URANIUM ENERGY CORP

For the period ended Oct 31, 2025. Filed Dec 10, 2025.

View on SEC.gov

About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Oct 31, 2025 · Filed Dec 10, 2025

UEC$6.92+6.8%Stored close · as of Nov 6, 2026

What changed in Risk Factors?

Read the current filing

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 123 previous paragraphs and 8 current paragraphs.

5 unchanged; 1 reworded; 2 added; 117 removed; 0 previous and 0 current paragraphs rearranged.

Tables are not compared: 8 previous and 0 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (2)

Current report

Item 1A -- Risk Factors of the Form 10-K Annual Report for Fiscal 2025 sets forth information relating to important risks and uncertainties that could materially adversely affect the Company’s business, financial condition or operating results. The risk factors set forth in our Form 10-K Annual Report for Fiscal 2025 remain current and there have been no material changes to those risk factors that needed to be supplemented or updated on this Form 10-Q for the quarter ended October 31, 2025. Additional risks and uncertainties that the Company does not presently know about or that it currently deems immaterial also may impair our business operations.

Current report

On October 2, 2025, we completed a private placement offering of 575,000 shares of our common stock issued as “flow-through shares”, as defined in subsection 66(15) of the Income Tax Act (Canada), for gross proceeds of $8.63 million. The proceeds will be applied toward certain qualifying Canadian exploration expenditures, as defined in the Income Tax Act (Canada), at the Company’s Roughrider Project located in Saskatchewan, Canada. We relied upon the exemption from the registration requirements under the Securities Act provided by Rule 903 of Regulation S with respect to the issuance of these flow-through shares.
Removed paragraphs (117)

Previous report

In addition to the information contained in our Annual Report on Form 10-K for Fiscal 2024, and this Quarterly Report on Form 10-Q, we have identified the following material risks and uncertainties which reflect our outlook and conditions known to us as of the date of this Quarterly Report. These material risks and uncertainties should be carefully reviewed by our stockholders and any potential investors in evaluating the Company, our business and the market value of our common stock. Furthermore, any one of these material risks and uncertainties has the potential to cause actual results, performance, achievements or events to be materially different from any future results, performance, achievements or events implied, suggested or expressed by any forward-looking statements made by us or by persons acting on our behalf. Refer to“Cautionary Note Regarding Forward-looking Statements”*** as disclosed in our Annual Report on Form 10-K for Fiscal 2024.***

Previous report

There is no assurance that we will be successful in preventing the material adverse effects that any one or more of the following material risks and uncertainties may cause on our business, prospects, financial condition and operating results, which may result in a significant decrease in the market price of our common stock. Furthermore, there is no assurance that these material risks and uncertainties represent a complete list of the material risks and uncertainties facing us. There may be additional risks and uncertainties of a material nature that, as of the date of this Quarterly Report, we are unaware of or that we consider immaterial that may become material in the future, any one or more of which may result in a material adverse effect on us. You could lose all or a significant portion of your investment due to any one of these material risks and uncertainties.

Previous report

Risks Related to Our Company and Business

Previous report

Evaluating our future performance may be difficult since we have a limited financial and operating history, with significant negative operating cash flow and an accumulated deficit to date. Our long-term success will depend ultimately on our ability to achieve and maintain profitability and to develop positive cash flow from our mining activities.

Previous report

As more fully described under Item 1, Business, in our Annual Report on Form 10-K for Fiscal 2024, we were incorporated under the laws of the State of Nevada on May 16, 2003 and, since 2004, we have been primarily engaged in uranium mining and related activities, including exploration, pre-extraction, extraction and processing, on projects located in the United States, Canada and the Republic of Paraguay. In November 2010, we commenced uranium extraction for the first time at our Palangana Mine utilizing ISR methods and processed those materials at our Hobson Processing Facility into drums of U 3 O 8. We also hold uranium projects in various stages of exploration and pre-extraction in the States of Arizona, Colorado, New Mexico, Texas and Wyoming, in Canada and the Republic of Paraguay. In August 2024, we restarted uranium extraction at our fully permitted, and past producing, Christensen Ranch Mine ISR operation in Wyoming. We expect the ramp-up phase will continue while new production areas are being constructed and completed in 2025.

