A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Sep 30, 2024 · Filed Nov 19, 2024

AUMN$0.20-0.4%Stored close · as of Jun 29, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-Q

Period ended 2024-06-30; filed 2024-08-14.

0001558370-24-012118

ITEM 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

Current report: 10-Q

Period ended 2024-09-30; filed 2024-11-19.

0001558370-24-015859

ITEM 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 68 previous paragraphs and 79 current paragraphs.

19 unchanged; 43 reworded; 13 added; 4 removed; 2 previous and 4 current paragraphs rearranged.

Tables are not compared: 27 previous and 31 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (13)

Current report

As previously disclosed, we have completed the sale of our wholly owned subsidiary, Silex Argentina, which is the sole owner of El Quevar, our advanced exploration property in Argentina, and have entered into an agreement to sell our Yoquivo exploration property in Mexico. We expect the closing of these transactions to satisfy a portion of our projected capital needs over the next twelve months (see Note 2 above). The Company continues to hold an interest in several remaining exploration properties, including Sarita Este/Desierto, a gold-silver-copper exploration project located in northwest Salta Province Argentina and Sand Canyon, an exploration-stage, gold-silver project in northwestern Nevada.

Current report

For the results of operations discussed below, we compare the results from operations for the three months ended September 30, 2024, to the three months ended September 30, 2023. Operations did not produce concentrate during the three months ended September 30, 2024, but revenue was recorded during the third quarter on several of the Velardeña concentrate shipments completed earlier in 2024 that were finalized during the quarter. During the three months ended September 30, 2023, all of the operating activity related to the Rodeo property. Mining at Rodeo concluded in August 2023 as the ore was depleted as expected. Processing of the Rodeo stockpiles concluded in September 2023.

Current report

Other operating income (loss), net. We recorded $3.3 million of net other operating income for the nine months ended September 30, 2024 primarily related to the sale of a portion of the Velardeña assets, Silex Argentina and Minera Labri. For the nine months ended September 30, 2023, we recorded $0.6 million of net other operating income primarily related to the sale of non-core assets.

Current report

As previously disclosed, the Company ceased mining at the Velardeña mines in Mexico in the first quarter 2024, and subsequently sold the mines and certain related assets. Subsequent to September 30, 2024, the Plant 2 Buyer made additional payments of approximately $0.3 million bringing the total amounts paid through November 15, 2024 to approximately $1.3 million, but the Buyer remains in default. As of November 15, 2024, the Company is still owed $1.7 million plus VAT of the $3.0 million purchase price for the Velardeña oxide plant and water wells and other minor remaining Velardeña assets. We do not know whether or when the Buyer will make the remaining payments due. We are continuing to negotiate an extension of the agreement which would allow for the transfer of the title of Plant 2 and the ARO liability to the Buyer and the Company would hold a mortgage to secure the payment.

Current report

With the receipt of the proceeds from the sale of Silex Argentina and the cash payments received to date for the Yoquivo Transaction, as of November 15, 2024 the Company has cash and cash equivalents of approximately $3.6 million and accounts payable of approximately $1.2 million.

Current report

The Company’s only near-term opportunity to generate cash flow to meet its expected cash requirements is from the sale of assets, equity or other external financing. The Company is evaluating and pursuing alternatives, including the potential sale of the Company, finalizing the sale of its assets at the Velardeña Properties and Yoquivo, seeking buyers or partners for the Company’s other assets or obtaining equity or other external financing. In the absence of additional cash inflows, the Company anticipates that its cash resources will be exhausted in the second quarter of 2025. If we are unable to obtain additional cash resources or sell the Company, we will be forced to cease operations and liquidate.

Current report

Company also continues to evaluate other strategic transactions.

Current report

As previously disclosed, on June 6, 2023, we received written notification (the “Notice”) from the NYSE American LLC (the “NYSE American”) that the Company was not in compliance with Section 1003(a)(iii) of the NYSE American Company Guide (the “Company Guide”). We are required to report a stockholders’ equity of $6.0 million or more if the Company has reported losses from continuing operations and/or net losses in our five most recent fiscal years. The Notice noted that the Company reported a stockholders’ equity of $4.1 million as of March 31, 2023, and losses from continuing operations and/or net losses in each of its five most recent fiscal years ended December 31, 2022. As a result, we have become subject to the procedures and requirements of Section 1009 of the Company Guide and were required to submit a plan of compliance by July 6, 2023, addressing how the Company intends to regain compliance with Section 1003(a)(iii) of the Company Guide. On July 6, 2023, the Company submitted a plan (the “Plan”) to the NYSE American to regain compliance with the continued listing standards set forth in the Company Guide. On August 22, 2023, the NYSE American accepted the Company’s Plan and granted the Company a cure period until December 6, 2024 (the “Compliance Deadline”).

Current report

On July 2, 2024, we received second written notification (the “Second Notice”) from the NYSE American that we are now also below compliance with Sections 1003(a)(i) and 1003(a)(ii) the Company Guide since the Company reported stockholders’ equity of $621,000 as of March 31, 2024, and losses from continuing operations and/or net losses in our five most recent fiscal years ended December 31, 2023. As a result, we must regain compliance with Sections 1003(a)(i) and 1003(a)(ii), in addition to Section 1003(a)(iii), of the Company Guide by the Compliance Deadline.

