EX-99.1 · Notes:
Notes:
| 1. | All tabulated data have been rounded and as a result minor computational errors may occur. |
| 2. | Mineral Resources, which are not Mineral Reserves, have no demonstrated economic viability. There is no guarantee that that all or any part of the Mineral Resource will be converted into a Mineral Reserve. The estimate of Mineral Resources may be materially affected by geology, environment, permitting, legal title, taxation, socio-political, marketing, or other relevant issues. |
| 3. | kt = thousand tonnes, Mlbs = Million pounds, koz = thousand ounces. |
| 4. | The 2026 MRE has been prepared in accordance with the CIM Definition Standards (2014) and CIM Best Practice Guidelines (2019) with an effective date of June 22, 2026. |
| 5. | Mineral Resources are reported at a cut-off value of US$25/t Net Smelter Return (“NSR”) defined as received value of final metal recovered minus off-site costs. |
| 6. | Mineral Resources are estimated using long-term prices of US$9.10/lb Ni, US$5.10/lb Cu, US$20.00/lb Co, US$1,800/oz Pt, US$1,550/oz Pd, US$3,600/oz Au and US$52.00/oz Ag. The same metal prices were used in CuEq and NSR calculations. |
| 7. | Mineral Resources are estimated using nickel, copper, cobalt, platinum, palladium, gold and silver recoveries of 54%, 88%, 53%, 56%, 78%, 72% and 61%, respectively, derived from metallurgical studies which consider a two-concentrate scenario. |
| 8. | Payabilities and off-site treatment and refining costs were derived from an independent marketing study commissioned by NEXM. |
| 9. | The CuEq value was calculated based on relative recovered value received for each metal excluding costs. Received value for each metal was calculated using the formula: in-situ gradeconcentrator recoverypayability*metal price. The ratio between received copper value and total other metal value was then used to calculate CuEq, i.e., CuEq = (1+value excluding Cu / Cu value) * Cu grade. |
| 10. | Bulk density has been estimated in the block model based on an extensive data set of measurements taken from drillhole cores. |
| 11. | Mineral Resources are reported within an optimized pit shell using NSR values, mining cost of US$3/tonne (additional US$0.008 per metre depth from pit rim), concentrate costs of US$20/tonne, G&A of US$1.35 per tonne, 45°pit slope to base of partially weathered and 60° in fresh rock. |
| 12. | There are no Mineral Reserves. |