Previous report

As more fully described under “Liquidity and Capital Resources” of Item 2, Management’s Discussion and Analysis of Financial Condition and Result of Operations, herein, we have a history of significant negative cash flow and net losses, with an accumulated deficit balance of $379.51 million as of April 30, 2025. Historically, we have been reliant primarily on equity financings from the sale of our common stock in order to fund our operations. Although we generated revenues from sales of U 3 O 8 we extracted during Fiscal 2015, Fiscal 2013 and Fiscal 2012 of $3.08 million, $9.03 million and $13.76 million, respectively, and generated revenues from sales of purchased uranium inventory totaling $66.84 million during the nine months ended April 30, 2025 , we have yet to achieve consistent profitability or develop consistent positive cash flow from our operations, and we do not expect to achieve consistent profitability or develop consistent positive cash flow from operations in the near term. As a result of our limited financial and operating history, including our significant negative cash flow from operations and net losses to date, it may be difficult to evaluate our future performance.

Previous report

As at April 30, 2025, we had working capital (current assets less current liabilities) of $137.57 million including cash and cash equivalents of $71.40 million and purchased uranium inventory holdings of $72.90 million. Subsequent to April 30, 2025, we received additional net cash proceeds of $54.82 million under our 2024 ATM Offering. We believe that our existing cash resources and, if necessary, cash generated from the sale of the Company’s liquid assets, will provide sufficient funds to carry out our planned operations for 12 months from the date of this Quarterly Report. Our continuation as a going concern for a period beyond those 12 months will be dependent upon our ability to obtain adequate additional financing, as our operations are capital intensive and future capital expenditures are expected to be substantial. Our continued operations, including the recoverability of the carrying values of our assets, are dependent ultimately on our ability to achieve and maintain profitability and positive cash flow from our operations.

Previous report

Our reliance on equity and debt financings is expected to continue for the foreseeable future, and their availability whenever such additional financing is required will be dependent on many factors beyond our control and including, but not limited to, the market price of uranium, the continuing public support of nuclear power as a viable source of electrical generation, the volatility in the global financial markets affecting our stock price and the status of the worldwide economy, any one of which may cause significant challenges in our ability to access additional financing, including access to the equity and credit markets. We may also be required to seek other forms of financing, such as asset divestitures or joint venture arrangements, to continue advancing our projects which would depend entirely on finding a suitable third party willing to enter into such an arrangement, typically involving an assignment of a percentage interest in the mineral project.

Previous report

Our long-term success, including the recoverability of the carrying values of our assets and our ability to acquire additional uranium projects and continue with exploration and pre-extraction activities and mining activities on our existing uranium projects, will depend ultimately on our ability to achieve and maintain profitability and positive cash flow from our operations by establishing ore bodies that contain commercially recoverable uranium and to develop these into profitable mining activities. The economic viability of our mining activities, including the expected duration and profitability of our ISR Mines and of any future satellite ISR mines, such as our Burke Hollow and Goliad Projects located within the South Texas Uranium Belt, our Christensen Ranch Mine and Reno Creek Project located in the Powder River Basin, Wyoming, and our projects in Canada and in the Republic of Paraguay, have many risks and uncertainties. These include, but are not limited to: (i) a significant, prolonged decrease in the market price of uranium; (ii) difficulty in marketing and/or selling uranium concentrates; (iii) significantly higher than expected capital costs to construct a mine and/or processing plant; (iv) significantly higher than expected extraction costs; (v) significantly lower than expected mineral extraction; (vi) significant delays, reductions or stoppages of uranium extraction activities; and (vii) the introduction of significantly more stringent regulatory laws and regulations. Our mining activities may change as a result of any one or more of these risks and uncertainties and there is no assurance that any ore body that we extract mineralized materials from will result in achieving and maintaining profitability and developing positive cash flow.

