A company's yearly report to the SEC, with audited financial statements. It is the fullest account a company gives of its business, its finances and the risks it sees.

FY2024 · Filed Feb 28, 2025

AMRC$21.61+12.8%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-K

Period ended 2023-12-31; filed 2024-02-29.

0001488139-24-000014

ITEM 7. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

Current report: 10-K

Period ended 2024-12-31; filed 2025-02-28.

0001488139-25-000018

ITEM 7. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 131 previous paragraphs and 142 current paragraphs.

63 unchanged; 46 reworded; 32 added; 20 removed; 2 previous and 1 current paragraphs rearranged.

Tables are not compared: 6 previous and 6 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (32)

Current report

Ameresco is a leading energy solutions provider dedicated to helping customers navigate the energy transition. Our comprehensive portfolio includes implementing smart energy efficiency solutions, upgrading aging infrastructure, and developing, constructing, and operating distributed energy resources.

Current report

Drawing from decades of experience, Ameresco reduces energy use and delivers diversified generation solutions to Federal, state and local governments, utilities, educational and healthcare institutions, housing authorities, and commercial and industrial customers.

Current report

Federal policies play an important role in our business and our business benefits from regulatory measures and various tax credits, such as the Investment Tax Credit (“ITC”) and the Production Tax Credit (“PTC”) and funds appropriated through the IRA and the IIJA. The scope of these tax credits and the availability of funding through the IRA and IIJA may evolve with the new U.S. administration. Recent presidential executive orders that directed a review and potential termination of funds appropriated through the IRA and the IIJA have resulted in some pauses and cancellations of our projects. We also anticipate that federal workforce reductions and other cost savings initiatives may cause additional delays, extend our sales cycles and impact new award activity. However, we continue to believe there is a long-term demand for our budget neutral, cost-saving solutions.

Current report

These tariffs, restrictions, and strained trade relations may affect our ability to source materials and products, potentially leading to increased costs and operational challenges and decreased demand for or offerings. We are closely monitoring the regulatory environment and actions of the current administrations that could impact our business.

Current report

•Earnings from Unconsolidated Entities: the decrease in earnings from unconsolidated entities is due to the sale of one of our equity method investments during the first quarter of 2024.

Current report

•Gain on Sale of Business, Net: in 2024, we divested an energy technology and advisory services company and recognized a gain of $38.0 million, net of transaction expenses.

Current report

•Europe: revenues increased primarily due to higher project revenue of $100.1 million, or 72%, resulting from the timing of revenue recognized based upon costs incurred to date relative to total expected costs on active projects in the United Kingdom compared to the prior period.

Current report

•All Other: All other revenues were higher primarily due to increased consulting revenue.

Current report

•North America Regions: the increase is primarily due to the higher revenues described above, offset by lower gross profit as a percent of revenues primarily due to cost overruns on two large-scale legacy projects and increased depreciation and intangible amortization and interest expense, and a loss on derivatives this year versus a gain last year.

Current report

•Renewable Fuels: the decrease is primarily due to higher asset impairment charges of $7.6 million on one of our landfill gas to energy assets and higher interest expense of $9.5 million, partially offset by the higher revenues described above.

Current report

•Europe: the decrease is primarily due to a higher mix of lower-margin projects, increased salaries and benefits, net, and higher interest expense, partially offset by decreased bank discount fees.

Current report

•All Other: the increase is primarily due to a gain of $38.0 million on the sale of business, net and increased consulting revenue.

Current report

On December 31, 2024, we completed the sale of a business. As a result of this transaction, we received net proceeds of $54.2 million, and recorded a gain of $38.0 million, net of transaction costs of $2.2 million, from this disposition. At closing we prepaid $57.0 million towards our senior secured term loan.

Current report

On January 23, 2025, we refinanced our Senior Secured Credit Facility by entering into a sixth amended and restated senior secured credit agreement (“Restated Credit Agreement”). At closing we paid approximately$2.0 million in lender’s fees.

Current report

The restated credit agreement amended and restated the Senior Secured Credit Facility to provide for the following facilities:

Current report

•a $225 million revolving credit facility, maturing on December 28, 2028, and

Current report

•a $100 million term loan A, maturing on December 28, 2028.

Current report

On June 28, 2024, we entered into a second lien credit agreement which provided a term loan in a principal amount of $100 million with a maturity date of June 28, 2029. The term loan bears an interest rate of Secured Overnight Financing Rate (“SOFR”) (4.692% at December 31, 2024), plus an applicable margin of 5.875% per annum. Interest is payable quarterly and unpaid interest and principal is due in the aggregate on June 28, 2029.

Current report

Energy Asset Construction and Operating Facilities, Sale-leasebacks, and Financing Leases

Current report

During the year ended December 31, 2024, we discovered a defect in a Battery Energy Storage System (“BESS”) that we installed for a customer under a long-term power purchase agreement for a project financed under the August 2018 master sale-leaseback agreement. As a result, the BESS had to be removed. Our financing partner has agreed to temporarily waive any events of default and refrain from pursuing remedies available under the master sale-leaseback associated with the BESS failure until December 31, 2025 to allow remediation of the issue (subject to certain conditions). We have fully funded lease payments due under the master lease agreement through December 31, 2025 into a reserve account from which lease payments will be made.

Current report

August 2024 Master Sale-leaseback - On April 18, 2023 we entered into lease agreements with two investors and on August 14, 2024 we sold and leased back an energy asset for $234.8 million, of which 50% was allocated to each investor under these agreements. One lease has an expiration date of August 14, 2034 with an option to extend to August 14, 2044 while the other has an expiration date of August 14, 2044. At closing, we used $140.8 million of the proceeds to pay off the April 2023 construction credit facility and made rent prepayments of $60.1 million.

Current report

Our cash flow from operating activities in 2024 improved over 2023 primarily due to a decrease in the use of cash from Federal ESPC receivables of $101.4 million, increase in cash flows of $90.5 million from accounts payable, accrued expenses, and other current liabilities, $68.2 million from unbilled revenue, and $63.7 million from prepaid expenses and other current assets which includes the sale of ITCs on energy assets for $47.5 million. These were partially offset by decreased cash flows of $149.5 million from accounts receivable.

