What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-Q
Period ended 2025-03-31; filed 2025-05-12.
0001477932-25-003550
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsCurrent report: 10-Q
Period ended 2025-06-30; filed 2025-08-13.
0001477932-25-005731
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 82 previous paragraphs and 102 current paragraphs.
41 unchanged; 29 reworded; 25 added; 11 removed; 1 previous and 7 current paragraphs rearranged.
Tables are not compared: 6 previous and 10 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (25)
Current report
Our Business and Current Industry Trends
Current report
Use of Artificial Intelligence Tools
Current report
We continue to explore and adopt innovative technologies to enhance our business operations and research capabilities. In this regard, the Company has begun utilizing certain nuclear industry-focused artificial intelligence tools that leverage machine learning and advanced analytics to support information gathering, data analysis, and research workflows related to nuclear fuel development and industry trends.
Current report
The Company uses tools to supplement internal analysis and decision-making. While the tool is designed to improve efficiency and support our R&D and market research efforts, it does not replace the professional judgment of our management, engineers, or other technical personnel. The Company does not rely exclusively on AI-generated content or recommendations for any material regulatory submissions, safety decisions, or financial reporting.
Current report
While we continue to target LTAs with our metallic fuel in commercial reactors in the 2030s, there are several potential developments that, if successful, could accelerate our anticipated timelines. These developments include:
Current report
G&A expenses increased by $0.7 million for the three months ended June 30, 2025, as compared to the three months ended June 30, 2024. The increase primarily consisted of an increase in IT services fees of $0.1 million, an increase in subscription expense of $0.1 million, an increase in professional fees of $0.3 million, and an increase in stock-based compensation of $0.2 million.
Current report
Other income increased by $0.3 million for the three months ended June 30, 2025, driven by higher cash balances from our ATM sales. The additional cash generated was deployed in purchasing treasury bills and deposited into bank savings, which collectively yielded greater interest income compared to the same period in 2024.
Current report
Operating Expenses
Current report
General and Administrative
Current report
Total stock-based compensation included in G&A expenses was $1.6 million and $0.7 million for six months ended June 30, 2025 and June 30, 2024, respectively.
Current report
Research and Development
Current report
Other Income
Current report
Other income increased by $0.3 million for the six months ended June 30, 2025, driven by higher cash balances from our ATM sales. The additional cash generated was deployed in purchasing treasury bills and deposited into bank savings, which collectively yielded greater interest income compared to the same period in 2024.
Current report
Overview
Current report
We assess our liquidity based on our ability to fund the cash requirements of our R&D activities, G&A expenses, contractual obligations, and other operating needs. Based on our current level of operating expenses and our available cash resources, we believe we have sufficient liquidity to fund our operations and meet our anticipated cash requirements for at least the next 12 months.
Current report
Short-Term Liquidity and Capital Resources
Current report
We currently estimate that our cash requirements for operating activities, capital expenditures, and other planned expenditures for the 12-month period following the filing of this Quarterly Report on Form 10-Q will total approximately $39.0 million. These projected expenditures include ongoing R&D expenses, G&A expenses, and capital investments.
Current report
We believe that our existing cash and cash equivalents of $97.9 million as of June 30, 2025, together with any additional sources such as cash flows from potential financing and ATM proceeds will be sufficient to meet our working capital and capital expenditure requirements for at least the next 12 months from the date of this filing. While we do not anticipate any material incoming cash flows from operations in the near term, we expect to continue funding our business primarily through our ATM equity offering.
Current report
Long-Term Liquidity and Capital Requirements
Current report
The actual amount and timing of future capital requirements will depend on several factors, including:
Current report
There is inherent uncertainty in forecasting future expenditures, and actual costs may vary materially from current estimates.
Current report
Sources of Liquidity
Current report
Liquidity Risks and Uncertainties
Current report
We anticipate continued negative cash flows from operations for the foreseeable future. If we are unable to secure adequate funding through equity sales, strategic partnerships, or government support, we may be required to seek additional financing, which could include the issuance of common stock, preferred stock, or convertible securities. Any such future financings may result in dilution to existing stockholders or could impose additional financial or operational restrictions.
Current report
Our ability to continue the development of our nuclear fuel and achieve key R&D milestones is dependent on securing sufficient funding and forming strategic partnerships in the future. Failure to obtain adequate funding on acceptable terms in the future could significantly delay or prevent the advancement of our nuclear fuel development program.