Current report

The Company will continue its efforts to regain compliance with all stockholders’ equity standards in accordance with the Plan. If the Company is not in compliance with the continued listing standards by the Compliance Deadline, or if we do

Current report

not make progress consistent with the Plan during the Plan period, we expect the NYSE American to initiate delisting proceedings.
Removed paragraphs (4)

Previous report

With an effective date of February 24, 2023, an initial mineral resource estimate was completed for Yoquivo that estimates an inferred mineral resource of 937,000 tonnes at 570 g/t Ag eq (equivalent ounces are calculated using prices of $1,840/oz Au and $24.00/oz Ag) on five veins that had enough drill density to support mineral resources. Further information regarding this initial mineral resource estimate is included in our 2023 Annual Report. Numerous other veins on the property have yet to be drilled sufficiently to allow estimation of additional resources. Since 2020, exploration and delineation drilling of 16,565 meters in 70 holes has advanced the project to this stage. We are seeking opportunities to sell Yoquivo.

Previous report

Other operating income (loss), net. We recorded net operating income of $1.1 million for the six months ended June 30, 2024 primarily related to the sale of certain Velardeña assets offset by severance expenses paid to and accrued for employees who were terminated during the six months ended June 30, 2024 in connection with the cessation of operations at the Velardeña Properties. In June, the underlying value of the Velardeña oxide plant was written down to its salvage amount which is equal to the amount of the deposits received from the Buyer on the sale of the oxide processing plant through June 30, 2024 and is recorded in current liabilities as deferred revenue (see Note 3 above). For the six months ended June 30, 2023, we recorded $0.1 million of net other operating income.

Previous report

As of June 30, 2024, we had VAT receivable in Mexico of approximately $0.3 million. Although we believe it is likely we will receive some portion of this receivable, there is no certainty as to the timing and amount of such payment.
Reworded paragraphs (43)

Previous wording

We were incorporated in Delaware in March 2009 under the Delaware General Corporation Law. During the six months ended June 30, 2024, our principal source of revenue was from the sale of gold and silver contained in concentrate from our Velardeña Properties in Durango, Mexico. We also had secondary sources of revenue from tolling material at our oxide plant for a third party and selling the Velardeña assets that are held for sale. We incurred net operating losses for the six months ended June 30, 2024 and 2023.

Current wording

We were incorporated in Delaware in March 2009 under the Delaware General Corporation Law. During the nine months ended September 30, 2024, our principal source of revenue was from the sale of gold and silver contained in concentrate from our Velardeña Properties in Durango, Mexico. We also had secondary sources of revenue from tolling material at our oxide plant for a third party and selling the Velardeña assets that are held for sale. We incurred net operating losses for the nine months ended September 30, 2024 and 2023.

Previous wording

We restarted mining at our Velardeña Properties in December 2023 and continued through the end of February 2024 when it was determined that the initial performance of both the mine and the plant did not achieve expected results. We processed all the mineralized material that had been mined and shut down the sulfide processing plant at the end of March 2024 and held the Velardeña Properties for short-term sale as we evaluated options to realize value from the assets. As previously disclosed, we entered into certain sales agreements to sell the Velardeña and Chicago mines, both sulfide and oxide processing plants, water wells, and related equipment of the Velardeña Properties to a privately held Mexican company (the “Buyer”) in exchange for an aggregate purchase price of $5.5 million in cash, plus VAT. There were 4 separate sales agreements. The first three sales agreements which include the combined sales of the Velardeña and Chicago mines, the sulfide processing plant and various related equipment were completed on June 20, 2024 and the titles to the assets have been transferred to the Buyer. The Buyer agreed to pay $3.0 million plus VAT on July 1, 2024, to complete the last sales agreement which covered the oxide processing plant and water wells. The Buyer has made payments of approximately $477,000 through August 7, 2024 and is currently in default. The Buyer has operational control of the plant, and we are no longer operating the oxide plant. We are uncertain as to when or if additional payments will be received. We are negotiating an extension of the agreement which would allow for the transfer of title of the oxide plant to the Buyer and the Company would hold a mortgage to secure the payment. The collection of the amount due from the sale may satisfy a portion of our projected capital needs over the next twelve months (See Note 2 above). We hold other exploration properties, including the Yoquivo exploration property in Mexico and our El Quevar advanced exploration property in Argentina. We also hold an additional portfolio of approximately 11 properties located in Mexico, Nevada and Argentina.

