NexMetals Mining Corp.
For the period ended Sep 30, 2025. Filed Nov 13, 2025.
View on SEC.govAbout this filing
A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.
Sep 30, 2025 · Filed Nov 13, 2025
What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-Q
Period ended 2025-06-30; filed 2025-08-13.
0001493152-25-011913
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsCurrent report: 10-Q
Period ended 2025-09-30; filed 2025-11-13.
0001493152-25-022391
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 167 previous paragraphs and 153 current paragraphs.
82 unchanged; 42 reworded; 28 added; 40 removed; 3 previous and 1 current paragraphs rearranged.
Tables are not compared: 25 previous and 20 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (28)
Current report
Additional holes have been designed to evaluate the lateral extent of the down-plunge extensions in the South Limb and N2 Limbs with the purpose of collecting sufficient additional data to include the new mineralization in an updated MRE.
Current report
To date, a total of 9,014 metres have been drilled as part of the Hinge surface program, comprising two completed holes, one hole extension, one abandoned hole and four holes currently in progress.
Current report
On September 3, 2025, the Company announced results from a comprehensive bulk sample-based metallurgical program. The program demonstrated the ability to generate two separate saleable copper and nickel-cobalt concentrates based on underground bulk samples from both the Selebi North and Selebi Main deposits. The optionality to produce separate saleable concentrates supports potential restart scenarios with significantly lower capital intensity and decreased execution risk. Based on these results, the Company now has an alternative path forward in which an on-site smelter or hydrometallurgical facility may not be required, significantly derisking the capital requirements and operational complexity of future production at the Selebi Mines.
Current report
The Company commenced a Preliminary Economic Assessment, as defined in NI 43-101 (“PEA”) in October 2025 for the Selebi Mines under the separate saleable concentrates scenario, the scope of which will include mine design and scheduling, process engineering, infrastructure planning, and capital and operating cost estimation. This assessment is being undertaken in accordance with Canadian disclosure standards and does not constitute an “initial assessment,” “pre-feasibility study,” or “feasibility study” as defined under the SEC’s Regulation S-K 1300.
Current report
The Selebi North Underground Resource Expansion Drilling program is expected to conclude in November. BHEM surveys are planned to characterize the conductive trends associated with the newly intersected massive sulphides to confirm continuity and outline strike extent. Initial interpretations indicate that the new data will contribute to resource expansion in an updated MRE.
Current report
The Selebi Hinge drilling offers a strategic opportunity for potential substantial resource expansion. The drill holes with subsequent follow-up holes are designed to provide sufficient data to support the inclusion of new results in an updated MRE. The final holes of this program are expected to commence prior to the year-end pause in drilling activities.
Current report
All fifteen holes were surveyed and returned BHEM anomalies that are known to correlate directly with massive or semi-massive sulphide mineralization. Surveys from the deepest holes identified modeled plates located down-plunge of the Selkirk MRE. The strong and consistent correlation with massive sulphides has confirmed that BHEM is a proven exploration tool for identifying additional mineralization at the Selkirk Mine.
Current report
In September 2025, a historic hole originally drilled by TNMC in 2003 to a depth of 1,054.7 metres was reamed and reopened to enable gyro and BHEM surveys. The hole, located approximately 450 metres southwest of the conceptual open pit, provides an opportunity to evaluate the down-plunge potential of the Selkirk deposit. Results from the BHEM survey identified high-quality conductors.
Current report
Work has commenced on the four prospecting licences, consisting of surface EM surveys and soil sampling programs designed to follow up on historic exploration data.
Current report
Outlook
Current report
With the 2025 drilling programs now complete, the Company intends to focus on advancing the metallurgical testwork. The results of these studies, together with the new assay results, will support the preparation of an updated MRE. In parallel, surface geophysical surveys and soil sampling have commenced over prospective geology within the Selkirk mining licence and the adjoining prospecting licences.
Current report
On October 28, 2025, the Company announced a brokered “best efforts” public offering in Canada and concurrent private placement in the United States. On October 30, 2025, the Company announced an upsizing of the Offering to 14,035,100 November 2025 Units of the Company at a price of $5.70 per November 2025 Unit for aggregate gross proceeds of up to $80,000,070.
Current report
Each November 2025 Unit will consist of one Common Share and one common share purchase warrant of the Company. Each November 2025 Warrant will entitle the holder to acquire one Common Share for a period expiring 24 months following the date of issuance at a price of $8.00.
Current report
The net proceeds from the Offering are expected to be used to fund the prepayment of the first contingent milestone payment under the Selebi APA and Selkirk APA, the timing of which is planned prior to the end of 2025, to advance exploration and development activities at the Mines, and for working capital and general corporate purposes.
Current report
The agents will receive a cash fee equal to 6% of the gross proceeds of the Offering, subject to a reduced cash fee equal to 2.0% for sales to certain individuals on gross proceeds of $7,000,000 million. In connection with the Offering, on November 12, 2025 we entered into an agency agreement with the agents, a copy of which is attached hereto as Exhibit 10.1.
Current report
**** The Offering is expected to close on November 17, 2025 (the “Closing Date”) and remains subject to customary closing conditions.
Current report
As per the Selebi APA, the following milestone payments remain outstanding:
Current report
Critical Accounting Estimates and Judgments
Current report
This management’s discussion and analysis of our financial condition and results of operations is based on our unaudited condensed interim consolidated financial statements, which have been prepared in accordance with U.S. GAAP. The preparation of these unaudited condensed interim consolidated financial statements requires us to make estimates and judgments that affect the reported amounts of assets, liabilities, revenues and expenses and the disclosure of contingent assets and liabilities in our unaudited condensed interim consolidated financial statements. We base our estimates on historical experience, known trends and events, and other assumptions that we believe are reasonable under the circumstances, and we evaluate these estimates on an ongoing basis. Actual results may differ from these estimates under different assumptions or conditions.
Current report
There have been no significant changes to the critical accounting estimates and judgements disclosed in our Annual Report on Form 10-K for the year ended December 31, 2024, with the exception of the below:
Current report
Debt Extinguishment
Current report
Upon the extinguishment of debt, the difference between the amount paid on extinguishment, including miscellaneous costs of reacquisition, and the net carrying amount of the debt being extinguished, being the amount due at maturity, adjusted for unamortized premiums, discounts, and costs of issuance, is recognized as a gain or loss when the debt is extinguished. The fair value of the assets transferred or the fair value of an equity interest granted is used in accounting for the settlement of the debt unless the fair value of the debt being settled is more clearly evident.
Current report
Recently Adopted Accounting Pronouncements
Current report
ASU 2023-09, Income Taxes: Improvements to Income Tax Disclosures
Current report
In December 2023, FASB issued a final standard on improvements to income tax disclosures. The standard requires disaggregated information about a reporting entity’s effective tax rate reconciliation as well as information on income taxes paid. The Company adopted the new standard effective January 1, 2025, and will include certain additional disclosures in the notes to its consolidated financial statements for the year ending December 31, 2025.
