A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.
Sep 30, 2024 · Filed Nov 14, 2024
What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-Q
Period ended 2024-06-30; filed 2024-08-14.
0001493152-24-032123
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsCurrent report: 10-Q
Period ended 2024-09-30; filed 2024-11-14.
0001493152-24-045722
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 149 previous paragraphs and 170 current paragraphs.
73 unchanged; 56 reworded; 41 added; 19 removed; 1 previous and 0 current paragraphs rearranged.
Tables are not compared: 30 previous and 18 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (41)
Current report
In 2024, our execution has been focused on four key initiatives, namely:
Current report
(1) Optimize Projects – improve the profitability, operational efficiency, customer satisfaction and customer mix at our operating data centers;
Current report
(2) Grow Pipeline – increase the number of curtailment assessments completed, sign more term sheets for projects and mature more projects to shovel readiness;.
Current report
(3) Launch AI – form, capitalize, and begin operations of our AI Cloud services business in partnership with a leading Original Equipment Manufacturer (“OEM”) partner and kick off customer development activities; and
Current report
(4) Financing Opportunities – Raise capital to support our growth initiatives, including Project Dorothy 2, Project Ada, and Project Kati. to support.
Current report
Dorothy 1A
Current report
Dorothy 1B
Current report
Sophie is focused on Bitcoin Hosting of multiple large customers such as Bit Digital and Compass. The data center generates revenue via a combination of fixed services fees and profit share, while energy cost is passed through. There are approximately 9,000 Bitcoin miners installed, resulting in an installed hashrate of approximately 801 PH/s. For 2023, the facility achieved a PUE of 1.03. For the three and nine months ended September 30, 2024, the facility achieved a PUE of 1.02.
Current report
Flagship Expansion
Current report
Dorothy 2
Current report
We began planning for the 50 MW expansion of Project Dorothy in 2023. We partnered with SLC who will finance up to $30 million of the project cost. We closed the initial financing contribution and operation agreement with SLC in July 2024 and broke ground in the third quarter of 2024. Initial energization and ramp-up is expected by the end of the first quarter of 2025. Dorothy 2 will feature a stronger waterfall structure and enhanced management and development fees compared to Dorothy 1A, allowing Soluna to benefit from substantial income once the facility is operational.
Current report
Pipeline Growth
Current report
Kati
Current report
Project Kati is planned to be a 166 MW data center integrated with a 300 MW wind farm in South Texas. It is expected to host a mix of Bitcoin Mining and AI/HPC customers in separate data center facilities located onsite and sharing certain infrastructure. The project has progressed rapidly from term sheet signing in 2023 through the ERCOT planning process and signing of a PPA with EDF Renewables and Masdar - Abu Dhabi Future Energy Company.
Current report
Rosa
Current report
Project Rosa is planned to be a 187 MW data center integrated with a 240 MW wind farm in North Texas. It is, like Kati, expected to host a mix of Bitcoin Mining and AI/HPC customers in separate data center facilities located onsite and sharing certain infrastructure. Term sheets for power and land were signed in September 2024 and the project will soon move into and through the ERCOT planning process as well as securing a PPA.
Current report
We are on track to nearly double our assets under management by the end of 2024 or early 2025 and thereafter which is our goal.
Current report
Ada
Current report
Project Ada launched when a subsidiary of Soluna Cloud entered into a $12.5 million credit facility with GreenCloud Partners in June 2024 and a $1.25 million credit facility on the same terms with a syndicated group of lenders related to Alpha Capital in July. These funds enabled us to fund ongoing working capital needs and to secure an agreement with Hewlett Packard Enterprise Company (“HPE”) to acquire access to datacenter and cloud services for AI and HPC processes for 36 months at a cost of $34 million, with $10.3 million pre-paid in June at contract execution.
Current report
Grace
Current report
Financing Opportunities
Current report
Yorkville Standby Equity Purchase Agreement (“SEPA”)
Current report
We secured a $25 million SEPA in August 2024 with a subsidiary fund of Yorkville Advisors. This facility provides cash to us by way of draws against it which can be made once the S-1 registration statement that was filed in September 2024 is effective and can be fully used once shareholder approval to remove the exchange cap is obtained which is expected to be in November 2024. Funds from this facility will fund critical Soluna Cloud AI operations and data center development, capital for deployment into projects to improve equity ownership and cash flows, to strengthen the balance sheet and to retire existing convertible loan notes.
Current report
In order to secure necessary consents for the SEPA, agreements were reached with existing convertible loan noteholders and the Preferred Series B stockholder. The agreements with convertible loan note holders resulted in prepayment of convertible loan note prepayment fees, payment of a waiver fee of $750 thousand and an obligation to purchase the $1.25 million Soluna Cloud notes and pay unconverted convertible loan note balances from cash raised from the SEPA. The agreements with the Preferred Series B stockholder resulted in limitations of future rights of first refusal, participation, consent and warrant or stock conversion and repricing of the conversion price and existing warrants and issuance of new warrants.
Current report
Future Financing
Current report
We plan to raise funds, via the SEPA and other means, to support accretive opportunities related to our growth initiatives and projects.
Current report
Fiscal years 2022 and 2023 presented unprecedented challenges for the Bitcoin mining industry. In 2022, a sharp drop in Bitcoin prices, compounded by geopolitical tensions such as the war in Ukraine and surging global energy costs, drove several mining companies into bankruptcy proceedings, resulting in market oversaturation with used mining equipment at steep discounts. This destabilization persisted well into 2023, further complicated by high-profile industry setbacks, including the collapse of FTX and regulatory scrutiny on Binance, the largest global cryptocurrency exchange. These events collectively dampened investor confidence and weighed on Bitcoin prices.
Current report
In late 2023, a critical turning point emerged as major asset managers, including BlackRock, Grayscale, and Bitwise, submitted applications for Bitcoin Spot Exchange-Traded Funds (ETFs). The anticipation surrounding potential ETF approvals reignited interest in Bitcoin, creating a bullish shift in market sentiment. Bitcoin prices have since seen upward momentum, providing substantial revenue opportunities across the ecosystem. The approval and adoption of Bitcoin ETFs in mainstream financial markets could seem poised to have marked a milestone for broader institutional support, having facilitated greater liquidity, price stability, and increased investment in the sector.
Current report
As we progress through 2024, the Bitcoin mining sector seems positioned for both recovery and transformation. The trend of institutionalization appears to be shaping the industry’s landscape, with consolidation likely reducing network competition, thus potentially increasing our share of Bitcoin rewards. Our company’s access to low-cost and renewable energy sources places us in a strategic position to maximize uptime and efficiency as hash rates and mining difficulty continue to climb.
Current report
Key factors shaping industry dynamics include ETF approvals, which have bolstered Bitcoin prices, increased institutional participation that may provide stability, and the possibility of a more defined regulatory framework as the digital asset landscape matures. However, as the sector gains mainstream acceptance, miners must also prepare for regulatory and ESG scrutiny, fluctuating energy costs, and market consolidation. Our emphasis on low-cost, renewable energy sources and strategic risk management supports our ability to navigate these challenges while maximizing profitability and operational longevity.
Current report
Looking forward, we are cautiously optimistic about industry trends, with a strong focus on agility, cost-efficiency, and compliance as we adapt to an evolving Bitcoin mining landscape.
Current report
Inflation Reduction Act
Current report
Hosting Agreement Termination
Current report
Recently we have entered into substantive discussions with a customer, representing over 50% of our data hosting revenue, to mutually terminate a hosting agreement early. This is most likely to take place during the fourth quarter of 2024. We are also in significant and advanced discussions with multiple potential customers who are expected to fully replace the lost hosting capacity with minimal interruptions, also likely to take place during the fourth quarter of 2024.
Current report
***Cost of High-Performance Computing Services:***Cost of high-performance computing services include production costs related to high performance computing services which for the three months ended September 30, 2024 was approximately $2.9 million and related to an agreement with HPE effective July 1, 2024 to acquire access to datacenter and cloud services for AI and HPC processes. As of September 30, 2024, no revenue has been generated for these services. There were no such costs associated for the three months ended September 30, 2023.
Current report
Loss (Gain) on Sale of Fixed Assets: The Company did not have a loss or gain on sale of fixed assets for the three months ended September 30, 2024. For the three months ended September 30, 2023, the Company incurred a loss on sale of fixed assets of approximately $373 thousand in relation to the sale of miners for Project Sophie and sale of the remaining Project Marie fixed assets including the Tesseracks.
Current report
Consolidated Results of Operations for the Nine Months Ended September 30, 2024 Compared to the Nine Months Ended September 30, 2023.
Current report
The following table summarizes the balances for the Project sites for cryptocurrency mining revenue, data hosting revenue, cost of cryptocurrency mining revenue, exclusive of depreciation, cost of data hosting revenue, exclusive of depreciation, and cost of depreciation during the nine months ended September 30, 2024:
Current report
The following table summarizes the balances for the Project sites for cryptocurrency mining revenue, data hosting revenue, cost of cryptocurrency mining revenue, exclusive of depreciation, cost of data hosting revenue, exclusive of depreciation, and cost of depreciation during the nine months ended September 30, 2023:
Current report
***Cost of High-Performance Computing Services:***Cost of high-performance computing services include production costs related to high performance computing services which for the nine months ended September 30, 2024 was approximately $2.9 million and related to an agreement with HPE effective July 1, 2024 to acquire access to datacenter and cloud services for AI and HPC processes. As of September 30, 2024, no revenue has been generated for these services. There were no such costs associated for the nine months ended September 30, 2023.
