What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-Q

Period ended 2025-09-30; filed 2025-11-14.

0001493152-25-022560

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

Current report: 10-Q

Period ended 2026-03-31; filed 2026-05-15.

0001493152-26-023798

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 58 previous paragraphs and 93 current paragraphs.

34 unchanged; 19 reworded; 40 added; 2 removed; 3 previous and 0 current paragraphs rearranged.

Tables are not compared: 2 previous and 3 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (40)

Current report

Bimergen Energy’s business model as a BESS project owner and developer will leverage long-term contracted tolling agreements to generate stable revenue with upside potential. While Bimergen owns and plans to develop a portfolio of BESS projects, tolling agreements with major energy trading entities or institutional financial firms will provide a dual revenue model including guaranteed floor payments and upside profit sharing. The floor payment could be a fixed or minimum revenue guarantee to cover operational costs and provide downside protection against low market prices or volatility. Upside sharing is a profit-sharing mechanism where revenues above the floor would be split between Bimergen and the offtaker, incentivizing optimization of energy trading.

Current report

While these contracts have not yet been finalized, institutional traders will manage daily operations and energy trading under the agreements once signed. They will monitor market prices and advise Bimergen to charge the batteries during off-peak hours using low-cost grid energy, then discharge the batteries during peak hours, selling high-priced power back to the grid. Under the prospective agreements, institutional offtakers would buy the discharged power wholesale, resell it at market prices for profit, guarantee the floor payment, and share upside revenue with Bimergen. Beyond arbitrage, tolling agreements may include provisions for ancillary services like frequency regulation, voltage support, or capacity payments, where the BESS helps stabilize the grid for additional revenue streams. The offtaker would assume market price risk, while the BESS owner would be responsible for system maintenance and performance, ensuring the assets meet contractual obligations. The floor payment would ensure predictable cash flows, making projects bankable by institutional investors or lenders to provide project financing. Upside sharing would allow developers to benefit from high market prices without direct exposure to trading risks. Partnering with experienced traders leverages their market knowledge, reducing the need for in-house trading capabilities. Offtakers benefit from access to infrastructure by gaining control over a BESS without owning or maintaining it, and capture margins by reselling power at market prices, especially during peak demand. Offtake agreements are long-term contracts, often spanning 10–20 years, to align with the lifecycle of BESS projects and provide revenue certainty for financing.

Current report

As renewable energy penetration increases, BESS tolling agreements are becoming more common to manage intermittency (e.g., storing solar/wind energy for peak times). The global BESS market is projected to grow significantly, with tolling agreements facilitating project financing. The structure of tolling agreements vary on a case-by-case basis. While the floor payment mitigates downside, low market prices can limit upside potential, affecting overall returns. BESS performance declines over time, which may impact revenue if not accounted for in the agreement. The financial stability of the offtaker is critical, as their ability to meet floor payments or share upside depends on their market success. Shifts in energy market policies or grid incentives can affect the profitability of tolling agreements.

Current report

We are in talks with a number of investment banks to secure offtake agreements for our projects. However, to date, we have not entered into any offtake agreements and there can be no assurance that we will be able to do so on terms favorable to the Company. If we are not successful in obtaining favorable terms, we will operate these projects by selling merchant power and use a third-party scheduling entity to assist us in scheduling the power. This exposes the BESS to market volatility, where prices fluctuate based on supply, demand, fuel costs, and other dynamics. Without guaranteed revenue streams, the BESS owner assumes financial risk, as electricity prices can vary significantly. However, during periods of high demand or grid stress, the system can capitalize on higher prices. The BESS can also provide services like energy arbitrage, storing low-cost electricity and selling it when prices rise, or ancillary services like frequency regulation and reserves, which can be more profitable during grid instability. The key advantage of this model is the potential for higher returns in favorable market conditions, but it also carries the risk of lower profits or losses when market prices drop or when demand for storage services is insufficient. Like traditional merchant power plants, a BESS in this model faces financial uncertainty but has the flexibility to adjust based on real-time market conditions.

Current report

We anticipate management will be active in identifying, negotiating and establishing the financing relationships required for our projects. Since the Company and its subsidiaries do not have the in-house personnel to construct these projects, we also anticipate management will hire third parties to manage the construction of the project facilities and we will manage and negotiate the purchase of the key components of the facility (most importantly being the batteries). The Development Projects purchased are at various stages and we executed an agreement with Energy Independent Partners (“EIP”) (a Delaware limited liability company controlled by Cole Johnson, our Co-CEO and President and Director commencing as of the date of acquisition of Emergen) for services to include: pre-construction and pre-operational activities such as assisting with qualifying the Development Projects for financing; assisting with achieving RTB Status for Development Projects; and assisting with marketing the Development Project to a third party, if desired. The relevant fees for these services are $0.035 per watt of capacity.

Current report

Location is a key consideration when selecting a site to develop a project. All projects are chosen in rural areas, outside high electricity demand zones, and on existing transmission lines. Transmission lines are then measured for available capacity and evaluated for potential BESS projects. After confirming that the site is suitable for BESS, we contact the landowner and conduct environmental studies to ensure it is viable for construction and operation. Most of our projects are in non-regulated markets, which allow us to sell power into the merchant markets using a scheduling entity.

