Skip to main content

Atlas Lithium Corp

For the period ended Jun 30, 2024. Filed Aug 9, 2024.

View on SEC.gov

About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Jun 30, 2024 · Filed Aug 9, 2024

ATLX$1.64-2.4%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-Q

Period ended 2024-03-31; filed 2024-05-15.

0001493152-24-019927

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

Current report: 10-Q

Period ended 2024-06-30; filed 2024-08-09.

0001493152-24-030957

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 58 previous paragraphs and 29 current paragraphs.

13 unchanged; 14 reworded; 2 added; 31 removed; 0 previous and 0 current paragraphs rearranged.

Tables are not compared: 5 previous and 4 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (2)

Current report

During the second quarter of 2024, Atlas Lithium achieved important milestones across several key operational areas including:

Current report

The Six Months Ended June 30, 2024, Compared to the Six Months ended June 30, 2023
Removed paragraphs (31)

Previous report

We believe that we can increase our value by continuing of our exploratory work and quantification of our lithium mineralization as well as by expanding our exploration campaign to new, high-potential areas within our portfolio of mineral rights. Our initial commercial goal is to be able to enter production of lithium concentrate, a product which is highly sought after in the battery supply chain for electric vehicles.

Previous report

We also have 100%-ownership of early-stage projects and properties in other minerals that are needed in the battery supply chain and high technology applications such as nickel, copper, rare earths, graphite, and titanium. We believe that the shift from fossil fuels to battery power may yield long-term opportunities for us not only in lithium but also in such other minerals.

Previous report

Our ongoing drilling campaign is delineating the lithium resources of our 100%-owned Neves Project, a cluster of four lithium mineral rights within MGLP. Our current geological team is comprised of 15 geologists, all of whom are full-time employees. To support the work of our geologists we have 13 full-time field and support technicians and machinery operators, as well as 3 trainee technicians and over 19 field assistants. Our geological team and our exploration campaign is supervised by James Abson, a Qualified Person for lithium as such term is defined in Subpart 1300 of Regulation S-K promulgated by the SEC (“Regulation S-K 1300”). Mr. Abson was appointed as our Chief Geology Officer in October 2023 and has over 29 years of diverse experience in mining and mineral exploration.

Previous report

Under Mr. Abson’s leadership, our technical team adopted a systematic approach to exploration of additional potential target areas within the Neves Project. These efforts involve geological mapping, sampling of historical artisanal mining sites and exposed pegmatites to analyze potassium-rubidium ratios, as well as soil sampling using both XRF and ICP testing for both LCT pathfinders and Li. Geophysical surveys, including magnetics, are used when warranted to pinpoint additional pegmatite deposits and related structures. Deep trenching of anomalous areas is used to identify and confirm lithium-cesium-tantalum (LCT) pegmatites and estimate width, strike, dip and mineralization prior to drilling. Finally, scout drilling is aimed at testing the highest priority pegmatite targets that appear widest and most mineralized. Within Neves Project area, four confirmed pegmatite bodies with spodumene mineralization were identified (designated as Anitta 1 through 4).

Previous report

Expanding beyond the Neves Project area, our regional exploration is now centered on the other mineral rights for lithium within the broader Minas Gerais Lithium Project (“MGLP”), a large footprint of 468 km 2 of lithium mineral claims, many of which are located in Brazil’s Lithium Valley, a well-known hard-rock lithium district. A specialized exploration geology team has been assembled to initiate reconnaissance work across this wider land package. Initial efforts involve LiDAR and geological mapping with a specific focus on historical artisanal mining sites, sampling of known and previously identified pegmatites, as well as first-pass soil sampling lines and geophysics to identify anomalies. This phased approach has systematically advanced regional prospecting across our mineral rights in MGLP with a number of targets generated for further exploration by our exploration team.

Previous report

We have engaged SGS Canada Inc. (“SGS”), and, in particular, their geologist Marc-Antoine Laporte, a Qualified Person for lithium under Regulation S-K 1300, to produce a mineral resource estimate report (the “Maiden Resource Report”) for our Neves Project in accordance with Regulation S-K 1300. Mr. Laporte is the author of mineral resource reports for two other companies which have hard-rock lithium projects in Lithium Valley, the general area where our Neves Project is located, and has worked on lithium properties in Lithium Valley since 2017. Mr. Laporte visited our Neves Project between May 4 and May 6, 2023.

