Nano Nuclear Energy Inc.
For the period ended Mar 31, 2026. Filed May 14, 2026.
View on SEC.govAbout this filing
A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.
Mar 31, 2026 · Filed May 14, 2026
What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-Q
Period ended 2025-12-31; filed 2026-02-17.
0001493152-26-007105
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsCurrent report: 10-Q
Period ended 2026-03-31; filed 2026-05-14.
0001493152-26-023071
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 89 previous paragraphs and 101 current paragraphs.
45 unchanged; 37 reworded; 13 added; 7 removed; 0 previous and 6 current paragraphs rearranged.
Tables are not compared: 4 previous and 4 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (13)
Current report
To date, we have not generated any material revenues. For the three and six months ended March 31, 2026 and the year ended September 30, 2025, our net loss was approximately $9.2 million, $15.7 million and $40.1 million, respectively, and our accumulated deficit was approximately $73.5 million, $73.5 million and $57.5 million, respectively.
Current report
On April 9, 2026, we announced that we have been awarded a Gateway for Accelerated Innovations in Nuclear (GAIN) Voucher, NE-26-38854, by DOE relating to our KRONOS MMR™ Energy System titled, “Uncertainty Quantification and Sensitivity Analysis Support for NANO Nuclear Reactor Design Using ORNL’s Tools – SCALE/TSUNAMI.” In collaboration with the ORNL, we will apply the SCALE/TSUNAMI code suite to quantify the impact of nuclear data, modeling assumptions, and operational parameters on key reactor physics metrics, including reactivity, power distribution, and temperature coefficients. ORNL’s analytical tools and expertise, which are recognized by the NRC, will enable development of a validated UQ framework tailored to the KRONOS MMR™ design.
Current report
Research and development expenses decreased by $1,053,116 or 16%, to $5,659,427 for the three months ended March 31, 2026, compared to $6,712,543 for the comparative period ended March 31, 2025. This overall decrease was entirely driven by a reduction in research and development-related equity-based compensation. During the three months ended March 31, 2026 and 2025, $646,762 and $4,700,077, respectively, of our total research and development expenses corresponded to equity-based compensation. Excluding this non-cash equity-based compensation, our core research and development expenses, which primarily reflect internal and external personnel costs corresponding to the design and analysis of our microreactors, actually increased by approximately $3.0 million, reflecting our continued operational investment in microreactor development during the period.
Current report
Comparison of the Six Months Ended March 31, 2026 and the Six Months Ended March 31, 2025
Current report
Revenue
Current report
Expenses
Current report
Research and Development Expense
Current report
General and Administrative Expense
Current report
General and administrative expenses decreased by $2,715,834, or 15%, to $15,475,915 for the six months ended March 31, 2026, compared to $18,191,748 for the comparative period ended March 31, 2025. This overall decrease was entirely driven by a significant reduction in equity-based compensation. During the six months ended March 31, 2026, general and administrative expenses primarily consisted of $9.5 million in total personnel costs, of which $3.5 million corresponded to equity-based compensation and $3.8 million in professional fees for legal and audit costs. In contrast, during the six months ended March 31, 2025, expenses primarily consisted of $13.4 million in total personnel costs, of which $11.8 million corresponded to equity-based compensation and $2.5 million in professional fees. Excluding the impact of non-cash equity-based compensation, our core general and administrative expenses increased significantly during the current six-month period. This increase was primarily due to the aforementioned rise in professional fees and additional office and staff costs required to support our expanding research and development activities.
Current report
Revaluation of contingent consideration
Current report
Other Income
Current report
During the six months ended March 31, 2026 and 2025, the company earned interest income of $9,553,397 and $1,947,631, respectively, on its cash held at financial institutions. During the six months ended March 31, 2026 and 2025, the Company earned $42,000 and $42,000, respectively, from a lease agreement with LIST, a related party. Also, during six months ended March 31, 2026, the Company earned $71,850 from consulting services.
Current report
Net cash used in investing activities for the six months ended March 31, 2025 was $12,700,891, which consisted of $9,075,045 of cash paid for the acquisition of the USNC Assets that closed on January 10, 2025 and consisted of $3,625,846 of cash paid for additions to property, plant and equipment.
Removed paragraphs (7)
Previous report
The KRONOS MMR™ reactor at UIUC is being developed as a research microreactor intended primarily for demonstration, testing, and research applications, but the reactor will be a full-scale system analogous to the commercial KRONOS MMR™ reactor we are planning to sell and deploy post receipt of a construction permit issued by the NRC, followed by an operating license. The UIUC project will also serve as the reactor which the NRC will be evaluating as part of its licensing process for the entire system. Subject to the NRC review timeline, completion of required safety and environmental reviews, construction activities, and successful commissioning, we expect the KRONOS MMR™ to achieve initial operation or research availability around 2030 to 2031. When considering the above project timeline and construction timelines, licensing timeframes, sourcing key materials and fuel, we expect the KRONOS MMR™ to be commercially ready in the early 2030’s.
Previous report
Given our corporate emphasis on the KRONOS MMR™ reactor and the fact that all of our reactor designs, except for the ODIN™ reactor, are within the high-temperature gas-cooled reactor family, we are considering strategic alternatives for ODIN. In September 2025, we signed a letter of intent for the proposed sale of our ODIN™ microreactor design and all associated intellectual property to Cambridge Atom Works, our commercial collaborator for the ODIN™ project. This transaction is intended to monetize our investment in the project to date and enable us to allocate more time and resources to the KRONOS MMR™ reactor and our other designs and technologies.
Previous report
Our Business Services and Consulting Business
Previous report
We have identified an opportunity for more immediate revenue for our company by acquiring more expertise to advance our businesses and deploying those personnel as part of a consulting and services business. We have already identified several nuclear services and consultancy providers, which have been assessed as potentially suitable for acquisition by our company. We have concentrated on identifying small teams with expert personnel, with good portfolios of work and existing contracts, and good expansion potential, which would provide us with immediate revenue post-acquisition. We believe we are in a competitively advantageous position to expand these acquired businesses with the highly qualified teams it has built over the previous years.
Previous report
Technology Acquisitions and Collaborations
Previous report
During 2024 and 2025, we announced our acquisition and development of complementary nuclear pump technology (the ALIP technology) as well as non-binding memoranda of understanding with third party collaborators to explore (i) the use of our microreactors in remote artificial intelligence data centers, the use of artificial intelligence in modernizing the nuclear regulatory and licensing process and (iii) development of nuclear fuel and microreactor capabilities in several non-U.S. jurisdictions in both Africa and South America. We expect that a material aspect of our business will involve continuing to develop, identify or seek to collaborate on, or acquire novel and beneficial technology for our company, and to support advanced nuclear technology both in the U.S. and around the world. Our inability to grow our company through such acquisitions or collaborations could have a material adverse effect on our business.