Current wording

We restarted mining at our Velardeña Properties in December 2023 and continued through the end of February 2024 when it was determined that the initial performance of both the mine and the plant did not achieve expected results. We processed all the mineralized material that had been mined and shut down the sulfide processing plant at the end of March 2024 and held the Velardeña Properties for short-term sale as we evaluated options to realize value from the assets. We entered into certain sales agreements to sell the Velardeña and Chicago mines, both sulfide and oxide processing plants, water wells, and related equipment of the Velardeña Properties to a privately held Mexican company (the “Buyer”) in exchange for an aggregate purchase price of $5.5 million in cash, plus VAT. There were 4 separate sales agreements. The first three sales agreements which include the combined sales of the Velardeña and Chicago mines, the sulfide processing plant and various related equipment were completed on June 20, 2024 and the titles to the assets have been transferred to the Buyer. The Buyer agreed to pay $3.0 million plus VAT on July 1, 2024, to complete the last sales agreement which covered the oxide processing plant and water wells. The Buyer has made payments of approximately $1.3 million through November 15, 2024 and is currently in default. The Buyer has operational control of the plant, and we are no longer operating the oxide plant. We are uncertain as to when or if additional payments will be received. We are continuing to negotiate an extension of the agreement which would allow for the transfer of title of the oxide plant to the Buyer and the Company would hold a mortgage to secure the payment. The collection of the amount due from the sale may satisfy a portion of our projected capital needs over the next twelve months (see Note 2 above).

Previous wording

Because we have ceased production at the Velardeña Properties, our only near-term opportunity to generate cash flow is from the sale of assets or new sources of debt or equity capital. We are evaluating alternatives to obtain funds to continue as a going concern, including finalizing the sale of our Velardeña oxide plant, seeking buyers or partners for the Company’s other assets including El Quevar or obtaining equity or other financing. In the absence of additional cash inflows, we anticipate that our cash resources will be exhausted in September 2024. If we are unable to obtain additional resources, we may be forced to cease operations and liquidate. See “—Liquidity, Capital Resources and Going Concern—2024 Liquidity Forecast and Going Concern Qualification” below.

Current wording

Because we have ceased production at the Velardeña Properties, our only near-term opportunity to generate cash flow is from the sale of assets or new sources of debt or equity capital. We are evaluating and pursuing alternatives to obtain funds to continue as a going concern, including the potential sale of the Company, finalizing the sale of its assets at the Velardeña Properties and Yoquivo, seeking buyers or partners for the Company’s other assets or obtaining equity or other external financing. In the absence of additional cash inflows, the Company anticipates that its cash resources will be exhausted in the second quarter of 2025. If we are unable to obtain additional cash resources or sell the Company, we will be forced to cease operations and liquidate. See “—Liquidity, Capital Resources and Going Concern—2024 Liquidity Forecast and Going Concern Qualification” below.

Previous wording

We restarted mining at Velardeña in December 2023. In the first quarter of 2024, we sold just over 2,000 tonnes of concentrate containing approximately 640 ounces of gold and approximately 21,750 ounces of silver. Mill throughput of mined material totaled 5,186 tonnes over the period of operations in February and March 2024. We stopped mining at the end of February when we determined that the initial performance of the mine and the processing plant did not achieve expected results due to operational issues caused by a combination of insufficient experienced miners, issues with ventilation and issues with aging mining equipment at the mine. We stopped processing the mined material at the end of March 2024.

Current wording

We restarted mining at Velardeña in December 2023. In the first quarter of 2024, we sold just over 2,000 tonnes of concentrate containing approximately 640 ounces of gold and approximately 21,750 ounces of silver. Mill throughput of mined material totaled 5,186 tonnes over the period of operations in February and March 2024. We stopped mining at the end of February when we determined that the initial performance of the mine and the processing plant had not achieved expected results due to operational issues caused by a combination of insufficient experienced miners, issues with ventilation and issues with aging mining equipment at the mine. We stopped processing the mined material at the end of March 2024.

Previous wording

The table below sets forth the key processing and sales statistics for the Velardeña operation for the three months and the six months ended June 30, 2024:

Current wording

The table below sets forth the key processing and sales statistics for the Velardeña operation for the three months and the nine months ended September 30, 2024:

Previous wording

As noted above, we have entered into sales agreements pursuant to which a third-party has agreed to purchase theVelardeña and Chicago mines, both sulfide and oxide processing plants, water wells, and related equipment of the Velardeña Properties. The first three agreements have closed. The Buyer has made payments on the fouth agreement of approximately $477,000 through August 7, 2024 and is currently in default. The Buyer has operational control of the plant, and we are no longer operating the oxide plant. We are uncertain as to when or if additional payments will be received.

Current wording

As noted above, we have entered into sales agreements pursuant to which a third-party has purchased the Velardeña and Chicago mines, mining equipment and the sulfide plant, and agreed to purchase the oxide processing plant and water wells. The Buyer has made payments of approximately $1.3 million for the oxide plant and water wells through November 15, 2024 and is currently in default. The Buyer has operational control of the plant, and we are no longer operating the oxide plant. We are uncertain as to when or if additional payments will be received.

Previous wording

We hold 100% ownership of the Yoquivo concessions subject to royalty interests between 2% and 3% net smelter return payable on production to third parties and capped at $2.8 million in the aggregate.

Current wording

On October 25, 2024, we entered into a sales agreement with Advance Metals Limited (“AVM”) to sell our Yoquivo exploration property. We hold 100% ownership of the Yoquivo concessions subject to royalty interests between 2% and 3% net smelter return payable on production to third parties and capped at $2.8 million in the aggregate. We have received $295,000 under the sales agreement and will receive an additional $275,000 if the transaction is completed as scheduled in late November.

