AIRO Group Holdings, Inc.
For the period ended Sep 30, 2025. Filed Nov 14, 2025.
View on SEC.govAbout this filing
A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.
Sep 30, 2025 · Filed Nov 14, 2025
What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-Q
Period ended 2025-06-30; filed 2025-08-13.
0001641172-25-023610
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsCurrent report: 10-Q
Period ended 2025-09-30; filed 2025-11-14.
0001493152-25-023461
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 159 previous paragraphs and 159 current paragraphs.
119 unchanged; 32 reworded; 8 added; 7 removed; 1 previous and 0 current paragraphs rearranged.
Tables are not compared: 10 previous and 9 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (8)
Current report
Initial Public Offering, Follow-on Offering and Repurchase
Current report
On September 12, 2025, the Company completed its Follow-on Offering of 4.8 million shares of its common stock, which included an additional 0.6 million shares of common stock pursuant to the full exercise of the underwriters’ option to purchase additional shares, at an offering price of $18.50 per share. The net proceeds to AIRO from the Follow-on Offering, after deducting $6.8 million of underwriting discounts and commissions were $82.6 million.
Current report
On September 12, 2025, the Company repurchased 1.1 million shares, which included an additional 0.1 million shares of common stock as a result of the underwriters’ option described above, from certain existing shareholders, including certain directors and executive officers and their affiliates at an offering price of $17.39 per share. The proceeds to shareholders paid were $19.4 million.
Current report
During the quarter ended September 30, 2025, a key customer requested a configuration change to dual-band antennas on certain RQ-35 systems. Under our revenue recognition policy, transfer of control had not occurred for the affected units as of September 30, 2025. We are qualifying additional antenna suppliers and are implementing dual-sourcing to reduce component risk. The antenna update also requires incremental retrofit and related services which are accounted for as a separate performance obligation.
Current report
Three and Nine Months Ended September 30, 2025 and 2024
Current report
For the three months ended September 30, 2025 compared to 2024, the $17.4 million decrease in revenue was due to a $17.8 million decrease in the Drones segment and a $0.5 million decrease in the Avionics segment partially offset by a $0.9 million increase in the Training segment. For the nine months ended September 30, 2025 compared to 2024, the $4.6 million decrease in revenue was due to a $3.7 million decrease in the Drones segment and a $2.0 million decrease in the Avionics segment partially offset by a $1.2 million increase in the Training segment. The Drones decline was driven primarily by shipment timing as the planned third quarter deliveries were delayed after a key customer requested a configuration change to dual-band antennas. Our incumbent supplier was unable to provide the required units in time to complete deliveries scheduled to be delivered during the quarter ended September 30, 2025. Avionics revenue reflects deliberate sequencing of R&D and commercialization activities during the period to prioritize drone production. Training revenue continues to reflect deferred aircraft acquisitions; the segment benefited from a biennial government contract with higher margins associated with ground target vehicle programs. Following the Company’s completed equity offerings, we have begun reinitiating targeted investments in Avionics and Training.
Current report
For the three months ended September 30, 2025 compared to 2024, general and administrative expense increased $5.2 million primarily due to a $4.1 million increase in corporate costs such rent, insurance, and recruiting fees as well as $1.3 million of compensation and $0.9 million of equity compensation.
Current report
The Company is evaluating opportunistic debt financing to support growth initiatives; any proceeds, if obtained, would be used to expand our market position, pursue strategic opportunities, and support revenue growth and long-term profitability.
Removed paragraphs (7)
Previous report
Initial Public Offering
Previous report
U.S. Government’s Continuing Resolution
Previous report
In March 2025, President Trump signed a continuing resolution that funds federal agencies through September 30, 2025. A continuing resolution authorizes federal agencies to operate generally at the same funding levels from the prior year, but typically does not authorize new spending initiatives during this period. If Congress is unable to enact formal fiscal year 2026 appropriation bills by September 30, 2025, it may pass another continuing resolution. However, if Congress fails to pass the formal appropriations bills or a continuing resolution, then the U.S. government would shut down during which federal agencies would cease all non-essential functions.
Previous report
In the event of a U.S. government shutdown, our business, program performance and results of operations could be impacted by the resulting disruptions to federal government offices, workers, and operations, including risks relating to the funding of certain programs, stop work orders, as well as delays in contract awards, new program starts, payments for work performed, and other actions. We also may experience similar impacts in the event of an extended period of continuing resolutions. Generally, the significance of these impacts will primarily be based on the length of the continuing resolution or shutdown.
Previous report
Three and Six Months Ended June 30, 2025 and 2024
Previous report
For the three months ended June 30, 2025 compared to 2024, the $14.8 million increase in revenue was due to a $15.0 million increase in the Drones segment and a $0.5 million increase in the Training segment offset by a $0.8 million decrease in the Avionics segment. For the six months ended June 30, 2025 compared to 2024, the $12.8 million increase in revenue was due to a $14.1 million increase in the Drones segment and a $0.3 million increase in the Training segment offset by a $1.5 million decrease in the Avionics segment. The increase in revenue in the Drones segment was due to the continued success of market entry strategies that target NATO member countries that have resulted in increased shipments. The increase in the Training segment was largely due to a specific government contract which occurs every two years that has higher profit margins as we provide training using ground target vehicles. The decrease in revenue in the Avionics segment reflects our strategic decision to delay investments in R&D and the commercialization of higher-margin products, particularly those targeting the general aviation and multi-engine aircraft markets, while prioritizing resources toward drone production. Training segment revenue continues to be impacted by our decision to defer aircraft acquisitions necessary to conduct certain programs as we focus capital on scaling our drone operations in response to growing market demand. We expect to resume investment in the Avionics and Training segments now that we have completed our initial public offering.
Previous report
The Company is opportunistically pursuing additional capital through equity or debt financing to support growth initiatives. Management believes the Company’s current liquidity is sufficient to fund ongoing operations for at least the next twelve months. Any additional capital, if raised, would be directed toward expanding the Company’s market position, pursuing strategic opportunities, and supporting revenue growth and long-term profitability.
Reworded paragraphs (32)
Previous wording
The following discussion and analysis of our financial condition and results of operations should be read in conjunction with the audited consolidated financial statements as of December 31, 2024 and 2023 and for each of the two years in the period ended December 31, 2024, together with related notes thereto, included in the Company’s final prospectus, dated June 12, 2025, filed with the SEC pursuant to Rule 424(b) under the Securities Act of 1933, as amended (the “Securities Act”), on June 16, 2025 (the “Prospectus”), and the unaudited condensed consolidated financial statements as of June 30, 2025 and for the three and six-month periods ended June 30, 2025 and 2024 included in this Quarterly Report on Form 10-Q, which have been prepared in accordance with GAAP. Some of the information contained in this discussion and analysis includes forward-looking statements that involve risks and uncertainties. You should review the sections titled “Note Regarding Forward-Looking Statements” and “Risk Factors” in this Quarterly Report on Form 10-Q for a discussion of forward-looking statements and important factors that could cause actual results to differ materially from the results described in or implied by the forward-looking statements contained in the following discussion and analysis.