Previous report
Net cash used by investing activities for the three months ended December 31, 2024 was $3,560,000 representing the payment of deposits towards the acquisition of the USNC Assets that closed subsequent to December 31, 2024.
Reworded paragraphs (37)
Previous wording
You should read the following discussion and analysis of our financial condition and results of operations of the unaudited financial statements and related notes included elsewhere in this Report. Data as of and for the year ended September 30, 2025 has been derived from our audited consolidated financial statements. Data as of and for the three months ended December 31, 2025 and 2024 has been derived from our unaudited condensed consolidated financial statements appearing in this Report.
Current wording
You should read the following discussion and analysis of our financial condition and results of operations of the unaudited financial statements and related notes included elsewhere in this Report. Data as of and for the year ended September 30, 2025 has been derived from our audited consolidated financial statements. Data as of and for the three and six months ended March 31, 2026 and 2025 has been derived from our unaudited condensed consolidated financial statements appearing in this Report.
Previous wording
The following discussion contain forward-looking statements, such as those relating to our plans, objectives, expectations, intentions, and beliefs, which involve significant risks, uncertainties and assumptions. Our actual results could differ materially from those discussed in these forward-looking statements. Factors that could cause or contribute to such differences include, but are not limited to, those identified below and those discussed in the section titled “Cautionary Note Regarding Forward-Looking Statements” in this Report.
Current wording
The following discussion contains forward-looking statements, such as those relating to our plans, objectives, expectations, intentions, and beliefs, which involve significant risks, uncertainties and assumptions. Our actual results could differ materially from those discussed in these forward-looking statements. Factors that could cause or contribute to such differences include, but are not limited to, those identified below and those discussed in the section titled “Cautionary Note Regarding Forward-Looking Statements” in this Report.
Previous wording
We are an emerging nuclear energy company developing smaller, simpler, and safer advanced microreactors utilizing proprietary microreactor designs, intellectual property and research methods to contribute towards a sustainable future. Led by a world class management and technical team, our business plan involves comprehensive engagement across every sector of the nuclear power and energy industry, traversing the path from sourcing raw materials through to developing leading edge advanced nuclear microreactors. Our dedication extends further, with our company looking at opportunities to involve ourselves in other key aspects of the nuclear energy fuel supply chain and the commercial nuclear fuel transportation sector. We are currently in the pre-revenue stage, and we have not generated any material revenues from our inception through December 31, 2025. We have incurred accumulated net losses of $64,017,136 since inception in 2022 through December 31, 2025.
Current wording
We are a nuclear energy and technology company developing smaller, simpler, and safer advanced clean energy solutions, utilizing proprietary reactor designs, intellectual property and research methods to build the sustainable energy solutions of the future. Led by a world class scientific and management team, our business plan involves comprehensive engagement across every sector of the nuclear power and energy industry, traversing the path from sourcing raw materials through to developing cutting edge advanced nuclear microreactors. Our dedication extends further, encompassing ambitions within the commercial nuclear fuel transportation sector, of the nuclear energy fuel supply chain, technology development, and nuclear consulting services.
Previous wording
With the goal of vertical integration across the nuclear energy supply chain, we are principally focused on the following four business lines as part of our development strategy:
Current wording
We are principally focused on the following four business lines as part of our development strategy:
Previous wording
We continue to benefit from a global nuclear energy renaissance driven by several long term, sustainable growth trends and significant regulatory tailwinds. These include growth in AI data centers, industrial reshoring, and broader electrification, all driving a significant need for clean and reliable power, energy sustainability and independence, and climate mandates requiring reliable zero-emissions energy. All of this comes at a time of unprecedented bipartisan legislative and policy support in the U.S. for nuclear energy. Equally important, there is broad recognition that advanced reactors like the ones we are developing will be critical to future clean energy infrastructure.
Current wording
We continue to benefit from a global nuclear energy renaissance driven by several long term, sustainable growth trends and significant regulatory tailwinds. These include growth in AI data centers, industrial reshoring, and broader electrification, all driving a significant need for clean and reliable power, energy sustainability and independence, and climate mandates requiring reliable zero-emissions energy. All of this comes at a time of unprecedented bipartisan legislative and policy support in the U.S. for nuclear energy. Equally important, there is growing recognition that advanced reactors like the ones we are developing will be critical to future clean energy infrastructure.
Previous wording
Over the next twelve months, we will continue to progress the development of our advanced reactors (notably the KRONOS MMR reactor prototypes in the U.S. and Canada) and our vertically integrated business plan, with estimated cash expenditures to be approximately $65 million. This allocation comprises approximately $43 million dedicated to the research, development, quality assurance, licensing, and physical test work of our microreactors and other technologies. A further amount of approximately $12 million will be allocated to the development of our planned HALEU fuel processing facilities alongside LIST, the related-party uranium enrichment company with whom we collaborate and in which we have made a strategic investment. The remaining approximately $10 million is earmarked for miscellaneous costs essential to propelling the progress of our microreactors, encompassing the support of current personnel engaged in executive, finance, accounting, and other administrative functions. We may also utilize our cash resources raised in 2024 and 2025 for acquisitions of complementary businesses or assets. As such, and for a variety of other factors, our estimated expenditures may differ substantially from the above estimates and we find it desirable or necessary to utilize cash resources faster than we currently plan. Our projected expenditures are expected to be partially offset by interest income generated from the Company’s cash and cash equivalent balances.
Current wording
For our fiscal year 2026 (the period from October 1, 2025 to September 30, 2026), we will continue to progress the development of our advanced reactors (notably the KRONOS MMR reactor prototypes in the U.S. and Canada) and our vertically integrated business plan, with estimated cash expenditures to be approximately $65 million. This allocation comprises approximately $43 million dedicated to the research, development, quality assurance, licensing, and physical test work of our microreactors and other technologies. A further amount of approximately $12 million will be allocated to activities related to our nuclear fuel supply chain business, the related-party uranium enrichment company with whom we collaborate and in which we have made a strategic investment. The remaining approximately $10 million is earmarked for miscellaneous costs essential to propelling the progress of our microreactors, encompassing the support of current personnel engaged in executive, finance, accounting, and other administrative functions. We assess our cash expenditure estimates each quarter during the fiscal year, and there are no material changes to the estimated expenditures for the 2026 fiscal year as of the date of this Report. However, we may utilize our cash resources raised in 2024 and 2025 for acquisitions of complementary businesses or assets. As such, and for a variety of other factors, our estimated cash expenditures may differ substantially from the above estimates and if we find it desirable or necessary to utilize cash resources faster than we currently plan. Our projected expenditures are expected to be partially offset by interest income generated from our significant cash and cash equivalent balances.