Removed paragraphs (11)
Previous report
Our Business
Previous report
The Company’s other income, consisting of interest income earned from the purchase of treasury bills and from our bank savings account for the three months ended March 31, 2025, was relatively constant, as compared to the three months ended March 31, 2024.
Previous report
Liquidity Outlook
Previous report
We measure liquidity in terms of our ability to fund the cash requirements of our R&D activities and our general and administrative expenses, including our contractual obligations and other commitments. We believe that based on our current level of operating expenses and currently available cash resources, we will have sufficient funds available to cover our business activities and operating cash needs for the next 12 months. In order to meet these long-term cash requirements for future planned operations to develop and commercialize our nuclear fuel, including any additional expenditures that may result from unexpected developments, it will be necessary for our project to receive direct or indirect funding and/or in-kind support from government and/or strategic partners and/or other third-party sources.
Previous report
Sufficient funding is needed to continue our nuclear fuel development project and to achieve our future R&D milestones leading to the commercialization of our nuclear fuel. The actual amount of cash we will need to reach the commercialization of our nuclear fuel is subject to many factors, including, but not limited to, the timing, design and conduct of the R&D work at the DOE’s national laboratories for our fuel along with other costs to commercialize our nuclear fuel. Accordingly, there is high potential for budget variances in the current above cost projections and fuel development timelines of our current planned operations over the above cited fuel development period. Currently, we plan to continue to utilize our ATM to finance our future R&D and general and administrative activities.
Previous report
We will also need to receive substantial funding and in-kind support from government, strategic partners and/or other third-party sources throughout our nuclear fuel R&D development period in order to fund our ongoing R&D efforts in the future. If we are unable to obtain such funding and/or in-kind support that meets our future R&D cash requirements, we will need to seek other funding, which may include the issuance of additional shares of the Company’s common stock, if available. This will result in dilution to our existing stockholders. If we can raise additional funds through the issuance of preferred stock, other equity or convertible securities, these securities could have rights or preferences senior to those of our common stock and could contain covenants that restrict our operations in the future. There can be no assurance that we will be able to obtain additional equity or debt financing on terms acceptable to us, if at all.
Previous report
We have approximately $61 million of working capital as of the date of this filing and this amount exceeds our anticipated cash requirements for the next 12 months. We currently project a negative cash flow from our operations from both our general and administrative and R&D expenses, resulting in total expected expenditures of approximately $25.0 million for the full year 2025. Our R&D expenses are expected to increase over the next 12 months as we continue advancing our nuclear fuel development program. There are inherent uncertainties in forecasting the R&D and other expenditures that will be required in the future. We may also be unsuccessful in raising the capital necessary in the future to continue the R&D development of our fuel. Once other anticipated agreements are finalized or other future R&D agreements are entered into and the future R&D expenses are known, we expect to incur a significantly higher level of future required R&D expenses to further develop our fuel, resulting in higher negative monthly cash flows from operations in future periods.
Previous report
Our current source of cash available to us for the next 12 months, in addition to cash and cash equivalents on hand, is the potential funding from equity issuances pursuant to the at-the-market equity offering sales agreement, as amended, with Stifel, Nicolaus & Company, Incorporated. We filed a shelf registration statement on Form S-3 with the Securities and Exchange Commission (SEC) on March 29, 2024, registering the sale of up to $75.0 million of the Company’s securities that was declared effective on April 19, 2024. On May 10, 2024, we filed a prospectus supplement, which was further supplemented on July 19, 2024 and August 9, 2024 (collectively, the “First Prospectus Supplement”) pursuant to which we may offer and sell shares of common stock having an aggregate offering price of up to $12.6 million from time to time, through the ATM. The Company exhausted all sales under the First Prospectus Supplement. On November 22, 2024, we filed a prospectus supplement pursuant to which we may offer and sell shares of common stock having an aggregate offering price of up to $45.0 million from time to time through the ATM.
Previous report
Short-Term and Long-Term Liquidity Sources
Previous report
As discussed above, we will seek new financing in order to bring us additional sources of capital, depending on the capital market conditions of our common stock. There can be no assurance that these additional sources of capital will be made available on terms acceptable to us, or at all. The primary potential sources of cash that may be available to us are as follows:
Previous report
In support of our long-term business with respect to our fuel technology business, we endeavor to create strategic alliances with other parties to support the remaining R&D activities that are required to further enhance and complete the development of our fuel products to a commercial stage. We may be unable to form such strategic alliances on terms acceptable to us or at all.