Current report
Recently Issued Accounting Pronouncements and Disclosures Not Yet Adopted
Current report
ASU 2024-03, Income Statement—Reporting Comprehensive Income—Expense Disaggregation Disclosures
Current report
In November 2024, FASB issued an ASU which will require entities to provide disaggregated disclosure of specified categories of expenses that are included on the face of the income statement, including: purchases of inventory, employee compensation, depreciation, amortization and depletion. This ASU becomes effective January 1, 2027. The Company is assessing the impact of this ASU, and upon adoption, may be required to include certain additional disclosures in the notes to its consolidated financial statements.
Removed paragraphs (40)
Previous report
This MD&A is intended to assist the reader to assess material changes in the financial condition of the Company during the quarter ended June 30, 2025, and the results of operations of the Company for the three-month and six-month periods ended June 30, 2025 and June 30, 2024. The Quarterly Financial Statements and the financial information contained in this MD&A were prepared in accordance with US GAAP and pursuant to the rules and regulations of the U.S. Securities and Exchange Commission.
Previous report
During the quarter, new mineralization was also discovered in recently completed drill hole SNUG-25-189 which includes 5.20 metres of mineralization at South Limb and 15.50 metres of mineralization at N2 Limb. Assays for SNUG-25-189 are pending.
Previous report
The Company also commenced the hydrometallurgical test program during the quarter, the first phase of which will test the recoverability of Selebi concentrates.
Previous report
The Selebi North Underground Resource Expansion Drilling program is expected to continue throughout the remainder of the year for further testing of the BHEM plates. Drill hole SNUG-25-192, currently in progress, is targeting the southern strike extent between SNUG-25-184 and SNUG-25-186 to further evaluate the continuity and scale of both the South Limb and N2 mineralized systems.
Previous report
The Selebi Hinge drilling offers a strategic opportunity for potential substantial resource expansion. With the pre-collaring of the holes well underway and the recent mobilization of the more powerful deep drill to extend these holes to final target depths, the Company expects to make significant progress on the program through the remainder of the year. Drilling is expected to consist of approximately 12,500 metres in 6 holes over an estimated period of 7 months.
Previous report
Outlook – Selkirk
Previous report
The Company has expanded the exploration efforts to include a targeted electromagnetic (“EM”) program. With the metallurgical drilling program completed, the Company has advanced to the next phase of exploration. This next phase focuses on outlining high-grade mineralization through BHEM, the same technology used at the Selebi Mines, and drilling of untested historical VTEM anomalies located immediately south of the Selkirk resource.
Previous report
The BHEM surveys were completed in July 2025 in all metallurgical holes. Two drills are currently targeting modeled VTEM conductors, previously defined by a historical 2012 heliborne geophysical survey with no indication of drill testing. These conductors are situated near known mineralization within the existing mining license and represent potential new satellite discoveries.
Previous report
Selected Financial Information and Financial Position
Previous report
The following amounts are derived from the Company’s unaudited condensed interim consolidated financial statements prepared under US GAAP.
Previous report
Net Loss
Previous report
The net loss of $15,088,746 for the three months ended June 30, 2025 was higher by $5,295,554 compared to the prior year comparable period of $9,793,192, largely due to an increase in general exploration expenses of $3,742,820 and an increase in investor relations and communications of $1,848,659. The net loss of $30,317,076 for the six months ended June 30, 2025 was higher by $11,176,704 compared to the prior year comparable period of $19,140,372, largely due to the loss on the Term Loan extinguishment of $5,982,434, an increase in general exploration expenses of $3,164,138 and an increase in investor relations and communications of $1,983,353.
Previous report
Total Assets
Previous report
Total assets as at June 30, 2025 increased by $22,100,405 from the December 31, 2024 balance largely as a result of higher cash balances at June 30, 2025. In March 2025, the Company closed a Private Placement for aggregate gross proceeds of $46,000,000 (see “Liquidity & Capital Resources — Financings”).
Previous report
Current Liabilities
Previous report
Current liabilities as at June 30, 2025 increased by $1,288,277 from December 31, 2024 largely due to an increase in trade payables and accrued liabilities of $918,936 as the Company ramped up exploration and evaluation activities in the second quarter of 2025.
Previous report
On March 18, 2025, the Company closed a financing transaction which included anon-brokered private placement and the conversion into equity of its $20,882,353 three-year Term Loan with Cymbria, the lender and an affiliate of the Company’s largest shareholder, EdgePoint Investment Group Inc. (“EdgePoint”), which bore interest at a rate of 10% per annum.
Previous report
The Company issued to Cymbria an aggregate of 3,480,392 units (each, a “Settlement Unit”) at a deemed issue price of $6.00 per Settlement Unit in full satisfaction of the $20,882,353 principal amount outstanding under the Term Loan. Accrued interest under the Term Loan, up to the date of the Debt Conversion, in the amount of $268,896 was settled in cash. Each Settlement Unit consisted of one Common Share of the Company and one Common Share purchase warrant (each, a “Settlement Warrant”) of the Company.
Previous report
Each Settlement Warrant entitles the holder to acquire one additional Common Share of the Company at a price of $8.00 per Common Share until March 18, 2028. If, at any time prior to the expiry date, the volume-weighted average trading price of the Common Shares is at least $40.00 per Common Share for a period of 20 trading days, the Company may, at its option, accelerate the expiry date with 30 days’ notice to the Settlement Warrant holders.
Previous report
The Private Placement consisted of issuing 7,666,667 units (each, a “Private Placement Unit”) of the Company at a price of $6.00 per unit for aggregate gross proceeds of $46,000,000. Each Private Placement Unit consisted of one Common Share of the Company and one-half of one Common Share purchase warrant (each whole warrant, a “Private Placement Warrant”) of the Company. Each Private Placement Warrant entitles the holder to acquire one additional Common Share at a price of $11.00 per share until March 18, 2028.
Previous report
In connection with the March 2025 Financing, the Company issued: (i) 200,000 Common Shares to TriView Capital Ltd. (“TriView”) for its services as finder; (ii) 450,000 Common Shares to Fiore Management and Advisory Corp. (“Fiore”) and 187,500 Common Shares to Bowering Projects Ltd. (“Bowering”) for certain advisory services; and (iii) 179,335 Common Shares to a financial advisor for financial advisory services. In addition to the Common Shares, the Company incurred various legal, listing and financing fees payable in cash totalling $2,371,203.
Previous report
In June of 2024, the Company closed two tranches of a non-brokered private placement offering of units of the Company, pursuant to which the Company issued a total of 1,762,820 units at a price of $15.60 per unit for gross proceeds of approximately $27.5 million (the “June 2024 Financing”). Each unit was comprised of one Common Share and one Common Share purchase warrant. As at June 30, 2025, the Company has expended all the June 2024 Financing.
