodiversity. In 2023, the Environmental Management Unit at Buenavista del Cobre received certification from the Wildlife Habitat Council, which recognized our contributions to efforts to prevent the extinction of the Mexican grey wolf. These actions have allowed populations of this critically endangered species to increase its numbers significantly within in their natural habitat in Mexico. Going forward, we will continue to work side-by-side with institutions and authorities to serve the common good in the regions in which we operate.

Previous wording

Southern Copper Corporation prioritizes being a good neighbor in the localities close to our operations. Working together with the communities, we have the opportunity to collaborate and forge a path based on common objectives for social and

Current wording

Southern Copper Corporation prioritizes being a good neighbor in the localities near our operations. Working together with the communities, we have the opportunity to collaborate and forge a path based on common objectives for social and economic development as we work to support the United Nations’ Sustainable Development Goals. We believe that community outreach must be based on transparency and trust and strive to promote long-lasting ties.

Previous wording

Our Community Development model has three components: 1) responsible coexistence: to foster a positive and healthy coexistence with our neighbor communities, and to have open and ongoing channels of communication to address complaints and concerns; 2) economic development: it is important to share the economic value our operations generate with the community, and 3) human development: to optimize the skills of members of the communities where we work, to ensure that these individuals become the principal drivers of development in their communities.

Current wording

Our Community Development model has three components: 1) responsible coexistence: to foster a positive and healthy coexistence with our neighbor communities, and to have open and ongoing channels of communication to address complaints and concerns; 2) economic development: it is important to share the economic value our operations generate

Previous wording

The primary tool to ensure a responsible coexistence is our grievance mechanism for external stakeholders (Community Attention Service) that operates at 100% of our sites and gives resolution to complaints in an average of three days.

Current wording

The primary tool to ensure a responsible coexistence is our grievance mechanism for external stakeholders (Service and Attention Center) that operates at 100% of our sites and resolves complaints in an average of five days.

Previous wording

For economic development, during 2023, we trained 2,087 people in mining communities: 833 for employment, 1,145 in regional vocational and productive skills and 109 from local businesses to support the development of small and medium mining suppliers. In addition, we recorded a 97% increase in year-to-year investment in social infrastructure. In Mexico $35.9 million was allocated to these efforts, including a project that was focused on improving water infrastructure for the communities of Cananea and Nacozari for the benefit of 54,000 people. In Peru, $45.7 million was invested in social infrastructure, including the progress in building the wastewater treatment plant (PTAR) in Ilo.

Current wording

In relation to economic development, we trained 1,326 people in mining communities in 2024, including 654 people in employment, 776 people in regional vocational and productive skills and 27 local businesses to support the development of small and medium mining suppliers. In addition, we recorded a 97% increase in year-to-year investment in social infrastructure. In Mexico, we allocated $6.6 million to these efforts, including a project focused on improving water infrastructure for 54,000 people in the communities of Cananea and Nacozari. In Peru, we invested $36.5 million in social infrastructure, including the progress in building the wastewater treatment plant (PTAR) in Ilo.

Previous wording

SCC recognizes the importance and urgency of tackling climate change, and the Company is committed to support the objective of the Paris Agreement on climate change, preserve the environment, minimize the environmental footprint of our operations, and efficiently manage climate-related risks and opportunities. We recognize that climate change will likely influence our strategy in various ways, and we aim to meet the expectations of the global business trends that are moving to demand products with lower carbon footprint. Our focus is to seek continuous improvement in the responsible use of natural resources while complying with applicable legal standards for prevention, mitigation, control and remediation of environmental impacts.

Current wording

SCC recognizes the importance and urgency of tackling climate change and is committed to supporting the objective of the Paris Agreement, preserving the environment, minimizing the environmental footprint of our operations, and efficiently managing climate-related risks and opportunities. We recognize that climate change will influence our strategy in various ways, and we aim to meet the expectations of the global business trends that are increasingly demanding products with lower carbon footprints. Our focus is to continuously improve the responsible use of natural resources while complying with legal standards for prevention, mitigation, control and remediation of environmental impacts.

Previous wording

The Company is committed to continually improve its management performance with respect to the aforementioned issues, which is why it has initiated a multi-year process to align its disclosures on climate change with the TCFD recommendations. As a result beginning in 2020, Grupo Mexico’s Sustainable Development Report included sections on climate-related risks and opportunities, and more detailed information about new short, medium and long term Scope 1 and 2 climate targets, strategy and governance mechanisms, as well as new emissions and energy metrics informed by SASB standards. In our 2023 Sustainability Development Report, we will include Scope 3 targets and preliminary capital allocation figures on decarbonization projects. The report can be accessed at https://www.gmexico.com/en/Pages/development.aspx. We are referring our investors to Grupo Mexico's internet site for details on the aforementioned initiatives for informative purposes only. We do not intend for this internet link to be an active link or to otherwise incorporate the contents of the website into this Report on Form 10-K.

Current wording

In our commitment to improving performance on these critical issues, we have embarked on a multi-year process to align our climate change disclosures with the recommendations of the Task Force on Climate-Related Financial Disclosures (TCFD). Since 2020, Grupo Mexico’s Sustainable Development Report has included sections on climate-related risks and opportunities, more detailed information about new short-, medium- and long-term Scope 1 and 2 climate targets, strategy and governance mechanisms, and new emissions and energy metrics informed by Sustainability Accounting Standards Board (SASB) standards. In our 2023 Sustainability Development Report, we included Scope 3 targets and preliminary capital allocation figures on decarbonization projects. The report can be accessed at https://www.gmexico.com/en/Pages/development.aspx. We are referring our investors to Grupo Mexico's website for details on these initiatives for informative purposes only. We do not intend for this internet link to be an active link or to otherwise incorporate the contents of the website into this Report on Form 10-K.