Reworded paragraphs (29)
Previous wording
OVERVIEW OF OUR BUSINESS AND DEVELOPMENT OF LIGHTBRIDGE FUEL****TM
Current wording
OVERVIEW OF OUR BUSINESS AND DEVELOPMENT OF LIGHTBRIDGE FUELTM
Previous wording
When used in this Quarterly Report on Form 10-Q, the terms “Lightbridge,” the “Company,” “we,” “our,” and “us” refer to Lightbridge Corporation together with its wholly-owned subsidiaries Lightbridge International Holding LLC and Thorium Power Inc. Lightbridge’s principal executive offices are located at 11710 Plaza America Drive, Suite 2000, Reston, Virginia, 20190, USA.
Current wording
When used in this Quarterly Report on Form 10-Q, the terms “Lightbridge,” the “Company,” “we,” “our,” and “us” refer to Lightbridge Corporation together with its wholly-owned subsidiaries Lightbridge International Holding LLC and Thorium Power Inc. on a consolidated basis. Lightbridge’s principal executive offices are located at 11710 Plaza America Drive, Suite 2000, Reston, Virginia, 20190, USA.
Previous wording
At Lightbridge, we are developing next generation nuclear fuel for water-cooled reactors that could significantly improve the economics and safety of existing and new nuclear power plants, large and small, and enhance proliferation resistance of spent nuclear fuel while supplying clean energy to the electric grid or to “behind the meter” customers for electric power, including data centers. We believe that the world’s energy and climate needs can only be met if nuclear power’s share of the energy-generating mix grows substantially in the coming decades. We believe Lightbridge can benefit from a growing nuclear power industry, and that our nuclear fuel can help enable that growth to happen.
Current wording
At Lightbridge, we are developing next generation nuclear fuel for water-cooled reactors that could significantly improve the economics and safety of existing and new nuclear power plants, large and small, and enhance proliferation resistance of spent nuclear fuel while supplying clean energy to the electric grid or to “behind the meter” customers for electric power, including data centers. We believe that the world’s energy needs and climate goals can only be met if nuclear power’s share of the energy-generating mix grows substantially in the coming decades. We believe Lightbridge can benefit from a growing nuclear power industry, and that our nuclear fuel can help enable that growth to happen.
Previous wording
We believe our metallic fuel will offer significant economic and safety benefits over traditional nuclear fuel, primarily because of the superior heat transfer properties and the resulting lower operating temperature of all-metal fuel.
Current wording
We believe our metallic fuel will offer significant economic and safety benefits over traditional nuclear fuel, primarily because of the superior heat transfer properties and the resulting lower operating temperature of our all-metal fuel.
Previous wording
Technology industry companies believe that nuclear energy can offer a strategic, sustainable, and reliable solution for powering data centers. Advances in reactor technology, combined with growing corporate and governmental support for clean energy, can position nuclear power as a cornerstone of future energy strategies for data-intensive industries. We believe that by integrating nuclear power, the data center sector can achieve operational efficiency, energy security, and sustainability. We believe uses of our fuel could include providing additional power via power uprates of existing reactors, which may be willing to pay a premium for reliable, clean, and sustainable baseload electricity. Oil and gas producing companies are investing in low-emission energy technologies to reduce fossil fuel emissions from oil and gas production. Advances in nuclear reactor and fuel technology can position nuclear power as a key energy source for this purpose.
Current wording
The increased projected power need for data centers is driving large tech companies to invest in nuclear power, which in turn is driving utilities to seek ways to increase power output of existing nuclear plants and to explore deploying new plants. Data centers will need massive, constant power that nuclear power can provide. Advances in reactor technology, combined with growing corporate and governmental support for clean energy, can position nuclear power as a cornerstone of future energy strategies for data-intensive industries, which may be willing to pay a premium for reliable, clean, and sustainable baseload electricity. We believe that by integrating nuclear power, the data center sector can achieve operational efficiency, energy security, and sustainability. We believe uses of our fuel could include providing additional power via power uprates of existing reactors. Oil and gas producing companies are investing in low-emission energy technologies to reduce fossil fuel emissions from oil and gas production. Advances in nuclear reactor and fuel technology can position nuclear power as a key energy source for this purpose.
