NIOCORP DEVELOPMENTS LTD

For the period ended Sep 30, 2025. Filed Nov 13, 2025.

View on SEC.gov

About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Sep 30, 2025 · Filed Nov 13, 2025

NB$2.90+7.2%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-Q

Period ended 2025-03-31; filed 2025-05-08.

0001539497-25-001285

ITEM 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

Current report: 10-Q

Period ended 2025-09-30; filed 2025-11-13.

0001539497-25-002940

ITEM 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 80 previous paragraphs and 84 current paragraphs.

31 unchanged; 26 reworded; 24 added; 17 removed; 6 previous and 3 current paragraphs rearranged.

Tables are not compared: 4 previous and 6 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (24)

Current report

On July 18, 2025, the Company issued and sold 13,850,000 Common Shares, at an offering price of $3.25 per Common Share, in a registered offering (the “July 2025 Offering”) under the Company’s registration statement on Form S-3 (Registration No. 333-280176), pursuant to the Placement Agency Agreement between the Company and Maxim Group LLC (“Maxim”), dated July 17, 2025. The Company received net proceeds from the July 2025 Offering, after deducting placement agent fees and other offering expenses payable by the Company, of approximately $41.2 million.

Current report

On August 5, 2025, the Company announced that we entered into a Project Sub-Agreement (the “DoD Agreement”) with Advanced Technology International (“ATI”), an entity acting on behalf of the Defense Industrial Base Consortium under the authority of the U.S. Department of Defense (“DoD”). Subject to the terms and conditions of the DoD

Current report

Agreement, ECRC is entitled to receive up to an aggregate of approximately $10.0 million of reimbursement payments from the DoD upon the achievement of certain project milestones. These milestones include, among other matters, the completion of new drilling operations at the Elk Creek Project to support the conversion of a portion of the current indicated mineral resources into measured mineral resources and the subsequent conversion of a portion of the current probable mineral reserves into proven mineral reserves, the production of samples of scandium metal and scandium-aluminum master alloys, and the completion of a new feasibility study for the Elk Creek Project..

Current report

On September 19, 2025, the Company issued and sold 10,000,000 Common Shares, at an offering price of $5.00 per Common Share, in a registered direct offering (the “September 2025 Registered Direct Offering”) under the Company’s registration statement on Form S-3 (Registration No. 333-280176), pursuant to the Placement Agency Agreement between the Company and Maxim, dated September 17, 2025. The Company received net proceeds from the September 2025 Registered Direct Offering, after deducting placement agent fees and other offering expenses payable by the Company, of approximately $46.0 million.

Current report

On September 29, 2025, the Company issued and sold (a) 7,004,740 Common Shares at a public offering price of $6.15 per Common Share and (b) 2,755,260 pre-funded Warrants to purchase an aggregate of 2,755,260 Common Shares (the “September Pre-Funded Warrants”) at a public offering price of $6.1499 per September Pre-Funded Warrant in a confidentially marketed public offering (the “September 2025 Public Offering”) under the Company’s registration statement on Form S-3 (Registration No. 333-280176), pursuant to the Placement Agency Agreement between the Company and Maxim, dated September 26, 2025. On September 30, 2025, the Company issued 2,755,218 Common Shares in connection with the cashless exercise of all of the outstanding September Pre-Funded Warrants. The Company received net proceeds from the September 2025 Public Offering, after deducting placement agent fees and other offering expenses payable by the Company, of approximately $55.3 million.

Current report

On October 15, 2025, the Company issued and sold (a) 10,152,175 Common shares at an offering price of $9.34 per Common Share and (b) 5,925,000 pre-funded Warrants (the “October Pre-Funded Warrants”) to purchase up to an additional 5,925,000 Common Shares at an offering price of $9.3399 per October Pre-Funded Warrant in a registered offering (the “October 2025 Offering”) under the Company's registration statement on Form S-3 (Registration No. 333-290837), pursuant to the Placement Agency Agreement between the Company and Maxim, dated October 13, 2025. On October 17, 2025, the Company issued 5,924,942 Common Shares in connection with the cashless exercise of all of the outstanding October Pre-Funded Warrants. The Company received net proceeds from the October 2025 Offering, after deducting placement agent fees and other offering expenses payable by the Company, of approximately $139.1 million.

Current report

On August 1, 2025, Elk Creek Resources Corp. (“ECRC”), an indirect, majority-owned subsidiary of the Company, closed on its option to purchase three parcels of land in Johnson County, Nebraska (the “August Properties”), pursuant to the terms of the Option to Purchase, dated as of December 4, 2009, as amended (the “2009 Option Agreement”), and the Option to Purchase, dated December 4, 2014, as amended (the “2014 Option Agreement” and together with the 2009 Option Agreement, the “August Option Agreements”), each between Roger and Nancy Woltemath and ECRC. Pursuant to the terms of the August Option Agreements, Roger and Nancy Woltemath sold, transferred, conveyed and assigned to ECRC all of their rights, privileges, title and interest in and to the surface rights with respect to one of the parcels (consisting of the property known as Woltemath80S) and to the surface rights and associated mineral rights with respect to a 1.66-acre parcel. The purchase price was approximately $2.7 million, including indirect costs of $35,000.

Current report

On September 8, 2025, the Company announced the successful completion of its previously announced drilling program at the Elk Creek Project (the “2025 Drilling Program”). The 2025 Drilling Program was divided into two phases. Phase I of the 2025 Drilling Program comprised 11 HQ diamond drill holes totaling approximately 7,339 meters and Phase II of the 2025 Drilling Program comprised four HQ diamond drill holes totaling approximately 2,235 meters. Two additional geomechanical drill holes totaling approximately 1,950 meters were also completed as part of an accelerated effort to support the underground mine design related to access ramp development. Assays of the drill holes completed during the 2025 Drilling Program are underway at external laboratories.

Current report

On September 30, 2025, ECRC closed on its options to purchase two parcels of land in Johnson County, Nebraska, which include: (i) a portion of the property known as Woltemath002, consisting of approximately 105.77 acres of land (the “Woltemath002 Property”), pursuant to the terms of the 2009 Option Agreement and (ii) the property known as Woltemath003J, consisting of approximately 220 acres of land (the “Woltemath003J Property” and, together with the Woltemath002 Property, the “ September Properties”), pursuant to the terms of the Amended and Restated Option to Purchase, dated January 4, 2017, as amended, between Victor and Juanita Woltemath (together with Roger and Nancy Woltemath, the “Owners”) and ECRC (the “2017 Option Agreement” and, together with the 2009 Option Agreement, the “September Option Agreements”). Pursuant to the terms of the September Option Agreements, the Owners sold, transferred, conveyed and assigned to ECRC all of their respective rights, privileges, title and interest in and to the surface rights and associated mineral rights, which consisted of approximately 325.77 acres of the property. The aggregate purchase price was approximately $11.3 million, including indirect costs of $29,000. This acquisition provides NioCorp with ownership of all land that hosts the Elk Creek Project’s Mineral Resource and Mineral Reserve and all acreage necessary to commence construction once project financing is obtained.