Previous wording

In April 2020, we entered into the Earn-in Agreement with Barrick. For a description of the Earn-In Agreement, see “Our Material Mining Properties—El Quevar” in our 2023 Annual Report. In March 2024, Barrick notified us that it was withdrawing from the Earn-In Agreement. The termination was effective on April 20, 2024 and the El Quevar project reverted back into the full control of Golden Minerals. We are seeking to sell or find a partner for El Quevar.

Current wording

In April 2020, we entered into the Earn-in Agreement with Barrick. In March 2024, Barrick notified us that it was withdrawing from the Earn-In Agreement. The termination was effective on April 20, 2024 and the El Quevar project reverted back into the full control of the Company. In October 2024, we completed the sale of our wholly owned subsidiary, Silex Argentina, which is the sole owner of El Quevar, our advanced exploration property in Argentina, for a purchase price of $3.5 million.

Previous wording

In December 2019, we entered into an option agreement with Cascadero Minerals Corporation (“Cascadero”) to acquire a 51% interest in the gold/copper Sarita Este concession, located in the northwest portion of the Province of Salta, Argentina, adjacent to the Taca Taca project owned by First Quantum Minerals. We have exceeded the drilling requirement and have spent approximately $3.0 million since entering into the agreement in December 2019. After satisfying the drilling and expenditure requirements, we notified Cascadero of our intention to proceed with the joint venture as 51% owners of the concession. Completion of the joint venture documents and formation of the joint venture company are in progress.

Current wording

In December 2019, we entered into an option agreement with Cascadero Minerals Corporation (“Cascadero”) to acquire a 51% interest in the gold/copper Sarita Este concession, located in the northwest portion of the Province of Salta, Argentina, adjacent to the Taca Taca project owned by First Quantum Minerals. We have exceeded the drilling requirement and have spent approximately $3.0 million since entering into the agreement in December 2019. After satisfying the

Previous wording

Information regarding the drilling completed to date is included in our 2023 Annual Report.

Current wording

Information regarding the drilling completed to date is included in our 2023 Annual Report on Form 10-K.

Previous wording

The Desierto concessions (Desierto 1 and 2) which are adjacent to and south of the Sarita Este concession, are subject to an option agreement with a third-party partial owner and a proposed joint venture agreement also between the Company and Cascadero. The Desierto 1 concession is the object of a legal dispute between the Company and the Salta Ministry of Mines in which the Company is disputing the cancellation of the concession by the province. The dispute is expected to be resolved before the end of 2024.

Current wording

The Desierto concessions (Desierto 1 and 2) which are adjacent to and south of the Sarita Este concession, are subject to an option agreement with a third-party partial owner and a proposed joint venture agreement also between the Company and Cascadero. The Desierto 1 concession was the object of a legal dispute between the Company and the Salta Ministry of Mines in which the Company was disputing the cancellation of the concession by the province. On August 28, 2024, the judges of the Court of Appeals of Salta (i) accepted the Company’s appeal, (ii) revoked the Mining Court’s resolutions of cancellation and (iii) ordered the restitution to the Company of the Desierto I mining concession.

Previous wording

For the results of operations discussed below, we compare the results from operations for the three months ended June 30, 2024, to the three months ended June 30, 2023. The operating activities for the three-month period ended June 30, 2024 were related to the Oxide Plant of the Velardeña Properties which processed mineralized material for a third party. Due to the discontinuation of the mining and sulfide processing operations of the Velardeña Properties at the end of March 2024, the Velardeña properties are classified as assets held for short-term sale, and therefore, in the interim condensed consolidated financial statements for the period ended June 30, 2024, the asset values, revenues and expenditures of these discontinued operations have been presented as Assets Held for Sale, Liabilities Held for Sale, and Discontinued Operations (see Note 3 above). The revenues and costs discussed below are the amounts recorded prior to the reclassification of those items to Assets Held for Sale and Discontinued Operations in the interim condensed consolidated financial statements.

Current wording

Due to the discontinuation of the mining and sulfide processing operations of the Velardeña Properties at the end of March 2024, the Velardeña properties were classified as assets held for sale, and therefore, in the interim condensed consolidated financial statements for the period ended September 30, 2024, the asset values, revenues and expenditures of these discontinued operations have been presented as Assets Held for Sale, Liabilities Held for Sale, and Discontinued Operations (see Note 3 above). The revenues and costs discussed below are the amounts recorded prior to the reclassification of those items.

Previous wording

Revenue from the sale of metals. All revenue received in the three months ended June 30, 2024 was generated by the Velardeña properties. The Velardeña operations did not produce concentrate during the three months ended June 30, 2024, but revenue was recorded on several of the concentrate shipments completed earlier in 2024 that were finalized during the three months ended June 30, 2024. During the three months ended June 30, 2023, the Rodeo operations sold mainly doré. We also sold slag remaining from previous doré sales and doré production at Plant 2, and some concentrates produced from material previously stockpiled when test mining at the Velardeña mine.