Previous wording

Additionally, we have participated in the sustainability evaluation carried out by S&P Global through the CSA since 2020. In climate governance, we obtained in 2023 a rating of 90 out of 100, ratifying the progress that the company has made in this area, mainly associated to the publication of our Climate Policy and the supervision of the implementation of our climate change strategy, including the management of risks and opportunities associated with climate change by the Sustainable Development Committee at the Board level of Southern Copper Corporation. Also, we achieved a score of 100 in the TCFD category, which focuses on the management and disclosure of financial risks and opportunities related to climate change. In addition, the investor-led Climate Action 100+ initiative recognized the establishment of our emissions reduction roadmap and gave us a full compliance rating in the TCFD category.

Current wording

The execution of our climate strategy has allowed us to significantly improve our performance in several climate evaluation initiatives. In the sustainability evaluation conducted by S&P Global through the Corporate Sustainability Assessment (“CSA”) in which we have participated in this assessment since 2020, we scored 90 out of 100 for climate governance once again in 2024, which ratifies the progress we have made since 2023. This high rating recognized our efforts to publish our Climate Policy and our on-going supervision of the implementation of our climate change strategy, which evaluates management of the risks and opportunities associated with climate change by the Sustainable Development Committee at the Board level of Southern Copper Corporation. In a repeat of last year’s performance, we scored 100 in the Task Force on Climate-related Financial Disclosures (“TCFD”) category in 2024, which assesses management and disclosure of financial risks and opportunities related to climate change.

Previous wording

We obtained a score of 90 out of 100 on CSA’s climate governance index. This attests to the progress the Company has made in this area. Additionally, we achieved a score of 100 in the Task Force on Climate-Related Disclosures (TCDF) category, which focuses on management and disclosure of financial risks and opportunities related to climate change. Additionally, the investor-led Climate Action 100+ initiative recognized our efforts to develop an emissions reduction roadmap and awarded us a full compliance rating in the Task Force on Climate-Related Financial Disclosures (TCFD) category. Furthermore, the rating agency Sustainalytics reduced the Company's risk by two levels between 2020 and 2023.

Current wording

In addition, the investor-led Climate Action 100+ initiative recognized our efforts to develop an emissions reduction roadmap and gave us a full compliance rating in the TCFD category for the second consecutive year.

Previous wording

Since 2016, SCC has been participating annually in the evaluation on Climate Change of CDP and in 2022, for the first time in the evaluation of Water Security. In both questionnaires we achieved “B” result (third best score on a scale of eight levels), which is one level above the mining sector average score and the North America region overall score.

Current wording

Since 2016, SCC has been participating in Carbon Disclosure Project (“CDP”) annual evaluation of Climate Change, and in 2022, we participated in our first evaluation of Water Security. In 2024, our 2023 results for both questionnaires were “B” (third best score on a scale of eight levels), which is one level above the average score in the mining sector and the overall score for the North American region.

Previous wording

In 2024, we will continue to identify further financial impacts related to the climate risks and opportunities that our company will face in the future.

Current wording

In 2025, we will develop climate change mitigation and adaptation plans at the site level; evaluate the role that nature-based solutions could play in reducing our operational emissions; and continue to identify the financial impacts that our company will face in the future with regard to climate risks and opportunities.

Previous wording

At SCC we are committed to enforcing the United Nations Guiding Principles on Business and Human Rights. We have a series of policies and procedures that serve as a guide to all employees and suppliers: General Human Rights Policy; Policy of Respect for the Rights of Indigenous Peoples and Communities; Diversity, Inclusion and Non-Discrimination, No Workplace or Sexual Harassment Policy; and the Code of Conduct for Suppliers, Contractors and Relevant Business Partners, which includes several sections related to human rights.

Current wording

At SCC, we are committed to enforcing the United Nations Guiding Principles on Business and Human Rights. We have a series of policies and procedures that serve as a guide to all employees and suppliers, and the Code of Conduct for Suppliers, Contractors and Relevant Business Partners, which includes several sections related to human rights.

Showing the first 40 of 61 pairs. Open the source sections for the rest.

Rearranged current paragraphs (2)

Current report — wording carried from elsewhere

operate as a conventional open-pit mine with an annual production capacity of 36,000 tonnes of copper cathodes. This operation will use highly cost efficient and environmentally friendly SX-EW technology. The budget for El Pilar is $310 million.

Current report — wording carried from elsewhere

with the community, and 3) human development: to optimize the skills of members of the communities where we work, to ensure that these individuals become the principal drivers of development in their communities.
Rearranged previous paragraphs (5)

Previous report — wording carried elsewhere

charge. We believe these adjustments will allow our management and stakeholders to see a presentation of our controllable cash cost, which we believe is one of the lowest of all copper-producing companies of similar size.

Previous report — wording carried elsewhere

factors. All capital spending plans will continue to be reviewed and adjusted to respond to changes in the economy and market conditions.

Previous report — wording carried elsewhere

economic development as we work to support the United Nations’ Sustainable Development Goals. We believe that community outreach must be based on transparency and trust and strive to promote long-lasting ties.

Previous report — wording carried elsewhere

SCC also has a human rights’ due diligence process in place to protect the rights of employees (both the Company’s and those of contractors). The work climate surveys, Complaint Hotlines and the due diligence process of suppliers are tools

Previous report — wording carried elsewhere

and remediation work required to be performed by us. Any such increases in future costs could materially impact the amounts charged to operations for reclamation and remediation.