Previous report

Our operations are capital intensive and we will require significant additional financing to acquire additional mineral projects and continue with our exploration, pre-extraction and extraction activities on our existing projects.

Previous report

Our operations are capital intensive and future capital expenditures are expected to be substantial. We will require significant additional financing to fund our operations, including acquiring additional mineral projects and continuing with our exploration, pre-extraction and extraction activities which include assaying, drilling, geological and geochemical analysis and mine construction costs. In the absence of such additional financing we would not be able to fund our operations or continue with our exploration and pre-extraction activities, which may result in delays, curtailment or abandonment of any one or all of our projects.

Previous report

Our uranium extraction and sales history is limited. Our ability to generate revenue is subject to a number of factors, any one or more of which may adversely affect our financial condition and operating results.

Previous report

We have a limited history of uranium extraction and generating revenue. In November 2010, we commenced uranium extraction at our Palangana Mine, which has been our sole source of revenues from the sales of produced U 3 O 8 during Fiscal 2015, Fiscal 2013 and Fiscal 2012, with no revenues from sales of produced U 3 O 8 during the nine months ended April 30, 2025, or any other fiscal years. In August 2024, we restarted uranium extraction at our fully permitted, and past producing, Christensen Ranch Mine ISR operation in Wyoming. We expect the ramp-up phase will continue while new production areas are being constructed and completed in 2025.

Previous report

At the same time, we have continued to advance our Roughrider and Burke Hollow Projects with resource expansions and development programs, respectively. Our ability to generate revenue from our Palangana and recently acquired Christensen Ranch Mines is subject to a number of factors which include, but are not limited to: (i) a significant, prolonged decrease in the market price of uranium; (ii) difficulty in marketing and/or selling uranium concentrates; (iii) significantly higher than expected extraction costs; (iv) significantly lower than expected uranium extraction; (v) significant delays, reductions or stoppages of uranium extraction activities; and (vi) the introduction of significantly more stringent regulatory laws and regulations. Furthermore, continued mining activities at our ISR Mines will eventually deplete the mines or cause such activities to become uneconomical, and if we are unable to directly acquire or develop existing uranium projects, such as our Moore Ranch, Reno Creek, Burke Hollow and Goliad Projects, into additional uranium mines from which we can commence uranium extraction, it will negatively impact our ability to generate revenues. Any one or more of these occurrences may adversely affect our financial condition and operating results.

Previous report

Exploration, pre-extraction and extraction programs and mining activities are inherently subject to numerous significant risks and uncertainties, and actual results may differ significantly from expectations or anticipated amounts. Furthermore, exploration programs conducted on our projects may not result in the establishment of ore bodies that contain commercially recoverable uranium.

Previous report

Exploration, pre-extraction and extraction programs and mining activities are inherently subject to numerous significant risks and uncertainties, with many beyond our control and including, but not limited to: (i) unanticipated ground and water conditions and adverse claims to water rights; (ii) unusual or unexpected geological formations; (iii) metallurgical and other processing problems; (iv) the occurrence of unusual weather or operating conditions and other force majeure events; (v) lower than expected ore grades; (vi) industrial accidents; (vii) delays in the receipt of or failure to receive necessary government permits; (viii) delays in transportation; (ix) availability of contractors and labor; (x) government permit restrictions and regulation restrictions; (xi) unavailability of materials and equipment; and (xii) the failure of equipment or processes to operate in accordance with specifications or expectations. These risks and uncertainties could result in: (i) delays, reductions or stoppages in our mining activities; (ii) increased capital and/or extraction costs; (iii) damage to, or destruction of, our mineral projects, extraction facilities or other properties; (iv) personal injuries; (v) environmental damage; (vi) monetary losses; and (vii) legal claims.