Current wording

Revenue from the sale of metals. For the three months ended September 30, 2024, we recorded $0.1 million revenue from the sale of metal relating to concentrate shipments completed earlier in 2024 that were finalized during the three months ended September 30, 2024. For the three months ended September 30, 2023, we recorded $2.5 million from the sale of metal. The Rodeo operations sold mainly doré. We also sold slag remaining from previous doré sales and doré production at the Velardeña Plant 2, and some concentrates produced from material previously stockpiled when test mining at the Velardeña mine.

Previous wording

Cost of metals sold. For the three months ended June 30, 2024 and 2023, we recorded $2.5 million and $3.9 million of cost of metals sold, respectively. Lower costs in 2024 compared to 2023 were due primarily to zero mining costs as mining was discontinued at the end of February 2024, and lower processing costs because the sulfide plant discontinued operations at the end of March 2024.

Current wording

Cost of metals sold. For the three months ended September 30, 2024 and 2023, we recorded $0.6 million and $3.3 million of cost of metals sold, respectively.

Previous wording

Exploration expense. Our exploration expense, including property holding costs and allocated administrative expenses, totaled $0.8 million and $2.2 million for the six months ended June 30, 2024 and 2023, respectively. The lower exploration expense for 2024 is primarily related to less activity in 2024 due to the cash constraints of the Company.

Current wording

Exploration expense. Our exploration expense, including property holding costs and allocated administrative expenses, totaled $0.4 million and $0.7 million for the three months ended September 30, 2024 and 2023, respectively.

Previous wording

that period and are now being held for short-term sale. We recorded $0.3 million related to care and maintenance for the three-month period ended June 30, 2023, respectively, for expenses related to care and maintenance at our Velardeña Properties as the result of the suspension of mining and processing activities in November 2015.

Current wording

Velardeña care and maintenance costs. We recorded no expenses related to care and maintenance at our Velardeña Properties for the three-month period ended September 30, 2024 as the Velardeña Properties were discontinued during that period and have either been sold or are being held for sale. We recorded $0.3 million related to care and maintenance for the three-month period ended September 30, 2023.

Previous wording

*El Quevar project expense.*We incurred $0.2 million and $0.2 million for the three-month periods ended June 30, 2024 and 2023, respectively, related to holding and evaluation costs for the Yaxtché deposit at our El Quevar project in Argentina. During the three months ended June 30, 2024 and 2023, approximately $0.0 million and $0.1 million, respectively, of costs actually incurred were offset by reimbursements from Barrick.

Current wording

El Quevar project expense. We incurred $0.2 million and $0.1 million for the three-month periods ended September 30, 2024 and 2023, respectively, related to holding and evaluation costs for the Yaxtché deposit at our El Quevar project in Argentina. Because the Barrick agreement had been terminated in April 2024, there were zero reimbursements from Barrick during the three months ended September 30, 2024. During the three months ended 2023, approximately $0.0 million of costs actually incurred were offset by reimbursements from Barrick.

Previous wording

Administrative expense. Administrative expenses totaled $1.1 million and $1.2 million for the three months ended June 30, 2024 and 2023, respectively. Administrative expenses, including costs associated with being a public company, are incurred primarily by our corporate activities in support of the Yoquivo Property, Rodeo Property, Velardeña Properties, El Quevar project and our exploration portfolio.

Current wording

Administrative expense. Administrative expenses totaled $0.8 million and $1.1 million for the three months ended September 30, 2024 and 2023, respectively. Administrative expenses, including costs associated with being a public company, are incurred primarily by our corporate activities in support of the Yoquivo Property, Rodeo Property, Velardeña Properties, El Quevar project and our exploration portfolio.

Previous wording

Stock-based compensation. During the three months ended June 30, 2024 and 2023, we incurred approximately $0.2 million and $0.0 million, respectively, of expense related to stock-based compensation. Stock-based compensation varies from period to period depending on the number and timing of shares granted, the type of grant, the market value of the shares on the date of grant and other variables.

Current wording

Stock-based compensation. During each of the three months ended September 30, 2024 and 2023, we incurred approximately $0.1 million of expense related to stock-based compensation. Stock-based compensation varies from period to period depending on the number and timing of shares granted, the type of grant, the market value of the shares on the date of grant and other variables.

Previous wording

Other operating income (loss), net. We recorded $2.1 million of net other operating income for the three months ended June 30, 2024 primarily related to the sale of the Velardeña mine, sulfide plant and related equipment in connection with the cessation of operations at the Velardeña Properties. In June, the underlying value of the Velardeña oxide plant and water wells was written down to its salvage amount which is equal to the amount of the deposits received from the Buyer through June 30, 2024 on the sale of the oxide processing plant and water wells and is recorded in current liabilities as deferred revenue (see Note 3 above). For the three months ended June 30, 2023, we recorded $0.1 million of net other operating income.

Current wording

Other operating income (loss), net. We recorded $1.6 million of net other operating income for the three months ended September 30, 2024 primarily related to the sale of Silex Argentina and Minera Labri. For the three months ended September 30, 2023, we recorded $0.5 million of net other operating income.

Previous wording

Depreciation, depletion and amortization. During each of the three months ended June 30, 2024 and 2023, we incurred depreciation, depletion and amortization expense of approximately $0.1 million.