Current report

Our primary sources of financing during 2024 were proceeds of $643.5 million from energy asset debt financings, $170.8 million from advances on Federal ESPC projects and energy assets, proceeds from the second lien term loan of $100.0 million, contributions from non-controlling interest of $35.4 million, partially offset by repayments of energy asset debt and financing leases totaling $424.4 million, repayments of long-term corporate debt of $127.0 million, and payments on the seller’s promissory note of $61.9 million.

Current report

We account for our interest rate swaps and our make-whole provisions as derivative financial instruments which are carried on our consolidated balance sheets at fair value.

Current report

The fair value of our interest rate swaps are determined based on observable market data in combination with expected cash flows for each instrument. Among the key drivers of value are interest rates, since the future floating rates are unknown. The value of our interest rate swaps will change in subsequent periods as counterparty credit risk and forward expectations of the floating rate change. Therefore, depending on how the yield curve changes in subsequent measuring periods, a swap can become an asset or a liability for us. In addition, model inputs used in swap analyses can also substantially affect the fair value of the swaps.

Current report

Our make-whole provisions fulfill the requirements of embedded derivative instruments that were required to be bifurcated from the host agreement. The fair value of these make-whole provisions are determined based on available market data and a with and without model. There are several assumptions and estimates used in the calculation of the fair value of derivatives, such as discount rate and risk premium.

Current report

Any changes in the fair value of our derivatives designated as hedging instruments are recorded as adjustments to other comprehensive (loss) income and any changes in fair value of our derivatives not designated hedging instruments are recorded in interest and other expenses, net in our consolidated statements of income. See Note 19 “Derivative Instruments and Hedging Activities” for more information.
Removed paragraphs (20)

Previous report

Ameresco is a leading clean technology integrator with a comprehensive portfolio of energy efficiency and renewable energy supply solutions. We help organizations meet energy saving and energy management challenges with an integrated, comprehensive approach to energy efficiency and renewable energy. Leveraging budget neutral solutions, including ESPCs and PPAs, we aim to eliminate the financial barriers that traditionally hamper energy efficiency and renewable energy projects.

Previous report

Drawing from decades of experience, Ameresco develops tailored energy management projects for its customers in the commercial, industrial, local, state and federal government, K-12 education, higher education, healthcare, public housing sectors, and utilities.

Previous report

The IRA was signed into law on August 16, 2022. The bill invests nearly $369 billion in energy and climate policies. The provisions of the IRA are intended to, among other things, incentivize domestic clean energy investment, manufacturing, and deployment. The IRA incentivizes the deployment of clean energy technologies by extending and expanding federal incentives such as the ITC and the Production Tax Credit (“PTC”). We view the enactment of the IRA as favorable for the overall business climate for the renewable energy industry. However, there is uncertainty related to the applicability of the IRA to our current and planned projects and the scope of the IRA and its interpretations may change if there is a change in the U.S. administration or if government agencies’ authority to interpret federal law is restricted as a result of the Supreme Court’s review of the Chevron doctrine under which federal government agencies have been awarded board authority to interpret broad or ambiguous legislation. We may also continue to experience a delay in our sales cycles and new award activity as our customers consider the applicability of the IRA and as financing projects may take longer as result of this uncertainty. The IRA may increase the competition in our industry and as such increase the demand and cost for labor, equipment and commodities needed for our projects.

Previous report

In August 2023, the U.S. Department of Commerce issued a final ruling in the Auxin Solar trade case related to solar tariff imports that will lead to higher tariffs on certain imported solar products from Malaysia, Vietnam, Thailand, and Cambodia beginning in June 2024. Similarly, other changes in trade regulations and the enforcement of the Uyghur Forced Labor Prevention Act, could disrupt the solar panel supply chain, increase the cost for solar cells and panels, and ultimately impact the demand for clean energy solutions. We are closely monitoring the investigation and any regulations issued in connection with it.

Previous report

We are working closely with SCE on the final steps toward substantial completion for two of the three projects. Construction activities and preparation for commissioning have begun for the third project, which was significantly impacted by the heavy rainfall in California in 2023. This last site is expected to reach substantial completion in the summer of 2024.

Previous report

•Income before Income Taxes: the decrease is due to reasons described above.

Previous report

•Canada: the increase is primarily due to higher project revenues which were partially offset by unfavorable foreign exchange rates.

Previous report

•Europe: revenues increased year-over-year primarily due to higher project revenue of $85.1 million, or 158%, resulting from increased overall activity which included revenues of $52.2 million related to the acquisition of Enerqos earlier in 2023 and increased revenues in Greece of $28.3 million.

Previous report

•All Other: All other revenues is consistent with the prior year.

Previous report

•U.S. Regions: the decrease is primarily due to the lower revenues described above, partially offset by lower salaries and benefit costs and lower project development costs.

Previous report

•Canada: the increase is primarily due to the increase in project revenues described above partially offset by higher project development costs.

Previous report

•Alternative Fuels: the decrease is primarily due to higher direct costs related to unplanned downtime, higher interest expense, higher depreciation expense related to the timing of assets placed in operations and impairment charges recorded in 2023 related to two of our landfill gas to energy assets.

Previous report

•Europe: the decrease is primarily due to factoring fees of $5.8 million, increased salaries and benefits, net, and depreciation and amortization as a result of the acquisition of Enerqos, partially offset by the increased revenues noted above.

Previous report

•All Other: the decrease is primarily due to increased salaries and benefits, net.

Previous report

After the end of the year, we announced that we had engaged an investment bank to raise subordinated debt as required by the December 2023 amendment to our senior secured credit facility. The debt raise, if successful, would be used to repay outstanding amounts on the senior secured credit facility.

Previous report

Energy Asset Construction Facilities, Financing Facilities, and Term Loans

Previous report

•March 2023 Construction Credit Facility, 2.00% - we entered into a credit agreement for a construction facility with a total commitment of CAD$100.0 million and as of December 31, 2023, no funds were drawn under this facility.

