LIGHTBRIDGE Corp
For the period ended Mar 31, 2026. Filed Apr 30, 2026.
View on SEC.govAbout this filing
A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.
Mar 31, 2026 · Filed Apr 30, 2026
What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-Q
Period ended 2025-09-30; filed 2025-11-06.
0001477932-25-007949
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsCurrent report: 10-Q
Period ended 2026-03-31; filed 2026-04-30.
0001477932-26-002678
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 108 previous paragraphs and 70 current paragraphs.
21 unchanged; 25 reworded; 24 added; 56 removed; 6 previous and 0 current paragraphs rearranged.
Tables are not compared: 10 previous and 6 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (24)
Current report
Our Business
Current report
We believe our metallic fuel can be used in different types of water-cooled commercial power reactors, such as pressurized water reactors, boiling-water reactors, Russian-designed water-cooler commercial power reactors, Canada Deuterium Uranium heavy water reactors, water-cooled small modular reactors, and water-cooled research reactors. We have obtained patent validation in key countries that we believe would have a commercial market for our fuel and will continue to seek patent validation in countries that either currently operate or are expected to build and operate a large number of nuclear power reactors compatible with our fuel technology.
Current report
Recent Developments Regarding Lightbridge Fuel™
Current report
Updates to the SPPA and CRADA
Current report
In March 2026, we entered into Modification No. 4 to CRADA Project Task Statement (PTS) No. 1 with BEA to extend the performance period end date through September 2032 and increase advanced funding by $0.3 million, with no increase to the total estimated reimbursable cost.
Current report
In April 2026, the Company entered into SPPA PTS No. 6 to support the development of coextruded fuel rod components for future irradiation testing. This program builds on prior INL fabrication work and is intended to further refine manufacturing processes and materials necessary to produce fuel rods and rodlets in their final cross-sectional configurations. Initial process development activities will be conducted using depleted uranium, with the expectation that, upon successful demonstration, these processes may be applied to enriched uranium to produce fuel rod segments for irradiation experiments at test reactors, including the Advanced Test Reactor (ATR) at INL. The program is expected to help bridge the transition from earlier-stage fabrication development and initial coupon fuel material samples currently undergoing irradiation testing in the ATR to the production of irradiation rod segment test specimens. The scope of work includes enhancements to fabrication processes and equipment, development and testing of key materials (including central displacer alloys and cladding behavior), and validation of coextrusion techniques for both cylindrical and multi-lobe fuel designs. The program also includes preparation of fuel rod segment specimens, including those with controlled defects, to support non-destructive evaluation calibration and irradiation testing. The total estimated cost of SPPA PTS No.6 is approximately $4.6 million over an expected performance period of 36 months. Costs are incurred on a reimbursable basis, with advance and monthly funding provided by the Company. The Company is not obligated to continue work beyond the estimated cost without additional authorization. Actual expenditures may differ from this amount based on the scope and timing of work performed through the issuance of additional PTSs to BEA. This effort represents a key step in the Company’s ongoing fuel qualification strategy, supporting the advancement from process development toward irradiation testing and future commercialization activities.
Current report
Total Cumulative Estimated Costs
Current report
As of March 31, 2026, the Company expects to pay an aggregate $19.5 million to BEA under the CRADA and the SPPA on a cost reimbursable basis over the performance periods. As of March 31, 2026, $6.0 million has been cumulatively expensed and the aggregate funding commitment remaining under these agreements is $13.5 million. In April 2026, the Company entered into SPPA PTS No. 6 with BEA, with an estimated total cost of approximately $4.6 million. These obligations are generally cancellable with 30-60 days’ notice and, therefore, are not considered firm commitments, and are not expensed until incurred.
Current report
Development of a Lightbridge Expandable Fuel Facility
Current report
The Company is evaluating a potential site location and working on a conceptual design for a Lightbridge Expandable Fuel Facility (LEFF) to support the possible future fabrication of Lightbridge Fuel™ for use in commercial reactors. The construction of such a facility might commence as early as late 2027, subject to various factors, including those described below. This initiative would represent a significant potential expansion of the Company’s operations beyond its current R&D activities. While the scope, timing, and cost of constructing such a facility cannot be reasonably estimated at this time, the Company expects that the capital required to design, license, and construct the LEFF would be substantial. The timing, amount, and sources of any related financing activities will depend on a number of factors, including the progress of the Company’s development programs, regulatory considerations, market conditions, and the availability of strategic partnerships or other funding sources. There can be no assurance that the Company will be able to obtain such financing on acceptable terms, or at all, nor can there be any assurance that the Company will pursue the construction of the fabrication facility.
Current report
During our preliminary evaluation of co-location at Oklo’s proposed Idaho Falls site, we identified regulatory considerations associated with the application of different licensing frameworks, including oversight by the DOE for Oklo’s proposed activities and the U.S. Nuclear Regulatory Commission for our commercial fuel fabrication facility. Based on these considerations, co-location at this site with Oklo under separate licensing frameworks is not currently being pursued. We are currently evaluating potential sites for a standalone Lightbridge fuel fabrication facility.
Current report
We also continue to contemplate co-locating a Lightbridge fuel fabrication facility with an Oklo facility at a site where a coordinated licensing approach may be implemented, and we continue to assess the potential collaboration opportunities with Oklo in areas such as recycling and reprocessing of spent uranium-zirconium fuel; however, no definitive agreements have been reached, and there can be no assurance that any such collaboration will be realized.
