Atlas Lithium Corp
For the period ended Jun 30, 2026. Filed Aug 14, 2026.
View on SEC.govAbout this filing
A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.
Jun 30, 2026 · Filed Aug 14, 2026
What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-Q
Period ended 2026-03-31; filed 2026-05-07.
0001493152-26-021719
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsCurrent report: 10-Q
Period ended 2026-06-30; filed 2026-08-14.
0001493152-26-038358
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 34 previous paragraphs and 40 current paragraphs.
16 unchanged; 12 reworded; 11 added; 6 removed; 0 previous and 1 current paragraphs rearranged.
Tables are not compared: 9 previous and 9 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (11)
Current report
We have disclosed mineral resources and mineral reserves for the Neves Project based on our technical report summary, effective May 15, 2025, as updated on June 16, 2026 (see Exhibit 96.1 to our 2025 Form 10-K/A).
Current report
During the second quarter of 2026, we continued to advance our flagship Neves Project toward production while achieving several important strategic, operational, and corporate milestones. As described in further detail below, we obtained additional global recognition for the Neves Project, further strengthened our Board of Directors, contracted key execution partners, participated in leading industry conferences, and received an expansion permit for the project, as described below.
Current report
On April 27, 2026, we announced the engagement of key operational partners for the implementation of the Neves Project, selected through a competitive process led by our technical team. Each awarded contract was finalized at or below the budget projections outlined in our Definitive Feasibility Study (the “DFS”). The selected partners included Promon Engenharia, responsible for completing multiple detailed engineering components; TSX Engineering, appointed to oversee and manage project implementation; Cerne Construções, engaged under an Engineering, Procurement, and Construction (EPC) contract for the design and construction of the project’s administrative and operational facilities; and RETC Infraestrutura, responsible for earthworks and civil construction activities. Each of these firms brings a strong track record of performance and deep experience in Brazil’s mining sector.
Current report
On May 18, 2026, we announced the engagement of Alfa Engenharia (“Alfa”) as the specialized electromechanical assembly contractor for the Neves Project. The scope of work awarded to Alfa encompasses the complete assembly of the project’s processing plant, from the crushing systems through to final product processing and dispatch, including the installation of all mechanical, electrical, instrumentation, and automation systems required for plant operations. As with our previously announced execution partners, the contract with Alfa was finalized at or below the budget projections outlined in the DFS. Our processing plant, fully-paid and 100%-owned by us, and which had previously been transported to Brazil, is ready for assembly, and Alfa’s selection provides the expertise necessary for this endeavor.
Current report
During the second quarter of 2026, members of our senior management participated in several leading industry conferences to raise the profile of the Atlas Lithium and Brazil’s emerging critical minerals sector. On June 9-10, 2026, our Chairman and Chief Executive Officer, Marc Fogassa, delivered a conference-wide address titled “The Growing Role of Brazilian Critical Minerals in Securing Global Supply” at Benchmark Giga USA 2026, held at the Ronald Reagan Building and International Trade Center in Washington, D.C. On June 17-18, 2026, Mr. Fogassa delivered the Strategic Keynote Presentation, “Lithium in Brazil: Building a Competitive Industry,” opening the 3rd Brazil Lithium & Critical Minerals Summit 2026 in Belo Horizonte, Minas Gerais, Brazil. These engagements reflect our continued efforts to strengthen relationships with industry stakeholders and to position us within global critical minerals supply chains.
Current report
On June 29, 2026, we announced that we had received the expansion permit for our Neves Project, a significant milestone in our disciplined journey toward production. Permitting is widely regarded as one of the greatest challenges in mining, and the additional permit followed comprehensive technical studies that confirmed the Neves Project’s minimal environmental impact, as well as the strong relationships we have built with our local communities in the Jequitinhonha Valley. With the expansion permit in hand, we are positioned to advance implementation of the Neves Project towards production.