Previous wording
We have made material progress advancing the KRONOS MMR™ since acquiring the asset in January of 2025. On March 29, 2025, we executed a Sponsored Research Agreement Amendment No. 2 with The Board of Trustees of the University of Illinois (referred to for these purposes as “U of I”) that substituted our company as an assignee of the rights and obligations of USNC regarding the sponsored research relationship with The University of Illinois Urbana-Champaign (“UIUC”) for the KRONOS MMR™ project. Under the Sponsored Research Agreement and its amendments (the “UIUC Agreement”), our company, in collaboration with U of I, will construct, obtain regulatory approval for, and deploy a KRONOS MMR™ research and test reactor on the UIUC campus. The UIUC Agreement as entered into with U of I is effective January 1, 2022, and will terminate on February 28, 2027, unless terminated earlier under certain stipulations. In December of 2025, we signed a Memorandum of Understanding (MOU) with the Board of Trustees of the University of Illinois (“U. of I.”) on behalf of UIUC to collaborate on the development, construction, and operation of its KRONOS MMR™ on campus as an advanced research reactor. While the aforementioned definitive sponsored research agreement between NANO Nuclear and U. of I. provided for U. of I.’s support in design and regulatory licensing of the prototype KRONOS MMR™, the December 2025 MOU set forth the next steps for the design, construction, ownership and ultimate operation of a KRONOS MMR™ on the UIUC campus.
Current wording
We have made material progress advancing the KRONOS MMR™ since acquiring the asset in January of 2025. On March 29, 2025, we executed a Sponsored Research Agreement Amendment No. 2 with The Board of Trustees of the University of Illinois (referred to for these purposes as “U of I”) that substituted our company as an assignee of the rights and obligations of USNC regarding the sponsored research relationship with UIUC for the KRONOS MMR™ project. Under the Sponsored Research Agreement and its amendments (the “UIUC Agreement”), our company, in collaboration with U of I, will construct, obtain regulatory approval for, and deploy a KRONOS MMR™ research and test reactor on the UIUC campus. The UIUC Agreement as entered into with U of I is effective January 1, 2022, and will terminate on February 28, 2027, unless terminated earlier under certain stipulations. In December of 2025, we signed a Memorandum of Understanding (MOU) with the U. of I. on behalf of UIUC to collaborate on the development, construction, and operation of its KRONOS MMR™ on campus as an advanced research reactor. While the aforementioned definitive sponsored research agreement between NANO Nuclear and U. of I. provided for U. of I.’s support in design and regulatory licensing of the prototype KRONOS MMR™, the December 2025 MOU set forth the next steps for the design, construction, ownership and ultimate operation of a KRONOS MMR™ on the UIUC campus.
Previous wording
In late April 2025, the U.S. Nuclear Regulatory Commission (“NRC”) issued its final Safety Evaluation (SE) approving the Fuel Qualification Methodology Topical Report (FQM TR) for the advanced fuel design to be used in the KRONOS MMR™ Energy System. The FQM TR is a technical document that defines the analytical framework and testing approach by which irradiation data and fuel performance information will be evaluated to demonstrate that the KRONOS MMR™ fuel meets NRC safety and reliability requirements. Approval of the FQM TR does not in itself authorize construction or operation of the KRONOS MMR™ reactor; rather, it represents NRC approval of the methodology that will be used to qualify the fuel in subsequent testing and licensing steps. Our regulatory activities to date have been conducted within the NRC’s pre-application framework, which has included multiple technical submittals, meetings, and NRC staff feedback towards our technical submittals documented on the NRC’s public pre-application docket for UIUC.
Current wording
In late April 2025, the NRC issued its final Safety Evaluation (SE) approving the Fuel Qualification Methodology Topical Report (FQM TR) for the advanced fuel design to be used in the KRONOS MMR™ Energy System. The FQM TR is a technical document that defines the analytical framework and testing approach by which irradiation data and fuel performance information will be evaluated to demonstrate that the KRONOS MMR™ fuel meets NRC safety and reliability requirements. Approval of the FQM TR does not in itself authorize construction or operation of the KRONOS MMR™ reactor; rather, it represents NRC approval of the methodology that will be used to qualify the fuel in subsequent testing and licensing steps. Following NRC approval of the FQM TR, we have initiated the fuel qualification program using the NRC-approved methodology. Fuel qualification is a staged and iterative process that includes defining test plans, generating and evaluating fuel performance data, and documenting results.
Previous wording
Our next steps toward submission of a construction permit application for the KRONOS MMR™ reactor consist of several regulatory and technical workstreams that are being conducted in parallel rather than sequentially. These activities include continued NRC pre-application engagement and technical interactions, completion of site characterization activities and development of site-specific inputs (including collecting and preparing location-specific technical, environmental, and engineering information to support regulatory filings and design work for a particular site), preparation of the environmental report required to support a construction permit application, preparation of preliminary safety analyses and application documentation, and initiation and ongoing execution of the NRC-approved fuel qualification program in accordance with its approved scope and phased development plan. With respect to site-specific work, we engaged AECOM, a multi-disciplinary engineering firm, in June 2025 to support site characterization, engineering, environmental analysis, and regulatory planning activities associated with the proposed reactor site at UIUC. We expect to complete these activities in the first quarter of 2026.
Current wording
On April 2, 2026, we announced that a Construction Permit Application (CPA) had been formally submitted by The Grainger College of Engineering at the U. of I., our partner for the KRONOS MMR™ deployment, to the NRC. With this submission, we become the first commercially-ready microreactor developer and the third commercially-ready Generation IV advanced reactor developer to submit a CPA, placing us among a small group of advanced nuclear companies progressing toward commercial deployment. The CPA submission represented a significant milestone for the KRONOS MMR™ in its progression from engineering design to potential construction on the campus of the U of I, through the reactor licensing process, and ultimately toward commercial deployment. Our regulatory activities prior to the submission were conducted within the NRC’s pre-application framework, which had included multiple technical submittals, meetings, and NRC staff feedback towards our technical submittals documented on the NRC’s public pre-application docket for UIUC. In order to make the CPA submission, the Company had to complete NRC pre-application engagement and technical interactions, completion of site characterization activities and development of site-specific inputs (including collecting and preparing location-specific technical, environmental, and engineering information to support regulatory filings and design work for a particular site), preparation of the environmental report required to support a construction permit application, preparation of preliminary safety analyses and application documentation, and initiation and ongoing execution of the NRC-approved fuel qualification program in accordance with its approved scope and phased development plan. With respect to site-specific work, we engaged AECOM, a multi-disciplinary engineering firm, in June 2025 to support site characterization, engineering, environmental analysis, and regulatory planning activities associated with the proposed reactor site at UIUC.