Current wording
The following discussion and analysis of our financial condition and results of operations should be read in conjunction with the audited consolidated financial statements as of December 31, 2024 and 2023 and for each of the two years in the period ended December 31, 2024, together with related notes thereto, included in the Company’s final prospectus, dated June 12, 2025, filed with the SEC pursuant to Rule 424(b) under the Securities Act of 1933, as amended (the “Securities Act”), on June 16, 2025 (the “Prospectus”), and the unaudited condensed consolidated financial statements as of September 30, 2025 and for the three and nine-month periods ended September 30, 2025 and 2024 included in this Quarterly Report on Form 10-Q, which have been prepared in accordance with GAAP. Some of the information contained in this discussion and analysis includes forward-looking statements that involve risks and uncertainties. You should review the sections titled “Note Regarding Forward-Looking Statements” and “Risk Factors” in this Quarterly Report on Form 10-Q for a discussion of forward-looking statements and important factors that could cause actual results to differ materially from the results described in or implied by the forward-looking statements contained in the following discussion and analysis.
Previous wording
On June 16, 2025, we completed the initial public offering of 6.9 million shares of our common stock (the “IPO”), which included an additional 0.9 million shares of common stock pursuant to the full exercise of the underwriters’ option to purchase additional shares, at an initial public offering price of $10.00 per share. Our common stock began trading on the Nasdaq Global Market under the ticker symbol “AIRO” on June 13, 2025. The net proceeds to AIRO from the IPO, after deducting $7.5 million of underwriting discounts and commissions, and issuance costs paid were $61.5 million.
Current wording
On June 16, 2025, we completed the initial public offering of 6.9 million shares of our common stock (the “IPO”), which included an additional 0.9 million shares of common stock pursuant to the full exercise of the underwriters’ option to purchase additional shares, at an initial public offering price of $10.00 per share. Our common stock began trading on the Nasdaq Global Market under the ticker symbol “AIRO” on June 13, 2025. The net proceeds to AIRO from the IPO, after deducting $10.7 million of underwriting discounts and commissions, and issuance costs paid were $58.3 million.
Previous wording
We acquired Agile Defense on February 25, 2022, pursuant to the terms and conditions of an Agreement and Plan of Merger by and among Agile Defense, AIRO Group, Inc., n/k/a Old AGI, Inc., a Delaware corporation (“Legacy AIRO”), us, Agile Defense Merger Sub, LLC, and Joseph Burns as target representative, dated as of October 6, 2021, as amended, in exchange for consideration in the form of a promissory note in the amount of $2.3 million (the “Agile Defense Promissory Note”). The Agile Defense Promissory Note bears no interest and was originally payable within five business days following the commencement of public trading of our common stock. On October 2, 2023, the parties signed a promissory note termination agreement (the “Agile Defense Promissory Note Termination Agreement”) whereby six of the seven note holders agreed to convert $1.4 million of the principal owed to them under the Agile Defense Promissory Note into 34,360 shares of our common stock immediately prior to the closing of the BCA Transactions, with the remaining principal of $0.2 million owed to such holders to be paid at the closing of the BCA Transactions. Given that the BCA Transactions were not consummated, in connection with the closing of the IPO, we issued 34,360 shares of our common stock to partially satisfy our obligations pursuant to the Agile Defense Promissory Note Termination Agreement and used proceeds of $0.8 million from the IPO to satisfy our obligations to the remaining holder under the Agile Defense Promissory Note during the quarter ended June 30, 2025. In July 2025, we used proceeds of $0.2 million to satisfy the remaining obligations to the holders pursuant to the Agile Defense Promissory Note Termination Agreement.
Current wording
We acquired Agile Defense on February 25, 2022, pursuant to the terms and conditions of an Agreement and Plan of Merger by and among Agile Defense, AIRO Group, Inc., n/k/a Old AGI, Inc., a Delaware corporation (“Legacy AIRO”), us, Agile Defense Merger Sub, LLC, and Joseph Burns as target representative, dated as of October 6, 2021, as amended, in exchange for consideration in the form of a promissory note in the amount of $2.3 million (the “Agile Defense Promissory Note”). The Agile Defense Promissory Note bears no interest and was originally payable within five business days following the commencement of public trading of our common stock. On October 2, 2023, the parties signed a promissory note termination agreement (the “Agile Defense Promissory Note Termination Agreement”) whereby six of the seven note holders agreed to convert $1.4 million of the principal owed to them under the Agile Defense Promissory Note into 34,360 shares of our common stock immediately prior to the closing of the BCA Transactions, with the remaining principal of $0.2 million owed to such holders to be paid at the closing of the BCA Transactions. Given that the BCA Transactions were not consummated, in connection with the Closing, we issued 34,360 shares of our common stock to satisfy our obligations pursuant to the Agile Defense Promissory Note Termination Agreement and used proceeds of $1.0 million from the IPO to satisfy our obligations to the remaining holder under the Agile Defense Promissory Note during the nine months ended September 30, 2025.
Previous wording
We acquired AIRO Drone on February 25, 2022, pursuant to the terms and conditions of an Agreement and Plan of Merger by and among AIRO Drone, Legacy AIRO, us, AIRO Drone Merger Sub, LLC and Joseph Burns as target representative, dated as of October 6, 2021, as amended, in exchange for consideration in the form of a promissory note in the amount of $2.1 million (the “AIRO Drone Promissory Note”). The AIRO Drone Promissory Note bears no interest and was originally payable within five business days following the commencement of public trading of our common stock. On October 2, 2023, the parties signed a promissory note termination agreement (the “AIRO Drone Promissory Note Termination Agreement”) whereby nine of the ten note holders agreed to convert approximately $1.5 million of the principal owed to them under the AIRO Drone Promissory Note into 37,080 shares of our common stock immediately prior to the closing of the BCA Transactions, with the remaining principal of $0.2 million owed to such holders to be paid at the closing of the BCA Transactions. Given that the BCA Transactions were not consummated, in connection with the closing of the IPO, we issued 37,080 shares of our common stock to partially satisfy our obligations pursuant to the AIRO Drone Promissory Note Termination Agreement and used proceeds of $0.4 million from the IPO to satisfy our obligations to the remaining holder under the AIRO Drone Promissory Note and the other holders pursuant to the AIRO Drone Promissory Note Termination Agreement during the quarter ended June 30, 2025. In July 2025, we used proceeds of $0.2 million to satisfy the remaining obligations to the holders pursuant to the AIRO Drone Promissory Note Termination Agreement.