Previous wording
In January 2025, we signed a memorandum of understanding (MOU) with Oklo, Inc. Oklo is developing advanced micro-reactors to provide clean, reliable, and affordable energy at scale. The scope of the MOU includes the following areas: (1) to conduct a preliminary evaluation of feasibility of co-locating a Lightbridge Commercial-scale Fuel Fabrication Facility at Oklo’s proposed commercial fuel fabrication facility, (2) to explore opportunities for collaboration on reprocessing and recycling of spent uranium zirconium fuel, and (3) to explore any other areas of collaboration that may be of mutual interest. We believe there may be some potential synergies in co-locating our commercial scale fuel fabrication facility at Oklo’s proposed site. We also believe recycling and reprocessing spent uranium-zirconium fuel represents another area of potential synergies.
Current wording
In January 2025, we signed a memorandum of understanding (MOU) with Oklo, Inc. Oklo is developing advanced micro-reactors to provide clean, reliable, and affordable energy at scale. The scope of the MOU includes the following areas: (1) to conduct a preliminary evaluation of feasibility of co-locating a Lightbridge Commercial-scale Fuel Fabrication Facility at Oklo’s proposed commercial fuel fabrication facility; (2) to explore opportunities for collaboration on reprocessing and recycling of spent uranium zirconium fuel; and (3) to explore any other areas of collaboration that may be of mutual interest. We believe there may be some potential synergies in co-locating our commercial scale fuel fabrication facility at Oklo’s proposed site. We also believe recycling and reprocessing spent uranium-zirconium fuel may represent another area of potential synergies.
Previous wording
We anticipate that the initial phase of work under the two agreements that has been released will culminate in casting and extrusion of unclad fuel material samples using enriched uranium supplied by the DOE that will subsequently be inserted for irradiation testing in the Advanced Test Reactor (ATR) at INL. The initial phase of work aims to generate irradiation performance data for Lightbridge’s delta-phase uranium-zirconium alloy relating to various thermophysical properties. The data will support fuel performance modeling and regulatory licensing efforts for commercial deployment of Lightbridge Fuel™. We use a rolling wave planning approach for project management purposes on the released scopes of work. It is an iterative planning technique in which the work to be accomplished in the near term is planned in detail, while work further in the future is planned at a higher level. As such, periodic revisions to the scope and/or cost estimates are anticipated.
Current wording
We anticipate that the initial phase of work under the two agreements that has been released will culminate in the insertion of extruded unclad fuel material samples using enriched uranium supplied by the DOE for irradiation testing in the Advanced Test Reactor (ATR) at INL. The initial phase of work aims to generate irradiation performance data for Lightbridge’s delta-phase uranium-zirconium alloy relating to various thermophysical properties. The data will support fuel performance modeling and regulatory licensing efforts for commercial deployment of Lightbridge Fuel™. We use a rolling wave planning approach for project management purposes on the released scopes of work. It is an iterative planning technique in which the work to be accomplished in the near term is planned in detail, while work further in the future is planned at a higher level. As such, periodic revisions to the scope and/or cost estimates are anticipated.
Previous wording
On March 26, 2024 and October 24, 2024, the Company and BEA entered into Modifications No. 2 and No. 3 respectively, to PTS No. 1 under the SPPA, dated December 9, 2022, as amended on May 23, 2023, by and between the Company and BEA. Pursuant to the terms of Modifications No. 2 and No. 3, the potential amounts payable by the Company to reimburse BEA for its expenses and employee time were increased by approximately $0.6 million and $0.3 million, respectively, bringing the total estimated cost for the work to be performed under the “umbrella” SPPA to approximately $2.0 million.
Current wording
On March 26, 2024 and October 24, 2024, the Company and BEA entered into Modifications No. 2 and No. 3 respectively, to Project Task Statement (PTS) No. 1 under the SPPA, dated December 9, 2022, as amended on May 23, 2023, by and between the Company and BEA. Pursuant to the terms of Modifications No. 2 and No. 3, the potential amounts payable by the Company to reimburse BEA for its expenses and employee time were increased by approximately $0.6 million and $0.3 million, respectively, bringing the total estimated cost for the work to be performed under the “umbrella” SPPA to approximately $2.0 million.