Previous report

Success in mineral exploration is dependent on many factors including, without limitation, the experience and capabilities of a company’s management, the availability of geological expertise and the availability of sufficient funds to conduct the exploration program. Even if an exploration program is successful and commercially recoverable material is established, it may take a number of years from the initial phases of drilling and identification of the mineralization until extraction is possible, during which time the economic feasibility of extraction may change such that the material ceases to be economically recoverable. Exploration is frequently non-productive due, for example, to poor exploration results or the inability to establish ore bodies that contain commercially recoverable material, in which case the project may be abandoned and written-off. Furthermore, we will not be able to benefit from our exploration efforts and recover the expenditures that we incur on our exploration programs if we do not establish ore bodies that contain commercially recoverable material and develop these projects into profitable mining activities, and there is no assurance that we will be successful in doing so for any of our projects.

Previous report

Whether an ore body contains commercially recoverable material depends on many factors including, without limitation: (i) the particular attributes, including material changes to those attributes, of the ore body such as size, grade, recovery rates and proximity to infrastructure; (ii) the market price of uranium, which may be volatile; and (iii) government regulations and regulatory requirements including, without limitation, those relating to environmental protection, permitting and land use, taxes, land tenure and transportation.

Previous report

We have not established proven or probable reserves through the completion of a final or bankable feasibility study for any of our projects, including our ISR Mines. Furthermore, we have no plans to establish proven or probable reserves for any of our uranium projects for which we plan on utilizing ISR mining, such as our ISR Mines. Since we commenced extraction of mineralized materials from our ISR Mines without having established proven or probable reserves, it may result in our mining activities at our ISR Mines, and at any future projects for which proven or probable reserves are not established, being inherently riskier than other mining activities for which proven or probable reserves have been established.

Previous report

We have established the existence of mineralized materials for certain of our projects, including our ISR Mines. We have not established proven or probable reserves, as defined by the SEC, through the completion of a final or bankable feasibility study for any of our projects, including our ISR Mines. Furthermore, we have no present plans to establish proven or probable reserves for any of our projects for which we plan on utilizing ISR mining. Since we commenced the extraction of mineralized materials at our ISR Mines without having established proven or probable reserves, there may be greater inherent uncertainty as to whether or not any mineralized material can be economically extracted as originally planned and anticipated. Any mineralized materials established or extracted from our ISR Mines should not in any way be associated with having established or produced from proven or probable reserves.

Previous report

We prepare estimates of future uranium extraction and recovery, and there are no assurances that such estimates will be achieved.

Previous report

We may from time to time prepare estimates of future uranium extraction and recovery, or increases in uranium extraction and recovery, for particular operations, or relating to our ability to increase uranium extraction and recovery in response to increases in commodity prices, as market conditions warrant or otherwise. No assurance can be given that any such extraction and recovery estimates will be achieved, nor can assurance be given that extraction or recovery increases will be achieved in a cost effective or timely manner. Failure to achieve extraction and recovery estimates or failure to achieve extraction and recovery in a cost effective or timely manner could have an adverse impact on our future cash flows, earnings, results of operations and financial condition. These estimates are based on, among other things, the following factors: the accuracy of mineral resource estimates; the accuracy of assumptions regarding ground conditions and physical characteristics of mineralized materials, such as hardness and presence or absence of particular metallurgical characteristics; the accuracy of estimated rates and costs of extraction, recovery and processing; assumptions as to future commodity prices; assumptions relating to changes in laws, regulations or policies, or lack thereof, that could impact the cost and time required to obtain regulatory approvals, licenses and permits; assumptions relating to obtaining required licenses and permits in a timely manner, including the time required to satisfy environmental analyses, consultations and public input processes; assumptions relating to challenges to or delays in the licensing and permitting process; and assumptions regarding any appeals or lack thereof, or injunctions or lack thereof, relating to any approvals, licenses or permits.