Current report
Lithium market conditions remained constructive during the second quarter of 2026. Lithium prices remained well above the lows seen in mid-2025. We believe demand continues to be supported by durable, long-term trends, including accelerating growth in the energy storage systems (“ESS”) segment — particularly for grid-scale applications and for data centers supporting the expansion of artificial intelligence — alongside continued adoption of electric vehicles worldwide. While the lithium market remains subject to price volatility and evolving supply and demand dynamics, we believe that our anticipated position among the lowest-cost lithium producers globally should provide meaningful margin protection across a range of pricing environments. Consistent with these conditions and our continued progress toward production, we have received written indications of interest from several parties seeking to secure long-term supply arrangements for our future lithium concentrate production. The level of interest may be subject to then current industry supply and demand scenario.
Current report
The Six Months Ended June 30, 2026, Compared to the Six Months Ended June 30, 2025
Current report
● assets and liabilities were translated into the new functional currency using exchange rates as of the date of change;
Current report
● nonmonetary assets and liabilities were translated at historical exchange rates (the effective date of the change is considered for the translation of existing nonmonetary assets and liabilities); and
Current report
● cumulative translation adjustments previously recorded in accumulated other comprehensive income were not reversed.
Removed paragraphs (6)
Previous report
In 2025, we received our dense media separation lithium processing plant (the “DMS Plant”), which was designed to produce approximately 150,000 tons of lithium concentrate per annum (“tpa”). Our DMS Plant represents a cornerstone of our Neves Project, designed to deliver high-quality lithium concentrate to the global market for electric vehicles (EVs) and renewable energy storage systems. With worldwide lithium demand growing, we are positioned to emerge as a key contributor to the sustainable energy transition.
Previous report
During the first quarter of 2026, we continued to advance our flagship Neves Project toward production while achieving several important strategic and corporate milestones. Work items related to project implementation continued to progress, with particular emphasis on finalizing the project management framework that the Company will utilize to oversee construction execution and the coordination of third party service providers.
Previous report
On April 27, 2026, we announced that four key operational partners had been selected for the implementation of the Neves Project after a process that lasted several months in which multiple qualified firms participated in a competitive selection process led by our technical team. Contracts were awarded based on a comprehensive evaluation of relevant criteria, including technical experience, proven performance, quality, and cost efficiency. Each awarded contract was finalized at or below the budget projections outlined in our Definitive Feasibility Study (DFS). Each of these four companies brings a strong track record of performance and deep experience in Brazil’s mining sector.
Previous report
In addition to the key firms mentioned above, our technical team is rapidly advancing the selection of additional operational partners during the second quarter of 2026 for remaining scopes of the Neves Project implementation, as detailed in the DFS.
Previous report
On January 9, 2026, the common stock of our subsidiary Atlas Critical Minerals Corporation (“Atlas Critical Minerals”) commenced trading on the Nasdaq Capital Market under the ticker symbol “ATCX,” which we announced by press release on January 14, 2026. Atlas Critical Minerals controls more than 218,000 hectares of mineral rights in Brazil, with projects in rare earths, titanium, graphite, uranium, including a revenue-generating iron ore operation that commenced shipments in late 2025. Atlas Lithium Corporation currently holds an approximate 20% ownership stake in Atlas Critical Minerals, which we believe provides our shareholders with diversified exposure to a broader portfolio of critical minerals while allowing our management team to maintain its focus on advancing the Neves Project. More details about Atlas Critical Minerals are available on its website at www.atlascriticalminerals.com and in its filings with the Securities and Exchange Commission.
Previous report
Lithium market conditions continued to improve during the first quarter of 2026, supported by accelerating growth in the energy storage systems (“ESS”) segment — particularly for grid-scale applications and power for data centers — alongside continued robust demand for electric vehicles worldwide. These demand drivers were reinforced by ongoing supply disruptions, including production constraints impacting Chinese lepidolite operations and export restrictions affecting Zimbabwean spodumene producers, which together tightened global supply availability. These dynamics created a favorable backdrop for the continued improvement in lithium prices observed during the quarter. Consistent with this environment, we have received written indications of interest from several parties seeking to secure long-term supply arrangements for our future lithium concentrate production.