Current report
Master Services Agreement with Amentum Technology Inc.
Current report
In December 2025, the Company entered into a Master Services Agreement (MSA) with Amentum Technology Inc. (Amentum) relating to the performance of activities by Amentum in support of the co-location feasibility study under the MOU with Oklo described above, as well as other activities as the Company and Amentum may agree from time to time. The Company is in the process of finalizing a new task order with Amentum to conduct a site selection study and perform a conceptual design for a standalone LEFF in 2026.
Current report
Commercialization Outlook and Key Drivers of Timing
Current report
R&D expenses increased by $1.6 million for the three months ended March 31, 2026, as compared to the three months ended March 31, 2025. The increase was primarily due to a:
Current report
We expect to significantly increase our R&D spend as we evaluate a potential site location and work on a conceptual design for the LEFF and as we continue to hire additional engineers in the near future to focus on fuel fabrication development, irradiation testing programs, and our collaboration with the DOE at INL.
Current report
There was an increase in interest income of $0.9 million due to higher cash balances, which resulted in an increase in interest income earned from the purchase of treasury bills and from our bank savings account for the three months ended March 31, 2026, as compared to the three months ended March 31, 2025.
Current report
Overview – Funding Requirements
Current report
Our current primary source of liquidity is potential proceeds from our ATM equity offerings. During the three months ended March 31, 2026, we sold approximately 1.4 million shares of our common stock under our sales agreement with Jefferies LLC, receiving net proceeds (less sales commissions and expenses) of $18.6 million.
Current report
We have a $350 million shelf registration statement on Form S-3 (File No. 333-291837). As of March 31, 2026, approximately $122.9 million of our common stock remained available for issuance and sale under the Company’s $150 million at-the-market offering program pursuant to the related prospectus supplement, as amended.
Current report
Liquidity Outlook and Risks
Current report
Contractual and Other Obligations
Current report
As noted previously, we have entered into PTSs with BEA, the operating contractor of INL, in collaboration with the DOE, which statements set forth the initial scopes of work and funding commitments under the SPPA and CRADA umbrella agreements. Performance of work under these agreements may be terminated at any time by either party, without any liability, after the effective date of termination, upon 30 days’ written notice under the SPPA and 60 days’ written notice under the CRADA. In the event of termination, the Company shall be responsible for BEA’s costs (including the closeout costs), through the effective date of termination, but in no event shall the Company’s cost responsibility exceed the total estimated cost stated in each PTS and any subsequent modification to the PTS. As of March 31, 2026, the aggregate funding commitment remaining from the Company to BEA, if and when incurred, would not exceed $13.5 million. In April 2026, the Company entered into SPPA PTS No. 6 with BEA, with an estimated total cost of approximately $4.6 million.
Removed paragraphs (56)
Previous report
This MD&A consists of the following sections:
Previous report
Our Business and Current Industry Trends
Previous report
The increased projected power need for data centers is driving large tech companies to invest in nuclear power, which in turn is driving utilities to seek ways to increase power output of existing nuclear plants and to explore deploying new plants. Data centers will need massive, constant power that nuclear power can provide. Advances in reactor technology, combined with growing corporate and governmental support for clean energy, can position nuclear power as a cornerstone of future energy strategies for data-intensive industries, which may be willing to pay a premium for reliable, clean, and sustainable baseload electricity. We believe that by integrating nuclear power, the data center sector can achieve operational efficiency, energy security, and sustainability. We believe uses of our fuel could include providing additional power via power uprates of existing reactors. Oil and gas producing companies are investing in low-emission energy technologies to reduce fossil fuel emissions from oil and gas production. Advances in nuclear reactor and fuel technology can position nuclear power as a key energy source for this purpose.
Previous report
Emerging nuclear technologies include small modular reactors (SMRs), which are now in the development and licensing phases. We expect that Lightbridge Fuel™ can provide water-cooled SMRs with the same benefits our technology brings to large reactors, with such benefits being even more meaningful to the economic case for deployment of SMRs, including potential load following capability when included on a virtually zero-carbon electric grid with renewable energy sources. We expect Lightbridge Fuel™ to enable power uprates in SMRs.
Previous report
We have built a significant portfolio of patents, and we anticipate testing our nuclear fuel through third-party vendors and others, including the United States Department of Energy’s (DOE) national laboratories. Currently, we are performing the majority of our R&D activities within and in collaboration with the DOE’s national laboratories.
Previous report
Use of Artificial Intelligence Tools
Previous report
We continue to explore and adopt innovative technologies to enhance our business operations and research capabilities. In this regard, the Company has begun utilizing certain nuclear industry-focused artificial intelligence tools that leverage machine learning and advanced analytics to support information gathering, data analysis, and research workflows related to nuclear fuel development and industry trends.
Previous report
The Company uses tools to supplement internal analysis and decision-making. While the tool is designed to improve efficiency and support our R&D and market research efforts, it does not replace the professional judgment of our management, engineers, or other technical personnel. The Company does not rely exclusively on AI-generated content or recommendations for any material regulatory submissions, safety decisions, or financial reporting.