Current report

On November 7, 2025, ECRC completed the acquisition of a 40-acre parcel of land and associated mineral rights (the “November Property”) located within the one-square-mile section that comprises the Elk Creek Project area. The acquisition was completed in exchange for (i) the transfer of surface rights to a separate 40-acre tract constituting a portion of the September Properties, which lies outside the Elk Creek Project section, (ii) cash consideration of $500, and (iii) the grant of a 2% net smelter return royalty on the November Property. As a result of this transaction, the Company now holds full ownership of all surface rights within the one-square-mile section in which it plans to construct both the underground critical minerals mine and integrated surface processing facility associated with the Elk Creek Project.

Current report

Exploration expenditures increased for the three-month period in 2025 as compared to 2024, primarily due to expenditures associated with the 2025 Drilling Program.

Current report

Common Shares (“Options”) issued to board members and advisors in 2025 and increases in investor-facing services and stipend payments provided to board members.

Current report

Interest income represents earnings from the investment of excess cash balances in a commercial money market account. The increase for the three-month period in 2025 as compared to 2024 is due to an increase in our cash balance resulting from our successful financing efforts during calendar year 2025.

Current report

Adjusted net loss and adjusted net loss per share both increased for the three-month period in 2025, as compared to 2024, primarily due to the increase in exploration expenditures, as noted above, incurred by ECRC.

Current report

As discussed above under “—Recent Corporate Events”, the Company closed four equity offering transactions between July 18, 2025 and October 15, 2025. The combined net proceeds from these offerings were approximately $194.4 million, after deducting placement agency fees and other offering expenses payable by the Company. In addition, during the three-month period ended September 30, 2025, the Company issued an aggregate of 10,975,634 Common Shares through the exercise of Warrants and Options by their holders, for which the Company received proceeds totaling approximately $15.2 million. The Company expects to use these net proceeds for working capital and general corporate purposes, including to advance efforts to launch construction of the Elk Creek Project and move it to commercial operation.

Current report

and associated mine plan and an updated capital cost estimate in connection with the EXIM application process, ongoing engineering and metallurgical test work, environmental and permitting activities, community and stakeholder engagement programs, corporate and administrative overhead, and advisory costs related to securing project financing.

Current report

The Company will need to secure additional capital to finance construction and achieve commercial production to support its long-term business objectives. Until sufficient funding for construction is secured, the Company expects to limit activities to modest, value-preserving work and project readiness efforts. The Company also intends to evaluate strategies and potential investment opportunities that could reduce overall project costs, capital requirements, or execution risk.

Current report

We expect our cash balance as of September 30, 2025, as well as the net proceeds from the October 2025 Offering, the proceeds from Warrant and Option exercises that occurred since September 30, 2025, and the reimbursement payments pursuant to the DoD Agreement, to be sufficient to fund our planned expenditures for the next twelve months. However, additional work is required in order to advance the Elk Creek Project to construction, requiring additional financing. The technical report summary for the Elk Creek Project prepared in accordance with subpart 1300 of Regulation S-K (“S-K 1300”) and filed as Exhibit 96.1 to the Company’s Annual Report on Form 10-K for the fiscal year ended June 30, 2025, includes an estimated total upfront capital expenditure for the Elk Creek Project of approximately $1,141.0 million. The actual amount of capital expenditure required to successfully achieve commercial production at the Elk Creek Project is subject to, among other factors, the timing and actual cost of further exploration, preparing feasibility studies, permitting, engineering and the construction of infrastructure, mining and processing facilities. In addition, to the extent that EXIM requests further project activities to be undertaken in connection with the diligence process, the Company would require additional funding to complete such activities. As noted above, the Company’s ability to continue operations, fund our current work plan, and construct and operate the Elk Creek Project is dependent on management’s ability to secure additional financing. When available, the Yorkville Equity Facility Financing Agreement provides an opportunity for opportunistic share sales to help fund our current work plan. However, the Yorkville Equity Facility Financing Agreement will expire by its terms on April 1, 2026.

Current report

During the three months ended September 30, 2025, the Company’s investing activities consumed $14.1 million of cash (2024: $0). The cash used in investing activities for the three months ended September 30, 2025, reflects the acquisition of additional land and mineral rights for the Elk Creek Project.

Current report

The Company has included certain non-GAAP financial measures in this Quarterly Report on Form 10-Q such as adjusted net loss and adjusted net loss per share. Adjusted net loss for presentation purposes is our net loss attributable to the Company plus non-cash items plus (gain)/loss on non-recurring items plus tax adjustments. Adjusted net loss per share is the impact of these adjustments on the per share net losses incurred. These non-GAAP measures are intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance U.S. GAAP. Because these non-GAAP performance measures do not have any standardized meaning prescribed by U.S. GAAP, they may not be comparable to similar measures presented by other companies. The Company’s management believes that presenting adjusted net loss and adjusted net loss per share provides

Current report

investors with additional insight into underlying operating performance by excluding the non-cash losses noted above. Our presentation of certain non-GAAP financial measures should not be construed to imply that our future results will be unaffected by the types of items excluded from the calculations of non-GAAP measures. These non-GAAP measures are not presented in accordance with U.S. GAAP and the use of these terms vary from others in our industry.

Current report

Reconciliations of net loss attributable to the Company to adjusted net loss and net loss per share attributable to the Company to adjusted net loss per share are presented below:
Removed paragraphs (17)

Previous report

On April 21, 2025, the Company closed an underwritten public offering (the “April 2025 Offering”), pursuant to the underwriting agreement, dated April 17, 2025 (the “April 2025 Underwriting Agreement”), with Maxim Group LLC (“Maxim”), as underwriter, pursuant to which the Company issued and sold (i) 6,628,846 Common Shares at a public offering price of $2.60 per Common Share and (ii) 1,063,462 pre-funded Common Share Purchase Warrants (the “April 2025 Pre-Funded Warrants”) to purchase up to an additional 1,063,462 Common Shares at a public offering price of $2.5999. The April 2025 Pre-Funded Warrants have an exercise price of $0.0001 per underlying Common Share, are exercisable immediately, and do not have an expiration date. On April 17, 2025, Maxim partially exercised its over-allotment option to purchase 323,504 additional Common Shares at the closing. The gross proceeds from the April 2025 Offering were approximately $20.8 million, before deducting underwriting discounts and offering expenses.

Previous report

During the quarter ended March 31, 2025, the Company completed negotiations with two landowners in Nebraska and entered into contract amendments which extended the option periods by approximately five years for each Option to Purchase agreement (“OTP”) covering two parcels of land for project construction and operation which the Company

Previous report

does not already own. The Company paid $90,000 upon closing of the OTP extensions and will make periodic payments totaling $23,000 over the extension period related to these contract amendments. With the closing of these two OTP extensions, along with four extensions closed earlier in fiscal year 2025, all substantive OTPs related to the project have expiration dates between December 2029 and May 2040.