Showing the first 40 of 41 passages. Open the source sections for the rest.
Removed paragraphs (19)
Previous report
The Company owns 100% of the facility and completed its construction in 2021. In the second quarter of fiscal year 2023, we shifted Project Sophie to Data Hosting, signing contracts with leading Bitcoin miners. We sold older, less efficient Bitcoin mining equipment and used the cash to make operational improvements to the site and to fund corporate operations. Throughout 2023, Sophie progressively secured new more profitable hosting contracts. We have deployed over 8,000 mining machines for hosting in 2023 and 2024 at the site. The Data Hosting agreements generate revenue for a combination of a fixed services fee and a profit share component. The cost of power is passed through to customers. Customers at the site now include leading public Bitcoin Miners such as Bit Digital, Compass Mining, and other leading sustainability focused customers. During the second quarter of 2024, Project Sophie’s team executed well, mitigating the effects of Kentucky tornadoes. Critical infrastructure optimizations were implemented to prepare for the summer heat to improve efficiency and utilize additional available capacity to prepare for Sophie’s AI hosting customer.
Previous report
Expand Flagship, Dorothy 2
Previous report
In 2023, we began the planning process for building out the second 50 MW phase of Project Dorothy – Dorothy 2. We completed the design, established new procurement partners, and submitted an updated approval to ERCOT. In May 2024, the Company partnered with Spring Lane Capital (“SLC”) to finance up to $30 million. The financing will facilitate the construction of the Dorothy 2 facility, in which the parties will begin construction with the goal of achieving initial energization and ramp-up by the end of the first quarter of 2025. Dorothy 2 will feature a stronger waterfall structure and enhanced management and development fees compared to Dorothy 1A, allowing Soluna to benefit from substantial current income during operational phase. On July 22, 2024, the financing on the Dorothy 2 project closed. Project Dorothy 2 will be adjacent to two other Soluna modular data center projects co-located at the same site. Project Dorothy 2 is financed by SLC, which will make a capital contribution up to approximately $29.98 million, and the Company, which will make a capital contribution up to approximately $4.6 million, and as of July 22, 2024 became co-owners of ComputeCo with Soluna Digital, Inc.
Previous report
Grow Pipeline
Previous report
In 2023, we signed a term sheet for a new 166 MW data center called Kati that will be integrated with a 300 MW wind farm that has surplus energy due to increasing curtailment by the grid. We worked throughout 2023 to advance the project through grid operator’s, ERCOT planning process, and in 2024 have resubmitted a key study to take into account a change in distance from substation. In May 2024, we announced the signing of a Power Purchase Agreement (“PPA”) for Project Kati with EDF Renewables and Abu Dhabi Future Energy Company- Masdar. Project Kati will be co-located at a wind facility owned by EDF Renewables and Masdar. Project Kati will be executed in two phases, with each phase delivering 83 MW of renewable energy capacity to power high-performance computing applications including AI.
Previous report
For 2024, we aim to double our assets under management to 150 MW by the end of fiscal year 2024 or the beginning of 2025, focusing on constructing and energizing 48 MW of Project Dorothy 2 as noted above, and breaking ground on Project Kati.
Previous report
On June 24, 2024, Soluna Cloud closed on a $12.5 million secured credit facility to fund the GPU contract and Soluna Cloud startup costs, and on July 17, 2024, raised an additional $1.25 million secured credit facility enabling Soluna Cloud to continue its innovative approach to sustainable AI clouds and meet the increasing demand for renewable-energy powered, high-performance computing solutions.
Previous report
Finance Opportunities
Previous report
We plan to raise funds to support our growth initiatives, particularly in our AI hosting business, which we believe is a great fit for our renewable computing data center model.
Previous report
Fiscal years 2022 and 2023 proved challenging for the Bitcoin Mining industry. In 2022, several companies in the ecosystem initiated bankruptcy proceedings due to the severe decline in the price of Bitcoin and, the impact on energy prices of the war in Ukraine. This turmoil continued into most of 2023 with many companies working their way through chapter 11 and flooding the market with equipment sales. The trial of Sam Backman Fried, founder and CEO of FTX, the industry’s largest digital asset exchange, dominated the news and continued to compress the value of Bitcoin. Later in the year Changpeng Zhao, the founder of Binance, the largest cryptocurrency exchange in the world, pleaded guilty to money laundering violations. By the end of 2023, tides began to turn for Bitcoin as major asset managers like Black Rock, Greyscale, and Bitwise filed for Bitcoin Spot ETFs. This caused a surge in Bitcoin price beginning in the tail end of 2023 that has benefited revenues in the ecosystem. Consolidation in the space will likely decrease competition on the Bitcoin network, increasing our pro rata share of profits. Our industry leading power prices will allow us to stay on the network longer. Increased regulation of the industry could increase our costs.
Previous report
Inflation Rate Act
Previous report
***Impairment on Fixed Assets:***During the three months ended June 30, 2024, there were no impairment charges on fixed assets, compared to the Company had impairment charges of approximately $169 thousand for the three months ended June 30, 2023 due to revaluing the S19 miners to the current market conditions.
Previous report
Loss (Gain) on Sale of Fixed Assets: The Company had an immaterial loss on sale of equipment of approximately $21 thousand for the three and six months ended June 30, 2024, in which related to equipment held for sale and in storage. The Company received proceeds on the sale of equipment $145 thousand for the three months ended June 30, 2024, in which the net book value was approximately $166 thousand. For the three months ended June 30, 2023, the Company had a gain on sale of equipment of $48 thousand in relation to the sale of M30 miners in May and June of 2023, which the Company sold the miners for a higher value than the current net book value. The Company received proceeds of approximately $561 thousand in which the miners had a net book value of approximately $513 thousand. In addition, the Company sold Switchgear and M31 miners for cash proceeds of approximately $476 thousand in which no gain or loss was recognized as the switchgear and miners were sold at net book value.
Previous report
Consolidated Results of Operations for the Six Months Ended June 30, 2024 Compared to the Six Months Ended June 30, 2023.
Previous report
The following table summarizes the balances for the Project sites for cryptocurrency mining revenue, data hosting revenue, cost of cryptocurrency mining revenue, exclusive of depreciation, cost of data hosting revenue, exclusive of depreciation, and cost of depreciation during the six months ended June 30, 2024:
Previous report
The following table summarizes the balances for the Project sites for cryptocurrency mining revenue, data hosting revenue, cost of cryptocurrency mining revenue, exclusive of depreciation, cost of data hosting revenue, exclusive of depreciation, and cost of depreciation during the six months ended June 30, 2023:
Previous report
For the six months ended June 30, 2023, the Company had a loss on sale of equipment of approximately $30 thousand. In January 2023, the Company sold M20 and M21 miners for a loss on sale of equipment of approximately $82 thousand in which the Company received proceeds of $213 thousand for our M20 and M21 miners which were previously reported as held for sale as of December 31, 2022, in which had a net book value of $295 thousand. There were additional proceeds of $36 thousand in March 2023, in which resulted in a gain of approximately $3 thousand of scrap and other equipment. This was offset with a gain on sale of approximately $48 thousand in relation to the sale of M30 miners in May and June of 2023, which the Company sold the miners for a higher value than the current net book value. The Company received proceeds of approximately $561 thousand in which the miners had a net book value of approximately $513 thousand. In addition, the Company sold Switchgear and M31 miners for cash proceeds of approximately $476 thousand in which no gain or loss was recognized as the switchgear and miners were sold at net book value.
Previous report
Stock based compensation costs represented approximately $1.4 million non-cash restricted stock awards, units and options for the three months ended June 30, 2024 to members of our Board of Directors and certain Company employees compared to non-cash restricted stock units and options of $2.2 million to members of our Board of Directors and certain Company employees for the three months ended June 30, 2023. Stock based compensation costs represented approximately $2.0 million non-cash restricted stock units, awards and options for the six months ended June 30, 2024 to members of our Board of Directors and certain Company employees compared to non-cash restricted stock units and options of approximately $3.1 million to members of our Board of Directors and certain Company employees for the six months ended June 30, 2023.
Previous report
On May 16, 2024, SDI SL Borrowing – 1, LLC, an affiliate of Soluna Holdings, Inc. (the “Borrower”) entered into a loan agreement (the “Equipment Loan Agreement” or the “Loan”) with Soluna2 SLC Fund II Project Holdco LLC (the “Lender”, and collectively, the “Parties”). The Equipment Loan Agreement provides for the Company to borrow, from time to time, up to $1.0 million to be used to purchase necessary equipment for the progression of Project Dorothy 2. Any loans made under the Equipment Loan Agreement have a maturity date of May 16, 2027, and will bear interest at a rate of 15% per annum. On May 17, 2024, the Borrower drew down $720 thousand of the equipment loan with the Lender. As of June 30, 2024, the Borrower has an outstanding principal and compounded interest of approximately $734 thousand. Subsequently, on July 22, 2024, the Borrower satisfied and repaid the Borrowing Amount in full by issuing the Investor Class B Membership Interests in the Dorothy 2 project at three times the value of the Borrowing Amount (i.e., $2.16 million).
