A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.
Mar 31, 2025 · Filed May 6, 2025
What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-Q
Period ended 2024-09-30; filed 2024-11-04.
0001509991-24-000087
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsCurrent report: 10-Q
Period ended 2025-03-31; filed 2025-05-06.
0001509991-25-000032
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 155 previous paragraphs and 117 current paragraphs.
65 unchanged; 31 reworded; 21 added; 56 removed; 3 previous and 0 current paragraphs rearranged.
Tables are not compared: 7 previous and 6 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (21)
Current report
Kosmos Energy is a leading deepwater exploration and production company focused on meeting the world’s growing demand for energy. We have diversified oil and gas production from assets offshore Ghana, Equatorial Guinea, Mauritania, Senegal and the Gulf of America. Additionally, in the proven basins where we operate we are advancing high-quality development opportunities, which have come from our exploration success.
Current report
In March 2025, during the Spring 2025 redetermination, the Company’s lending syndicate approved a borrowing base at the full Facility size of $1.35 billion.
Current report
During the first quarter of 2025, Ghana production averaged approximately 99,300 Boepd gross (33,000 Boepd net), including the partial impact on the quarter of the two week scheduled shutdown of the Jubilee FPSO.
Current report
The partnership completed a new 4D seismic survey on the Jubilee and TEN Fields during the first quarter of 2025 with processing currently underway. In December 2024, Tullow as the operator, entered into a drilling rig contract for the next development drilling campaign in the Jubilee Field, which is expected to commence in the second quarter of 2025. The campaign is planned to include the drilling and completion of two in-fill wells in the Jubilee Field in 2025 and a planned four-well drilling campaign in the Jubilee Field in 2026.
Current report
Gulf of America
Current report
Production from the Gulf of America averaged approximately 17,200 Boepd net (~85% oil) for the first quarter of 2025, including the impact of the one month scheduled shutdown at Devils Tower, the host facility for the Kodiak field.
Current report
In the fourth quarter of 2024, the corporate tax rate in Equatorial Guinea was reduced from 35% to 25%, with an effective date of January 1, 2025.
Current report
Greater Tortue Ahmeyim Project
Current report
Production in Mauritania and Senegal averaged approximately 5,100 Boepd gross (1,300 Boepd net) in the first quarter of 2025, as production from the GTA field was ramping up.
Current report
The Greater Tortue Ahmeyim (GTA) liquified natural gas (LNG) project achieved first gas production from the subsea system to the FPSO on December 31, 2024. First LNG was achieved in February 2025 and the partnership expects to achieve the ramp-up to the daily contracted sales volume, equivalent to approximately 2.45 million tonnes per annum, in the second quarter of 2025. The first LNG cargo was successfully completed in April 2025, with the second cargo currently lifting.
Current report
During the first quarter of 2025, low-rate subsea gas bubbles were discovered at the GTA A02 well offshore Mauritania during a planned commissioning test. The well has been capped which stopped the minor release. The A02 well is one of four wells for GTA Phase 1, and ramp-up and commissioning activities at GTA are not expected to be impacted while the A02 well is unavailable. Insurance proceeds are expected to cover a substantial portion of the costs for any repair of the well.
Current report
(1)Includes $58.1 million related to the LNG production at the GTA Phase 1 project in Mauritania and Senegal. All gas sales in Mauritania and Senegal are LNG sales. First LNG was achieved in February 2025.
Current report
(1)Includes the Winterfell-4 well which is considered a step out well from an accounting perspective, but is being drilled as part of the Winterfell phased development.
Current report
Depletion, depreciation and amortization. Depletion, depreciation and amortization increased by $19.7 million during the three months ended March 31, 2025, as compared with the three months ended March 31, 2024 primarily as a result of higher depletion rates per boe across our portfolio as a result of increased cost basis related to the respective development activities in 2024 and increased production in the Gulf of America, partially offset by the lower sales volumes in Ghana and Equatorial Guinea.
Current report
As of March 31, 2025, borrowings under the Facility totaled $1.0 billion and the undrawn availability under the Facility was $350.0 million. In March 2025, during the Spring 2025 redetermination, the Company’s lending syndicate approved a borrowing base at the full Facility size of $1.35 billion.
Current report
• complete development of the first phase of GTA; and
Current report
• advance appraisal and development efforts for the existing discoveries in the Gulf of America and internationally.
Current report
•Approximately $50 million related to the completion of the first phase of the GTA development in Mauritania and Senegal;
Current report
•Less than $75 million related to progressing our appraisal and development programs in the Gulf of America, Mauritania and Senegal.
Current report
In March 2025, during the Spring 2025 redetermination, the Company’s lending syndicate approved a borrowing base at the full Facility size of $1.35 billion.
Current report
We have a commitment to our buyer under the Tortue Phase 1 SPA, BP Gas Marketing Limited, to deliver our proportionate share of a minimum annual contract quantity of LNG of 127,951,000 MMBtu, which is equivalent to approximately 2.45 million tonnes per annum, subject to certain downward adjustments by the sellers. Under certain circumstances, in the event the annual quantities provided are lower than the minimum annual contract quantity, Kosmos may be obligated to credit or pay a portion of the Contract Price to BP Gas Marketing Limited for the shortfall volumes.
