Notes:

1.All tabulated data have been rounded and as a result minor computational errors may occur.
2.Mineral Resources, which are not Mineral Reserves, have no demonstrated economic viability. There is no guarantee that all or any part of the Mineral Resource will be converted into a Mineral Reserve. The estimate of Mineral Resources may be materially affected by geology, environment, permitting, legal title, taxation, socio-political, marketing, or other relevant issues.
3.kt = thousand tonnes, Mt = Million tonnes, Mlbs = million pounds
4.The 2026 MRE has been prepared in accordance with the CIM Definition Standards (2014) and CIM Best Practice Guidelines (2019) with a data cut-off of September 21, 2026, and an effective date of September 28, 2026.
5.Mineral Resources are reported at a cut-off value of US$75/t NSR (Net Smelter Return) defined as received value of final metal recovered minus off-site costs, and a minimum thickness of 1.5 metres.
6.Mineral Resources are estimated using long-term prices of US$9.10/lb Ni, US$5.10/lb Cu, US$20.00/lb Co. The same metal prices were used in NSR calculations.
7.Mineral Resources are estimated using nickel, copper and cobalt recoveries of 55.6%, 96.1%, and 60.2%, respectively, derived from metallurgical studies which consider a two-concentrate scenario.
8.Payabilities and off-site treatment and refining costs were derived from an independent marketing study commissioned by NexMetals.
9.Bulk density has been estimated in the block model based on an extensive data set of measurements taken from drillhole cores. The average density is 3.51 t/m3 for the Upper vein and 3.38 t/m3 for the Lower vein.
10.Mineral Resources are reported using NSR values which assume mining costs of US$47.60/tonne, concentrate processing costs of US$20.00/tonne and G&A of US$5.50/tonne.
11.Areas depleted or sterilized by mining were removed from the mineral resource as well as an interpreted dyke.
12.There are no Mineral Reserves.
13.Copper equivalent is calculated using the formula CuEq =(Cu%*96.4+Ni%*87.0+Co%*132.7)/96.4.

The table reports Selebi Main only. The updated Selebi North mineral resource estimate is pending and is not included. Totals may not add up due to rounding.

Figure 1:Long section of Selebi Mines highlighting the 2026 Selebi Main MRE.