Previous report
Although the Company has been successful in its past fundraising activities, there is no assurance as to the success of future fundraising efforts or as to the sufficiency of funds raised in the future. Factors that could affect the availability of financing include the progress and results of ongoing exploration and evaluation activities at the Mines, the state of international debt and equity markets, and investor perceptions and expectations with respect to global commodity markets. If necessary, depending on the amount of funding raised, the Company may explore opportunities to defer the timing of certain discretionary expenditures and the Company’s planned initiatives and other work programs may be postponed, or otherwise revised.
Previous report
As per the Selebi APA, the aggregate purchase price payable to the seller for the Selebi Mines is the sum of US$56,750,000 which amount shall be paid in three instalments:
Previous report
Related Party Transactions
Previous report
Key management personnel
Previous report
Key management (defined as members of the Board of Directors and certain senior management) compensation was related to the following:
Previous report
Other related parties
Previous report
On March 18, 2025, the Company closed the March 2025 Financing which includedthe conversion of its Term Loan held by EdgePoint and its affiliates to equity. The Company issued to EdgePoint and its affiliates an aggregate of 3,480,392 Settlement Units. As of June 30, 2025, EdgePoint and its affiliates beneficially owned an aggregate of 4,672,053 Common Shares and 4,166,208 warrants, representing approximately 21.8% of the outstanding Common Shares (approximately 34.5% on a partially-diluted basis assuming the exercise of all warrants held by EdgePoint).
Previous report
In connection with the Private Placement, certain insiders of the Company subscribed for an aggregate of 196,833 Private Placement Units for gross proceeds of $1,181,000.
Previous report
During 2024, EdgePoint and its affiliates, related parties of the Company, subscribed for 384,615 units as part of the June 2024 Financing. As of December 31, 2024, EdgePoint and its affiliates beneficially owned 1,191,661 Common Shares and 685,815 warrants, representing approximately 12.8% of the issued and outstanding Common Shares (approximately 18.8% on a partially-diluted basis assuming the exercise of all warrants held by EdgePoint).
Previous report
For the three and six months ended June 30, 2025, the Company paid interest of $nil (three months ended June 30, 2024 - $519,206) and $268,896 (six months ended June 30, 2024 - $1,038,412), respectively, to Cymbria Corporation. For the three and six months ended June 30, 2025, the Company recognized a loss on the Debt Conversion of $nil (three months ended June 30, 2024 - $nil) and $5,982,434 (six months ended June 30, 2024 - $nil), respectively.
Previous report
The following table shows the Company’s undiscounted contractual obligations as at June 30, 2025:
Previous report
The DSU liability of $1,120,153 is not presented in the above liquidity analysis as management considers it not practical to allocate the amounts into maturity groupings.
Previous report
The above table does not include the second instalment under the Selebi APA of $34,107,500 (US$25,000,000) which is due January 31, 2026 (see*“Contractual Obligations and Contingencies”*) as the liability has not yet been recognized. This instalment payment may require the Company to raise additional funding as the Company does not currently have sufficient funds to meet this obligation.
Previous report
Off-Balance Sheet Arrangements
Previous report
There are no off-balance sheet arrangements as at June 30, 2025.
Previous report
Share Capital Information
Previous report
As of the date of this Report, the fully diluted share capital of the Company, including Common Shares issuable upon exercise of securities of the Company, is as follows:
Reworded paragraphs (42)
Previous wording
NEXM is a mineral exploration and development company focused on the discovery and advancement of high-quality nickel-copper-cobalt-platinum group elements (“Ni-Cu-Co-PGE”) resources. The principal assets of the Company are the Selebi Main and Selebi North nickel-copper-cobalt (“Ni-Cu-Co”) mines in Botswana and related infrastructure (together, the “Selebi Mines”), as well as the Ni-Cu-Co-PGE Selkirk mine in Botswana, together with associated infrastructure and four surrounding prospecting licenses (collectively, the “Selkirk Mine” and together with the Selebi Mines, the “Mines”). NEXM is committed to governance through transparency, accountability, and open communication among NEXM’s team and stakeholders.
Current wording
NEXM is a mineral exploration and development company focused on the discovery and advancement of high-quality copper-nickel-cobalt-platinum group elements (“Cu-Ni-Co-PGE”) resources. The principal assets of the Company are the Selebi Main and Selebi North copper-nickel-cobalt (“Cu-Ni-Co”) mines in Botswana and related infrastructure (together, the “Selebi Mines”), as well as the Cu-Ni-Co-PGE Selkirk mine in Botswana, together with associated infrastructure and four surrounding prospecting licenses (collectively, the “Selkirk Mine” and together with the Selebi Mines, the “Mines”). NEXM is committed to governance through transparency, accountability, and open communication among NEXM’s team and stakeholders.
Previous wording
The Selebi and Selkirk Mines are permitted with 10-year mining licences, granted in 2022, and renewable upon the submission of approved mine plans and other customary conditions, and benefit from significant local infrastructure. The Company’s Selebi Mines include two shafts, the Selebi Main and Selebi North shafts, and related infrastructure such as rail, power and roads.
Current wording
The Company’s principal business activity is the exploration and evaluation of the Mines. The Selebi and Selkirk Mines are permitted with 10-year mining licences, granted in 2022, and renewable upon the submission of approved mine plans and other customary conditions, and benefit from significant local infrastructure. The Company’s Selebi Mines include two shafts, the Selebi Main and Selebi North shafts, and related infrastructure such as rail, power and roads.
Previous wording
NEXM is headquartered in Toronto, Ontario, Canada and its common shares (the “Common Shares”) are publicly traded on the Nasdaq Capital Market (the “Nasdaq”) and the TSX Venture Exchange (the “TSXV”) under the symbol “NEXM”. Prior to June 11, 2025, the Company traded on the TSXV under its previous name and symbol, Premium Resources Ltd. and PREM, respectively.
Current wording
NEXM is headquartered in Vancouver, British Columbia, Canada and its common shares (the “Common Shares”) are publicly traded on the Nasdaq Capital Market (the “Nasdaq”) and the TSX Venture Exchange (the “TSXV”) under the symbol “NEXM”. Prior to June 11, 2025, the Company traded on the TSXV under its previous name and symbol, Premium Resources Ltd. and PREM, respectively.
Previous wording
The Selebi Mines infrastructure includes two previously operating mines, Selebi Main (#2 Shaft) and Selebi North (#4 Shaft), and associated surface infrastructure.
Current wording
The Selebi Mines infrastructure includes two previously operating mines, Selebi Main (#2 Shaft) and Selebi North (#4 Shaft), and associated surface infrastructure. The Selebi Main deposit began production in 1980 and Selebi North began production in 1990. Mining terminated at both operations in 2016 due to weak global commodity prices and a failure in the separate Phikwe smelter processing facility. The BCL assets were subsequently placed under liquidation in 2017.