Previous wording
On January 16, 2025 the Company and BEA entered into Modification No. 3 to PTS No. 1 under the CRADA, dated September 27, 2022, as amended on May 22, 2023, May 30, 2023, by and between the Company and BEA. Pursuant to the terms of Modification No. 3, the potential amounts payable by the Company to reimburse BEA for its expenses and employee time were increased from $2.6 million by approximately $1.6 million, bringing the total estimated cost for the work to be performed under the “umbrella” CRADA to $4.2 million. This modification also required that a $0.6 million advance payment be made, which was paid on January 16, 2025.
Current wording
On January 16, 2025 the Company and BEA entered into Modification No. 3 to PTS No. 1 under the CRADA, dated September 27, 2022, as amended in May 2023, by and between the Company and BEA. Pursuant to the terms of Modification No. 3, the potential amounts payable by the Company to reimburse BEA for its expenses and employee time were increased from $2.6 million by approximately $1.6 million, bringing the total estimated cost for the work to be performed under the “umbrella” CRADA to $4.2 million. This modification also required that a $0.6 million advance payment be made, which was paid on January 16, 2025.
Previous wording
After accounting for all modifications, cash payments from Lightbridge to Battelle under both CRADA and SPPA are estimated at approximately $6.8 million on a cost reimbursable basis over the performance periods.
Current wording
After accounting for all modifications, cash payments from Lightbridge to Battelle under both CRADA and SPPA are estimated at approximately $6.8 million on a cost reimbursable basis over the performance periods. The balance of the obligations as of June 30, 2025 was $2.8 million. These obligations are generally cancellable with 30 days’ notice and, therefore, are not considered firm commitments.
Previous wording
The Company anticipates entering into additional modifications to the Project Task Statements (PTS) under the SPPA and/or CRADA with INL to expand the scope of work, including performing additional extrusions, updating the experiment design for irradiation testing of coupon samples in the ATR, and other potential activities. The successful execution of this project is subject to risks, including potential delays, cost overruns, regulatory challenges, and changes in funding availability, and if the project scope does increase, then the project will be successfully executed or completed. Regardless of whether further project modifications occur, INL has indicated to the Company that due to resource and manufacturing equipment constraints, INL may not be able to meet the Company’s preferred project timeline, and that the total project cost will exceed the current budget.
Current wording
The Company anticipates entering into additional Project Task Statements and/or modifications to the existing PTS under the SPPA and/or CRADA with INL to expand the scope of work, including performing additional extrusions, creating a detailed plan for post-irradiation examination, reviewing and contributing to Lightbridge’s Fuel Qualification Plan, and other potential activities. The successful execution of this project is subject to increase in project scope and risks, including potential delays, cost overruns, regulatory challenges, and changes in funding availability.
Previous wording
On October 16, 2023, we engaged Institutul de Cercetări Nucleare Pitești, a subsidiary of Regia Autonoma Tehnologii pentru Energia Nucleara (RATEN ICN) in Romania to perform an engineering study to assess the compatibility and suitability of Lightbridge Fuel™ for use in CANDU reactors. This assessment covers key areas including mechanical design, neutronics analysis, and thermal and thermal-hydraulic evaluations. The findings from this engineering study will play an important role in guiding future economic evaluations and navigating potential regulatory licensing-related issues for potential use of Lightbridge Fuel™ in CANDU reactors.
Current wording
On October 16, 2023, we engaged Institutul de Cercetări Nucleare Pitești, a subsidiary of Regia Autonoma Tehnologii pentru Energia Nucleara (RATEN ICN) in Romania to perform an engineering study to assess the compatibility and suitability of Lightbridge Fuel™ for use in Canada Deuterium Uranium (CANDU) reactors. This assessment covers key areas including mechanical design, neutronics analysis, and thermal and thermal-hydraulic evaluations. The findings from this engineering study will play an important role in guiding future economic evaluations and navigating potential regulatory licensing-related issues for potential use of Lightbridge Fuel™ in CANDU reactors.
Previous wording
The results of this Feasibility Study indicated that Lightbridge Fuel™ can double the discharged burnup in a CANDU reactor at U-235 enrichment levels of less than 3% compared to conventional uranium dioxide fuel. Based on these favorable initial results, we plan to continue further evaluation of Lightbridge Fuel™ in CANDU reactors.
Current wording
The results of this Feasibility Study indicated that Lightbridge Fuel™ can double the discharged burnup in a CANDU reactor at U-235 enrichment levels of less than 3% compared to conventional uranium dioxide fuel. Based on these favorable initial results, we plan to continue further evaluation of Lightbridge Fuel™ in CANDU reactors and are currently in the process of finalizing the scope of work for the next phase of activities.