Previous report

Our actual uranium extraction and recovery may vary from estimates for a variety of reasons, including, among others: actual mineralized material extracted, mined or recovered varying from estimates of grade, tonnage, dilution, metallurgical and other characteristics; short-term operating factors relating to the mineral resources, such as the need for sequential construction or development of mineralized materials or deposits and the processing of new or different mineral grades; risk and hazards associated with extraction, mining and recovery; natural phenomena, such as inclement weather conditions, underground floods, earthquakes, pit wall failures and cave-ins; unexpected labor shortages or strikes; varying conditions in the commodities markets; and delays in obtaining or denial, challenges or appeals of regulatory approvals, licenses and permits or renewals of existing approvals, licenses or permits.

Previous report

Since we are in the Exploration Stage, pre-production expenditures including those related to pre-extraction activities are expensed as incurred, the effects of which may result in our consolidated financial statements not being directly comparable to the financial statements of companies in the Production Stage.

Previous report

Despite the fact that we commenced uranium extraction at our ISR Mines, we remain in the Exploration Stage (as defined by the SEC) and will continue to remain in the Exploration Stage until such time as proven or probable reserves have been established, which may never occur. We prepare our consolidated financial statements in accordance with U.S. GAAP under which acquisition costs of mineral rights are initially capitalized as incurred while pre-production expenditures are expensed as incurred until such time as we exit the Exploration Stage. Expenditures relating to exploration activities are expensed as incurred and expenditures relating to pre-extraction activities are expensed as incurred until such time as proven or probable reserves are established for that uranium project, after which subsequent expenditures relating to mine development activities for that particular project are capitalized as incurred.

Previous report

We have neither established nor have any present plans to establish proven or probable reserves for our uranium projects for which we plan on utilizing ISR mining. Companies in the Production Stage (as defined by the SEC), having established proven and probable reserves and exited the Exploration Stage, typically capitalize expenditures relating to ongoing development activities, with corresponding depletion calculated over proven and probable reserves using the units-of-production method and allocated to inventory and, as that inventory is sold, to cost of goods sold. As we are in the Exploration Stage, it has resulted in us reporting larger losses than if we had been in the Production Stage due to the expensing, instead of capitalization, of expenditures relating to ongoing processing facility and mine pre-extraction activities. Additionally, there would be no corresponding amortization allocated to our future reporting periods since those costs would have been expensed previously, resulting in both lower inventory costs and cost of goods sold and results of operations with higher gross profits and lower losses than if we would have been in the Production Stage. Any capitalized costs, such as acquisition costs of mineral rights, are depleted over the estimated extraction life using the straight-line method. As a result, our consolidated financial statements may not be directly comparable to the financial statements of companies in the Production Stage.

Previous report

Our mineral resource estimates may not be reliable and are inherently more uncertain than estimates of proven and probable reserves; there is risk and increased uncertainty to commencing and conducting production without established mineral reserves.

Previous report

Our properties do not contain mineral reserves as defined under S-K 1300. Until mineral reserves or mineral resources are mined and processed, the quantity of mineral resources and grades must be considered as estimates only and may be inaccurate. We have established the existence of uranium resources for certain uranium projects, including at our Palangana Mine, Christensen Ranch Mine, Roughrider Project and Christie Lake Project. We have not established proven or probable reserves, as defined under S-K 1300, through the completion of a feasibility study, for any of our uranium projects, including the Palangana Mine, Christensen Ranch Mine, Roughrider Project and Christie Lake Project. Furthermore, we currently have no plans to establish proven or probable reserves for any of our uranium projects for which we utilize ISR methods, such as the Palangana Mine and Christensen Ranch Mine. As a result, and despite the fact that we have previously produced U 3 O 8 at the Palangana Mine, there is increased uncertainty and risk that may result in economic and technical failure which may adversely impact our future profitability.

