Trio Petroleum Corp
For the period ended Oct 31, 2025. Filed Jan 20, 2026.
View on SEC.govAbout this filing
A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.
FY2025 · Filed Jan 20, 2026
What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-K
Period ended 2024-10-31; filed 2025-01-17.
0001493152-25-002760
Item 7. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONSCurrent report: 10-K
Period ended 2025-10-31; filed 2026-01-20.
0001493152-26-002848
Item 7. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONSThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 101 previous paragraphs and 118 current paragraphs.
46 unchanged; 20 reworded; 51 added; 35 removed; 0 previous and 1 current paragraphs rearranged.
Tables are not compared: 5 previous and 10 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (51)
Current report
Our Canadian projects represent a significant growth opportunity, driven primarily by planned workovers intended to enhance production across the acquired assets. We began executing this program immediately following the closing of our April 2025 acquisition of certain heavy oil assets in west-central Saskatchewan, Canada, including producing heavy oil wells, from Novacor, a company recognized as one of the lowest-cost operators in the region. In November 2025, we expanded our presence with the acquisition of a second Canadian project from Capital Land. Our strategy continues to focus on acquiring assets that generate immediate cash flow, provide meaningful long-term development potential, and offer the potential for transformative value creation through targeted strategic investment.
Current report
Initially, California was a significant part of our geographic focus; however, due to rising drilling costs and the negative impact on potential profitability, we have strategically shifted our efforts beyond California to pursue more economically viable opportunities. This transition is reflected in our acquisition of an interest in oil properties that are a part of the Asphalt Ridge Project in Uintah County, Utah, as well as our recent acquisition from Novacor, as described above, in the prolific Lloydminster, Saskatchewan heavy oil region and from Capital Land in the County of Vermilion of River (formerly known as the Municipal District of Wellington No. 41).
Current report
The acquired assets included six oil wells, a water-disposal well, a steam generator, boiler, storage tanks, and various operational infrastructure. While initial production was restarted on February 22, 2024, we have subsequently determined that under previously negotiated terms, natural gas prices and water disposal costs, particularly in California, makes it cost prohibitive for the Company to employ cyclic-steam operations to increase production and will not be economically feasible in the long run. On May 27, 2025, we executed a termination agreement with Trio LLC to end operations at the location and abandon all related leases. Capitalized costs totaling $500,614 have been written off and expensed in the statement of operations for the period ended October 31, 2025.
Current report
On December 29, 2023, we and HSO entered into an Amendment to the Asphalt Ridge Option Agreement, under which we funded $200,000 in exchange for an immediate 2% working interest in the initial 960 acres. An additional $25,000 was funded in January 2024, increasing our working interest to 2.25%. While we had the option to acquire an additional 17.75% working interest, we decided not to exercise this option and will instead retain our existing 2.25% working interest in the initial 960 acres.
Current report
Novacor Asset Purchase Agreement
Current report
As of April 4, 2025, we entered into an Asset Purchase Agreement (the “April 2025 Novacor APA”) with Trio Canada and Novacor Exploration Ltd., a corporation incorporated under the Canada Business Corporations Act (“Novacor”), pursuant to which, subject to the terms and conditions set forth in the April 2025 Novacor APA, Trio Canada agreed to acquire certain assets of Novacor relating its oil and gas business, including certain contracts, leases and permits for working interests in petroleum and natural gas and mineral rights located in the Lloydminster, Saskatchewan heavy oil region in Canada (collectively, the “April 2025 Novacor Assets”), free and clear of any liens other than certain specified liabilities of Novacor that are being assumed (collectively, the “Liabilities” and such acquisition of the Novacor Assets and assumption of the Liabilities together, the “April 2025 Novacor Acquisition”) for a total purchase price of (i) US$650,000, in cash, US$65,000 of which was previously provided as a deposit to Novacor, and (ii) the issuance to Novacor of 526,536 shares of common stock of common stock. The April 2025 Novacor Acquisition was consummated in two closings, with the first closing being consummated on April 8, 2025 and the second closing consummated on May 22, 2025. All five of our currently active wells are in the newly acquired Novacor property
Current report
P.R. Spring Letter of Intent and Option
Current report
On May 15, 2025, we entered into a non-binding Letter of Intent (LOI) with HSO for the potential acquisition of 2,000 acres of oil and gas properties at P.R. Spring, Uintah Basin, Utah (“P.R. Spring”), which is adjacent to Asphalt Ridge. The LOI contemplates our issuance of 1,492,272 restricted shares of common stock and the payment of $850,000 at closing, subject to execution of definitive agreements. Upon signing the LOI, we made a non-refundable $150,000 payment to HSO in consideration for the option. The LOI requires evidence of a minimum sustained production rate of 40 barrels per day for a continuous 30-day period from two wells at Asphalt Ridge by May 15, 2026, or the LOI will expire unless extended by us. We are not under any obligation to enter into definitive agreements in connection with an acquisition.
Current report
Capital Land Services Acquisition
Current report
On August 20, 2025, the Company), through its wholly owned subsidiary Trio Canada, entered into an Asset Purchase Agreement (“APA”) with Capital Land Services Ltd. (“Capital Land”). Pursuant to the APA, Trio Canada agreed to acquire certain mineral leasehold interests and related rights located in the County of Vermilion of River, Alberta, Canada, together with associated contracts, permits, and registrations (collectively, the “Assets”). The total purchase price consists of CAD $150,000 in cash and the issuance of restricted shares of the Company’s common stock having an aggregate value of CAD $150,000.
Current report
On November 3, 2025, subsequent to the Company’s fiscal year ended October 31, 2025, the transactions contemplated under the APA were completed (the “Capital Land Acquisition”). At closing, Trio Canada paid Capital Land CAD $150,000 in cash and we issued 104,227 restricted shares of our common stock to Capital Land. In exchange, Trio Canada acquired the Assets, including certain wells that had been purchased out of receivership. Due to regulatory requirements of the Alberta Energy Regulator (“AER”), the Company arranged for all applicable licenses to be transferred to Novacor, an experienced operator with whom the Company has an existing commercial relationship. Novacor utilizes Capital Land as its AER agent. In consideration for Capital Land’s services as AER agent, the Company granted Capital Land a 1% gross overriding royalty with respect to the mineral rights, for as long as Capital Land continues to provide such services.
Current report
Asset Purchase Transaction with Novacor Exploration Ltd.
Current report
As of December 30, 2025, the Company entered into an Asset Purchase Agreement (the “December 2025 Novacor APA”) with Trio Canada, and Novacor, pursuant to which, subject to the terms and conditions set forth in the December 2025 Novacor APA, Trio Canada agreed to acquire certain assets of Novacor’s relating to Novacor’s oil and gas business, including certain contracts, leases and permits for working interests in petroleum and natural gas and mineral rights located in the Lloydminster, Saskatchewan heavy oil region in Canada (collectively, the “December 2025 Novacor Assets”), free and clear of any liens other than certain specified liabilities of Novacor that are being assumed (collectively, the “Liabilities” and such acquisition of the Assets and assumption of the Liabilities together, the “December 2025 Novacor Acquisition”) for a total purchase price of CAD $1,000,000 (US$730,300 based on the applicable exchange rate to U.S. Dollars). The Company issued to Seller 912,875 restricted shares of common stock of the Company, subject to certain registration rights (the “Purchase Price”).