Previous report

•October 2022 Financing Facility, 6.70%, due August 31, 2039 - during 2023, we entered into an amendment and an amended and restated loan agreement that increased the original commitment of $125.0 million to $500.0 million, increased the interest rate to 6.70% and changed the maturity date to August 31, 2039. The loan also provides for a residual percentage of distributable cash flows payable after the maturity date of the loan, until the earlier of the lender achieving an 8.51% internal rate of return (“IRR”) on funds borrowed under the facility, or the facility discharge date which was extended to August 31, 2049. During 2023, we drew down a total of $276.7 million under this facility.

Previous report

Our cash flow from operating activities in 2023 improved over 2022 primarily due to a $259.4 million and $49.2 million increase in cash flows from unbilled revenue (costs and estimated earnings in excess of billings) and accounts receivable, respectively, due to the timing of when certain projects are invoiced, including our SCE battery storage project, partially offset by a decrease of $34.6 million in net income.
Reworded paragraphs (46)

Previous wording

We provide solutions primarily throughout the U.S., Canada, and Europe, and our revenues are derived principally from energy efficiency projects, which entail the design, engineering, and installation of equipment and other measures that incorporate a range of innovative technology and techniques to improve the efficiency and control the operation of a facility’s energy infrastructure; this can include designing and constructing a central plant or cogeneration system for a customer providing power, heat and/or cooling to a building, or other small-scale plant that produces electricity, gas, heat or cooling from renewable sources of energy. We also derive revenue from long-term O&M contracts, energy supply contracts for renewable energy operating assets that we own, integrated-PV, and consulting and enterprise energy management services.

Current wording

We provide solutions primarily throughout North America and Europe, and our revenues are derived principally from energy efficiency projects, which entail the design, engineering, and installation of equipment and other measures that incorporate a range of innovative technology and techniques to improve the efficiency and control the operation of a facility’s energy infrastructure; this can include designing and constructing a central plant or cogeneration system for a customer providing power, heat and/or cooling to a building, or other small-scale plant that produces electricity, gas, heat or cooling from renewable sources of energy. We also derive revenue from long-term O&M contracts, energy supply contracts for renewable energy operating assets that we own, integrated-PV, and consulting and enterprise energy management services.

Previous wording

In addition to organic growth, strategic acquisitions of complementary businesses and assets, and joint venture arrangements have been an important part of our growth enabling us to broaden our service offerings and expand our geographical reach. During 2022, we entered into joint venture arrangements in Greece and California and acquired an operating wind farm in Ireland. During 2023, we acquired Enerqos Energy Solutions S.r.l. (“Enerqos”) a renewable energy and energy efficiency company headquartered in Milan, Italy and entered into a joint venture agreement with Bristol City, U.K. to transform the way the city generates, distributes, stores and uses energy.

Current wording

In addition to organic growth, strategic acquisitions of complementary businesses and assets, and joint venture arrangements have been an important part of our growth enabling us to broaden our service offerings and expand our geographical reach.

Previous wording

We continue to monitor the impact of global economic conditions on our operations, financial results, and liquidity, including the result of supply chain challenges, war in Ukraine and the Middle East, evolving relations between the U.S. and China, and other geopolitical tensions. The impact to our future operations and results of operations as a result of these global trends remains uncertain and the challenges we face, including increases in costs for logistics and supply chains, intermittent supplier delays, and shortages of certain components needed for our business, such as lithium-ion battery cells, semiconductors, and other components required for our clean energy solutions may continue or become more pronounced.

Current wording

We continue to monitor the impact of global economic conditions on our operations, financial results, and liquidity, such as the impact of tariffs, supply chain challenges, the wars in Ukraine and the Middle East, evolving relations between the U.S. and China, and other geopolitical tensions. Import duties, tariffs and other import restrictions, including the Uyghur Forced Labor Protection Act, restrict the global supply of, and raise prices for, supplies needed for our business. In addition, tariffs and trade restrictions that have been introduced any may be introduced as part of the 'America First' trade policy may further increase the cost of components needed for our offerings and may strain trade relations, create inflationary pressures and cause additional supply chain disruptions. The impact to our future operations and results of operations as a result of these global trends remains uncertain and the challenges we face, including increases in costs for logistics and supply chains, intermittent supplier delays, and shortages of certain components needed for our business, such as electrical equipment, steel and aluminum as well as BESS equipment or components required for our projects and clean energy solutions may continue or become more pronounced.

Previous wording

During the year ended December 31, 2023, we were impacted by supply chain disruptions and varying levels of inflation, as a result macroeconomic conditions, causing delays in the timely delivery of material to customer sites and delays and disruptions in the completion of certain projects, including those pursuant to the SCE Agreement, and increased shipping and transportation costs, as well as increased component and labor costs. This negatively impacted our results of operations during the year ended December 31, 2023. We expect the trends of supply chain challenges to continue beyond this year. We continue to monitor macroeconomic conditions to remain flexible and to optimize and evolve our business as appropriate to address the challenges presented from these conditions.

Current wording

During the year ended December 31, 2024, we were impacted by supply chain disruptions and varying levels of inflation, as a result macroeconomic conditions, causing delays in the timely delivery of material to customer sites and delays and disruptions in the completion of certain project, and increased shipping and transportation costs, as well as increased component and labor costs. This negatively impacted our results of operations during the year ended December 31, 2024. We expect to experience continued supply chain challenges beyond this year. We continue to monitor macroeconomic conditions to remain flexible and to optimize and evolve our business as appropriate to address the challenges presented from these conditions.

Previous wording

In October 2021, we entered into a contract with SCE to design and build three grid scale BESS at three sites near existing substation parcels throughout SCE’s service territory in California with an aggregate capacity of 537.5 MW (“the SCE Agreement”). The engineering, procurement and construction price is approximately $892.0 million, in the aggregate, including two years of O&M revenues, subject to customary potential adjustments for changes in the work. As previously disclosed, due to supply chain delays, weather and other events, we were unable to complete the projects by August 1, 2022 (the “Guaranteed Completion Date”) and made related force majeure claims. In late 2022, SCE also instructed us to adjust the completion of the sites into 2023. Under the SCE Agreement, a failure to reach the Guaranteed Completion Date could, under certain circumstances, result in liquidated damages up to a maximum amount of $89 million being applied. We have been working with SCE to analyze the applicability and scope of force majeure relief based on our force majeure claims. In February 2024, in response to us issuing an invoice to SCE for one of the sites, SCE notified us that they intend to withhold liquidated damages for that project. Our view is that liquidated damages should not be applied. If we fail to come to an agreement with SCE about the applicability and scope of force majeure relief and liquidated damages, we may be required to pay liquidated damages up to an aggregate maximum of $89 million and may not be able to recover costs associated with the force majeure events.