Previous report

Interest expense decreased for the three-month period in 2025 as compared to 2024, as 2024 included accretion expense associated with the unsecured convertible debentures (the “Convertible Debentures”) issued to Yorkville in March 2023. The outstanding balance of the Convertible Debentures was substantially reduced during fiscal year 2024 and was fully retired in the first quarter of 2025.

Previous report

Other Gains for the three-month period ended March 31, 2024, represents the change in fair value of Canadian dollar-denominated Options which were being carried as a liability.

Previous report

Employee-related expenditures decreased for the nine-month period in 2025 as compared to 2024 primarily due to a reduction in the number of options issued to employees and the impact of a lower stock price on the Black-Scholes modeling results.

Previous report

Exploration expenditures decreased for the nine-month period in 2025 as compared to 2024, as 2024 costs included operation of the demonstration-scale processing plant located in Trois-Rivieres, Quebec built by the Company and L3 Process Development (“L3”) and operated by L3 (the “Demonstration Plant”). Operation of the Demonstration Plant ended during the third quarter of fiscal year 2024.

Previous report

Other operating expenses decreased for the nine-month period in 2025 as compared to 2024 primarily due to a decrease in director and officer insurance expense, the timing of fully vested Options issued to board members and advisors, and declines in scandium development initiatives and financial-related services, partially offset by the cybersecurity expense incurred in 2025 associated with a cybersecurity incident that resulted in misdirected vendor payments.

Previous report

Overall, changes in the fair value of Earnout Shares and Warrant liabilities, and the decline in interest expense were based on the same factors that impacted the three-month results noted above.

Previous report

On April 12, 2024, the Company issued and sold to Yorkville and Lind Global Fund II (“Lind II” and, together with Yorkville, the “April 2024 Purchasers”), $8.0 million aggregate principal amount of unsecured notes (the “April 2024 Notes”), pursuant to a securities purchase agreement, dated April 11, 2024, between the Company and each of the April 2024 Purchasers. The Company also issued to the April 2024 Purchasers, in proportion to the aggregate principal amount of the April 2024 Notes issued to each April 2024 Purchaser, Warrants to purchase up to 615,385 Common Shares. All remaining amounts due to Lind II ($176,000) and Yorkville ($1.0 million) under the April 2024 Notes were repaid on January 6, 2025, And February 7, 2025, respectively.

Previous report

On September 11, 2024, the Company and Mark Smith entered into the Loan Agreement, by and between the Company and Mark Smith (the “Smith Loan Agreement”), which provides for a $2.0 million non-revolving credit facility (the “Smith Loan”). A total of $504,000 was subsequently drawn down, and subsequently the Company repaid $508,000, representing the balance of the interest and principal outstanding under the Smith Loan, plus $41,000 related to the loan origination fees payable.

Previous report

On November 5, 2024, the Company closed an underwritten public offering (the “November 2024 Registered Offering”), pursuant to the underwriting agreement, dated November 3, 2024, with Maxim, as underwriter, which consisted of 1,592,356 Common Shares, 1,672,090 Series A warrants to purchase up to an additional 1,672,090 Common Shares and 836,045 Series B warrants to purchase up to 836,045 Common Shares.

Previous report

On November 13, 2024, the Company closed a non-brokered private placement (the “November 2024 Private Offering”) pursuant to binding subscription agreements with certain accredited investors as part of a non-brokered private placement of 2,199,602 units of the Company (the “November 2024 Units”). Each November 2024 Unit consists of one Common Share, one Series A warrant to purchase up to an additional Common Share and one-half of one Series B warrant to purchase up to one-half of one Common Share.

Previous report

On January 31, 2025, the Company closed an underwritten public offering (the “January 2025 Offering”), pursuant to the underwriting agreement, dated January 29, 2025, with Maxim, as underwriter, which consisted of 2,577,320 Common Shares, 2,577,320 Series A warrants to purchase up to an additional 2,577,320 Common Shares and 1,288,660 Series B warrants to purchase up to 1,288,660 Common Shares.

Previous report

The gross proceeds from the April 2025 Offering were approximately $20.8 million, before deducting underwriting discounts and offering expenses of approximately $2.0 million. In addition, during the period from April 1, 2025 through May 8, 2025, the Company issued Common Shares under the Yorkville Equity Facility Financing Agreement and through the exercise of Warrants by their holders. As a result of these transactions, the Company received cash totaling approximately $3.6 million and issued 1,568,694 Common Shares. We expect to use the proceeds from the April 2025 Offering, the Yorkville Equity Facility Financing Agreement, and the Warrant exercise issuances noted above, to fund our planned expenditures for the next twelve months. However, additional work is required in order to advance the Elk Creek Project, and if the Company were able to obtain additional funding, the Company would be able to accelerate planned expenditures ahead of its current schedule. In addition, to the extent that EXIM requests further project activities to be undertaken in connection with the diligence process, the Company would require additional funding to complete such activities. The Company’s ability to continue operations and fund our current work plan is dependent on management’s ability to secure additional financing.

Previous report

When available, the Yorkville Equity Facility Financing Agreement provides an opportunity to actively manage the cash needs of the Company more closely, and the Company may also utilize the Yorkville Equity Facility Financing Agreement to potentially generate funds at a time when they are in need. Alternatively, the Company can also utilize the Yorkville Equity Facility Financing Agreement for opportunistic share sales. However, the Yorkville Equity Facility Financing Agreement will expire by its terms on April 1, 2026.

Previous report

Based on the conditions described within, management has concluded, as supported by the notes that accompany our financial statements for the year ended June 30, 2024, that substantial doubt exists as to our ability to continue as a going concern. The interim condensed consolidated financial statements included in this Quarterly Report on Form 10-Q have been prepared under the assumption that we will continue as a going concern. As defined under S-K 1300, we are a development stage issuer and we have incurred losses since our inception. We may not have sufficient cash, including Option and Warrant exercises subsequent to March 31, 2025, to fund normal operations for the next twelve months from the issuance date of this Quarterly Report on Form 10-Q without raising additional funds.
Reworded paragraphs (26)

Previous wording

The following discussion and analysis should be read in conjunction with our historical interim condensed consolidated financial statements and related notes included elsewhere in this Quarterly Report on Form 10-Q and the Annual Report on Form 10-K filed with the Securities and Exchange Commission (the “SEC”) for the year ended June 30, 2024 filed on September 23, 2024 (the “Annual Report on Form 10-K”), which have been prepared in accordance with generally accepted accounting principles in the United States (“U.S. GAAP”). This discussion and analysis contains forward-looking statements and forward-looking information that involve risks, uncertainties, and assumptions. Our actual results may differ materially from those anticipated in these forward-looking statements and information as a result of many factors, including, but not limited to, those set forth elsewhere in this Quarterly Report on Form 10-Q. See “Note Regarding Forward-Looking Statements” below.