Removed paragraphs (56)
Previous report
We are a full-cycle, deepwater, independent oil and gas exploration and production company focused along the offshore Atlantic Margins. Our key assets include production offshore Ghana, Equatorial Guinea and the U.S. Gulf of Mexico, as well as world-class gas projects offshore Mauritania and Senegal. We also pursue a proven basin exploration program in Equatorial Guinea and the U.S. Gulf of Mexico.
Previous report
Globally, the impacts of Russia’s war in Ukraine, potential instability in the Middle East, a potential recession, inflationary pressures and other varying macroeconomic conditions have impacted supply and demand for oil and gas, which also has resulted in variability in oil and gas prices. The Company’s revenues, earnings, cash flows, capital investments, debt capacity and, ultimately, future rate of growth are highly dependent on these commodity prices.
Previous report
In September 2024, the Company issued $500.0 million of 8.750% Senior Notes and received net proceeds of approximately $494.9 million after deducting fees. We used the net proceeds, together with cash on hand, to complete the repurchase of an aggregate principal amount of $400.0 million of the 7.125% Senior Notes, $50.0 million of the 7.750% Senior Notes, and approximately $49.7 million of the 7.500% Senior Notes and to pay expenses related to the issuance of the 8.750% Senior Notes.
Previous report
During the third quarter of 2024, Ghana production averaged approximately 118,800 Boepd gross (40,500 Boepd net).
Previous report
The three year infill drilling campaign in Ghana concluded in the second quarter of 2024. The partnership now plans to conduct a new 4D seismic survey on the Jubilee Field starting in early 2025.
Previous report
During 2023, the Jubilee partners reached an interim agreement to sell Jubilee Field gas at a price of $2.95 per MMBtu to the Government of Ghana. This interim gas sales agreement has been extended for a further 18 months to November 2025 at a price of approximately $3.00 per MMBtu.
Previous report
U.S. Gulf of Mexico
Previous report
Production from the U.S. Gulf of Mexico averaged approximately 16,900 Boepd net (~84% oil) for the third quarter of 2024.
Previous report
The Odd Job Field subsea pump installation project was completed and successfully brought online in July 2024.
Previous report
The Kodiak #3 infill well located in Mississippi Canyon was initially brought online in April 2021. The well experienced production issues and was shut-in. In March 2022, the Company commenced operations to plug back and side-track the original Kodiak #3 infill well. The Kodiak-3ST well was brought online in early September 2022. Well results and initial production were in line with expectations, however well productivity declined thereafter. Workover operations were completed in July 2024 and successfully restored well productivity.
Previous report
In October 2023, we announced the Tiberius infrastructure-led exploration well, located in Keathley Canyon Block 964 in the Outer Wilcox play, encountered approximately 75 meters (250 feet) of net oil pay in the primary Wilcox target. Initial fluid and core analysis supports the production potential of the well, with characteristics analogous with similar nearby discoveries in the Wilcox trend. During the first quarter of 2024, Kosmos was awarded five blocks in the U.S. Gulf of Mexico Lease Sale 261, including three blocks nearby to our Tiberius discovery. In March 2024, Kosmos completed the acquisition of an additional 16.7% participating interest in the Keathley Canyon Blocks 920 and 964, offshore U.S. Gulf of Mexico. As a result of the transaction, Kosmos’ participating interest in the Tiberius discovery area increased from 33.3% to 50.0%. The Tiberius project continues to progress as a phased development with discussions ongoing with our partner to finalize the development plan and timing of a final investment decision.
Previous report
The Ceiba Field and Okume Complex workover and infill drilling campaign commenced in the fourth quarter of 2023, completing one production well workover. However, as a result of safety issues with the drilling rig, the operator terminated the rig contract in early February 2024. In the second quarter of 2024, the partnership secured an alternative rig and drilling contractor to resume the drilling campaign. The infill drilling campaign re-commenced in July 2024 bringing one infill production well in Block G online in October 2024. The second infill production well has been drilled and the partnership expects to bring it online in the fourth quarter of 2024. Following completion of the second infill production well, the rig is contracted to drill the Akeng Deep ILX prospect in Block S, with results expected around the end of the year.
Previous report
In October 2024, Kosmos elected to enter the next phase of the Block S exploration license with a scheduled expiration in December 2025 and no well commitments. The election is subject to customary government approvals.
Previous report
Greater Tortue Ahmeyim Unit
Previous report
The Greater Tortue liquefied natural gas project continues to make good progress. The following milestones have been achieved:
Previous report
•Drilling: The first batch of four wells has been completed with expected production capacity significantly higher than is required for first gas.
Previous report
•Hub Terminal: The Hub Terminal has been handed over to operations.
Previous report
•Subsea: The subsea workscope for first gas is mechanically complete.
Previous report
•FPSO: The FPSO is ready for startup shortly with first gas expected thereafter.
Previous report
•FLNG: Cool down and commissioning of the FLNG vessel has commenced with first LNG expected around the end of the fourth quarter of 2024.
Previous report
On October 7, 2024, the International Chamber of Commerce informed the Company that a final award had been issued in the arbitration proceedings with BP Gas Marketing regarding future LNG sales from Phase 1 of Greater Tortue Ahmeyim. The final, binding award prohibits the Company from selling LNG cargos to third party buyers during the contract term of the Tortue Phase 1 SPA, which the Company has an option to end in 2033. The final award does not change the terms of the Tortue Phase 1 SPA and is therefore not expected to have an impact on the Company’s long-term expectations and financial condition.