Current report

Another key component of site qualification is identification of the potential energy customers and markets we can serve, either by rights acquired in the development process, those which can be secured via competitive utility procurements and those which can be secured under direct bilateral agreements

Current report

The revenue opportunities relating to our primary energy purchase customers – the regulated utilities and regulated wholesale energy markets operating where each of our projects are located, are quantified at the earliest stages of project qualification and the commercial relationship with these customers is fully established at the time we anticipate executing our interconnection agreement, typically prior to commencement of construction. These utility energy purchase mechanisms generally preclude any direct participation by these customers in asset ownership or profit distributions.

Current report

Additionally, at each site location, screening is conducted to identify and qualify potential industrial, commercial and municipal customers. Those which meet our criteria for potentially enhancing our revenues and profits are contacted to determine their interest in purchasing energy services at or after the point in time when our projects enter revenue operations. It is not our normal practice, and these energy purchase agreements do not typically include participation in equity ownership or profit distributions from the projects, but these options are not precluded legally or regulatorily.

Current report

The physical quality of our sites in terms of their development is valued against industry comparables. The energy and revenue generation potential of our sites and projects and the number and credit quality of our established and potential utility and non-utility customers are also key factors in the valuation of our projects, their ability to attract investors and the ultimate cost of that capital. This is true for the majority of projects in our industry.

Current report

Our projects may include multiple classes of equity investors. Project level preferred equity investors enjoy returns which include one or more fixed components plus a participation component in which they share in the net free cash flows of our combined arbitration and contracted energy revenue operations; common equity investors participate directly in ownership of the project assets and receive distributions of net free cash flows from our energy trading (arbitrage) revenues and those from contracted energy services. We also have tax equity investors who participate in a transaction to acquire these tax benefits outright and may also enjoy a nominal carried interest in our net distributions.

Current report

Our pro forma models and financial practices meet customary industry standards to estimate, calculate and project these revenues both for institutional financing purposes as well as regulatory requirements.

Current report

It is our intent to own and operate our projects in most cases, but in others we may deem it financially beneficial to the company and our equity investors to partly or fully monetize our project assets.

Current report

Our Redbird and Wildfire projects are currently the most advanced within our portfolio and are ready to proceed to the financing and construction phases. We are actively pursuing project-level debt and equity financing to fund the construction and/or operationalization of these projects. Upon securing financing, of which there can be no assurance we will be able to do so or do so on terms favorable to us, we intend to execute binding agreements with key counterparties, initiate site preparation activities, and commence construction in accordance with our development timelines. As part of the rights to the Work Product and continued development, we identify and negotiate with the appropriate counterparts in the specific project, but do not enter into binding contracts until specific project financing is obtained so as to not create liabilities before project financing is secured. We recognize the importance of managing risks associated with project development, including regulatory, technical, financial, and market risks. Our approach involves conducting thorough feasibility studies, engaging in proactive stakeholder consultations, and maintaining flexibility in project planning. We do not enter into binding contracts related to site control, equipment procurement, or construction until project-specific financing is secured, mitigating financial exposure. The next steps for these projects will include executing contracts with key counterparties, purchasing equipment, and initiating the construction process. Our current project pipeline consists of multiple BESS initiatives, with an estimated development timeline spanning eight to nine years.

Current report

The Battery Energy Storage Systems (BESS) industry is young but has experienced significant growth in the United States, driven by the integration of renewable energy, the need for grid stability, and various economic and policy incentives.

Current report

Battery storage systems are not a primary electricity source, meaning the technology does not create electricity from a fuel or natural resource. Instead, batteries store electricity that has already been created from an electricity generator or the electric power grid, which makes energy storage systems secondary sources of electricity.

Current report

The acceleration of global integration of renewable energy sources has amplified the critical need for efficient energy storage solutions, driving substantial investment into grid infrastructure, particularly BESS. Despite its emergence as a distinct sector only in the 2010s, the BESS market has since experienced exponential growth, attracting significant investor interest worldwide.

Current report

Battery Energy Storage Systems (BESS) play a crucial role in managing the grid, and their importance is expected to increase as more electrification and AI data centers are installed across the United States and the world. The sharp increase in demand for AI clusters has resulted in a notable emphasis on data center capacity, placing significant strain on the power grid, generation capabilities, and environmental concerns. With this surge in demand for electricity, there is a corresponding need for efficient storage systems to balance supply and demand on the grid. The current benefits of BESS towards the grids are as follows:

Current report

As we progress towards optimizing BESS operations for the future, several advantages become apparent:

Current report

BESS market is projected to grow exponentially, making it a massive and lucrative market in the US market. However, despite its rapid growth, there are currently limited players involved in this sector. Management believes this situation presents an opportunity for companies with extensive development and operating experience like the Company today to enter and capitalize on this expanding market. As the US continues to transition towards cleaner energy sources, BESS systems will become even more critical in ensuring a stable and resilient power grid while reducing carbon emissions. We believe it is an exciting time for the BESS industry with immense potential for growth and innovation.

Current report

On April 14, 2024, the Company, Emergen Energy LLC, a Delaware limited liability company (“Emergen”), Bridgelink Development, LLC, a Delaware limited liability company (“Bridgelink”) and C & C Johnson Holdings LLC, the sole member of Bridgelink (“C&C”) entered into a Membership Interest Purchase Agreement (the “MIPA”) (the “Business Combination”).

Current report

Originally, in a letter agreement executed and disclosed in January 2024 the above acquisition was contingent upon the parties entering into a definitive agreement which would contain certain conditions to close, including a commitment for a capital investment or other financing transaction of not less than $50,000,000 (the “Capital Infusion”) prior to closing. This Capital Infusion condition was negotiated out of the acquisition definitive agreement.