Current wording

The following discussion and analysis should be read in conjunction with our historical interim condensed consolidated financial statements and related notes included elsewhere in this Quarterly Report on Form 10-Q and the Annual Report on Form 10-K filed with the Securities and Exchange Commission (the “SEC”) for the year ended June 30, 2025 filed on September 11, 2025 (the “Annual Report on Form 10-K”), which have been prepared in accordance with generally accepted accounting principles in the United States (“U.S. GAAP”). The Company uses certain non-GAAP financial measures. For a detailed description of each of the non-GAAP measures used herein, please refer to the discussion under “—Use of Non-GAAP Financial Measures and Reconciliations.”

Previous wording

Forward-looking statements have been based upon our current business and operating plans, as approved by the Company’s Board of Directors, and may include statements regarding the anticipated benefits of the transactions (the “2023 Transactions”) contemplated by the previously disclosed Business Combination Agreement, dated September 25, 2022 (the “Business Combination Agreement”), among the Company, GX Acquisition Corp. II and Big Red Merger Sub Ltd, including NioCorp’s ability to access the full amount of the expected net proceeds of the Standby Equity Purchase Agreement, dated January 26, 2023 (the “Yorkville Equity Facility Financing Agreement”), between the Company and YA II PN, Ltd., an investment fund managed by Yorkville Advisors Global, LP (“Yorkville”); the anticipated benefits of the April 2025 Offering (as defined below); NioCorp’s ability to receive a final commitment of financing from the Export-Import Bank of the United States (“EXIM”); anticipated benefits of the listing of the Common Shares, no par value, of the Company (“Common Shares”) on The Nasdaq Stock Market LLC (“Nasdaq”); the financial and business performance of NioCorp; NioCorp’s anticipated results and developments in the operations of NioCorp in future periods; NioCorp’s planned exploration and development activities; the adequacy of NioCorp’s financial resources; NioCorp’s ability to secure sufficient project financing to complete construction and commence operation of the Company’s niobium, scandium and titanium project (the “Elk Creek Project”) located in southeastern Nebraska and move it to commercial operation, including the required financing to get to a final investment decision; NioCorp’s expectation and ability to produce niobium, scandium, and titanium and the potential to produce rare earth elements at the Elk Creek Project; NioCorp’s plans to produce and supply specific products and market demand for those products; the outcome of current recovery process improvement testing and the evaluation of the benefits and costs of electrifying the mine using Railveyor technology, and NioCorp’s expectation that such process and design improvements could lead to greater efficiencies and cost savings in the Elk Creek Project, including the twin ramp Railveyor mining design; the Elk Creek Project’s ability to produce multiple critical metals; the Elk Creek Project’s projected ore production and mining operations over its expected mine life; the completion of technical and economic analyses on the potential addition of magnetic rare earth oxides to NioCorp’s planned product suite; NioCorp’s updating its technical report for the Elk Creek Project; statements with respect to the estimation of mineral resources and mineral reserves; the exercise of options to purchase additional land parcels; the execution of contracts with engineering, procurement and construction companies; the advancement of offtake discussions with potential customers; NioCorp’s ongoing evaluation of t…

Excerpt shortened here; the source contains the full paragraph.

Current wording

Forward-looking statements have been based upon our current business and operating plans, as approved by the Board, and may include statements regarding, among other matters, the financial and business performance of NioCorp; NioCorp’s anticipated results and developments in the operations of NioCorp in future periods; NioCorp’s planned exploration activities; the adequacy of NioCorp’s financial resources; NioCorp’s ability to secure sufficient project financing to complete construction and commence operation of the Company’s niobium, scandium, and titanium project (the “Elk Creek Project”) located in southeastern Nebraska; NioCorp’s ability to receive a final commitment of financing from the Export-Import Bank of the United States (“EXIM”); the estimated total upfront capital expenditure for the Elk Creek Project; NioCorp’s expectation and ability to produce niobium, scandium, and titanium and the potential to produce rare earth elements at the Elk Creek Project; NioCorp’s plans to produce and supply specific products and market demand for those products; NioCorp’s ability to access the full amount of the expected net proceeds of the Standby Equity Purchase Agreement, dated January 26, 2023 (the “Yorkville Equity Facility Financing Agreement”) between the Company and YA II PN, Ltd., an investment fund managed by Yorkville Advisors Global, LP (“Yorkville”); NioCorp’s expectation that it will receive the full $10 million in reimbursement under the DoD Agreement (as defined below); the intended use of our cash balance as of September 30, 2025 as well as the proceeds from the October 2025 Offering (as defined below), the proceeds from the exercise of Common Share purchase warrants (“Warrants”) and the reimbursement payments pursuant to the DoD Agreement; the expected results of the 2025 Drilling Program (as defined below) at the Elk Creek Project; the expectation that the results of the 2025 Drilling Program will be used to update the feasibility study for the Elk Creek Project; the Elk Creek Project’s ability to produce multiple critical metals; the Elk Creek Project’s projected ore production and mining operations over its expected mine life; the completion of technical and economic analyses on the potential addition of magnetic rare earth oxides to NioCorp’s planned product suite; statements with respect to the estimation of mineral resources and mineral reserves; the exercise of options to purchase additional land parcels; the execution of contracts with engineering, procurement and construction companies; NioCorp’s ongoing evaluation of the impact of inflation, supply chain issues, tariffs, and geopolitical unrest on the Elk Creek Project’s economic model; and the creation of full time and contract construction jobs over the construction period of the Elk Creek Project.

Previous wording

Forward-looking statements are frequently, but not always, identified by words such as “expects,” “anticipates,” “believes,” “intends,” “estimates,” “potential,” “possible,” and similar expressions, or statements that events, conditions, or results “will,” “may,” “could,” or “should” (or the negative and grammatical variations of any of these terms) occur or be achieved. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions, or future events or performance (often, but not always, using words or phrases such as “expects” or “does not expect,” “is expected,” “anticipates” or “does not anticipate,” “plans,” “estimates,” or “intends,” or stating that certain actions, events, or results “may,” “could,” “would,” “might,” or “will” be taken, occur or be achieved) are not statements of historical fact and may be forward-looking statements. Forward-looking statements reflect material expectations and assumptions, including, without limitation, expectations and assumptions relating to: NioCorp’s ability to receive sufficient project financing for the construction and development of the Elk Creek Project on acceptable terms or at all; the future price of metals; the stability of the financial and capital markets; NioCorp’s ability to service its debt and meet the payment obligations thereunder; and current estimates and assumptions regarding the 2023 Transactions and their benefits. Such forward-looking statements reflect the Company’s current views with respect to future events and are subject to certain known and unknown risks, uncertainties, and assumptions. Many factors could cause actual results, performance, or achievements to be materially different from any future results, performance, or achievements that may be expressed or implied by such forward-looking statements, including, among others, risks related to the following: NioCorp’s ability to use the net proceeds of the April 2025 Offering in a manner that will increase the value of shareholders’ investment; NioCorp’s ability to operate as a going concern; NioCorp’s requirement of significant additional capital; NioCorp’s ability to receive sufficient project financing for the construction of the Elk Creek Project on acceptable terms or at all; NioCorp’s ability to receive a final commitment of financing from EXIM on an acceptable timeline, on acceptable terms, or at all; NioCorp’s ability to recognize the anticipated benefits of the 2023 Transactions, including NioCorp’s ability to access the full amount of the expected net proceeds under the Yorkville Equity Facility Financing Agreement; NioCorp’s ability to continue to meet Nasdaq listing standards; risks relating to the Common Shares, including price volatility, lack of dividend payments and dilution or the perception of the likelihood of any of the foregoing; the extent to which NioCorp’s level of indebtedness and/or the terms contained in agreements…

Excerpt shortened here; the source contains the full paragraph.