Previous report
Yakaar and Teranga Discoveries
Previous report
The Yakaar and Teranga discoveries continue to be analyzed as a joint development. The participating interests in the Cayar Offshore Profond Block are: Kosmos 90% and PETROSEN 10%, with PETROSEN having the right to increase its participating interest after issuance of an exploitation authorization to up to 35%. In March 2024, the current phase of the Cayar Block exploration license was extended an additional two years to July 2026. Kosmos has completed the concept development work and will now transition towards finalizing the partnership to support advancement of the project.
Previous report
Depletion, depreciation and amortization. Depletion, depreciation and amortization decreased by $11.6 million during the three months ended September 30, 2024, as compared with the three months ended September 30, 2023 primarily as a result of the timing of a TEN oil lifting in Ghana and a lower depletion rate per barrel in Jubilee resulting from an increase in reserves at the end of 2023, partially offset by increased production and a higher depletion rate per barrel in the U.S. Gulf of Mexico related to the Winterfell and Odd Job fields, post project completion in the third quarter of 2024.
Previous report
Other expenses, net. Other expenses, net decreased by $8.8 million during the three months ended September 30, 2024, as compared to the three months ended September 30, 2023 primarily as a result of loss on asset retirement obligations in the U.S. Gulf of Mexico business unit during the third quarter of 2023.
Previous report
Nine months ended September 30, 2024 compared to nine months ended September 30, 2023
Previous report
Oil and gas revenue. Oil and gas revenue increased by $84.0 million during the nine months ended September 30, 2024, as compared to the nine months ended September 30, 2023 primarily due to higher sales volumes primarily driven by increased production at Jubilee and higher average realized gas prices in Ghana. We sold 17,465 MBoe at an average realized price per barrel equivalent of $73.16 during the nine months ended September 30, 2024 and 16,344 MBoe at an average realized price per barrel equivalent of $73.04 during the nine months ended September 30, 2023.
Previous report
Oil and gas production. Oil and gas production costs increased by $91.5 million during the nine months ended September 30, 2024, as compared to the nine months ended September 30, 2023 primarily as a result of increased sales volumes, inclusion of operating costs associated with Greater Tortue Ahmeyim and costs incurred related to planned workovers in the U.S. Gulf of Mexico and Equatorial Guinea.
Previous report
Exploration expenses. Exploration expenses increased by $6.7 million during the nine months ended September 30, 2024, as compared to the nine months ended September 30, 2023 primarily as a result of increased seismic data acquisition costs in the U.S. Gulf of Mexico business unit.
Previous report
Depletion, depreciation and amortization. Depletion, depreciation and amortization decreased $19.9 million during the nine months ended September 30, 2024, as compared with the nine months ended September 30, 2023 primarily as a result of a lower depletion rate per barrel in Ghana resulting from an increase in Jubilee reserves at the end of 2023 and a lower cost basis in our TEN Fields due to the impairment loss recorded in the year ended December 31, 2023 partially offset by higher sales volumes in the current year.
Previous report
Interest and other financing costs, net. Interest and other financing costs, net increased $1.5 million during the nine months ended September 30, 2024, as compared to the nine months ended September 30, 2023, primarily as a result of a $24.8 million loss on debt modifications and extinguishments for the nine months ended September 30, 2023 related to the amendment and restatement of the Facility during the second quarter of 2024 and the repurchase of aggregate principal amounts of the 7.125% Senior Notes, the 7.750% Senior Notes, and the 7.500% Senior Notes during the third quarter of 2024 and increase in interest expense for the period due to higher interest rates offset by increased capitalized interest related to the Greater Tortue Ahmeyim project.
Previous report
Other expenses, net. Other expenses, net decreased by $11.4 million during the nine months ended September 30, 2024, as compared to the nine months ended September 30, 2023 primarily as a result of loss on asset retirement obligations in the U.S. Gulf of Mexico business unit and approximately $5.4 million of asset impairments recorded in 2023.
Previous report
Income tax expense. For the nine months ended September 30, 2024 and 2023, our overall effective tax rates were impacted by the difference in our 21% U.S. income tax reporting rate and the 35% statutory tax rates applicable to our Ghanaian and Equatorial Guinean operations, jurisdictions that have a 0% statutory tax rate or where we have incurred losses and have recorded valuation allowances against the corresponding deferred tax assets, and other non-deductible expenses, primarily in the U.S.
Previous report
As of September 30, 2024, borrowings under the Facility totaled $850.0 million and the undrawn availability under the Facility was $500.0 million. Additionally, as of September 30, 2024, there were no outstanding borrowings under the Corporate Revolver and the undrawn availability was approximately $165 million. In October 2024, pursuant to a voluntary cancellation notice sent by the Company, the Corporate Revolver was terminated.
Previous report
(1)In October 2024, pursuant to a voluntary cancellation notice sent by the Company, the Corporate Revolver was terminated.
Previous report
• execute appraisal and development activities in Ghana, the U.S. Gulf of Mexico, Mauritania and Senegal; and
Previous report
• execute infrastructure-led exploration and appraisal efforts in the U.S. Gulf of Mexico and Equatorial Guinea.