Current report

We plan to raise the working capital and project specific financing we need to commence the Development Projects through future debt and equity financing.

Current report

Development Projects are the result of a significant amount of feasibility studies determining capacity and compatibility, establishing production model of the project parameters, identifying any curtailment for the project, power flow site verification and substation identification, and noting project specific challenges. Subsequent to positive feasibility studies is the development process of legal formation, analyzing and negotiating site control/surface and materials, identifying engineering requirements before construction, identifying and negotiating interconnection to the grid, identifying tax abatements, identifying permitting and study requirements, and noting project specific challenges. We identify and negotiate with the appropriate counterparts in the specific project but do not enter into binding contracts until specific project financing is obtained. Currently we have no binding contracts for our development projects.

Current report

Through Emergen, Bimergen Energy management will determine which projects will be developed and when, how financing arrangements will be pursued and accepted, and whether a project may be sold instead of developed, and the criteria for establishing the sale price.

Current report

Emergen was formed on April 4, 2024, and had no operating activity but held the Development Projects. The Development Projects were assigned to Emergen on April 23, 2024, with no cost basis and deemed to be intangible

Current report

From an accounting perspective, we treated the transaction as an acquisition of assets versus a business combination due to the lack of any operations. Also, the projects that were purchased in the acquisition were development stage and deemed to not be tangible assets under FASB 805-10-20 and have classified these as intangible assets with indefinite useful lives and are not amortized but are tested for impairment annually, or more frequently if events or changes in circumstances indicate the assets may be impaired. To the extent that an intangible asset is successfully developed into a revenue-generating asset, it will be relieved over time in the same time period as the property, plant and equipment purchased to have the project become a revenue-generating project. To the extent that an intangible asset is not successfully developed into a revenue-generating assets, it will be considered impaired and charged to operations at that time. The Company valued the transaction at the value of $22,222,200, the value of the restricted stock ($14.00 closing price per share on April 24, 2024) issued as consideration for Emergen. Emergen had no liabilities associated with it at the time of the transaction.

Current report

On May 30, 2024, Emergen entered into a Project Sale Agreement (“PSA”) with Bridgelink covering approximately 2.425 GW of greenfield solar projects. Total consideration payable to Emergen is approximately $19.4 million, consisting of a non-refundable deposit of $943,500 received in June 2024 and up to $18.5 million of milestone payments. The deposit is recorded as deferred revenue. No revenue was recognized through March 31, 2026, because the contractual milestone conditions had not been met. Effective December 31, 2024, the PSA was amended to provide that Bridgelink may return a project, without refund, only if no milestone payment has yet been made and the return occurs within seven years of the PSA’s effective date. All other material terms remain unchanged. All funds paid to Emergen are non-refundable.

Current report

In the event that Purchaser, under the purchase agreement decides to transfer any Project along with its interests to Bridgelink or any creditworthy entity designated by Bridgelink (“Returned Project”), Bridgelink shall provide written notice to Emergen within ten (10) business days of receipt of such notice from the Purchaser and Bridgelink shall convey, transfer, assign, deliver, and contribute over certain rights and interests to the Returned Project to Emergen within ten (10) business days of receipt of such Returned Project, unless otherwise agreed upon by Emergen in writing. For clarity, any creditworthy entity designated by Bridgelink shall be confirmed in writing by Emergen. Bridgelink is to receive payment from the Purchaser no later than March 31 of the year following each calendar year end for any milestones that have been achieved during that calendar year. Emergen is to receive payment within five days from Bridgelink receiving payment from the Purchaser. Effective December 31, 2024, Emergen and Bridgelink amended the Agreement to provide that Bridgelink could only return a Project if it has not yet made a milestone payment to Emergen on prior to the seventh (7th) anniversary of the Effective Date of the Agreement

Current report

The Projects sold by Emergen to Bridgelink are in what are termed as “Greenfield Projects.” With respect to each Greenfield Project, Emergen will be paid:

Current report

(i) $5,000 per megawatt (in alternating current) measured at the Point of Interconnection after such Greenfield Project has secured all necessary land rights as determined in good faith ($12,125,000 for the estimated 2,425 megawatts sold); and

Current report

(ii) $3,000 per megawatt (in alternating current) measured at the Point of Interconnection when the relevant Greenfield Project has achieved ready-to-build (RTB) status as determined in good faith ($7,275,000 for the estimated 2,435 megawatts sold.

Current report

There is no specified timeframe for the milestones to be achieved.

Current report

The $943,500 deposit remains included in deferred revenue at March 31, 2026, because the applicable revenue recognition milestones had not been achieved, and no revenue has been recognized through March 31, 2026. A December 31, 2024 amendment clarified that amounts paid to Emergen are non-refundable and limited the circumstances in which projects may be returned. During the three months ended March 31, 2026, the Company paid $339,688 related to amounts previously received under this arrangement that remained accrued to EIP, a related party, and was included in accounts payable and accrued liabilities – related parties at December 31, 2025.