Previous report
Recent Developments of Lightbridge Fuel™
Previous report
Loading of Capsules Containing Lightbridge Fuel Material Samples for Irradiation Testing
Previous report
On October 9, 2025 we announced the successful completion of the loading of capsules containing Lightbridge Fuel material samples comprised of enriched uranium‑zirconium alloy, recently manufactured at INL, into an experiment assembly. The experiment assembly was inserted into the ATR for irradiation testing in October 2025.
Previous report
On March 26, 2024 and October 24, 2024, the Company and BEA entered into Modifications No. 2 and No. 3 respectively, to Project Task Statement (PTS) No. 1 under the SPPA, dated December 9, 2022, as amended on May 23, 2023, by and between the Company and BEA. Pursuant to the terms of Modifications No. 2 and No. 3, the potential amounts payable by the Company to reimburse BEA for its expenses and employee time were increased by approximately $0.6 million and $0.3 million, respectively, bringing the total estimated cost for the work to be performed under the “umbrella” SPPA to approximately $2.0 million.
Previous report
On March 18, 2025, the Company and BEA entered into Modification No. 4 to PTS No. 1 under the SPPA, dated December 9, 2022, as amended on May 23, 2023, March 26, 2024 and October 24, 2024, by and between the Company and BEA. Pursuant to the terms of Modification No. 4, the potential amounts payable by the Company to reimburse BEA for its expenses and employee time were increased by approximately $0.6 million, bringing the total estimated cost for the work to be performed under the “umbrella” SPPA to $2.6 million.
Previous report
On January 16, 2025, the Company and BEA entered into Modification No. 3 to PTS No. 1 under the CRADA, dated September 27, 2022, as amended in May 2023, by and between the Company and BEA. Pursuant to the terms of Modification No. 3, the potential amounts payable by the Company to reimburse BEA for its expenses and employee time were increased from $2.6 million by approximately $1.6 million, bringing the total estimated cost for the work to be performed under the “umbrella” CRADA to $4.2 million. This modification also required that a $0.6 million advance payment be made, which was paid on January 16, 2025.
Previous report
On October 6, 2025, the Company and BEA entered into Modification No. 3 to the SPPA extending the duration of this umbrella agreement from 7 years to 12 years. On November 5, 2025, the Company and BEA entered into Modification No. 1 to the CRADA with INL, extending the period of performance from September 27, 2029 to September 27, 2032.
Previous report
After accounting for all modifications, cash payments from Lightbridge to Battelle under both CRADA and SPPA are estimated at approximately $6.8 million on a cost reimbursable basis over the performance periods. The balance of the obligations as of September 30, 2025 was $2.0 million. These obligations are generally cancellable with 30 days’ notice and, therefore, are not considered firm commitments.
Previous report
The Company anticipates entering into additional Project Task Statements and/or modifications to the existing PTS under the SPPA and/or CRADA with INL to expand the scope of work, including performing additional extrusions, creating a detailed plan for post-irradiation examination, reviewing and contributing to Lightbridge’s Fuel Qualification Plan, and other potential activities. The successful execution of this project is subject to increase in project scope and risks, including potential delays, cost overruns, regulatory challenges, and changes in funding availability.
Previous report
We anticipate that subsequent phases of work under the two umbrella agreements that have not yet been released may include post-irradiation examination of the irradiated fuel material coupons, loop irradiation testing in the ATR, and post-irradiation examination of one or more uranium-zirconium fuel rodlets, transient experiments in the Transient Reactor Test Facility at INL, Fuel Qualification Plan support, safety analysis modeling development and support, as well as fuel thermo-mechanical modeling development and support.
Previous report
Safety Analysis Code Development Agreement
Previous report
On October 27, 2025, we entered into an Agreement for Safety Analysis Codes and Services for Lightbridge Fuel Designs with Numerical Advisory Solutions, LLC (“NAS”), a provider of nuclear engineering analysis software. Under the agreement, NAS will perform code-development, benchmarking, and modeling services to support the creation of Lightbridge’s proprietary fuel-safety analysis methods and the adaptation of industry-standard computer codes for the Lightbridge Fuel™ helical-cruciform metallic U-Zr design.
Previous report
The work scope includes hold-point reviews and deliverable acceptance by Lightbridge with an estimated completion window between October 2026 through January 2027. The total contract value is approximately $0.8 million, with milestone-based payments. The resulting software and analysis models will be owned by Lightbridge and are expected to strengthen Lightbridge’s internal capability to perform reactor safety analyses in support of future regulatory submissions and commercial fuel demonstrations.
Previous report
Romania Feasibility Study of Lightbridge Fuel™ for use in CANDU reactors
Previous report
On October 16, 2023, we engaged Institutul de Cercetări Nucleare Pitești, a subsidiary of Regia Autonoma Tehnologii pentru Energia Nucleara (RATEN ICN) to perform an engineering study to assess the compatibility and suitability of Lightbridge Fuel™ for use in Canada Deuterium Uranium (CANDU) reactors. This assessment covers key areas including mechanical design, neutronics analysis, and thermal and thermal-hydraulic evaluations. The findings from this engineering study will play an important role in guiding future economic evaluations and navigating potential regulatory licensing-related issues for potential use of Lightbridge Fuel™ in CANDU reactors.