Previous wording
The Selebi Mines consist of a single mining licence covering an area of 11,504 hectares. The mining licence is centred approximately at 22°03’00”S and 27°47’00”E. Mining licence 2022/1L was granted to PNRPL on January 31, 2022, over the Selebi Mines deposits discovered under mining licence 4/72. The original licence which had been granted to BCL Limited (“BCL”) on March 7, 1972, which covered both Selebi and Phikwe project areas, was amended several times and renewed once, and was set to expire on March 6, 2022. The current mining licence is limited to the Selebi Main and Selebi North deposits and their surrounding areas, expires May 26, 2032, and excludes the Phikwe mines and associated infrastructure.
Current wording
The Selebi Mines consist of a single mining licence covering an area of 11,504 hectares. The mining licence is centred approximately at 22°03’00”S and 27°47’00”E. Mining licence 2022/1L was granted to PNRPL on January 31, 2022, over the Selebi Mines deposits discovered under mining licence 4/72. The original licence which had been granted to BCL on March 7, 1972, which covered both Selebi and Phikwe project areas, was amended several times and renewed once, and was set to expire on March 6, 2022. The current mining licence is limited to the Selebi Main and Selebi North deposits and their surrounding areas, expires May 26, 2032, and excludes the Phikwe mines and associated infrastructure.
Previous wording
The key assumptions, parameters, and methods used to estimate the mineral resources are contained in the Selebi TRS.Readers are cautioned not to assume that all or any part of Indicated Mineral Resources will ever be converted into Mineral Reserves as defined by S-K 1300. Readers are cautioned not to assume that all or any part of an Inferred Mineral Resource exists or is economically or legally mineable, or that an Inferred Mineral Resource will ever be upgraded to a higher category.
Current wording
The key assumptions, parameters, and methods used to estimate the mineral resources are contained in the Selebi TRS.Readers are cautioned not to assume that all or any part of Indicated Mineral Resources will ever be converted into Mineral Reserves as defined by S-K 1300. Readers are cautioned not to assume that all or any part of an Inferred Mineral Resource exists or that, if it exists, is economically or legally mineable, or that an Inferred Mineral Resource will ever be upgraded to a higher category.
Previous wording
In March 2025, the Selebi North Underground Resource Expansion Drilling program commenced with one drill rig targeting Borehole Electromagnetic (“BHEM”) plates located down-dip and down-plunge from the N3, N2, and South Limbs. During the second quarter of 2025, drill hole SNUG-25-184 intersected mineralization in the South Limb 183 metres down-plunge from the Selebi Mines MRE, and in the N2 Limb 300 metres down-plunge of the MRE. Highlights from this hole included 13.50 metres of 3.68% CuEq 1 (1.13% Cu, 1.24% Ni, 0.06% Co) in the South Limb and 6.25 metres of 2.16% CuEq 1 (0.62% Cu, 0.75% Ni, 0.04% Co) in the N2 Limb. A BHEM survey completed in SNUG-25-184 revealed strong off-hole conductors, confirming the South Limb and N2 zones remain open down-plunge.
Current wording
In March 2025, the Selebi North Underground Resource Expansion Drilling program commenced with one drill rig targeting Borehole Electromagnetic (“BHEM”) plates located down-dip and down-plunge from the N3, N2, and South Limbs. Drill hole SNUG-25-184 intersected mineralization in the South Limb 183 metres down-plunge from the Selebi Mines MRE, and in the N2 Limb 300 metres down-plunge of the MRE. Highlights from this hole included 13.50 metres of 3.68% CuEq 1 (1.13% Cu, 1.24% Ni, 0.06% Co) in the South Limb and 6.25 metres of 2.16% CuEq 1 (0.62% Cu, 0.75% Ni, 0.04% Co) in the N2 Limb. A BHEM survey completed in SNUG-25-184 revealed strong anomalies, confirming the South Limb and N2 Limb remain open down-plunge.
Previous wording
Follow-up hole SNUG-25-186 was drilled to test these conductors and intersected South Limb mineralization 132 metres down-plunge of SNUG-25-184. Highlights from this hole included 16.25 metres of 3.06% CuEq 1 (1.13% Cu, 0.94% Ni). As a result, South Limb mineralization has been extended 315 metres down-plunge beyond the 2024 Selebi Mines MRE, representing an increase in the Selebi North South Limb plunge extent by 35%.
Current wording
Follow-up hole SNUG-25-186 was drilled to test modeled conductors and intersected South Limb mineralization 132 metres down-plunge of SNUG-25-184. Highlights from this hole included 16.25 metres of 3.06% CuEq 1 (1.13% Cu, 0.94% Ni). As a result, South Limb mineralization has been extended 315 metres down-plunge beyond the 2024 Selebi Mines MRE, representing an increase in the Selebi North South Limb plunge extent by 35%.
Previous wording
During 2025 and up to the date of this Report, the Company has drilled approximately 5,123 metres in 8 holes as part of the Selebi North Underground Resource Expansion Drilling program. Assays for a total of approximately 38,139 metres across 86 completed holes at Selebi North have not been accounted for in the 2024 Selebi Mines MRE. All core is sampled and sent to ALS Chemex in Johannesburg for analysis. All holes are surveyed with a gyro instrument and selected holes are surveyed with BHEM geophysical tools.
Current wording
During 2025 and up to the date of this Report, the Company has drilled approximately 8,173 metres in 14 holes as part of the Selebi North Underground Resource Expansion Drilling program. Assays for a total of approximately 41,189 metres across 91 completed holes at Selebi North have not been accounted for in the 2024 Selebi Mines MRE. All core is sampled and sent to ALS Chemex in Johannesburg for analysis. All holes are surveyed with a gyro instrument and selected holes are surveyed with BHEM geophysical tools.
Previous wording
The Company has implemented a surface drilling program at Selebi Main to investigate BHEM responses beyond the end of several holes, interpreted to be caused by a potential third parallel mineralized horizon beneath the two known zones. The initial drill testing has been through the extension of historic drill holes, to target a large conductor interpreted to lie 150 to 200 metres beneath the Selebi Main resource. During 2025 and up to the date of this Report, the Company has extended 3 historic drillholes by approximately 768 metres. Although a thick zone of altered amphibolite host rock was intersected, no mineralization was present in the original target area. Subsequent BHEM surveys indicate that the conductor has a steeper dip than the known resources; follow-up drilling is planned. With this work, the Company is investigating the potential of a new mineralized horizon. The modeled BHEM plate is situated outside the initial Selebi Mines MRE extents.
Current wording
The Company implemented a surface drilling program at Selebi Main to investigate BHEM responses beyond the end of several holes, interpreted to be caused by a potential third parallel mineralized horizon beneath the two known zones. The drill testing has been through the extension of 4 historic drill holes, to target a large conductor interpreted to lie 150 to 200 metres beneath the Selebi Main resource. Although a thick zone of altered amphibolite host rock has been intersected, no significant mineralization was present in either the original or revised target area. A total of 969 metres in 4 hole extensions was completed. BHEM surveys in these hole extensions have provided additional information that indicate a steeper target dip than was assumed in the initial interpretation of the building responses. Additional drilling is planned.