Current wording
We acquired AIRO Drone on February 25, 2022, pursuant to the terms and conditions of an Agreement and Plan of Merger by and among AIRO Drone, Legacy AIRO, us, AIRO Drone Merger Sub, LLC and Joseph Burns as target representative, dated as of October 6, 2021, as amended, in exchange for consideration in the form of a promissory note in the amount of $2.1 million (the “AIRO Drone Promissory Note”). The AIRO Drone Promissory Note bears no interest and was originally payable within five business days following the commencement of public trading of our common stock. On October 2, 2023, the parties signed a promissory note termination agreement (the “AIRO Drone Promissory Note Termination Agreement”) whereby nine of the ten note holders agreed to convert approximately $1.5 million of the principal owed to them under the AIRO Drone Promissory Note into 37,080 shares of our common stock immediately prior to the closing of the BCA Transactions, with the remaining principal of $0.2 million owed to such holders to be paid at the closing of the BCA Transactions. Given that the BCA Transactions were not consummated, in connection with the Closing, we issued 37,080 shares of our common stock to satisfy our obligations pursuant to the AIRO Drone Promissory Note Termination Agreement and used proceeds of $0.6 million from the IPO to satisfy our obligations to the remaining holder under the AIRO Drone Promissory Note and the other holders pursuant to the AIRO Drone Promissory Note Termination Agreement during the nine months ended September 30, 2025.
Previous wording
We acquired Jaunt on March 10, 2022, pursuant to the terms and conditions of an Agreement and Plan of Merger by and among Jaunt, Legacy AIRO, us, Jaunt Merger Sub, LLC and Martin Peryea as member representative, dated as of October 6, 2021, as amended, in exchange for consideration in the form of 3,143,001 shares of our common stock. As part of this acquisition, we acquired a contingent obligation originating from Jaunt’s acquisition of certain patents, licenses, and other intellectual property from Carter Aviation, a former member of Jaunt, in April 2019 (the “Jaunt Contingent Arrangement”). Under the Jaunt Contingent Arrangement, 10% of any cash receipt, including all income, receipts, proceeds, debt or equity investment, earnings, sales, or winnings, up to $50 million is payable to Carter Aviation. As of the acquisition date, $49.6 million in future payments remained on this obligation. The original terms of the Jaunt Contingent Arrangement provided that upon the completion of a business combination, the contingent consideration assumed from Jaunt would be replaced by promissory notes, the first of which would be for $23.0 million due one day after the closing of such business combination, and the second would be for the remaining portion of the contingent consideration and would be paid over three years subsequent to such closing. On October 27, 2023, we signed a satisfaction of indebtedness and satisfaction of covenant agreement (the “Jaunt Satisfaction of Indebtedness and Satisfaction of Covenant Agreement”), whereby the holder agreed to convert $44.6 million of the obligations owed to it as part of the Jaunt acquisition into 1,122,437 shares of our common stock immediately prior to the closing of the BCA Transactions, with the remaining portion of the contingent consideration of $5.0 million owed to such holders to be paid at the closing of the BCA Transactions. Given that the BCA Transactions were not consummated, in connection with the closing of the IPO, we issued 1,122,437 shares of our common stock to partially satisfy our obligations pursuant to the Jaunt Satisfaction of Indebtedness and Satisfaction of Covenant Agreement during the quarter ended June 30, 2025. In July 2025, we used proceeds of $3.9 million from the IPO to partially satisfy our obligations to the holders under the Jaunt Satisfaction of Indebtedness and Satisfaction of Covenant Agreement and signed an agreement to fund the remaining $1.1 million, subject to 10% per year in interest, on September 10, 2025.
Current wording
We acquired Jaunt on March 10, 2022, pursuant to the terms and conditions of an Agreement and Plan of Merger by and among Jaunt, Legacy AIRO, us, Jaunt Merger Sub, LLC and Martin Peryea as member representative, dated as of October 6, 2021, as amended, in exchange for consideration in the form of 3,143,001 shares of our common stock. As part of this acquisition, we acquired a contingent obligation originating from Jaunt’s acquisition of certain patents, licenses, and other intellectual property from Carter Aviation, a former member of Jaunt, in April 2019 (the “Jaunt Contingent Arrangement”). Under the Jaunt Contingent Arrangement, 10% of any cash receipt, including all income, receipts, proceeds, debt or equity investment, earnings, sales, or winnings, up to $50 million is payable to Carter Aviation. As of the acquisition date, $49.6 million in future payments remained on this obligation. The original terms of the Jaunt Contingent Arrangement provided that upon the completion of a business combination, the contingent consideration assumed from Jaunt would be replaced by promissory notes, the first of which would be for $23.0 million due one day after the closing of such business combination, and the second would be for the remaining portion of the contingent consideration and would be paid over three years subsequent to such closing. On October 27, 2023, we signed a satisfaction of indebtedness and satisfaction of covenant agreement (the “Jaunt Satisfaction of Indebtedness and Satisfaction of Covenant Agreement”), whereby the holder agreed to convert $44.6 million of the obligations owed to it as part of the Jaunt acquisition into 1,122,437 shares of our common stock immediately prior to the closing of the BCA Transactions, with the remaining portion of the contingent consideration of $5.0 million owed to such holders to be paid at the closing of the BCA Transactions. Given that the BCA Transactions were not consummated, in connection with the Closing, we issued 1,122,437 shares of our common stock and funded $5.0 million to satisfy our obligations pursuant to the Jaunt Satisfaction of Indebtedness and Satisfaction of Covenant Agreement during the nine months ended September 30, 2025.
Previous wording
We acquired Sky-Watch on March 28, 2022, pursuant to the terms and conditions of an Equity Purchase Agreement by and among Sky-Watch, Legacy AIRO, us, Dangroup ApS and Mekan I/S v/Per Pedersen & Claus Bo Jensen, dated as of October 6, 2021, as amended, in exchange for consideration in the form of a promissory note in the amount of $12.9 million (the “Sky-Watch Promissory Note”), 524,064 shares of our common stock and an earnout of up to $6.5 million based on performance commencing on the closing date of the acquisition through June 2024. The $6.5 million earnout was made up of $3 million that was payable on a dollar-for-dollar basis on revenue earned within the first two-year anniversary of the acquisition and $3.5 million would become due and payable if Sky-Watch earns a minimum of $13.8 million in revenue during the period from the acquisition date through June 2024. In December 2022, the Equity Purchase Agreement was amended to increase the second earnout amount from $3.5 million to $7.5 million and to extend the earnout period to include the full fiscal year periods of 2022 through 2024. In March 2023, the Equity Purchase Agreement was further amended to add a third earnout of $4.0 million if revenue during the full fiscal year periods of 2022 through 2024 reaches $17.0 million. In March 2024, the parties further amended the Equity Purchase Agreement, pursuant to which the former shareholders of Sky-Watch became eligible for an additional earnout of $1.0 million if Sky-Watch achieves earnings before interest, taxes, depreciation and amortization (“EBITDA”) of DKK 127,107,500 or above for fiscal year 2024. On June 28, 2024, the parties signed an amendment to the promissory notes (the “Sky-Watch Promissory Note Amendment”) whereby (i) the remaining principal of $5.7 million payable within five business days of the date that we or our successor closes one or more financing transactions with an aggregate value of at least $35.0 million and (ii) the remaining earnout liability is payable within five business days following the date that the we, or our successor, closes one or more financing transactions with an aggregate value of at least $45.0 million with interest continuing to accrue on the earned but unpaid earnout amounts at the federal discount rate plus 5.0%, compounded quarterly. In December 2024, we made a $13.9 million payment which resulted in a remaining balance of $3.1 million as of December 31, 2024. During the quarter ended June 30, 2025, we funded $2.3 million and funded the remaining $1.0 million related to the final earnout in July 2025.