Previous report
•Approximately $375 million related to the development of Phase 1 of Greater Tortue Ahmeyim in Mauritania and Senegal and Winterfell in the U.S. Gulf of Mexico;
Previous report
•Approximately $75 million related to progressing our infrastructure-led exploration and appraisal programs in the U.S. Gulf of Mexico, including Tiberius appraisal activities, and the drilling of the ILX prospect Akeng Deep in Equatorial Guinea, as well as the appraisal plans of our greater gas resources in Mauritania and Senegal, including the next phase of Greater Tortue Ahmeyim and Yakaar-Teranga.
Previous report
In April 2024, in conjunction with the spring borrowing base redetermination, the Company executed an amendment and restatement of the Facility. The amendment includes the following material changes: an increase in the Facility size and borrowing base capacity to $1.35 billion (from $1.25 billion), an increase in the interest margin by 0.25% or 0.50%, depending on the length of time that has passed from the date the Facility was entered into, and an extension in the tenor by approximately three years (final maturity date now occurs December 31, 2029). The amended Facility size and borrowing base capacity of approximately $1.35 billion was capped by total commitments of approximately $1.21 billion as of June 30, 2024. In September 2024, we added two new lenders to the Facility syndicate, increasing current total commitments by approximately $145.0 million to the full Facility size and borrowing base capacity of $1.35 billion. The available facility amount is subject to borrowing base constraints and, beginning on April 1, 2027, outstanding borrowings will be constrained by an amortization schedule.
Showing the first 40 of 56 passages. Open the source sections for the rest.
Reworded paragraphs (31)
Previous wording
In July 2024, we announced start-up of oil production at the Winterfell development in the Green Canyon area of the U.S. Gulf of Mexico (25% working interest). The Winterfell project is a phased development with the initial two production wells of the first phase brought online in the third quarter of 2024. The third development well was drilled in the second quarter of 2024 and brought online in October 2024. Shortly after startup of the third well, production at the field was curtailed due to sand production from the third well seen at the production facility. We are currently working with the operator to restart production from the first two wells and to evaluate options to remediate the third well.
Current wording
In July 2024, we announced start-up of oil production from the first phase of the Winterfell development in the Green Canyon area of the Gulf of America (25% working interest). In October 2024, shortly after startup of the third well, production at the field was curtailed due to sand production from the third well seen at the production facility. Production from the first two wells was restored in December 2024. Remediation work on Winterfell-3 was performed in the first quarter of 2025, however was unsuccessful. Winterfell-3 has now been temporarily plugged and abandoned while the partnership evaluates options to restore production from the Winterfell-3 fault block. The drilling rig has moved to drill and complete Winterfell-4, commencing the second phase of the Winterfell development project. Winterfell-4 is expected online in the third quarter of 2025.
Previous wording
Production in Equatorial Guinea averaged approximately 22,900 Bopd gross (8,000 Bopd net) in the third quarter of 2024.
Current wording
Production in Equatorial Guinea averaged approximately 25,700 Bopd gross (9,000 Bopd net) in the first quarter of 2025.
Previous wording
All of our results, as presented in the table below, represent operations from Ghana, the U.S. Gulf of Mexico and Equatorial Guinea. Certain operating results and statistics for the three and nine months ended September 30, 2024 and 2023 are included in the following tables:
Current wording
All of our results, as presented in the table below, represent operations from Ghana, Equatorial Guinea, Mauritania, Senegal and the Gulf of America. Certain operating results and statistics for the three months ended March 31, 2025 and 2024 are included in the following tables:
Previous wording
Oil and gas revenue. Oil and gas revenue decreased by $118.6 million during the three months ended September 30, 2024, as compared to the three months ended September 30, 2023 as a result of lower sales volumes due to the timing of a TEN oil lifting in Ghana and lower average realized oil and gas prices. We sold 5,811 MBoe at an average realized price per barrel equivalent of $70.18 during the three months ended September 30, 2024 and 6,727 MBoe at an average realized price per barrel equivalent of $78.24 during the three months ended September 30, 2023.
Current wording
Oil and gas revenue. Oil and gas revenue decreased by $129.0 million during the three months ended March 31, 2025 as compared to the three months ended March 31, 2024 primarily as a result of lower production at Jubilee, the timing of our oil liftings in Equatorial Guinea and lower average realized oil and gas prices. We sold 4,445 MBoe at an average realized price per barrel equivalent of $65.27 during the three months ended March 31, 2025 and 5,701 MBoe at an average realized price per barrel equivalent of $73.52 during the three months ended March 31, 2024.
Previous wording
Oil and gas production. Oil and gas production costs decreased by $5.3 million during the three months ended September 30, 2024, as compared to the three months ended September 30, 2023 primarily as a result of the timing of a TEN cargo lifting in Ghana offset by inclusion of operating costs associated with Greater Tortue Ahmeyim and increased production costs in Equatorial Guinea.
Current wording
Oil and gas production. Oil and gas production costs increased by $73.7 million during the three months ended March 31, 2025 as compared to the three months ended March 31, 2024 primarily as a result of the inclusion of operating costs associated with LNG production at the GTA Phase 1 project in Mauritania and Senegal, costs related to the scheduled shutdown and maintenance activities in Ghana, and workovers in the Gulf of America.
Previous wording
Exploration expenses. Exploration expenses increased by $4.4 million during the three months ended September 30, 2024, as compared to the three months ended September 30, 2023 primarily as a result of increased seismic data acquisition costs in the U.S. Gulf of Mexico business unit.