Reworded paragraphs (56)
Previous wording
We currently operate 75 MW of facilities across two locations. We have another 216 MW of facilities in development or near shovel ready in the United States. In addition, we have a 2 GW long term pipeline of renewable-energy powered projects. A summary of our pipeline, current and anticipated operating locations are as follows (as of June 30, 2024):
Current wording
We currently operate 75 MW of facilities at two locations. We have another 405 MW of facilities in development or near shovel ready in the United States. In addition, we have a 2 GW+ pipeline of renewable-energy powered projects. A summary of our pipeline, current and anticipated operating locations are as follows (as of September 30, 2024):
Previous wording
2023 and 2024 overview and developments
Current wording
2024 overview and developments
Previous wording
In 2023, we executed on the following four-pronged strategy: (1) Energize Project Dorothy; (2) Cash Flow, Site and Process Optimization; (3) Flagship Expansion; (4) Pipeline growth. In 2024, we continue to execute upon: (1) Optimize Projects; (2) Grow Pipeline; (3) Launch AI; and (4) Finance Opportunities. A summary of our overview and developments in these areas follows below.
Current wording
A summary of our overview and developments in these areas follows below.
Previous wording
We transitioned our flagship data center Project Dorothy from construction to operations. ERCOT approved the energizing of the first 50 MW of our new data center on April 20, 2023. We completed the construction and ramping of the facility starting in the spring of fiscal year 2023, and completed the full ramp by the end of October 2023. The data center is co-located with Briscoe Wind Farm (“Briscoe”), a 150 MW wind power generation facility in Silverton, Texas. The project is comprised of two elements, Project Dorothy 1A (“D1A”), and Project Dorothy 1B (“D1B”), each 25 MW facilities.
Current wording
We transitioned our flagship data center Project Dorothy from construction to operations during 2023 between spring and fall. The data center is co-located with Briscoe Wind Farm (“Briscoe”), a 150 MW wind power generation facility in Silverton, Texas. The project is comprised of two elements, Project Dorothy 1A (“D1A”), and Project Dorothy 1B (“D1B”), each 25 MW facilities.
Previous wording
D1A is focused on Bitcoin Hosting. On April 26, 2023 we signed a 5 MW 2-year hosting deal with Compass Mining at D1A. On April 24, 2023 we signed a 20 MW 2-year hosting agreement with another strategic hosting partner at Dorothy 1A. In the summer of 2023, we completed the construction of D1A and the installation of approximately 7,700 Bitcoin miners between the two customers, resulting in an installed hashrate of approximately 950 PH/s. From May 2023 through December 31, 2023, D1A has consumed over 11,900 MWh of Curtailed Energy from the co-located power plant and achieved a power usage effectiveness (“PUE”) of 1.03. For the three and six months ended June 30, 2024, D1A has consumed over 12,900 MWh and 28,100 MWh of Curtailed Energy from the co-located power plant and has achieved a PUE of 1.01 as of June 30, 2024.
Current wording
D1A is focused on Bitcoin Hosting of two large customers. There are approximately 7,700 Bitcoin miners installed between the two customers, resulting in an installed hashrate of approximately 950 PH/s. From May 2023 through December 31, 2023, D1A consumed over 11,900 MWh of Curtailed Energy and achieved a power usage effectiveness (“PUE”) of 1.03. For the three and nine months ended September 30, 2024, D1A consumed over 2,900 MWh and 31,000 MWh of Curtailed Energy and achieved a PUE of 0.99.
Previous wording
The construction of D1A was made possible by a partnership with Spring Lane Capital (“SLC”), a leading venture capital firm focused on sustainability solutions. On April 22, 2022, we finalized agreements with SLC for a $35 million capital pool to finance Soluna projects alongside renewable energy power plants. Approximately $12.5 million of this was designated for the Dorothy Project. In July 2022, Soluna began tapping into the SLC managed funds to finance Dorothy construction and repay prior funding provided by the Company. In return, SLC received approximately 32% of Class B Membership Interests of D1A. On March 10, 2023, we completed a new series of project-level agreements for $7.5 million from SLC-managed funds. Due to limited liquidity, and access to the capital markets, we sold a portion of our ownership to SLC in 2023. The funds raised aided in the completion of the substation interconnection, and the final stages of project Dorothy. It also provided capital to fund Soluna’s corporate operations. SLC, increased its stake in D1A from approximately 32% to 85%, reducing Soluna’s ownership from 68% to 15%. After SLC achieves an 18% Internal Rate of Return hurdle, Soluna retains 50% of the profits on D1A.
Current wording
D1A was constructed in partnership with Spring Lane Capital (“SLC”), a leading venture capital firm focused on sustainability solutions. SLC owns approximately 85% of the Class B Membership Units, while we own 15% and own 100% of the Class A Membership Units. After SLC achieves an 18% Internal Rate of Return hurdle, Soluna retains 50% of the profits on D1A.
Previous wording
D1B is focused on Bitcoin Mining through a strategic partnership with Navitas Global (“Navitas”). On May 9, 2023, we consummated a project-level financing with Navitas, which included a $2 million loan to D1B to complete the construction and a $12.1 million equity investment in the project. After consummating the financing, Navitas owned 49% of D1B and Soluna owned 51%. As of March 31, 2024, Navitas owns 46.7% of D1B, and Soluna owns 53.3%. In June 2023, D1B purchased 8,378 Bitmain Antminer S19s, S19j Pro and S19j Pro+ machines for the partnership. The purchase resulted in an estimated 868 PH/s of hashrate with an average efficiency of 29.9 J/TH and at a cost of $10.59 $/TH. As of December 31, 2023, over 7,900 of the miners had been deployed. D1B was fully energized and began ramping in late October 2023. D1B now has an installed hashrate of 817 PH/s. From July 2023 through December 31, 2023, D1B has consumed over 10,600 MWh of Curtailed Energy from the co-located power plant and achieved a power usage effectiveness (“PUE”) of 1.03. For the three and six months ended June 30 2024, D1B has consumed over 12,700 and 28,100 MWh of Curtailed Energy from the co-located power plant and achieved a PUE of 1.01 as of June 30, 2024.
Current wording
D1B is focused on proprietary Bitcoin Mining. There are approximately 7,900 Bitmain Antminer S19s, S19j Pro and S19j Pro+ machines installed, resulting in an installed hashrate of 817 PH/s From July 2023 through December 31, 2023, D1B consumed over 10,600 MWh of Curtailed Energy and achieved a PUE of 1.03. For the three and nine months ended September 30 2024, D1B consumed over 2,650 and 30,800 MWh of Curtailed Energy and achieved a PUE of 0.99.
Previous wording
In November 2023, we completed our registration of Project Dorothy for one of ERCOT’s demand response programs establishing the project as a key contributor to intelligent and flexible energy solutions, promoting environmental and economic advantages for the state of Texas. It also allowed us to diversify our revenue. Under the program, we have a single promise to stand ready, on a monthly basis, to deliver a set amount of curtailment (committed capacity) per month when and if called upon by ERCOT. Soluna will be able to generate additional revenue for Project Dorothy by providing this grid resilience support and potentially reduce its power costs, making it among the lowest cost players in the industry. Since November 2023, Project Dorothy has successfully participated and completed in the Winter and Spring demand response periods in ERCOT, and is currently in the summer standby period.
Current wording
In November 2023, we completed registration of Project Dorothy for one of ERCOT’s Demand Response Services (“DRS”) programs establishing the project as a key contributor to intelligent and flexible energy solutions, promoting environmental and economic advantages for the state of Texas. It also allowed us to diversify our revenue. Under the program, we have a single promise to stand ready, on a monthly basis, to deliver a set amount of curtailment (committed capacity) per month when and if called upon by ERCOT. The Company is able to generate additional revenue for Project Dorothy by providing this grid resilience support which reduces its power costs, making it one of the lowest cost players in the industry. Since November 2023, Project Dorothy has successfully participated in and completed the Winter, Spring and Summer DRS periods in ERCOT, and is currently in the fall standby period.
Previous wording
Project Sophie is a 25 MW data center, based in Murray, Kentucky connected to the grid, (“Sophie”). The project has a Power Purchase Agreement (“PPA”) that requires the curtailment of the site during certain hours of the day to help balance the Kentucky grid.
Current wording
Project Sophie is a 25 MW data center, based in Murray, Kentucky connected to the grid, (“Sophie”). The project has a Power Purchase Agreement (“PPA”) that requires the curtailment of the site during certain hours of the day to help balance the Kentucky grid. We own 100% of the facility which was completed in 2021.
Previous wording
In 2023, we implemented a number of cost cutting measures including staff reductions, renegotiations or termination of key advisory agreements. We ramped up a new Financial Planning and Analysis (“FP&A”) function to provide our management and operations teams better insight into the financial performance of our data centers. This helped us find opportunities to improve profitability and proactively address critical issues with infrastructure equipment at all sites. Our MaestroOS software platform managed the efficient operations of projects Dorothy and Sophie through record setting temperatures (hot and cold) in both Texas and Kentucky in 2023. In 2024, our Maestro control system has continued to respond to increases in grid demand throughout the summer.