Current wording
We acquired Sky-Watch on March 28, 2022, pursuant to the terms and conditions of an Equity Purchase Agreement by and among Sky-Watch, Legacy AIRO, us, Dangroup ApS and Mekan I/S v/Per Pedersen & Claus Bo Jensen, dated as of October 6, 2021, as amended, in exchange for consideration in the form of a promissory note in the amount of $12.9 million (the “Sky-Watch Promissory Note”), 524,064 shares of our common stock and an earnout of up to $6.5 million based on performance commencing on the closing date of the acquisition through June 2024. The $6.5 million earnout was made up of $3 million that was payable on a dollar-for-dollar basis on revenue earned within the first two-year anniversary of the acquisition and $3.5 million would become due and payable if Sky-Watch earns a minimum of $13.8 million in revenue during the period from the acquisition date through June 2024. In December 2022, the Equity Purchase Agreement was amended to increase the second earnout amount from $3.5 million to $7.5 million and to extend the earnout period to include the full fiscal year periods of 2022 through 2024. In March 2023, the Equity Purchase Agreement was further amended to add a third earnout of $4.0 million if revenue during the full fiscal year periods of 2022 through 2024 reaches $17.0 million. In March 2024, the parties further amended the Equity Purchase Agreement, pursuant to which the former shareholders of Sky-Watch became eligible for an additional earnout of $1.0 million if Sky-Watch achieves earnings before interest, taxes, depreciation and amortization (“EBITDA”) of DKK 127,107,500 or above for fiscal year 2024. On June 28, 2024, the parties signed an amendment to the promissory notes (the “Sky-Watch Promissory Note Amendment”) whereby (i) the remaining principal of $5.7 million payable within five business days of the date that we or our successor closes one or more financing transactions with an aggregate value of at least $35.0 million and (ii) the remaining earnout liability is payable within five business days following the date that the we, or our successor, closes one or more financing transactions with an aggregate value of at least $45.0 million with interest continuing to accrue on the earned but unpaid earnout amounts at the federal discount rate plus 5.0%, compounded quarterly. In December 2024, we made a $13.9 million payment which resulted in a remaining balance of $3.1 million as of December 31, 2024. During the nine months ended September 30, 2025, we funded $3.2 million to satisfy our obligations under these agreements.
Previous wording
We acquired Aspen Avionics on April 1, 2022, pursuant to the terms and conditions of an Agreement and Plan of Merger (the “Aspen Merger Agreement”) by and among Aspen, Legacy AIRO, us, Aspen Merger Sub, Inc. and John Uczekaj as target representative, dated as of October 6, 2021, as amended, in exchange for consideration in the form of 1,515,151 shares of our common stock. As part of this transaction, we agreed to assume $25.3 million of obligations, which primarily included $19.4 million related to the Aspen Notes, $2.9 million related to the Aspen Carveout Contingency and $1.9 million attributable to future allowable services or to be payable to the former Aspen Avionics shareholders at the closing of the IPO (“Aspen Contingent Debt”).
Current wording
We acquired Aspen Avionics on April 1, 2022, pursuant to the terms and conditions of an Agreement and Plan of Merger (the “Aspen Merger Agreement”) by and among Aspen, Legacy AIRO, us, Aspen Merger Sub, Inc. and John Uczekaj as target representative, dated as of October 6, 2021, as amended, in exchange for consideration in the form of 1,515,151 shares of our common stock. As part of this transaction, we agreed to assume $25.3 million of obligations, which primarily included $19.4 million related to the Aspen Notes, $2.9 million related to the Aspen Carveout Contingency and $1.9 million attributable to future allowable services or to be payable to the former Aspen Avionics shareholders at the Closing (“Aspen Contingent Debt”).
Previous wording
On October 6, 2023, we signed a satisfaction of indebtedness and satisfaction of covenant agreement (the “Aspen Satisfaction of Indebtedness and Satisfaction of Covenant Agreement”), whereby all of the holders agreed to convert various amounts due, which included $17.5 million under the Aspen Notes, $0.8 million related to the cash portion of Aspen Carveout Contingency, and $1.7 million attributable to the Aspen Contingent Debt into 440,584 shares, 43,512 shares and 20,010 shares, respectively, of our common stock immediately prior to the closing of the BCA Transactions, with the remaining amount of $2.2 million owed to such holders to be paid at the closing of the BCA Transactions. The 2021 Management Carveout Plan also provides for a $2.0 million Aspen Carveout Stock Obligation which equates to 51,309 shares that is also due at the closing of a business combination. Given that the BCA Transactions were not consummated, in connection with the closing of the IPO, we issued an aggregate of 484,096 shares of our common stock to partially satisfy our obligations to the holders under the Aspen Satisfaction of Indebtedness and Satisfaction of Covenant Agreement. During July 2025, we issued the 71,319 shares of our common stock based on the amended Satisfaction of Indebtedness and Satisfaction of Covenant Agreement dated June 30, 2025 and used proceeds of $0.1 million to satisfy our obligations to the participants in the Aspen Carveout Plan. During August 2025, we funded $1.5 million of the $1.9 million remaining balance of the Aspen Bridge Notes and signed an agreement to fund the remaining $0.2 million related to the Aspen Contingent Debt by October 1, 2025.