Current report
The December 2025 Novacor Acquisition was closed on December 30, 2025, simultaneously with the execution by the Company, Trio Canada and Novacor of the December 2025 Novacor APA and other transaction documents (the “Closing”). At the Closing, title to the December 2025 Novacor Assets was delivered to the Trio Canada, and the Company, thereafter deliver the restricted shares to Novacor.
Current report
Following the Closing, (i) operating costs for the December 2025 Novacor Assets shall, for a period of two (2) years, be held at the levels detailed in the auditor’s report over the eighteen (18) month period prior to the Closing, prepared for Trio Canada on the basis of the due diligence materials provided by Novacor to Trio Canada in connection with the December 2025 Novacor Acquisition, unless mutually agreed otherwise; (ii) after such two-year period, operating costs shall remain competitive with other operators in the area; and (iii) Trio Canada shall be entitled to terminate Novacor’s post-Closing actions at any time on 30 days’ prior written notice to the Novacor. After the Closing, with respect to the December 2025 Novacor Assets, Novacor shall act as the on-site operator of the December 2025 Novacor Assets and perform all work and services as provided in the December 2025 Novacor APA.
Current report
On December 30, 2025, the Company and Novacor executed and entered into a Registration Rights Agreement with respect to the restricted shares (the “RRA”). Pursuant to the provisions of the RRA, Novacor is entitled to certain “piggyback” registration rights, with respect to the Registrable Securities (as such term is defined in the RRA), providing Novacor with the right to include the Registrable Securities in a registration statement filed by the Company for the registration of its securities and/or the resale of shares of Common Stock by other stockholders of the Company (a “Piggyback Registration Statement”), subject to certain limitations and restrictions. In the event that the Registrable Securities are not included in a Piggyback Registration Statement filed by the Company with the Securities and Exchange Commission (“SEC”) on or before March 31, 2026, the Company is obligated to file a registration statement on or before March 31, 2026, to register the resale of the Registrable Securities, subject to certain limitations and restrictions. The Company has agreed to pay all fees relating to the registration of the Registrable Securities, except any broker or similar commissions payable by a holder of Registrable Securities.
Current report
Ladenburg ATM Agreement
Current report
On January 9, 2026, we entered into an At Market Issuance Sales Agreement (the “ATM Agreement”) with Ladenburg Thalmann & Co. Inc. (“Ladenburg”) as agent, pursuant to which the Company may issue and sell shares of our common stock from time to time through Ladenburg (the “ATM Offering”). On January 9, 2026, the Company also filed a prospectus supplement with the SEC covering the sale of shares of common stock having an aggregate offering price of up to $3,600,000 (the “Placement Shares”), in connection with the ATM Offering. Upon delivery of a Placement Notice (as such term is defined in the ATM Agreement) and subject to the terms and conditions of the ATM Agreement, Ladenburg shall use its commercially reasonable efforts to sell the Placement Shares by (i) any method permitted by law deemed to be an “at the market offering” as defined in Rule 415(a)(4) promulgated under the Securities Act of 1933, as amended (the “Securities Act”), including sales made directly on or through the NYSE American or on any other existing trading market for the common stock and/or (ii) any other method permitted by law with the Company’s consent. The ATM Agreement provides that Ladenburg will be entitled to aggregate compensation for its services up to 3.0% of the gross proceeds from each sale of Placement Shares sold through Ladenburg under the ATM Agreement.
Current report
We began generating revenues in the prior fiscal year but have incurred significant losses since inception. As of October 31, 2025, we had an accumulated deficit of $27,355,812 and a working capital deficit of $785,902. For the year ended October 31, 2025, we reported a net loss of $7,282,133 and used $2,604,749 in cash for operating activities.
Current report
To date, we have funded our operations primarily through equity and debt financings, including:
Current report
Despite these financings, our recurring losses, accumulated deficit, and working capital deficit raise substantial doubt about our ability to continue as a going concern. Our current revenue levels are insufficient to cover operating costs, and we remain dependent on external financing to sustain operations and fund planned development activities.
Current report
We will require additional capital to advance drilling and development at our South Salinas and Asphalt Ridge assets, meet payment obligations, and support ongoing operations. There is no assurance that we will be able to raise such capital on favorable terms or at all. If we are unable to secure adequate funding or achieve operational profitability, we may need to pursue alternative strategies to reduce expenses and conserve cash.
Current report
Factors and Trends Affecting Our Business and Results of Operations
Current report
We are mindful of global economic trends and their potential influence on commodity prices. Recent fluctuations in global oil prices, political considerations and tariffs can impact cash flow and ultimately profitability. Mitigating factors include our relatively low lift costs and a continued commitment to cost management and efficient production techniques. Our ability to continue to grow our business will in large part depend on continued access to receptive capital markets.
Current report
TPET’s current strategy and focus at the PR Spring project is to monitor the results of the new 2-4 and 8-4 wells at the Company’s Asphalt Ridge project. Once production attains 40 barrels per day for thirty days from both wells, TPET will be in a position to exercise its option on the 2000-acre project and enter into a definitive development agreement.
Current report
Revenues, net for the year ended October 31, 2025 increased by approximately $0.2 million, or 87.0%, compared to revenue in the prior year. The increase was primarily attributable to higher oil production volumes following the acquisition of properties in the Lloydminster region of Saskatchewan, Canada. During fiscal 2025, we sold and shipped approximately 8,400 barrels of oil from the Saskatchewan region, compared to approximately 2,900 barrels in fiscal 2024, which were primarily produced from the HH-1 well.
Current report
General and administrative expenses decreased by approximately $1.9 million for the year ended October 31, 2025, compared to the prior year. This reduction was primarily driven by lower salary expenses (approximately $900,000), advertising and marketing fees ($435,000), filing fees ($200,000), consulting fees ($380,000), and legal fees ($170,000); the decrease reflects both structural and strategic actions taken by the Company during the fiscal year. Specifically, the Company reduced the size of its management team, resulting in lower compensation and related benefit costs. In addition, management implemented a company-wide initiative to streamline operations and reduce discretionary spending. These efforts included scaling back external marketing campaigns, renegotiating vendor contracts, limiting reliance on outside consultants, and consolidating legal and filing activities.
Current report
For the year ended October 31, 2025, other expenses, net decreased by approximately $1.4 million when compared to the prior year period. This decline was primarily driven by (i) an approximate $1.5 million reduction in non-cash interest expense resulting from lower debt levels in the current period (non-cash interest expense is recognized as debt discounts on financings are amortized), as well as (ii) an approximate $0.6 million decrease in the loss on a note conversion recorded in the prior period, which stemmed from principal payments made via conversion shares under the October 2023 Securities Purchase Agreement. These reductions were partially offset by a $0.6 million loss incurred in the current period due to the abandonment of oil and gas properties.
Current report
Current assets increased primarily due to a $3.4 million rise in cash, driven by proceeds from the sale of common shares under the Company’s at-the-market (ATM) offering agreement during the fiscal quarter ended January 31, 2025. Current liabilities decreased overall, reflecting reductions in promissory notes (approximately $0.7 million), notes payable to related parties ($0.2 million), and other current liabilities ($0.4 million). These decreases were partially offset by an increase in accounts payable of approximately $0.2 million and an increase in convertible notes of approximately $0.5 million.
Current report
Capital Resources
Current report
We hold various leases related to unproved properties in the South Salinas Project, including two leases with the same lessor:
Current report
In February and March 2023, we entered into additional leases covering unproved properties in the South Salinas Project:
Current report
During the second and third quarters of fiscal 2025, we strategically terminated all additional leases in the South Salinas Project. All associated exploration and development costs, including capitalized expenditures for equipment and facilities, were expensed in accordance with applicable accounting standards. This decision followed a comprehensive evaluation of the leases’ economic viability, market conditions, regulatory factors, and operational constraints.
Current report
We previously held interests in two parcels of unproved leases in the McCool Ranch Oil Field:
Current report
As of the second quarter of 2025, we elected to terminate all McCool Ranch leases. These leases have been written off and expensed in the statement of operations. No further rental payments or development activities will be pursued.
Current report
Asphalt Ridge Leases – ARLO Agreement
Current report
On December 29, 2023, we amended the ARLO Agreement and funded $200,000 of the initial $500,000 tranche in advance of HSO satisfying the required conditions. In exchange, we acquired a 2% interest in the leases. These funds were designated for infrastructure development, including road construction. As of October 31, 2025, we had paid a total of $225,000 to HSO and hold a 2.25% working interest in the leases. These costs have been capitalized and are reflected in the oil and gas property balance as of October 31, 2025.
Current report
Under the most recent amendment signed in April 2025, we had until May 10, 2025 to pay an additional $1,775,000 to exercise its option for the remaining 17.75% interest. The option expired unexercised and we forfeited our right to acquire the additional interest. We retain our existing 2.25% interest.
Current report
Proved Property Leases
Current report
Saskatchewan, Canada
Showing the first 40 of 51 passages. Open the source sections for the rest.
Removed paragraphs (35)
Previous report
California is a significant part of our geographic focus and we recently acquired a 22% working interest in the McCool Ranch Oil Field (the “McCool Ranch Oil Field”, “McCool Ranch Field” or “McCool Ranch”) in Monterey County, California. However, our interests extend beyond California and we recently acquired an interest in the Asphalt Ridge Project in Uintah County, Utah; we may acquire additional assets both inside and outside of California and Utah.
Previous report
South Salinas Project
Previous report
McCool Ranch operations have been successfully restarted, including the restarting of oil production at the HH-1, 35X and 58X wells. The HH-1 well has a short horizontal completion in the Lombardi Oil Sand, whereas the 35X and 58X wells are both vertical wells with similar oil columns in the Lombardi Oil Sand and with similar subsurface borehole completions. The HH-1 well at McCool Ranch upon restart was initially producing about 47 barrels of oil per day. The HH-1 and 35X wells collectively are currently producing about 10 to 15 bopd. The 58X well is temporarily idle. Oil production at the HH-1 and 35X wells is currently “cold” (i.e., without steam). The Company expects to restart cyclic steam operations in December 2024 or the first calendar quarter of 2025.
Previous report
The aforementioned initial three wells at McCool Ranch were each restarted and produced “cold” (i.e. without steam injection), which allows for lower operating costs, with expectation that each would be produced cold as long as profitable. The Company expects to transition each well from cold to cyclic-steam production, also known as “huff and puff,” which is expected to significantly increase production. The wells at McCool Ranch historically have responded favorably when cyclic-steam operations have been applied.
Previous report
The Company expects to restart the last two wells in the restart program, the HH-3 and HH-4 wells, in December 2024 or the first calendar quarter of 2025. The HH-3 and HH-4 wells will have horizontal completions similar to but longer than that of the HH-1 well. All water produced from these wells will be disposed in the on-site water disposal well.
Previous report
The HH-1 well was initially produced cold for about 380 days in 2012-2013, during which time peak production was about 156 barrels of oil per day (“BOPD”), average production was about 35 BOPD and cumulative production was about 13,147 barrels of oil (“BO”). The 58X well was initially produced cold for about 230 days in 2011-2013, during which time peak production was about 41 BOPD, average production was about 13 BOPD and cumulative production was about 2,918 BO.
Previous report
KLS Petroleum Consulting LLC (“KLSP”), a third-party, independent engineering firm, recommends that McCool Ranch be developed with horizontal wells, each landed in the Lombardi Oil Sand with a 1,000-foot lateral. Management estimates that TPET’s property can probably accommodate approximately 22 additional horizontal wells and TPET accordingly may commence a drilling program in 2025. TPET expects to add the reserve value of the McCool Ranch Field to the Company’s reserve report after a further period of observation and review of the oil production that was restarted on February 22, 2024.
Previous report
The Asphalt Ridge Project, according to J. Wallace Gwynn of Energy News, is estimated to be the largest measured tar sand resource in the United States and is unique given its low wax and negligible sulfur content, which is expected to make the oil produced very desirable for many industries, including shipping.
Previous report
Asphalt Ridge is a prominent, northwest-southeast trending topographic feature (i.e., a dipping slope called a hog’s back or cuesta) that crops-out along the northeast flank of the Uinta Basin. The outcrop is comprised largely of Tertiary and Cretaceous age sandstones that are locally highly saturated with heavy oil and/or tar. The oil-saturated sandstones extend into the shallow subsurface of the Uinta Basin to the southwest, which is the site of the Asphalt Ridge Development Project, and where the sandstones are estimated in various independent studies to contain billions of barrels of oil-in-place. The project leasehold comprises over 30,000 acres and trends northwest-southeast, along the trend of Asphalt Ridge, over a distance of about 20 miles.
Previous report
The area has been underdeveloped for decades due, in large part, to lease ownership issues and the definition of heavy oil falling under mining regulations in the State of Utah. These factors created conflict between surface rights and subsurface mineral rights and were obstacles to developing the asset using proven advanced cyclic-steam production techniques. Necessary permits have now been secured that should allow drilling to commence by our operating partner. HSO hopes to continue to work with the State of Utah to supplement prior receipt of permits with other state incentives, including working with the State on an arrangement requiring only an 8% state royalty in connection with this project.
Previous report
An early development phase contemplates the development of 240 acres with an estimated 119 wells in the Northwest Asphalt Ridge Area. The plan is to develop the 240 acres using advanced cyclic-steam production techniques, including initial CO2 injection. This phase contemplates seventeen 7-spot hexagonal well patterns on 2 ½ acre spacing (a 7-spot has a central steam/CO2 injection well that is surrounded by six producing oil wells). Upgrades have been made to existing roads and well pads as part of this early development phase.
Previous report
Two oil-saturated Cretaceous sandstones are targeted for development at Asphalt Ridge: the Rimrock Sandstone and the underlying Asphalt Ridge Sandstone. We expect to add the reserve value, if any, of the Asphalt Ridge Project to the Company’s reserve report after a brief period of observation and review of the oil development operations that commenced in the third calendar quarter of 2024.
Previous report
During the quarterly period ended April 30, 2024, we announced the commencement of drilling activities at Asphalt Ridge. The first well, HSO 8-4 (API# 4304757202), was spud on May 10, 2024 and drilled to a total depth of 1,020 feet. The well found 100 feet of Rimrock Sandstone tar-sand pay zone with good oil saturation and good porosity and thirty feet of the Rimrock was cored. A small, representative piece of Rimrock core was placed in water and brought to boiling point, and within a few minutes the sand disaggregated and the bitumen became liquid, mobile-oil, floating on top of the water – this simple laboratory test indicates that the bitumen becomes mobile-oil at relatively low temperatures and supports our contention that oil extraction using subsurface thermal-recovery methods may be very successful. A second well, the HSO 2-4 (API# 430475201), was spud on May 19, 2024 and drilled to a total depth of 1,390 feet. The well drilled through both the Rimrock tar-sand, which had a thickness of 135 feet, and the Asphalt Ridge tar-sand, which had a thickness of 59 feet. Oil production has commenced using downhole heaters, whereas the operator plans to transition to production using advanced cyclic-steam and steam-drive methods.
Previous report
We have only begun to generate revenues in the current fiscal year and have incurred significant losses since inception. As of October 31, 2024, we have an accumulated deficit of $20,073,679 and a working capital deficit of $2,025,480, and for the year ended October 31, 2024, a net loss of $9,626,797 and cash used in operation activities of $3,840,744. To date, we have been funding operations through proceeds from the issuance of common stock, financing through certain investors, the consummation of our IPO in April 2023, and convertible note financing under two tranches in October 2023 and December 2023, pursuant to which we raised total gross proceeds of $2,371,500. Additionally, we received funds in the amount of $125,000 from an unsecured promissory note from our CEO, gross proceeds of $184,500 from a promissory note with an investor in March 2024, gross proceeds of $720,000 from convertible debt financing with two investors in April 2024, gross proceeds of $720,000 from convertible debt financing with two investors in June 2024, as well as additional financing secured after the end of the period in August 2024 for gross proceeds in the aggregate amount of $359,000 from two unsecured promissory notes.
Previous report
There is substantial doubt regarding our ability to continue as a going concern as a result of our accumulated deficit and no source of revenue sufficient to cover our costs of operations as well as our dependence on private equity and financing.
Previous report
The accompanying financial statements have been prepared assuming we will continue as a going concern. As we have only begun to generate revenues, we need to raise a significant amount of capital to pay for our development, exploration, drilling and operating costs. While we raised capital in April 2023 with our IPO, in October 2023, December 2023, April 2024 and June 2024 with convertible debt financing, and in March 2024 and August 2024 with promissory notes, we expect to require additional funding in the future and there is no assurance that we will be able to raise additional needed capital or that such capital will be available under favorable terms or at all. We are subject to all the substantial risks inherent in the development of a new business enterprise within an extremely competitive industry. Due to the absence of a long-standing operating history and the emerging nature of the markets in which we compete, we anticipate operating losses until we can successfully implement our business strategy, which includes all associated revenue streams. We may never achieve profitable operations or generate significant revenues.
Previous report
We will require additional capital funding in order to drill additional planned wells at the South Salinas, McCool Ranch and Asphalt Ridge assets and to pay for additional development costs and other payment obligations and operating costs until our planned revenue streams are fully implemented and begin to offset our operating costs, if ever.
Previous report
Optioned Assets - McCool Ranch Oil Field
Previous report
In October 2023, we entered into an agreement (“McCool Ranch Purchase Agreement”) with Trio LLC for the purchase of a 21.918315% working interest in the McCool Ranch Oil Field located in Monterey County near our flagship South Salinas Project; we initially recorded a payment of $100,000 upon the execution of the McCool Ranch Purchase Agreement, at which time Trio LLC began refurbishment operations with respect to the San Ardo WD-1 water disposal well (the “WD-1”) to determine if it was capable of reasonably serving the produced water needs for the assets. With refurbishment successfully accomplished, we will pay an additional $400,000 per the McCool Ranch Purchase Agreement; to date, operations have been successfully restarted at three wells, and we expect to restart the last two wells in the restart program during the calendar quarter ending September 30, 2024. As of October 31, 2024, we have paid approximately $284,000 during the year for restarting production operations on the assets and have a liability recorded of approximately $116,000 to Trio LLC as of October 31, 2024.
Previous report
Optioned Assets – Asphalt Ridge Leasehold Acquisition & Development Option Agreement
Previous report
On November 10, 2023, we entered into a leasehold acquisition and development option agreement (“ARLO Agreement”) with Heavy Sweet Oil, LLC (“HSO”) for a term of nine months, which gives the Company the exclusive right to acquire up to a 20% interest in a 960 acre drilling and production program in the Asphalt Ridge leases for $2,000,000, which may be invested in tranches by us, with an initial tranche closing for an amount no less than $500,000 and paid within seven days subsequent to HSO providing certain required items to the Company.
Previous report
On December 29, 2023, we entered into an amendment to the ARLO Agreement, whereby we funded $200,000 of the $500,000 payable by us to HSO at the Initial Closing, in advance of HSO satisfying certain required items for a 2% interest in the leases; such funds are to be used by HSO solely for the building of roads and related infrastructure in furtherance of the development of the leases. During the quarterly period ended April 30, 2024, we announced the commencement of drilling activities at Asphalt Ridge and two wells (the HSO 8-4 and the HSO 2-4) were spud during May 2024; a third well is planned to be drilled in the third calendar quarter of 2024.
Previous report
We have until February 10, 2025 to pay HSO an additional $1,775,000 to exercise an option for the remaining 17.75% working interest in the initial 960 acres of the Asphalt Ridge Leases; if this option is not exercised on or before such date, we will forfeit any further right to acquire this additional 17.75% working interest in the initial 960 acres. As of October 31, 2024, we have paid a total of $225,000 to HSO in costs related to infrastructure and have a 2.25% interest in the leases; such costs are capitalized costs and are reflected in the balance of the oil and gas property as of October 31, 2024.
Previous report
Revenues, net increased for year ended October 31, 2024 by approximately $0.2 million as compared to the prior period, which had no revenue; we sold and shipped approximately 2,900 barrels of oil, primarily produced from the HH-1 well.
Previous report
General and administrative expenses increased for year ended October 31, 2024 by approximately $1.4 million as compared to the prior period due to increases in legal fees of $210,000, increased insurance expenses of $150,000, increased filing fees of $325,000, increased consulting fees of $100,000 and increased salary expenses of approximately $550,000.
Previous report
For the year ended October 31, 2024, other expenses, net increased by approximately $1.5 million when compared to the prior year period. The increase is attributable to an increase in non-cash interest expense of $1.3 million, which is recognized as debt discounts on financings are amortized; there were less financings in the prior period.
Previous report
Current assets decreased because of i) a decrease to the cash account of approximately $1.3 million due to increased payroll expenses and additional cash outlays for capital expenditures for the oil and gas properties, offset by an increase in prepaid assets of approximately $0.2 million. Current liabilities increased because of i) an increase in accounts payable of approximately $0.5 million, as well as an increase in notes payable – related parties of approximately $0.3 million.
Previous report
Our cash change was a decrease of approximately $1.3 million as of October 31, 2024. Management believes that the cash on hand and working capital are sufficient to meet its current anticipated cash requirements for anticipated capital expenditures and operating expenses for the next twelve months.
Previous report
We hold various leases related to the unproved properties of the South Salinas Project; two of the leases are held with the same lessor. The first lease, which covers 8,417 acres, was amended on May 27, 2022 to provide for an extension of then-current force majeure status for an additional, uncontested twelve months, during which we would be released from having to evidence to the lessor the existence of force majeure conditions. As consideration for the granting of the lease extension, we paid the lessor a one-time, non-refundable payment of $252,512; this amount was capitalized and reflected in the balance of the oil and gas property as of October 31, 2022. The extension period commenced on June 19, 2022 and currently, the “force majeure” status has been extinguished by the drilling of the HV-1 well. The ongoing operation and oil production at the HV-3A well maintain the validity of the lease.
Previous report
The second lease covers 160 acres of the South Salinas Project; it is currently held by delay rental and is renewed every three years. Until drilling commences, we are required to make delay rental payments of $30/acre per year. We are currently in compliance with this requirement and have paid in advance the delay rental payment for the period from October 2023 through October 2024.
Previous report
We hold interests in various leases related to the unproved properties of the McCool Ranch Oil Field. These leases occur in two parcels, “Parcel 1” and “Parcel 2”. Parcel 1 comprises ten leases and approximately 480 acres, which are held by delay rental payments that are paid-up and current. Parcel 2 comprises one lease and approximately 320 acres, which is held by production. The total leasehold comprises approximately 800 gross and net acres.
Previous report
During February and March of 2023, we entered into additional leases related to the unproved properties of the South Salinas Project with two groups of lessors. The first group of leases covers 360 acres and has a term of 20 years; we are required to make rental payments of $25/acre per year. We are currently in compliance with this requirement and have paid in advance the rental payment for the period February 2024 through February 2025. The second group of leases covers 307.75 acres and has a term of 20 years; we are required to make rental payments of $30/acre per year. We are currently in compliance with this requirement and have paid in advance the rental payment for the period from March 2024 through March 2025.
Previous report
On December 29, 2023, we entered into an amendment to the ARLO Agreement, whereby we funded $200,000 of the $500,000 payable by us to HSO at the Initial Closing, in advance of HSO satisfying certain required items for a 2% interest in the leases; such funds are to be used by HSO solely for the building of roads and related infrastructure in furtherance of the development of the leases. As of October 31, 2024, we have paid a total of $225,000 to HSO in costs related to infrastructure and has obtained a 2.25% interest in the leases; such costs are capitalized costs and are reflected in the balance of the oil and gas property as of October 31, 2024.
Previous report
Agreements with Advisors
Previous report
On October 4, 2023 and December 29, 2023, the Company entered into placement agent agreements with Spartan Capital Securities, LLC (“Spartan”), whereby Spartan will serve as the exclusive placement agent in connection with the closing of private placements. The agreements provide the agent with i) a cash fee 7.5% of the aggregate proceeds raised in the sale and ii) warrants to purchase a number of common shares equal to 5% of the number of common shares initially issuable upon conversion of each note tranche; warrants to purchase 4,167 and 2,750 common shares with exercise prices of $26.40 and $11.00 for the first and second tranches, respectively, were issued to Spartan as of January 31, 2024. Such warrants may be exercised beginning 6 months after issuance until four- and one-half years thereafter.
Reworded paragraphs (20)
Previous wording
We are a California-based oil and gas exploration and development company headquartered in Bakersfield, California, with our principal executive offices located at 5401 Business Park South, Suite 115, Bakersfield, California 93309, with operations in Monterey County, California, and Uintah County, Utah.
Current wording
We are a California-based oil and gas exploration and development company headquartered in Malibu, California, with our principal executive offices located at 23823 Malibu Road, Suite 304, Malibu, California 90265, with operations in Monterey County, California, Uintah County, Utah and Lloydminster, Saskatchewan.
Previous wording
We have had revenue-generating operations since the McCool Ranch Oil Field was restarted on February 22, 2024, and recognized our first revenues in our fiscal quarter ended April 30, 2024, and received the proceeds from these operations in June 2024.
Current wording
We have had revenue-generating operations since the McCool Ranch Oil Field was restarted on February 22, 2024, and recognized our first revenues in our fiscal quarter ended April 30, 2024, and received the proceeds from these operations in June 2024. During the period ended April 30, 2025, we began generating revenue from our newly acquired properties in Saskatchewan, Canada.
Previous wording
We were formed to initially acquire an approximate 82.75% working interest (which was subsequently increased to an approximate 85.775% working interest) from Trio Petroleum LLC (“Trio LLC”) in the large, approximately 9,300-acre South Salinas Project that is located in Monterey County, California, and subsequently partner with certain members of Trio LLC’s management team to develop and operate those assets. We hold an approximate 68.62% interest after the application of royalties (“net revenue interest”) in the South Salinas Project. Trio LLC holds an approximate 3.8% working interest in the South Salinas Project. We and Trio LLC are separate and distinct companies.
Current wording
We were formed to initially acquire an approximate 82.75% working interest (which was subsequently increased to an approximate 85.775% working interest) from Trio LLC (“Trio LLC”) in the large, approximately 9,300-acre South Salinas Project that is located in Monterey County, California, and subsequently partner with certain members of Trio LLC’s management team to develop and operate those assets. We hold an approximate 68.62% interest after the application of royalties (“net revenue interest”) in the South Salinas Project. Trio LLC holds an approximate 3.9% working interest in the South Salinas Project. We and Trio LLC are separate and distinct companies. The remaining working interests are owned by two unrelated parties.
Previous wording
Efforts to obtain from Monterey County conditional use permits and a full field development permit for the South Salinas Project are progressing. Efforts to obtain from the California Geologic Energy Management Division (“CalGEM”) and from the California Water Boards a permit for a water disposal project at the South Salinas Project are also progressing. In the meantime, the Company recently determined that existing permits allow production testing to continue at the HV-3A discovery well at Presidents Field and, consequently, testing operations were restarted at this well on March 22, 2024. Oil production from this well has occurred with a generally favorable oil-water ratio and the Company expects, in December 2024, or the first calendar quarter of 2025, to takes steps to attempt to increase the well’s gross production rate, for example by adding up to 650 feet of additional perforations in the oil zone and/or acidizing the well for borehole cleanup. First oil sales from the HV-3A well occurred in the third calendar quarter of 2024.
Current wording
Efforts to obtain from Monterey County conditional use permits and a full field development permit for the South Salinas Project are progressing. Efforts to obtain from the California Geologic Energy Management Division (“CalGEM”) and from the California Water Boards a permit for a water disposal project at the South Salinas Project are also progressing. In the meantime, the Company recently determined that existing permits allow production testing to continue at the HV-3A discovery well at Presidents Field and, consequently, testing operations were restarted at this well on March 22, 2024. Oil production from this well has occurred and the Company is assessing steps to attempt to increase the well’s gross production rate, for example by adding up to 650 feet of additional perforations in the oil zone and/or acidizing the well for borehole cleanup. First oil sales from the HV-3A well occurred in the third calendar quarter of 2024 but is currently idled as we further discussions with local oil and gas companies to joint venture the project.
Previous wording
On October 16, 2023, we entered into a Purchase and Sale Agreement with Trio LLC (the “McCool Ranch Purchase Agreement”) pertaining to the McCool Ranch Oil Field. Pursuant to this agreement, effective October 1, 2023, we acquired an approximate 22% working interest in and to certain oil and gas assets at the McCool Ranch Field, which is located in Monterey, County, California, just seven miles from our flagship South Salinas Project. The assets are situated in what is known as the “Hangman Hollow Area” of the McCool Ranch Field. The acquired property is a relatively new oil field (discovered in 2011) developed with six oil wells, one water-disposal well, a steam generator, boiler, three 5,000 barrel tanks, a 250-barrel test tank, a water softener, two freshwater tanks, two soft water tanks, in-field steam pipelines, oil pipelines and other facilities. The property is fully and properly permitted for oil and gas production, cyclic-steam injection and water disposal. We are acquiring the working interest at McCool Ranch primarily through work commitment expenditures, which are being allocated to restart production at the field and establish cash flow for us, with upside potential given the numerous undrilled infill and development well locations. Oil production was restarted on February 22, 2024.
Current wording
On October 16, 2023, we entered into a Purchase and Sale Agreement with Trio LLC (the “McCool Ranch Purchase Agreement”) pertaining to the McCool Ranch Oil Field. Pursuant to this agreement, effective October 1, 2023, we entered into an agreement to acquire an approximate 22% working interest in and to certain oil and gas assets at the McCool Ranch Field, located in Monterey County, California, near our flagship South Salinas Project.
Previous wording
On November 10, 2023, TPET entered into a Leasehold Acquisition and Development Option Agreement (the “Asphalt Ridge Option Agreement”) with Heavy Sweet Oil LLC (“HSO”). Pursuant to the Asphalt Ridge Option Agreement, the Company acquired an option to purchase up to a 20% working interest in certain leases at a long-recognized, major oil accumulation in northeastern Utah, in Uintah County, southwest of the city of Vernal, including an initial 960 acres and a subsequent 1,920 acres, as well as a right-of-refusal option on approximately 30,000 acres. HSO holds the right to such leases below 500 feet depth from surface and the Company acquired the option to participate in HSO’s initial 960 acre and subsequent 1,920 acre drilling and production programs (the “HSO Program”) on such Asphalt Ridge Leases. TPET also holds the right of first refusal to participate with up to a 20% working interest on the greater approximate 30,000 acre leasehold at terms offered to other third-parties. On December 29, 2023, the Company and HSO entered into an Amendment to Leasehold Acquisition and Development Agreement (the “Amendment to the Asphalt Ridge Option Agreement”), pursuant to which the Company and HSO amended the Asphalt Ridge Option Agreement to provide that, within three (3) business days of the effective date of the Amendment to the Asphalt Ridge Option Agreement, the Company would fund $200,000 of the $2,000,000 total purchase price in advance of HSO satisfying the closing conditions set forth in the Asphalt Ridge Option Agreement, in exchange for the Company receiving an immediate 2% interest in the initial 960 acres, which advanced funds would be used solely for the building of roads and related infrastructure in furtherance of the development plan. In January 2024, the Company funded an additional $25,000 resulting in a 2.25% working interest in the initial 960 acres.
Current wording
On November 10, 2023, we entered into a Leasehold Acquisition and Development Option Agreement (the “Asphalt Ridge Option Agreement”) with Heavy Sweet Oil LLC (“HSO”). Pursuant to the Asphalt Ridge Option Agreement, we acquired an option to purchase up to a 20% working interest in certain leases at a long-recognized, major oil accumulation in northeastern Utah, including an initial 960 acres and a subsequent 1,920 acres, as well as a right-of-refusal option on approximately 30,000 acres.
Previous wording
The accompanying condensed financial statements have been prepared in accordance with accounting principles generally accepted in the United States of America on a going concern basis, which contemplates the realization of assets and the satisfaction of liabilities in the normal course of business. Accordingly, the financial statements do not include any adjustments relating to the recoverability of assets and classification of liabilities that might be necessary should we be unable to continue as a going concern. The financial statements included in this report also include a going concern footnote (see Note 3).
Current wording
The accompanying condensed consolidated financial statements have been prepared in accordance with U.S. GAAP on a going concern basis, which assumes the realization of assets and settlement of liabilities in the normal course of business. These financial statements do not include any adjustments that might result from the outcome of this uncertainty. Additional information is provided in Note 3 to the condensed consolidated financial statements.
Previous wording
We are an “emerging growth company,” as defined in Section 2(a) of the Securities Act, as modified by the JOBS Act, and it may take advantage of certain exemptions from various reporting requirements that are applicable to other public companies that are not emerging growth companies including, but not limited to, not being required to comply with the auditor attestation requirements of Section 404(b) of the Sarbanes-Oxley Act of 2002, reduced disclosure obligations regarding executive compensation in periodic reports and proxy statements, and exemptions from the requirements of holding a nonbinding advisory vote on executive compensation and stockholder approval of any golden parachute payments not previously approved. Further, Section 102(b)(1) of the JOBS Act exempts emerging growth companies from being required to comply with new or revised financial accounting standards until private companies (that is, those that have not had a Securities Act registration statement declared effective or do not have a class of securities registered under the Exchange Act) are required to comply with the new or revised financial accounting standards. The JOBS Act provides that a company can elect to opt out of the extended transition period and comply with the requirements that apply to non-emerging growth companies but any such election to opt out is irrevocable. We have elected not to opt out of such extended transition period which means that when a standard is issued or revised and it has different application dates for public or private companies, we, as an emerging growth company, can adopt the new or revised standard at the time private companies adopt the new or revised standard. This may make comparison of our financial statements with another public company which is neither an emerging growth company nor an emerging growth company which has opted out of using the extended transition period difficult or impossible because of the potential differences in accounting standards used.
Current wording
We are an “emerging growth company,” as defined in Section 2(a) of the Securities Act, as modified by the JOBS Act, and it may take advantage of certain exemptions from various reporting requirements that are applicable to other public companies that are not emerging growth companies including, but not limited to, not being required to comply with the auditor attestation requirements of Section 404(b) of the Sarbanes-Oxley Act of 2002, reduced disclosure obligations regarding executive compensation in periodic reports and proxy statements, and exemptions from the requirements of holding a nonbinding advisory vote on executive compensation and stockholder approval of any golden parachute payments not previously approved. Further, Section 102(b)(1) of the JOBS Act exempts emerging growth companies from being required to comply with new or revised financial accounting standards until private companies (that is, those that have not had a Securities Act registration statement declared effective or do not have a class of securities registered under the Exchange Act) are required to comply with the new or revised financial accounting standards. The JOBS Act provides that a company can elect to opt out of the extended transition period and comply with the requirements that apply to non-emerging growth companies but any such election to opt out is irrevocable. We have elected not to opt out of such extended transition period which means that when a standard is issued or revised and it has different application dates for public or private companies, we, as an emerging growth company, can adopt the new or revised standard at the time private companies adopt the new or revised standard. This may make comparison of our condensed consolidated financial statements with another public company which is neither an emerging growth company nor an emerging growth company which has opted out of using the extended transition period difficult or impossible because of the potential differences in accounting standards used.
Previous wording
Under the successful efforts method of accounting for crude oil and natural gas properties, exploration expenses consist primarily of exploratory geological and geophysical costs, delay rentals and exploratory overhead, and are expensed as incurred. Exploration expenses decreased by approximately $0.1 million as compared to the prior year period due to a decrease in exploratory, geological, and geophysical costs incurred during the period.
Current wording
Under the successful efforts method of accounting for crude oil and natural gas properties, exploration expenses consist primarily of exploratory geological and geophysical costs, delay rentals and exploratory overhead, and are expensed as incurred. Exploration expenses decreased by approximately $0.1 million as compared to the prior year due to a decrease in exploratory, geological, and geophysical costs incurred during the period.
Previous wording
We record stock-based compensation expenses for costs associated with options and restricted shares granted in connection with the Plan, as well as for shares issued as payment for services. Stock-based compensation expense increased by approximately $0.5 million for the year ended October 31, 2024 due to the amortization of 260,000 options issued in the current year period; such had not yet been granted during the same period in the prior year.
Current wording
We record stock-based compensation expenses for costs associated with options and restricted shares granted in connection with the Plan, as well as for shares issued as payment for services. For the year ended October 31, 2025, stock-based compensation expense increased by approximately $1.1 million, primarily reflecting the grant and immediate recognition of expense for 1,552,500 options issued during the fourth quarter of fiscal 2025.
Previous wording
For the years ended October 31, 2024 and 2023, cash used in operating activities was $3,840,744 and $4,036,834, respectively. The cash used in operations for the year ended October 31, 2024 was primarily attributable to our net loss of $9,626,797, adjusted for non-cash expenses in the aggregate amount of $5,042,982, as well as $743,071 of net cash provided to fund changes in the levels of operating assets and liabilities. Our cash used in operations for year ended October 31, 2023 was primarily attributable to our net loss of $6,544,426, adjusted for non-cash expenses in the aggregate amount of $2,520,829, as well as $13,237 of net cash used to fund changes in the levels of operating assets and liabilities.
Current wording
For the years ended October 31, 2025 and 2024, cash used in operating activities was $2,604,749 and $3,840,744, respectively. The cash used in operations for the year ended October 31, 2025 was primarily attributable to our net loss of $7,282,133, adjusted for non-cash expenses in the aggregate amount of $4,706,442, as well as $109,058 of net cash used to fund changes in the levels of operating assets and liabilities. The cash used in operations for the year ended October 31, 2024 was primarily attributable to our net loss of $9,626,797, adjusted for non-cash expenses in the aggregate amount of $5,042,982, as well as $743,071 of net cash provided to fund changes in the levels of operating assets and liabilities.
Previous wording
For the years ended October 31, 2024 and 2023, cash used in investing activities was $1,089,882 and $2,189,859, respectively. The cash used during the current period is attributable to approximately $1.2 million related to costs for capital expenditures, which were capitalized and are reflected in the balance of the oil and gas property as of October 31, 2024. Cash used from investing activities for the year ended October 31, 2023 was attributable to approximately $3.7 million related to drilling exploratory wells and approximately $0.4 million related to acquisition and reserve analysis costs, both of which were capitalized and are reflected in the balance of the oil and gas property as of October 31, 2023. These amounts were offset by approximately $1.9 million in amounts used from the Advance to Operators account, which is designated for costs for the HV-1 well.
Current wording
For the years ended October 31, 2025 and 2024, cash used in investing activities was $978,563 and $1,089,882, respectively. The decrease in cash used during the current year primarily reflects slightly lower capital investment activity; for the year ended October 31, 2025, cash outflows were primarily attributable to approximately $0.9 million in connection with the acquisition of assets related to the Lloydminster, Saskatchewan properties. Cash used from investing activities for the year ended October 31, 2024 was attributable to approximately $1.2 million related to costs for capital expenditures, which were capitalized and are reflected in the balance of the oil and gas property as of October 31, 2024.
Previous wording
For the years ended October 31, 2024 and 2023, cash provided by financing activities was$ 3,654,647 and $7,714,969, respectively. Cash provided by financing activities during the year ended October 31, 2024 was primarily attributable to proceeds of approximately $3.1 million from the issuance of promissory notes, related party notes and convertible notes payable and proceeds of approximately $1.2 million from the issuance of common shares in connection with an ATM agreement, offset by payments for debt in the amount of approximately $0.4 million and debt issuance costs of $0.3 million. Cash provided by financing activities during the year ended October 31, 2023 was primarily attributable to $6.7 million in gross proceeds from the issuance of common stock, $1.8 million in net proceeds from the exercise of warrants and $1.6 million in net proceeds from the convertible note financing, offset by the payment of offering costs of approximately $1.0 million and the payment of notes payables of approximately $1.5 million.
Current wording
For the years ended October 31, 2025 and 2024, cash provided by financing activities was $4,165,058 and $3,654,647, respectively. Cash provided by financing activities during the year ended October 31, 2025 was primarily attributable to (i) proceeds approximately $3.5 million from the issuance of shares of common stock in connection with an ATM agreement, (ii) proceeds from the issuance of convertible debt of approximately $1.6 million, offset by repayments of related party debt and promissory notes of approximately $0.2 million and $0.6 million, respectively, as well as payments of debt issuance costs of approximately $0.1 million. Cash provided by financing activities during the year ended October 31, 2024 was primarily attributable to proceeds of approximately $3.1 million from the issuance of promissory notes, related party notes and convertible notes payable and proceeds of approximately $1.2 million from the issuance of common shares in connection with an ATM agreement, offset by payments for debt in the amount of approximately $0.4 million and debt issuance costs of $0.3 million.
Previous wording
Since our inception, we have funded our operations with the proceeds from equity and debt financing. We have experienced liquidity issues due to, among other reasons, our limited ability to raise adequate capital on acceptable terms. We have historically relied upon the issuance of equity and promissory notes that are convertible into shares of our common stock to fund our operations and have devoted significant efforts to reduce that exposure. We anticipate that we will need to issue equity to fund our operations for the foreseeable future. If we are unable to achieve operational profitability or are not successful in securing other forms of financing, we will have to evaluate alternative actions to reduce our operating expenses and conserve cash.
Current wording
Since our inception, we have funded our operations with the proceeds from equity and debt financing. We have experienced liquidity issues due to, among other reasons, our limited ability to raise adequate capital on acceptable terms. We have historically relied upon the issuance of equity and promissory notes that are convertible into shares of our common stock to fund our operations and have devoted significant efforts to reduce that exposure. Unless we are able to raise additional capital through equity and/or debt financing, we believe our existing cash and cash flow from operations will be sufficient to meet our working capital and capital expenditure needs for not more than six months from the date of this report. Future capital requirements will depend on many factors, including the time period in which we are able to ramp up the operation of wells and the acquisition of additional properties. To the extent that existing capital and revenue growth are not sufficient to fund future activities, we will need to raise capital through additional equity or debt financings. Additional funds may not be available on terms favorable to us or at all. Failure to raise additional capital, if needed, could have a material adverse effect on our financial position, results of operations and cash flows. SeeGoing Consideration Concernsabove in which we raise substantial doubt about our ability to continue as a going concern.
Previous wording
On November 10, 2023, we entered into the ARLO Agreement with HSO for a term of nine months which allows us the exclusive right to acquire up to a 20% interest in a 960 acre drilling and production program in the Asphalt Ridge leases for $2,000,000, which may be invested in tranches, with an initial tranche closing for an amount no less than $500,000 and paid within seven days subsequent to HSO providing certain required items to us.
Current wording
On November 10, 2023, we entered into the ARLO Agreement with HSO, granting the exclusive right to acquire up to a 20% working interest in a 960-acre drilling and production program in the Asphalt Ridge leases for $2,000,000. The agreement allowed for investment in tranches, with an initial tranche of no less than $500,000 payable within seven days of HSO satisfying certain conditions.
Previous wording
On July 11, 2022, our Board of Directors approved compensation for each of the non-employee directors of the Company, which would be effective upon the consummation of the IPO. Such compensation is structured as follows: an annual retainer of $50,000 cash plus an additional $10,000 for each Board committee upon which the Director serves, each paid quarterly in arrears. Payment for this approved compensation commenced upon successful completion of our IPO in April 2023; for the years ended October 31, 2024 and 2023, the Company has recognized $223,170 and $156,154, respectively, in directors’ fees.
Current wording
On July 11, 2022, our Board of Directors approved a compensation plan for non-employee directors, effective upon the consummation of our initial public offering (IPO). Under this plan, each non-employee director is entitled to an annual cash retainer of $50,000, plus an additional $10,000 per Board committee served, with all payments made quarterly in arrears. Compensation payments commenced following the successful completion of the IPO in April 2023.
Previous wording
We prepare our financial statements in conformity with GAAP, which requires management to make certain estimates and assumptions and apply judgments. We base our estimates and judgments on historical experience, current trends and other factors that management believes to be important at the time the condensed financial statements are prepared, and actual results could differ from our estimates and such differences could be material. Due to the need to make estimates about the effect of matters that are inherently uncertain, materially different amounts could be reported under different conditions or using different assumptions. On a regular basis, we review our critical accounting policies and how they are applied in the preparation of our condensed financial statements, as well as the sufficiency of the disclosures pertaining to our accounting policies in the footnotes accompanying our financial statements. Described below are the most significant policies we apply in preparing our condensed financial statements, some of which are subject to alternative treatments under GAAP. We also describe the most significant estimates and assumptions we make in applying these policies. See “Note 2 - Summary of Significant Accounting Policies” to our financial statements.
Current wording
We prepare our consolidated financial statements in conformity with GAAP, which requires management to make certain estimates and assumptions and apply judgments. We base our estimates and judgments on historical experience, current trends and other factors that management believes to be important at the time the consolidated financial statements are prepared, and actual results could differ from our estimates and such differences could be material. Due to the need to make estimates about the effect of matters that are inherently uncertain, materially different amounts could be reported under different conditions or using different assumptions. On a regular basis, we review our critical accounting policies and how they are applied in the preparation of our consolidated financial statements, as well as the sufficiency of the disclosures pertaining to our accounting policies in the footnotes accompanying our consolidated financial statements. Described below are the most significant policies we apply in preparing our consolidated financial statements, some of which are subject to alternative treatments under GAAP. We also describe the most significant estimates and assumptions we make in applying these policies. See “Note 2 - Summary of Significant Accounting Policies” to our consolidated financial statements.
Previous wording
Costs to acquire mineral interests in crude oil and/or natural gas properties, drill and equip exploratory wells that find proved reserves and drill and equip development wells are capitalized. Acquisition costs of unproved leaseholds are assessed for impairment during the holding period and transferred to proven crude oil and/or natural gas properties to the extent associated with successful exploration activities. Significant undeveloped leases are assessed individually for impairment, based on our current exploration plans, and a valuation allowance is provided if impairment is indicated. Capitalized costs from successful exploration and development activities associated with producing crude oil and/or natural gas leases, along with capitalized costs for support equipment and facilities, are amortized to expense using the unit-of-production method based on proved crude oil and/or natural gas reserves on a field-by-field basis, as estimated by qualified petroleum engineers. We currently have four wells that are producing (one well in President’s Field in the South Salinas Project and three wells at the McCool Ranch Oil Field) and are evaluating the impact of production on the reserve determination for those wells and fields. We expect to add the reserve value of such fields to our reserve report after a further period of observation and review of oil production.
Current wording
Costs to acquire mineral interests in crude oil and/or natural gas properties, drill and equip exploratory wells that find proved reserves and drill and equip development wells are capitalized. Acquisition costs of unproved leaseholds are assessed for impairment during the holding period and transferred to proven crude oil and/or natural gas properties to the extent associated with successful exploration activities. Significant undeveloped leases are assessed individually for impairment, based on our current exploration plans, and a valuation allowance is provided if impairment is indicated. Capitalized costs from successful exploration and development activities associated with producing crude oil and/or natural gas leases, along with capitalized costs for support equipment and facilities, are amortized to expense using the unit-of-production method based on proved crude oil and/or natural gas reserves on a field-by-field basis, as estimated by qualified petroleum engineers.
Previous wording
Unproved oil and natural gas properties
Current wording
Proved and unproved oil and natural gas properties
Previous wording
Unproved oil and natural gas properties are not subject to amortization and are assessed periodically for impairment on a property-by-property basis based on remaining lease terms, drilling results or future plans to develop acreage. We currently have four wells that are producing (one well in President’s Field in the South Salinas Project and three wells at the McCool Ranch Oil Field) and are evaluating the impact of production on the reserve determination for those wells and fields. We expect to add the reserve value of such fields to our reserve report after a further period of observation and review of the oil production. As of October 31, 2024 and 2023, all of our oil and gas properties were classified as unproved properties and were not subject to depreciation, depletion and amortization.
Current wording
Unproved oil and natural gas properties are not subject to amortization and are assessed periodically for impairment on a property-by-property basis based on remaining lease terms, drilling results or future plans to develop acreage. As of October 31, 2025 and 2024, such oil and gas properties were classified as unproved properties and were not subject to depreciation, depletion and amortization.
Rearranged current paragraphs (1)
Current report — wording carried from elsewhere
Our primary business strategies and objectives are to grow our recently acquired Canadian assets aggressively by acquiring projects that generate immediate cash flow and/or offer workover opportunities without committing huge resources to new exploratory drilling, or offer transformative growth potential with strategic investment in favorable political and economic environments such as our option on PR Spring in Uintah Basin, Utah. TPET’s current strategy and focus at the South Salinas Project is to seek out a joint venture partner with the knowledge and capacity to operate in California. We are also endeavoring to secure approval from CalGEM and WaterBoards of a proposed short-term water-disposal program that should significantly reduce lease operating costs, launching a Carbon Capture and Storage Project, pursuing permits for full field development, and similar matters. Efforts to obtain from Monterey County conditional use permits and a full field development permit for the South Salinas Project are progressing. Efforts to obtain from the California Geologic Energy Management Division (“CalGEM”) and from the California Water Boards a permit for a water disposal project at the South Salinas Project are also progressing. In the meantime, the Company recently determined that existing permits allow production testing to continue at the HV-3A discovery well at Presidents Field and, consequently, testing operations were restarted at this well on March 22, 2024. Oil production from this well has occurred and the Company has idled operations currently pending an assessment of the viability of increasing the well’s gross production rate, for example by adding up to 650 feet of additional perforations in the oil zone and/or acidizing the well for borehole cleanup. First oil sales from the HV-3A well occurred in the third calendar quarter of 2024.