Current wording
In 2023, we implemented a number of cost improvement initiatives and ramped up a new Financial Planning and Analysis (“FP&A”) function to provide our management and operations teams better insight into the financial performance of our data centers. This helped us find opportunities to improve profitability and proactively address critical issues with infrastructure equipment at all sites. Our MaestroOS software platform managed the efficient operations of projects Dorothy and Sophie through record setting temperatures (hot and cold) in both Texas and Kentucky in 2023. In 2024, our Maestro control system has continued to respond well to increases in grid demand throughout the summer.
Previous wording
Continuing in 2024, our objective is to achieve operational excellence across all data centers, targeting a budgeted EBITDA and maintaining high customer satisfaction. Our infrastructure optimization efforts have been completed to protect equipment against the severe summer heat to include miner heat shielding, building insulation upgrades, and transformer fan kit installations.
Current wording
In 2024, our objective is to achieve operational excellence across all data centers, targeting a budgeted EBITDA and maintaining high customer satisfaction. Our infrastructure optimization efforts have been completed to protect equipment against the severe summer heat to include miner heat shielding, building insulation upgrades, and transformer fan kit installations.
Previous wording
On June 18, 2024, CloudCo entered into an HPE Agreement with Hewlett Packard Enterprise Company (“HPE”). Pursuant to the HPE Agreement, HPE agreed to provide datacenter and cloud services for artificial intelligence and supercomputing processes via Nvidia H100 GPUs to CloudCo in exchange for an aggregate of $34.0 million, including an initial pre-payment of $10.3 million made on June 24, 2024. The HPE Agreement has a term of 36 months, and the services thereunder are expandable upon agreement of the parties. Soluna Cloud will begin offering its services by leveraging HPE’s renewable- powered high performance data centers. Their cutting-edge facilities, known for their energy efficiency and sustainability, will support the environmental sustainability of Soluna Cloud’s operations. Additionally, this collaboration expands Soluna Cloud’s offering beyond just bare-metal infrastructure, making available HPE’s comprehensive software solutions for AI pipelines. As an HPE Partner Ready Service Provider partner, Soluna Cloud will offer its advanced cloud solutions to HPE’s global customer base demonstrating AI expertise and delivery capabilities.
Current wording
Soluna Cloud began offering its services by leveraging HPE’s renewable-powered high performance data centers. Their cutting-edge facilities, known for their energy efficiency and sustainability, support the environmental sustainability of Soluna Cloud’s operations. Additionally, this collaboration expands Soluna Cloud’s offering beyond just bare-metal infrastructure, making available HPE’s comprehensive software solutions for AI pipelines. As an HPE Partner Ready Service Provider partner, Soluna Cloud will offer its advanced cloud solutions to HPE’s global customer base demonstrating AI expertise and delivery capabilities. This partnership can be expanded in the future.
Previous wording
Soluna’s new Helix data centers will serve as the growth pathway for customers, addressing the growing demand for more sustainable data centersfor AI powered by renewable energy.
Current wording
Project Grace will leverage Soluna’s new Helix data center model to be built at 2 MW capacity adjacent to Project Dorothy. The Helix model will serve as the growth pathway for customers, addressing the growing demand for more sustainable data centers for AI powered by renewable energy and will demonstrate Soluna’s proprietary data center design and its substantial expected benefits.
Previous wording
In 2023, the Company negotiated three amendments to the October Convertible Notes. On February 28, 2024, a fourth amendment was executed. These amendments were focused on extending the maturity date of the notes, lowering the conversion price of the notes, adding features to the notes to allow early payoff with predetermined cost, and the repricing of certain warrants to assist the Company in raising capital for operations. Additionally on May 17, 2024, certain warrants were further repriced to assist in raising additional capital.
Current wording
In 2023 and early 2024, the Company negotiated four amendments to the Convertible Notes. These amendments were focused on extending the maturity date of the notes, lowering the conversion price of the notes, adding features to the notes to allow early payoff with predetermined cost, and the repricing of certain warrants to assist the Company in raising capital for operations. Additionally on May 17, 2024, certain warrants were further repriced to assist in raising additional capital.
Previous wording
In April 2024, Bitcoin underwent its fourth halving event, occurring approximately every four years or after every 210,000 blocks are mined. During a halving, miners’ rewards for validating transactions and creating new blocks on the Bitcoin blockchain are cut in half, reducing the rate of new Bitcoin generation. This event typically triggers anticipation and speculation within the Bitcoin community and among investors, leading to increased market activity. Price volatility tends to rise before and after a halving as the market reacts to perceived supply scarcity. Mining profitability decreases post-halving, potentially prompting some miners to shut down operations. This often sparks consolidations in the space, reducing the number of mining companies. However, the network automatically adjusts mining difficulty to ensure consistent block production. The halving also causes a supply shock, reducing Bitcoin’s inflation rate and potentially driving long-term price appreciation, although past performance does not guarantee future outcomes. The 2024 halving was the first to happen during a high interest rate environment, and in the presence of strong institutional demand for Bitcoin driven by ETFs. Reduction in block-reward will represent a short-term reduction in revenue. But, the supply-shock effect and the growth of ETF may lessen the volatility in the long run. A projected rise in Bitcoin price in the months after the halving would increase revenues and increase demand for our low-cost data centers.
Current wording
In April 2024, Bitcoin underwent its fourth halving event, occurring approximately every four years or after every 210,000 blocks are mined. During a halving, miners’ rewards for validating transactions and creating new blocks on the Bitcoin blockchain are cut in half, reducing the rate of new Bitcoin generation. This event typically triggers anticipation and speculation within the Bitcoin community and among investors, leading to increased market activity. Price volatility tends to rise before and after a halving as the market reacts to perceived supply scarcity. Mining profitability decreases post-halving, potentially prompting some miners to shut down operations. This often sparks consolidations in the space, reducing the number of mining companies. However, the network automatically adjusts mining difficulty to ensure consistent block production. The halving also causes a supply shock, reducing Bitcoin’s inflation rate and potentially driving long-term price appreciation, although past performance does not guarantee future outcomes. The 2024 halving was the first to happen during a high interest rate environment, and in the presence of strong institutional demand for Bitcoin driven by ETFs. Reduction in block-reward will represent a short-term reduction in revenue. But the supply-shock effect and the growth of ETFs may lessen the volatility in the long run. A projected rise in Bitcoin price in the months after the halving would increase revenues and increase demand for our low-cost data centers.
Previous wording
Recent events, including the Mt. Gox settlement has significantly impacted Bitcoin’s price and supply due to the reintroduction of approximately 141,000 bitcoins into the market, raising concerns about increased selling pressure and market volatility. Despite these concerns, experts believe the market has sufficient liquidity to absorb the selling pressure, and the impact on Bitcoin’s value is expected to be temporary. The announcement of repayments led to a notable decline in cryptocurrency prices, with Bitcoin experiencing a 6% drop in a single day and the overall market capitalization decreasing by over $170 billion. However, the long-term investment prospects for Bitcoin remain positive, influenced by broader economic factors such as potential Federal Reserve rate cuts.
Current wording
Recent events, including the Mt. Gox settlements have significantly impacted Bitcoin’s price and supply due to the reintroduction of approximately 141,000 bitcoins into the market, raising concerns about increased selling pressure and market volatility. Despite these concerns, experts believe the market has sufficient liquidity to absorb the selling pressure, and the impact on Bitcoin’s value is expected to be temporary. The announcement of repayments led to a notable decline in cryptocurrency prices, with Bitcoin experiencing a 6% drop in a single day and the overall market capitalization decreasing by over $170 billion. However, the long-term investment prospects for Bitcoin remain positive, influenced by broader economic factors such as potential Federal Reserve rate cuts.
Previous wording
The global supply chain is facing challenges, particularly in the electric power sector, due to the scarcity of power infrastructure components like transformers. The electric grid component market is experiencing a supply and demand mismatch, leading to an ongoing shortage of transformers and other grid components. Over 70% of transmission and power transformers in the U.S. are over 25 years old, and there is insufficient manufacturing capacity to meet the demand for grid transformers and component parts. Factors contributing to the scarcity include aging infrastructure, increasing demand for electricity, extreme weather events threatening reliability, insufficient domestic manufacturing capacity, and reliance on foreign suppliers. President Biden authorized the use of the Defense Production Act Title III to accelerate domestic production of electric grid transformers and components to address the shortage. Companies are using emergency stocks of components, reviewing scheduled work, substituting materials when possible, improving communication with suppliers, and digitalizing processes to enhance efficiency. The scarcity of power infrastructure components like transformers is a critical issue and efforts are being made to address these challenges through various strategies and actions. Difficult to source equipment could affect our growth. We have developed strategic relationships with key equipment providers with manufacturing facilities in the US and Abroad.