Current wording
On October 6, 2023, we signed a satisfaction of indebtedness and satisfaction of covenant agreement (the “Aspen Satisfaction of Indebtedness and Satisfaction of Covenant Agreement”), whereby all of the holders agreed to convert various amounts due, which included $17.5 million under the Aspen Notes, $0.8 million related to the cash portion of Aspen Carveout Contingency, and $1.7 million attributable to the Aspen Contingent Debt into 440,584 shares, 43,512 shares and 20,010 shares, respectively, of our common stock immediately prior to the closing of the BCA Transactions, with the remaining amount of $2.2 million owed to such holders to be paid at the closing of the BCA Transactions. The 2021 Management Carveout Plan also provides for a $2.0 million Aspen Carveout Stock Obligation which equates to 51,309 shares that is also due at the closing of a business combination. Given that the BCA Transactions were not consummated, in connection with the Closing, during the nine months ended September 30, 2025, we issued an aggregate of 484,096 shares of our common stock to partially satisfy our obligations to the holders under the Aspen Satisfaction of Indebtedness and Satisfaction of Covenant Agreement. During July 2025, we issued the 71,319 shares of our common stock based on the amended Satisfaction of Indebtedness and Satisfaction of Covenant Agreement dated June 30, 2025 and used proceeds of $0.1 million to satisfy our obligations to the participants in the Aspen Carveout Plan. During the nine months ended September 30, 2025, we funded $1.9 million of the Aspen Bridge Notes and signed an agreement to fund the remaining $0.2 million related to the Aspen Contingent Debt by December 1, 2025.
Previous wording
We acquired CDI on April 26, 2022, pursuant to the terms and conditions of an Agreement and Plan of Merger by and among CDI, Legacy AIRO, us, Coastal Merger Sub, Inc. and Jeffrey Parker as target representative, dated as of October 6, 2021, as amended, in exchange for consideration in the form of a promissory note in the amount of $10.1 million (the “CDI Promissory Note”) and 1,069,514 shares of our common stock. The CDI Promissory Note bears no interest and was originally payable within five business days following the commencement of public trading of our common stock. On October 17, 2023, the parties signed a promissory note termination agreement (the “CDI Promissory Note Termination Agreement”), as amended on March 7, 2025, whereby all of the holders agreed to convert $8.1 million of the principal owed to them under the CDI Promissory Note into 203,707 shares of our common stock immediately prior to the closing of an initial public offering, with the remaining principal of $2.0 million owed to such holders to be paid at the closing of an initial public offering. During the quarter ended June 30, 2025, we issued 203,707 shares and funded $2.0 million to fully satisfy our obligations to the holders of the CDI Promissory Note Termination Agreement.
Current wording
We acquired CDI on April 26, 2022, pursuant to the terms and conditions of an Agreement and Plan of Merger by and among CDI, Legacy AIRO, us, Coastal Merger Sub, Inc. and Jeffrey Parker as target representative, dated as of October 6, 2021, as amended, in exchange for consideration in the form of a promissory note in the amount of $10.1 million (the “CDI Promissory Note”) and 1,069,514 shares of our common stock. The CDI Promissory Note bears no interest and was originally payable within five business days following the commencement of public trading of our common stock. On October 17, 2023, the parties signed a promissory note termination agreement (the “CDI Promissory Note Termination Agreement”), as amended on March 7, 2025, whereby all of the holders agreed to convert $8.1 million of the principal owed to them under the CDI Promissory Note into 203,707 shares of our common stock immediately prior to the closing of an initial public offering, with the remaining principal of $2.0 million owed to such holders to be paid at the closing of an initial public offering. During the nine months ended September 30, 2025, we issued 203,707 shares and funded $2.0 million to fully satisfy our obligations to the holders of the CDI Promissory Note Termination Agreement.
Previous wording
1 IPO contingencies are made up of $1.0 million related to Kipps, $0.8 million related to the legal settlement, $0.5 million legal accrual, $0.2 million for NGA, $0.3 million bonus, $0.6 million Aspen contingent debt, $0.1 million cash portion of the Aspen carve-out, net of a $1.4 million gain on deferred compensation.
Current wording
1 IPO contingencies for the three months ended September 30, 2025 are made up of a $1.2 million charge related to the Libertas warrants, net of a $4.5 million gain on deferred compensation. IPO contingencies for the nine months ended September 30, 2025 are made up of $1.0 million related to Kipps, $0.8 million related to the legal settlement, $0.5 million legal accrual, $0.2 million for NGA, $0.3 million bonus, $0.6 million Aspen contingent debt, $1.2 million charge related to the Libertas warrants, $0.1 million cash portion of the Aspen carve-out, net of a $5.9 million gain on deferred compensation.
Previous wording
The following table shows our consolidated financial results for the three and six months ended June 30, 2025 and 2024:
Current wording
The following table shows our consolidated financial results for the three and nine months ended September 30, 2025 and 2024:
Previous wording
For the three months ended June 30, 2025 compared to 2024, cost of revenue increased by $5.5 million primarily due to a $6.0 million and a $0.1 million increase in cost of revenue within the Drones and Training segment, respectively, offset by a decrease of $0.6 million within the Avionics segment. Gross margin was 61.2% during the three months ended June 30, 2025 compared to 59.0% during the same period in 2024. This 2.2% point increase in gross margin was primarily attributable to a 30.5% increase in the Training segment margin due to the higher profitability of the ground target vehicles contract and a 7.2% increase in the Avionics segment margin due to favorable operating variances. These increases were offset by an 8.7% decrease in the margin within the Drones segment primarily due to product discounting and the mix of products sold during the period.
Current wording
For the three months ended September 30, 2025 compared to 2024, cost of revenue decreased by $3.9 million primarily due to a $4.3 million and a $0.4 million decrease in cost of revenue within the Drones and Avionics segments, respectively, offset by an increase of $0.7 million in cost of revenue within the Training segment. Gross margin was 44.4% during the three months ended September 30, 2025 compared to 68.7% during the same period in 2024. This 24.3% point decrease in gross margin was primarily attributable to an 8.4% decrease in the margin within the Drones segment primarily due to product discounting and the mix of products sold during the period. The Training segment margin increased 4.7% due to the higher profitability of the ground target vehicles contract and the Avionics segment had a 2.5% increase in margin due to favorable operating variances.
Previous wording
For the six months ended June 30, 2025 compared to 2024, cost of revenue increased by $5.1 million primarily due to a $6.1 million and a $0.1 million increase in cost of revenue within the Drones and Training segment, respectively, offset by a decrease of $1.1 million within the Avionics segment. Gross margin remained relatively flat at approximately 60.4% and 60.6% during the six months ended June 30, 2025 and 2024, respectively, with the increases in margins within the Training and Avionics segment being partially offset by the decrease in the Drones segment margin as discussed above.
Current wording
For the nine months ended September 30, 2025 compared to 2024, cost of revenue increased by $1.2 million primarily due to a $1.8 million and a $0.9 million increase in cost of revenue within the Drones and Training segments, respectively, offset by a decrease of $1.5 million within the Avionics segment. Gross margin decreased from 64.7% to 58.1% during the nine months ended September 30, 2025 and 2024, respectively, with the decrease in the Drones segment margin partially offset by increases in margins within the Training and Avionics segments as discussed above.