Previous wording
During the quarter, the Company commenced the surface drilling program targeting BHEM plates in the 2-kilometre gap zone between the Selebi North and Selebi Main deposits known as the “Hinge”. The program is designed to rapidly demonstrate the broader scale potential of the Selebi Mines and to further support the Company’s core thesis that these deposits are larger than previously recognized.
Current wording
During the second quarter of 2025, the Company commenced the surface drilling program targeting BHEM plates in the 2-kilometre gap zone between the Selebi North and Selebi Main deposits known as the “Hinge”. The program is designed to demonstrate the broader scale potential of the Selebi Mines and to further support the Company’s core thesis that these deposits are larger than previously recognized.
Previous wording
The two company-owned underground U5 drills were converted into surface A5 drills and commenced drilling the first two holes of the deep drilling program, with one drill testing large BHEM plates located down-plunge and down-dip from the Selebi Main mine horizon and trending toward the Selebi North deposit, and the second drill testing BHEM plates located 500 metres down-plunge and down-dip from the Selebi North deposit and trending toward Selebi Main. A large drill capable of drilling to depths of 2,500 metres (NQ core) arrived on site in July and is currently extending one of these two holes to its final target depth. To date, a total of 2,700 metres in 2 holes have been completed.
Current wording
The program is being executed using two company-owned underground U5 drills which were converted into surface A5 drills, and a new Marcotte HTM2500 drill purchased by the Company capable of drilling to depths of 2,500 metres (NQ core) which arrived on site in July.
Previous wording
The historical BCL operations consisted of an integrated mining, concentrating and smelting complex which operated for over 40 years over the Selebi Phikwe project area. The smelter processed Selebi and Phikwe concentrates and toll treated nickel concentrates received from the Nkomati Nickel Mine and the Phoenix Mine. The concentrator plant and smelter were placed on care and maintenance in 2016 and are located adjacent to the Selebi Mines at the historical Phikwe Mine.
Current wording
The historical BCL operations consisted of an integrated mining, concentrating and smelting complex which operated for over 40 years over the Selebi Phikwe project area. The smelter processed Selebi and Phikwe concentrates and toll treated nickel concentrates received from the Nkomati Nickel Mine and the Phoenix Mine. The concentrator plant and smelter were located adjacent to the Selebi Mines at the historical Phikwe Mine; however, these facilities were not included in the Company’s acquisition of the Selebi Mines and remain under separate ownership. Both facilities were placed on care and maintenance in 2016. Following the completion of comprehensive technical and trade-off studies, the Company intends to construct a new processing facility at the Selebi Mines to produce concentrate for commercial sale, or for further refining, and does not plan to restart the existing concentrator or smelter. The Company is also evaluating pre-concentration using XRT technology.
Previous wording
Metallurgical sampling and testing iterations from Selebi flotation studies are ongoing. On July 28, 2025, the Company reported initial results from its bulk test work using XRT pre-concentration sorting at the Selebi Mines. The initial results demonstrated the potential to significantly reduce the amount of waste rock being sent to the mill and enhance the head grade by over 15% from previous tests. By reducing the volume of waste into the mill, the waste volume directed to grinding and flotation circuits is substantially reduced. This is expected to have a positive impact on processing including energy, reagent and water usage, reduced downstream tailings, and lower expected operating costs. XRT pre-concentration sorting has the potential to be applied at both the Selebi Mines and Selkirk Mine.
Current wording
On July 28, 2025, the Company reported initial results from its bulk test work using XRT pre-concentration sorting at the Selebi Mines. The initial results demonstrated the potential to reduce the amount of waste rock being sent to the mill and enhance the head grade by over 15% compared to a bulk sample. By reducing the volume of waste into the mill, the waste volume directed to grinding and flotation circuits could be substantially reduced.
Previous wording
During the three and six months ended June 30, 2025, the Company incurred $8,620,305 (three months ended June 30, 2024 - $6,223,952) and $14,614,458 (six months ended June 30, 2024 - $12,693,881), respectively, in exploration and evaluation expenditures on the Selebi Mines. The Company incurred $8,735,401 to acquire the Selebi Mines, and has incurred a further $83,911,034 in exploration and evaluation expenditures project-to-date as at June 30, 2025.
Current wording
During the three and nine months ended September 30, 2025, the Company incurred $8,465,855 (three months ended September 30, 2024 - $7,988,816) and $23,080,313 (nine months ended September 30, 2024 - $20,682,696), respectively, in exploration and evaluation expenditures on the Selebi Mines. The Company incurred $8,735,401 to acquire the Selebi Mines, and has incurred a further $92,376,889 in exploration and evaluation expenditures project-to-date as at September 30, 2025.
Previous wording
In addition to the drilling, the Company is advancing metallurgical studies including hydrometallurgical test work. Flowsheet designs are in progress, taking into consideration the ongoing XRT pre-concentration sorting evaluations. The Company plans to continue advancing the 3D modelling work to continually optimize drill hole placement.
Current wording
In addition to drilling, the Company is advancing study work. Mineralogical studies and flowsheet optimization are underway with the objective of improving recoveries under the separate saleable concentrates scenario, which includes the completion of studies on (i) copper rougher tailings and nickel cleaner tailings streams to better understand nickel losses, (ii) assessing finer regrind opportunities to improve nickel liberation and recovery, and (iii) conducting batch tests on Selebi Main and Selebi North material individually. Flowsheet designs will also take into consideration the ongoing XRT pre-concentration sorting evaluations. The Company plans to continue advancing the 3D modelling work to continually optimize drill hole placement. Hydrometallurgical studies have been deferred pending the foregoing investigations.
Previous wording
The Selkirk Mine is accessed year-round via paved and gravel roads from Gaborone and Francistown. The Selkirk Mine infrastructure includes relict surface infrastructure supporting the historical underground mine, and the original decline.
Current wording
The Selkirk Mine is located in the northeast of Botswana approximately 28 km southeast of the city of Francistown, and 450 km northeast of the national capital Gaborone. The property is accessed year-round via paved and gravel roads from Gaborone and Francistown. The Selkirk Mine infrastructure includes relict surface infrastructure supporting the historical underground mine, and the original decline.
Previous wording
The Selkirk Mine consists of a single mining licence covering an area of 1,458 hectares (14.58 km 2) and four prospecting licences covering a total of 12,670 hectares (126.7 km 2). The mining licence, 2022/7L, is centred approximately at 21°19’13” S and 27°44’17” E and is held by PNGPL, a subsidiary of NEXM. The mining licence was renewed for ten years commencing on May 27, 2022, ending on May 26, 2032. The four prospecting licences (PL050/2010, PL051/2010, PL210/2010, and PL071/2011) were renewed during the first quarter of 2025 and will expire March 31, 2027.