Current wording

Forward-looking statements are frequently, but not always, identified by words such as “expects,” “anticipates,” “believes,” “intends,” “estimates,” “potential,” “possible,” and similar expressions, or statements that events, conditions, or results “will,” “may,” “could,” or “should” (or the negative and grammatical variations of any of these terms) occur or be achieved. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions, or future events or performance (often, but not always, using words or phrases such as “expects” or “does not expect,” “is expected,” “anticipates” or “does not anticipate,” “plans,” “estimates,” or “intends,” or stating that certain actions, events, or results “may,” “could,” “would,” “might,” or “will” be taken, occur or be achieved) are not statements of historical fact and may be forward-looking statements. Forward-looking statements reflect material expectations and assumptions, including, without limitation, expectations and assumptions relating to: NioCorp’s ability to receive sufficient project financing for the construction of the Elk Creek Project on acceptable terms, or at all; the future price of metals; the stability of the financial and capital markets; and current estimates and assumptions regarding the Yorkville Equity Facility Financing Agreement and its benefits. Such forward-looking statements reflect the Company’s current views with respect to future events and are subject to certain known and unknown risks, uncertainties, and assumptions. Many factors could cause actual results, performance, or achievements to be materially different from any future results, performance, or achievements that may be expressed or implied by such forward-looking statements, including, among others, risks related to the following: NioCorp’s requirement of significant additional capital; NioCorp’s ability to receive sufficient project financing for the construction of the Elk Creek Project on acceptable terms, or at all; NioCorp’s ability to achieve the required milestones and receive the full $10.0 million in reimbursement under the DoD Agreement; NioCorp’s ability to receive a final commitment of financing from EXIM or other debt financing or financial support on acceptable timelines, on acceptable terms, or at all; NioCorp’s ability to access the full amount of the expected net proceeds under the Yorkville Equity Facility Financing Agreement; NioCorp’s ability to continue to meet Nasdaq listing standards; risks relating to the common shares, no par value, of the Company (“Common Shares”), including price volatility, lack of dividend payments and dilution or the perception of the likelihood of any of the foregoing; the extent to which NioCorp’s level of indebtedness and/or the terms contained in agreements governing NioCorp’s indebtedness, if any, the Yorkville Equity Facility Financing Agreement or other agreements may impair NioCor…

Excerpt shortened here; the source contains the full paragraph.

Previous wording

Should one or more of these risks or uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described herein. This list is not exhaustive of the factors that may affect any of the Company’s forward-looking statements. Forward-looking statements are statements about the future and are inherently uncertain, and actual achievements of the Company or other future events or conditions may differ materially

Current wording

Should one or more of these risks or uncertainties materialize, or should underlying assumptions prove incorrect, actual results may vary materially from those described herein. This list is not exhaustive of the factors that may affect any of the Company’s forward-looking statements. Forward-looking statements are statements about the future and are inherently uncertain, and actual achievements of the Company or other future events or conditions may differ materially from those reflected in the forward-looking statements due to a variety of risks, uncertainties, and other factors, including without limitation those discussed under the heading “Risk Factors” in our Annual Report on Form 10-K, as well as other factors described elsewhere in this Quarterly Report on Form 10-Q and the Company’s other reports filed with the SEC.

Previous wording

Our primary business strategy is to advance our Elk Creek Project to commercial production. We are focused on obtaining additional funds to carry out our near-term planned work programs associated with securing the project financing necessary to complete mine development and construction of the Elk Creek Project.

Current wording

Our primary business strategy is to advance our Elk Creek Project to commercial production. We are focused on carrying out our near-term planned work programs associated with securing the project financing package necessary to complete mine development and construction of the Elk Creek Project.

Previous wording

The combined gross proceeds from the November 2024 Registered Offering, the November 2024 Private Offering, and the January 2025 Offering were approximately $11.0 million, before deducting underwriting discounts and offering expenses. These proceeds were used for working capital and general corporate purposes, to repay amounts outstanding on the Smith Loan, to repay the April 2024 Notes, and to a limited degree, to advance efforts to launch construction of the Elk Creek Project and move it to commercial operation.

Current wording

The Company intends to use the net proceeds from the July 2025 Offering, September 2025 Registered Direct Offering, September 2025 Public Offering, and October 2025 Offering for working capital and general corporate purposes, including to advance its efforts to launch construction of the Elk Creek Project and move it to commercial operation.

Previous wording

On April 23, 2025, the Company announced the launch of a drilling campaign (the “Campaign”) designed to support the conversion of a portion of its current Indicated Resources into Measured Resources and the subsequent conversion of a portion of its current Probable Mineral Reserves into Proven Mineral Reserves at the Elk Creek Project. The Campaign will supplement previous exploratory drilling and will operate under existing permits issued by the State of Nebraska. The Campaign is intended to complement other technical and economic analyses necessary to update the feasibility study for the Elk Creek Project. An updated feasibility study is necessary as part of the due diligence process for up to $800 million in potential debt financing that NioCorp is seeking from EXIM, as further discussed under “Liquidity and Capital Resources*”*below.

Current wording

The 2025 Drilling Program and associated technical work is designed to support the conversion of a portion of the Elk Creek Project's Indicated Mineral Resources into Measured Mineral Resources and the subsequent conversion of a portion of its Probable Mineral Reserves into Proven Mineral Reserves. The 2025 Drilling Program was designed to help meet Mineral Resource and Mineral Reserve classification requirements associated with the ongoing review of the Company's application for up to $800 million in potential debt financing by EXIM, as further discussed under “—Liquidity and Capital Resources.”

Previous wording

The Company has developed and begun to execute a work plan to further advance the development of the Elk Creek Project. In addition to the expected updates to Mineral Resources and Mineral Reserves, noted above, the Company expects to finalize engineering and costing of its new and more efficient production process which incorporates the potential addition of light and heavy magnetic rare earth oxides, the planned production of titanium in the form of titanium tetrachloride, and the potential to produce both ferroniobium and niobium oxide as commercial products. In addition, the Company is examining plans to potentially modify the design of the mine to incorporate a twin ramp for access along with a Railveyor system for material movement instead of utilizing its currently planned vertical mining shafts. The updated mine design is expected to also incorporate updated costing. This work is expected to be summarized in an updated feasibility study for the Elk Creek Project.