Previous report

On March 19, 2024, our Board appointed Brian Talbot to serve as director on the Board, effective as of April 1, 2024. In addition to joining the Board, Mr. Talbot was also appointed by the Board as our Chief Operating Officer (“COO”), effective as of April 1, 2024. In his capacity as COO, Mr. Talbot will be responsible for both the Company’s development of its lithium mine and processing plant as well as all of its lithium exploration geology program. Mr. Talbot is a qualified person for lithium as such a term is defined in Item 1300 of Regulation S-K.

Previous report

Mr. Talbot has an extensive track record as a technical and operational leader throughout his career with over 30 years of experience in mining operations. In particular, he has extensive experience in DMS (dense media separation) plant development and operation. Most recently, Mr. Talbot was employed by RTEK International DMCC (“RTEK”), a consulting firm that advises lithium developers and producers. From July 2022 to September 2023, Mr. Talbot was the Chief Operating Officer at Sigma Lithium Corporation (“Sigma Lithium”), a Canadian lithium producer with operations in Brazil. At Sigma Lithium, he oversaw the development of that company’s flagship Grota do Cirilo project from construction through commissioning and operations. From 2017 to 2022, Mr. Talbot held positions as General Manager and Head of Australian Operations at Galaxy Resources, now part of Arcadium Lithium PLC, one of the world’s largest fully integrated lithium companies. While at Galaxy Resources, Mr. Talbot was instrumental in increasing the production at Mt. Cattlin (a hard-rock lithium mine in Ravensthorpe, Western Australia) which resulted in record production. From 2015 to 2017, Mr. Talbot was at Bikita Minerals in Zimbabwe, which owns and operates the longest running hard-rock lithium mine in the world. Mr. Talbot holds a bachelor’s degree in chemical engineering with Honors from the University of Witwatersrand, South Africa. Please refer to Part III, Item 10, for further information on Mr. Talbot.

Previous report

The Company’s geological team continues to explore the Neves Project area to expand its already known mineralized pegmatite tonnage. Previously discovered mineralized pegmatites in the Neves Project were initially located with the help of historic artisanal mines, outcroppings of pegmatite, or shallow sub-crop unearthed by trenching Li in soil anomalies. To date, Atlas has mapped and sampled over 84 pegmatite outcrops within the Neves permit, and ranked them based on their K/Rb ratios. The more evolved pegmatites have a higher possibility of hosting lithium minerals. In an effort to expedite the exploration of the substantial surface area of the Neves project, in late 2023, Atlas Lithium embarked on a systematic exploration campaign designed by James Abson, the Company’s Chief Geology Officer.

Previous report

The comprehensive data sets have generated several highly promising coincident and parallel targets (Figure 1). One notable example is a linear lithium anomaly with a strike length of 1.2km, which coincides with the Anitta 2 mineralized pegmatite. While some of these targets may represent extensions of the known mineralized Anitta trends, others could potentially indicate entirely new, untested pegmatite discoveries, particularly in the southern region of Neves.

Previous report

The practical application of this new lithium soil anomaly information is exemplified at Anitta 1. Previously, an unexplained anomaly existed to the east of the drilled orebody. Guided by this anomaly, additional drilling has now uncovered the up-dip extension of Anitta 1 and a parallel orebody immediately to the east. These discoveries are expected to contribute significantly to the project’s mineralized pegmatite tonnage, demonstrating the effectiveness of the exploration approach in identifying and delineating high-quality lithium mineralization.

Previous report

Figure 1: Soil sampling lithium anomaly map in relation to mapped pegmatites (pink), the mineralized Anitta pegmatites, topography, and structural geophysics data.

Previous report

Drilled lithium-mineralized sections of pegmatites can extend up to 150m along strike beyond the termination of the surface lithium anomaly, as observed in the case of Anitta 2. In certain areas, it is probable that these pegmatites continue undetected from the surface along the same strike direction, particularly beneath higher hills where the cover and weathering profiles may be thicker. The Company’s exploration team is currently evaluating the potential use of other less mobile LCT pathfinders, such as Cs, Sn, and Ta, to identify new anomalous trends or extensions that warrant further investigation.

Previous report

Furthermore, the majority of the Anitta pegmatites exhibit a close association with magnetic lows and NNE-SSW structural lineaments. This valuable information will enable the Atlas team to refine its approach to future exploration targeting activities. These activities will include more detailed follow-up work, such as infill soil grids, trenching, and drilling, to better delineate and characterize the identified targets.

Previous report

On December 4, 2023, we announced implementing an early-revenue strategy. With the well-delineated initial Anitta pegmatites, positive metallurgical test work and well-advanced mining and environmental permits Atlas Lithium’s technical team opted to expedite the production timeline for its 100%-owned Neves Project. This early-revenue strategy targets initial “Phase I” production of spodumene concentrate by the fourth quarter of 2024, ramping up to “Phase II” production in mid-2025. The early-revenue Phase I plant is expected to have a maximum capacity of 150,000 tons per annum of spodumene concentrate.