Current wording
The global supply chain is facing challenges, particularly in the electric power sector, due to the scarcity of power infrastructure components like transformers. The electric grid component market is experiencing a supply and demand mismatch, leading to an ongoing shortage of transformers and other grid components. Over 70% of transmission and power transformers in the U.S. are over 25 years old, and there is insufficient manufacturing capacity to meet the demand for grid transformers and component parts. Factors contributing to the scarcity include aging infrastructure, increasing demand for electricity, extreme weather events threatening reliability, insufficient domestic manufacturing capacity, and reliance on foreign suppliers. President Biden authorized the use of the Defense Production Act Title III to accelerate domestic production of electric grid transformers and components to address the shortage. Companies are using emergency stocks of components, reviewing scheduled work, substituting materials when possible, improving communication with suppliers, and digitizing processes to enhance efficiency. The scarcity of power infrastructure components like transformers is a critical issue and efforts are being made to address these challenges through various strategies and actions. Difficult to source equipment could affect our growth. We have developed strategic relationships with key equipment providers with manufacturing facilities in the US and Abroad.
Previous wording
Since the inception of ChatGPT by OpenAI, AI has experienced remarkable growth, transforming the field. Large language models (“LLM”s) have revolutionized AI, fueling interest in generative AI technologies. The introduction of ChatGPT alone has increased AI-related job listings significantly, indicating its impact beyond tech. In 2023, global venture capital investments in AI soared to $50 billion, reflecting confidence in AI’s future potential. Funding focus has shifted to mature companies with proven technologies, signaling market maturation. This growth has driven demand for computing resources and attracted enterprise interest. The generative AI market is projected to reach $1.3 trillion by 2032, with significant energy implications. By 2030, AI could comprise 3-4% of global power demand, with Google already attributing 10-15% of its power use to AI technologies. The widespread adoption of generative AI like ChatGPT may substantially increase energy consumption across various applications and services. The energy demands of AI will increase focus on the sustainability of the industry. We expect increasing demand for specialized AI data centers with access to renewable energy. This will likely open opportunities for Soluna to provide AI Cloud and Co-location services to new companies and enterprises investing in AI initiatives.
Current wording
Since the inception of ChatGPT by OpenAI, AI has experienced remarkable growth, transforming the field. Large language models (“LLM” s) have revolutionized AI, fueling interest in Generative AI technologies. The introduction of ChatGPT alone has increased AI-related job listings significantly, indicating its impact beyond tech. In 2023, global venture capital investments in AI soared to $50 billion, reflecting confidence in AI’s future potential. Funding focus has shifted to mature companies with proven technologies, signaling market maturation. This growth has driven demand for computing resources and attracted enterprise interest. The Generative AI market is projected to reach $1.3 trillion by 2032, with significant energy implications. By 2030, AI could comprise 3-4% of global power demand, with Google already attributing 10-15% of its power use to AI technologies. The widespread adoption of Generative AI like ChatGPT has substantially increased energy consumption across various applications and services.*(In 2023, Google reported a 17% increase in data center energy consumption, driven by AI. Microsoft consumed 24 TWh of energy in a single year—more than some developed nations.)*The energy demands of AI will increase focus on the sustainability of the industry. We expect increasing demand for specialized AI data centers with access to renewable energy. This will likely open opportunities for Soluna to provide AI Cloud and Colocation services to new companies and enterprises investing in AI initiatives.
Previous wording
Cryptocurrency Mining Revenue: Cryptocurrency revenue consists of revenue recognized from Soluna’s cryptocurrency mining operations. Cryptocurrency revenue was approximately $4.5 million for the three months ended June 30, 2024 compared to $915 thousand for the three months ended June 30, 2023. For the three months ended June 30, 2024, all cryptocurrency mining revenue related to Project Dorothy 1B, which began energization in the fourth quarter of 2023, and has been running at a full 25 MWs. Operations were stopped for Project Marie in February 2023 with the CCMA termination and NYDIG repossession of collateralized assets, and Project Sophie switched to Data Hosting beginning in the second quarter of fiscal year 2023 creating only $915 thousand in cryptocurrency revenue for the three months ended June 30, 2023, as such no revenue was recognized for either Project Marie or Sophie for the three months ended June 30, 2024. In addition to the above, the average price of Bitcoin increased by 134% from the three months ended June 30, 2023 compared to the same period for June 2024.
Current wording
Cryptocurrency Mining Revenue: Cryptocurrency revenue consists of revenue recognized from Soluna’s cryptocurrency mining operations. Cryptocurrency revenue was approximately $2.8 million for the three months ended September 30, 2024 compared to $1.8 million for the three months ended September 30, 2023. For the three months ended September 30, 2024, all cryptocurrency mining revenue related to Project Dorothy 1B, which began energization in the third quarter of 2023, and has been running at a full 25 MWs. Operations were stopped for Project Marie in February 2023 with the CCMA termination and NYDIG repossession of collateralized assets, and Project Sophie switched to Data Hosting beginning in the second quarter of fiscal year 2023 creating only $47 thousand in cryptocurrency revenue for the three months ended September 30, 2023, as such no revenue was recognized for either Project Marie or Sophie for the three months ended September 30, 2024. As noted above, Project Dorothy 1B began operations in the third quarter of 2023 as such was not running at 100% in the third quarter of 2023 and generated approximately $1.7 million of revenue. In addition to the above, the average price of Bitcoin increased by 118% from the three months ended September 30, 2023 compared to the same period for September 2024.
Previous wording
Data Hosting Revenue: The Company’s cryptocurrency hosting services provide energized space and operating services to third-party mining companies who locate their mining hardware at one of our mining locations. Services include fees for hosting the miners which could be fixed fees or profit sharing, as well as potential additional fees for services provided such as installation charges or other services fees. Data hosting revenue was approximately $4.9 million for the three months ended June 30, 2024 compared to $1.2 million for the three months ended June 30, 2023. The significant increase was primarily related to energization and the deployment of hosting customers at Project Dorothy 1A in the second quarter of 2023 creating approximately $3.6 million in data hosting revenue for the second quarter of 2024 compared to approximately $456 thousand for the second quarter of 2023, approximately a $3.1 million increase. In addition, Project Sophie switched their business model from proprietary mining to data hosting in the second quarter of 2023 in which created an additional increase of approximately $639 thousand from approximately $692 thousand in the second quarter of 2023 to approximately $1.3 million.
Current wording
Data Hosting Revenue: The Company’s cryptocurrency hosting services provide energized space and operating services to third-party mining companies who locate their mining hardware at one of our mining locations. Services include fees for hosting the miners which could be fixed fees or profit sharing, as well as potential additional fees for services provided such as installation charges or other services fees. Data hosting revenue was approximately $4.3 million for the three months ended September 30, 2024 compared to $4.0 million for the three months ended September 30, 2023. The increase was primarily related to continued energization and the deployment of hosting customers at Project Dorothy 1A which began in the second quarter of 2023 creating approximately $3.5 million in data hosting revenue for the third quarter of 2024 compared to approximately $3.0 million for the third quarter of 2023, approximately a $500 thousand increase, in which was offset by a slight decrease in revenue of $235 thousand at Project Sophie who switched their business model from proprietary mining to data hosting in the second quarter of 2023.
Previous wording
Cost of Cryptocurrency Revenue, exclusive of depreciation*:* Cost of cryptocurrency mining revenue includes direct utility costs, site overhead expenses, and overhead costs that relate to the operations of our cryptocurrency mining facilities in Kentucky and Texas. Going forward, cost of cryptocurrency revenue will include any additional cryptocurrency mining facilities that are part of the Company’s future pipeline.
Current wording
Cost of Cryptocurrency Mining Revenue, exclusive of depreciation*:* Cost of cryptocurrency mining revenue includes direct utility costs, site overhead expenses, and overhead costs that relate to the operations of our cryptocurrency mining facilities in Kentucky and Texas. Going forward, cost of cryptocurrency revenue will include any additional cryptocurrency mining facilities that are part of the Company’s future pipeline.
Previous wording
Cost of cryptocurrency revenue, exclusive of depreciation costs was approximately $1.9 million and $1.2 million for the three months ended June 30, 2024 and 2023, respectively, approximately $723 thousand increase. The higher costs during the three months ended June 30, 2024 compared to 2023 were due to the full Project Dorothy 1B site being active the entire quarter of 2024, versus as a start up in 2023. Also noted was that Project Sophie was dropping from being a proprietary mining site in the second quarter of 2023.
Current wording
Cost of cryptocurrency revenue, exclusive of depreciation costs was approximately $2.0 million and $1.0 million for the three months ended September 30, 2024 and 2023, respectively, approximately $923 thousand increase. The higher costs during the three months ended September 30, 2024 compared to 2023 were due to the full Project Dorothy 1B site being active the entire quarter of 2024, versus as a startup in 2023. Also noted was that Project Sophie was dropping from being a proprietary mining site in the second quarter of 2023.
Previous wording
Cost of data hosting revenue was approximately $2.2 million for the three months ended June 30, 2024 compared to $759 thousand for the same period in 2023. This increase was due to Project Dorothy 1A which began operations and hosting services in May 2023, creating costs of approximately $1.8 million for the three months ended June 30, 2024, compared to $508 thousand for the three months ended June 30, 2023. Also, the Company began data hosting operations at Project Sophie in mid-April 2023, which created an increase in costs of approximately $166 thousand between the comparable periods.