Current wording

Depreciation, depletion and amortization. We recorded nominal depreciation, depletion and amortization expense during the three months ended September 30, 2024. We recorded approximately $0.1 million for depreciation, depletion and amortization expense during the three months ended September 30, 2023.

Previous wording

(Loss) gain on foreign currency losses. During the three months ended June 30, 2024, we recorded $0.1 million of foreign exchange losses. During the three months ended June 30, 2023, we recorded a nominal amount of foreign exchange gains. Foreign currency gains and losses are primarily related to the effect of currency fluctuations on monetary transactions incurred by our foreign subsidiaries that are denominated in currencies other than U.S. dollars.

Current wording

(Loss) gain on foreign currency losses. We recorded a nominal amount of foreign currency gains during each of the three months ended September 30, 2024 and 2023. Foreign currency gains and losses are primarily related to the effect of currency fluctuations on monetary transactions incurred by our foreign subsidiaries that are denominated in currencies other than U.S. dollars.

Previous wording

Income taxes. We recorded a zero tax expense for the three months ended June 30, 2024. We recorded a $51,000 income tax benefit for the three months ended June 30, 2023.

Current wording

Income taxes. We recorded a zero tax expense for the three months ended September 30, 2024. We recorded a zero income tax benefit for the three months ended September 30, 2023.

Previous wording

Revenue from the sale of metals. During the six months ended June 30, 2024, all revenue was generated from the Velardeña properties. The Velardeña operations produced three types of concentrate, and also generated revenue from slag sales. During the six months ended June 30, 2023, the Rodeo operations sold mainly doré*.*We also sold slag remaining from previous doré sales and doré production at Plant 2.

Current wording

Revenue from the sale of metals. During the nine months ended September 30, 2024, all revenue was generated from the Velardeña properties. The Velardeña operations produced three types of concentrate before operations terminated in March 2024, and also generated revenue from slag sales. During the nine months ended September 30, 2023, the Rodeo operations sold mainly doré*.*We also sold slag remaining from previous doré sales and doré production at Plant 2.

Previous wording

Cost of metals sold. For the six months ended June 30, 2024 and 2023, we recorded $5.4 million and $7.9 million of cost of metals sold, respectively. Lower costs in 2024 compared to 2023 were due primarily to lower mining costs as mining was discontinued at the end of February 2024, and lower processing costs, as the processing of sulfide material was discontinued at the end of March 2024.

Current wording

Cost of metals sold. For the nine months ended September 30, 2024 and 2023, we recorded $6.0 million and $11.2 million of cost of metals sold, respectively. Lower costs in 2024 compared to 2023 were due primarily to lower mining costs as mining was discontinued at the end of February 2024, and lower processing costs, as the processing of sulfide material was discontinued at the end of March 2024.

Previous wording

Exploration expense. Our exploration expense, including property holding costs and allocated administrative expenses, totaled $0.3 million and $0.8 million for the three months ended June 30, 2024 and 2023, respectively. The lower exploration expense for 2024 is primarily related to less activity in 2024 due to the cash constraints of the Company.

Current wording

Exploration expense. Our exploration expense, including property holding costs and allocated administrative expenses, totaled $1.2 million and $2.9 million for the nine months ended September 30, 2024 and 2023, respectively. The lower exploration expense for 2024 is primarily related to less activity in 2024 due to the cash constraints of the Company.

Previous wording

Velardeña care and maintenance costs. We recorded no expenses related to care and maintenance at our Velardeña Properties for the six-month period ended June 30, 2024 as the Velardeña Properties were operating during that period and are now being held for short-term sale. We recorded $0.6 million related to care and maintenance for the six-month period ended June 30, 2023, respectively, for expenses related to care and maintenance at our Velardeña Properties as the result of the suspension of mining and processing activities in November 2015.

Current wording

Velardeña care and maintenance costs. We recorded no expenses related to care and maintenance at our Velardeña Properties for the nine-month period ended September 30, 2024 as the Velardeña Properties were operating during that period and have either been sold or are now being held for sale. We recorded $0.9 million related to care and maintenance for the nine-month period ended September 30, 2023, respectively, for expenses related to care and maintenance at our Velardeña Properties as the result of the previous suspension of mining and processing activities in November 2015.

Previous wording

*El Quevar project expense.*We recorded $0.3 million for each of the six months ended June 30, 2024 and June 30, 2023. During the six months ended June 30, 2024 and 2023, approximately $0.0 million and $0.0 million, respectively, of costs actually incurred were offset by reimbursements from Barrick.

Current wording

*El Quevar project expense.*We recorded $0.4 million for each of the nine months ended September 30, 2024 and September 30, 2023. During the nine months ended September 30, 2024 and 2023, approximately $0.0 million and $0.1 million, respectively, of costs actually incurred were offset by reimbursements from Barrick.

Previous wording

Administrative expense. Administrative expenses totaled $2.1 million and $2.5 million for the six months ended June 30, 2024 and 2023, respectively. Administrative expenses, including costs associated with being a public company, are incurred primarily by our corporate activities in support of the Yoquivo Property, Rodeo Property, Velardeña Properties, El Quevar project and our exploration portfolio.