Previous wording
While the environmental report and safety analysis must be submitted with the application, the NRC’s detailed safety and environmental reviews occur after the application is docketed and may involve requests for additional information, audits, hearings, and public participation as part of the NRC’s review process. Following NRC approval of the FQM TR, we have initiated the fuel qualification program using the NRC-approved methodology. Fuel qualification is a staged and iterative process that includes defining test plans, generating and evaluating fuel performance data, and documenting results. We expect to provide sufficient fuel-related information to support submission of a construction permit application based on the approved methodology, while continuing fuel qualification activities during NRC review and in later licensing stages. However, although fuel qualification is important to our business operations, completion of all fuel qualification activities is not required as a condition for the approval or docketing of a construction permit application.
Current wording
While the environmental report and safety analysis must be submitted with the application, the NRC’s detailed safety and environmental reviews occur after the application is docketed and may involve requests for additional information, audits, hearings, and public participation as part of the NRC’s review process. We will also continue fuel qualification activities during NRC review and in later licensing stages.
Previous wording
Based on the foregoing parallel workstreams, we currently anticipate submitting a construction permit application for the KRONOS MMR™ reactor in the first half of 2026 and receiving the approval in mid-2027, subject to the NRC’s review process. We estimate this will be the first construction permit for a microreactor issued in the United States. The permit application will not incur any government fees, as the KRONOS MMR™ reactor, due to its location at UIUC, qualifies for a fee exemption under applicable regulations due to its use for research purposes.
Current wording
Following submission, the NRC will conduct an acceptance review to determine whether the application is sufficiently complete to docket. NRC guidance indicates that this acceptability determination is generally expected to occur within approximately 60 days; however, timing may vary. We currently expect to receive the CPA approval in ~12 months following the application being docketed, or sometime in mid-2027, subject to the NRC’s review process. We estimate this will be the first construction permit for a commercially-ready microreactor issued in the United States. The permit application will not incur any government fees, as the KRONOS MMR™ reactor, due to its location at UIUC, qualifies for a fee exemption under applicable regulations due to its use for research purposes.
Previous wording
Following submission, the NRC will conduct an acceptance review to determine whether the application is sufficiently complete to docket. NRC guidance indicates that this acceptability determination is generally expected to occur within approximately 60 days; however, timing may vary. After docketing, the duration of the NRC’s safety and environmental reviews is not fixed and is not typically completed within a single year. There can be no assurance as to the timing of completion of such reviews. The duration of the NRC’s review process may vary materially based on numerous factors, including, among other things, the completeness and quality of the application at submission, the number and complexity of NRC requests for additional information, the extent to which the application relies on previously reviewed topical reports, NRC staffing and resource availability, the scope and outcome of any required hearings, and the type and complexity of the environmental review, including whether an environmental impact statement is required. Accordingly, the timing of NRC review and any resulting licensing decisions is inherently uncertain and largely outside the Company’s control and any delays in the review process could materially and adversely affect the Company’s business, financial condition, and results of operations.
Current wording
After docketing, the duration of the NRC’s safety and environmental reviews is not fixed. There can be no assurance as to the timing of completion of such reviews. The duration of the NRC’s review process may vary materially based on numerous factors, including, among other things, the completeness and quality of the application at submission, the number and complexity of NRC requests for additional information, the extent to which the application relies on previously reviewed topical reports, NRC staffing and resource availability, the scope and outcome of any required hearings, and the type and complexity of the environmental review, including whether an environmental impact statement is required. Accordingly, the timing of NRC review and any resulting licensing decisions is inherently uncertain and largely outside the Company’s control and any delays in the review process could materially and adversely affect the Company’s business, financial condition, and results of operations.
Previous wording
To support this effort, on July 30, 2025, we announced our acquisition of a 2.75-acre land and building package in Oak Brook, Illinois to serve as a regional demonstration and office facility to support the development of the KRONOS MMR™ reactor. This facility is intended to support engineering, component manufacturing and assembly, prototype fabrication, non-nuclear testing, research and development activities, and administrative functions. The timing, scale, and configuration of the Illinois facility will depend on multiple factors, including site selection, permitting, availability of skilled labor, supply chain readiness, financing, and alignment with our regulatory and commercialization milestones. We currently anticipate initiating planning and early-stage development activities for the Illinois facility during the late 2020s, with phased buildout aligned to the advancement of our reactor programs. Initial facility capabilities may precede full commercial manufacturing capacity and may focus on research, development, and prototype support, with manufacturing capabilities expanded over time as regulatory approvals are obtained and commercial demand materializes.
Current wording
To support the building of our first prototype reactor at the U of I and further development of our KRONOS MMR™ reactor, on July 30, 2025, we announced our acquisition of a 2.75-acre land and building package in Oak Brook, Illinois to serve as a regional demonstration and office facility. This facility is intended to support engineering, component manufacturing and assembly, prototype fabrication, non-nuclear testing, research and development activities, and administrative functions. We have undertaken significant work on retrofitting this facility to meet our anticipated needs, although the timing, scale, and configuration of our Oak Brook facility will depend and may change based on multiple factors, including permitting, availability of skilled labor, supply chain readiness, financing, and alignment with our regulatory and commercialization milestones. We will continue activities for our Oak Brook facility in the coming years in a manner aligned with the advancement of our reactor programs or other needs. Initial facility capabilities will focus on research, development, and prototype support, with manufacturing capabilities expanded over time as regulatory approvals are obtained and commercial demand materializes.
Previous wording
Significant capital will be needed to support our facility construction, licensing, fuel qualification testing, regulatory compliance, prototype construction, and workforce expansion for the development of our microreactors. We estimate that the capital costs needed to construct prototype KRONOS MMR™ reactors at the UIUC and Canada over the next several years could be around $300 million to $350 million per reactor. This range reflects inherent uncertainty in building a first-of-a-kind reactor due to several factors that can result in a material increase to these estimates, including site specific factors, the timing and scope of project development and regulatory licensing and supply chain considerations. Subsequent reactors’ capital costs are expected to decline substantially due to supply chain scaling for mass production of components, factory fabrication, modular assembly, and multiple deployments.