Current wording
Cost of data hosting revenue was approximately $2.6 million for the three months ended September 30, 2024 compared to $2.2 million for the same period in 2023. This increase was due to Project Dorothy 1A which began operations and hosting services in May 2023, creating costs of approximately $2.0 million for the three months ended September 30, 2024, compared to $1,8 million for the three months ended September 30, 2023. Also, the Company began data hosting operations at Project Sophie in mid-April 2023, which created an increase in costs of approximately $137 thousand between the comparable periods.
Previous wording
Cost of revenue- depreciation: Depreciation costs associated with cryptocurrency and data hosting revenue was approximately $1.5 million for the three months ended June 30, 2024 compared to approximately $539 thousand for the three months ended June 30, 2023. The increase related to the capital additions to fixed assets between the second quarter of fiscal year 2023 through the second quarter of 2024. It was noted that Project Marie was discontinued in February of 2023, Project Sophie had sold a majority of its miners in the second quarter of 2023, and the significant additions of capital expenditures at Project Dorothy, causing an increase in depreciation costs period over period. As the Company has begun to invest more in capital expenditures, we expect to see depreciation costs to significantly increase over the next several quarters.
Current wording
Cost of revenue- depreciation: Depreciation costs associated with cryptocurrency and data hosting revenue was approximately $1.5 million for the three months ended September 30, 2024 compared to approximately $1.2 million for the three months ended September 30, 2023. The increase related to the capital additions to fixed assets between the second quarter of fiscal year 2023 through the third quarter of 2024. It was noted that Project Marie was discontinued in February of 2023, Project Sophie had sold a majority of its miners in the second quarter of 2023, and the significant additions of capital expenditures at Project Dorothy, causing an increase in depreciation costs period over period. As the Company has begun to invest more in capital expenditures, we expect to see depreciation costs to significantly increase over the next several quarters.
Previous wording
Interest expense: Interest expense for the three months ended June 30, 2024 was approximately $449 thousand related to approximately $361 thousand to the NYDIG loan and $37 thousand to the Navitas loan. In addition there was compounded interest and deferred financing amortization expense of approximately $50 thousand for the equipment financing loan and June 2024 secured note financing. Interest expense for the three months ended June 30, 2023, was $486 thousand which primarily related to amortization of warrants for the convertible notes of $115 thousand and interest on the NYDIG Financing Loan of approximately $315 thousand, as well as interest on the Navitas loan of $47 thousand.
Current wording
Interest expense: Interest expense for the three months ended September 30, 2024 was approximately $821 thousand related to approximately $369 thousand to the NYDIG loan, $431 thousand to compounded interest and deferred financing amortization expense for the equipment financing loan and June and July 2024 secured note financing, and $22 thousand to the Navitas loan. Interest expense for the three months ended September 30, 2023, was $495 thousand which primarily related to mainly related to interest accrued on the Navitas loan of $85 thousand and interest on the NYDIG Financing Loan of approximately $405 thousand.
Previous wording
Loss on Debt Extinguishment and Revaluation: For the three months ended June 30, 2024, the Company had a loss on debt revaluation of approximately $5.6 million, in which was in relation to approximately $4.0 million for the convertible notes due to factors including assumptions on conversions and payouts, annual volatility and stock price conditions on the dates of valuations compared to what the noteholders could convert at as of June 30, 2024. In addition, there was a $1.6 million loss on the valuation of a warrant liability. The warrant liability was ultimately reversed when Shareholder approval occurred on May 30, 2024, however, the Company needed to revalue the warrants as of May 30, 2024, in which created a loss of approximately $1.6 million due to mainly changes in the stock price as amount of warrants outstanding. For the three months ended June 30, 2023, the Company had a loss on debt revaluation of approximately $2.1 million. On May 11, 2023, the Company entered into a new debt agreement with the convertible noteholders and issued new warrants, and with doing so, created a debt extinguishment and loss of approximately $1.8 million, in which the main factor was the valuation of the new warrants. There was an additional $170 thousand valuation loss as of June 30, 2023 due to additional assumptions and assessments on the valuation of the debt at quarter end. See Note 8 for further details.
Current wording
Gain (Loss) on Debt Extinguishment and Revaluation, net: For the three months ended September 30, 2024, the Company had a gain on revaluation of approximately $1.2 million. The gain was in relation to the convertible notes of $2.3 million due to factors including conversion assumptions and payouts, annual volatility and stock price conditions on the dates of valuations compared to what the noteholders could convert at as of September 30, 2024, in addition to a gain on warrant revaluation of the Soluna Cloud warrants for $327 thousand. The gain for the three months ended September 30, 2024 was offset with a loss on debt of approximately $1.4 million due to the satisfaction and redemption of the Dorothy 2 equipment loan through issuance of Class B Membership interests in the Dorothy 2 project valued at three times the borrowing amount (i.e., $2.16 million), in which created approximately a $1.4 million loss. For the three months ended September 30, 2023, the Company had a loss on debt revaluation of approximately $769 thousand due to additional assumptions and assessments on the valuation of the debt at quarter end. See Note 7 for further details.
Previous wording
Income Tax Benefit: Income tax benefit for the three months ended June 30, 2024 was $649 thousand, compared to $547 thousand for the three months ended June 30, 2023. The comparable balances were mainly related to deferred tax amortization impact of acquiring an asset in a transaction that is not a business combination when the amount paid exceeds the tax basis on the acquisition date. As such, the Company is required to adjust the value of the strategic contract pipeline by approximately $10.9 million at inception date (October 29, 2021), in which was recorded as a deferred tax liability and this amount will be amortized over the life of the asset. For the three months ended June 30, 2024 and June 30, 2023, the Company amortized $547 thousand, respectively. In addition, for the three months ended June 30, 2024, the income tax benefit increased due to changes in estimable income and permanent differences in 2024.
Current wording
Income Tax Benefit (expense): Income tax benefit for the three months ended September 30, 2024 was $547 thousand compared to an income tax expense of approximately $569 thousand for the three months ended September 30, 2023. The balance for the three months ended September 30, 2024 and 2023 was related to deferred tax amortization impact of acquiring an asset in a transaction that is not a business combination when the amount paid exceeds the tax basis on the acquisition date. As such, the Company is required to adjust the value of the strategic contract pipeline by approximately $10.9 million at inception date (October 29, 2021), in which was recorded as a deferred tax liability and this amount will be amortized over the life of the asset. For the three months ended September 30, 2024 and September 30, 2023, the Company amortized $547 thousand, respectively. In addition, for the three months ended September 30, 2023, there were timing difference due to significant increase for in-service capital assets for the three months ended September 30, 2023 which created an offset of approximately $1.1 million in deferred income tax expense.
Previous wording
Net income / (loss) attributable to non-controlling interest: Net income attributable to non-controlling interest for the three months ended June 30, 2024 was $1.7 million compared to a net loss of approximately $482 thousand for the three months ended June 30, 2023. This amount relates to Spring Lane’s 85% noncontrolling interest of the net profit in Soluna DVSL and Navitas 45.0% through 46.7% noncontrolling interest of the net profit in Soluna DV ComputeCo for the three months ended June 30, 2024 and 2023. The change in non-controlling interest relates to continued profitability at Dorothy 1A and Dorothy 1B, creating a total net profit which started to grow in the third quarter of fiscal year 2023. There was no minority interest for Dorothy 1B until the 2nd quarter of 2023, when Navitas obtained interest in DV ComputeCo. Dorothy 1A had a net profit of approximately $1.4 million for three months ended June 30, 2024, creating a non-controlling interest profit of approximately $1.2 million, compared to a $463 thousand net loss for the three months ended June 30, 2023, creating a non-controlling interest loss of $396 thousand. In addition, the increase also related to Dorothy 1B, which had a $87 thousand non-controlling interest loss for the three months ended June 30, 2023 to a non-controlling interest profit of $564 thousand for the three months ended June 30, 2024. As the Company was generating revenue from energization at Project Dorothy, the Company began to see a shift from a net loss to profit within non-controlling interest.
Current wording
Net (loss) income attributable to non-controlling interest: Net loss attributable to non-controlling interest for the three months ended September 30, 2024 was $903 thousand compared to net income attributable to non-controlling interest of $646 thousand for the three months ended September 30, 2023 This amount relates to Spring Lane’s 85% noncontrolling interest of the net profit in Soluna DVSL and Navitas 45% - 49% noncontrolling interest of the net loss in Soluna DV ComputeCo for the three months ended September 30, 2024 and 2023. The change in non-controlling interest relates to a net loss in noncontrolling interest at Dorothy 1B of approximately $177 thousand, in which was driven by price of Bitcoin and site curtailments, and new for third quarter of 2024 was a noncontrolling interest loss of approximately $1.4 million associated to Dorothy 2 in which Spring Lane had noncontrolling interest of 58% - 72% for the three months ended September 30, 2024 in which the site is in development stage and would expect losses, offset with continued profitability at Dorothy 1A having a noncontrolling interest profit of $648 thousand in which is largely due to strong margins, creating a total net loss attributable to non-controlling interest of $68 thousand. The three-month net income for September 2023 balance in relation to non-controlling interest relates to Spring Lane’s 85% noncontrolling interest of the Net Profit in Soluna DVSL for approximately $759 thousand offset with Navitas 49% noncontrolling interest of the Net Loss of in Soluna DV ComputeCo of $111 thousand for the 3 months ended September 30, 2023.