Current wording

Administrative expense. Administrative expenses totaled $3.0 million and $3.7 million for the nine months ended September 30, 2024 and 2023, respectively. Administrative expenses, including costs associated with being a public company, are incurred primarily by our corporate activities in support of the Yoquivo Property, Rodeo Property, Velardeña Properties, El Quevar project and our exploration portfolio.

Previous wording

Stock-based compensation. During the six months ended June 30, 2024 and 2023, we incurred approximately $0.3 million and $0.2 million, respectively, of expense related to stock-based compensation. Stock-based compensation varies from period to period depending on the number and timing of shares granted, the type of grant, the market value of the shares on the date of grant and other variables.

Current wording

Stock-based compensation. During each of the nine months ended September 30, 2024 and 2023, we incurred approximately $0.3 million of expense related to stock-based compensation. Stock-based compensation varies from period to period depending on the number and timing of shares granted, the type of grant, the market value of the shares on the date of grant and other variables.

Previous wording

Reclamation and accretion expense. During the six months ended June 30, 2024, we incurred approximately $0.2 million of reclamation expense, during the six months ended June 30, 2024, we incurred approximately $0.1 million of reclamation expense related to the accretion of an asset retirement obligation at the Velardeña and Rodeo properties.

Current wording

Reclamation and accretion expense. During each of the nine months ended September 30, 2024 and 2023 we incurred approximately $0.2 million of reclamation expense, related to the accretion of an asset retirement obligation at the Velardeña and Rodeo properties.

Previous wording

Depreciation, depletion and amortization. During each of the six months ended June 30, 2024 and 2023, we incurred depreciation, depletion and amortization expense of approximately $0.2 million.

Current wording

Depreciation, depletion and amortization. During the nine months ended September 30, 2024 and 2023, we incurred depreciation, depletion and amortization expense of approximately $0.2 million and $0.4 million respectively.

Previous wording

Interest and other expense, net. We recorded a nominal amount of interest and other expense, net for each of the six months ended June 30, 2024 and 2023.

Current wording

Interest and other expense, net. We recorded a nominal amount of interest and other expense, net for each of the nine months ended September 30, 2024 and 2023.

Previous wording

(Loss) gain on foreign currency losses. During the six months ended June 30, 2024, we recorded $0.1 million of foreign exchange losses. During the six months ended June 30, 2023, we recorded $0.1 million of foreign exchange gains. Foreign currency gains and losses are primarily related to the effect of currency fluctuations on monetary transactions incurred by our foreign subsidiaries that are denominated in currencies other than U.S. dollars.

Current wording

(Loss) gain on foreign currency losses. During each of the nine months ended September 30, 2024 and 2023, we recorded $0.1 million of foreign exchange losses. Foreign currency gains and losses are primarily related to the effect of

Previous wording

Income taxes. We recorded a zero tax expense for the six months ended June 30, 2024. We recorded less than $1,000 of tax expense for the six months ended June 30, 2023.

Current wording

Income taxes. We recorded a zero tax expense for the nine months ended September 30, 2024. We recorded less than $1,000 of tax expense for the nine months ended September 30, 2023.

Previous wording

We do not currently have sufficient resources to meet our expected cash needs during the twelve months ended June 30, 2025. At June 30, 2024, we had current assets of approximately $2.5 million, including cash and cash equivalents of approximately $1.4 million. On the same date, we had accounts payable and other current liabilities of approximately $4.8 million. Because we have ceased mining at the Velardeña mine, our only near-term opportunity to generate cash flow is from the sale of assets and equity or other external financings. As of August 9, 2024, we have cash and cash equivalents of approximately $0.7 million. In the absence of additional cash inflows, the Company anticipates that its cash resources will be exhausted in September 2024. The Company is considering bankruptcy filings for several of the its subsidiaries in Mexico. If we are unable to obtain additional cash resources, we will be forced to cease operations and liquidate.

Current wording

We do not currently have sufficient resources to meet our expected cash needs during the twelve months ending September 30, 2025. At September 30, 2024, we had current assets of approximately $2.5 million, including cash and cash equivalents of approximately $1.8 million. On the same date, we had accounts payable and other current liabilities of approximately $4.5 million, which includes $1.0 million in deferred revenue for the sale of the Velardeña oxide plant and water wells recorded withinCurrent liabilities held for sale on the interim Condensed Consolidated Balance Sheets.

Previous wording

We will require further sources of capital. In order to satisfy the Company’s projected general, administrative, exploration and other expenses through June 30, 2025, we will need approximately $6.0 to $8.0 million in capital inflows. These capital inflows may take the form of asset sales, equity or other external financing activities, collection of the amount due from the Velardeña sale, or from other sources.

