Recent Developments
On February 5, 2024, the Company released the results of the Oxide Tailings Project Prefeasibility Study for the Avino Property, Durango Mexico (the “Report”) prepared in accordance with National Instrument 43-101 – Standard for Disclosure for Mineral Projects with a NPV US$98 million (pre-tax) and US$61 million (post-tax) at a 5% discount rate, IRR 35% (pre-tax) and 26% (post-tax), proven and probable mineral reserves of 6.70 million tonnes at a silver and gold grade of 55 g/t and 0.47 g/t respectively, over a 9-year LOM in respect of the existing oxide tailings. The completion of the Report is a milestone in our 5-year growth plan to become an intermediate silver producer in Mexico.
On January 9, 2024, the Company announced that it had signed a long-term land-use agreement with a local community for the development of La Preciosa in Durango, Mexico. La Preciosa hosts one of the largest undeveloped primary silver resources in Mexico and is located approximately 19 kilometres from the current Avino Mine production operations. With this long-term land-use agreement in place, the Company will start planning to commence hauling of old surface stockpiles of material to our mill at the Avino Mine for processing. In addition, the Company will now begin the filing of the environmental permit for underground extraction. The La Preciosa mine represents a key pillar in Avino’s transformational growth strategy.