Previous wording
The following table summarizes changes in the various components of our net loss during the six months ended June 30, 2024 compared to the six months ended June 30, 2023.
Current wording
The following table summarizes changes in the various components of our net loss during the nine months ended September 30, 2024 compared to the nine months ended September 30, 2023.
Previous wording
Cryptocurrency Mining Revenue: Cryptocurrency revenue consists of revenue recognized from Soluna’s cryptocurrency mining operations. Cryptocurrency revenue was approximately $10.9 million for the six months ended June 30, 2024 compared to $3.7 million for the six months ended June 30, 2023. For the six months ended June 30, 2024, all cryptocurrency mining revenue related to Project Dorothy 1B, which began energization in the fourth quarter of 2023, and has been running at a full 25 MWs. Operations were stopped for Project Marie in February 2023 with the CCMA termination and NYDIG repossession of collateralized assets, and Project Sophie switched to Data Hosting beginning in the second quarter of fiscal year, as such no revenue was recognized for either Project Marie or Sophie for the six months ended June 30, 2024. The Company also noted for the six months ended June 30, 2024, that Project Marie shut down when only 8 MW was running for Proprietary Mining and Project Sophie was beginning to struggle and was not able to maintain running at 25 MW, therefore we started our transition to a hosting model and was fully switched by June 2023. In addition to the above, the average price of Bitcoin increased by 134% in the six months ended June 30, 2023 compared to the same period for June 2024.
Current wording
Cryptocurrency Mining Revenue: Cryptocurrency revenue consists of revenue recognized from Soluna’s cryptocurrency mining operations. Cryptocurrency revenue was approximately $13.7 million for the nine months ended September 30, 2024 compared to $5.5 million for the nine months ended September 30, 2023. For the nine months ended September 30, 2024, all cryptocurrency mining revenue related to Project Dorothy 1B, which began energization in the third quarter of 2023, and has been running at a full 25 MWs. Operations were stopped for Project Marie in February 2023 with the CCMA termination and NYDIG repossession of collateralized assets, and Project Sophie switched to Data Hosting beginning in the second quarter of fiscal year, as such no revenue was recognized for either Project Marie or Sophie for the nine months ended September 30, 2024. The Company also noted for the nine months ended September 30, 2024, that Project Marie shut down when only 8 MW was running for Proprietary Mining and Project Sophie was beginning to struggle and was not able to maintain running at 25 MW, therefore we started our transition to a hosting model and was fully switched by June 2023. In addition to the above, the average price of Bitcoin increased by 128% in the nine months ended September 30, 2023 compared to the same period for September 2024.
Previous wording
Data Hosting Revenue: The Company’s cryptocurrency hosting services provide energized space and operating services to third-party mining companies who locate their mining hardware at one of our mining locations. Services include fees for hosting the miners which could be fixed fees or profit sharing, as well as potential additional fees for services provided such as installation charges or other services fees. Data hosting revenue was approximately $10.2 million for the six months ended June 30, 2024 compared to $1.4 million for the six months ended June 30, 2023. The significant increase was primarily related to energization and the deployment of hosting customers at Project Dorothy 1A in the second quarter of 2023 creating approximately $7.1 million in data hosting revenue for the six months ended June 30, 2024 compared to approximately $456 thousand for the same period in 2023, approximately a $6.7 million increase. In addition, Project Sophie switched their business model from proprietary mining to data hosting in the second quarter of 2023 which created an additional increase of approximately $2.4 million from approximately $692 thousand for the six months ended June 30, 2023 to approximately $3.1 million for the six months ended June 30, 2024. As such, the Company was performing hosting services utilizing approximately 50 MW between Project Dorothy 1A and Project Sophie. Offsetting the increase was the decommission of Project Marie operations in February 2023 causing a decline of approximately $276 thousand six months ended June 30, 2024 compared to June 30, 2023. For the first quarter of 2023, Project Marie was hosting at approximately 10 MW.
Current wording
Data Hosting Revenue: The Company’s cryptocurrency hosting services provide energized space and operating services to third-party mining companies who locate their mining hardware at one of our mining locations. Services include fees for hosting the miners which could be fixed fees or profit sharing, as well as potential additional fees for services provided such as installation charges or other services fees. Data hosting revenue was approximately $14.4 million for the nine months ended September 30, 2024 compared to $5.5 million for the nine months ended September 30, 2023. The significant increase was primarily related to energization and the deployment of hosting customers at Project Dorothy 1A in the second quarter of 2023 creating approximately $10.6 million in data hosting revenue for the nine months ended September 30, 2024 compared to approximately $3.5 million for the same period in 2023, approximately a $7.1 million increase. In addition, Project Sophie switched their business model from proprietary mining to data hosting in the second quarter of 2023 which created an additional increase of approximately $2.1 million from approximately $1.7 million for the nine months ended September 30, 2023 to approximately $3.8 million for the nine months ended September 30, 2024. As such, the Company was performing hosting services utilizing approximately 50 MW between Project Dorothy 1A and Project Sophie. Offsetting the increase was the decommission of Project Marie operations in February 2023 causing a decline of approximately $276 thousand nine months ended September 30, 2024 compared to September 30, 2023. For the first quarter of 2023, Project Marie was hosting at approximately 10 MW.
Previous wording
Demand Response Service: In November 2023, we completed our registration of Project Dorothy for one of ERCOT’s demand response programs, and we began services in December 2023. On a monthly basis we stand ready to deliver a set amount of committed capacity per period when and if called upon by ERCOT. We note that based on the time of the year, certain months and weather create more lucrative rewards. No such services were performed for the six months ended June 30, 2023.
Current wording
Demand Response Service: In November 2023, we completed our registration of Project Dorothy for one of ERCOT’s demand response programs, and we began services in December 2023. On a monthly basis we stand ready to deliver a set amount of committed capacity per period when and if called upon by ERCOT. We note that based on the time of the year, certain months and weather create more lucrative rewards. No such services were performed for the nine months ended September 30, 2023.
Previous wording
Cost of Cryptocurrency Revenue, exclusive of depreciation*:* Cost of cryptocurrency mining revenue includes direct utility costs, site overhead expenses, and overhead costs that relate to the operations of our cryptocurrency mining facilities in Kentucky and Texas. Going forward, cost of cryptocurrency revenue will include any additional cryptocurrency mining facilities that are part of the Company’s future pipeline.
Current wording
Cost of Cryptocurrency Mining Revenue, exclusive of depreciation*:* Cost of cryptocurrency mining revenue includes direct utility costs, site overhead expenses, and overhead costs that relate to the operations of our cryptocurrency mining facilities in Kentucky and Texas. Going forward, cost of cryptocurrency revenue will include any additional cryptocurrency mining facilities that are part of the Company’s future pipeline.
Previous wording
Cost of cryptocurrency revenue, exclusive of depreciation costs was approximately $3.7 million and $3.4 million for the six months ended June 30, 2024 and 2023, respectively, approximately a $314 thousand increase. The higher costs during the six months ended June 30, 2024 compared to 2023 were due to the full Project Dorothy 1B site being active the entire six months ended June 30, 2024, versus as a start up beginning in the second quarter of 2023. Also noted, Project Sophie was no longer a proprietary mining site in the second quarter of 2023. The increase was slightly offset with the Company operating only one facility for the six months ended June 30, 2024, compared to two facilities for the six months ended June 30, 2023. Also, the electricity costs at Project Dorothy 1B are comparatively lower than the costs were at Project Sophie and Marie.
Current wording
Cost of cryptocurrency mining revenue, exclusive of depreciation costs was approximately $5.7 million and $4.5 million for the nine months ended September 30, 2024 and 2023, respectively, approximately a $1.2 million increase. The higher costs during the nine months ended September 30, 2024 compared to 2023 were due to the full Project Dorothy 1B site being active the entire nine months ended September 30, 2024, versus as a startup beginning in the second quarter of 2023. Also noted, Project Sophie was no longer a proprietary mining site by the second quarter of 2023. The increase was slightly offset with the Company operating only one facility for the nine months ended September 30, 2024, compared to three facilities for the nine months ended September 30, 2023. Also, the electricity costs at Project Dorothy 1B are comparatively lower than the costs were at Project Sophie and Marie.
Previous wording
Cost of data hosting revenue was approximately $4.4 million for the six months ended June 30, 2024 compared to $1.0 million for the six months ended June 30, 2023. This increase was due to Project Dorothy 1A which began operations and hosting services in May 2023, creating costs of approximately $3.5 million for the six months ended June 30, 2024, compared to $566 thousand for the six months ended June 30, 2023. Also, the Company began data hosting operations at Project Sophie in mid-April 2023, which created an increase in costs of approximately $680 thousand between the comparable periods. The increase was offset as a direct result by Project Marie’s operations ceasing in February 2023, where the main hosting contract was also simultaneously terminated, creating a decline in costs of approximately $214 thousand.