Previous wording
The preparation of financial statements in conformity with generally accepted accounting principles requires management to make a variety of estimates and assumptions that affect (i) the reported amounts of assets and liabilities and disclosure of contingent assets and liabilities as of the date of the financial statements and (ii) the reported amounts of revenues and expenses during the reporting periods covered by the financial statements. For a discussion of the accounting judgments and estimates that we have identified as critical in the preparation of our financial statements, please see “Critical Accounting Estimates” under Item 7, “Management’s Discussion and Analysis of Financial Condition and Results of Operations” in our Annual Report on Form 10-K for the year ended December 31, 2024, filed with the SEC on March 3, 2025. There have been no significant changes in our critical accounting policies and estimates during the three months ended March 31, 2025.
Current wording
The preparation of financial statements in conformity with generally accepted accounting principles requires management to make a variety of estimates and assumptions that affect (i) the reported amounts of assets and liabilities and disclosure of contingent assets and liabilities as of the date of the financial statements and (ii) the reported amounts of revenues and expenses during the reporting periods covered by the financial statements. For a discussion of the accounting judgments and estimates that we have identified as critical in the preparation of our financial statements, please see “Critical Accounting Estimates” under Item 7, “Management’s Discussion and Analysis of Financial Condition and Results of Operations” in our Annual Report on Form 10-K for the year ended December 31, 2024, filed with the SEC on March 3, 2025. There have been no significant changes in our critical accounting policies and estimates during the six months ended June 30, 2025.
Previous wording
General and administrative expenses consist mostly of compensation and related costs for personnel and facilities, stock-based compensation, finance, human resources, information technology, fees for consulting and other professional services. Professional services are principally comprised of legal, audit, strategic advisory services, and outsourcing services.
Current wording
G&A expenses consist mostly of compensation and related costs for personnel and facilities, stock-based compensation, finance, human resources, information technology, fees for consulting, IT services and other professional services. Professional services are principally comprised of legal, audit, strategic advisory services, and outsourcing services.
Previous wording
Total stock-based compensation included in general and administrative expenses was $1.1 million and $0.4 million for three months ended March 31, 2025 and March 31, 2024, respectively.
Current wording
Total stock-based compensation included in G&A expenses was $0.5 million and $0.3 million for three months ended June 30, 2025 and June 30, 2024, respectively.
Previous wording
R&D expenses consist primarily of costs associated with our CRADA and SPPA agreements with INL, employee compensation and related fringe benefits including stock-based compensation and other R&D costs for the development of our Lightbridge Fuel™.
Current wording
R&D expenses consist primarily of costs associated with our CRADA and SPPA agreements with INL, employee compensation and related fringe benefits including stock-based compensation and related allocable overhead costs for the R&D of our fuel.
Previous wording
R&D expenses increased by $0.7 million for the three months ended March 31, 2025, as compared to the three months ended March 31, 2024, due to the increase in R&D activities related to the development of Lightbridge Fuel™. This increase primarily consisted of an increase in INL project labor costs of $0.4 million, and an increase in allocated employee compensation and employee benefits and stock-based compensation expenses of $0.6 million, partially offset by a decrease in R&D expenses of $0.3 million due to two completed R&D studies in 2024.
Current wording
R&D expenses increased by $0.7 million for the three months ended June 30, 2025, as compared to the three months ended June 30, 2024, due to the increase in R&D activities related to the development of Lightbridge Fuel™. This increase primarily consisted of an increase in INL project labor costs of $0.5 million, an increase in allocated employee compensation and stock-based compensation expenses of $0.1 million and an increase of other R&D expenses of $0.2 million offset by a decrease in R&D expenses related to the Romania feasibility study of $0.1 million, which study was completed in 2024.
Previous wording
General and administrative expenses increased by $1.3 million for the three months ended March 31, 2025, as compared to the three months ended March 31, 2024. The increase primarily consisted of an increase in employee compensation and employee benefits of $0.2 million, an increase in consulting fees of $0.1 million, an increase in professional fees of $0.4 million, and an increase in stock-based compensation of $0.7 million primarily due to the accelerated vesting of RSAs issued to a former employee of $0.5 million, partially offset by a decrease in information technology and recruitment expenses of $0.1 million.