Current wording

The Company continues to execute a work plan to further advance the development of the Elk Creek Project. In addition to the expected updates to Mineral Resources and Mineral Reserves, noted above, the Company expects to finalize engineering and costing of its new and more efficient production process which incorporates the potential addition of light and heavy magnetic rare earth oxides, the planned production of titanium in the form of titanium tetrachloride, and the potential to produce both ferroniobium and niobium oxide as commercial products. In addition, the Company is advancing engineering to potentially modify the design of the mine to incorporate a twin ramp for access along with a Railveyor system for material movement instead of utilizing vertical mining shafts. The updated mine design is expected to also incorporate updated costing. This work is expected to be summarized in an updated feasibility study for the Elk Creek Project.

Previous wording

Employee-related expenditures decreased for the three-month period in 2025 as compared to 2024 primarily due to the timing of options issued to employees in 2024.

Current wording

Employee-related expenditures increased for the three-month period in 2025 as compared to 2024 primarily due to the timing of options issued to employees in 2025.

Previous wording

Professional fees decreased for the nine-month period in 2025 as compared to 2024, primarily due to higher costs incurred in 2024 related to the timing of legal services associated with the Company’s SEC registration statements filed in October 2023, as well as increased audit fees associated with the Company’s June 30, 2023 financial statements and increased review fees in connection with the Company’s September 30, 2023 financial statements.

Current wording

Professional fees increased for the three-month period in 2025 as compared to 2024, primarily due to higher costs incurred in 2025 related to the timing of legal services associated with the preparation of the Company’s SEC registration statements filed in October 2025.

Previous wording

Other operating expensesinclude costs related to investor relations, general office expenditures, equity offering and proxy expenditures, board-related expenditures, and other miscellaneous costs. These costs decreased for the three-month period in 2025 as compared to 2024 primarily due to the timing of fully vested Options issued to board members and advisors in 2024, a decline in financial services spending, and lower general insurance costs, partially offset by the cybersecurity expense incurred in 2025 associated with a cybersecurity incident that resulted in misdirected vendor payments.

Current wording

Other operating expensesinclude costs related to investor relations, general office expenditures, shareholder services and proxy expenditures, board-related expenditures, and other miscellaneous costs. These costs increased for the three-month period in 2025 as compared to 2024 primarily due to the timing of fully vested options to purchase

Previous wording

Other significant items impacting the change in the Company’s net loss are noted below*:*

Current wording

Other significant items impacting the change in the Company’s net loss and net loss per share are noted below*:*

Previous wording

Change in fair value of Earnout Shares liabilityrepresents the changes in fair value related to the shares of Class B common stock of Elk Creek Resource Corporation (“ECRC”), an indirect, majority-owned subsidiary of NioCorp formerly known as GX Acquisition Corp. II, the rights of the holders of which to exchange such shares into Common Shares are subject to certain vesting conditions (such shares of ECRC Class B common stock, the “Earnout Shares”). The 2025 expense represents the impact of an increase in the Company’s Common Share price on the financial modeling used to determine the period end fair values, whereas the 2024 gain represents the impact of a lower share price on the financial modeling results.

Current wording

Change in fair value of Earnout Shares liabilityrepresents the changes in fair value related to the shares of Class B common stock of ECRC, the rights of the holders of which to exchange such shares into Common Shares are subject to certain vesting conditions (such shares of ECRC Class B common stock, the “Earnout Shares”). The 2025 expense represents the impact of an increase in the Company’s Common Share price on the financial modeling used to determine the period end fair values, whereas the 2024 gain represents the impact of a lower share price on the financial modeling results.

Previous wording

Change in fair value of warrant liabilitiesrepresents the changes in fair value of Common Share purchase warrants (“Warrants”) that are carried as liabilities in the condensed consolidated balance sheet. Expense for the three-month period ending March 31, 2025, reflects the impact of an increase in the Company’s Common Share price on the

Current wording

Change in fair value of warrant liabilitiesrepresents the changes in fair value of Warrants that are carried as liabilities in the condensed consolidated balance sheet. Expense for the three-month period ending September 30, 2025, reflects the impact of an increase in the Company’s Common Share price on the Black-Scholes modeling results for our outstanding Warrant liabilities, whereas the 2024 gain primarily represents the impact of a lower share price on the modeling at period end.

Previous wording

Loss attributable to noncontrolling interest represents the portion of net loss in ECRC not owned by the Company.

Current wording

Loss attributable to noncontrolling interest represents the portion of net loss in ECRC not owned by the Company. The increase in loss for the three-month period in 2025 as compared to 2024 is related to the increased exploration expenditures, as noted above, incurred by ECRC.

Previous wording

As of March 31, 2025, the Company had cash of $1.3 million and working capital of $0.3 million, compared to cash of $2.0 million and a working capital deficit of $9.0 million on June 30, 2024.

Current wording

As of September 30, 2025, the Company had cash of $162.8 million and working capital of $159.6 million, compared to cash of $25.6 million and working capital of $24.8 million on June 30, 2025.

Previous wording

We expect that the Company will operate at a loss for the foreseeable future. The Company’s current planned cash needs are approximately $23.0 million for the next twelve months. In addition to outstanding accounts payable and short-term liabilities, our planned expenditures over the next twelve months are expected to consist of expenditures relating to certain advancements of the Elk Creek Project by NioCorp’s majority owned subsidiary, ECRC, corporate overhead costs and estimated costs related to securing financing necessary for advancement of the Elk Creek Project.

Current wording

We expect that the Company will operate at a loss for the foreseeable future. The Company’s current planned cash outflows are approximately $40.0 million to $50.0 million for the next twelve months. Our planned cash outflows over the next twelve months are expected to consist of expenditures relating to limited, incremental activities to advance certain aspects of the Elk Creek Project by NioCorp’s majority owned subsidiary, ECRC, corporate overhead costs, and estimated costs related to securing financing necessary for advancement of the Elk Creek Project. These planned expenditures include expenditures relating to the anticipated completion of an updated resource and reserve estimate

Previous wording

The planned corporate overhead costs include Elk Creek property lease commitments, which are $22,000 through June 30, 2025, and outstanding accounts payable.

Current wording

The planned corporate overhead costs over the next twelve months are approximately $11.0 million, including Elk Creek property lease commitments, which are $65,000 through June 30, 2026, and the settlement of outstanding accounts payable as of September 30, 2025.