Current wording

In October 2021, we entered into a contract with SCE to design and build three grid scale BESS at three sites near existing substation parcels throughout SCE’s service territory in California with an aggregate capacity of 537.5 MW (“the SCE Agreement”). The engineering, procurement and construction price is approximately $892.0 million, in the aggregate, including two years of O&M revenues, subject to customary potential adjustments for changes in the work. As previously disclosed, due to supply chain delays, weather and other events, we were unable to complete the projects by August 1, 2022 (the “Guaranteed Completion Date”). On August 30 2024, we reached an agreement with SCE on the substantial completion of two out of three battery energy storage system projects. We received approximately $110 million on September 5, 2024 as milestone payments, reflecting both an offset of liquidated damages which are still in dispute and $3 million that SCE withheld for additional work SCE required. Upon final acceptance of these two projects, we will invoice SCE for the remaining final acceptance milestone payments for these projects. The SCE Agreement also confirmed that the final resolution related to our obligation to pay the liquidated damages withheld and the applicability and scope of any force majeure relief as well as any cost recovery we may be entitled to remain subject to dispute. We are continuing discussions with SCE on these matters and our view continues to be that liquidated damages should not be applied. If we fail to come to an agreement with SCE about the applicability and scope of force majeure relief and liquidated damages, we may be required to pay liquidated damages up to an aggregate maximum of $89 million and may not be able to recover costs associated with the force majeure events.

Previous wording

During the year ended December 31, 2023, we granted 170,000 common stock options to certain employees and 66,247 restricted stock units to our employees and non-employee directors under our 2020 Stock Incentive Plan. Our stock-based compensation expense decreased from $15.0 million for the year ended December 31, 2022 to $10.3 million for the year ended December 31, 2023. Stock-based compensation decreased in 2023, primarily due to the reversal of previously recognized expense of approximately $5.1 million related to performance-based option grants as the estimated probability of such awards vesting was reduced to zero based on the expected attainment of certain performance targets due to revised results in 2023.

Current wording

During the year ended December 31, 2024, we granted 791,503 common stock options to certain employees and 122,366 restricted stock units (“RSUs”) to our employees and non-employee directors under our 2020 Stock Incentive Plan. Our stock-based compensation expense increased from $10.3 million for the year ended December 31, 2023 to $14.1 million for the year ended December 31, 2024. Stock-based compensation increased in 2024, primarily due to the increase in options and RSUs granted, partially offset by a decrease in the weighted average fair value of stock options and RSUs granted.

Previous wording

In addition, our unrecognized stock-based compensation expense decreased from $46.7 million at December 31, 2022 to $30.1 million at December 31, 2023, and is expected to be recognized over a weighted-average period of two years. See Note 14 “Stock-based Compensation and Other Employee Benefits” for additional information.

Current wording

In addition, our unrecognized stock-based compensation expense decreased from $30.1 million at December 31, 2023 to $28.0 million at December 31, 2024, and is expected to be recognized over a weighted-average period of two years. See Note 14 “Stock-based Compensation and Other Employee Benefits” for additional information.

Previous wording

Total project backlog represents energy efficiency projects that are active within our sales cycle. Our sales cycle begins with the initial contact with the customer and ends, when successful, with a signed contract, also referred to as fully-contracted backlog. Our sales cycle recently has been averaging 18 to 42 months. Awarded backlog is created when a potential customer awards a project to Ameresco following a request for proposal. Once a project is awarded but not yet contracted, we typically conduct a detailed energy audit to determine the scope of the project as well as identify the savings that may be expected to be generated from upgrading the customer’s energy infrastructure. At this point, we also determine the subcontractor, what equipment will be used, and assist in arranging for third party financing, as applicable. Recently, awarded projects have been taking an average of 12 to 24 months to result in a signed contract and convert to fully-contracted backlog. It may take longer, as it depends on the size and complexity of the project. Historically, approximately 90% of our awarded backlog projects have resulted in a signed contract. After the customer and Ameresco agree to the terms of the contract and the contract becomes executed, the project moves to fully-contracted backlog. The contracts reflected in our fully-contracted backlog typically have a construction period of 12 to 36 months and we typically expect to recognize revenue for such contracts over the same period.

Current wording

Total project backlog represents energy efficiency projects that are active within our sales cycle, either full-contracted or awarded. Our sales cycle begins with the initial contact with the customer and ends, when successful, with a signed contract, also referred to as fully-contracted backlog. Our sales cycle recently has been averaging 18 to 42 months. Awarded backlog is created when a potential customer awards a project to Ameresco following a request for proposal. Once a project is awarded but not yet contracted, we typically conduct a detailed energy audit to determine the scope of the project as well as identify the savings that may be expected to be generated from upgrading the customer’s energy infrastructure. At this point, we also determine the subcontractor, what equipment will be used, and assist in arranging for third party financing, as applicable. Recently, awarded projects have been taking an average of 12 to 24 months to result in a signed contract and convert to fully-contracted backlog. It may take longer, as it depends on the size and complexity of the project. Historically, approximately 90% of our awarded backlog projects have resulted in a signed contract. After the customer and Ameresco agree to the terms of the contract and the contract becomes executed, the project moves to fully-contracted backlog. The contracts reflected in our fully-contracted backlog typically have a construction period of 12 to 36 months and we typically expect to recognize revenue for such contracts over the same period.

Previous wording

We define our 12-month backlog as the estimated amount of revenues that we expect to recognize in the next twelve months from our fully-contracted backlog. See Note 2 “Summary of Significant Accounting Policies” for our revenue recognition policies. See “We may not recognize all revenues from our backlog or receive all payments anticipated under awarded projects and customer contracts” and “In order to secure contracts for new projects, we typically face a long and variable selling cycle that requires significant resource commitments and requires a long lead time before we realize revenues” in Item 1A, Risk Factors.