Current wording
Significant capital will be needed to support our facility construction, licensing, fuel qualification testing, regulatory compliance, prototype construction, and workforce expansion for the development of our microreactors. We estimate that the capital costs needed to construct prototype KRONOS MMR™ reactors at the UIUC and Canada over the next several years could be around $300 million to $350 million per reactor. This range reflects inherent uncertainty in building a first-of-a-kind (FOAK) reactor due to several factors that can result in a material increase to these estimates, including site specific factors, the timing and scope of project development and regulatory licensing and supply chain considerations. At the same time, we are evaluating several potential non-dilutive funding sources, including government incentives and strategic funding support to reduce the cost of these FOAK reactors. Subsequent reactors’ capital costs are expected to decline substantially due to supply chain scaling for mass production of components, factory fabrication, modular assembly, and multiple deployments.
Previous wording
In Canada, following our acquisition of GFPL and the Chalk River Licensing Application, followed by GFPL’s recent rebranding to True North Nuclear, we are working to finalize a formal agreement with a partner for a potential Chalk River Project. Upon finalization of an agreement for the project, the timing of which is uncertain, we aim to initiate formal licensing activities with the CNSC through a submission of a License to Prepare Site (LTPS) application with the CNSC.
Current wording
In Canada, following our acquisition of GFPL and the Chalk River Licensing Application, followed by GFPL’s recent rebranding to True North Nuclear (see Note 10 to the accompanying unaudited consolidated financial statements for background information), we are working to finalize a formal agreement with a partner for a potential Chalk River Project. Upon finalization of an agreement for the project, the timing of which is uncertain, we aim to initiate formal licensing activities with the CNSC through a submission of a License to Prepare Site (LTPS) application with the CNSC.
Previous wording
With respect to the LOKI MMR™ system, we are still in the process of assessing and developing demonstration, licensing and commercial launch timelines for this reactor.
Current wording
With respect to the LOKI MMR™ system, we are still in the process of assessing and developing demonstration, licensing and commercial launch timelines for this reactor, while also assessing potential strategic partners that could help accelerate development and commercialization.
Previous wording
Our results of operations and our long-term prospects are significantly influenced by factors and trends related to the development, commercialization, and regulatory advancement of our microreactors. KRONOS™ MMR reactor is our lead reactor program and is being designed as an advanced, high-temperature microreactor intended for deployment for AI data centers, industrial environments, defense applications, and other off-grid settings requiring resilient, emissions-free power. The following factors and trends have impacted, and we expect will continue to impact, our KRONOS development program and our operating results.
Current wording
Our results of operations and our long-term prospects are significantly influenced by factors and trends related to the development, commercialization, and regulatory advancement of our microreactors. KRONOS™ MMR reactor is our lead reactor program and is being designed as a high-temperature microreactor intended for deployment for AI data centers, industrial environments, defense applications, and other off-grid settings requiring resilient, emissions-free power. The following factors and trends have impacted, and we expect will continue to impact, our KRONOS development program and our operating results.
Previous wording
The LOKI MMR™ reactor originated as a compact, transportable nuclear microreactor design. The reactor is designed for versatility across terrestrial, marine, and space applications. It is engineered to deliver on the order of 1 MWth to around 5 MWth of power, making it suitable for remote deployments, off-grid energy needs, critical infrastructure support, and other distributed energy use-cases where traditional grid power is unavailable or unreliable. Its transportability via road, rail, sea, or air enables rapid deployment and modular scalability, especially when multiple units are networked for larger power requirements. The LOKI MMR™ supports diverse applications ranging from remote industrial operations to space exploration architectures. The design is positioned to support long-duration extra-terrestrial applications, including power for lunar or orbital infrastructure and potential deep-space missions.
Current wording
The LOKI MMR™ reactor originated as a compact, transportable nuclear microreactor design. The reactor is designed for versatility across terrestrial, marine, and space applications. It is engineered to deliver on the order of 0.5 MWe to around 3 MWe of power, making it suitable for remote deployments, off-grid energy needs, critical infrastructure support, and other distributed energy use-cases where traditional grid power is unavailable or unreliable. Its transportability via road, rail, sea, or air enables rapid deployment and modular scalability, especially when multiple units are networked for larger power requirements. The LOKI MMR™ supports diverse applications ranging from remote industrial operations to space exploration architectures. The design is positioned to support long-duration extra-terrestrial applications, including power for lunar or orbital infrastructure and potential deep-space missions.
Previous wording
We believe, based on our market research, that no small modular reactor (SMR) microreactor company is currently developing a fuel supply chain to produce fuel for their reactors. Our strategy to develop key steps of the fuel for our own reactors and also to position our company to supply key steps of the fuel to the wider nuclear industry and other reactor manufacturers, addressing anticipated significant shortfalls in fuel supply. Through our investment and collaboration with LIST, which we believe is the only U.S.-origin and patented laser uranium enrichment company, our goal is to progress towards being what we believe will be the most vertically integrated microreactor business in the country. This would give our business an enormous competitive advantage for both our own reactor development and establishing multiple sources of future revenue to de-risk our company.
Current wording
Our strategy is to develop key steps of the fuel for our own reactors and also to position our company to supply key steps of the fuel to the wider nuclear industry and other reactor manufacturers, addressing anticipated significant shortfalls in fuel supply. Through our investment and collaboration with LIST, which we believe is the only U.S.-origin and patented laser uranium enrichment company, our goal is to progress towards being what we believe will be the most vertically integrated microreactor business in the country. This would give our business a significant competitive advantage for both our own reactor development and establishing multiple sources of future revenue to de-risk our company.
Previous wording
We also plan to establish a transportation business focused on the movement of both LEU and HALEU. Currently we are developing a regulatorily licensed, high-capacity HALEU transportation system, capable of moving commercial quantities of HALEU fuel around North America and beyond.
Current wording
We also plan to establish a transportation business focused on the movement of both LEU and HALEU. Currently we are developing a regulatorily licensed, high-capacity HALEU transportation system, capable of moving commercial quantities of HALEU fuel around North America and beyond. We are also actively exploring the potential acquisition of an existing nuclear fuel transportation business as a means of launching this business line.