Current report

The following agreements were entered into on the date of Closing as provided for in the MIPA:

Current report

The Company acquired Bitech Mining Corporation (“BTM”) on March 31, 2022 (the “Closing Date”) through a share exchange pursuant to a Share Exchange Agreement (the “Share Exchange Agreement”) by and among the Company, BTM, each of BTM’s shareholders (each, a “Seller” and collectively, the “Sellers”), and Benjamin Tran, solely in his capacity as Sellers’ Representative (“Sellers’ Representative”). The transaction contemplated by the Share Exchange Agreement is hereinafter referred to as the “Share Exchange”). The Share Exchange Agreement provides that the Company will acquire from the Sellers, an aggregate of 673,659 shares of BTM’s Common Stock, par value $0.001 per share, representing 100% of the issued and outstanding shares of BTM (collectively, the “BTM Shares”). In consideration of the BTM Shares, the Company issued to the Sellers an aggregate of 9,000,000 shares of the Company’s newly authorized Series A Convertible Preferred Stock, par value $0.001 per share (the “Series A Preferred Stock”). Each BTM Share shall be entitled to receive 0.09543 shares of Series A Preferred Stock. Each share of Series A Preferred Stock shall automatically convert into 0.385541 shares (an aggregate of approximately 3,469,867) of the Company’s Common Stock (the “Company Common Stock”) upon filing of an amendment to its Certificate of Incorporation increasing the number of the Company’s authorized common stock so that there are a sufficient number of shares of Company Common Stock authorized but unissued to permit a full conversion of all the Series A Preferred Stock. Effective as of June 27, 2022, the Series A Preferred Stock automatically converted into 3,469,866 shares of Company Common Stock following the June 27, 2022 filing of an amendment to its Certificate of Incorporation increasing the number of the Company’s authorized common stock to 1,000,000,000 shares. Upon conversion of the Series A Preferred Stock, the Sellers held, in the aggregate, approximately 96% of the issued and outstanding shares of Company capital stock on a fully diluted basis.

Current report

The Share Exchange was treated as a recapitalization and reverse acquisition for financial reporting purposes, and BTM is considered the acquirer for accounting purposes. As a result of the Share Exchange and the change in our business and operations, a discussion of the past financial results of our predecessor, Spine Injury Solutions Inc., is not pertinent, and under applicable accounting principles, the historical financial results of BTM, the accounting acquirer, prior to the Share Exchange are considered our historical financial results.
Removed paragraphs (2)

Previous report

General and administrative expenses have increased approximately $1.5 million primarily related to approximately $1,150,000 non-cash stock compensation and approximately $84,000 of investor relations expense, $71,000 of Emergen consulting and contractor fees related to the Emergen projects, $136,000 of audit costs and $258,000 in officer salaries. The notable decrease was ($213,000) in legal fees related to a litigation that was resolved in our favor during 2025 resulting in the cancellation of the defendant’s common stock.

Previous report

At September 30, 2025, the Company has $825,700 of unsecured notes to a related party with a due date of December 31, 2025.
Reworded paragraphs (19)

Previous wording

This management discussion and analysis (“MD&A”) of the financial condition and results of operations of Bimergen Energy Corporation (the “Company,” “Bimergen Energy,” “our” or “we”) is for the nine months ended September 30, 2025 and 2024. It is supplemental to, and should be read in conjunction with, our condensed consolidated financial statements for the nine months ended September 30, 2025 and 2024. Our financial statements are prepared in accordance with accounting principles generally accepted in the United States of America (“GAAP”). Financial information presented in this MD&A is presented in United States dollars (“$” or “US$”), unless otherwise indicated.

Current wording

This management discussion and analysis (“MD&A”) of the financial condition and results of operations of Bimergen Energy Corporation (the “Company,” “Bimergen Energy,” “our” or “we”) is for the three months ended March 31, 2026 and 2025. It is supplemental to, and should be read in conjunction with, our condensed consolidated financial statements for the three months ended March 31, 2026 and 2025. Our financial statements are prepared in accordance with accounting principles generally accepted in the United States of America (“GAAP”). Financial information presented in this MD&A is presented in United States dollars (“$” or “US$”), unless otherwise indicated.

Previous wording

In addition to energy arbitrage, our BESS assets are positioned to provide essential grid services, including frequency regulation, voltage support, and emergency backup during grid outages. Frequency regulation refers to the rapid response to changes in grid frequency, maintaining stability and preventing potential grid failures. Voltage control enhances the quality and reliability of power supplied to consumers. The rapid response capabilities also maintain stability for key infrastructure during outages via immediate response to fluctuations in voltage and frequency. By reducing demand imbalances at peak times, known as peak shaving, we hope to flatten the energy demand and lower electricity costs for consumers. By integrating advanced EMS controls, we aim to optimize the dispatch timing and increase the overall economic value of stored energy, delivering both reliable performance efficient operation in dynamic market conditions. Our systems will enable more flexible and adaptive grid operations, accommodating dynamic energy flows and diverse generation sources. These ancillary services both relieve grid stress, offer additional potential revenue streams, and maximize likelihood of punctual project development within budget and ensure product quality standards. We believe we well- positioned to leverage our existing relationships to secure multi-year customer contracts prior to project construction and integrate cutting-edge battery technologies as they are developed into future developments. Our systems will also be capable of deferred infrastructure upgrades, which reduce the need for expensive grid infrastructure upgrades by efficiently managing local supply and demand.