Current wording

“We may not recognize all revenues from our backlog or receive all payments anticipated under awarded projects and customer contracts” and “In order to secure contracts for new projects, we typically face a long and variable selling cycle that requires significant resource commitments and requires a long lead time before we realize revenues” in Item 1A, Risk Factors.

Previous wording

Assets in development, which represents the potential design/build project value of small-scale renewable energy plants that have been awarded or for which we have secured development rights, were estimated at $2,445.9 million as of December 31, 2023, including $89.8 million attributable to a non-controlling interest, and $1,625.7 million as of December 31, 2022. The portion related to spending for EaaS assets was approximately $399.8 million and $36.4 million at December 31, 2023 and 2022, respectively. These are also important metrics because they help us gauge our future capacity to generate electricity or deliver renewable gas fuel which contributes to our recurring revenue stream.

Current wording

Assets in development, which represents the potential design/build project value of small-scale renewable energy plants that have been awarded or for which we have secured development rights, were estimated at $2.3 billion as of December 31, 2024, and $2.4 billion, including $90 million attributable to a non-controlling interest, as of December 31, 2023. The portion related to spending for EaaS assets was approximately $538.4 million and $399.8 million at December 31, 2024 and 2023, respectively. These are also important metrics because they help us gauge our future capacity to generate electricity or deliver renewable gas fuel which contributes to our recurring revenue stream.

Previous wording

Our results of operations for the year-ended December 31, 2023 reflect a year-over-year decline in terms of revenues, operating income, and net income attributable to common shareholders. All financial result comparisons are against the prior year period.

Current wording

Our results of operations for the year-ended December 31, 2024 reflect a year-over-year increase in terms of revenues, operating income, and net income attributable to common shareholders. All financial result comparisons are against the prior year period.

Previous wording

•Revenue: total revenues decreased primarily due to a $480.0 million, or 32%, decrease in our project revenue attributed to the timing of revenue recognized based upon costs incurred to date relative to total expected costs on active projects, including our SCE battery storage project.

Current wording

•Revenue: total revenues increased primarily due to a $337.4 million, or 34%, increase in our project revenue attributed to the timing of revenue recognized based upon costs incurred to date relative to total expected costs on active projects.

Previous wording

•Cost of Revenues and Gross Profit: the decrease in cost of revenues is primarily due to the decrease in project revenues described above, however, our gross profit as a percent of revenues increased due to the lower revenue contribution from our lower margin, design-build SCE battery storage project.

Current wording

•Cost of Revenues and Gross Profit: the increase in cost of revenues is primarily due to the increased project revenues described above, however, our gross profit as a percent of revenues decreased primarily due to cost overruns on two large-scale legacy projects and a mix of lower-margin projects.

Previous wording

•Selling, General and Administrative Expenses: the increase is primarily due to higher professional fees of $2.5 million, higher project development fees of $2.1 million, partially offset by lower net salaries and benefits of $4.6 million as a result of a decrease in non-cash stock-based compensation expense.

Current wording

•Selling, General and Administrative Expenses: the increase is primarily due to higher net salaries and benefits of $8.3 million, of which $3.8 million is from increased non-cash stock-based compensation expense, higher insurance of $1.6 million and occupancy costs of $1 million, partially offset by a decrease in professional fees of $2.0 million.

Previous wording

•Asset Impairments: This year includes impairment charges of $1.6 million recorded in 2023 related to two of our landfill gas to energy assets, and a goodwill impairment charge of $2.2 million related to one of our reporting units.

Current wording

•Asset Impairments: This year includes long-lived asset impairment charges of $12.4 million recorded in 2024 primarily related to one of our landfill gas to energy assets and solar panels purchased under the IRS safe harbor provisions for renewable energy projects. Last year included long-lived asset impairment charges of $1.6 million related to two of our landfill gas to energy assets, and a goodwill impairment charge of $1.6 million, which was $2.2 million after taking into account the effect of deferred income taxes related to one of our reporting units.

Previous wording

•Other Expenses, Net: Other expenses, net, includes gains and losses from derivatives transactions, foreign currency transactions, interest expense, interest income, amortization of financing costs and certain government incentives. Other expenses, net increased primarily due to higher interest expenses, net of interest income of $9.7 million related to increased levels of project debt, a higher average balance on our senior secured debt facility, factoring fees in Italy of $5.8 million, and a decrease in government incentives received of $2.0 million.

Current wording

•Interest and Other Expenses, Net: Interest and other expenses, net, includes gains and losses from derivatives transactions, foreign currency transactions, interest expense, interest income, amortization of financing costs and certain government incentives. Interest and other expenses, net increased primarily due to higher interest expenses, net of interest income of $28.9 million related to increased levels of project debt and higher rate paid on our second lien term loan, and foreign currency transaction losses of $3.8 million versus gains of $0.6 million last year.

Previous wording

•Income Tax Expense (Benefit): the provision for income taxes is based on various rates set by federal, state, provincial, and local authorities and is affected by permanent and temporary differences between financial accounting and tax reporting requirements. The effective tax rate was lower in 2023 as compared to 2022 primarily due to higher deductions under the Section 179D Energy Efficient Commercial Buildings Deduction for both 2023 under the IRA and for prior periods which were documented and claimed on amended tax returns during 2023, deferred state tax benefits resulting from reduced state tax rates in future periods. The tax benefit rate for 2022 was favorable, primarily due to increases in the benefits associated with energy efficiency tax incentives, including Section 48 Solar Investment Tax Credits, deductions associated with the Section 179D Commercial Buildings Energy Efficiency Tax Deduction, and compensation deductions resulting from employee stock option disqualifying dispositions.