Current wording
The Selkirk Mine consists of a single mining licence covering an area of 1,458 hectares (14.58 km 2) and four prospecting licences covering a total of 12,670 hectares (126.7 km 2). The mining licence, 2022/7L, is centred approximately at 21°19’13” S and 27°44’17” E and is held by PNGPL, a subsidiary of NEXM. The mining licence was renewed for ten years commencing on May 27, 2022, and expires on May 26, 2032. The four prospecting licences (PL050/2010, PL051/2010, PL210/2010, and PL071/2011) were renewed during the first quarter of 2025 and will expire March 31, 2027.
Previous wording
The key assumptions, parameters, and methods used to estimate the mineral resources are contained in the Selkirk TRS.Readers are cautioned not to assume that all or any part of an Inferred Mineral Resource exists or is economically or legally mineable, or that an Inferred Mineral Resource will ever be upgraded to a higher category.
Current wording
The key assumptions, parameters, and methods used to estimate the mineral resources are contained in the Selkirk TRS.Readers are cautioned not to assume that all or any part of an Inferred Mineral Resource exists or that, if it exists, is economically or legally mineable or that an Inferred Mineral Resource will ever be upgraded to a higher category.
Previous wording
During the quarter, the Company commenced a 12-hole surface drilling program. The two drill rigs were focused on twinning 11 historical holes to validate legacy data and one hole to fill a gap in the resource. The surface drilling program was collecting fresh HQ-sized core to support metallurgical flowsheets, generate material for preliminary XRT pre-concentration sorting tests, and to support the potential expansion and upgrade of the resource. In July 2025, the Company commenced a 3-hole exploration program targeting untested historical Versatile Time-Domain Electromagnetic (“VTEM”) anomalies located immediately south of the Selkirk resource. The Company has completed the 12-hole surface drilling program which consisted of 3,903 metres. Up to the date of this Report, the Company has drilled 139 metres in 2 exploration holes.
Current wording
In May 2025, the Company commenced a 12-hole surface drilling program. The program was focused on twinning 11 historical holes to collect metallurgical samples and validate legacy data with a twelfth hole to fill a gap in the resource. The 11 twinned holes provided fresh HQ-sized core to support metallurgical flowsheets, generate material for preliminary XRT pre-concentration sorting tests, and to support the potential expansion and upgrade of the resource. The Company has completed the 12-hole surface drilling program which consisted of 3,903 metres. Assays have been released for 8 of the 11 holes, highlights of which include 201 metres of 0.91% CuEq 2, 210 metres of 1.06% CuEq 2, and 219 metres of 1.03% CuEq 2.
Previous wording
The Company continued its re-sampling program of historic drill core throughout the first half of 2025, targeting both resource expansion and reclassification in an updated MRE and to obtain complete PGE analysis. An additional 34 historical holes have been identified for resampling. To date, 29 of 34 holes have been processed, relogged and resampled for a total of 8,707 metres. The 2025 program has confirmed high-grade mineralization including 8.69% CuEq 2 and elevated Rhodium outside of the Selkirk MRE.
Current wording
The Company continued its re-sampling program of historic drill core throughout the year, targeting both resource expansion and reclassification in an updated MRE and to obtain complete PGE analysis. An additional 34 historical holes have been identified for resampling. To date, 31 holes have been processed, relogged and resampled. A total of 17 holes from a previous program were completed with assays announced in October 2024, while results from an initial 6 holes of the current 34 hole program were released on August 28, 2025. Assays for the remaining 2025 holes are pending. The results received to-date for the 2025 program have confirmed large intercepts of mineralization within the current Selkirk MRE as well as outside of the Selkirk MRE and within the conceptualized pit shell demonstrating potential for expansion of the deposit.
Previous wording
Metallurgical studies are ongoing, focused on supporting the development of a modern metallurgical flowsheet including the potential for XRT pre-concentration. Sample preparation works for separate copper and nickel concentrate testing are also underway. This work will be incorporated into an updated Mineral Resource Estimate and future economic evaluations.
Current wording
Metallurgical studies are ongoing, focused on supporting the development of a modern metallurgical flowsheet including the potential for XRT pre-concentration. Sample preparation works for separate copper and nickel concentrate testing are also underway using the large diameter drill core. The results of this work will be incorporated into an updated Mineral Resource Estimate and future economic evaluations.
Previous wording
During the three and six months ended June 30,2025, the Company incurred $1,603,705 (three months ended June 30, 2024 - $322,642) and $1,705,673 (six months ended June 30, 2024 - $519,139), respectively, in exploration and evaluation expenditures on the Selkirk Mine. The Company incurred $327,109 to acquire the Selkirk Mine, and has incurred a further $4,764,175 in exploration and evaluation expenditures project-to-date as at June 30, 2025.
Current wording
During the three and nine months ended September 30, 2025, the Company incurred $2,084,888 (three months ended September 30, 2024 - $606,725) and $3,790,561 (nine months ended September 30, 2024 - $1,125,865), respectively, in exploration and evaluation expenditures on the Selkirk Mine. The Company incurred $327,109 to acquire the Selkirk Mine, and has incurred a further $6,849,063 in exploration and evaluation expenditures project-to-date as at September 30, 2025.
Previous wording
No exploration work was completed in the first half of 2025 on the Post Creek Property. The claims have sufficient work credits to keep them in good standing until 2030. No material expenditures or activities are contemplated on the Post Creek property at this time.
Current wording
No exploration work was completed in the first three quarters of 2025 on the Post Creek Property. The claims have sufficient work credits to keep them in good standing until 2030. No material expenditures or activities are contemplated on the Post Creek property at this time.
Previous wording
The Halcyon property is located 35 kilometres northeast of Sudbury in the Parkin and Aylmer townships and consists of 62 unpatented mining cells for a total of 1,024 hectares. Halcyon is adjacent to the Post Creek property and is approximately two kilometres north of the producing Podolsky Mine of FNX Mining. The property was acquired through an option agreement and as at the date of this Report, the Company holds a 100% interest in the Halcyon property and is obligated to pay advances on a net smelter return of $8,000 per annum, which will be deducted from any payments to be made under the net smelter return.
Current wording
The Halcyon property is located 35 kilometres northeast of Sudbury in the Parkin and Aylmer townships and consists of 62 unpatented mining cells for a total of 1,024 hectares. Halcyon is adjacent to the Post Creek property and is approximately two kilometres north of the Podolsky Mine. The property was acquired through an option agreement and as at the date of this Report, the Company holds a 100% interest in the Halcyon property and is obligated to pay advances on a net smelter return of $8,000 per annum, which will be deducted from any payments to be made under the net smelter return.
Previous wording
No exploration work was completed in the first half of 2025 on the Halcyon Property. The claims are in good standing through 2030. No material expenditures or activities are contemplated on the Halcyon property at this time.
Current wording
No exploration work was completed in the first three quarters of 2025 on the Halcyon Property. The claims are in good standing through 2030. No material expenditures or activities are contemplated on the Halcyon property at this time.
Previous wording
In December 2024, the Company notified the Government of Greenland that it was relinquishing its licences effective immediately. The Company is expecting final approval from authorities pending the removal of remaining structures. The Company provisioned $140,000 for the three and six months ended June 30, 2025 (three and six months ended June 30, 2024 - $nil) for the remediation work at the property.