Current wording
Exploration expenses. Exploration expenses decreased by $2.4 million during the three months ended March 31, 2025, as compared to the three months ended March 31, 2024 primarily as a result of decreased seismic data acquisition costs in the Gulf of America business unit.
Previous wording
Interest and other financing costs, net. Interest and other financing costs, net decreased by $3.3 million during the three months ended September 30, 2024, as compared to the three months ended September 30, 2023 primarily as a result of increased capitalized interest related to the Greater Tortue Ahmeyim project partially offset by an increase in interest expense due to higher interest rates.
Current wording
Interest and other financing costs, net. Interest and other financing costs, net increased by $35.4 million during the three months ended March 31, 2025, as compared to the three months ended March 31, 2024 primarily as a result of decreased capitalized interest related to the GTA Phase 1 project commencing first gas production in December 2024.
Previous wording
Derivatives, net. During the three months ended September 30, 2024 and 2023, we recorded a gain of $15.3 million and a loss of $46.0 million, respectively, on our outstanding hedge positions. The amounts recorded were a result of changes in the forward oil price curve during the respective periods.
Current wording
Derivatives, net. During the three months ended March 31, 2025 and 2024, we recorded a loss of $6.7 million and a loss of $23.8 million, respectively, on our outstanding hedge positions. The amounts recorded were a result of changes in the forward oil price curve during the respective periods.
Previous wording
We are actively engaged in an ongoing process of anticipating and meeting our funding requirements related to our strategy as a full-cycle exploration and production company. We have historically met our funding requirements through cash flows generated from our operating activities and obtained additional funding from issuances of equity and debt, as well as partner carries.
Current wording
We are actively engaged in an ongoing process of anticipating and meeting our funding requirements related to our strategy as a deepwater exploration and production company. We have historically met our funding requirements through cash flows generated from our operating activities and obtained additional funding from issuances of equity and debt, as well as partner carries.
Previous wording
Oil prices are historically volatile and a significant decrease in oil prices could negatively impact our ability to generate sufficient operating cash flows to meet our funding requirements. This volatility could also result in wide fluctuations in future oil prices, which could impact our ability to comply with our financial covenants. To partially mitigate this price volatility, we maintain an active hedging program and review our capital spending program on a regular basis. Our investment decisions are based on longer-term commodity prices based on the nature of our projects and development plans. Current commodity prices, combined with our hedging program and our current liquidity position support our remaining capital program for 2024.
Current wording
Oil prices are historically volatile and could negatively impact our ability to generate sufficient operating cash flows to meet our funding requirements. This oil price volatility could impact our ability to comply with our financial covenants. To partially mitigate this price volatility, we maintain an active hedging program and review our capital spending program on a regular basis. Our investment decisions are based on longer-term commodity prices based on the nature of our projects and development plans. Current commodity prices, combined with our hedging program and our current liquidity position support our remaining capital program for 2025.
Previous wording
As such, our 2024 capital budget is based on our exploitation and production plans for Ghana, Equatorial Guinea and the U.S. Gulf of Mexico, our infrastructure-led exploration and appraisal program in the U.S. Gulf of Mexico and Equatorial Guinea, and our appraisal and development activities in the U.S. Gulf of Mexico, Mauritania and Senegal.
Current wording
As such, our 2025 capital budget is based on our exploitation and production plans for Ghana, Equatorial Guinea, Mauritania, Senegal and the Gulf of America, and our appraisal and development activities in the Gulf of America, Mauritania and Senegal.
Previous wording
Our future financial condition and liquidity can be impacted by, among other factors, the success of our exploitation, exploration and appraisal drilling programs, the number of commercially viable oil and natural gas discoveries made and the quantities of oil and natural gas discovered, the speed with which we can bring such discoveries to production, the reliability of our oil and gas production facilities, our ability to continuously export oil and gas, our ability to secure and maintain partners and their alignment with respect to capital plans, the actual cost of exploitation, exploration, appraisal and development of our oil and natural gas assets, and coverage of any claims under our insurance policies.
Current wording
Our future financial condition and liquidity can be impacted by, among other factors, the success of our exploration, appraisal and exploitation drilling programs, the number of commercially viable oil and natural gas discoveries made and the quantities of oil and natural gas discovered, the speed with which we can bring such discoveries to production, the reliability of our oil and gas production facilities, our ability to continuously export oil and gas, our ability to secure and maintain partners and their alignment with respect to capital plans, the actual cost of exploration, appraisal, exploitation and development of our oil and natural gas assets, and coverage of any claims under our insurance policies.
Previous wording
The following table presents the sources and uses of our cash and cash equivalents and restricted cash for the nine months ended September 30, 2024 and 2023:
Current wording
The following table presents the sources and uses of our cash and cash equivalents and restricted cash for the three months ended March 31, 2025 and 2024:
Previous wording
Net cash provided by operating activities. Net cash provided by operating activities for the nine months ended September 30, 2024 was $502.5 million compared with net cash provided by operating activities for the nine months ended September 30, 2023 of $471.4 million. The increase in cash provided by operating activities in the nine months ended September 30, 2024 when compared to the same period in 2023 is primarily a result of higher sales volumes and higher average realized gas prices for the nine months ended September 30, 2024 offset by higher oil and gas production costs and changes in working capital.