Previous wording

The estimated financing costs associated with the Elk Creek Project over the next twelve months include, but are not limited to, costs relating to the EXIM application process, the scope of which remains under discussion with EXIM. On June 6, 2023, the Company announced that it had submitted an application to EXIM for debt financing (the “EXIM Financing”) to fund the project costs for the Elk Creek Project, under EXIM’s “Make More in America” initiative. The EXIM Financing is subject to, among other matters, the satisfactory completion of due diligence, the negotiation and settlement of final terms, and the negotiation of definitive documentation. There can be no assurance that the EXIM Financing will be completed on the terms described herein or at all. The Company was informed that its application received approval by the first of three reviews by the EXIM Transaction Review Committee (the “TRC”) on October 2, 2023. During the quarter, EXIM continued to process the Company’s application for debt financing under EXIM’s Make More in America Program. The Company’s application sits at TRC in the second step in EXIM’s four-step approval process. The Company continues to meet with EXIM as well as providing responses to requests for additional information from EXIM and to the consultants that are conducting due diligence on the Company’s application on behalf of EXIM. As part of the diligence process, EXIM has identified additional project activities to be undertaken, including, among other things, an updated mine plan and updated Elk Creek Project capital costs on a final or close-to-final basis reflecting updated process flows. However, there can be no assurance what further project activities or matters EXIM may request in connection with the application process. We are currently unable to estimate how long the application process may

Current wording

The estimated financing costs associated with the Elk Creek Project over the next twelve months include, but are not limited to, costs relating to the EXIM application process, the scope of which remains under discussion with EXIM. On June 6, 2023, the Company announced that it had submitted an application to EXIM for up to $800 million in debt financing (the “EXIM Financing”) to fund the project costs for the Elk Creek Project, under EXIM’s “Make More in America” initiative. The EXIM Financing is subject to, among other matters, the satisfactory completion of due diligence, the negotiation and settlement of final terms, and the negotiation of definitive documentation. The Company was informed that its application received approval by the first of three reviews by the EXIM Transaction Review Committee (the “TRC”) on October 2, 2023. In April 2024, EXIM provided the Company with a preliminary, non-binding indicative term sheet as part of a Preliminary Project Letter (the “PPL”), which also conveyed EXIM’s initial due diligence findings on the Company’s application for the EXIM Financing. The PPL identified additional project activities to be undertaken by the Company as part of EXIM’s due diligence process. These included, among other things, an updated mine plan and updated Elk Creek Project capital costs on a final or close-to-final basis reflecting updated process flows. The 2025 Drilling Program, which started in April 2025, was designed to help meet mineral resource and mineral reserve classification requirements necessary to complete certain of the additional project activities identified by the PPL. In addition, as previously disclosed, the Company took an additional step in the process by executing a professional services agreement with SLR Consulting to conduct an independent environmental and social review as part of EXIM’s ongoing project due diligence.

Previous wording

Except for the potential funding from advances under the Yorkville Equity Facility Financing Agreement, as discussed above, and the potential exercise of Options and Warrants, we currently have no further funding commitments or arrangements for additional financing at this time. Management is actively pursuing additional sources of debt and equity financing, and while it has been successful in doing so in the past, there is no assurance that we will be able to obtain any such additional financing on acceptable terms, if at all. Pursuant to the Exchange Agreement, dated as of March 17, 2023 (as amended, supplemented or otherwise modified, the “Exchange Agreement”), by and among NioCorp, ECRC and the Sponsor, NioCorp is restricted from issuing equity or equity-linked securities (other than Common Shares) or any preferred equity or non-voting equity if such issuance would adversely impact the rights of the holders of the shares of Class B common stock of ECRC, without the consent of the holders of a majority of the shares of Class B common stock of ECRC. The April 2025 Underwriting Agreement also contains certain covenants that, among other things, limit NioCorp’s ability to enter into any variable rate transaction, including issuances of equity or debt securities that are convertible into Common Shares at variable rates and any equity line of credit, at-the-market agreement or other continuous offering of Common Shares, subject to certain exceptions, until July 2025. Notwithstanding the restrictions set forth in the Exchange Agreement and the April 2025 Underwriting Agreement, there is significant uncertainty that we would be able to secure any additional financing in the current equity or debt markets. The quantity of funds to be raised and the terms of any proposed equity or debt financing that may be undertaken will be negotiated by management as opportunities to raise funds arise. Management may pursue funding sources of both debt and equity financing, including but not limited to the issuance of equity securities in the form of Common Shares, Warrants, subscription receipts, or any combination thereof in units of the Company pursuant to private placements to accredited investors or pursuant to public offerings in the form of underwritten/brokered offerings, registered direct offerings, or other forms of equity financing and public or private issuances of debt securities, including secured and unsecured convertible debt instruments, or secured debt project financing. Management does not currently know the terms pursuant to which such financings may be completed in the future, but any such financings will be negotiated at arm’s-length. Future financings involving the issuance of equity securities or derivatives thereof will likely be completed at a discount to the then-current market price of the Company’s securities and will likely be dilutive to current shareholders. In addition, we could raise funds through the sale of interests in our minera…

Excerpt shortened here; the source contains the full paragraph.

Current wording

Except for the potential funding from advances under the Yorkville Equity Facility Financing Agreement, as discussed above, and the potential exercise of Options and Warrants, we currently have no further funding commitments or arrangements for additional financing at this time. Management currently anticipates that it will fund the upfront capital expenditure amount for the Elk Creek Project through a combination of debt and equity financing, with approximately two-thirds of such amount being funded from the net proceeds of debt financing, including the amount of debt that would be represented by the EXIM Financing, if any. Management is actively pursuing additional sources of debt and equity financing to meet its long-term funding requirements, and while it has been successful in doing so in the past, there is no assurance that we will be able to obtain any such additional financing on acceptable terms, if at all. Pursuant to the Exchange Agreement, dated as of March 17, 2023 (as amended, supplemented or otherwise modified, the “Exchange Agreement”), by and among NioCorp, ECRC and GX Sponsor II LLC, NioCorp is restricted from issuing equity or equity-linked securities (other than Common Shares) or any preferred equity or non-voting equity if such issuance would adversely impact the rights of the holders of the shares of Class B common stock of ECRC, without the consent of the holders of a majority of the shares of Class B common stock of ECRC. The various placement agency agreements entered into with Maxim in connection with the equity offerings described above under “—Recent Corporate Events,” including the October 2025 Placement Agency Agreement, also contain certain covenants that, among other things, limit NioCorp’s ability to enter into any variable rate transaction on or before November 28, 2025, including issuances of equity or debt securities that are convertible into Common Shares at variable rates and any equity line of credit, at-the-market offering agreement, or other continuous offering of Common Shares, other than with Maxim, subject to certain exceptions. Notwithstanding the restrictions set forth in the Exchange Agreement, as well as the various placement agency agreements, there is significant uncertainty that we would be able to secure any additional financing in the current equity or debt markets. The quantity of funds to be raised and the terms of any proposed equity or debt financing that may be undertaken will be negotiated by management as opportunities to raise funds arise. Management may pursue funding sources of both debt and equity financing, including but not limited to the issuance of equity securities in the form of Common Shares, Warrants, subscription receipts, or any combination thereof in units of the Company pursuant to private placements to accredited investors or pursuant to public offerings in the form of underwritten/brokered offerings, registered direct offerings, or other forms of equity financing and pu…

Excerpt shortened here; the source contains the full paragraph.