Previous report

We intend to deploy compacted modular dense media separation (DMS) technology together with contracting the crushing and mining operations. The total capital expenditures, including the initial production and ramp-up is estimated at $49.5 million, which includes the modular DMS plants, tailings management module for dry stacked tailings; engineering, procurement, construction management costs; earthworks and civils; site access upgrade, mining preparation and pre-strip, commissioning and ramp-up. The fabrication of the DMS modules, tailing management module, and associated materials handling equipment is nearing completion and trial assembly is currently underway at the South African manufacturing facility as a quality assurance measure prior to shipment to Brazil.

Previous report

On February 26, 2024, we announced that the fabrication of the DMS modules, tailing management module, and associated materials handling equipment is progressing on schedule, and first commissioning and initial production anticipated for the fourth quarter of 2024. The manufacturing orders were placed by us in December 2023. By condensing components into modules with significantly reduced footprint and weight versus recent DMS plants, Atlas Lithium plans to streamline installation and commissioning. For example, whereas fully assembled traditional DMS facilities commonly weigh 250-300 tons, the Company’s modular plant is predicted to weigh only approximately 41 tonnes. Modular DMS trial assembly on the primary 100 tons per hour (tph) module and the secondary 50 tph module. We engaged CDM Group as engineering contractor and construction coordinator and ADP Marine & Modular for plant manufacturing, with both of these firms located in South Africa. The manufacturing facility located in South Africa has recently been visited by our technical team and photographs of parts completed and in progress of our modular DMS lithium processing plant under construction can be seen in Figures 2-4 below. Figures 5-7 depict 3-D model views of our planned modular DMS lithium processing plant.

Previous report

Figure 2: Our modular DMS lithium processing plant under construction.

Previous report

Figure 3: View of part of our DMS lithium processing plant under construction.

Previous report

Figure 4: View of part of our modular DMS lithium processing plant under construction.

Previous report

Figure 5: View of 3-D model of our planned DMS lithium processing plant.

Previous report

Figure 6: Additional view of 3-D model of our planned DMS lithium processing plant.

Previous report

Figure 7: Additional view of 3-D Model of our planned DMS lithium processing plant.

Previous report

On January 18, 2023, we announced that we had signed a non-binding, non-exclusive Memorandum of Understanding (“MOU”) with Mitsui & Co., Ltd. (“Mitsui”) with respect to Mitsui’s potential interest in acquiring the right to purchase our future lithium concentrate production. In November 2023, we ceased discussions with Mitsui regarding a potential offtake arrangement as contemplated by the MOU, but continued discussions with Mitsui regarding other possible strategic opportunities. On March 28, 2024, the Company and Mitsui entered into an agreement pursuant to which the Company agreed to sell to Mitsui 1,871,250 shares of our common stock for a purchase price of $30,000,000, representing a 10% premium to the 5-day VWAP . The closing of the sale of the shares occurred on April 4, 2024. In connection with the sale of the shares, on April 4, 2024, parties entered into an Offtake and Sales Agreement (the “Offtake”) for the future purchase of 15,000 tons of lithium concentrate from Phase 1 and 60,000 tons per year for five years from Phase 2 of Atlas Lithium’s soon to be producing Neves Project in Brazil’s Lithium Valley. The investment provided Atlas Lithium with funds to continue its development towards revenue generation

Previous report

The Three Months Ended March 31, 2024, Compared to the Three Months ended March 31, 2023
Reworded paragraphs (14)

Previous wording

Atlas Lithium Corporation (“Atlas Lithium”, the “Company”, “we”, “us”, or “our” refer to Atlas Lithium Corporation and its consolidated subsidiaries) is a mineral exploration and development company with lithium projects and multiple lithium exploration properties. In addition, we own exploration properties in other battery minerals, including nickel, copper, rare earths, graphite, and titanium. Our current focus is the development from exploration to active mining of our hard-rock lithium project located in the state of Minas Gerais in Brazil at a well-known pegmatitic district in Brazil, which has been denominated by the government of Minas Gerais as “Lithium Valley.” We intend to mine and then process our lithium-containing ore to produce lithium concentrate (also known as spodumene concentrate), a key ingredient for the battery supply chain.