Current wording
G&A expenses increased by $2.0 million for the six months ended June 30, 2025, as compared to the six months ended June 30, 2024. The increase primarily consisted of an increase in consulting fees of $0.1 million, an increase in IT services fees of $0.1 million, an increase in professional fees of $0.7 million, an increase in employee compensation and employee benefits of $0.2 million, and an increase in stock-based compensation of $0.9 million primarily due to the accelerated vesting of RSAs issued to a former employee of $0.5 million.
Previous wording
We currently anticipate investing approximately $17.0 million in the R&D of our nuclear fuel for the full year 2025. This future budgeted R&D spending for the next 12 months is uncertain and actual spending may differ.
Current wording
We currently anticipate investing approximately $12.0 million in the R&D of our nuclear fuel for the full year 2025. However, this projected spending for 2025 is subject to change and actual expenditures may vary.
Previous wording
At March 31, 2025, we had cash and cash equivalents of $56.9 million, as compared to $40.0 million at December 31, 2024, an increase of $16.9 million. We raised net proceeds of $20.2 million from the sale of approximately 2.6 million shares of common stock for the three months ended March 31, 2025. Our net cash used in operating activities for the three months ended March 31, 2025, was $3.3 million and our cash flow projections indicate that we will have continued negative cash flows for the foreseeable future. We currently do not anticipate any incoming cash flows, other than the sale of common stock through our at-the-market (ATM) offering. We are not profitable, and we cannot provide any assurance that we will become profitable in the future. We will continue to incur losses because we are in the early R&D development stage of our nuclear fuel.
Current wording
As of June 30, 2025, we had cash and cash equivalents of $97.9 million, compared to $40.0 million as of December 31, 2024, an increase of $57.9 million. During the six months ended June 30, 2025, we raised net proceeds of $63.1 million from the sale of approximately 6.2 million shares of common stock. Our net cash used in operating activities for the six months ended June 30, 2025, was $5.6 million.
Previous wording
To complete the development and commercial deployment of Lightbridge Fuel™ we currently estimate a total R&D, including capital expenditures investment in the range of $200 million to $300 million or approximately $20.0 million per year over the next 10-15 years. We plan to raise this capital through a combination of strategic and financial investors, as well as potentially receiving grants from the DOE and/or other government sources.
Current wording
Looking beyond the next 12 months, we expect to require significant additional capital to complete the development and potential commercialization of our Lightbridge Fuel™. We currently estimate that total R&D and related capital expenditures will be in the range of approximately $200 million to $300 million over the next 10 to 15 years, or approximately an average of $20.0 million per year.
Previous wording
Currently, our primary source of liquidity is cash raised from our ATM offering.
Current wording
Our current primary source of liquidity is cash on hand and potential proceeds from our ATM equity offering. On June 5, 2025, we entered into an Open Market Sale Agreement with Jefferies LLC (Jefferies) to offer and sell up to $75.0 million of our common stock, from time to time, pursuant to our effective shelf registration statement on Form S-3 (File No. 333-287563), filed on May 23, 2025, and declared effective on June 4, 2025. Sales under the ATM will be made pursuant to the base prospectus filed as part of the shelf registration and the prospectus supplement filed on June 5, 2025.
Previous wording
Although we expect this ATM offering to continue to be our primary source of working capital for the Company in 2025, there is no assurance that an ATM financing arrangement will be available to us in the future. See Note 7. Stockholders’ Equity and Stock-Based Compensation of the Notes to our Unaudited Condensed Consolidated Financial Statements included in Part I. Item 1.Financial Statements, of this Quarterly Report on Form 10-Q for information regarding our prior equity financings.
Current wording
Although we expect the ATM offering to remain our primary source of working capital in 2025, there are inherent uncertainties associated with our ability to continue raising capital through the ATM program. These uncertainties include potential declines in our stock price, fluctuations in trading volume, adverse market conditions, or regulatory changes that could limit our access to capital under the current ATM arrangement. In addition, the issuance of additional shares through the ATM may result in significant dilution to existing stockholders, and the potential for such dilution could negatively impact the market price of our common stock. There can be no assurance that the ATM financing will remain available to us on acceptable terms, or at all, when needed. See Note 7. Stockholders’ Equity and Stock-Based Compensation of the Notes to our Unaudited Condensed Consolidated Financial Statements included in Part I. Item 1. Financial Statements of this Quarterly Report on Form 10-Q for additional information regarding our prior equity financings.