Current wording
Cost of data hosting revenue was approximately $7.0 million for the nine months ended September 30, 2024 compared to $3.2 million for the nine months ended September 30, 2023. This increase was due to Project Dorothy 1A which began operations and hosting services in May 2023, creating costs of approximately $5.5 million for the nine months ended September 30, 2024, compared to $2.3 million for the nine months ended September 30, 2023. Also, the Company began data hosting operations at Project Sophie in mid-April 2023, which created an increase in costs of approximately $807 thousand between the comparable periods. The increase was offset as a direct result by Project Marie’s operations ceasing in February 2023, where the main hosting contract was also simultaneously terminated, creating a decline in costs of approximately $204 thousand.
Previous wording
Cost of revenue- depreciation: Depreciation costs associated with cryptocurrency and data hosting revenue was approximately $3.0 million for the six months ended June 30, 2024 compared to approximately $1.2 million for the six months ended June 30, 2023. The increase related to the capital additions to fixed assets between the second quarter of fiscal year 2023 through the second quarter of 2024. It was noted that Project Marie was discontinued in February of 2023, Project Sophie had sold a majority of its miners in the second quarter of 2023, and the significant additions of capital expenditures at Project Dorothy, causing an increase in depreciation costs period over period. As the Company has begun to invest more in capital expenditures, we expect to see depreciation costs to significantly increase over the next several quarters.
Current wording
Cost of revenue- depreciation: Depreciation costs associated with cryptocurrency and data hosting revenue was approximately $4.5 million for the nine months ended September 30, 2024 compared to approximately $2.4 million for the nine months ended September 30, 2023. The increase related to the capital additions to fixed assets between the second quarter of fiscal year 2023 through the third quarter of 2024. It was noted that Project Marie was discontinued in February of 2023, Project Sophie had sold a majority of its miners in the second quarter of 2023, and the significant additions of capital expenditures and energization at Project Dorothy, causing an increase in depreciation costs period over period. As the Company has begun to invest more in capital expenditures, we expect to see depreciation costs to significantly increase over the next several quarters.
Previous wording
Depreciation and Amortization associated with general and administrative expenses: Depreciation and amortization expense was comparable for the six months ended June 30, 2024 and the six months ended June, 2023 in which the balances totaled approximately $4.8 million, respectively. The balances mainly related to amortization expense related to the strategic pipeline contract that was acquired in October 2021.
Current wording
Depreciation and Amortization associated with general and administrative expenses: Depreciation and amortization expense was comparable for the nine months ended September 30, 2024 and the nine months ended June, 2023 in which the balances totaled approximately $7.2 million, respectively. The balances mainly related to amortization expense related to the strategic pipeline contract that was acquired in October 2021.
Previous wording
***Impairment on Fixed Assets:***During the six months ended June 30, 2024, the Company had impairment charges of approximately $130 thousand. This charge related to the sale of S19 miners that occurred in April 2024, whereas the Company wrote down the net book value of the miners to the subsequent sales price. During the six months ended June 30, 2023, the Company had impairment charges of approximately $377 thousand in which related to impairment of approximately $165 thousand for power supply units (PSUs) at the Sophie location and $43 thousand for M31 miners in which were subsequently sold in April 2023, in which the Company wrote down the net book value to subsequent sale price.
Current wording
***Impairment on Fixed Assets:***During the nine months ended September 30, 2024, the Company had impairment charges of approximately $130 thousand. This charge related to the sale of S19 miners that occurred in April 2024, whereas the Company wrote down the net book value of the miners to the subsequent sales price. During the nine months ended September 30, 2023, the Company had impairment charges of approximately $418 thousand relating to impairment of approximately $166 thousand in power supply units (PSUs) at their Sophie location, $43 thousand for M31 miners in which were subsequently sold in April 2023, in which the Company wrote down the net book value to the subsequent sale price, $169 thousand of S19 miners to adjust to market value and $41 thousand related to miners held for sale.
Previous wording
Interest expense: Interest expense for the six months ended June 30, 2024 was approximately $873 thousand related to approximately $722 thousand to the NYDIG loan and $100 thousand to the Navitas loan. In addition there was compounded interest and deferred financing amortization expense of approximately $50 thousand for the equipment financing loan and June 2024 secured note financing. Interest expense for the six months ended June 30, 2023 was $1.8 million and related to default and continuing interest expense of the NYDIG loan of approximately $692 thousand, interest and other charges of approximately $220 thousand for the promissory notes issued in January and February of 2023, and interest on amortization of warrants for the convertible debt of approximately $475 thousand, as well as default interest charged through March 10, 2023 for the convertible holders of approximately $420 thousand.
Current wording
Interest expense: Interest expense for the nine months ended September 30, 2024 was approximately $1.7 million related to approximately $1.1 million to the NYDIG loan, $480 thousand to compounded interest and deferred financing amortization expense of equipment financing loan and June and July 2024 secured note financing, and $122 thousand to the Navitas loan. Interest expense for the nine months ended September 30, 2023 was $2.4 million and related to default and continuing interest expense of the NYDIG loan of approximately $1.1 million, interest and other charges of approximately $220 thousand for the promissory notes issued in January and February of 2023, and interest on amortization of warrants for the convertible debt of approximately $475 thousand, as well as default interest charged through March 10, 2023 for the convertible holders of approximately $420 thousand.
Previous wording
Loss on Debt Extinguishment and Revaluation: For the six months ended June 30, 2024, the Company had a loss on debt extinguishment and revaluation of approximately $8.7 million. This was due to on February 28, 2024, the Company entered into the Fourth Amendment with the Noteholders and lowered the conversion price and issued new warrants and repriced additional warrants with certain exercise features. The issuance and reprice of warrants created a loss of extinguishment of debt of approximately $5.8 million, in which was offset by a gain on debt revaluation of the convertible debt of approximately $1.3 million as of February 28, 2024 (date of Fourth Amendment) and March 31, 2024 due to several factors including assumptions on conversions and payouts, annual volatility and stock price conditions on the dates of valuations. In addition, there was a revaluation of the warrant liability, in which created a gain on revaluation of approximately $1.5 million. The Company did a fair value assessment of the notes as of June 30, 2024, in which created a loss on revaluation of approximately $4.0 million in which was noted above. In addition, in the second quarter of fiscal year 2024, the Company did a revaluation of the warrants through May 30, 2024 in which was the date of Annual Shareholder approval, in which created a loss on revaluation of approximately $1.6 million. The Company notes for the six months ended June 30, 2023, the Company had a net loss on debt extinguishment and revaluation of $1.6 million due to the extinguishment and revaluation noted above in the second quarter of 2023, offset with a gain of $473 thousand in the first quarter of 2023. See Note 8 for further details.
Current wording
Loss on Debt Extinguishment and Revaluation, net: For the nine months ended September 30, 2024, the Company had a loss on debt extinguishment and revaluation of approximately $6.1 million. This was due to on February 28, 2024, the Company entered into the Fourth Amendment with the Noteholders and lowered the conversion price and issued new warrants and repriced additional warrants with certain exercise features. The issuance and reprice of warrants created a loss of extinguishment of debt of approximately $5.8 million, in which was offset by a gain on debt revaluation of the convertible debt of approximately $1.3 million as of February 28, 2024 (date of Fourth Amendment) and March 31, 2024 due to several factors including assumptions on conversions and payouts, annual volatility and stock price conditions on the dates of valuations. In addition, there was a revaluation of the warrant liability, in which created a gain on revaluation of approximately $1.5 million. The Company did a fair value assessment of the notes as of June 30, 2024, in which created a loss on revaluation of approximately $4.0 million due to factors including assumptions on conversions and payouts, annual volatility and stock price conditions on the dates of valuations compared to what the noteholders could convert at as of June 30, 2024. The convertible notes were revalued again on September 30, 2024, in which a gain was recorded of approximately $2.3 million due mainly to change in Company stock price offsetting the previous quarter assessments. In addition, in the second quarter of fiscal year 2024, the Company did a revaluation of the warrants through May 30, 2024 in which was the date of Annual Shareholder approval, in which created a loss on revaluation of approximately $1.6 million. In addition to the revaluation of the notes and warrants the loss on debt extinguishment had an additional loss on debt of approximately $1.4 million due to the satisfaction and redemption of the Dorothy 2 equipment loan through issuance of Class B Membership interests in the Dorothy 2 project valued at three times the borrowing amount (i.e., $2.16 million), in which created approximately a $1.4 million loss for the nine months ended September 30, 2024. The Company notes for the nine months ended September 30, 2023, the Company had a net loss on debt extinguishment and revaluation of $2.4 million due to the extinguishment and revaluation of the convertible debt agreement in the second quarter of 2023, as well as quarter end revaluations effected by changes in annual volatility, offset with a gain of $473 thousand in the first quarter of 2023. See Note 7 for further details.
Showing the first 40 of 56 pairs. Open the source sections for the rest.
Rearranged previous paragraphs (1)
Previous report — wording carried elsewhere
***Other expense, net:***For the three months ended June 30, 2024, other expense, net was approximately $49 thousand, compared to $238 thousand for the three months ended June 30, 2023. The main reason for the decrease in other expense, net, was that for the three months ended June 30, 2023 , there was a $250 thousand expense in relation to an extension fee for the noteholders of the convertible debt when the 2nd Amendment was signed on May 11, 2023, whereas for the three months ended June 30, 2024, there was an extension fee expense of approximately $325 thousand, offset with a gain on settlement of litigation with Atlas of approximately $254 thousand, in addition to some small additional other income items.