Current wording

We will require further sources of capital. In order to satisfy the Company’s projected general, administrative, exploration and other expenses through September 30, 2025, we will need approximately $1.5 to $3.5 million in capital inflows. These capital inflows may take the form of asset sales, equity or other external financing activities, collection of the outstanding amounts due on the sale of the remaining Velardeña Properties and Yoquivo, or from other sources. The

Previous wording

The interim condensed consolidated financial statements have been prepared on a going concern basis under which an entity is considered to be able to realize its assets and satisfy its liabilities in the normal course of business. However, as noted above, our continuing operations will be dependent upon our ability to secure sufficient funding to support future operations. The amounts shown as mineral properties in our interim condensed consolidated financial statements are dependent on our ability to sell certain assets of the Company and receive future equity or other financings to continue to fund general administrative, and exploration activities that would lead to additional profitable mining and processing activities or to generate proceeds from the disposition of mineral exploration properties.

Current wording

These interim condensed consolidated financial statements have been prepared on a going concern basis under which an entity is considered to be able to realize its assets and satisfy its liabilities in the normal course of business. However, as noted above, our continuing operations will be dependent upon our ability to secure sufficient funding to support future operations. The amounts shown as mineral properties in our interim condensed consolidated financial statements are dependent on our ability to sell certain assets of the Company and receive future equity or other financings to continue to fund general administrative, and exploration activities that would lead to profitable mining and processing activities or to generate proceeds from the disposition of mineral exploration properties.

Previous wording

The ability of the Company to maintain a positive cash balance for a period of twelve months beyond the filing date of this Quarterly Report on Form 10-Q is dependent upon its ability to generate sufficient cash flow from the sale of assets, reduction of expenses, collection of the amount due from the Buyer for the oxide plant and water wells, collection of VAT accounts receivable from the Mexican government, and to raise sufficient funds through equity or other financings or from other sources. These material uncertainties cast significant doubt on the Company’s ability to continue as a going concern. Therefore, the Company cannot conclude that substantial doubt does not exist as to the Company’s ability to continue as a going concern for the twelve months following the filing date of this Quarterly Report on Form 10-Q. The financial statements do not include any adjustments relating to the recoverability and classification of recorded assets or liabilities, which might be necessary should the Company not continue as a going concern.

Current wording

The ability of the Company to maintain a positive cash balance for a period of twelve months beyond the filing date of this Quarterly Report on Form 10-Q is dependent upon its ability to generate sufficient cash flow from the sale of assets, reduction of expenses, collection of VAT accounts receivable from the Mexican government, collection of the amount due from the buyers of the remaining Velardeña Properties and Yoquivo, and to raise sufficient funds through equity or other external financings or from other sources. These material uncertainties cast significant doubt on the Company’s ability to continue as a going concern. Therefore, the Company cannot conclude that substantial doubt does not exist as to the Company’s ability to continue as a going concern for the twelve months following the filing date of this Quarterly Report on Form 10-Q. The financial statements do not include any adjustments relating to the recoverability and

Previous wording

At June 30, 2024, our aggregate cash and cash equivalents totaled $1.4 million, compared to the $3.8 million in similar assets held at December 31, 2023. The June 30, 2024 decrease is the result of the following expenditures and cash inflows for the six months ended June 30, 2024. Expenditures totaled $8.3 million from the following:

Current wording

At September 30, 2024, our aggregate cash and cash equivalents totaled $1.8 million, compared to the $3.8 million in similar assets held at December 31, 2023. The September 30, 2024 decrease is the result of the following expenditures and cash inflows for the nine months ended September 30, 2024. Expenditures totaled $10.1 million from the following:

Showing the first 40 of 43 pairs. Open the source sections for the rest.

Rearranged current paragraphs (4)

Current report — wording carried from elsewhere

drilling and expenditure requirements, we notified Cascadero of our intention to proceed with the joint venture as 51% owners of the concession. Completion of the joint venture documents and formation of the joint venture company are in progress.

Current report — wording carried from elsewhere

The lower exploration expense for 2024 is primarily related to less activity in 2024 due to the cash constraints of the Company.

Current report — wording carried from elsewhere

currency fluctuations on monetary transactions incurred by our foreign subsidiaries that are denominated in currencies other than U.S. dollars.

Current report — wording carried from elsewhere

classification of recorded assets or liabilities, which might be necessary should the Company not continue as a going concern.
Rearranged previous paragraphs (2)

Previous report — wording carried elsewhere

Velardeña care and maintenance costs. We recorded no expenses related to care and maintenance at our Velardeña Properties for the three-month period ended June 30, 2024 as the Velardeña Properties were operating during

Previous report — wording carried elsewhere

We have previously announced the execution of certain asset purchase and sale agreements with a privately held Mexican company. Pursuant to the terms of the sale agreements, we agreed to sell certain mining concessions, equipment, land parcels and other assets in exchange for an aggregate purchase price of $5.5 million in cash, plus VAT. There are four separate sales agreements. The first three sales agreements which include the combined sales of the Velardeña and Chicago mines, the sulfide processing plant and various related equipment were completed on June 20, 2024 and the titles to the assets were transferred to the Buyer. The fourth agreement covers the oxide plant and water wells, and the Buyer agreed to complete total payments of $3.0 million plus VAT on July 1, 2024. The Buyer has made payments of $477,000 through August 8, 2024 (see Note 19 above) and is currently in default. The Buyer has operational control of the plant, and we are no longer operating the oxide plant. The closing of the last sale may satisfy a portion of our projected capital needs over the next twelve months.