Current wording

•Income Tax Benefit: the benefit for income taxes is based on various rates set by federal, state, provincial, and local authorities and is affected by generated tax credits and differences between financial accounting and tax reporting requirements. The tax benefit was lower in 2024 as compared to 2023 because we incurred additional tax expense from the deferred effect of an increase in our future effective state tax rates resulting from apportionment changes and the Section 179D Energy Efficient Commercial Buildings Deduction available for 2024 was lower due to the timing of project completions, offset by higher tax credits generated as a result of new U.S. Treasury regulations related to renewable gas projects. The tax benefit for 2023 was favorable, primarily due to higher deductions under Section 179D and deferred state tax benefits resulting from reduced state tax rates.

Previous wording

•Net Income and Earnings Per Share: Net income attributable to common shareholders decreased due to the reasons described above. Basic earnings per share for 2023 was $1.20, a decrease of $0.63 per share compared to 2022. Diluted earnings per share for 2023 was $1.17, a decrease of $0.61 per share, compared to 2022.

Current wording

•Net Income and Earnings Per Share: Net income attributable to common shareholders decreased due to the reasons described above. Basic earnings per share for 2024 was $1.08, a decrease of $0.12 per share compared to 2023. Diluted earnings per share for 2024 was $1.07, a decrease of $0.10 per share, compared to 2023.

Previous wording

Our reportable segments for the year ended December 31, 2023 were U.S. Regions, U.S. Federal, Canada, Alternative Fuels, and Europe. The remaining amounts are included in “All Other”. Europe was formerly included in “All Other” but was disaggregated due to growth in the segment in 2023. As a result, previously reported amounts have been reclassified for comparative purposes. See Note 20 “Business Segment Information” for additional information about our segments.

Current wording

Our reportable segments for the year ended December 31, 2024 were North America Regions, U.S. Federal, Europe, and Renewable Fuels (formerly Alternative Fuels). On January 1, 2024, we changed the structure of our internal organization, and our U.S. Regions and Canada are now included in North America Regions. Additionally, our Asset Sustainability Group was formerly included in Canada, but is now included in “All Other”. As a result, previously reported amounts have been reclassified for comparative purposes. See Note 20 “Business Segment Information” for additional information about our segments.

Previous wording

•U.S. Regions: the decrease is primarily due to a $584.1 million, or 56%, decrease in project revenues attributable to the timing of revenue recognized based upon costs incurred to date relative to total expected costs on active projects, including our SCE battery storage project, versus the prior year partially offset by a $13.1 million, or 28%, increase in revenue from the growth of our energy assets in operation.

Current wording

•North America Regions: the increase is primarily due to a $243.3 million, or 47%, increase in project revenues attributable to the timing of revenue recognized based upon costs incurred to date relative to total expected costs on active projects.

Previous wording

•U.S. Federal: the increase is primarily due to a $8.4 million, or 3%, increase in project revenue attributable to the timing of revenue recognized as a result of the phase of active projects compared to the prior year and a $1.6 million, or 3%, increase in O&M revenue.

Current wording

•U.S. Federal: the decrease is primarily due to a $48.2 million, or 14%, decrease in project revenue attributable to the timing of revenue recognized as a result of the phase of active projects compared to the prior year, partially offset by increases of $11.1 million in energy asset revenue and $6.6 million in O&M revenue.

Previous wording

•Alternative Fuels: the increase is primarily due to a $2.3 million, or 2%, increase in energy asset revenues resulting from the continued growth of our operating portfolio, increased production levels and more favorable pricing on renewable identification numbers (“RIN’s”) generated from our renewable natural gas facilities.

Current wording

•Renewable Fuels: the increase is primarily due to higher project revenues of $43.4 million and a $15.6 million increase in energy asset revenues resulting from the continued growth of our operating portfolio, increased production levels and stronger pricing on renewable identification numbers (“RIN’s”) generated from our renewable natural gas facilities.

Previous wording

Income before Income Taxes and Unallocated Corporate Activity

Current wording

Income (Loss) before Income Taxes and Unallocated Corporate Activity

Previous wording

•U.S. Federal: the decrease is due primarily to higher interest expense.

Current wording

•U.S. Federal: the decrease is due primarily to the decreased revenues described above, higher interest expense, net of $3.6 million and lower earnings from unconsolidated entities of $1.1 million.

Previous wording

•Unallocated corporate activity includes all corporate level selling, general and administrative expenses and other expenses not allocated to the reportable segments. We do not allocate any indirect expenses to the segments. Corporate activity improved primarily due to lower net salaries and benefit costs of $4.7 million, related to a decrease in non-cash stock-based compensation expense, and higher interest income partially offset by higher interest expense of $3.2 million.

Current wording

•Unallocated corporate activity includes all corporate level selling, general and administrative expenses and other expenses not allocated to the reportable segments. We do not allocate any indirect expenses to the segments. Corporate expenses increased primarily due higher interest expense, net of $11.1 million, higher net salaries and benefit costs of $7.6 million, including an increase in non-cash stock-based compensation expense of $3.8 million, and foreign currency transaction losses of $2.5 million versus gains of $0.5 million last year.

Previous wording

Since inception, we have funded operations primarily through cash flow from operations, advances from Federal ESPC projects, our senior secured credit facility, and various forms of other debt (see “Project Financing” below). In addition, in March 2021, we completed an underwritten public offering of 2,875,000 shares of our Class A Common Stock, for total net proceeds of $120.1 million. See Note 13 “Equity and Earnings per Share” for additional information.

Current wording

Since inception, we have funded operations primarily through cash flow from operations, advances from Federal ESPC projects, our senior secured credit facility, second lien term loan, and various forms of other debt (see “Energy Asset Financing” below).

Previous wording

•equity investments, energy project asset acquisitions and business acquisitions that we may fund from time to time

Current wording

•equity investments, project asset acquisitions, and business acquisitions that we may fund from time to time

Previous wording

We regularly monitor and assess our ability to meet funding requirements. We believe that cash and cash equivalents, working capital and availability under our revolving senior secured credit facility, combined with our right (subject to lender consent) to increase our revolving credit facility by $100.0 million, plus develop and sell transactions, tax equity transfers, and our general access to credit and equity markets, will be sufficient to fund our operations through at least February 2025. With the adjustments to the anticipated timeline for completing the SCE battery storage projects, we requested an additional extension to the maturity date for the remaining principal amount of the delayed draw term loan A under our senior secured credit facility, which is scheduled to mature April 15, 2024.