Current wording

In addition to energy arbitrage, our BESS assets are positioned to provide essential grid services, including frequency regulation, voltage support, and emergency backup during grid outages. Frequency regulation refers to the rapid response to changes in grid frequency, maintaining stability and preventing potential grid failures. Voltage control enhances the quality and reliability of power supplied to consumers. The rapid response capabilities also maintain stability for key infrastructure during outages via immediate response to fluctuations in voltage and frequency. By reducing supply-demand imbalances at peak times, known as peak shaving, we hope to flatten the energy demand and lower electricity costs for consumers. By integrating advanced EMS controls, we aim to optimize the dispatch timing and increase the overall economic value of stored energy, delivering both reliable performance and efficient operation in dynamic market conditions. Our systems will enable more flexible and adaptive grid operations, accommodating dynamic energy flows and diverse generation sources. These ancillary services both relieve grid stress, offer additional potential revenue streams, and maximize likelihood of punctual project development within budget and ensure product quality standards. We believe we are well- positioned to leverage our existing relationships to secure multi-year customer contracts prior to project construction and integrate cutting-edge battery technologies as they are developed into future developments. Our systems will also be capable of deferred infrastructure upgrades, which reduce the need for expensive grid infrastructure upgrades by efficiently managing local supply and demand. We expect our customers will include traditional trading houses (e.g., Goldman Sachs, BP, Shell), commercial and industrial (C&I) entities, and utilities. The terms of our agreements with customers will be defined by tolling agreements, financial hedges, or power purchase agreements (PPAs), which serve as financial instruments to guarantee all or a portion of future revenues.

Previous wording

We expect our BESS projects to be located alongside traditional power transmission lines or near large offtakers with high energy demands, enhancing grid stability and reducing energy costs. These locations are suitable for battery storage facilities of approximately thirty acres and undergo environmental studies and assessments to ensure feasibility. While the letters of intent the Company has entered into or negotiated for these projects are for specific locations, the Company’s development plans are not dependent on the landowner or address, but, rather, are county based. The Company believes it could adjust its plans to find a similar, suitable location if it is unable to negotiate a definitive agreement to develop a project with the landowner.

Current wording

BESS project locations are selected to be located alongside traditional power transmission lines or near large offtakers (our expected customers) with high energy demands, enhancing grid stability and reducing energy costs. These locations are suitable for battery storage facilities of approximately thirty acres and undergo environmental studies and assessments to ensure feasibility. While the letters of intent the Company has entered into or negotiated for these projects are for specific locations, the Company’s development plans are not dependent on the landowner or address, but, rather, are county based. The Company believes it could adjust its plans to find a similar, suitable location if it is unable to negotiate a definitive agreement to develop a project with the landowner.

Previous wording

We maintain strong relationships with tier-one battery and equipment suppliers, utilities, and power purchasers to optimize transmission efficiency and lower consumer costs. We believe these partnerships may also help us secure regulatory support, ensure timely project development within budget, and uphold high product quality standards. Our strategic position allows us to secure multi-year customer contracts before project construction and integrate emerging battery technologies into future developments. Additionally, our systems are designed to enable deferred infrastructure upgrades, reducing the need for costly grid enhancements by efficiently managing local supply and demand.

Current wording

We maintain strong relationships with tier-one battery and equipment suppliers, utilities, and power purchasers to optimize transmission efficiency and lower consumer costs. These partnerships may also help us secure regulatory support, ensure timely project development within budget, and uphold high product quality standards. Our strategic position allows us to secure multi-year customer contracts before project construction and integrate emerging battery technologies into future developments. Additionally, our systems are designed to enable deferred infrastructure upgrades, reducing the need for costly grid enhancements by efficiently managing local supply and demand.

Previous wording

Our portfolio of Development Projects includes approximately 3.6 GW of alternating current (GWAC) power capacity across various regions served by Independent System Operators (ISOs) such as ERCOT, WECC, PJM, and MISO. These regions have been selected strategically based on favorable market conditions, grid infrastructure, and regulatory environments conducive to renewable energy integration. In connection with the Emergen transaction, we have secured rights to comprehensive “Work Product” Intangible assets essential for project development, including but not limited to: feasibility studies determining capacity and compatibility, establishing a production model of the project parameters, identifying any curtailment for the project, power flow site verification and substation identification, permitting and regulatory compliance documentation, engineering designs, equipment procurement plans, site preparation guidelines, and noting project specific challenges.

Current wording

Our portfolio of Development Projects includes approximately 3.6 GW of alternating current (GWAC) power capacity across various regions served by Independent System Operators (ISOs) such as ERCOT, WECC, PJM, and MISO. These regions have been selected strategically based on favorable market conditions, grid infrastructure, and regulatory environments conducive to renewable energy integration. In connection with the Emergen transaction, we currently have no proprietary rights but we have secured rights to comprehensive “Work Product” Intangible assets essential for project development, including but not limited to: feasibility studies determining capacity and compatibility, establishing a production model of the project parameters, identifying any curtailment for the project, power flow site verification and substation identification, permitting and regulatory compliance documentation, engineering designs, equipment procurement plans, site preparation guidelines, and noting project specific challenges.

Previous wording

On April 24, 2024 (the “Closing”) the Company completed the acquisition of Emergen in accordance with the MIPA whereby the Company issued 1,587,300 unregistered shares of its common stock to Emergen’s sole member, C&C Johnson Holdings LLC (“C&C”) in exchange for 100% of Emergen’s equity interests. C&C is controlled by Cole Johnson who became our President and a director following the Closing as well as the President of the Company’s BESS and Solar Divisions. In addition, Emergen became a wholly-owned subsidiary of the Company with C&C’s owning approximately 31.3% of the Company’s issued and outstanding shares of the Company’s capital stock.