Previous wording
We are seeking to form the first transportation company able to supply emerging SMR and microreactor companies with the fuel they require at their manufacturing facilities to construct their reactors. We also expect to service the national nuclear laboratories and DOE programs which require HALEU by providing the fuel for their programs. Mobile reactors requiring HALEU for remote military bases are also anticipated, with potential military contacts. In 2026, our fuel transportation business will build on the work already completed by INL and ORNL to create a high-capacity HALEU transportation package. In September 2024, we signed an agreement with GNS to undertake a wide-ranging project to produce an optimized HALEU transportation system solution based on our exclusively licensed fuel transportation basket design. The GNS agreement encompasses a study for the transport of multiple HALEU nuclear fuel types, including uranium oxide, TRISO particles, uranium-zirconium hydride, uranium mononitride, and salt fuel for molten salt reactors, thus optimizing the quantity of material that can be transported and developing a conceptual package design that will accommodate the new basket design. We are receiving support from two former executives of the largest shipping company in the world who are assisting us in developing a North American transportation company using our licensed or developed technology to deliver (subject to applicable government licensing and certification) nuclear fuel for a wide customer base, including SMR and microreactor companies, national laboratories, military, and DOE programs.
Current wording
We are seeking to establish the first transportation company able to supply emerging SMR and microreactor companies with the fuel they require at their manufacturing facilities to construct their reactors. We also expect to service the national nuclear laboratories and DOE programs which require HALEU by providing the fuel for their programs. Mobile reactors requiring HALEU for remote military bases are also anticipated, with potential military contacts. In 2026, our fuel transportation business will build on the work already completed by INL and ORNL to create a high-capacity HALEU transportation package. In September 2024, we signed an agreement with GNS to undertake a wide-ranging project to produce an optimized HALEU transportation system solution based on our exclusively licensed fuel transportation basket design. The GNS agreement encompasses a study for the transport of multiple HALEU nuclear fuel types, including uranium oxide, TRISO particles, uranium-zirconium hydride, uranium mononitride, and salt fuel for molten salt reactors, thus optimizing the quantity of material that can be transported and developing a conceptual package design that will accommodate the new basket design. We are receiving support from two former executives of the largest shipping company in the world who are assisting us in developing a North American transportation company using our licensed or developed technology to deliver (subject to applicable government licensing and certification) nuclear fuel for a wide customer base, including SMR and microreactor companies, national laboratories, military, and DOE programs.
Previous wording
The regulatory licensing process for our microreactor prototypes is expected to be completed in the early 2030s, with manufacturing facilities being constructed during the licensing phase so we are ready to deploy microreactors (most notably our KRONOS MMR™) across the country upon licensing approval. Our KRONOS MMR™ reactor system has already undergone important pre-licensing activities, including the submission of a Regulatory Engagement Plan, several White Papers and Topical Reports, and NRC approval for Fuel Qualification Methodology for the advanced fuel design to be used in our KRONOS micro modular reactor energy system. Our ability to successfully license and certify our microreactors will subsequently be dependent on working through the licensing process with the NRC (and, as applicable, Canadian and other regulators) and satisfying their examinations that the reactor is safe to deploy to customers, provided the agreed protocols are adhered to. Our ability to successfully design and construct our own commercial nuclear fuel facilities will be dependent on obtaining the necessary regulatory approvals from the NRC and other applicable authorities to permit the commercial deployment of microreactors. The NRC inspects the site construction at new fuel cycle facilities and only approves the facility’s capability to possess nuclear material after ensuring that the facility’s safety controls are robust and able to safely handle these materials. Fuel cycle facilities must comply with the regulatory requirements established by the NRC. The facility will need to acquire an NRC license containing site-specific requirements that the facility is required to comply with. Each license is unique and is specific to the nuclear material and hazards present at the fuel cycle facility. To obtain a license will involve significant communication and interaction between the NRC and our company. NRC safety oversight includes three important components: NRC inspection, the routine assessment of each licensee’s performance, and enforcement in the case that the regulatory requirements are not met. We will also develop an environmental report to support any fuel cycle facility application and will work with the NRC through the process established under the National Environmental Policy Act of 1970, which will begin when a federal agency develops a proposal to take a major federal action.
Current wording
The regulatory licensing process for our microreactor prototypes is expected to be completed in the early 2030s, with manufacturing facilities being constructed during the licensing phase so we are ready to deploy microreactors (most notably our KRONOS MMR™) globally upon licensing approval. Our KRONOS MMR™ reactor system has already undergone important pre-licensing activities, including the submission of a Regulatory Engagement Plan, several White Papers and Topical Reports, and NRC approval for Fuel Qualification Methodology for the advanced fuel design to be used in our KRONOS micro modular reactor energy system. Our ability to successfully license and certify our microreactors will subsequently be dependent on working through the licensing process with the NRC (and, as applicable, Canadian and other regulators) and satisfying their examinations that the reactor is safe to deploy to customers, provided the agreed protocols are adhered to. Our ability to successfully design and construct our own commercial nuclear fuel facilities will be dependent on obtaining the necessary regulatory approvals from the NRC and other applicable authorities to permit the commercial deployment of microreactors. On April 2, 2026, we issued a press release announcing the formal submission of the Construction Permit Application by The Grainger College of Engineering at the UIUC, our partner for the KRONOS MMR™ deployment, to the NRC.
Previous wording
Loss of EGC and Smaller Reporting Company Status
Current wording
EGC and Smaller Reporting Company Status
Previous wording
As of December 31, 2025, we continue to qualify as an “emerging growth company” as defined in the Jumpstart Our Business Startups Act of 2012. However, as of such date, we no longer qualify as a “smaller reporting company” as defined under Rule 12b-2 of the Exchange Act due to our public float exceeding the applicable threshold for smaller reporting company status. Accordingly, while we remain eligible to take advantage of certain reduced reporting and disclosure requirements applicable to emerging growth companies, we are no longer entitled to the reduced disclosure requirements available to smaller reporting companies. Notwithstanding the foregoing, we continue to qualify as a non-accelerated filer under the Exchange Act.
Current wording
As of March 31, 2026, we continue to qualify as an “emerging growth company” as defined in the Jumpstart Our Business Startups Act of 2012. However, as of such date, we no longer qualify as a “smaller reporting company” as defined under Rule 12b-2 of the Exchange Act due to our public float exceeding the applicable threshold for smaller reporting company status. Accordingly, while we remain eligible to take advantage of certain reduced reporting and disclosure requirements applicable to emerging growth companies, we are no longer entitled to the reduced disclosure requirements available to smaller reporting companies. Notwithstanding the foregoing, we continue to qualify as a non-accelerated filer under the Exchange Act until September 30, 2026.