Previous report
The results of this Feasibility Study indicated that Lightbridge Fuel™ can double the discharged burnup in a CANDU reactor at U-235 enrichment levels of less than 3% compared to conventional uranium dioxide fuel. Based on these favorable initial results, we plan to continue further evaluation of Lightbridge Fuel™ in CANDU reactors and are currently in the process of finalizing the scope of work for the next phase of activities.
Previous report
In August 2025, we entered into an agreement with RATEN ICN (the 2025 RATEN ICN Agreement) to design and conduct irradiation test(s) for several Lightbridge fuel rodlets, with the objective of irradiating the rodlets to one or more target discharge burnups and subjecting the irradiated rodlets to Post Irradiation Examination. In accordance with the terms of the 2025 RATEN ICN Agreement, the work will occur in two phases: (1) In Phase 1, ICN RATEN will conduct scoping studies to develop preliminary experiment designs, evaluate infrastructure and equipment needs, and obtain cost and schedule estimates for potential new driver fuel; (2) In Phase 2, ICN RATEN will implement refurbishments, procure equipment and driver fuel as needed, finalize experiment design, fabricate and operate the test assembly, and complete post-irradiation examination. Lightbridge will be responsible for supplying experimental fuel rodlets for use in the irradiation tests. The Phase 1 work began in August 2025 at a cost of $35,000.
Previous report
Nuclear Energy University Program Awards
Previous report
Texas A&M University (TAMU), NuScale Power, and Structural Integrity Associates are working on a 3-year study of our nuclear fuel, led by TAMU. The TAMU study is expected to be completed in 2026. In mid-2023, TAMU was awarded $1.0 million by the DOE’s Nuclear Energy University Program (NEUP) R&D Awards to conduct this study. The project entails a characterization of the performance of the Lightbridge Fuel™ Helical Cruciform advanced fuel design, which will generate sets of experimental data on friction factor, flow, and heat transfer behavior under NuScale’s SMR simulated normal and off-normal conditions.
Previous report
We previously announced the ongoing NEUP project with the Massachusetts Institute of Technology (MIT). The study led by MIT and funded by DOE relates to evaluation of accident tolerant fuels in various SMRs. The project aims to simulate the fuel and safety performance of Lightbridge Fuel™ for the NuScale SMR and provide scoping analysis to improve the safety and economics of water-cooled SMRs. In October 2024, MIT presented a technical paper with preliminary safety evaluation results at the TopFuel 2024 Conference in Grenoble, France. According to MIT, the results have shown promising safety and performance benefits for Lightbridge Fuel™. Compared to conventional fuel, Lightbridge Fuel™ demonstrated improved thermal-hydraulic margins, lower operating temperatures, and greater potential for power uprates, which contributes to enhancing reactor economics.
Previous report
We do not have any performance obligations with the collaboration teams working on the above-mentioned projects and will not receive any revenue or record any economic benefits from these awards.
Previous report
Future Steps Toward Our Fuel Development and Timeline For The Commercialization of Our Nuclear Fuel Assemblies
Previous report
We anticipate fuel development milestones for Lightbridge Fuel™ over the next 2-3 years will consist of the following:
Previous report
The above future steps describe our current proposed approach to deploying Lightbridge Fuel™ in CANDU and/or U.S. pressurized water reactors (PWRs).
Previous report
While we continue to target LTAs with our metallic fuel in commercial reactors in the 2030s, there are several potential developments that, if successful, could accelerate our anticipated timelines. These developments include:
Previous report
Our management expects to make judgments and estimates about the effect of matters that are inherently uncertain. As the number of variables and assumptions affecting the future resolution of the uncertainties increase, these judgments become even more subjective and complex. Although we believe that our estimates and assumptions are reasonable, actual results may differ significantly from these estimates. Changes in estimates and assumptions based upon actual results may have a material impact on our results of operations and/or financial condition.
Previous report
R&D expenses increased by $0.7 million for the three months ended September 30, 2025, as compared to the three months ended September 30, 2024, due to the increase in R&D activities related to the development of Lightbridge Fuel™. This increase primarily consisted of an increase in INL project labor costs of $0.4 million, an increase in allocated employee compensation and stock-based compensation expenses of $0.4 million and an increase in consulting fees of $0.1 million, partially offset by a decrease in R&D expenses related to the Centrus Energy FEED study of $0.1 million, which was completed in 2024, and a decrease in IT expenses of $0.1 million.
Previous report
Total stock-based compensation included in research and development expenses was $0.5 million and $0.1 million for the three months ended September 30, 2025 and 2024, respectively.
Previous report
Interest income increased by $0.8 million for the three months ended September 30, 2025, driven by higher cash balances from our ATM sales. The additional cash generated was deployed in purchasing treasury bills and deposited into bank savings, which collectively yielded greater interest income compared to the same period in 2024.
Previous report
Operating Expenses
Previous report
General and Administrative
Previous report
G&A expenses increased by $3.5 million for the nine months ended September 30, 2025, as compared to the nine months ended September 30, 2024. The increase primarily consisted of an increase in professional fees of $1.3 million, an increase in consulting fees of $0.3 million, an increase in IT services fees of $0.1 million, an increase in employee compensation and employee benefits of $0.1 million, and an increase in stock-based compensation of $1.7 million primarily due to the accelerated vesting of RSAs issued to a former employee of $0.5 million and an increase in grants of PSAs of $1.2 million.