Current wording

We regularly monitor and assess our ability to meet funding requirements. We believe that cash and cash equivalents, working capital and availability under our revolving senior secured credit facility, combined with our right (subject to lender consent) to increase our revolving credit facility by $100.0 million, plus develop and sell asset transactions, sales of tax attributes, and our general access to credit and equity markets, will be sufficient to fund our operations through at least February 2026.

Previous wording

We continue to evaluate and take action, as necessary, to preserve adequate liquidity and ensure that our business can continue to operate and that we can meet our capital and debt service requirements. This may include limiting discretionary spending across the organization and re-prioritizing our capital projects amid times of political unrest, the duration of supply challenges, and the rate and duration of the inflationary pressures. For example, recent increases in inflation and interest rates have impacted overall market returns on assets. We have therefore been particularly prudent in our capital commitments over the past few quarters, ensuring that our assets in development continue to align with our hurdle rates.

Current wording

We continue to evaluate and take action, as necessary, to preserve adequate liquidity and ensure that our business can continue to operate and that we can meet our capital and debt service requirements. This may include limiting discretionary spending across the organization and re-prioritizing our capital projects amid times of political unrest, the duration of supply challenges, and the rate and duration of the inflationary pressures, and other events affecting our liquidity. For example, recent increases in inflation and interest rates have impacted overall market returns on assets. We have therefore been particularly prudent in our capital commitments over the past few quarters, ensuring that our assets in development continue to align with our hurdle rates.

Previous wording

The adjusted purchase price for phase 1 was $88.0 million, of which $5.0 million was paid in cash, $46.7 million was financed through a seller’s note, and we assumed a construction loan on the energy asset project for $36.3 million. We are in process of converting the construction loan to a term loan. We also received cash of $11.2 million. During the year ended December 31, 2023, we paid $18.4 million in principal on the seller’s note, the balance of which was paid in January 2024. We also agreed to sell back to the seller investment tax credits for the project acquired as part of this transaction for the fair market value of these credits and we received $21.0 million in January 2024 for the transfer of these credits. In addition, we assumed a land lease for the energy asset project. See Note 8 Leases for additional information on the lease.

Current wording

The adjusted purchase price for phase 1 was $88.0 million, of which $5.0 million was paid in cash, $46.7 million was financed through a seller’s note, and we assumed a construction loan on the energy asset project for $36.3 million. The construction loan was converted to a term loan in February 2024 and has a maturity date of April 2030. We also received cash of $11.2 million. In January 2024 we paid off the remaining balance on the seller’s note in the amount of $29.4 million. We sold back to the seller ITCs for the project acquired as part of this transaction for the fair market value of these credits and we received $21.0 million in early 2024 for the transfer of these credits. In addition, we assumed a land lease for the energy asset project. See Note 8 “Leases” for additional information on the lease.

Previous wording

In the second phase, which closed on January 12, 2024, we acquired BCE, including its interest in one of our consolidated joint venture and its interests in project subsidiaries developing or with rights to develop solar, battery, and microgrid assets for a purchase price of $39.1 million, of which $6.6 million was paid at the closing. The remaining $32.5 million was financed by a seller’s note accruing interest of 5.0% and is payable in August 2024. We may be required to make additional contingent payments for this acquisition based on certain projects achieving commercial operation and if the projects qualify for higher energy tax credits than expected.

Current wording

In the second phase, which closed on January 12, 2024, we acquired BCE, including its interest in one of our consolidated joint venture and its interests in project subsidiaries developing or with rights to develop solar, battery, and microgrid assets for a purchase price of $39.1 million, of which $6.6 million was paid at the closing. The remaining $32.5 million was financed by a seller’s note accruing interest of 5.0%, through August 2024 and was adjusted to 9% per annum until the note was paid off in full in November 2024. We may be required to make additional contingent payments for this acquisition based on certain projects achieving commercial operation and if the projects qualify for higher energy tax credits than expected.

Previous wording

During the year ended December 31, 2023, we entered into three amendments to our fifth amended and restated senior secured credit facility, which extended the maturity date of our delayed draw term loan A, resulted in $155.0 million paid for the year ended December 31, 2023, $10.0 million due and paid on January 31, 2024 and February 14, 2024, and $10.0 million due on March 31, 2024. The remaining principal amount of our delayed draw term loan is $35.0 million which is due on April 15, 2024. The overall rate table for all loans under the current agreement was also increased by 0.25%. The amendment increased the total funded debt to EBITDA covenant ratio from a maximum of 3.50 to 3.75 for the quarter ending December 31, 2023, and 3.50 thereafter.

Current wording

During the year ended December 31, 2024, we entered into a number of amendments to our fifth amended and restated senior secured credit facility (the “Senior Secured Credit Facility”) , which extended the maturity date of our delayed draw term loan A (“DDTLA”). The overall rate table for all loans under the agreement was also increased by 0.25%. The amendments increased the total funded debt to EBITDA covenant ratio from a maximum of 3.50 to 3.75 for the quarter ending December 31, 2024, and 3.50 thereafter. On June 28, 2024, we entered into amendment number six to the fifth amended and restated senior secured credit facility to modify certain of the covenants and other terms to permit us to enter into the second lien credit agreement (as defined below) and to incur indebtedness and make certain other conforming changes in connection with our entry into the second lien credit agreement. The remaining balance on the DDTLA of $15 million was paid off with the proceeds from the second lien credit agreement.

Previous wording

As of December 31, 2023, the balance on the senior secured credit facility was $279.9 million and we had funds available of $37.5 million.

Current wording

As of December 31, 2024, the balance on the senior secured credit facility was$148.0 million and we had funds available of $21.1 million.