Previous wording
For the three months ended June 30, 2025 compared to 2024, R&D expense increased $0.9 million primarily due to a $1.1 million increase in personnel costs within the Drones segment with offsetting decreases in personnel costs within the Electric Air Mobility and Avionics segments. For the six months ended June 30, 2025 compared to 2024, R&D expense increased $1.5 million primarily due to a $1.7 million increase in personnel costs within the Drones segment with offsetting decreases in personnel costs within the Electric Air Mobility and Avionics segments.
Current wording
For the three months ended September 30, 2025 compared to 2024, R&D expense increased $0.9 million primarily due to a $0.6 million increase and a $0.3 million increase within the Drones segment and Avionics segment, respectively. For the nine months ended September 30, 2025 compared to 2024, R&D expense increased $2.3 million primarily due to increases within the Drones segment. Increases within the Drones segment were primarily due to increased personnel and other costs.
Previous wording
For the three months ended June 30, 2025 compared to 2024, sales and marketing expense increased $0.3 million primarily due to a $0.3 million increase in personnel costs within the Drones segment. For the six months ended June 30, 2025 compared to 2024, sales and marketing expense increased $0.5 million primarily due to a $0.5 million increase in personnel costs within the Drones segment.
Current wording
For the three months ended September 30, 2025 compared to 2024, sales and marketing expense remained relatively flat at $1.6 million. For the nine months ended September 30, 2025 compared to 2024, sales and marketing expense increased $0.6 million primarily due to a $0.5 million increase within the Drones segment. Increases within the Drones segment were primarily due to increased personnel costs.
Previous wording
For the six months ended June 30, 2025 compared to 2024, general and administrative expense increased $25.3 million primarily due to a $13.1 million increase due to corporate costs which included $6.8 million of equity compensation, $0.5 million of bonus compensation, $1.0 million of advisory services and $1.3 million of legal settlement accruals, all of which were contingent upon the IPO, $2.6 million increase in incentive and consulting fees at the corporate level related to the expansion of the Drones segment and $0.9 million of other corporate costs. There was also a $1.5 million increase within the Drones segment, a $10.0 million increase within the Training segment, and a $1.5 million increase within the Avionics segment partially offset by a $0.8 million decrease within the Electric Air Mobility segment. Increases within the Drones segment were primarily due to a $1.5 million increase in personnel and other costs. Increases within the Avionics segment and Training segment were primarily attributable to equity compensation. The $0.8 million decrease within the Electric Air Mobility segment was due to cost reduction initiatives in the business.
Current wording
For the nine months ended September 30, 2025 compared to 2024, general and administrative expense increased $30.5 million primarily due to a $17.1 million increase in corporate costs which included $7.7 million of equity compensation, $0.5 million of bonus compensation, $1.0 million of advisory services and $1.3 million of legal settlement accruals, all of which were contingent upon the IPO, $2.1 million increase in incentive and consulting fees at the corporate level related to the expansion of the Drones segment, $1.0 million of bonus compensation and $3.5 million of other corporate costs. There was also a $2.1 million increase within the Drones segment, a $10.3 million increase within the Training segment, and a $1.8 million increase within the Avionics segment partially offset by a $0.8 million decrease within the Electric Air Mobility segment. Increases within the Drones segment were primarily due to increases in personnel and other costs. Increases within the Avionics segment and Training segment were primarily attributable to equity compensation. The $0.8 million decrease within the Electric Air Mobility segment was due to cost reduction initiatives in the business.
Previous wording
For the three months ended June 30, 2025 and 2024, we had interest expense, net, of $8.0 million and $1.0 million, respectively. For the six months ended June 30, 2025 and 2024, we had interest expense, net, of $9.3 million and $1.2 million, respectively. The 2025 interest was primarily attributable to the interest paid in shares on the investor notes which totaled $6.7 million and additional interest paid on borrowings with WebBank and Libertas. The 2024 interest was primarily attributable to interest accrued on investor notes.
Current wording
For the three months ended September 30, 2025, we had interest income of $0.1 million compared to interest expense of $1.7 million for the three months ended September 30, 2024 which was primarily due to the interest of the amounts due to Sky Watch as described in Note 12 to our unaudited condensed consolidated financial statements. For the nine months ended September 30, 2025 and 2024, we had interest expense, net, of $9.2 million and $2.9 million, respectively. The interest for the nine months ended September 30, 2025 was primarily attributable to the interest paid in shares on the investor notes which totaled $6.7 million and additional interest paid on borrowings with WebBank and Libertas. The 2024 interest was primarily attributable to interest accrued on investor notes.
Previous wording
For the three months and six months ended June 30, 2025, we had a gain on debt extinguishment, net of $15.6 million which was the result of the partial settlement in equity of the Aspen bridge notes which resulted in a $13.1 million gain and a $5.7 million gain on settlement of certain investor notes at fair value, partially offset by losses on debt extinguishment of a combined $3.2 million for WebBank and Libertas.
Current wording
For the nine months ended September 30, 2025, we had a gain on debt extinguishment, net of $15.6 million which was the result of the partial settlement in equity of the Aspen bridge notes which resulted in a $13.1 million gain and a $5.7 million gain on settlement of certain investor notes at fair value, partially offset by losses on debt extinguishment of a combined $3.2 million for WebBank and Libertas.
Previous wording
For the three months ended June 30, 2025 compared to 2024, we had $20.1 million of other income, primarily due to $17.5 million of income from fair value adjustments on contingent consideration that was resolved in conjunction with the IPO and $1.8 million of income from a fair value adjustment on the Libertas warrants, net of a $0.6 million contingency recorded related to the Aspen contingent debt as compared to $1.5 million of other expense during the three months ended June 30, 2024, which was primarily due to the increase in the fair value of the Jaunt Contingent Arrangement.
Current wording
For the three months ended September 30, 2025 compared to 2024, we had $3.3 million of other income, primarily due to $4.5 million of income from the settlement of deferred compensation offset by a $1.2 million charge related to Libertas warrants as compared to $4.1 million of other income during the three months ended September 30, 2024, which was primarily due to the decrease in the fair value of the Jaunt Contingent Arrangement.
Previous wording
For the six months ended June 30, 2025 compared to 2024, we had $22.7 million of other income, primarily due to $20.3 million of income from fair value adjustments on contingent consideration, $1.8 million of income from a fair value adjustment on the Libertas warrants, net of a $0.6 million contingency recorded related to the Aspen contingent debt as compared to $1.8 million of other expense during the six months ended June 30, 2024, which was primarily due to the increase in the fair value of the Jaunt Contingent Arrangement.
Current wording
For the nine months ended September 30, 2025 compared to 2024, we had $26.1 million of other income, primarily due to $20.3 million of income from fair value adjustments on contingent consideration, $1.8 million of income from a fair value adjustment on the Libertas warrants and $4.5 million of income from the settlement of deferred compensation offset by a $1.2 million charge related to Libertas warrants and a $0.6 million contingency recorded related to the Aspen contingent debt as compared to $2.3 million of other income during the nine months ended September 30, 2024, which was primarily due to the decrease in the fair value of the Jaunt Contingent Arrangement.