Showing the first 40 of 56 passages. Open the source sections for the rest.
Reworded paragraphs (25)
Previous wording
The following Management’s Discussion and Analysis of Financial Condition and Results of Operations, or MD&A, is intended to help the reader understand Lightbridge Corporation, our operations, and our present business environment. MD&A is provided as a supplement to, and should be read in conjunction with, our unaudited condensed consolidated financial statements and the accompanying notes thereto contained in Part I, Item 1 of this report, as well as those included in our Annual Report on Form 10-K for the year ended December 31, 2024.
Current wording
The following Management’s Discussion and Analysis of Financial Condition and Results of Operations (MD&A) is intended to help the reader understand Lightbridge Corporation, our operations, and our present business environment. MD&A is provided as a supplement to, and should be read in conjunction with, our unaudited condensed consolidated financial statements and the accompanying notes thereto contained in Part I, Item 1 of this Quarterly Report on Form 10-Q, as well as those included in our Annual Report on Form 10-K for the year ended December 31, 2025.
Previous wording
OVERVIEW OF OUR BUSINESS AND DEVELOPMENT OF LIGHTBRIDGE FUELTM
Current wording
Overview of Our Business and Recent Developments Regarding Lightbridge Fuel™
Previous wording
When used in this Quarterly Report on Form 10-Q, the terms “Lightbridge,” the “Company,” “we,” “our,” and “us” refer to Lightbridge Corporation together with its wholly-owned subsidiaries Lightbridge International Holding LLC and Thorium Power Inc. on a consolidated basis. Lightbridge’s principal executive offices are located at 11710 Plaza America Drive, Suite 2000, Reston, Virginia, 20190, USA.
Current wording
When used in this Quarterly Report on Form 10-Q, the terms “Lightbridge,” the “Company,” “we,” “our,” and “us” refer to Lightbridge Corporation together with its wholly-owned subsidiary, Thorium Power Inc.
Previous wording
At Lightbridge, we are developing next generation nuclear fuel for water-cooled reactors that could significantly improve the economics and safety of existing and new nuclear power plants, large and small, and enhance proliferation resistance of spent nuclear fuel while supplying clean energy to the electric grid or to “behind the meter” customers for electric power, including data centers. We believe that the world’s energy needs and climate goals can only be met if nuclear power’s share of the energy-generating mix grows substantially in the coming decades. We believe Lightbridge can benefit from a growing nuclear power industry, and that our nuclear fuel can help enable that growth to happen.
Current wording
At Lightbridge, we are developing next generation nuclear fuel for water-cooled reactors that could significantly improve the economics and safety of existing and new nuclear power plants and enhance proliferation resistance of spent nuclear fuel while supplying clean energy to the electric grid or to “behind the meter” customers for electric power, including data centers. We believe our metallic fuel could offer significant economic and safety benefits over traditional nuclear fuel, primarily because of the superior heat transfer properties and the resulting lower operating temperature of our all-metal fuel. Data centers will need massive, constant power that we believe nuclear power can provide. Advances in reactor technology, combined with growing corporate and governmental support for clean energy, can position nuclear power as a cornerstone of future energy strategies for data-intensive industries, which may be willing to pay a premium for reliable, clean, and sustainable baseload electricity.
Previous wording
We anticipate that the initial phase of work under the two agreements that has been released will culminate in the insertion of extruded unclad fuel material samples using enriched uranium supplied by the DOE for irradiation testing in the ATR at INL. The initial phase of work aims to generate irradiation performance data for Lightbridge’s delta-phase uranium-zirconium alloy relating to various thermophysical properties. The data will support fuel performance modeling and regulatory licensing efforts for commercial deployment of Lightbridge Fuel™. We use a rolling wave planning approach for project management purposes on the released scopes of work. It is an iterative planning technique in which the work to be accomplished in the near term is planned in detail, while work further in the future is planned at a higher level. As such, periodic revisions to the scope and/or cost estimates are anticipated.
Current wording
In 2022, we entered into agreements with Batelle Energy Alliance, LLC (BEA), the U.S. Department of Energy’s (DOE) operating contractor for Idaho National Laboratory (INL), to support the development of Lightbridge Fuel™. The framework agreements consist of an “umbrella” Strategic Partnership Project Agreement (SPPA) and an “umbrella” Cooperative Research and Development Agreement (CRADA), each with BEA. The initial phase of work aims to generate irradiation performance data for Lightbridge’s delta-phase uranium-zirconium alloy relating to various thermophysical properties. The data will support fuel performance modeling and regulatory licensing efforts for commercial deployment of Lightbridge Fuel™. We use a rolling wave planning approach for project management purposes on the released scopes of work. It is an iterative planning technique in which the work to be accomplished in the near term is planned in detail, while work further in the future is planned at a higher level. As such, periodic revisions to the scope and/or cost estimates are anticipated.
Previous wording
In January 2025, we signed a memorandum of understanding (MOU) with Oklo, Inc. Oklo is developing advanced micro-reactors to provide clean, reliable, and affordable energy at scale. The scope of the MOU includes the following areas: (1) to conduct a preliminary evaluation of feasibility of co-locating a Lightbridge Commercial-scale Fuel Fabrication Facility at Oklo’s proposed commercial fuel fabrication facility; (2) to explore opportunities for collaboration on reprocessing and recycling of spent uranium zirconium fuel; and (3) to explore any other areas of collaboration that may be of mutual interest. We believe there may be some potential synergies in co-locating our commercial scale fuel fabrication facility at Oklo’s proposed site. We also believe recycling and reprocessing spent uranium-zirconium fuel may represent another area of potential synergies.