Previous wording
General and administrative expenses increased by $4,392,033, or 176%, to $6,886,603 for the three months ended December 31, 2025, compared to $2,494,570 for the comparative period ended December 31, 2024, primarily due to equity-based compensation, professional fees for legal and audit costs, and additional office and staff costs to support our research and development activities during the three months ended December 31, 2025 compared to the three months ended December 31, 2024. During the three months ended December 31, 2025, general and administrative expenses primarily consisted of $4.3 million in personnel costs, including $1.5 million in equity-based compensation and $1.0 million in professional fees. During the period ended December 31, 2024, general and administrative expenses primarily consisted of $0.8 million in personnel costs and $0.8 million in professional fees.
Current wording
General and administrative expenses decreased by $7,107,866, or 45%, to $8,589,312 for the three months ended March 31, 2026, compared to $15,697,178 for the comparative period ended March 31, 2025. This overall decrease was entirely driven by a significant reduction in equity-based compensation. During the three months ended March 31, 2026, general and administrative expenses primarily consisted of $5.2 million in total personnel costs, of which $2.0 million corresponded to equity-based compensation and $1.9 million in professional fees for legal and audit costs. In contrast, during the three months ended March 31, 2025, expenses primarily consisted of $12.6 million in total personnel costs, of which $11.8 million corresponded to equity-based compensation and $1.7 million in professional fees. Excluding the impact of non-cash equity-based compensation, our core general and administrative expenses increased during the current period, primarily due to the aforementioned rise in professional fees and additional office and staff costs required to support our research and development activities.
Previous wording
The revaluation of contingent consideration resulted in an expense recovery of $727,500 for the three months ended December 31, 2025, compared to an expense of $524,250 for the comparative period ended December 31, 2024, as a result of our acquisition of the ALIP technology on June 21, 2024.
Current wording
The revaluation of contingent consideration resulted in an expense recovery of $176,500 for the three months ended March 31, 2026, compared to an expense of $78,250 for the comparative period ended March 31, 2025, as a result of our acquisition of the ALIP technology on June 21, 2024.
Previous wording
During the three months ended December 31, 2025 and 2024, we earned interest income of $4,920,707 and $789,381, respectively, on our cash and cash equivalents held at a financial institution. In addition, during the three months ended December 31, 2025 and 2024 we earned $21,000 from a lease agreement from a related party. Also, during the three months ended December 31, 2025, we earned $71,850 from consulting services.
Current wording
During the three months ended March 31, 2026 and 2025, we earned interest income of $4,632,690 and $1,158,252, respectively, on our cash and cash equivalents held at a financial institution. In addition, during the three months ended March 31, 2026 and 2025, we earned $21,000 and $21,000, respectively, from a lease agreement from a related party.
Previous wording
Research and development expenses increased by $4,495,487, or 497%, to $5,400,410 for the three months ended December 31, 2025, compared to $904,923 for the comparative period ended December 31, 2024, primarily due to a significant increase in expenses from research and development of our microreactors during the three months ended December 31, 2025 compared to the three months ended December 31, 2024. Research and development expenses primarily reflect the internal and external personnel costs corresponding to the design and analysis of our microreactors. During the three months ended December 31, 2025 and 2024, $569,509 and nil, respectively, of our research and development expenses corresponded to equity-based compensation
Current wording
Research and development expenses increased by $3,442,372, or 45%, to $11,059,838 for the six months ended March 31, 2026, compared to $7,617,466 for the comparative period ended March 31, 2025. This increase was primarily driven by a significant ramp-up in core research and development activities related to our microreactors during both the first and second quarters of the current fiscal year. These core expenses primarily reflect internal and external personnel costs corresponding to the design and analysis of our microreactors. The overall increase in total research and development expenses was partially offset by a reduction in research and development-related equity-based compensation. During the six months ended March 31, 2026 and 2025, $1,216,271 and $4,700,077, respectively, of our research and development expenses corresponded to equity-based compensation.
Previous wording
We have been able to utilize our status as a public company to raise significant capital since our May 2024 initial public offering. As such, we believe that our existing cash will fund our current operating and research and development plans through at least the next twelve months from the date of this Report. We have coupled our fundraising with what we believe is a prudent deployment of capital as we move our business forward. Although we have negative operating cash outflows of $3,989,840 for the three months ended December 31, 2025, and $3,242,526 for the three months ended December 31, 2024, we had approximately $578 million in cash and cash equivalents as of December 31, 2025 (compared to approximately $203 million as of September 30, 2025) and working capital of approximately $576 million as of December 31, 2025 (compared to approximately $201 million as of September 30, 2025).
Current wording
We have been able to utilize our status as a public company to raise significant capital since our May 2024 initial public offering. As such, we believe that our existing cash will fund our current operating and research and development plans through at least the next twelve months from the date of this Report. We have coupled our fundraising with what we believe is a prudent deployment of capital as we move our business forward. Although we experienced operating cash outflows of $9.3 million and $5.6 million for the six months ended March 31, 2026, and 2025, respectively, we maintain a robust liquidity profile. As of March 31, 2026, we held $568.7 million in total liquidity, consisting of $197.7 million in cash and cash equivalents and $371 million in short-term U.S. Treasury securities. This represents a significant increase from September 30, 2025, when we held $203.3 million in cash and cash equivalents and no short-term investments. Additionally, our working capital increased to $565.7 million as of March 31, 2026, compared to $200.8 million at our prior fiscal year-end. On March 13, 2026, our 2025 Shelf Registration Statement was declared effective by the SEC, which registers the offer and sale of securities with an aggregate offering price of up to $900 million. Of this amount, up to $400 million may be offered pursuant to an “at-the-market” offering program, which we may utilize from time to time in the future if needed and subject to market conditions (See Note 5 to the accompanying unaudited consolidated financial statements for background information).
Previous wording
As part of issuing our unaudited condensed consolidated financial statements, we evaluated whether there were any conditions and events that raise substantial doubt about our ability to continue as a going concern over the twelve months after the date the unaudited condensed consolidated financial statements were issued. Since inception, we have incurred significant operating losses, and have an accumulated deficit of approximately $64 million and negative operating cash flow during the three months ended December 31, 2025 and 2024. Management expects that operating losses and negative cash flows may increase from the 2025 levels because of additional costs and expenses related to our research and development activities. Our continued solvency is dependent upon our ability to obtain additional working capital to complete the design, construction, demonstration, regulatory licensing and ultimately commercialization of our reactors in development and other technologies and contemplated services.