Current wording

Atlas Lithium Corporation (“Atlas Lithium”, the “Company”, “we”, “us”, or “our” refer to Atlas Lithium Corporation and its consolidated subsidiaries) is a mineral exploration and development company with a developing lithium project and multiple lithium exploration properties. In addition, we own exploration properties in other battery minerals, including nickel, copper, rare earths, graphite, and titanium. Our current focus is the development from exploration to future active mining of our hard-rock lithium project located in the state of Minas Gerais in Brazil at a well-known pegmatitic district in Brazil, which has been denominated by the government of Minas Gerais as “Lithium Valley.” We intend to mine and then process our lithium-containing ore to produce lithium concentrate (also known as spodumene concentrate), a key ingredient for the battery supply chain.

Previous wording

We are building a modular plant targeted at producing 150,000 tons of lithium concentrate per annum (“tpa”) in what we describe as Phase I. We plan on adding additional modules to the plant with the intent of doubling its production capacity to 300,000 tpa in Phase II. However, there can be no assurance that we will have the necessary capital resources to develop such facility or, if developed, that we will reach the production capacity necessary to commercialize our products and with the quality needed to meet market demand.

Current wording

We are building a modular plant targeted at producing up to 150,000 tons of lithium concentrate per annum (“tpa”) in what we describe as Phase I. We plan on adding additional modules to the plant with the intent of doubling its production capacity to up to 300,000 tpa in Phase II. However, there can be no assurance that we will have the necessary capital resources to develop such facility or, if developed, that we will reach the production capacity necessary to commercialize our products and with the quality needed to meet market demand.

Previous wording

All our mineral projects and properties are located in Brazil, a well-established mining jurisdiction. Our mineral rights include approximately:

Current wording

All our mineral projects and properties are located in Brazil, a well-established mining jurisdiction. Our lithium properties include approximately 53,942 hectares (539 km 2) divided in 95 mineral rights (2 in pre-mining concession stage, 85 in exploration stage, and 8 in pre-exploration stage).

Previous wording

In addition, we also have a few additional mineral rights in the process of being acquired and not yet titled in our name. We believe that we hold the largest portfolio of exploration properties for lithium and other battery minerals in Brazil.

Current wording

In addition, we also have a few additional lithium mineral rights that are in the process of being acquired and not yet titled in our name.

Previous wording

We are primarily focused on advancing and developing our hard-rock lithium project located in the state of Minas Gerais, Brazil. Our Minas Gerais Lithium Project (“MGLP”) is our largest project and consists of 85 mineral rights spread over approximately 468 km 2 and predominantly located within the Brazilian Eastern Pegmatitic Province which has been surveyed by the Brazilian Geological Survey and is known for the presence of hard rock formations known as pegmatites which contain lithium-bearing minerals such as spodumene and petalite.

Current wording

We are primarily focused on advancing and developing our hard-rock lithium project located in the state of Minas Gerais, Brazil. Our Minas Gerais Lithium Project (“MGLP”) consists of 85 mineral rights spread over approximately 468 km 2 and predominantly located within the Brazilian Eastern Pegmatitic Province which has been surveyed by the Brazilian Geological Survey and is known for the presence of hard rock formations known as pegmatites which contain lithium-bearing minerals such as spodumene and petalite. Our primary area of focus is the Neves Project, which is part of MGLP. The Neves Project has been drilled extensively and presents spodumene-bearing deposits amenable to open pit mining, with generation of ore material that can be processed by dense media separation technique to yield lithium concentrate, a commercial product within the battery supply chain.

Previous wording

In addition to these projects, we own 58.71% of the shares of common stock of Apollo Resources, a private company primarily focused on the development of its initial iron mine.

Current wording

We own approximately 47.58% of the shares of common stock of Apollo Resources, a private company primarily focused on the development of its initial iron mine.

Previous wording

We also own approximately 27.42% of the shares of common stock of Jupiter Gold, a company focused on the exploration of two gold projects and a quartzite mine, the common stock of which is quoted on the OTCQB marketplace under the symbol “JUPGF.” The quartzite mine started preliminary operations in June 2023.

Current wording

We also own approximately 22.30% of the shares of common stock of Jupiter Gold, a company with an operating quartzite quarry and gold projects in exploration phase, the common stock of which is quoted on the OTCQB marketplace under the symbol “JUPGF.”

Previous wording

Net loss for the three months ended March 31, 2024, totaled $13,184,196, compared to net loss of $4,465,353 during the three months ended March 31, 2023. The increase is mainly due to:

Current wording

Net loss for the six months ended June 30, 2024, totaled $25,581,120, compared to net loss of $13,862,249 during the six months ended June 30, 2023. The increase is mainly due to:

Previous wording

As of March 31, 2024, we had cash and cash equivalents of $17,529,465 and working capital of $11,280,122.