Current wording
In January 2025, we entered into a Memorandum of Understanding (MOU) with Oklo, Inc. (Oklo), a developer of advanced micro-reactors designed to provide clean, reliable, and affordable energy. The MOU contemplates potential areas of collaboration, including: (i) a preliminary evaluation of the feasibility of co-locating a Lightbridge commercial-scale fuel fabrication facility with Oklo’s proposed commercial fuel fabrication facility; (ii) exploring opportunities for collaboration on the reprocessing and recycling of spent uranium-zirconium fuel; and (iii) evaluating other potential areas of mutual interest. In April 2026, the term of the MOU was extended through December 31, 2026.
Previous wording
The long-term milestones towards development and commercialization of nuclear fuel assemblies include, among other things, irradiating nuclear material samples and prototype fuel rods with enriched uranium in test reactors, conducting post-irradiation examination of irradiated material samples and/or prototype fuel rods, performing thermal-hydraulic experiments, performing seismic and other out-of-reactor experiments, performing advanced computer modeling and simulations to support fuel qualification, designing a lead test assembly (LTA), entering into a lead test rod/assembly agreement(s) with a host reactor(s), demonstrating the production process of lead test rods and/or lead test assemblies at a pilot-scale fuel fabrication facility and demonstrating the operation of lead test rods and/or lead test assemblies in commercial reactors.
Current wording
The long-term milestones towards development and commercialization of nuclear fuel assemblies include, among other things, irradiating nuclear material samples and prototype fuel rods with enriched uranium in test reactors, conducting post-irradiation examination of irradiated material samples and/or prototype fuel rods, performing thermal-hydraulic experiments, performing seismic and other out-of-reactor experiments, performing advanced computer modeling and simulations to support fuel qualification, designing a lead test assembly, entering into one or more lead test rod/assembly agreements with host reactors, demonstrating the production process of our fuel including lead test rods and/or lead test assemblies at a planned LEFF and demonstrating the operation of lead test rods and/or lead test assemblies in commercial reactors.
Previous wording
There are inherent uncertainties in the cost and outcomes of the many steps needed for successful deployment of our fuel in commercial nuclear reactors, which makes it difficult to accurately predict the timing of the commercialization of our nuclear fuel technology. However, based on our best estimate and assuming adequate R&D funding levels, we expect to begin demonstration of lead test rods and/or possibly LTAs with our metallic fuel in commercial reactors in the 2030s and begin receiving purchase orders for initial fuel reload batches from utilities 15-20 years from now, with deployment of our nuclear fuel in the first reload batch in a commercial reactor taking place approximately two years thereafter. We are exploring ways of shortening this timeframe that may include securing access to expanded irradiation test loop capacity in existing or new research reactor facilities. Lightbridge aims to engage early with relevant nuclear regulators to inform our future R&D activities.
Current wording
There are inherent uncertainties in the cost and outcomes of the many steps needed for successful deployment of our fuel in commercial nuclear reactors, which makes it difficult to accurately predict the timing of the commercialization of our nuclear fuel technology. Our ultimate commercial model remains under evaluation and may evolve as our fuel development progresses, regulatory pathways are clarified, and commercial partnerships are established. See Part I, Item 1A.Risk Factors—“Risks Related to Our Business and to the Commercialization of Lightbridge Fuel™” in our Annual Report on Form 10-K for the year ended December 31, 2025.
Previous wording
The preparation of financial statements in conformity with generally accepted accounting principles requires management to make a variety of estimates and assumptions that affect (i) the reported amounts of assets and liabilities and disclosure of contingent assets and liabilities as of the date of the financial statements and (ii) the reported amounts of revenues and expenses during the reporting periods covered by the financial statements. For a discussion of the accounting judgments and estimates that we have identified as critical in the preparation of our financial statements, please see “Critical Accounting Estimates” under Item 7, “Management’s Discussion and Analysis of Financial Condition and Results of Operations” in our Annual Report on Form 10-K for the year ended December 31, 2024, filed with the SEC on March 3, 2025. There have been no significant changes in our critical accounting policies and estimates during the nine months ended September 30, 2025.
Current wording
For a discussion of the accounting judgments and estimates that we have identified as critical in the preparation of our financial statements, please see Part II, Item 7.Management’s Discussion and Analysis of Financial Condition and Results of Operations—“Critical Accounting Estimates” in our Annual Report on Form 10-K for the year ended December 31, 2025. There have been no significant changes in our critical accounting policies and estimates during the three months ended March 31, 2026.
Previous wording
The following table presents our historical operating results and the change in amounts for the periods indicated (rounded to millions):
Current wording
The following table presents our operating results and the change in amounts for the periods indicated (in millions):
Previous wording
G&A expenses consist mostly of compensation and related costs for personnel and facilities, stock-based compensation, finance, human resources, information technology, fees for consulting, IT services and other professional services. Professional services are principally comprised of legal, audit, strategic advisory services, and outsourcing services.