Current wording
Net cash provided by (used in) operating activities. Net cash used in operating activities for the three months ended March 31, 2025 was $0.9 million compared with net cash provided by operating activities for the three months ended March 31, 2024 of $272.6 million. The decrease in cash provided by operating activities in the three months ended March 31, 2025 when compared to the same period in 2024 is primarily a result of lower sales volumes in Ghana and Equatorial Guinea, lower average realized oil and gas prices, higher oil and gas production costs related to the inclusion of operating costs associated with LNG production at the GTA Phase 1 project and costs related to the scheduled shutdown and maintenance activities in Ghana and workovers in the Gulf of America for the three months ended March 31, 2025.
Previous wording
• drill additional infill wells and execute exploitation and production activities in Ghana, Equatorial Guinea and the U.S. Gulf of Mexico;
Current wording
• drill additional infill wells and execute exploitation and production activities in Ghana, Equatorial Guinea and the Gulf of America;
Previous wording
We estimate we will spend around $800 million of capital for the year ending December 31, 2024, excluding any acquisitions or divestiture of oil and gas properties during the year. This capital expenditure budget consists of:
Current wording
We estimate we will spend $400 million or less of capital for the year ending December 31, 2025, excluding any acquisitions or divestiture of oil and gas properties during the year. This capital expenditure budget consists of:
Previous wording
•Approximately $350 million related to maintenance activities across our Ghana, Equatorial Guinea and U.S. Gulf of Mexico assets, including infill development drilling and integrity spend;
Current wording
•Approximately $275 million related to maintenance activities across our producing Ghana, Equatorial Guinea and Gulf of America assets, including infill development drilling and facilities integrity spend;
Previous wording
The ultimate amount of capital we will spend may fluctuate materially based on market conditions and the success of our exploitation and drilling results among other factors. Our future financial condition and liquidity will be impacted by, among other factors, our level of production of oil and the prices we receive from the sale of oil, our ability to effectively hedge future production volumes, the success of our multi-faceted infrastructure-led exploration and appraisal drilling programs, the number of commercially viable oil and natural gas discoveries made and the quantities of oil and natural gas discovered, the speed with which we can bring such discoveries to production, our partners’ alignment with respect to capital plans, and the actual cost of exploitation, exploration, appraisal and development of our oil and natural gas assets, and coverage of any claims under our insurance policies.
Current wording
The ultimate amount of capital we will spend may fluctuate materially based on market conditions and the success of our exploitation and drilling results among other factors. Our future financial condition and liquidity will be impacted by, among other factors, our level of production of oil, natural gas and LNG and the prices we receive from the sale of oil, natural gas and LNG, and our ability to effectively hedge future production volumes, the success of our multi-faceted infrastructure-led exploration, appraisal and development drilling programs, the number of commercially viable oil and natural gas discoveries made and the quantities of oil and natural gas discovered, the speed with which we can bring such discoveries to production, our partners’ alignment with respect to capital plans, and the actual cost of exploration, appraisal, exploitation and development of our oil and natural gas assets, and coverage of any claims under our insurance policies.
Previous wording
The Facility supports our oil and gas exploration, appraisal and development programs and corporate activities. The amount of funds available to be borrowed under the Facility, also known as the borrowing base amount, is determined every March and September. The borrowing base amount is based on the sum of the net present values of net cash flows and relevant capital expenditures reduced by certain percentages as well as value attributable to certain assets’ reserves and/or resources in the Jubilee and TEN Fields in Ghana and the Ceiba Field and Okume Complex in Equatorial Guinea. As of September 30, 2024, borrowings under the Facility totaled $850.0 million and the undrawn availability under the Facility was $500.0 million.
Current wording
The Facility supports our oil and gas exploration, appraisal and development programs and corporate activities. The amount of funds available to be borrowed under the Facility, also known as the borrowing base amount, is determined every March and September. The borrowing base amount is based on the sum of the net present values of net cash flows and relevant capital expenditures reduced by certain percentages as well as value attributable to certain assets’ reserves and/or resources in the Company’s production assets in Ghana and Equatorial Guinea. As of March 31, 2025, borrowings under the Facility totaled $1.0 billion and the undrawn availability under the Facility was $350.0 million.
Previous wording
The Facility provides a revolving credit and letter of credit facility. The availability period for the revolving credit facility expires one month prior to the final maturity date. The letter of credit facility expires on the final maturity date. As of September 30, 2024, we had no letters of credit issued under the Facility. We have the right to cancel all the undrawn commitments under the amended and restated Facility.
Current wording
The Facility provides a revolving credit and letter of credit facility. The availability period for the revolving credit facility expires one month prior to the final maturity date. The letter of credit facility expires on the final maturity date. The available facility amount is subject to borrowing base constraints and, beginning on April 1, 2027, outstanding borrowings will be constrained by an amortization schedule. The Facility has a final maturity date of December 31, 2029. As of March 31, 2025, we had no letters of credit issued under the Facility. We have the right to cancel all the undrawn commitments under the amended and restated Facility.