Previous wording

Material energy asset construction and term loan financings during the year ended December 31, 2023 were as follows:

Current wording

Other than what is included above, significant financings during the year ended December 31, 2024 were as follows:

Previous wording

•April 2023 Construction Credit Facility, 6.82%, due July 1, 2024 - one of our consolidated joint venture subsidiaries (“JV”) entered into a construction loan agreement with two lenders for a principal amount of up to $140.8 million under an energy asset credit facility. At the closing, the JV drew down $90.9 million for construction of an energy asset and subsequently drew down an additional $43.5 million. The loan will be repaid after the energy asset project achieves provisional acceptance, through a sale-leaseback financing under lease agreements entered into between the same parties, as part of the closing documents. We acquired the remaining interest in this JV in January 2024 when we closed on the acquisition of BCE.

Current wording

•April 2023, 6.82%, due July 31, 2024 - one of our consolidated joint venture subsidiaries (“JV”) entered into a construction loan agreement with two lenders for a principal amount of up to $140.8 million under an energy asset credit facility. We acquired the remaining interest in this JV in January 2024 when we closed on the acquisition of BCE. In August 2024, this construction loan was repaid through a sale-leaseback financing under lease agreements entered into between the same parties, as part of the original closing. See “August 2024 Master Sale-leaseback” below.

Previous wording

•August 2023 Construction Credit Facility, 9.34%, due August 31, 2026 - we entered into a construction and development loan agreement which provides a loan in a principal amount of up to $300.0 million. At the closing, we drew down $200.0 million under this facility, of which approximately $187.0 million was used to reimburse Ameresco for development and construction costs. Subsequent to closing, we drew down an additional $78.9 million. The loan contains a one-year extension option that can be exercised if certain circumstances are met, including payment of a $3.0 million extension fee. The obligations under the loan are guaranteed by all the related subsidiaries and are secured by the subsidiaries’ assets as well as our equity interest in the borrower entity and in the case of default under the facility, a default under our Senior Secured Credit Facility or a change in control of Ameresco, Inc., we are required to make capital contributions to the borrower entity who then would be required to use the proceeds from the capital contributions to repay the construction and development loan.

Current wording

•August 2023, 8.53%, due August 31, 2026 - we entered into a construction and development loan agreement, which provides a loan in a principal amount of up to $300.0 million. At the closing, we drew down $200.0 million under this facility, of which approximately $187.0 million was used to reimburse Ameresco for development and construction costs. On December 18, 2024, we amended the loan agreement to increase the principal amount up to $400.0 million, extend the maturity date to December 15, 2027, and set a minimum rate of interest at 6.00% and a Term SOFR Floor of 2.00%. Additionally, an accordion option providing for an option to increase the principal amount to $500.0 million, for which we paid a $0.3 million fee. The accordion option can be exercised no later than June 18, 2026 and only if certain circumstances are met. At closing, we incurred $3.2 million in lenders fees and debt issuance costs. The obligations under the loan are guaranteed by all the subsidiaries that are part of the loan portfolio and are secured by the subsidiaries’ assets as well as Ameresco Inc.'s equity interest in the subsidiary which is the borrower entity. In the case of default under the facility, a default under our Senior Secured Credit Facility or a change in control of Ameresco, Inc., we are required to make capital contributions to the borrower entity who then would be required to use the proceeds from the capital contributions to repay the construction and development loan.

Previous wording

As of December 31, 2023, our total construction and term loans outstanding was $1.0 billion. See Note 9 “Debt and Financing Lease Liabilities” for additional information about these loans.

Current wording

As of December 31, 2024, our total energy asset construction and operating facilities outstanding was $1.0 billion. See Note 9 “Debt and Financing Lease Liabilities” for additional information about these loans.

Previous wording

As of December 31, 2023, our total sale-leasebacks classified as long-term financing facilities outstanding was $185.7 million.

Current wording

As of December 31, 2024, our total sale-leasebacks classified as long-term financing facilities outstanding was $399.4 million.

Previous wording

As of December 31, 2023, our total financing leases outstanding was $13.9 million. These are our sale-leaseback arrangements entered into as of December 31, 2018 which remain under the previous guidance.

Current wording

As of December 31, 2024, our total financing leases outstanding was $12.9 million. These are our sale-leaseback arrangements entered into as of December 31, 2018 which remain under the previous guidance.

Previous wording

We have arrangements with certain third-parties to provide advances to us during the construction or installation of projects for certain customers, typically federal governmental entities, in exchange for our assignment to the lenders of our rights to the long-term receivables arising from the ESPCs related to such projects. These financings totaled $533.1 million in principal amounts as of December 31, 2023 and $478.5 million as of December 31, 2022. Under the terms of these financing arrangements, we are required to complete the construction or installation of the project in accordance with the contract with our customer, and the liability remains on our consolidated balance sheets until the completed project is accepted by the customer.

Current wording

We have arrangements with certain third-parties to provide advances to us during the construction or installation of projects for certain customers, typically federal governmental entities, in exchange for our assignment to the lenders of our rights to the long-term receivables arising from the ESPCs related to such projects. These financings totaled $555.4 million in principal amounts as of December 31, 2024 and $533.1 million as of December 31, 2023. Under the terms of these financing arrangements, we are required to complete the construction or installation of the project in accordance with the contract with our customer, and the liability remains on our consolidated balance sheets until the completed project is accepted by the customer.

Showing the first 40 of 46 pairs. Open the source sections for the rest.

Rearranged current paragraphs (1)

Current report — wording carried from elsewhere

We define our 12-month backlog as the estimated amount of revenues that we expect to recognize in the next twelve months from our fully-contracted backlog. See Note 2 “Summary of Significant Accounting Policies” for our revenue recognition policies. See
Rearranged previous paragraphs (2)

Previous report — wording carried elsewhere

On August 4, 2023, we entered into a purchase and sale agreement to acquire an energy asset project and the ability to acquire 100% of the stock of Bright Canyon Energy Corporation (“BCE”) in a two-phased transaction, exclusive of each other. Phase 1, the purchase of the energy asset project, closed on August 4, 2023. In the second phase, which closed on January 12, 2024, we acquired BCE, including its interest in one of our consolidated joint ventures and its interests in project subsidiaries developing or with rights to develop solar, battery, and microgrid assets.

Previous report — wording carried elsewhere

During 2022, we received net proceeds of $468.5 million from long-term debt financings, $252.7 million from advances on Federal ESPC projects and energy assets, partially offset by repayments of long-term debt totaling $161.9 million.