Current wording

On April 24, 2024 (the “Closing”) the Company completed the acquisition of Emergen pursuant to the MIPA whereby the Company issued 1,587,300 unregistered shares of its common stock to Emergen’s sole member, C&C Johnson Holdings LLC (“C&C”) in exchange for 100% of Emergen’s equity interests. C&C is controlled by Cole Johnson who became our President and a director following the Closing as well as the President of the Company’s BESS and Solar Divisions. In addition, Emergen became a wholly owned subsidiary of the Company with C&C’s owning approximately 31.3% of the Company’s issued and outstanding shares of the Company’s capital stock.

Previous wording

Emergen holds a portfolio of battery energy storage system (“BESS”) projects identified in the MIPA with a cumulative storage capacity estimated at 1.965 gigawatts (GW) upon completion of the construction of such project (the “BESS Development Projects”) and rights to develop a portfolio of solar energy development projects with a cumulative capacity estimated at 1.640 GW upon completion of construction of such project (the “Solar Development Projects,” together with the BESS Development Projects, collectively, the “Development Projects”). The Company agreed that following the Closing, the Company would take all commercially reasonable steps necessary to uplist the Company to the NASDAQ stock exchange.

Current wording

Emergen holds a portfolio of battery energy storage system (“BESS”) projects identified in the MIPA with a cumulative storage capacity estimated at 1.965 gigawatts (GW) upon completion of the construction of such project (the “BESS Development Projects”) and rights to develop a portfolio of solar energy development projects with a cumulative capacity estimated at 3.840 GW upon completion of construction of such project (the “Solar Development Projects,” together with the BESS Development Projects, collectively, the “Development Projects”).

Previous wording

BESS Development Fees. In consideration of the provision of the Services related to the BESS Development Projects, and subject to the terms and conditions herein, during the Term, The Company shall pay EIP the following amounts per BESS Development Project: $0.035 per W for each applicable BESS Development Project, subject to such BESS Development Project achieving sufficient project specific equity or debt financing from third parties to fund the payment of the fees (“BESS Development Fees”). Currently, the Company is focusing on developing the BESS projects and the total fees related to all 23 of the BESS projects would be the $0.035 per watt multiplied by the estimated capacity 1.965 GW (1,965,000,000 watts) or approximately $69 million.

Current wording

BESS Development Fees. In consideration of the provision of the Services related to the BESS Development Projects, and subject to the terms and conditions herein, during the Term, Bitech shall pay EIP the following amounts per BESS Development Project: $0.035 per W for each applicable BESS Development Project, subject to such BESS Development Project achieving sufficient project specific equity or debt financing from third parties to fund the payment of the fees (“BESS Development Fees”). Currently, the Company is focusing on developing the BESS projects and the total fees related to all 23 of the BESS projects would be the $0.035 per watt multiplied by the estimated capacity 1.965 GW (1,965,000,000 watts) or approximately $69 million.

Previous wording

Solar Development Fees. In consideration of the provision of the Services related to the Solar Development Projects, and subject to the terms and conditions herein, during the Term, The Company shall pay EIP the following amounts per Solar Development Project: $0.035 per W for each applicable Solar Development Project, subject to such Solar Development Project achieving sufficient project specific equity or debt financing from third parties to fund the payment of the fees (“Solar Development Fees”). The Solar projects still in the Emergen portfolio have an estimated capacity of 1.640 GW and would have Solar Development Fees of approximately $57 million if developed.

Current wording

Solar Development Fees. In consideration of the provision of the Services related to the Solar Development Projects, and subject to the terms and conditions herein, during the Term, Bitech shall pay EIP the following amounts per Solar Development Project: $0.035 per W for each applicable Solar Development Project, subject to such Solar Development Project achieving sufficient project specific equity or debt financing from third parties to fund the payment of the fees (“Solar Development Fees”). The Solar projects still in the Emergen portfolio have an estimated capacity of 1.640 GW and would have Solar Development Fees of approximately $57 million if developed.

Previous wording

The BESS Development Fees shall be due and payable upon (i) The Company, or any of its Affiliates, receiving project financing directly related to and collateralized by BESS Projects, this specifically excludes any general public or private offerings by The Company not directly related to financing a BESS Project, and (ii) when a BESS Project’s financing funding terms is sufficient to pay the project specific Development Fees. EIP will be paid on the same timing as the funding terms. For example: if the terms for development fees are 50% at acceptance, 40% RTB and 10% at COD then EIP will be paid as the project development fees are funded.

Current wording

The BESS Development Fees shall be due and payable upon (i) Bitech, or any of its Affiliates, receiving project financing directly related to and collateralized by BESS Projects, this specifically excludes any general public or private offerings by Bitech not directly related to financing a BESS Project, and (ii) when a BESS Project’s financing funding terms is sufficient to pay the project specific Development Fees. EIP will be paid on the same timing as the funding terms. For example: if the terms for development fees are 50% at acceptance, 40% RTB and 10% at COD then EIP will be paid as the project development fees are funded.