Reworded paragraphs (12)
Previous wording
The following discussion of our financial condition and results of operations should be read in conjunction with our unaudited condensed consolidated financial statements and the notes to those financial statements included in Item 1 of this Quarterly Report and our consolidated financial statements and notes thereto and related Management’s Discussion and Analysis of Financial Condition and Results of Operations included in our Annual Report on Form 10-K for the year ended December 31, 2025 (the “2025 Form 10-K”).
Current wording
The following discussion of our financial condition and results of operations should be read in conjunction with our unaudited condensed consolidated financial statements and the notes to those financial statements included in Item 1 of this Quarterly Report and our consolidated financial statements and notes thereto and related Management’s Discussion and Analysis of Financial Condition and Results of Operations included in our Annual Report on Form 10-K for the year ended December 31, 2025 as amended (the “2025 Form 10-K”).
Previous wording
Atlas Lithium is a mineral exploration and development company with lithium projects and multiple lithium exploration properties. In addition, we own exploration properties in other battery minerals, including nickel, copper, rare earths, graphite, and titanium. Our current focus is the continued advancement of our hard-rock lithium project in Minas Gerais, Brazil toward active mining. The project is located within a well-known lithium-bearing pegmatitic district designated by the state government as “Lithium Valley.” We intend to mine and then process our lithium-containing ore to produce lithium concentrate (also known as spodumene concentrate), a key ingredient for the battery supply chain.
Current wording
Atlas Lithium is a mineral development company implementing its first mine and processing facility at its 100%-owned Neves Project, our material mineral property. In addition, Atlas Lithium owns multiple lithium exploration properties. Furthermore, through our approximately 20% ownership interest in Atlas Critical Minerals Corporation (“Atlas Critical Minerals”, Nasdaq: ATCX), a separate publicly traded company, we have exposure to other critical minerals, including rare earths, titanium, graphite, and uranium. Our current focus is the continued advancement of the Neves Project, our hard-rock lithium project in the Lithium Valley area of Minas Gerais state in Brazil, toward active mining. We intend to mine and then process our lithium-containing ore to produce lithium concentrate (also known as spodumene concentrate), a key ingredient for the energy storage system and electric vehicle battery supply chain.
Previous wording
On April 2, 2026, we announced that our 100%-owned Neves Project had been named in the Joint Fact Sheet for Japan-U.S. Critical Minerals Project Cooperation (the “Joint Fact Sheet”), released on March 20, 2026 by Japan’s Ministry of Economy, Trade, and Industry (“METI”) together with the Ministry of Foreign Affairs of Japan (“MOFA”). The Neves Project is the only Brazil-based lithium project named in the Joint Fact Sheet, which states that the Government of Japan and the Government of the United States are considering financial support for the purpose of development of the Neves Project. The Joint Fact Sheet followed the U.S.-Japan Critical Minerals Investment Ministerial held on March 14, 2026 in Tokyo, as well as the summit held between Japan’s Prime Minister, Sanae Takaichi, and U.S. President, Donald Trump, on March 19, 2026. This recognition builds upon our existing strategic partnership with Mitsui & Co., Ltd., which made a US$30 million strategic investment in Atlas Lithium common shares in March 2024 and entered into an offtake agreement for the purchase of lithium concentrate from the Neves Project.
Current wording
On April 2, 2026, we announced that the Neves Project had been named in the Joint Fact Sheet for Japan-U.S. Critical Minerals Project Cooperation (the “Joint Fact Sheet”), released on March 20, 2026 by Japan’s Ministry of Economy, Trade, and Industry together with the Ministry of Foreign Affairs of Japan. The Neves Project is the only Brazil-based lithium project named in the Joint Fact Sheet, which followed the U.S.-Japan Critical Minerals Investment Ministerial held on March 14, 2026 in Tokyo, as well as the summit held between Japan’s Prime Minister, Sanae Takaichi, and U.S. President, Donald Trump, on March 19, 2026.