Current wording
General and administrative (G&A) expenses consist primarily of compensation and related costs for finance personnel, including stock-based compensation, and fees for professional and consulting services. Professional services are principally comprised of legal, audit, strategic advisory services, and outsourced services such as human resources and information technology.
Previous wording
G&A expenses increased by $1.5 million for the three months ended September 30, 2025, as compared to the three months ended September 30, 2024. The increase primarily consisted of an increase in professional fees of $0.6 million, an increase in consulting fees of $0.1 million, and an increase in stock-based compensation of $0.8 million. The increase was primarily attributable to an increase in grants of performance-based restricted stock awards ( PSAs).
Current wording
G&A expenses increased by $0.8 million for the three months ended March 31, 2026, as compared to the three months ended March 31, 2025. The increase was primarily due to a:
Previous wording
Total stock-based compensation included in G&A expenses was $1.1 million and $0.3 million for three months ended September 30, 2025 and September 30, 2024, respectively.
Current wording
Total stock-based compensation included in G&A expenses was $1.8 million and $1.1 million for the three months ended March 31, 2026 and March 31, 2025, respectively.
Previous wording
R&D expenses consist primarily of costs associated with our CRADA and SPPA agreements with INL, employee compensation and related fringe benefits including stock-based compensation and related allocable overhead costs for the R&D of our fuel.
Current wording
R&D expenses consist primarily of costs associated with our CRADA and SPPA agreements with BEA, IT expenses, employee compensation and related fringe benefits, including stock-based compensation, and other R&D costs for the development of our Lightbridge Fuel™.
Previous wording
The following table presents our total R&D expenses, including internal costs and other outside R&D costs, for the three months ended September 30, 2025 and 2024 (rounded to millions):
Current wording
The following table presents our total R&D expenses for the three months ended March 31, 2026 and 2025 (in millions):
Previous wording
Total stock-based compensation included in research and development expenses was $0.9 million and $0.2 million for the nine months ended September 30, 2025 and 2024, respectively.
Current wording
Total stock-based compensation included in R&D expenses was $0.7 million and $0.2 million for the three months ended March 31, 2026 and 2025, respectively.
Previous wording
Due to the nature of our R&D expenditures, future costs and schedule estimates are inherently uncertain and can vary significantly as new information and the outcome of these R&D activities become available. Our future business operations are dependent on budgetary constraints due primarily to market conditions and the uncertainty of future liquidity and capital resources available to us to conduct our future R&D activities.
Current wording
Due to the nature of our R&D expenditures, future costs and schedule estimates are inherently uncertain and can vary significantly as new information and the outcomes of these R&D activities become known. Our future business operations are dependent on budgetary constraints due primarily to market conditions and the uncertainty of future liquidity and capital resources available to us to conduct our future R&D activities.
Previous wording
We assess our liquidity based on our ability to fund the cash requirements of our R&D activities, G&A expenses, contractual obligations, and other operating needs. Based on our current level of operating expenses and our available cash resources, we believe we have sufficient liquidity to fund our operations and meet our anticipated cash requirements for at least the next 12 months.
Current wording
We assess our liquidity based on our ability to fund the cash requirements of our R&D activities, G&A expenses, contractual obligations, and other operating needs. Based on our current level of operating expenses and our available cash resources, we believe we have sufficient liquidity to fund our operations and meet our anticipated cash requirements for at least the next 12 months from the date of this filing. Our longer-term liquidity will depend on our ability to obtain additional financing, as our existing capital resources are not sufficient to fund our long-term operations, R&D activities, and commercialization efforts.
Previous wording
As of September 30, 2025, we had cash and cash equivalents of $153.3 million, compared to $40.0 million as of December 31, 2024, an increase of $113.3 million. During the nine months ended September 30, 2025, we raised net proceeds of $120.4 million from the sale of approximately 9.9 million shares of common stock. Our net cash used in operating activities for the nine months ended September 30, 2025, was $8.1 million.
Current wording
At March 31, 2026, we had cash and cash equivalents of $215.7 million, as compared to $201.9 million at December 31, 2025, an increase of $13.8 million. We raised net proceeds of $18.6 million from the sale of approximately 1.4 million shares of common stock during the three months ended March 31, 2026. Our net cash used in operating activities for the three months ended March 31, 2026, was $4.8 million. We do not anticipate any material incoming cash flows from operations for the foreseeable future, and we expect to continue funding our business primarily through our ATM program or other equity offerings.
Previous wording
Beyond 12 months, we expect to require additional capital to continue R&D activities over a protracted time period as we advance the development and potential commercialization of our Lightbridge Fuel™.
Current wording
Due to the uncertainties inherent in our R&D programs and the broader industry environment, we are unable to reliably estimate our total cash requirements over the full R&D period or beyond the next 12 months. We expect our expenditures to increase over time as we advance the development and potential commercialization of our Lightbridge Fuel™. We expect that significant additional capital will be required over an extended period to advance Lightbridge Fuel™ through development and toward commercial deployment. The amount and timing of future funding needs will depend on technical progress, regulatory requirements, design and construction costs of the LEFF, partnering arrangements, and the availability of government support. At this stage, we cannot reliably estimate the total funding required to reach commercial deployment. We currently intend to fund these activities through a mix of equity financing, strategic partnerships, and potential government grants or awards, but there can be no assurance that these additional sources of capital will be made available on terms acceptable to us, or at all.