Previous wording

Acceleration of Payment Clause: Within ninety (90) days (i) of the effective date of a Change of Control or (ii) the removal of Cole W. Johnson as an employee or consultant to Emergen and/or the head of the BESS and Solar Division of Bimergen Energy, any remaining BESS Initial Fee and Solar Initial Fee shall become due and payable. A “Change of Control” shall be deemed to have occurred if, after the Effective Date, (x) the beneficial ownership (as defined in Rule 13d-3 under the Securities Exchange Act of 1934, as amended (the “Exchange Act”)) of securities representing more than 50% of the combined voting power of the Company is acquired by any “person” as defined in sections 13(d) and 14(d) of the Exchange Act (other than the Company, any subsidiary of the Company, or any trustee or other fiduciary holding securities under an employee benefit plan of the Company); (y) the merger or consolidation of the Company with or into another corporation where the shareholders of the Company, immediately prior to the consolidation or merger, would not, immediately after the consolidation or merger, beneficially own (as such term is defined in Rule 13d-3 under the Exchange Act), directly or indirectly, shares representing in the aggregate 50% or more of the combined voting power of the securities of the corporation issuing cash or securities in the consolidation or merger (or of its ultimate parent corporation, if any) in substantially the same proportion as their ownership of the Company immediately prior to such merger or consolidation; or (z) the sale or other disposition of all or substantially all of the Company’s assets to an entity, other than a sale or disposition by the Company of all or substantially all of the Company’s assets to an entity, at least 50% of the combined voting power of the voting securities of which are owned directly or indirectly by shareholders of the Company, immediately prior to the sale or disposition, in substantially the same proportion as their ownership of the Company immediately prior to such sale or disposition.

Current wording

Acceleration of Payment Clause: Within ninety (90) days (i) of the effective date of a Change of Control or (ii) the removal of Cole W. Johnson as an employee or consultant to Emergen and/or the head of the BESS and Solar Division of Bimergen Energy, 62.5% of any remaining BESS and Solar Development Fees shall become due and payable. A “Change of Control” shall be deemed to have occurred if, after the Effective Date, (x) the beneficial ownership (as defined in Rule 13d-3 under the Securities Exchange Act of 1934, as amended (the “Exchange Act”)) of securities representing more than 50% of the combined voting power of the Company is acquired by any “person” as defined in sections 13(d) and 14(d) of the Exchange Act (other than the Company, any subsidiary of the Company, or any trustee or other fiduciary holding securities under an employee benefit plan of the Company); (y) the merger or consolidation of the Company with or into another corporation where the shareholders of the Company, immediately prior to the consolidation or merger, would not, immediately after the consolidation or merger, beneficially own (as such term is defined in Rule 13d-3 under the Exchange Act), directly or indirectly, shares representing in the aggregate 50% or more of the combined voting power of the securities of the corporation issuing cash or securities in the consolidation or merger (or of its ultimate parent corporation, if any) in substantially the same proportion as their ownership of the Company immediately prior to such merger or consolidation; or (z) the sale or other disposition of all or substantially all of the Company’s assets to an entity, other than a sale or disposition by the Company of all or substantially all of the Company’s assets to an entity, at least 50% of the combined voting power of the voting securities of which are owned directly or indirectly by shareholders of the Company, immediately prior to the sale or disposition, in substantially the same proportion as their ownership of the Company immediately prior to such sale or disposition.

Previous wording

General and administrative expenses have increased significantly for the three months ended September 30, 2025 compared to the three months ended September 30, 2024. The primary increase was approximately $810,000 of non-cash stock compensation. The decreases included approximately $23,000 in legal fees related to a litigation that was resolved in our favor during 2025 resulting in the cancellation of the defendant’s common stock and a decrease of approximately $33,000 of contract services.

Current wording

General and administrative expenses have increased significantly for the three months ended March 31, 2026, compared to the three months ended March 31, 2025. The primary increase was approximately $2,251,000 of non-cash stock compensation, $193,000 Delaware franchise tax and $155,000 legal fees.

Previous wording

As of September 30, 2025 and December 31, 2024, we had total current liabilities of $3.3 million and $1.8 million, respectively, and current assets of $1.0 million and $1.0 million, respectively, to meet our current obligations. As of September 30, 2025, we had working capital of ($2.3 million) as compared to working capital of ($0.8 million) as of December 31, 2024.

Current wording

As of March 31, 2026, and December 31, 2025, we had total current liabilities of $5.2 million and $7.8 million, respectively, and current assets of $11.4 million and $3.3 million, respectively, to meet our current obligations. As of March 31, 2026, we had working capital of $6.3 million as compared to working capital of ($4.5 million) as of December 31, 2025.

Previous wording

For the nine months ended September 30, 2025, cash used by operations was approximately ($787,000) which primarily included the net loss of approximately ($3.2 million) but adjusted for the non-cash stock based compensation of $1.5 million, common stock issued for legal services of $118,000, an increase in accounts payable (including related parties) of $757,000 compared to approximately $83,000 cash used by operations for the nine months ended September 30, 2024 which primarily included the net loss of approximately ($1.9 million) but adjusted for the non-cash stock based compensation of $928,000 and deferred revenue of $943,500.

Current wording

For the three months ended March 31, 2026, cash used in operations was approximately $2.9 million, primarily driven by net loss of approximately $3.8 million and decreases in accounts payable and related-party accounts payable of approximately $1.7 million, partially offset by noncash stock-based compensation of approximately $2.6 million compared to approximately $0.14 million cash used by operations for the three months ended March 31, 2025, which primarily included the net loss of approximately $0.9 million and primarily offset by the non-cash stock-based compensation of $0.3 million and an increase in accounts payable (including related parties) of $0.3 million.

Previous wording

For the nine months ended September 30, 2025, cash provided by financing was approximately $705,000 including proceeds of $825,700 from short term loans due to a related party compared to $229,000 provided for the nine months ended September 30, 2024 primarily from sale of common stock.