Previous wording
On April 7, 2026, we announced the appointment of Admiral Flávio Augusto Viana Rocha, a former Cabinet member of the Brazilian Government, to our board of directors as an independent director. Admiral Rocha is a distinguished Brazilian leader with over 43 years of experience in strategy, governance, logistics, and international relations, including official government missions to more than 50 countries. From 2020 to 2022, he held the Minister-level position of Chief of the Secretariat for Strategic Affairs of the Presidency of Brazil, where he led the development of Brazil’s National Long-Term Policy and National Strategic Agenda, including the National Energy Policy. We believe Admiral Rocha’s experience will be valuable as we continue to advance the Neves Project and strengthen our position within the global critical minerals landscape.
Current wording
On April 7, 2026, we announced the appointment of Admiral Flávio Augusto Viana Rocha, a former Cabinet member of the Brazilian Government, to our Board of Directors as an independent director. Admiral Rocha is a distinguished Brazilian leader with over 43 years of experience in strategy, governance, logistics, and international relations, including official government missions to more than 50 countries. From 2020 to 2022, he held the Minister-level position of Chief of the Secretariat for Strategic Affairs of the Presidency of Brazil, where he led the development of Brazil’s National Long-Term Policy and National Strategic Agenda, including the National Energy Policy.
Previous wording
Net loss for the three months ended March 31, 2026 totaled $16.5 million, compared to net loss of $10.2 million during the three months ended March 31, 2025. The increase in net loss is mainly due to:
Current wording
Net loss for the three months ended June 30, 2026 totaled $11.5 million, compared to net loss of $6.3 million during the three months ended June 30, 2025. The increase is mainly due to:
Previous wording
As of March 31, 2026, we had cash and cash equivalents of $34.4 million and working capital of $21.9 million.
Current wording
As of June 30, 2026, we had cash and cash equivalents of $36.1 million and working capital of $22.1 million.
Previous wording
Net cash used by operating activities totaled $10.6 million for the three months ended March 31, 2026, compared to net cash used of $4.4 million during the three months ended March 31, 2025, representing an increase of $6.2 million. The increase in net cash used by operating activities was mainly due to higher general and administrative expenses. See the section entitled “Results of Operations”above.
Current wording
Net cash used by operating activities totaled $18.2 million for the six months ended June 30, 2026, compared to net cash used of $8.3 million during the six months ended June 30, 2025, representing an increase of $9.9 million. The increase in net cash used by operating activities was mainly due to higher general and administrative expenses offset by better financial results. Please refer to section “Results of Operations” above.
Previous wording
Net cash used by investing activities totaled $1.3 million for the three months ended March 31, 2026, compared to net cash used of $4.2 million during the three months ended March 31, 2025, representing a decrease in cash used of $2.9 million. The increase is essentially driven by:
Current wording
Net cash used in investing activities totaled $2.0 million for the six months ended June 30, 2026, compared to net cash used of $6.3 million during the six months ended June 30, 2025, representing a decrease in cash used of $4.3 million or 68%. The decrease primarily reflects:
Previous wording
Net cash provided by financing activities totaled $10.4 million for the three months ended March 31, 2026, compared to $7.1 million during the three months ended March 31, 2025, representing an increase in cash provided of $3.3 million. The increase is due to the following:
Current wording
Net cash provided by financing activities totaled $20.4 million for the six months ended June 30, 2026, compared to $12.9 million during the six months ended June 30, 2025, representing an increase in cash provided of $7.5 million or 58%. The increase is due to the following financing activities that occurred during the six months ended June 30, 2026:
Previous wording
We have historically incurred net operating losses and have not yet generated material revenues from the sale of products or services. As a result, our primary sources of liquidity have been derived through proceeds from the sales of our equity and the equity of one of our subsidiaries. We believe our cash and equivalents will be sufficient to meet our working capital and capital expenditure requirements for a period of at least twelve months from the date of these financial statements. However, our future short- and long-term capital requirements will depend on several factors, including but not limited to, the rate of our growth, our ability to identify areas for mineral exploration and the economic potential of such areas, the exploration and other drilling campaigns needed to verify and expand our mineral resources, the successful installation of our lithium processing facilities, and our ability to attract talent. To the extent that our current resources are insufficient to satisfy our cash requirements, we may need to seek additional equity or debt financing. If the needed financing is not available, or if the terms of financing are less desirable than we expect, we may be forced to scale back our existing operations and growth plans, which could have an adverse impact on our business and financial prospects and could raise substantial doubt about our ability to continue as a going concern.