Previous wording
We have four series of senior notes outstanding as of September 30, 2024, which we collectively refer to as the “Senior Notes.” Our 7.125% Senior Notes have an outstanding balance of $250.0 million and mature on April 4, 2026. Interest is payable on the 7.125% Senior Notes each April 4 and October 4. Our 7.750% Senior Notes have an outstanding balance of $350.0 million and mature on May 1, 2027. Interest is payable on the 7.750% Senior Notes each May 1 and November 1. Our 7.500% Senior Notes have an outstanding balance of approximately $400.3 million and mature on March 1, 2028. Interest is payable on the 7.500% Senior Notes each March 1 and September 1. In September 2024, the Company issued $500.0 million of 8.750% Senior Notes that mature on October 1, 2031. Interest is payable on the 8.750% Senior Notes each April 1 and October 1.
Current wording
We have four series of senior notes outstanding as of March 31, 2025, which we collectively refer to as the “Senior Notes.” Our 7.125% Senior Notes have an outstanding balance of $250.0 million and mature on April 4, 2026. Interest is payable on the 7.125% Senior Notes each April 4 and October 4. Our 7.750% Senior Notes have an outstanding balance of $350.0 million and mature on May 1, 2027. Interest is payable on the 7.750% Senior Notes each May 1 and November 1. Our 7.500% Senior Notes have an outstanding balance of approximately $400.3 million and mature on March 1, 2028. Interest is payable on the 7.500% Senior Notes each March 1 and September 1. Our 8.750% Senior Notes have an outstanding balance of $500.0 million and mature on October 1, 2031. Interest is payable on the 8.750% Senior Notes each April 1 and October 1.
Previous wording
The Senior Notes are senior, unsecured obligations of Kosmos Energy Ltd. and rank equally in right of payment with all of its existing and future senior indebtedness (including all borrowings under the Corporate Revolver and the 3.125% Convertible Senior Notes) and rank effectively junior in right of payment to all of its existing and future secured indebtedness (including all borrowings under the Facility). The Senior Notes are jointly and severally guaranteed on a senior, unsecured basis by certain subsidiaries owning the Company's U.S. Gulf of Mexico assets, and on a subordinated, unsecured basis by entities that borrow under, or guarantee, our Facility.
Current wording
The Senior Notes are senior, unsecured obligations of Kosmos Energy Ltd. and rank equally in right of payment with all of its existing and future senior indebtedness (including the 3.125% Convertible Senior Notes) and rank effectively junior in right of payment to all of its existing and future secured indebtedness (including all borrowings under the Facility). The Senior Notes are jointly and severally guaranteed on a senior, unsecured basis by certain subsidiaries owning the Company's Gulf of America assets, and on a subordinated, unsecured basis by entities that borrow under, or guarantee, our Facility.
Previous wording
The 3.125% Convertible Senior Notes are senior, unsecured obligations of Kosmos Energy Ltd. and rank equal in right of payment with all of its existing and future senior indebtedness (including all borrowings under the Corporate Revolver and the Senior Notes) and rank effectively junior in right of payment to all of its existing and future secured indebtedness (including all borrowings under the Facility, to the extent of the value of the assets securing such indebtedness). The 3.125% Convertible Senior Notes are guaranteed on a senior, unsecured basis by certain of our existing subsidiaries that guarantee on a senior basis the Corporate Revolver and the Senior Notes, and, in certain circumstances, certain of our other existing or future subsidiaries.
Current wording
The 3.125% Convertible Senior Notes are senior, unsecured obligations of Kosmos Energy Ltd. and rank equal in right of payment with all of its existing and future senior indebtedness (including all borrowings under the Senior Notes) and rank effectively junior in right of payment to all of its existing and future secured indebtedness (including all borrowings under the Facility, to the extent of the value of the assets securing such indebtedness). The 3.125% Convertible Senior Notes are guaranteed on a senior, unsecured basis by certain of our existing subsidiaries that guarantee on a senior basis the Senior Notes, and, in certain circumstances, certain of our other existing or future subsidiaries. The 3.125% Convertible Senior Notes are guaranteed on a subordinated, unsecured basis by certain of our existing subsidiaries that borrow under or guarantee the Facility and guarantee on a subordinated basis the Senior Notes, and, in certain circumstances, certain of our other existing or future subsidiaries.
Previous wording
Other than in connection with certain tax law changes, we may not redeem the notes prior to March 22, 2027. We may redeem for cash all or any portion of the 3.125% Convertible Senior Notes, at our option, on or after March 22, 2027 and prior to the 41st scheduled trading day immediately preceding the maturity date, if the last reported sale price of our common stock has been at least 130% of the conversion price then in effect for at least 20 trading days (whether or not consecutive), including the trading day immediately preceding the date on which we provide notice of redemption, during any 30 consecutive trading day period ending on, and including, the trading day immediately preceding the date on which we provide the related notice of redemption, at a redemption price equal to 100% of the principal amount of the 3.125% Convertible Senior Notes to be redeemed, plus accrued and unpaid interest to, but excluding, the redemption date. We are not required to redeem or retire the 3.125% Convertible Senior Notes periodically. We may not elect to redeem less than all of the outstanding 3.125% Convertible Senior Notes unless at least $75.0 million aggregate principal amount of 3.125% Convertible Senior Notes are outstanding and not subject to redemption as of the time we send the related redemption notice. The 3.125% Convertible Senior Notes indenture contains customary terms and covenants.
Current wording
The 3.125% Convertible Senior Notes indenture contains customary terms and covenants.
Previous wording
The following table summarizes by period the payments due for our estimated contractual obligations as of September 30, 2024, and the weighted average interest rates expected to be paid on the Facility and Corporate Revolver given current contractual terms and market conditions, and the instrument’s estimated fair value. Weighted-average interest rates are based on implied forward rates in the yield curve at the reporting date. This table does not include amortization of deferred financing costs.