Current wording

For the three months ended March 31, 2026, cash provided by financing activities was approximately $11.4 million, including approximately $12.3 million of net cash proceeds from the February 2026 offering after cash financing costs, offset by repayment of approximately $0.8 million of related-party short-term loans compared to $0.08 million cash provided for the three months ended March 31, 2025, from proceeds from short term loans due to a related party.

Previous wording

The Company received and recorded as deferred revenue during 2024 a $943,500 deposit payment from the Project Sale Agreement with Bridgelink for an estimated 2.425 GW of Emergen’s estimated 3.840 GW of solar energy development projects. The total amount to be received by Emergen for the projects sold to Bridgelink is expected to be $19,400,000 unless certain of the projects are returned without development to the payment milestones. We have paid EIP $250,000 during 2024 related to the $943,500 deposit and owe an additional $339,688 currently recorded in due to related party. EIP will be due 62.5% of the proceeds received related to the Project Sale Agreement. If the remaining $18.5 million is received from the ultimate purchaser via Bridgelink we will owe EIP $11.5 million for their portion per the agreement.

Current wording

The Company received and recorded as deferred revenue a $3.6 million payment from Gridspan in December 2025 related to the purchase of BESS development projects. The Company received $250,000 from Eos Energy Storage LLC as a one-time, non-refundable payment upon execution of a Joint Development Agreement. The Company received and recorded as deferred revenue a $943,500 deposit payment from the Project Sale Agreement with Bridgelink for an estimated 2.425 GW of Emergen’s estimated 3.840 GW of solar energy development projects in 2024. The total amount to be received by Emergen for the projects sold to Bridgelink is expected to be $19,400,000 unless certain of the projects are returned without development to the payment milestones. We paid EIP $250,000 during 2024 and $339,688 during the three months ended March 31, 2026, related to amounts previously accrued under the PSA. EIP will be due 62.5% of the proceeds received related to the Project Sale Agreement. If the remaining $18.5 million is received from the ultimate purchaser via Bridgelink we will owe EIP $11.5 million for their portion per the agreement.

Previous wording

The Company would be required to fund up to $12.5 million of capital calls over the ensuing 24 months related to its 20% ownerhip of joint venture with RelyEZ. Management is evaluating debt and equity alternatives to meet those obligations.

Current wording

The Company would be required to fund up to $5 million of capital calls over the term of the joint venture arrangement related to Emergen’s 20% ownership interest and 10% matching capital contribution requirement in the RelyEZ joint venture. Management is evaluating debt and equity alternatives to meet those obligations.

Previous wording

We have a history of operating losses. We have not yet achieved profitable operations and expect to incur further losses. We have funded our operations primarily from equity financing. As of September 30, 2025, cash generated from financing activities was not sufficient to fund our growth strategy in the short-term or long-term. The primary need for liquidity is to fund working capital requirements of the business, including operational and development costs to develop and construct our planned BESS and Solar projects that are part of the Development Project rights we acquired upon completion of the acquisition of Emergen. As the Development Projects are in their early phase of development, we have not determined the amount of capital needed to complete their development or operate them until sufficient cash is generated from their operations. The primary source of liquidity has primarily been private financing transactions. The ability to fund operations, to make planned capital expenditures, to execute on the development and commercialization of the Development Projects depends on our ability to raise funds from debt and/or equity financing which is subject to prevailing economic conditions and financial, business and other factors, some of which are beyond our control. There can be no assurance that additional financing will be available to us when needed or, if available, that it can be obtained on commercially reasonable terms.

Current wording

We have a history of operating losses. We have not yet achieved profitable operations and expect to incur further losses. We have funded our operations primarily from equity financing. As of March 31, 2026, cash generated from financing activities is sufficient to fund our growth strategy in the short term. The primary need for liquidity is to fund working capital requirements of the business, including operational and development costs to finalize development of our planned BESS projects that are part of the Development Project rights we acquired upon completion of the acquisition of Emergen. Financing for the project construction and equipment acquisition is planned to be generated within the project joint ventures and be non-recourse to the Company. The primary source of liquidity has primarily been private financing transactions and the public offering closed February 2026. The ability to fund operations, to make planned capital expenditures, to execute on the development and commercialization of the Development Projects depends on our ability to raise funds from debt and/or equity financing which is subject to prevailing economic conditions and financial, business and other factors, some of which are beyond our control. There can be no assurance that additional financing will be available to us when needed or, if available, that it can be obtained on commercially reasonable terms.

Previous wording

Our significant accounting policies and critical accounting estimates are described in Note 2 to our audited financial statements for the year ended December 31, 2024 included in Part II, Item 8 of our Annual Report on Form 10-K for the year ended December 31, 2024, filed with the SEC on May 30, 2025. There have been no material changes to our significant accounting policies or critical accounting estimates during the nine months ended September 30, 2025.

Current wording

Our significant accounting policies and critical accounting estimates are described in Note 2 to our audited financial statements for the year ended December 31, 2025 included in Part II, Item 8 of our Annual Report on Form 10-K for the year ended December 31, 2025, filed with the SEC on March 31, 2026. There have been no material changes to our significant accounting policies or critical accounting estimates during the three months ended March 31, 2026.
Rearranged previous paragraphs (3)

Previous report — wording carried elsewhere

Comparison of the nine month period ended September 30, 2025 with the nine month period ended September 30, 2024.

Previous report — wording carried elsewhere

The following table summarizes our results of operations for the periods presented:

Previous report — wording carried elsewhere

The Company has generated no revenues from its primary business for the nine months ended September 30, 2025 and September 30, 2024.