Current wording
In December 2024, the Company notified the Government of Greenland that it was relinquishing its licences effective immediately. Removal of the remaining structures from the camp was completed in September 2025. The Company is awaiting final approval of the relinquishment from authorities. The Company provisioned $nil and $140,000 for the three and nine months ended September 30, 2025 (three and nine months ended September 30, 2024 - $nil) for the remediation work at the property.
Previous wording
The following table summarizes the Company’s operations for the three- and six-month periods ended June 30, 2025 and June 30, 2024:
Current wording
The following table summarizes the Company’s operations for the three- and nine-month periods ended September 30, 2025, and September 30, 2024:
Previous wording
Net cash used in operating activities for the six months ended June 30, 2025 increased by $5,006,299 compared to the prior year comparable period resulting from: (i) an increase in general exploration expenses as the Company ramped up drilling, studies and other evaluation work during the second quarter of 2025 at both the Selebi Mines and Selkirk Mine; and (ii) an increase in investor relations and communications expenditures in an effort to create market awareness about the Company’s new strategic direction and related activities at the Mines.
Current wording
Net cash used in operating activities for the nine months ended September 30, 2025, increased by $8,439,102 compared to the prior year comparable period resulting from: (i) an increase in general exploration expenses as the Company executed on its expansionary drilling, metallurgical flowsheet development, and other studies and evaluation work in the current year period; and (ii) an increase in investor relations and communications expenditures in an effort to create market awareness about the Company’s new strategic direction and related activities at the Mines.
Previous wording
Key investing activities relate to the acquisition of property, plant and equipment. Net cash used in investing activities for the six months ended June 30, 2025 increased by $389,542 compared to the prior year comparable period. The higher spending in 2025 primarily relates to the acquisition of a deep drill for the Selebi Hinge zone, kits for converting two underground U5 drills into surface A5 drills, and light duty vehicles.
Current wording
Key investing activities relate to the acquisition of property, plant and equipment. Net cash used in investing activities for the nine months ended September 30, 2025, increased by $555,260 compared to the prior year comparable period. The higher spending in 2025 primarily relates to the acquisition of a deep drill for the Selebi Hinge zone, kits for converting two underground U5 drills into surface A5 drills, and light duty vehicles.
Previous wording
Net cash provided by financing activities for the six months ended June 30, 2025 increased by $17,037,715 compared to the prior year comparable period. The increase primarily reflects the closing of a Private Placement in March 2025 for gross proceeds of $46,000,000. In the comparative period, the Company closed a financing in June 2024 for gross proceeds of $27,454,421 (see “Liquidity and Capital Resources – Financings”).
Current wording
Net cash provided by financing activities for the nine months ended September 30, 2025, increased by $18,973,282 compared to the prior year comparable period. The increase primarily reflects the closing of a Private Placement in March 2025 for gross proceeds of $46,000,000. In the comparative period, the Company closed a financing in June 2024 for gross proceeds of $27,454,421 (see “Liquidity and Capital Resources – Financings”).
Previous wording
The properties in which the Company currently has an interest are in the pre-revenue stage. Operating cash outflows are highly dependent upon the exploration and evaluation programs taking place at that time. As such, the Company is dependent on external financing to fund its activities and the advancement of its projects. In order to carry out the planned project advancement and cover administrative costs, the Company will need to use its existing working capital and raise additional amounts as needed. Further, the second instalment under the Selebi APA of $34,107,500 (US$25,000,000) is due January 31, 2026 (see “Contractual Obligations and Contingencies”), which may require the Company to raise additional funding as the Company does not currently have sufficient funds to meet this obligation.
Current wording
The properties in which the Company currently has an interest are in the pre-revenue stage. Operating cash outflows are highly dependent upon the exploration and evaluation programs taking place at that time. As such, the Company is dependent on external financing to fund its activities and the advancement of its projects. In order to carry out the planned project advancement and cover administrative costs, the Company will need to use its existing working capital and raise additional amounts as needed.
Previous wording
As at June 30, 2025, the Company had $26,463,957 in available cash and cash equivalents (December 31, 2024–$6,105,933), with no source of operating cash flows, nor any significant credit lines in place. As at June 30, 2025, the Company had working capital (calculated as total current assets less total current liabilities) of $23,875,340 (December 31, 2024–$3,410,490). The increase in working capital is a result of the cash proceeds received from the Private Placement.
Current wording
As at September 30, 2025, the Company had $14,117,843 in available cash and cash equivalents (December 31, 2024 – $6,105,933), with no source of operating cash flows, nor any significant credit lines in place. As at September 30, 2025, the Company had working capital (calculated as total current assets less total current liabilities) of $9,972,465 (December 31, 2024 – $3,410,490). The increase in working capital is a result of the cash proceeds received from the Private Placement.
Previous wording
As at June 30, 2025, the Company has expended $17,582,633 of the Private Placement net proceeds. While the Company has arranged this additional financing, the proceeds are intended for the advancement of exploration and evaluation activities at the Mines and for general corporate and working capital purposes. Subject to any changes in the Company’s operational plan, this transaction will provide the Company with the funds required to advance its planned activities and cover administrative costs into the first quarter of 2026. Therefore, the Company will need to arrange additional financing to meet its commitments under the asset purchase agreements (see “Contractual Obligations and Contingencies”).
Current wording
Subject to any changes in the Company’s operational plan, this transaction will provide the Company with the funds required to prepay the first contingent milestone payment under the Selebi APA and Selkirk APA, advance its planned activities and cover administrative costs into the first quarter of 2027.
Previous wording
The ability of the Company to continue operations as a going concern is ultimately dependent upon achieving profitable operations and its ability to obtain adequate financing. The Company incurred a net loss of $15,088,746 and $30,317,076 for the three and six months ended June 30, 2025, respectively (net loss of $9,793,192 and $19,140,372 for the three and six months ended June 30, 2024, respectively). To date, the Company has not generated profitable operations from its resource activities. It is not possible to predict whether future financing efforts will be successful or if the Company will attain a profitable level of operations. These material uncertainties cast substantial doubt about the Company’s ability to continue as a going concern. The accompanying unaudited condensed interim consolidated financial statements do not include any adjustments relating to the recoverability and classification of recorded asset amounts and classification of liabilities, and the reported expenses and comprehensive loss that might be necessary should the Company be unable to continue as a going concern. These adjustments could be material. In assessing whether a going concern assumption is appropriate, management considers all available information about the future, which is at least, but not limited to, twelve months from the date of this Report.