Previous wording
We have no debt or lines of credit, and we have financed our operations to date through the sale of our preferred stock and common stock. Management believes that public or private equity investments may be available in the future; however, adverse market conditions, in our common stock price and trading volume, as well as other factors could substantially impair our ability to raise capital in the future and continue developing our nuclear fuel.
Current wording
We currently have no debt or lines of credit and have historically funded our operations through the sale of preferred and common stock. Although management believes additional public or private equity investments may be available in the future, adverse market conditions, unfavorable stock price movements, or reduced trading volumes could substantially impair our ability to raise capital when needed.
Previous wording
The following table provides detailed information about our net cash flows for the three months ended March 31, 2025 and 2024 (rounded in millions):
Current wording
The following table provides detailed information about our net cash flows for the six months ended June 30, 2025 and 2024 (rounded in millions):
Previous wording
Cash used in operating activities increased by $1.4 million for the three months ended March 31, 2025 as compared to the three months ended March 31, 2024. This increase was primarily due to increased spending on R&D and general and administrative expenses.
Current wording
Cash used in operating activities increased by $1.9 million for the six months ended June 30, 2025 as compared to the six months ended June 30, 2024. This increase was primarily due to increased spending on R&D and G&A expenses.
Previous wording
Cash provided by financing activities increased by $19.0 million for the three months ended March 31, 2025 as compared to the three months ended March 31, 2024. This increase was primarily due to an increase in the net proceeds received from the issuance of common stock under our ATM offering of $19.0 million and net proceeds from the exercise of stock options of 0.2 million, partially offset by an increase in net share settlement of equity awards for the payment of withholding taxes of $0.2 million.
Current wording
Cash provided by financing activities increased by $61.3 million for the six months ended June 30, 2025 as compared to the six months ended June 30, 2024. This increase was primarily due to an increase in the net proceeds received from the issuance of common stock under our ATM offering of $60.9 million and net proceeds from the exercise of stock options of 0.6 million, partially offset by an increase in net share settlement of equity awards for the payment of withholding taxes of $0.2 million.
Previous wording
Cash provided by our ATM offering was $20.2 million (sale of approximately 2.6 million common shares) and $1.2 million (sale of approximately 0.4 million common shares) for the three months ended March 31, 2025 and 2024, respectively.
Current wording
Cash provided by our ATM offering was $63.1 million (sale of approximately 6.2 million common shares) and $2.2 million (sale of approximately 0.8 million common shares) for the six months ended June 30, 2025 and 2024, respectively.
Rearranged current paragraphs (7)
Current report — wording carried from elsewhere
Due to the nature of our R&D expenditures, future costs and schedule estimates are inherently uncertain and can vary significantly as new information and the outcome of these R&D activities become available. Our future long-term business operations are dependent on budgetary constraints due primarily to market conditions and the uncertainty of future liquidity and capital resources available to us to conduct our future R&D activities.
Current report — wording carried from elsewhere
Condensed Consolidated Results of Operations–** Six Months Ended June 30, 2025 and 2024**
Current report — wording carried from elsewhere
The following table presents our historical operating results and the change in amounts for the periods indicated (rounded to millions):
Current report — wording carried from elsewhere
The following table presents our total R&D expenses, including internal costs and other outside R&D costs, for the six months ended June 30, 2025 and 2024 (rounded to millions):
Current report — wording carried from elsewhere
R&D expenses increased by $1.4 million for the six months ended June 30, 2025, as compared to the six months ended June 30, 2024, due to the increase in R&D activities related to the development of Lightbridge Fuel™. This increase primarily consisted of an increase in INL project labor costs of $0.9 million, an increase in allocated employee compensation and stock-based compensation expenses of $0.7 million, and an increase in IT services fees of $0.1 million included in Other R&D expenses, partially offset by a decrease in R&D expenses related to the Romania feasibility study and Centrus Energy FEED study of $0.3 million, both of which studies were completed in 2024.
Current report — wording carried from elsewhere
Total stock-based compensation included in research and development expenses was $0.4 million and $0.1 million for the six months ended June 30, 2025 and 2024, respectively.
Current report — wording carried from elsewhere
We plan to raise the required long-term capital through a combination of:
Rearranged previous paragraphs (1)
Previous report — wording carried elsewhere
See Note 7. Stockholders’ Equity and Stock-Based Compensation of the Notes to our Unaudited Condensed Consolidated Financial Statements included in Part I. Item 1.Financial Statements, of this Quarterly Report on Form 10-Q for information regarding our prior equity financings.