Current wording

As of June 30, 2024, we had cash and cash equivalents of $32,267,730 and working capital of $27,303,255.

Previous wording

Net cash used by operating activities totaled $6,103,264 for the three months ended March 31, 2024, compared to net cash used of $3,663,428 during the three months ended March 31, 2023, representing a decrease in cash available of $2,439,836 or 67%. The increase in net cash used by operating activities was mainly due to:

Current wording

Net cash used by operating activities totaled $13,735,837 for the six months ended June 30, 2024, compared to net cash provided of $11,783,491 during the six months ended June 30, 2023, representing a variation in the cash flow from operating activities of $25,519,328. The variation in net cash used /provided by operating activities was mainly due to:

Previous wording

Net cash used in investing activities totaled $6,055,535 for the three months ended March 31, 2024, compared to net cash used of $1,275,972 during the three months ended March 31, 2023, representing an increase in cash used of $4,779,563 or 375%. The increase reflects the payments made in connection with the construction of our Lithium processing plant.

Current wording

Net cash used in investing activities totaled $14,333,495 for the six months ended June 30, 2024, compared to net cash used of $2,679,812 during the six months ended June 30, 2023, representing an increase in cash used of $11,653,683 or 435%. The increase reflects the payments made in connection with the acquisition of the components of our lithium processing plant.

Previous wording

Net cash provided by financing activities totaled $0 for the three months ended March 31, 2024, compared to $9,564,335 during the three months ended March 31, 2023, representing a decrease in cash provided of $9,564,335 or 100%. The decrease is mainly due to the following financing activities that occurred during the three months ended March 31, 2023:

Current wording

Net cash provided by financing activities totaled $30,140,298 for the six months ended June 30, 2024, compared to $10,675,118 during the six months ended June 30, 2023, representing an increase in cash provided of $19,465,180 or 182%. The increase is mainly due to the following financing activities that occurred during the six months ended June 30, 2023:

Previous wording

For further information on three transactions mentioned above, please refer to note 4 – stockholders´ equity.

Current wording

For further information on the transaction mentioned above, please refer to note 7 – related parties transactions.

Previous wording

We have historically incurred net operating losses and have not yet generated material revenues from the sale of products or services. As a result, our primary sources of liquidity have been derived through proceeds from the (i) sales of our equity and the equity of one of our subsidiaries, and (ii) issuance of convertible debt. As of March 31, 2024, we had cash and cash equivalents of $17,729,465 and working capital of $11,280,122, compared to cash and cash equivalents $29,549,927 and a working capital of $24,044,931 as of December 31, 2023. We believe our cash on hand will be sufficient to meet our working capital and capital expenditure requirements for a period of at least twelve months. However, our future short- and long-term capital requirements will depend on several factors, including but not limited to, the rate of our growth, our ability to identify areas for mineral exploration and the economic potential of such areas, the exploration and other drilling campaigns needed to verify and expand our mineral resources, the types of processing facilities we would need to install to obtain commercial-ready products, and the ability to attract talent to manage our different areas of endeavor. To the extent that our current resources are insufficient to satisfy our cash requirements, we may need to seek additional equity or debt financing. If the needed financing is not available, or if the terms of financing are less desirable than we expect, we may be forced to scale back our existing operations and growth plans, which could have an adverse impact on our business and financial prospects and could raise substantial doubt about our ability to continue as a going concern.

Current wording

We have historically incurred net operating losses and have not yet generated material revenues from the sale of products or services. As a result, our primary sources of liquidity have been derived through proceeds from the (i) sales of our equity and the equity of one of our subsidiaries, and (ii) issuance of convertible debt. As of June 30, 2024, we had cash and cash equivalents of $32,267,730 and working capital of $27,303,255, compared to cash and cash equivalents $29,549,927 and a working capital of $24,044,931 as of December 31, 2023. We believe our cash and cash and equivalents will be sufficient to meet our working capital and capital expenditure requirements for a period of at least twelve months from the date of these financial statements. However, our future short- and long-term capital requirements will depend on several factors, including but not limited to, the rate of our growth, our ability to identify areas for mineral exploration and the economic potential of such areas, the exploration and other drilling campaigns needed to verify and expand our mineral resources, the successful installation of our lithium processing facilities, and the ability to attract talent to manage our different areas of endeavor. To the extent that our current resources are insufficient to satisfy our cash requirements, we may need to seek additional equity or debt financing. If the needed financing is not available, or if the terms of financing are less desirable than we expect, we may be forced to scale back our existing operations and growth plans, which could have an adverse impact on our business and financial prospects and could raise substantial doubt about our ability to continue as a going concern.