Previous wording
For the three months ended June 30, 2025 and 2024, our income tax expense was $2.1 million and $0.4 million, respectively. For the six months ended June 30, 2025 and 2024, our income tax expense was $2.3 million and $1.4 million, respectively. Tax expense for both periods was primarily attributable to Sky-Watch generating positive pre-tax income.
Current wording
For the three months ended September 30, 2025, our income tax benefit was $0.6 million as compared to $2.4 million of income tax expense for the three months ended September 30, 2024. For the nine months ended September 30, 2025 and 2024, our income tax expense was $1.7 million and $3.8 million, respectively. Tax expense for both nine month periods ended September 30, 2025 and 2024 as well as for the three months ended September 30, 2024 was primarily attributable to Sky-Watch generating positive pre-tax income. The tax benefit for the three months ended September 30, 2025 was attributable to lower pre-tax income.
Previous wording
As of June 30, 2025, we had cash and restricted cash of $40.5 million, of which $0.2 million was either restricted or was designated exclusively for Sky-Watch operations, and working capital of $12.6 million.
Current wording
As of September 30, 2025, we had cash and restricted cash of $83.7 million, of which $0.2 million was either restricted or was designated exclusively for Sky-Watch operations, and working capital of $74.5 million.
Previous wording
As of June 30, 2025, we had third party obligations of $3.0 million of Investor Notes as described within Note 2 to our unaudited condensed consolidated financial statements, of which $0.2 million was repaid in July of 2025 and the remaining $2.8 million is due 190 days from the IPO; $3.8 million of Investor Notes as described in Note 12 to our unaudited condensed consolidated financial statements which are due 190 days from the IPO; and $3.8 million of Investor Notes which we have elected to record using the fair value election as further described in Note 2 to our unaudited condensed consolidated financial statements. During July 2025, we repaid $2.1 million of the Investor notes at fair value and amended the remaining Investor Notes such that the remaining $1.8 million, inclusive of a $0.1 million extension fee, is due December 16, 2025. During the quarter ended June 30, 2025, we issued 1.1 million shares related to the Investor Notes and paid $0.6 million out of IPO proceeds.
Current wording
As of September 30, 2025, we had third party obligations of $2.8 million of Investor Notes as described within Note 2 to our unaudited condensed consolidated financial statements which is due 190 days from the IPO; $3.8 million of Investor Notes as described in Note 12 to our unaudited condensed consolidated financial statements which are due 190 days from the IPO; and $1.7 million of Investor Notes which we have elected to record using the fair value election as further described in Note 2 to our unaudited condensed consolidated financial statements. During July 2025, we amended certain Investor Notes such that $1.8 million inclusive of a $0.1 million extension fee, is due December 16, 2025. During the nine months ended September 30, 2025, we issued 1.1 million shares related to the Investor Notes and paid $3.0 million out of IPO proceeds.
Previous wording
In June 2024, we entered the Dangroup Incentive Agreement with Dangroup, whereby we agreed to pay Dangroup 20% of Sky-Watch’s EBITDA as an incentive bonus for their continued involvement in Sky-Watch’s governance, management and/or other operations, commencing on January 1, 2025 for an initial term of five years, which shall renew upon mutual agreement of the parties. In December 2024, we amended the Dangroup Incentive Agreement, whereby we agreed to transfer to Dangroup shares of our common stock immediately prior to the completion of the IPO such that Dangroup’s ownership would be increased to 5% of our capital stock on a fully diluted basis. During the three months ended June 30, 2025, we issued 0.5 million shares to Dangroup in satisfaction of this agreement.
Current wording
In June 2024, we entered the Dangroup Incentive Agreement with Dangroup, whereby we agreed to pay Dangroup 20% of Sky-Watch’s EBITDA as an incentive bonus for their continued involvement in Sky-Watch’s governance, management and/or other operations, commencing on January 1, 2025 for an initial term of five years, which shall renew upon mutual agreement of the parties. In December 2024, we amended the Dangroup Incentive Agreement, whereby we agreed to transfer to Dangroup shares of our common stock immediately prior to the completion of the IPO such that Dangroup’s ownership would be increased to 5% of our capital stock on a fully diluted basis. During the nine months ended September 30, 2025, we issued 0.5 million shares to Dangroup in satisfaction of this agreement.
Previous wording
Net cash used in operations for the six months ended June 30, 2025 totaled $30.8 million, and was primarily due to net income of $3.9 million and positive non-cash adjustments including stock-based compensation, non-cash interest, legal settlement, and depreciation and amortization, offset by negative non-cash adjustments of gains of IPO transactions, debt extinguishment and fair value adjustments of contingent consideration and warrant liability and working capital adjustments, primarily consisting of the changes in accounts receivable, accounts payable, accrued expenses and other long-term liabilities and deferred revenue. Net cash used in operations for the six months ended June 30, 2024 totaled $7.8 million which was due to a net loss of $7.6 million and a change in working capital adjustments, primarily the change in deferred revenue, which was partially offset primarily by a positive non-cash adjustment of depreciation and amortization.
Current wording
Net cash used in operations for the nine months ended September 30, 2025 totaled $36.5 million, and was primarily due to positive non-cash adjustments including stock-based compensation, non-cash interest, legal settlement, charge related to Libertas warrants, and depreciation and amortization, offset by negative non-cash adjustments of gains of IPO transactions, debt extinguishment and fair value adjustments of contingent consideration and warrant liability and working capital adjustments, primarily consisting of the changes in accounts receivable, prepaid expenses and other assets, inventory, accounts payable, accrued expenses and other long-term liabilities and deferred revenue. Net cash used in operations for the nine months ended September 30, 2024 totaled $2.5 million which was due to a net loss of $37.9 million and a change in working capital adjustments, primarily the change in deferred revenue, accounts receivable, inventory, prepaid expenses, net of changes in accounts payable, accrued expenses and other long-term liabilities and deferred compensation and by positive non-cash adjustments of goodwill impairment, depreciation and amortization, interest, and stock- based compensation, net of a negative non-cash adjustment for change in fair value of the contingent consideration.
Previous wording
Cash of $1.0 million and $0.5 million was used in investing activities during the six months ended June 30, 2025 and 2024, respectively, to purchase property and equipment and intangible assets.
Current wording
Cash of $2.0 million and $0.6 million was used in investing activities during the nine months ended September 30, 2025 and 2024, respectively, to purchase property and equipment and intangible assets.