Previous wording

The Company will require additional capital to meet its long-term operating requirements. Uncertainty in capital markets, supply chain disruptions, increased interest rates and inflation, and the potential for geographic recessions have contributed to general global economic uncertainty. During the three months ended March 31, 2025, these events continued to create uncertainty with respect to overall project funding and timelines. We believe that the going concern uncertainty cannot be alleviated with confidence until the Company has entered into a business climate where funding of its planned ongoing operating activities is secured. Therefore, these factors raise substantial doubt as to our ability to continue as a going concern.

Current wording

As defined under S-K 1300, we are a development stage issuer and we have incurred losses since our inception. The Company will require additional capital to meet its long-term operating requirements. Uncertainty in capital markets, supply chain disruptions, increased interest rates and inflation, and the potential for geographic recessions have contributed to general global economic uncertainty. During the three-month period ended September 30, 2025, these events continued to create uncertainty with respect to overall project funding and timelines. The Company will need to secure additional capital to finance construction and achieve commercial production to support its long-term business objectives.

Previous wording

During the nine months ended March 31, 2025, the Company’s operating activities consumed $5.9 million of cash (2024: $5.6 million). The cash used in operating activities for the nine months ended March 31, 2025, reflects the Company’s funding of losses of $8.0 million, increased fair value related to the Earnout Shares and Warrant liabilities, share-based compensation, and other non-cash transactions. Overall, operational outflows during the nine months ended March 31, 2025, decreased from the corresponding period of 2024 due to costs and expenditures incurred in connection with the Company’s Demonstration Plant. Going forward, the Company’s working capital requirements are expected to increase substantially in connection with the development of the Elk Creek Project.

Current wording

Shares and Warrant liabilities, share-based compensation, and other non-cash transactions. Overall, operational outflows during the three months ended September 30, 2025, increased from the corresponding period of 2024 due to costs and expenditures incurred in connection with the 2025 Drilling Program. Going forward, the Company’s working capital requirements are expected to increase substantially in connection with the development of the Elk Creek Project.

Previous wording

Financing inflows were $5.2 million during the nine months ended March 31, 2025 (2024 inflows: $3.5 million), with 2025 inflows reflecting the gross receipts of $11.0 million from the equity offerings, $3.1 million from Common Share issuances under the Yorkville Equity Facility Financing Agreement, and $0.4 million from warrant exercises, offset by $7.2 million of convertible debt repayments and $2.1 million of share issuance costs.

Current wording

Financing inflows were $158.0 million during the three months ended September 30, 2025 (2024 outflows: $1.2 million), with 2025 inflows reflecting the gross receipts of $155.0 million from the equity offerings, and $15.3 million from Warrant exercises, offset by $12.3 million of share issuance costs.

Previous wording

The Company has historically relied upon debt and equity financings to finance its activities. Subject to the restrictions set forth in the Exchange Agreement and the April 2025 Underwriting Agreement, the Company may pursue additional debt and/or equity financing in the medium term; however, there can be no assurance the Company will be able to obtain any required financing in the future on acceptable terms, or at all.

Current wording

The Company has historically relied upon debt and equity financings to finance its activities. Subject to the restrictions set forth in the Exchange Agreement and the various placement agency agreements with Maxim, the Company may pursue additional debt and/or equity financing in the medium term; however, there can be no assurance the Company will be able to obtain any required financing in the future on acceptable terms, or at all.

Previous wording

The ability of the Company to arrange additional financing in the future will depend, in part, on the prevailing capital market conditions, and its success in developing the Elk Creek Project. Any quoted market for the Common Shares may be subject to market trends generally, notwithstanding any potential success of the Company in creating revenue, cash flows, or earnings, and any depression of the trading price of the Common Shares could impact its ability to obtain equity financing on acceptable terms.

Current wording

The ability of the Company to arrange additional financing in the future will depend, in part, on the prevailing capital markets conditions, and its success in developing the Elk Creek Project. Any quoted market for the Common Shares may be subject to market trends generally, notwithstanding any potential success of the Company in creating revenue, cash flows, or earnings, and any depression of the trading price of the Common Shares could impact its ability to obtain equity financing on acceptable terms.

Previous wording

Historically, the Company has used net proceeds from issuances of Common Shares to provide sufficient funds to meet its near-term exploration and development plans and other contractual obligations when due. However, development and construction of the Elk Creek Project will require substantial additional capital resources. This includes near-term funding and, ultimately, funding for Elk Creek Project construction and other costs. See “Liquidity and Capital Resources” above for the Company’s discussion of arrangements related to possible future financings.

Current wording

Historically, the Company has used net proceeds from issuances of Common Shares to provide sufficient funds to meet its near-term exploration and development plans and other contractual obligations when due. However, development and construction of the Elk Creek Project will require substantial additional capital resources. This includes funding for Elk Creek Project construction and other costs. See “—Liquidity and Capital Resources” above for the Company’s discussion of arrangements related to possible future financings.
Rearranged current paragraphs (3)

Current report — wording carried from elsewhere

This discussion and analysis contains forward-looking statements and forward-looking information that involve risks, uncertainties, and assumptions. Our actual results may differ materially from those anticipated in these forward-looking statements and information as a result of many factors, including, but not limited to, those set forth elsewhere in this Quarterly Report on Form 10-Q. See “—Note Regarding Forward-Looking Statements” below.

Current report — wording carried from elsewhere

The Company continues to meet with EXIM, provide responses to requests for additional information from EXIM and to the consultants that are conducting due diligence on the Company’s application on behalf of EXIM and take steps to complete the additional project activities identified by the PPL. There can be no assurance as to what further project activities or matters EXIM may request in connection with the application process. We are currently unable to estimate how long the application process may take, and there can be no assurances that we will be able to successfully negotiate a final commitment of debt financing from EXIM.

Current report — wording carried from elsewhere

During the three months ended September 30, 2025, the Company’s operating activities consumed $6.7 million of cash (2024: $0.6 million). The cash used in operating activities for the three months ended September 30, 2025, reflects the Company’s funding of losses of $43.5 million, primarily resulting from increased fair value related to the Earnout
Rearranged previous paragraphs (6)

Previous report — wording carried elsewhere

from those reflected in the forward-looking statements due to a variety of risks, uncertainties, and other factors, including without limitation those discussed under the heading “Risk Factors” in our Annual Report on Form 10-K, as well as other factors described elsewhere in this Quarterly Report on Form 10-Q and the Company’s other reports filed with the SEC.

Previous report — wording carried elsewhere

Black-Scholes modeling results for our outstanding Warrant liabilities, whereas the 2024 gain primarily represents the impact of a lower share price on the modeling at period end.

Previous report — wording carried elsewhere

Nine-month period ended March 31, 2025 compared to the nine-month period ended March 31, 2024

Previous report — wording carried elsewhere

Significant items affecting operating expenses are noted below.

Previous report — wording carried elsewhere

take, and there can be no assurances that we will be able to successfully negotiate a final commitment of debt financing from EXIM.

Previous report — wording carried elsewhere

The planned expenditures relating to the advancement of the Elk Creek Project over the next twelve months include, but are not limited to, an updated mine plan and updated capital costs in connection with the EXIM application process.