Current wording
The ability of the Company to continue operations as a going concern is ultimately dependent upon achieving profitable operations and its ability to obtain adequate financing. The Company incurred a net loss of $16,004,468 and $46,321,544 for the three and nine months ended September 30, 2025, respectively (net loss of $12,004,960 and $31,145,332 for the three and nine months ended September 30, 2024, respectively). To date, the Company has not generated profitable operations from its resource activities. It is not possible to predict whether future financing efforts will be successful or if the Company will attain a profitable level of operations. These material uncertainties cast substantial doubt about the Company’s ability to continue as a going concern. The accompanying unaudited condensed interim consolidated financial statements do not include any adjustments relating to the recoverability and classification of recorded asset amounts and classification of liabilities, and the reported expenses and comprehensive loss that might be necessary should the Company be unable to continue as a going concern. These adjustments could be material. In assessing whether a going concern assumption is appropriate, management considers all available information about the future, which is at least, but not limited to, twelve months from the date of this Report.
Previous wording
As of June 30, 2025, the Company had commitments for capital expenditures over the next 12 months of $7,180 and the following other contractual obligations and commitments:
Current wording
As of September 30, 2025, the Company had commitments for capital expenditures over the next 12 months of $156,650 and the following other contractual obligations and commitments:
Previous wording
As per the terms and conditions of the Selebi APA, the Company has the option to cancel the second and third payments and return the Selebi Mines to the liquidator if the Company determines that the Selebi Mines are not economical. The Company also has an option to pay in advance the second and third payments if the Company determines that the Selebi Mines are economical. The Company’s accounting policy is to measure and record contingent consideration when the conditions associated with the contingency are met. As of June 30, 2025, none of the conditions of the second and third instalments have been met, hence these amounts are not accrued in the Financial Statements.
Current wording
As per the terms and conditions of the Selebi APA, the Company has the option to cancel the payments and return the Selebi Mines to the liquidator if the Company determines that the Selebi Mines are not economical. The Company also has an option to make the payments in advance if the Company determines that the Selebi Mines are economical. As of September 30, 2025, none of the conditions of the remaining milestone payments have been met, hence these amounts are not accrued in the Financial Statements.
Previous wording
In addition to the Selebi APA, the purchase of the Selebi Mines is also subject to a royalty agreement as well as a contingent consideration agreement with the liquidator. The royalty agreement consists of a net smelter royalty (“NSR”) of 2% on the net value of sales of concentrate or other materials with respect to production from the Selebi mining licence, of which the Company has the right to buy-back 50%. The contingent consideration agreement consists of two components: (i) a sliding scale payment of US$0.50/tonne of ore up to US$1.40/tonne of ore with respect to the discovery of new mineable deposits greater than 25 million tonnes of ore from a base case of 15.9 million tonnes, with a minimum grade of 2.5% nickel equivalent, accrued at the time of a decision to mine; (ii) price participation of 15% on post-tax net earnings directly attributable to an increase of 25% or more in commodity prices, on a quarterly basis, for a period of seven years from the date of first shipment of concentrate or other materials.
Current wording
In addition to the Selebi APA, the purchase of the Selebi Mines is also subject to a royalty agreement as well as a contingent consideration agreement with the liquidator. The royalty agreement consists of a net smelter royalty of 2% on the net value of sales of concentrate or other materials with respect to production from the Selebi mining licence, of which the Company has the right to buy-back 50%. The contingent consideration agreement consists of two components: (i) a sliding scale payment of US$0.50/tonne of ore up to US$1.40/tonne of ore with respect to the discovery of new mineable deposits greater than 25 million tonnes of ore from a base case of 15.9 million tonnes, with a minimum grade of 2.5% nickel equivalent, accrued at the time of a decision to mine; (ii) price participation of 15% on post-tax net earnings directly attributable to an increase of 25% or more in commodity prices, on a quarterly basis, for a period of seven years from the date of first shipment of concentrate or other materials.
Previous wording
In August 2023, the Company announced that it had entered into a binding commitment letter with the liquidator of BCL to acquire a 100% interest in two additional deposits, Phikwe South and the Southeast Extension, located adjacent to and immediately north of the Selebi North historical workings. The agreement has since lapsed and on August 11, 2025, the Company informed the liquidator of BCL that it would no longer be pursuing the acquisition of the Phikwe South and the Southeast Extension deposits.
Current wording
In August 2023, the Company entered into a binding commitment letter with the liquidator of BCL to acquire a 100% interest in two additional deposits, Phikwe South and the Southeast Extension, located adjacent to and immediately north of the Selebi North historical workings. The agreement has since lapsed and on August 11, 2025, the Company informed the liquidator of BCL that it would no longer be pursuing the acquisition of the Phikwe South and the Southeast Extension deposits.
Previous wording
In regard to the Selkirk Mine, the purchase agreement does not provide for a purchase price or initial payment for the purchase of the assets. The Selkirk purchase agreement provides that if the Company elects to develop Selkirk first, the payment of the second Selebi instalment of US$25 million would be due upon the approval by the Minister of MMRGTES of the Company’s Section 42 and Section 43 applications (for the further extension of the Selkirk mining licence and conversion of the Selkirk mining licence into an operating licence, respectively). For the third Selebi instalment of US$30 million, if Selkirk were commissioned earlier than Selebi, the payment would trigger on Selkirk’s commission date. The Selkirk APA provides for a three-year study phase expiring August 17, 2025, which can be extended for one year with written notice to the liquidator. The Company has submitted the written notice and, as of August 13, 2025, is awaiting formal acceptance by the liquidator.
Current wording
In regard to the Selkirk Mine, the purchase agreement does not provide for a purchase price or initial payment for the purchase of the assets. The Selkirk purchase agreement provides that if the Company elects to develop Selkirk first, the payment of the second Selebi instalment of US$25 million would be due upon the approval by the MMRGTES of the Company’s Section 42 and Section 43 applications (for the further extension of the Selkirk mining license and amendment of Selkirk mining programme, respectively). For the third Selebi instalment of US$30 million, if Selkirk were commissioned earlier than Selebi, the payment would trigger on Selkirk’s commission date. The Selkirk APA provides for a three-year study phase originally expiring August 17, 2025, which has been extended for one year to August 17, 2026.
Showing the first 40 of 42 pairs. Open the source sections for the rest.
Rearranged current paragraphs (1)
Current report — wording carried from elsewhere
In July 2025, the Company commenced a 3-hole exploration program targeting untested historical Versatile Time-Domain Electromagnetic (“VTEM”) anomalies located immediately south of the Selkirk resource. The Company has completed the 3-hole exploration program which consisted of 522 metres. Two of the three drill holes are located along the same geological horizon of the Selkirk deposit and intersected intervals of massive and disseminated sulphides. Assays are pending.
Rearranged previous paragraphs (3)
Previous report — wording carried elsewhere
The Company’s principal business activity is the exploration and evaluation of the Mines.
Previous report — wording carried elsewhere
NEXM intends to use pre-concentration methods to separate the minerals from waste materials to produce a mill feed and flotation to produce a concentrate for commercial sale, or for further refining, and does not plan to restart the existing concentrator or smelter.
Previous report — wording carried elsewhere
The Selkirk Mine is located in the northeast of Botswana approximately 28 km southeast of the city of Francistown, and 450 km northeast of the national capital Gaborone.