Current wording
The following table summarizes by period the payments due for our estimated contractual obligations as of March 31, 2025, and the weighted average interest rates expected to be paid on the Facility given current contractual terms and market conditions, and the instrument’s estimated fair value. Weighted-average interest rates are based on implied forward rates in the yield curve at the reporting date. This table does not include amortization of deferred financing costs.
Previous wording
(5)In April 2024, a Decommissioning Trust agreement with the Jubilee unit partners to cash fund future retirement obligations associated with the Jubilee Field was finalized. The operator currently estimates the total commitment to be approximately $148.9 million, net to Kosmos, which will be funded annually by Kosmos over an estimated 13 year period. The contributions into the trust will be invested into various securities. Those investments will be accounted for as trading securities and reported as long-term investments in our consolidated balance sheet and as operating activities in our statement of cash flows. It is possible that our funding requirements could change based on future changes in the decommissioning plan or estimates.
Current wording
(5)In April 2024, a decommissioning trust agreement with the Jubilee unit partners to cash fund future retirement costs associated with the Jubilee Field was finalized. The operator currently estimates the total commitment to be approximately $126.1 million as of March 31, 2025, net to Kosmos, which will be funded annually by Kosmos over an estimated 11 year period. It is possible that our funding requirements could change based on future changes in the decommissioning plan or estimates.
Previous wording
As of September 30, 2024, we have a commitment to drill two development wells and one exploration well in Equatorial Guinea. One of the two development wells is currently being drilled.
Current wording
As of March 31, 2025, we have a commitment to drill one development well in Equatorial Guinea.
Previous wording
In February 2019, Kosmos and BP signed Carry Advance Agreements with the national oil companies of Mauritania and Senegal, which obligate us separately to finance the respective national oil companies’ share of certain development and production costs. Kosmos’ total share for the two agreements combined is currently estimated at approximately $370.0 million, of which $261.8 million has been incurred through September 30, 2024, excluding accrued interest. These amounts will be repaid through the national oil companies’ share of future revenues.
Current wording
In February 2019, Kosmos and BP signed Carry Advance Agreements with the national oil companies of Mauritania and Senegal, which obligate us separately to finance the respective national oil companies’ share of certain development and production costs incurred for the GTA Phase 1 project. Kosmos’ total share for the two agreements combined is currently estimated at approximately $370.0 million, of which $312.7 million has been incurred through March 31, 2025, excluding accrued interest. The amount financed by Kosmos is to be repaid through the national oil companies’ share of future revenues.
Previous wording
We consider accounting policies related to our revenue recognition, exploration and development costs, receivables, income taxes, derivative instruments and hedging activities, estimates of proved oil and natural gas reserves, asset retirement obligations and impairment of long-lived assets as critical accounting policies. The policies include significant estimates made by management using information available at the time the estimates are made. However, these estimates could change materially if different information or assumptions were used. Other than items discussed in Note 2 — Accounting Policies, there have been no changes to our critical accounting policies which are summarized in “Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations” section in our annual report on Form 10-K, for the year ended December 31, 2023.
Current wording
We consider accounting policies related to our revenue recognition, exploration and development costs, receivables, income taxes, derivative instruments and hedging activities, estimates of proved oil and gas reserves, asset retirement obligations and impairment of long-lived assets as critical accounting policies. The policies include significant estimates made by management using information available at the time the estimates are made. However, these estimates could change materially if different information or assumptions were used. Other than items discussed in Note 2 — Accounting Policies, there have been no changes to our critical accounting policies which are summarized in “Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations” section in our annual report on Form 10-K, for the year ended December 31, 2024.
Previous wording
•the impacts of Russia’s war in Ukraine and potential instability in the Middle East and the effects these events have on the oil and gas industry as a whole, including increased volatility with respect to oil, natural gas and NGL prices and operating and capital expenditures;
Current wording
•the impacts of the continued war in Ukraine and ongoing instability in the Middle East and the effects these events have on the oil and gas industry as a whole, including increased volatility with respect to oil, natural gas and LNG prices and operating and capital expenditures;
Previous wording
•the volatility of oil, natural gas and NGL prices, as well as our ability to implement hedges addressing such volatility on commercially reasonable terms;
Current wording
•the volatility of oil, natural gas and LNG prices, as well as our ability to implement hedges addressing such volatility on commercially reasonable terms;
Rearranged previous paragraphs (3)
Previous report — wording carried elsewhere
Derivatives, net. During the nine months ended September 30, 2024 and 2023, we recorded a loss of $5.7 million and a loss of $42.2 million, respectively, on our outstanding hedge positions. The changes recorded were a result of changes in the forward curve of oil prices during the respective periods.
Previous report — wording carried elsewhere
We were in compliance with the financial covenants contained in the Corporate Revolver as of September 30, 2024 (the most recent assessment date). The Corporate Revolver contains customary cross default provisions.
Previous report — wording carried elsewhere
The 3.125% Convertible Senior Notes are guaranteed on a subordinated, unsecured basis by certain of our existing subsidiaries that borrow under or guarantee the Facility and guarantee on a subordinated basis the Corporate Revolver and the Senior Notes, and, in certain circumstances, certain of our other existing or future subsidiaries.