Current wording
We have historically incurred net operating losses and have not yet generated material revenues from the sale of products or services. As a result, our primary sources of liquidity have been derived through proceeds from the sales of our equity and the equity of one of our subsidiaries. We believe our cash and equivalents will be sufficient to meet our working capital and capital expenditure requirements for a period of at least twelve months from the date of these financial statements. However, our future short- and long-term capital requirements will depend on several factors, including but not limited to, the rate of our growth, our ability to identify areas for mineral exploration and the economic potential of such areas, the exploration and other drilling campaigns needed to verify and expand our mineral resources and reserves, the successful installation of our lithium processing facilities and availability of reserves at the estimated volume and grade, and our ability to attract talent. To the extent that our current resources are insufficient to satisfy our cash requirements, we may need to seek additional equity or debt financing. If the needed financing is not available, or if the terms of financing are less desirable than we expect, we may be forced to scale back our existing operations and growth plans, which could have an adverse impact on our business and financial prospects and could raise substantial doubt about our ability to continue as a going concern.
Previous wording
Until December 31, 2025, with the exception of Atlas Brazil, our foreign subsidiaries (all based in Brazil) used a local currency (Brazilian Reais) as the functional currency. Resulting translation gains or losses were recognized as a component of accumulated other comprehensive income. The Company determined that, as of January 1, 2026, the U.S. dollar is the currency of the primary economic environment in which the Brazilian subsidiaries operate.
Current wording
Until December 31, 2025, with the exception of Atlas Brazil, our subsidiaries based in Brazil used a local currency (Brazilian Reais) as the functional currency. Resulting translation gains or losses were recognized as a component of accumulated other comprehensive income. The Company determined that, as of January 1, 2026, the U.S. dollar is the currency of the primary economic environment in which the Brazilian subsidiaries operate.
Previous wording
Effective January 1, 2026, the Company’s foreign subsidiaries changed their functional currency from Brazilian Reais to U.S. Dollars due to a shift in the underlying economic facts and circumstances affecting the subsidiaries’ operations and financing activities. In particular, our subsidiary Atlas Critical Minerals listed on the Nasdaq Capital Market and commenced trading on the Nasdaq on January 9, 2026. As a result of such listing and the attendant access to U.S. capital markets, the U.S. Dollar is the primary currency through which we and our Brazilian subsidiaries expect to raise any additional capital.
Current wording
Effective January 1, 2026, the Company’s Brazilian subsidiaries changed their functional currency from Brazilian Reais to U.S. Dollars due to a shift in the underlying economic facts and circumstances affecting the subsidiaries’ operations and financing activities. In particular, our subsidiary Atlas Critical Minerals listed on the Nasdaq Capital Market and commenced trading on the Nasdaq on January 9, 2026. As a result of such listing and the attendant access to U.S. capital markets, the U.S. Dollar is the primary currency through which we and our Brazilian subsidiaries expect to raise any additional capital.
Rearranged current paragraphs (1)
Current report — wording carried from elsewhere
Net loss for the six months ended June 30, 2026 totaled $28.0 million, compared to net loss of $16.5 million during the six months ended June 30, 2025. The increase is mainly due to: