A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Sep 30, 2025 · Filed Nov 14, 2025

SLNH$0.52+13.2%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-Q

Period ended 2025-06-30; filed 2025-08-14.

0001641172-25-024045

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

Current report: 10-Q

Period ended 2025-09-30; filed 2025-11-14.

0001493152-25-023503

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 157 previous paragraphs and 198 current paragraphs.

94 unchanged; 43 reworded; 61 added; 18 removed; 2 previous and 0 current paragraphs rearranged.

Tables are not compared: 23 previous and 25 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (61)

Current report

We have signed a term sheet for power for Project Fei is a 100 MW data center in development co-located with a 240 MW utility-scale solar farm, Soluna’s second solar-based project to date. Developed in partnership with a global leader in energy infrastructure investment, Project Fei will convert underutilized solar energy into clean, high-performance computing power. The project is currently advancing through land acquisition, power contract negotiation, and ERCOT interconnection planning.

Current report

We have signed a term sheet for power for Project Gladys is a 150 MW facility in development, which will be co-located with a 226 MW wind farm and developed in partnership with a prominent U.S.-based independent power producer (“IPP”) managing over $40 billion in assets and more than 80 energy facilities nationwide. The project is currently advancing through land acquisition, power contract negotiation, and ERCOT interconnection planning.

Current report

On August 12, 2024, the Company entered into the SEPA with YA. Pursuant to the terms of the SEPA, the Company agreed to issue and sell to YA, from time to time, and YA agreed to purchase from the Company, up to $25 million of shares of the Company’s common stock (the “SEPA Shares”). The Company paid a commitment fee of approximately $250 thousand to YA and consent fee of $25 thousand to the holder of shares of Series B Preferred Stock, which was paid through the issuance of 65,320 shares of common stock. The commitment and consent fees were recorded within Other expense, net on the Company’s consolidated financial statements for the year ended December 31, 2024. The Company and YA also entered into a registration rights agreement, pursuant to which the Company agreed to prepare and file with the SEC a Registration Statement on Form S-1, registering the resale of the SEPA Shares. On November 12, 2024, the Company filed a registration statement on Form S-1 (File No. 333-282559) with the SEC for the resale by YA of 3,000,000 SEPA Shares, which was declared effective by the SEC on February 5, 2025. During the three and nine months ended September 30, 2025, the Company has issued and sold approximately 1.5 million and 3.0 million shares of common stock to YA pursuant to the SEPA for aggregate net proceeds to the Company of approximately $4.2 million and $6.2 million.

Current report

On November 7, 2025, the Company held a Special Meeting of Stockholders (the “Special Meeting”) at which, among other matters of business acted upon, the Company’s stockholders approved an amendment to the Company’s Articles of Incorporation, as amended, to increase the Company’s authorized shares of common stock from 75,000,000 shares to 375,000,000 shares (the “Certificate of Amendment”). On November 7, 2025, the Company filed the Certificate of Amendment with the Secretary of State of the State of Nevada, and such amendment became effective immediately.

Current report

As previously disclosed, the Company received written notice from Nasdaq indicating that the Company was not in compliance with the $1.00 minimum bid price requirement for continued listing on The Nasdaq Capital Market, as set forth in Nasdaq Listing Rule 5550(a)(2) (the “Bid Price Rule”), and in accordance with Nasdaq Listing Rule 5810(c)(3)(A), the Company was given until November 4, 2025, to regain compliance. On October 3, 2025, the Company received formal written notice from Nasdaq indicating that the Company had regained compliance with the Bid Price Rule and that this matter is now closed.

Current report

As previously disclosed, on December 29, 2022, NYDIG ABL LLC (“NYDIG”) filed a complaint against (i) Soluna MC Borrowings, LLC 2021-1, a Delaware limited liability company (“Borrower”) and indirect wholly-owned subsidiary of Soluna Holdings, Inc., a Nevada corporation (the “Company”), and Soluna MC, LLC, a Nevada limited liability company and indirect wholly-owned subsidiary of the Company (“Guarantor”, and together with Borrower, the “Soluna Parties”) in Marshall Circuit Court of the Commonwealth of Kentucky (the “Court”) regarding a series of loans (the “NYDIG Loans”) made by NYDIG to Borrower pursuant to a Master Equipment Finance Agreement, dated December 30, 2021, that were secured by certain assets of Borrower and guaranteed by Guarantor pursuant to a written guaranty agreement. The Soluna Parties and NYDIG entered into a Stipulation and Agreed Judgment which was approved by the Court on February 23, 2024, whereby judgment was granted to NYDIG on the counts in the complaint and the Soluna Parties became jointly and severally liable for an aggregate amount of $9,182,646.13 plus interest (the “Agreed Judgment Amount”).

Current report

On September 29, 2025, the Soluna Parties and NYDIG entered into a Settlement Agreement (the “Settlement Agreement”), pursuant to which the Soluna Parties and NYDIG agreed to fully settle and resolve the Agreed Judgment Amount and all other matters relating to the NYDIG Loans in exchange for the Soluna Parties’ agreement to make certain settlement payments to NYDIG in accordance with the Settlement Agreement. As of the date of filing these condensed financial statements, the Settlement Agreement has been fully satisfied and paid.

Current report

On September 12, 2025, the Company caused its subsidiaries Soluna DVSL ComputeCo, LLC (“Dorothy 1A Borrower”), Soluna DVSL II ComputeCo, LLC, and Soluna KK I ComputeCo, LLC (collectively, the “Borrowers”) to enter into a Credit and Guaranty Agreement (the “Credit Agreement”) with Generate Lending, LLC, as administrative agent and collateral agent (the “Agent”), and Generate Strategic Credit Master Fund I-A, L.P. (the “Lender”). The Credit Agreement provides for senior secured term loan commitments in an aggregate principal amount of up to $35.5 million, comprised of (i) Tranche A-1 ($5.5 million), (ii) Tranche A-3 ($11.5 million), and (iii) Tranche B ($18.5 million). In addition, the Credit Agreement permits the Borrowers to request one or more Additional Tranche Loan Commitments (as defined in the Credit Agreement), in the aggregate amount of up to $64.5 million, subject to the approval of the Lender and the Agent, for project-level financing of eligible projects. On September 12, 2025, the Borrowers borrowed $12,623,591 under the Credit Agreement, comprised of Tranche A-1 loans and Tranche A-3 loans. The Company can draw upon Tranche B from September 12, 2025 until October 31, 2026, subject to the conditions set forth in the Credit Agreement. The maturity date for the Tranche A and Tranche B loans is the earlier of (i) payment of outstanding principal, interest, and fees and (ii) September 12, 2030. Additional Tranche Loan Commitments will have maturity dates as set forth in their respective amendments to the Credit Agreement. See further details on the Generate Loan Facility in Note 8.

Current report

Pursuant to the Credit Agreement, the Company issued to Generate Strategic Credit Master Fund I-B, L.P., an affiliate of the Lender and the Agent (“Generate”), in a private placement: (i) a pre-funded warrant to purchase up to 2,000,000 shares of common stock; and (ii) a common warrant to purchase up to 2,000,000 shares of common stock (collectively, the “Generate Warrants”).

Current report

Project Fei is a 100 MW data center in development co-located with a 240 MW utility-scale solar farm, Soluna’s second solar-based project to date. Developed in partnership with a global leader in energy infrastructure investment, Project Fei will convert underutilized solar energy into clean, high-performance computing power. The project is currently advancing through land acquisition, power contract negotiation, and ERCOT interconnection planning.

Current report

Project Gladys is a 150 MW facility in development, which will be co-located with a 226 MW wind farm and developed in partnership with a prominent U.S.-based independent power producer (“IPP”) managing over $40 billion in assets and more than 80 energy facilities nationwide. The project is currently advancing through land acquisition, power contract negotiation, and ERCOT interconnection planning.

Current report

On October 9, 2025, we announced a new hosting partnership with KULR Technology Group, Inc. (“KULR”) (NYSE American: KULR), a Bitcoin+ treasury company that builds a portfolio of frontier technology businesses ranging from high-performance energy systems to AI Robotics. Under this agreement, Soluna will operate approximately 3.3 MW of Bitcoin mining capacity for KULR at its Project Sophie facility in Kentucky. The partnership marks the first time Soluna has partnered with a Bitcoin treasury-focused company, expanding the Company’s customer base beyond traditional Bitcoin miners and hyperscalers. The agreement reflects Soluna’s strategy to adapt its renewable-powered hosting model to meet the developing demand profiles of Bitcoin mining and adjacent industries. The 3.3 MW deployment at Project Sophie is expected to commence operations in the fourth quarter of 2025.

Current report

On September 30, 2025, we announced a strategic hosting agreement with Canaan Inc. (“Canaan”) (Nasdaq: CAN), an innovator in crypto mining, to deploy 20 megawatts (MW) of Avalon® A15 XP Bitcoin miners at Soluna’s Project Dorothy in Briscoe County, Texas. The 20 MW, ~1 EH/s deployment is part of a broader roadmap for both companies: Canaan aims to expand its North American presence amid growing global demand for secure and efficient blockchain infrastructure. At the same time, Soluna aims to monetize its 2.8 GW+ pipeline of Renewable Computing projects designed to support both Bitcoin mining and AI workloads. The 20 MW deployment is expected to commence operations in the first quarter of 2026.

Current report

On November 13, 2025, we announced the completion and full energization of Project Dorothy 2, the 48 MW second phase of its flagship Project Dorothy in West Texas. With this milestone, the 100 MW Project Dorothy campus is now fully operational, delivered on time and on budget, bringing Soluna’s total energized data center capacity to 123 MW and over 5 EH/s, a 73% increase since April 2025.

Current report

Cryptocurrency Mining Revenue: Cryptocurrency mining revenue remained substantially consistent, decreasing minimally for the three months ended September 30, 2025, compared to the three months ended September 30, 2024. We were awarded 24.6 Bitcoins (BTC) for the three-month period ended September 30, 2025, compared to 46.1 BTC for the prior-year period, representing a 46.6% decrease in Bitcoins earned due to decline in operational efficiency of the aging miners. This decrease was substantially offset by an 87.5% increase in the average market price of BTC during the period.

Current report

Data Hosting Revenue: Hosting revenue increased for the three months ended September 30, 2025, compared to the same period in 2024. This increase was primarily driven by the ramped-up energization and resulting revenue contribution from the D2 facility during the third quarter of 2025. This positive impact was partially offset by a shift in the customer contract mix at the D1A and Sophie locations. Specifically, following the exit of one of our largest fixed-fee customers in December 2024, the Company onboarded replacement customers operating under a profit-sharing fee structure, thereby impacting the overall revenue contribution model.

Current report

Demand Response Service: Demand response service revenue decreased during the three months ended September 30, 2025, compared to the same period in 2024. This reduction was due to a lower capacity of Megawatts bid into the program, primarily resulting from two factors: the known operational degradation of the D1B miner fleet and the required upgrade of the electrical Internet of Things hardware within the modular data centers.

Current report

***Cost of Data Hosting Revenue, exclusive of depreciation:***Cost of data hosting revenue includes direct utility costs, site overhead expenses, and overhead costs attributable to the operations of data hosting facilities in Kentucky and Texas.

Current report

Cost of data hosting increased for the three months ended September 30, 2025, compared to the same period in 2024. This increase was primarily driven by the initial energization of the Dorothy 2 facility during the second quarter of 2025 and the subsequent increase in MWs capacity and associated operating costs in the third quarter of 2025. This cost increase was partially offset by a favorable change in the hosting contract mix, specifically the replacement of certain fixed-rate volume contracts with new agreements that include an electricity cost passthrough provision.

Current report

***Cost of High-Performance Computing Services:***Cost of High-Performance Computing Services represents the direct production expenses associated with providing AI and HPC processing capabilities. For the three months ended September 30, 2024, this cost totaled approximately $2.9 million, which was related to the agreement executed with HPE effective July 1, 2024, to acquire access to essential datacenter and cloud services necessary for supporting our AI and HPC processes. We did not incur any cost of High-Performance Computing Services the three months ended September 30, 2025.

Current report

In connection with the termination of the HPE Agreement on March 24, 2025, we recognized a loss of approximately $28.6 million for the year ended December 31, 2024. This loss represented the remaining contractual obligations under the agreement.

Current report

Gain on Debt Extinguishment and Revaluation, net: For the three months ended September 30, 2025, we recognized a net gain on extinguishment of debt of approximately $10.1 million, primarily related to the settlement of the NYDIG equipment financing loan and related interest obligations. The gain was partially offset by a loss on extinguishment resulting from the satisfaction and redemption of the Project Kati equipment loan through the issuance of Class B Membership Interests in Project Kati, which were valued at approximately three and three-tenths times the original borrowing amount.

Current report

For the three months ended September 30, 2024, we recognized a net gain on revaluation of approximately $0.9 million, primarily related to the remeasurement of convertible notes with an aggregate principal balance of $2.3 million. The gain resulted from changes in conversion assumptions, payout terms, annualized volatility, and stock price conditions on the valuation dates compared to the conversion features available to noteholders as of September 30, 2024. This gain was partially offset by a loss on extinguishment of debt of approximately $1.4 million, resulting from the satisfaction and redemption of the Dorothy 2 equipment loan through the issuance of Class B Membership Interests in the Dorothy 2 project, which were valued at approximately three times the original borrowing amount.

Current report

Fair value adjustment, net: For the three months ended September 30, 2025, we recognized a net loss of approximately $22.0 million related to the revaluation of the Series A and Series B warrants issued in connection with the July 2025 Financing, which were classified as liabilities and subsequently exercised during the quarter. The loss also includes a $13.8 million fair value adjustment on the revaluation of outstanding warrant liabilities as of September 30, 2025. These losses were primarily driven by the increase in the Company’s stock price between July and September 2025, which resulted in a higher intrinsic value compared to the warrants’ original fair value. In addition, we incurred an approximate $9.1 million loss in connection with the fair value of warrants issued in excess of the related proceeds from the July 2025 Financing. These losses were partially offset by a gain of approximately $0.8 million related to the revaluation of the Generate Common Warrant during the period.

Current report

For the three months ended September 30, 2024, we recognized a gain of approximately $0.3 million related to the revaluation of the Soluna Cloud warrants, which were subsequently written off.

Current report

Loss on sale of fixed assets and credit on equipment deposit:During the three months ended September 30, 2025, we recognized a loss of approximately $780 thousand related to the forfeiture of an equipment credit that had been recorded in prior periods. The credit, which was restricted for use on future equipment purchases for Project Dorothy 2 and Project Kati through September 1, 2025, expired unused, and no further extension was granted.

Current report

***Other financing expense:***Other financing expenses totaled approximately $4.7 million for the three months ended September 30, 2025, primarily related to consent fees associated with draws under the ATM Agreement and the SEPA facility, as well as transaction costs incurred in connection with the July 2025 Financing.

Showing the first 40 of 61 passages. Open the source sections for the rest.

Removed paragraphs (18)

Previous report

On July 22, 2025, the Company closed a $20 million round of financing from Spring Lane Capital for a 35 megawatt (MW) expansion of Project Kati in Texas with Project Kati 1. The funds will be used for the construction of Project Kati 1 beginning in the third quarter of 2025.

Previous report

Cryptocurrency Mining Revenue: Cryptocurrency mining revenue decreased between the three months ended June 30, 2025 compared to the three months ended June 30, 2024 related to the Bitcoin halving event that occurred in April 2024, resulting in a $1.0 million decrease from price and a $583 thousand decrease due to volume driven primarily by aging of miners and higher curtailment in 2025 which resulted in fewer available hours.

Previous report

Data Hosting Revenue: Cryptocurrency hosting services provide energized space and operating services to third-party mining companies who locate their mining hardware at our mining locations- D1A, D2 and Project Sophie. Services include fees for hosting the miners which could be fixed fees or profit sharing, as well as potential additional fees for services provided such as installation charges or other services fees. The decrease for the three months ended June 30, 2025 compared to the three months ended June 30, 2024 related mainly in December 2024, in which one of our largest customers who was on a fixed fee charge exited, and the replacement customers were on a profit-sharing fee structure,thereby causing a contract mix change.

Previous report

Demand Response Service: Demand response service revenue was lower in the three months ended June 30, 2025 compared to the three months ended June, 2024 due to the fact that the capacity of MWs that we bid on were less due to known outages in the Texas area, as well as the aging of machines for D1B.

Previous report

***Cost of Data Hosting Revenue, exclusive of depreciation:***Cost of data hosting revenue includes utility charges, site overhead expenses, and other charges.

Previous report

Loss on Debt Extinguishment and Revaluation, net: For the three months ended June 30, 2025, there was no gain or loss on extinguishment or revaluation of debt.

Previous report

For the three months ended June 30, 2024, we had a loss on debt revaluation of approximately $5.6 million, which was in relation to approximately $4.0 million for the convertible notes, due to factors including assumptions on conversions and payouts, annual volatility, and stock price conditions on the dates of valuations compared to what the noteholders could convert at as of June 30, 2024. In addition, there was a $1.6 million loss on the valuation of a warrant liability. The warrant liability was ultimately reversed when Shareholder approval occurred on May 30, 2024, however, we needed to revalue the warrants as of May 30, 2024, which created a loss of approximately $1.6 million due to mainly changes in the stock price.

Previous report

***Other expense, net:***Other expense, net increased by approximately $497 thousand for the 3 months ended June 30, 2025 compared to June 30, 2024. For the three months ended June 30, 2025, we incurred a loss compensation cost of approximately $291 thousand in relation to the Las Majadas wind farm, and approximately $255 thousand financing expense mainly in relation to consent fees for the ATM Agreement draws, in addition to FINRA and SEC filing charges. For the three months ended June 30, 2024, other expense, net was approximately $49 thousand, related to an extension fee expense of approximately $325 thousand in relation to the Convertible Notes, offset with a gain on settlement of litigation with Atlas Technology Group LLC (“Atlas”) of approximately $254 thousand, in addition to some small additional other income items.

Previous report

The following table summarizes the balances for the project sites for cryptocurrency mining revenue, data hosting revenue, high-performance computing service revenue, demand response revenue, cost of cryptocurrency mining revenue, exclusive of depreciation, cost of data hosting revenue, exclusive of depreciation, cost of high-performance computing services, and cost of depreciation during the six months ended June 30, 2025:

Previous report

The following table summarizes the balances for the project sites for cryptocurrency mining revenue, data hosting revenue, high-performance computing service revenue, demand response revenue, cost of cryptocurrency mining revenue, exclusive of depreciation, cost of data hosting revenue, exclusive of depreciation, cost of high-performance computing services, and cost of depreciation during the six months ended June 30, 2024:

Previous report

Data Hosting Revenue: Cryptocurrency hosting services provide energized space and operating services to third-party mining companies who locate their mining hardware at our mining locations- D1A and Project Sophie. Services include fees for hosting the miners which could be fixed fees or profit sharing, as well as potential additional fees for services provided such as installation charges or other services fees. The decrease for the six months ended June 30, 2025 compared to the six months ended June 30, 2024 relate to the Bitcoin halving event that occurred in April 2024, which drove down the dollar Petahash (“PH”) per day. Also, in December 2024, one of our largest customers exited leaving 20 MW of capacity to fill that was ultimately filled slowly over December 2024 and into March 2025, in which the replacement customers were on a profit-sharing fee.

Previous report

Demand Response Service: Demand response service revenue was lower in the six months ended June 30, 2025 compared to the six months ended June 30, 2024 due to a decline in the ERCOT Clearing price per MW, in addition to the fact that the capacity we bid on was reduced due to known outages in the Texas area and efficiency of our aging miners at D1B.

Previous report

The cost remained consistent between the six months ended June 30, 2025 and the six months ended June 30, 2024.

Previous report

***Cost of Data Hosting Revenue, exclusive of depreciation:***Cost of data hosting revenue includes utility charges, site overhead expenses, and other charges.

Previous report

For the six months ended June 30, 2024, the Company had a loss on debt extinguishment and revaluation of approximately $8.7 million due to the entering into of the Fourth Amendment with the Noteholders on February 28, 2024, pursuant to which the Company lowered the conversion price, issued new warrants, and repriced additional warrants with certain exercise features. The issuance and reprice of warrants created a loss of extinguishment of debt of approximately $5.8 million which was offset by a gain on debt revaluation of the convertible debt of approximately $1.3 million as of February 28, 2024 (date of Fourth Amendment) and March 31, 2024 due to several factors including assumptions on conversions and payouts, annual volatility, and stock price conditions on the dates of valuations. In addition, there was a revaluation of the warrant liability which created a gain on revaluation of approximately $1.5 million. The Company did a fair value assessment of the notes as of June 30, 2024, which created a loss on revaluation of approximately $4.0 million, as noted above. In addition, in the second quarter of fiscal year 2024, the Company did a revaluation of the warrants through May 30, 2024, the date of Annual Shareholder approval, which created a loss on revaluation of approximately $1.6 million.

Previous report

***Other expense, net:***Other expense, net increased by approximately $835 thousand for the six months ended June 30, 2025 compared to June 30, 2024. For the six months ended June 30, 2025, we incurred approximately $118 thousand in fair value adjustments due to the timing of the SEPA draws and when such shares were issued, $456 thousand financing expense mainly in relation to consent fees for the SEPA and ATM Agreement draws, and we incurred a loss compensation cost of approximately $291 thousand in relation to the Las Majadas wind farm. For the six months ended June 30, 2024, other expense, net was approximately $25 thousand, related to an extension fee expense of approximately $325 thousand for the Convertible Notes, offset with a gain on settlement of litigation with Atlas of approximately $254 thousand, in addition to some small additional other income items.

Previous report

Adjusted EBITDA decreased for the three and six months ended June 30, 2025 compared to June 20, 2024 primarily driven by a decrease in revenue of $3.4 million and $9.7 million decline in Cryptocurrency mining and data hosting revenue following the April 2024 Bitcoin halving and a customer ramp-up of 20 MW through the first quarter of 2025, partially offset by approximately $675 thousand and $1.5 million decline in cryptocurrency cost of revenue and cost of data hosting revenue, excluding depreciation. General and administrative expenses, excluding stock-based compensation and provision for credit losses, decreased approximately $272 thousand for the three months ended June 30, 2025 compared to the three months ended June 30, 2024 mainly due to declines in bonus expenses and investor relation fees, offset by legal fees. General and administrative expenses, excluding stock-based compensation and provision for credit losses for the six months ended June 30, 2025 compared to June 30, 2024 increased approximately $527 thousand mainly related to legal fees associated with the SEPA and other consulting fees.
Reworded paragraphs (43)

Previous wording

With a repeatable strategy and a growing pipeline of projects, we are scaling a new category of digital infrastructure—one that energizes the grid, lowers computing costs, and advances a more sustainable future.

Current wording

With a repeatable strategy and a growing pipeline of projects, we are scaling a new category of digital infrastructure—one that enhances returns for renewable farms by purchasing excess capacity, lowers computing costs, and advances a more sustainable future.

Previous wording

In 2024, our execution strategy was centered around four key initiatives:

Current wording

In 2024 and into 2025, our execution strategy was centered around four key initiatives:

Previous wording

The profitability of this business is affected by several variables, including the market price of Bitcoin, global network hash rate, mining difficulty, electricity and infrastructure costs, and mining pool fees. In addition, Bitcoin undergoes a periodic “halving” event approximately every four years, reducing the Block Reward and potentially impacting future revenue. For the three and six months ended June 30, 2025, our Bitcoin Mining Business represented approximately 46% and 48% of total revenue. For the three and six months ended June 30, 2024, our Bitcoin Mining Business represented approximately 46% and 49% of total revenue.

Current wording

The profitability of this business is affected by several variables, including the market price of Bitcoin, global network hash rate, mining difficulty, electricity and infrastructure costs, and mining pool fees. In addition, Bitcoin undergoes a periodic “halving” event approximately every four years, reducing the Block Reward and potentially impacting future revenue. For the three and nine months ended September 30, 2025, our Bitcoin Mining Business represented approximately 33% and 42% of total revenue. For the three and nine months ended September 30, 2024, our Bitcoin Mining Business represented approximately 37% and 46% of total revenue.

Previous wording

For the three and six months ended June 30, 2025, our Bitcoin Hosting Business accounted for approximately 51% and 46% of total revenue. For the three and six months ended June 30, 2024, our Bitcoin Hosting Business accounted for approximately 51% and 46% of total revenue. Revenue in the Bitcoin Hosting Business was concentrated among a small number of customers. For the three months ended June 30, 2025, three customers made up approximately 79% of hosting revenue and 40% of total revenue. For the six months ended June 30, 2025, three customers made up approximately 80% of hosting revenue and 37% of total revenue.

Current wording

For the three and nine months ended September 30, 2025, our Bitcoin Hosting Business accounted for approximately 62% and 53% of total revenue. For the three and nine months ended September 30, 2024, our Bitcoin Hosting Business accounted for approximately 57% and 49% of total revenue. Revenue in the Bitcoin Hosting Business was concentrated among a small number of customers. For the three months ended September 30, 2025, two customers made up approximately 63% of hosting revenue and 40% of total revenue. For the nine months ended September 30, 2025, three customers made up approximately 80% of hosting revenue and 42% of total revenue.

Previous wording

Our first planned AI/HPC colocation project isProject Kati, which is in advanced development. Additional projects, including the announcedProject Rosa, are also in progress. For the fiscal year 2024 and the six months ended June 30, 2025, we generated minimal revenue from our HPC Business.

Current wording

Our first planned AI/HPC colocation project isProject Kati, which is in active construction, and breaking ground near the end of the third quarter 2025. Additional projects, including the announcedProject Rosa, are also in progress. For the fiscal year 2024 and the nine months ended September 30, 2025, we generated minimal revenue from our HPC Business.

Previous wording

For the three and six months ended June 30, 2025, our Demand Response Business represented approximately 3% and 6% of total revenue. For the three and six months ended June 30, 2024, our Demand Response Business represented approximately 3% and 5% of total revenue.

Current wording

For the three and nine months ended September 30, 2025, our Demand Response Business represented approximately 5% and 5% of total revenue. For the three and nine months ended September 30, 2024, our Demand Response Business represented approximately 6% and 5% of total revenue. 2026 compensation rates are trending notably downward from increased participation in the program.

Previous wording

As of June 30, 2025, we operate approximately 91 MW of capacity across two active sites located in Murray, Kentucky and Silverton, Texas. An additional 32 MW is under construction at our D2 project site, and as of June 30, 2025, we had over 650 MW of facilities in advanced development or near shovel-ready status. In total, our project pipeline includes over 2.8 gigawatts (GW) of renewable energy-powered data center developments.

Current wording

As of September 30, 2025, we operate approximately 105 MW of capacity across two active sites located in Murray, Kentucky and Silverton, Texas. An additional 18 MW is under construction at our D2 project site, and as of September 30, 2025, we had over 900 MW of facilities in advanced development or near shovel-ready status. In total, our project pipeline includes over 2.8 gigawatts (GW) of renewable energy-powered data center developments.

Previous wording

We finance the development and construction of our data centers through a combination of public equity offerings, debt instruments, and partnerships with project-level capital providers. As of June 30, 2025, we had two primary project-level financing partners:

Current wording

We finance the development and construction of our data centers through a combination of public equity offerings, debt instruments, and partnerships with project-level capital providers. As of September 30, 2025, we had four primary project-level financing partners:

Previous wording

D1A is focused on Bitcoin Hosting for industry hyperscale miners. There are approximately 7,800 Bitcoin miners installed at D1A, which as of June 30, 2025, resulted in a hashrate of approximately 900 TH/s. For the year ended December 31, 2024, D1A consumed over 45,700 MWh of Curtailed Energy and for the three and six months ended June 30, 2025, D1A consumed over 12,100 and 24,000 MWh of Curtailed Energy.

Current wording

D1A is focused on Bitcoin Hosting for industry hyperscale miners. There are approximately 7,700 Bitcoin miners installed at D1A, which as of September 30, 2025, resulted in a hashrate of approximately 990 PH/s. For the year ended December 31, 2024, D1A consumed over 45,700 MWh of Curtailed Energy and for the three and nine months ended September 30, 2025, D1A consumed over 700 and 24,400 MWh of Curtailed Energy.

Previous wording

D1B is focused on proprietary Bitcoin Mining. There are approximately 6,900 Bitmain Antminer S19s, S19j Pro and S19j Pro+ machines installed, resulting in an installed hashrate of 817 PH/s. For the year ended December 31, 2024, D1B consumed over 44,500 MWh of Curtailed Energy and for the three and six months ended June 30, 2025, D1B consumed over 11,300 MWh and 24,400 MWh of Curtailed Energy. D1B is co-owned by Navitas, which owns approximately 49% of D1B, while we own the remaining 51%.

Current wording

D1B is focused on proprietary Bitcoin Mining. There are approximately 6,800 Bitmain Antminer S19s, S19j Pro and S19j Pro+ machines installed, including a September 2025 addition of S19 XP, resulting in an installed hashrate of 726 PH/s for the three months ended September 30, 2025. For the year ended December 31, 2024, D1B consumed over 44,600 MWh of Curtailed Energy and for the three and nine months ended September 30, 2025, D1B consumed over 500 MWh and 24,700 MWh of Curtailed Energy. D1B is co-owned by Navitas, which owns approximately 49% of D1B, while we own the remaining 51%.

Previous wording

We began planning for the 48 MW expansion of Project Dorothy in 2023 – known as Project Dorothy 2. We partnered with SLC who agreed to finance up to $30 million of the project cost. We closed the initial financing contribution and operation agreement with SLC in July 2024 and broke ground in the third quarter of 2024. Initial energization and ramp-up began as of May 2025. This has enabled the commencement of the commissioning of the first of 3 phases, each of 16MW, that began in May 2025 and is expected to continue through October 2025 when the site is expected to be fully operational. As each phase is commissioned, it will begin to generate revenue, both due to Bitcoin Hosting and Demand Response Services. D2 features a superior financial waterfall structure and enhanced management and development fees for Soluna compared to D1A, allowing us to benefit from improved income once the facility is operational.

Current wording

We began planning for the 48 MW expansion of Project Dorothy in 2023 – known as Project Dorothy 2. We partnered with SLC who agreed to finance up to $30 million of the project cost. We closed the initial financing contribution and operation agreement with SLC in July 2024 and broke ground in the third quarter of 2024. Initial energization and ramp-up began as of May 2025. This has enabled the commencement of the commissioning of the first of 3 phases, of 16 MW, that began in May 2025 and was completed at the end of October 2025, as the site is now fully operational. As each phase was commissioned, it began to generate revenue, both due to Bitcoin Hosting and Demand Response Services. D2 features a superior financial waterfall structure and enhanced management and development fees for Soluna compared to D1A, allowing us to benefit from improved income once the facility is operational.

Previous wording

Sophie is focused on Bitcoin Hosting of multiple large customers. The data center generates revenue via a combination of fixed services fees and profit share, while energy cost is passed through. As of June 30, 2025, there are approximately 9,480 Bitcoin miners installed or contracted to be installed, resulting in an installed hashrate of approximately 1.24 EH/s and achieved a PUE of 1.03.

Current wording

Sophie is focused on Bitcoin Hosting of multiple large customers. The data center generates revenue via a combination of fixed services fees and profit share, while energy cost is passed through to customers. As of September 30, 2025, there are approximately 9,400 Bitcoin miners installed or contracted to be installed, resulting in an installed hashrate of approximately 1.23 EH/s.

Previous wording

We are developing Project Kati in Willacy County, Texas, which is expected to be developed into 166 MW (broken out in 2 phases) of data centers for HPC, Bitcoin Hosting and other computing-intensive applications. It is co-located with a 272.6MW wind farm. We have completed the necessary studies for the ERCOT planning phase, which is the last formal step to secure approvals by regulatory agencies or grid operators, such as ERCOT in Texas, to proceed with project construction and commissioning. We have completed the necessary amendments to the interconnection agreements with American Electric Power, the transmission service provider. We have secured land, contingent on reaching final agreement with local government and schools regarding taxation, for the project and have started capital formation activities. On July 22, 2025, we finalized a contribution agreement from SLC for the first 35 MW of the 83 MW phase of Kati 1 with the goal of achieving initial energization by the first quarter of 2026.

Current wording

We are developing Project Kati in Willacy County, Texas, which is expected to be developed into 166 MW (broken out in 2 phases) of data centers for HPC, Bitcoin Hosting and other computing-intensive applications. It is co-located with a 272.6MW wind farm. We have completed the necessary studies for the ERCOT planning phase, which is the last formal step to secure approvals by regulatory agencies or grid operators, such as ERCOT in Texas, to proceed with project construction and commissioning. We have completed the necessary amendments to the interconnection agreements with American Electric Power, the transmission service provider. We have secured land, contingent on reaching final agreement with local government and schools regarding taxation, for the project and have started capital formation activities. On July 22, 2025, we finalized a contribution agreement from SLC for the first 35 MW of the 83 MW phase of Kati 1 with the goal of achieving initial energization by the first quarter of 2026. On September 18, 2025, we held a groundbreaking ceremony and officially began construction of Project Kati in Willacy County Texas. Project Kati is designed as a two-phase buildout: Kati 1 (83MW) is dedicated to Bitcoin hosting with Galaxy Digital as the first customer already secured, while Kati 2 (83MW) will expand the site to support AI and high-performance computing (HPC) infrastructure.

Previous wording

In 2025, we are focused on advancing the following key initiatives:

Current wording

In 2025 and 2026, we are focused on advancing the following key initiatives:

Previous wording

On April 29, 2025, the Company entered into an At the Market Offering Agreement (the “ATM Agreement”) with H.C. Wainwright & Co., LLC (“Wainwright”), as sales agent, pursuant to which the Company may offer and sell, from time to time, through Wainwright, up to $3.75 million of shares of common stock. The Company will pay Wainwright a commission of 3.0% of the aggregate gross proceeds from each sale of shares and has agreed to provide Wainwright with customary indemnification and contribution rights.

Current wording

On April 29, 2025, the Company entered into an At the Market Offering Agreement (the “ATM Agreement”) with H.C. Wainwright & Co., LLC (“Wainwright”), as sales agent, pursuant to which the Company may offer and sell, from time to time, through Wainwright, up to $3.75 million of shares of common stock. The Company will pay Wainwright a commission of 3.0% of the aggregate gross proceeds from each sale of shares and has agreed to provide Wainwright with customary indemnification and contribution rights. An additional prospectus supplement was filed on September 2, 2025, in which the Company may offer and sell shares of our common stock having an aggregate offering price of up to $8,585,280 from time to time through Wainwright, and an additional prospectus supplement was filed on September 23, 2025, in which the Company may offer and sell shares of our common stock having an aggregate offering price up to $87,650,000 from time to time through Wainwright.

Previous wording

During the three months ended June 30, 2025, the Company sold 3,340,663 shares of common stock pursuant to the ATM Agreement for net proceeds of $2.2 million after deducting sales agent commissions of approximately $88 thousand. The Company has sold 1,867,824 shares of common stock pursuant to the ATM Agreement subsequent to June 30, 2025 for additional net proceeds of approximately $1.4 million.

Current wording

During the three and nine months ended September 30, 2025, the Company sold 14,649,141 and 17,989,804 shares of common stock pursuant to the ATM Agreement for net proceeds of $20.8 million and $23.0 million after deducting sales agent commissions. The Company has sold an additional 2,690,679 shares of common stock pursuant to the ATM Agreement subsequent to September 30, 2025 for additional net proceeds of approximately $6.3 million.

Previous wording

The shares of common stock sold under the ATM Agreement are offered and sold pursuant to the Company’s effective shelf registration statement on Form S-3 (File No. 333-286638) filed by the Company with the U.S. Securities and Exchange Commission (the “SEC”) on April 18, 2024, and declared effective by the SEC on April 29, 2025.

Current wording

The shares of common stock sold under the ATM Agreement are offered and sold pursuant to the Company’s effective shelf registration statement on Form S-3 (File No. 333-286638) filed by the Company with the U.S. Securities and Exchange Commission (the “SEC”) on April 18, 2024 and declared effective by the SEC on April 29, 2025. As of the date of these condensed financial statements, we have approximately $69.7 million of shares of common stock that are available for issuance under the ATM.

Previous wording

The net proceeds of the July 2025 Offering, after deducting the fees and expenses of the placement agent, and other offering expenses payable by the Company, but excluding the net proceeds, if any, from the exercise of the Common Warrants, is approximately $4.3 million. The July 2025 Offering closed on July 17, 2025.

Current wording

The net proceeds of the July 2025 Offering, after deducting the fees and expenses of the placement agent, and other offering expenses payable by the Company, but excluding the net proceeds, if any, from the exercise of the Common Warrants, is approximately $4.3 million. The July 2025 Offering closed on July 17, 2025. As of the date of these condensed financial statements, the Series A and B warrants have been fully exercised raising an additional $10.0 million in gross proceeds.

Previous wording

On August 5, 2025, John Tunison, the Company’s Chief Financial Officer, notified the Company that, effective August 21, 2025, he will resign from his position as Chief Financial Officer and Treasurer of the Company. In connection with Mr. Tunison’s resignation, on August 8, 2025, David C. Michaels, a member of the Company’s Board of Directors, was appointed as the Company’s interim Chief Financial Officer and Treasurer, effective August 21, 2025.

Current wording

On August 5, 2025, John Tunison, the Company’s prior Chief Financial Officer, notified the Company that, effective August 21, 2025, he will resign from his position as Chief Financial Officer and Treasurer of the Company. In connection with Mr. Tunison’s resignation, on August 8, 2025, David C. Michaels, a member of the Company’s Board of Directors, was appointed as the Company’s interim Chief Financial Officer and Treasurer, effective August 21, 2025.

Previous wording

Cost of Cryptocurrency Mining Revenue, exclusive of depreciation*:* Cost of cryptocurrency mining revenue includes direct utility costs, site overhead expenses, and overhead costs that relate to the operations of our cryptocurrency mining facilities in Kentucky and Texas.

Current wording

Cost of Cryptocurrency Mining Revenue, exclusive of depreciation*:* Cost of cryptocurrency mining revenue includes direct utility costs, site overhead expenses, and overhead costs attributable to the operations of our cryptocurrency mining facilities in Texas.

Previous wording

The decrease in costs for the three months ended June 30, 2025 compared to three months ended June 30, 2024 relate mainly to slight decreases in operating and electricity costs due to slight decrease in electricity usage.

Current wording

The decrease in the cost of cryptocurrency mining revenue for the three months ended September 30, 2025, compared to the same period in 2024, was primarily due to a reduction in operating and electricity costs, corresponding from a 18% decrease in electricity usage.

Previous wording

Depreciation and Amortization associated with general and administrative expenses: Depreciation and amortization expense was comparable for the three months ended June 30, 2025 and three months ended June 30, 2024 in which the balances totaled approximately $2.4 million, respectively. The balances mainly related to amortization expense related to the strategic pipeline contract that was acquired in October 2021.

Current wording

Depreciation and Amortization associated with general and administrative expenses: Depreciation and amortization expense was comparable for the three months ended September 30, 2025, and 2024, totaling approximately $2.4 million in each period. The expense primarily relates to amortization of the strategic pipeline contract acquired in October 2021.

Previous wording

Interest expense: Interest expense for the three months ended June 30, 2025 was approximately $1.2 million compared to the $449 thousand for the three months ended June 30, 2024. See table below noting the difference mainly relates to the new loans entered into in fiscal year 2024 and 2025 (June SPA, Galaxy Loan, and equipment loan), which includes amortization of deferred financing costs.

Current wording

Interest expense: Interest expense for the three months ended September 30, 2025 was approximately $1.2 million compared to the $821 thousand for the three months ended September 30, 2024. See table below noting the difference mainly relates to the new loans entered into in fiscal year 2024 and 2025 (June SPA, Galaxy Loan, Generate loan, and equipment loan), which includes amortization of deferred financing costs.

Previous wording

Consolidated Results of Operations for the Six Months Ended June 30, 2025 Compared to the Six Months Ended June 30, 2024.

Current wording

Consolidated Results of Operations for the Nine Months Ended September 30, 2025 Compared to the Nine Months Ended September 30, 2024.

Previous wording

The following table summarizes changes in the various components of our net loss during the six months ended June 30, 2025 compared to the six months ended June 30, 2024.

Current wording

The following table summarizes changes in the various components of our net loss during the nine months ended September 30, 2025 compared to the nine months ended September 30, 2024.

Previous wording

Cryptocurrency Mining Revenue: Cryptocurrency mining revenue decreased between the six months ended June 30, 2025 compared to the six months ended June 30, 2024 related to the Bitcoin halving event that occurred in April 2024, which reduced the block reward by 50%, which was offset by a change in bitcoin price. We were rewarded 61.2 Bitcoins for the six months ended June 30, 2025 compared to 187.5 Bitcoins for the six months ended June 30, 2024.

Current wording

Cryptocurrency Mining Revenue: Cryptocurrency mining revenue decreased between the nine months ended September 30, 2025 compared to the nine months ended September 30, 2024 related to the Bitcoin halving event that occurred in April 2024, which reduced the block reward by 50%, in addition to aging miners, which was offset by a change in bitcoin price. We were rewarded 85.8 Bitcoins for the nine months ended September 30, 2025 compared to 233.6 Bitcoins for the nine months ended September 30, 2024. The number of coins decreased by 63.3% but the BTC price of a Bitcoin increased 70.2%, therefore offsetting the difference between the nine months.

Previous wording

Cost of Cryptocurrency Mining Revenue, exclusive of depreciation*:* Cost of cryptocurrency mining revenue includes direct utility costs, site overhead expenses, and overhead costs that relate to the operations of our cryptocurrency mining facilities in Kentucky and Texas.

Current wording

Cost of Cryptocurrency Mining Revenue, exclusive of depreciation*:* Cost of cryptocurrency mining revenue includes direct utility costs, site overhead expenses, and overhead costs attributable to the operations of our cryptocurrency mining facilities in Texas.

Previous wording

Cost of data hosting decreased for the three months ended June 30, 2025 compared to the three months ended June 30, 2024 mainly due to a change in hosting contracts mix, in which contracts were entered that included electricity passthrough contracts replacing fixed rate volume contracts.

Current wording

Cost of data hosting decreased for the nine months ended September 30, 2025 compared to the nine months ended September 30, 2024 mainly due to a change in hosting contracts mix, in which contracts were entered that included electricity passthrough contracts replacing fixed rate volume contracts. This decrease was partially offset by the initial energization of the Dorothy 2 facility during the second quarter of 2025 and the subsequent increase in MWs capacity and associated operating costs in the third quarter of 2025.

Previous wording

Depreciation and Amortization associated with general and administrative expenses: Depreciation and amortization expense was comparable for the six months ended June 30, 2025 and six months ended June 30, 2024 in which the balances totaled approximately $4.7 million, respectively. The balances mainly related to amortization expense related to the strategic pipeline contract that was acquired in October 2021.

Current wording

Depreciation and Amortization associated with general and administrative expenses: Depreciation and amortization expense was comparable for the nine months ended September 30, 2025, and 2024, totaling approximately $7.2 million in each period. The expense primarily relates to the amortization of the strategic pipeline contract acquired in October 2021.

Previous wording

Interest expense: Interest expense for the six months ended June 30, 2025 was approximately $2.0 million compared to the $873 thousand for the six months ended June 30, 2024. See table below noting the difference mainly relates to the new loans entered into in fiscal year 2024 and 2025 (June and July SPA, Galaxy Loan, and equipment loan), which includes amortization of deferred financing costs, offset with the payoff of the Navitas loan.

Current wording

Interest expense: Interest expense for the nine months ended September 30, 2025, was approximately $3.2 million, compared to approximately $1.7 million for the nine months ended September 30, 2024. This increase is primarily attributable to the new debt facilities entered into during fiscal years 2024 and 2025, including the June and July Share Purchase Agreements, the Galaxy Loan, the Generate Loan, and the equipment loan. The expense for the current period also includes the amortization of deferred financing costs associated with these new facilities, partially offset by the full payoff of the Navitas loan. Further details on the components of interest expense are presented in the table below.

Previous wording

Gain (Loss) on Debt Extinguishment and Revaluation, net: For the six months ended June 30, 2025, there was a gain on extinguishment of debt of approximately $551 thousand. The gain was in relation to the Assignment and Assumption Agreement for the Additional Notes on March 14, 2025.

Current wording

Gain (Loss) on Debt Extinguishment and Revaluation, net: For the nine months ended September 30, 2025, we recognized a net gain on extinguishment of debt of approximately $10.7 million. The gain primarily related to the settlement of the NYDIG equipment financing loan and related interest obligations in September 2025, as well as the Assignment and Assumption Agreement for the Additional Notes executed on March 14, 2025. These gains were partially offset by a loss on extinguishment resulting from the satisfaction and redemption of the Project Kati equipment loan through the issuance of Class B Membership Interests in Project Kati, which were valued at approximately three and three-tenth times the original borrowing amount.

Previous wording

Net (loss) income attributable to non-controlling interest: We incurred a net loss attributable to non-controlling interest for the three months ended June 30, 2025 compared to a net income attributable to non-controlling interest for the three months ended June 30, 2024. The decrease related mainly due the variances in gross profit related to D1A and D1B noted above due to the halving event in April 2024 and the increase in profit sharing fees for data hosting for the three months ended June 30, 2025, which created an approximate $1.4 million variance between periods in non-controlling interest. In addition, in the second quarter of 2025, D2 began site energization, however, D2 generated greater costs and expenses than revenue, resulting in an additional cost of approximately $705 thousand in non-controlling interest, in which there is no comparable costs for the three months ended June 30, 2024.

Current wording

Net (loss) income attributable to non-controlling interest: We incurred a net loss attributable to non-controlling interest for the nine months ended September 30, 2025 compared to a net income attributable to non-controlling interest for the nine months ended September 30, 2024. The decrease related mainly due the variances in gross profit related to D1A and D1B noted above mainly due to the halving event in April 2024 and the increase in profit sharing fees for data hosting for the nine months ended September 30, 2025, which created an approximate $3.5 million variance between periods in non-controlling interest. In addition, we incurred a loss of approximately $1.7 million associated with the satisfaction of equipment loan through membership interest at Project Kati, in addition Project Kati costs of approximately $608 thousand, in which no revenue had been generated yet for the nine months ended September 30, 2025, and no comparable costs were noted for the nine months ended September 30, 2024. The change at Project Dorothy 2 was a gain of approximately $204 thousand, due to in the second quarter of 2025, D2 began site energization in which costs exceeded the revenue by approximately $1.2 million, however, D2 for the nine months ended September 30, 2024 had a loss on non-controlling interest due to the satisfaction of equipment loan at Project Dorothy 2, creating a loss of approximately $1.4 million.

Previous wording

To supplement our consolidated condensed financial statements included in this quarterly report presented under U.S. generally accepted accounting principles (“GAAP”), we are presenting certain non-GAAP financial measures. We are providing these non-GAAP financial measures to disclose additional information to facilitate the comparison of past and present operations by providing perspective on results absent one-time or significant non-cash items. We utilize these measures in the business planning processto understand expected operating performance and to evaluate results against those expectations. We believe that these non-GAAP financial measures, when considered together with our GAAP financial results, provide management and investors with an additional understanding of our business operating results regarding factors and trends affecting our business and provide a reasonable basis for comparing our ongoing results of operations.

Current wording

To supplement our consolidated condensed financial statements included in this quarterly report presented under U.S. generally accepted accounting principles (“GAAP”), we are presenting certain non-GAAP financial measures. We are providing these non-GAAP financial measures to disclose additional information to facilitate the comparison of past and present operations by providing perspective on results absent one-time or significant non-cash items. We utilize these measures in the business planning process to understand expected operating performance and to evaluate results against those expectations. We believe that these non-GAAP financial measures, when considered together with our GAAP financial results, provide management and investors with an additional understanding of our business operating results regarding factors and trends affecting our business and provide a reasonable basis for comparing our ongoing results of operations.

Previous wording

These non-GAAP financial measures are providedas supplemental measures to our performance measures calculated in accordance with GAAP and therefore, are not intended to be considered in isolation or as a substitute for comparable GAAP measures. Further, these non-GAAP financial measures have no standardized meaning prescribed by GAAP and are not prepared under any comprehensive set of accounting rules or principles. Because of the non-standardized definitions of non-GAAP financial measures, we caution investors that the non-GAAP financial measures as used by us in this quarterly report have limits in their usefulness to investors and may be calculated differently from, and therefore may not be directly comparable to, similarly titled measures used by other companies. Further, investors should be aware that when evaluating these non-GAAP financial measures, these measures should not be construed as an inference that our future results will be unaffected by unusual or non-recurring items. In addition, from time to time in the future there may be items that we may exclude for purposes of our non-GAAP financial measures and we may in the future cease to exclude items that we have historically excluded for purposes of our non-GAAP financial measures. Likewise, we may determine to modify the nature of the adjustments to arrive at our non-GAAP financial measures. Investors should review the non-GAAP reconciliations provided below and not rely on any single financial measure to evaluate our business.

Current wording

These non-GAAP financial measures are provided as supplemental measures to our performance measures calculated in accordance with GAAP and therefore, are not intended to be considered in isolation or as a substitute for comparable GAAP measures. Further, these non-GAAP financial measures have no standardized meaning prescribed by GAAP and are not prepared under any comprehensive set of accounting rules or principles. Because of the non-standardized definitions of non-GAAP financial measures, we caution investors that the non-GAAP financial measures as used by us in this quarterly report have limits in their usefulness to investors and may be calculated differently from, and therefore may not be directly comparable to, similarly titled measures used by other companies. Further, investors should be aware that when evaluating these non-GAAP financial measures, these measures should not be construed as an inference that our future results will be unaffected by unusual or non-recurring items. In addition, from time to time in the future there may be items that we may exclude for purposes of our non-GAAP financial measures, and we may in the future cease to exclude items that we have historically excluded for purposes of our non-GAAP financial measures. Likewise, we may determine to modify the nature of the adjustments to arrive at our non-GAAP financial measures. Investors should review the non-GAAP reconciliations provided below and not rely on any single financial measure to evaluate our business.

Previous wording

As of June 30, 2025, we had a consolidated accumulated deficit of approximately $329.2 million and we had negative working capital of approximately $30.9 million. As of June 30, 2025, we had total debt outstanding of approximately $23.3 million as summarized further below in the Debt table. In addition, we had outstanding commitments related to Soluna Digital Inc. (“SDI”) of approximately $10.1 million in capital expenditures mainly related to Project Dorothy 2 and Project Kati. In addition, due to CloudCo’s termination of the HPE Agreement on March 24, 2025, and HPE’s termination of the HPE Agreement on March 26, 2025, and the acceleration of the remaining unpaid amounts of the contract in accordance with the HPE Agreement, we have recognized a liability for the remainder of the HPE Agreement on the consolidated balance sheet of approximately $19.3 million. As of June 30, 2025, we had $9.9 million of cash available to fund our operations.

Current wording

As of September 30, 2025, we had a consolidated accumulated deficit of approximately $353.2 million and we had positive working capital of approximately $10.2 million, in which was due to significant financings in the third quarter of 2025. As of September 30, 2025, we had total debt outstanding of approximately $23.3 million as summarized further below in the Debt table. In addition, we had outstanding commitments related to Soluna Digital Inc. (“SDI”) of approximately $11.9 million in capital expenditures mainly related to Project Dorothy 2 and Project Kati. In addition, due to CloudCo’s termination of the HPE Agreement on March 24, 2025, and HPE’s termination of the HPE Agreement on March 26, 2025, and the acceleration of the remaining unpaid amounts of the contract in accordance with the HPE Agreement, we have recognized a liability for the remainder of the HPE Agreement on the consolidated balance sheet of approximately $19.3 million. As of September 30, 2025, we had $51.4 million of cash available to fund our operations.

Previous wording

Net cash used in operations was approximately $1.3 million during the six months ended June 30, 2025. The Company had a net loss for the six months ended June 30, 2025 of approximately $15.1 million. Non-cash items included approximately $3.1 million of depreciation expense, and $4.7 million of amortization expenses, and $3.8 million of stock compensation expenses. These non-cash items were offset with a deferred tax benefit of $1.1 million and gain on extinguishment of debt of approximately $551 thousand. The change in asset and liabilities of $3.3 million mainly relates to decrease in other long-term assets of $1.6 million in relation to receipt of Briscoe deposit in January 2025 and $1.0 million in relation to increase in interest payable in relation to NYDIG loan and Galaxy loan. The other changes in assets and liabilities of approximately $700 thousand mainly related to increase in customers deposits and accounts payable related to timing and billing amounts of invoices, offset with payment made to HPE in January.

Current wording

Net cash used in operations was approximately $3.5 million during the nine months ended September 30, 2025. The Company had a net loss for the nine months ended September 30, 2025 of approximately $40.9 million. Non-cash items included approximately $4.9 million of depreciation expense, $7.1 million of amortization expenses, $22.0 million in fair value adjustments mainly related to warrants being exercised, and $5.7 million of stock compensation expenses. These non-cash items were offset with a deferred tax benefit of $1.7 million and gain on extinguishment of debt of approximately $10.7 million. The change in asset and liabilities of $8.4 million mainly relates to increase in accrued expense of $5.2 million in relation to increase in construction fees for Project Kati and Dorothy 2, legal fees, financing costs, and bonus accrual. In addition, there was a $2.0 million increase in accounts payable due to timing and billing of invoices, and a $2.1 million increase in customer deposits due to new contract agreements being entered into. The other changes in assets and liabilities of approximately $885 thousand mainly related to increase in accounts receivable and other current assets related to timing and billing amounts of invoices, in addition with payment made to HPE in January, offset decrease in other long-term assets of $1.6 million in relation to receipt of Briscoe deposit in January 2025.

Previous wording

Net cash used in operations was approximately $3.5 million during the six months ended June 30, 2024. The Company had a net loss for the six months ended June 30, 2024 of approximately $11.7 million. Non-cash items included approximately $3.1 million of depreciation expense and $4.7 million of amortization expenses, $2.0 million of stock compensation expenses, $8.7 million of loss on debt extinguishment and revaluation, $244 thousand in provision for credit losses, and $130 thousand of impairment of fixed assets. These non-cash items were offset with a deferred tax benefit of $1.2 million. The change in asset and liabilities of $9.7 million is mainly due to an increase in prepaid expenses by $10.8 million due to a prepayment of an arrangement with HPE of $10.3 million, an increase in accounts receivable of $486 thousand attributable for demand service revenue and data hosting customer receivables increasing, offset with an increase in accrued expenses and accounts payable of $2.1 million in relation to bonus accruals, NYDIG interest, and Project Dorothy 2 and Kati related bills. The other changes in assets and liabilities were not material.

Current wording

Net cash used by operations was approximately $3.4 million during the nine months ended September 30, 2024. The Company had a net loss for the nine months ended September 30, 2024 of approximately $19.8 million. Non-cash items included approximately $4.6 million of depreciation expense and $7.1 million of amortization expenses, $3.3 million of stock compensation expenses, $7.1 million of loss on debt extinguishment and revaluation, $611 thousand in provision for credit losses, and $179 thousand amortized deferred financing costs. These non-cash items were offset with a deferred tax benefit of $1.8 million. The change in asset and liabilities is mainly due to an increase in prepaid expenses and other long-term assets by $9.2 million due to a prepayment of an arrangement with HPE of $10.3 million that is being amortized over the life of the agreement, an increase in accrued expenses and accounts payable of $4.2 million in relation to bonus accruals, NYDIG interest, and Project Dorothy 2 and Kati related bills. The other changes in assets and liabilities were not material.

Previous wording

Net cash used in investing activities during the six months ended June 30, 2025 was approximately $8.3 million consisting mainly of capital expenditures of $12.4 million offset with a decrease in deposits on equipment of $4.1 million. Net cash used in investing activities during the six months ended June 30, 2024 was approximately $2.2 million consisting mainly of capital expenditures of $278 thousand and increase in deposits on equipment of $2.1 million.

Current wording

Net cash used in investing activities during the nine months ended September 30, 2025 was approximately $18.1 million consisting mainly of capital expenditures of $17.0 million, which consist of additions to property, plant, and equipment offset with transfers from deposits on equipment, and $1.0 million deposit on equipment purchases. Net cash used in investing activities during the nine months ended September 30, 2024 was approximately $7.7 million consisting mainly of capital expenditures of $3.7 million and deposits on equipment purchases of $4.1 million.

Previous wording

Net cash provided by financing activities was approximately $14.3 million for the six months ended June 30, 2025 consisting mainly of $5.3 million of debt issuance proceeds, $4.1 million of net proceeds from SEPA draws and ATM Agreement settlements, and $11.9 million of contributions from non-controlling interest, offset with cash distributions to non-controlling interest members of approximately $3.6 million and payments on debt and deferred financing costs of approximately $3.3 million to the Green Cloud Secured Loan, CloudCo Additional Secured Loan, Navitas term loan, and for deferred financing costs. Net cash provided by financing activities for the six months ended June 30, 2024 was approximately $7.8 million consisting mainly of proceeds from financing of approximately $13.2 million in which $12.5 million was from 2024 secured loan financing and $720 thousand was drawn down for equipment financing. In addition, there was $2.3 million in warrants exercised. Offsetting the net cash provided by financing activities was $5.8 million in cash distributions to non-controlling interest members, and payments of $1.9 million relation to Navitas loan and deferred financing charges.

Current wording

Net cash provided by financing activities was approximately $71.6 million for the nine months ended September 30, 2025 consisting mainly of $18.4 million of debt issuance proceeds, $29.0 million of net proceeds from SEPA draws and ATM Agreement settlements, net proceeds of $4.4 million from the July financing offering, $9.5 million net proceeds from warrant exercises, and $22.1 million of contributions from non-controlling interest, offset with cash distributions to non-controlling interest members of approximately $4.8 million and payments on debt and deferred financing costs of approximately $6.9 million to the Green Cloud Secured Loan, Generate debt issuance costs, Galaxy principal and deferred financing costs, CloudCo Additional Secured Loan, and the Navitas term loan. Net cash provided by financing activities for the nine months ended September 30, 2024 was approximately $12.9 million consisting mainly of proceeds from financing of approximately $14.5 million in which $13.75 million was from 2024 secured loan financing in June and July, and $720 thousand was drawn down for equipment financing. In addition, there was $2.3 million in warrants exercised, as well as $5.1 million in contributions of non-controlling membership interest. Offsetting the net cash provided by financing activities was $6.7 million in cash distributions to non-controlling interest members, and payments of $2.3 million relation to Navitas loan and deferred financing charges.

Previous wording

On June 20, 2024, pursuant to the terms and subject to the conditions of the June SPA by and among (i) CloudCo, (ii) Soluna Cloud, (iii) the Company and (iv) the Investor, CloudCo issued to the Investor a secured promissory note in a principal amount equal to $12.5 million (the “Green Cloud Secured Note”). The Green Cloud Secured Note accrues interest at a rate 9.0% per annum, subject to adjustment upon an event of default. The Green Cloud Secured Note matures on June 20, 2027. On July 12, 2024, the Company, CloudCo, Soluna Cloud, and the Existing Investor entered into a First Amendment to the Note Purchase Agreement. Additional Notes were issued for $1.25 million (“Soluna CloudCo Additional Secured Note”) on July 12, 2024 and are subject to the same terms and conditions as the June SPA financing. On October 1, 2024, CloudCo, Soluna Cloud and the Company entered into assignment and assumption agreements (the “Assignment Agreements”) with the Additional Investors with respect to an aggregate of $1.25 million of notes issued by CloudCo. Pursuant to the Assignment Agreements, the Company will be able to purchase such notes for a purchase price of $750 thousand, or 60% of face value. The assignment and assumption will be effective once all conditions of the agreement are met including fulfilling the purchase price. The assignment and assumption was on March 14, 2025, therefore we extinguished the remaining third party outstanding debt on the Additional Note, and a gain on extinguishment of the debt of approximately $551 thousand was recorded. In relation to the Green Cloud Secured Note, as of June 30, 2025, the Company had an outstanding principal balance of approximately $9.6 million.

Current wording

On June 20, 2024, pursuant to the terms and subject to the conditions of the June SPA by and among (i) CloudCo, (ii) Soluna Cloud, (iii) the Company and (iv) the Investor, CloudCo issued to the Investor a secured promissory note in a principal amount equal to $12.5 million (the “Green Cloud Secured Note”). The Green Cloud Secured Note accrues interest at a rate 9.0% per annum, subject to adjustment upon an event of default. The Green Cloud Secured Note matures on June 20, 2027. On July 12, 2024, the Company, CloudCo, Soluna Cloud, and the Existing Investor entered into a First Amendment to the Note Purchase Agreement. Additional Notes were issued for $1.25 million (“Soluna CloudCo Additional Secured Note”) on July 12, 2024 and are subject to the same terms and conditions as the June SPA financing. On October 1, 2024, CloudCo, Soluna Cloud and the Company entered into assignment and assumption agreements (the “Assignment Agreements”) with the Additional Investors with respect to an aggregate of $1.25 million of notes issued by CloudCo. Pursuant to the Assignment Agreements, the Company will be able to purchase such notes for a purchase price of $750 thousand, or 60% of face value. The assignment and assumption will be effective once all conditions of the agreement are met including fulfilling the purchase price. The assignment and assumption was on March 14, 2025, therefore we extinguished the remaining third-party outstanding debt on the Additional Note, and a gain on extinguishment of the debt of approximately $551 thousand was recorded. In relation to the Green Cloud Secured Note, as of September 30, 2025, the Company had an outstanding principal balance of approximately $8.5 million.

Showing the first 40 of 43 pairs. Open the source sections for the rest.

Rearranged previous paragraphs (2)

Previous report — wording carried elsewhere

Cost of data hosting decreased for the six months ended June 30, 2025 compared to the six months ended June 30, 2024 mainly due to a change in hosting contracts mix, in which contracts were entered that included electricity passthrough contracts replacing fixed rate volume contracts.

Previous report — wording carried elsewhere

Net (loss) income attributable to non-controlling interest: We incurred a net loss attributable to non-controlling interest for the six months ended June 30, 2025 compared to a net income attributable to non-controlling interest for the six months ended June 30, 2024. The decrease related mainly due the variances in gross profit related to D1A and D1B noted above mainly due to the halving event in April 2024 and the increase in profit sharing fees for data hosting for the six months ended June 30, 2025, which created an approximate $3.6 million variance between periods in non-controlling interest. In addition, in the second quarter of 2025, D2 began site energization, however, D2 generated greater costs and expenses than revenue, resulting in an additional cost of approximately $1.0 million in non-controlling interest, in which there is no comparable costs for the six months ended June 30, 2024.