Previous wording
Although we expect the ATM offering to remain our primary source of working capital in 2025, there are inherent uncertainties associated with our ability to continue raising capital through the ATM program. These uncertainties include potential declines in our stock price, fluctuations in trading volume, adverse market conditions, or regulatory changes that could limit our access to capital under the current ATM arrangement. In addition, the issuance of additional shares through the ATM may result in significant dilution to existing stockholders, and the potential for such dilution could negatively impact the market price of our common stock. There can be no assurance that the ATM financing will remain available to us on acceptable terms, or at all, when needed. See Note 7. Stockholders’ Equity and Stock-Based Compensation of the Notes to our Unaudited Condensed Consolidated Financial Statements included in Part I. Item 1. Financial Statements of this Quarterly Report on Form 10-Q for additional information regarding our prior equity financings.
Current wording
Although we expect our ATM offerings to remain our primary source of working capital in 2026, there are inherent uncertainties associated with our ability to continue raising capital through an ATM program. These uncertainties include potential declines in our stock price, fluctuations in the trading volume of our common stock, adverse overall stock market conditions, dilution to existing shareholders, or regulatory changes that could limit our access to capital under the current ATM arrangement. Although management believes additional public or private equity investments may be available in the future, adverse market conditions, unfavorable stock price movements, or reduced trading volumes could substantially impair our ability to raise capital when needed.
Previous wording
The following table provides detailed information about our net cash flows for the nine months ended September 30, 2025 and 2024 (rounded in millions):
Current wording
The following table provides detailed information about our net cash flows for the three months ended March 31, 2026 and 2025 (in millions):
Previous wording
Cash used in operating activities increased by $2.4 million for the nine months ended September 30, 2025 as compared to the nine months ended September 30, 2024. This increase was primarily due to increased spending on R&D and G&A expenses.
Current wording
Cash used in operating activities increased by $1.5 million for the three months ended March 31, 2026 as compared to the three months ended March 31, 2025. This increase was primarily due to increased cash expenditures on R&D and G&A expenses, partially offset by higher interest income, reflecting increased average cash balances following equity financings. The changes in working capital in the three months ended March 31, 2026, which included an increase in prepaid expenses and other assets of $1.4 million, were partially offset by an increase in accounts payable and accrued liabilities of $0.4 million.
Previous wording
Cash provided by financing activities increased by $117.7 million for the nine months ended September 30, 2025 as compared to the nine months ended September 30, 2024. This increase was primarily due to an increase in the net proceeds received from the issuance of common stock under our ATM offering of $116.7 million and net proceeds from the exercise of stock options of $1.2 million, partially offset by an increase in net share settlement of equity awards for the payment of withholding taxes of $0.2 million.
Current wording
Cash provided by financing activities decreased by $1.6 million for the three months ended March 31, 2026 as compared to the three months ended March 31, 2025. This decrease was primarily due to a $1.6 million decrease in net proceeds received from the issuance of common stock under our ATM program and a $0.2 million decrease in net proceeds from the exercise of stock options, partially offset by a $0.2 million decrease in the payment of withholding taxes related to the net share settlement of equity awards.
Previous wording
Cash provided by our ATM offering was $120.4 million (sale of approximately 9.9 million common shares) and $3.7 million (sale of approximately 1.4 million common shares) for the nine months ended September 30, 2025 and 2024, respectively.
Current wording
Net cash provided by our ATM program was $18.6 million from the sale of approximately 1.4 million shares of common stock for the three months ended March 31, 2026 and $20.2 million from the sale of approximately 2.6 million shares of common stock for the three months ended March 31, 2025.
Rearranged previous paragraphs (6)
Previous report — wording carried elsewhere
We believe our metallic fuel will offer significant economic and safety benefits over traditional nuclear fuel, primarily because of the superior heat transfer properties and the resulting lower operating temperature of our all-metal fuel.
Previous report — wording carried elsewhere
In December 2022, Lightbridge entered into agreements with Battelle Energy Alliance, LLC (BEA), the DOE’s operating contractor for Idaho National Laboratory (INL), to support the development of Lightbridge Fuel™. The framework agreements use an innovative structure that consists of an “umbrella” Strategic Partnership Project Agreement (SPPA) and an “umbrella” Cooperative Research and Development Agreement (CRADA), each with BEA, with an initial duration of seven years.
Previous report — wording carried elsewhere
Due to the nature of our R&D expenditures, future costs and schedule estimates are inherently uncertain and can vary significantly as new information and the outcome of these R&D activities become available. Our future long-term business operations are dependent on budgetary constraints due primarily to market conditions and the uncertainty of future liquidity and capital resources available to us to conduct our future R&D activities.
Previous report — wording carried elsewhere
Condensed Consolidated Results of Operations–** Nine Months Ended September 30, 2025 and 2024**
Previous report — wording carried elsewhere
The following table presents our historical operating results and the change in amounts for the periods indicated (rounded to millions):
Previous report — wording carried elsewhere
We currently have no debt or lines of credit and have historically funded our operations through the sale of preferred and common stock. Although management believes additional public or private equity investments may be available in the future, adverse market conditions, unfavorable stock price movements, or reduced trading volumes could substantially impair our ability to raise capital when needed.