Previous wording
Net Cash Provided by Financing Activities
Current wording
Net Cash Provided by (Used in) Financing Activities
Previous wording
Net cash provided by financing activities during the six months ended June 30, 2025 was $49.6 million primarily due to $61.5 million of proceeds from the IPO net of issuance costs, $8.5 million of proceeds from the Libertas warrants and WebBank loans that were partially offset by $14.8 million of debt repayments on borrowings and related borrowings, $3.3 million of contingent consideration payments and $2.2 million in payments due to seller. Net cash provided by financing activities during the six months ended June 30, 2024 of $0.7 million was primarily due to $2.5 million proceeds from Investor Notes offset by repayments on borrowings and amounts paid to seller.
Current wording
Net cash provided by financing activities during the nine months ended September 30, 2025 was $97.5 million primarily due to $58.3 million of proceeds from the IPO net of issuance costs, $83.3 million of proceeds from the Follow-on Offering net of issuance costs, $8.5 million of proceeds from the Libertas warrants and WebBank loans that were partially offset by $20.0 million of stock repurchases, $20.9 million of debt repayments on borrowings and related borrowings, $8.5 million of contingent consideration payments and $3.2 million in payments due to seller. Net cash used in financing activities during the nine months ended September 30, 2024 was $1.4 million, primarily due to payments made to the sellers of Sky-Watch that were partially offset primarily by the proceeds from borrowings and related party borrowings, net of repayments.
Previous wording
Goodwill is not amortized and is tested at the reporting unit level for impairment on an annual basis or whenever events or changes in circumstances indicate that the carrying value may not be recoverable. We have selected October 1 st as the date to perform our annual impairment test. In the valuation of goodwill, management must make assumptions regarding estimated future cash flows to be derived from our business. If these estimates or their related assumptions change in the future, we may be required to record an impairment for these assets. Management may first evaluate qualitative factors to assess if it is more likely than not that the fair value of a reporting unit is less than its carrying amount and to determine if an impairment test is necessary. Management may choose to proceed directly to the evaluation, bypassing the initial qualitative assessment. The impairment test involves comparing the fair value of the reporting unit to which goodwill is allocated to its net book value, including goodwill. A goodwill impairment loss would be the amount by which a reporting unit’s carrying value exceeds its fair value, however, the loss recognized should not exceed the total amount of goodwill allocated to that reporting unit. No goodwill impairment charges were recorded for the three or six months ended June 30, 2025 and 2024.
Current wording
Goodwill is not amortized and is tested at the reporting unit level for impairment on an annual basis or whenever events or changes in circumstances indicate that the carrying value may not be recoverable. We have selected October 1 st as the date to perform our annual impairment test. In the valuation of goodwill, management must make assumptions regarding estimated future cash flows to be derived from our business. If these estimates or their related assumptions change in the future, we may be required to record an impairment for these assets. Management may first evaluate qualitative factors to assess if it is more likely than not that the fair value of a reporting unit is less than its carrying amount and to determine if an impairment test is necessary. Management may choose to proceed directly to the evaluation, bypassing the initial qualitative assessment. The impairment test involves comparing the fair value of the reporting unit to which goodwill is allocated to its net book value, including goodwill. A goodwill impairment loss would be the amount by which a reporting unit’s carrying value exceeds its fair value, however, the loss recognized should not exceed the total amount of goodwill allocated to that reporting unit. No goodwill impairment charges were recorded for the three or nine months ended September 30, 2025. We recorded goodwill impairment charges of $38.0 million during the three and nine months ended September 30, 2024.
Previous wording
EBITDA projections as of September 30, 2024 and October 1, 2023 were developed using estimates of manufacturing costs, production hours per unit, learning curves and subsequent efficiencies, and operating costs. While mid-term and long-term EBITDA projections at maximum capacity have not significantly changed compared to our prior year testing date of October 1, 2023, the impact of delaying the projected cash flows from the Jaunt Journey as a result of a later expected commercialization date resulted in a decrease in the fair value of the Electric Air Mobility segment, which indicated impairment. Projected EBITDA as of October 1, 2023 gave effect to net research and development costs expected to be incurred between 2024 and 2027 leading up to the commercialization of the Jaunt Journey aircraft and assumed positive EBITDA during the two years following commercialization. Projected EBITDA as of September 30, 2024 gave effect to net research and development costs expected to be incurred (i) between 2025 and 2028 leading up to the commercialization of the cargo UAV and (ii) between 2029 and 2031 leading up to the commercialization of the Jaunt Journey and assumed positive EBITDA during the two years following commercialization. Mid-term and long-term EBITDA margin projections at full rate production were reduced slightly (1-2%) compared to our prior year testing date of October 1, 2023.
Current wording
EBITDA projections as of September 30, 2024 were developed using estimates of manufacturing costs, production hours per unit, learning curves and subsequent efficiencies, and operating costs. While mid-term and long-term EBITDA projections at maximum capacity have not significantly changed compared to our prior year testing date of October 1, 2023, the impact of delaying the projected cash flows from the Jaunt Journey as a result of a later expected commercialization date resulted in a decrease in the fair value of the Electric Air Mobility segment, which indicated impairment. Projected EBITDA as of October 1, 2023 gave effect to net research and development costs expected to be incurred between 2024 and 2027 leading up to the commercialization of the Jaunt Journey aircraft and assumed positive EBITDA during the two years following commercialization. Projected EBITDA as of September 30, 2024 gave effect to net research and development costs expected to be incurred (i) between 2025 and 2028 leading up to the commercialization of the cargo UAV and (ii) between 2029 and 2031 leading up to the commercialization of the Jaunt Journey and assumed positive EBITDA during the two years following commercialization. Mid-term and long-term EBITDA margin projections at full rate production were reduced slightly (1-2%) compared to our prior year testing date of October 1, 2023.
Previous wording
No impairment charges were recorded during the three or six months ended June 30, 2025 or 2024.
Current wording
No impairment charges were recorded during the three or nine months ended September 30, 2025 or 2024.
Previous wording
No impairment charges were recorded during the three or six months ended June 30, 2025 or 2024.
Current wording
No impairment charges were recorded during the three or nine months ended September 30, 2025 or 2024.
Rearranged previous paragraphs (1)
Previous report — wording carried elsewhere
For the three months ended June 30, 2025 compared to 2024, general and administrative expense increased $25.0 million primarily due to a $13.3 million increase due to corporate costs which included $6.8 million of equity compensation, $0.5 million of bonus compensation, $1.0 million of advisory services and $1.3 million of legal settlement accruals, all of which were contingent upon the IPO, $2.0 million increase in incentive and consulting fees at the corporate level related to the expansion of the Drones segment and $1.7 million of other corporate costs. There was also a $10.1 million increase within the Training segment that was primarily attributable to equity compensation, a $1.6 million increase within the Avionics segment that was primarily attributable to equity compensation, and a $0.4 million increase within the Drones segment, partially offset by a $0.4 million decrease within the Electric Air Mobility segment.