Current wording
As part of issuing our unaudited condensed consolidated financial statements, we evaluated whether there were any conditions and events that raise substantial doubt about our ability to continue as a going concern over the twelve months after the date the unaudited condensed consolidated financial statements were issued. Since inception, we have incurred significant operating losses, and have an accumulated deficit of approximately $73 million and negative operating cash flow during the six months ended March 31, 2026 and 2025. Management expects that operating losses and negative cash flows may increase from the 2025 and 2026 levels because of additional costs and expenses related to our research and development activities. Our continued solvency is dependent upon our ability to obtain additional working capital to complete the design, construction, demonstration, regulatory licensing and ultimately commercialization of our reactors in development and other technologies and contemplated services.
Previous wording
Summary Statement of Cash Flows for the Three Months Ended December 31, 2025, and the Three Months Ended December 31, 2024
Current wording
Summary Statement of Cash Flows for the Six Months Ended March 31, 2026, and the Six Months Ended March 31, 2025
Previous wording
Net cash used by operating activities for the three months ended December 31, 2025 was $3,989,840, which consisted of our net loss of $6,516,279, net of non-cash items of $1,608,114, and net of changes in working capital accounts of $918,325.
Current wording
Net cash used by operating activities for the six months ended March 31, 2026 was $9,254,201, which consisted of our net loss of $15,696,445, net of non-cash items of $4,203,320, and net of changes in working capital accounts of $2,238,924.
Previous wording
Net cash used by operating activities for the three months ended December 31, 2024 was $3,242,526, which consisted of our net loss of $3,113,362, net of non-cash items of $63,894, and net of changes in working capital accounts of negative $198,058.
Current wording
Net cash used in operating activities for the six months ended March 31, 2025 was $5,620,979, which consisted of our net loss of $24,422,083, net of non-cash items of $17,251,684, and net of changes in working capital accounts of $1,549,420.
Previous wording
Our cash used in operating activities increased by $747,314 during the three months ended December 31, 2025, due to an increase in net loss and changes in working capital accounts. The increase in cash used in operating activities during the three months ended December 31, 2025, when compared to the three months ended December 31, 2024, was primarily due to increased research and development activities, additional regulatory and staff costs to support our research and development activities, and additional office and professional fees during the three months ended December 31, 2025 compared to the three months ended December 31, 2024.
Current wording
Our cash used in operating activities increased by $3,633,222 during the six months ended March 31, 2026, due to an increase in net loss and changes in working capital accounts. The increase in cash used in operating activities during the six months ended March 31, 2026, when compared to the six months ended March 31, 2025, was primarily due to increased research and development activities, additional regulatory and staff costs to support our research and development activities, and additional office and professional fees during the six months ended March 31, 2026 compared to the six months ended March 31, 2025.
Previous wording
Net cash used by investing activities for the three months ended December 31, 2025 was $3,058,681 representing $1.4 million payments related to construction in progress of property acquired in Oak Brook Illinois and $1.6 million in deposits related to additional acquisitions of property and further construction.
Current wording
Net cash used by investing activities for the six months ended March 31, 2026 was $380,500,548, representing $370,690,337 related to short-term investments, $5,620,823 paid for the acquisition of land and building for office space in New York, $3,139,388 payments related to construction in progress of property acquired in Oak Brook Illinois, and $1,050,000 in deposits.
Previous wording
Net cash provided by financing activities for the three months ended December 31, 2025 was $381,328,870, which consisted of approximately $2.5 million from exercises of warrants, $0.5 million from exercises of stock options, and $400,000,333 in cash received from our October 2025 private placement offering less $21,520,711 of corresponding offering costs, and less $135,500 in deferred financing costs.
Current wording
Net cash provided by financing activities for the six months ended March 31, 2026 was $384,182,368, which consisted of approximately $2.5 million from exercises of warrants, $3.3 million from exercises of stock options, and $400,000,333 in cash received from our October 2025 private placement offering less $21,520,711 of corresponding offering costs, and less $85,500 in deferred financing costs.
Previous wording
Net cash provided by financing activities for the three months ended December 31, 2024 was $101,562,943, which consisted of approximately $8 million from exercises of warrants, $1.2 million from exercises of stock options, and $101,400,012 in cash received from the issuance of shares of common stock from equity financings, less $9,058,855 in offering costs.
Current wording
Net cash provided by financing activities for the six months ended March 31, 2025 was $108,365,064, which consisted of approximately $14.4 million from exercises of warrants, $1.6 million from exercises of stock options, and net proceeds of approximately $92.3 million from the Company’s registered follow-on offering in October 2024, and its November 2024 private placement offering.
Rearranged current paragraphs (6)
Current report — wording carried from elsewhere
As it relates to any potential fuel cycle facilities, the NRC inspects the site construction of new fuel cycle facilities and only approves the facility’s capability to possess nuclear material after ensuring that the facility’s safety controls are robust and able to safely handle these materials. Fuel cycle facilities must comply with the regulatory requirements established by the NRC. The facility will need to acquire an NRC license containing site-specific requirements that the facility is required to comply with. Each license is unique and is specific to the nuclear material and hazards present at the fuel cycle facility. To obtain a license will involve significant communication and interaction between the NRC and our company. NRC safety oversight includes three important components: NRC inspection, the routine assessment of each licensee’s performance, and enforcement in the case that the regulatory requirements are not met. We will also develop an environmental report to support any fuel cycle facility application and will work with the NRC through the process established under the National Environmental Policy Act of 1970, which will begin when a federal agency develops a proposal to take a major federal action.
Current report — wording carried from elsewhere
We have not generated any material revenue from our inception through March 31, 2026.
Current report — wording carried from elsewhere
Our research and development expenses represent costs incurred for designing and engineering products, including the costs of developing design tools. All research and development costs related to product development are expensed as incurred.
Current report — wording carried from elsewhere
Our general and administrative expenses consist of compensation costs for personnel in executive, management, regulatory, finance, accounting, and other administrative functions. General and administrative expenses also include professional fees paid for legal, auditing and accounting services, consulting services, regulatory and compliance costs, lease and office costs, advertising costs, and insurance costs.
Current report — wording carried from elsewhere
Revaluation of contingent consideration corresponds to equity-based contingent consideration corresponding to the ALIP technology we acquired which is revalued at the end of each financial quarter based on the closing stock price of our common shares.
Current report — wording carried from elsewhere
The revaluation of contingent consideration was $904,000 for the six months ended March 31, 2026, compared to $602,500 for the comparative period ended March 31, 2025, as a result of our acquisition of the ALIP technology on June 21, 2024.