Previous report

There are numerous uncertainties inherent in estimating quantities of mineral resources, including many factors beyond our control, and no assurance can be given that the recovery of mineral resources will be realized. In general, estimates of mineral resources are based upon several factors and assumptions made as of the date on which the estimates were determined, including (i) geological and engineering estimates that have inherent uncertainties and the assumed effects of regulation by governmental agencies; (ii) the judgment of the geologists, engineers and other professionals preparing the estimate; (iii) estimates of future uranium prices and operating costs; (iv) the quality and quantity of available data and the interpretation of that data; and (v) the accuracy of various mandated economic assumptions, all of which may vary considerably from actual results.

Previous report

All estimates are, to some degree, uncertain; with in situ recovery, this is due in part to limited sampling information collected prior to mining. For these reasons, estimates of the recoverable mineral resources prepared by different professionals or by the same professionals at different times, may vary substantially. As such, there is significant uncertainty in any mineral resource estimate and actual deposits encountered and the economic viability of a deposit may differ materially from our estimates.

Previous report

Estimated costs of future reclamation obligations may be significantly exceeded by actual costs incurred in the future. Furthermore, only a portion of the financial assurance required for the future reclamation obligations has been funded.

Previous report

We are responsible for certain remediation and decommissioning activities in the future, primarily for our Hobson and Irigaray Processing Facilities, our ISR Mines, Roughrider Project and our recently acquired Sweetwater Acquisition assets, and have recorded a liability of $38.72 million on our balance sheet at April 30, 2025, to recognize the present value of the estimated costs of such reclamation obligations. Should the actual costs to fulfill these future reclamation obligations materially exceed these estimated costs, it may have an adverse effect on our financial condition and operating results, including not having the financial resources required to fulfill such obligations when required to do so.

Previous report

As at April 30, 2025, the total estimated reclamation costs for all of our projects was $88.86 million. We have secured $59.14 million of surety bonds as an alternate source of financial assurance for the estimated costs of the reclamation obligations, of which $9.21 million is funded and held as restricted cash for collateral purposes as required by the surety. We may be required at any time to fund the remaining $49.93 million or any portion thereof for a number of reasons including, but not limited to, the following: (i) the terms of the surety bonds are amended, such as an increase in collateral requirements; (ii) we are in default with the terms of the surety bonds; (iii) the surety bonds are no longer acceptable as an alternate source of financial assurance by the regulatory authorities; or (iv) the surety encounters financial difficulties. Should any one or more of these events occur in the future, we may not have the financial resources to fund the remaining amount or any portion thereof when required to do so.

Previous report

We cannot provide any assurance that our Physical Uranium Program involving the strategic acquisition of physical uranium will be successful, which may have an adverse effect on our results of operations.

Previous report

We have used or allocated a large portion of our cash on hand in order to fund the acquisition of drummed uranium under our Physical Uranium Program. This strategy will be subject to a number of risks and there is no assurance that the strategy will be successful. Future deliveries are subject to performance by other parties and there is a possibility of default by those parties, thus depriving us of potential benefits.

Previous report

Due to the fluctuation of uranium prices, the price of uranium will fluctuate and we will be subject to losses should we ultimately determine to sell the uranium at prices lower than the acquisition cost. The primary risks associated with physical uranium will be the normal risks associated with supply and demand fundamentals affecting price movements.

Previous report

We may be required to sell a portion or all of the physical uranium accumulated to fund our operations should other forms of financing not be available to meet our capital requirements.

Previous report

Since there is no public market for uranium, selling the uranium may take extended periods of time and suitable purchasers may be difficult to find, which could have a material adverse effect on our financial condition and may have a material adverse effect on our securities.

Previous report

There is no public market for the sale of uranium, although there are several trading and brokerage houses that serve the industry with bid and ask data as well as locations and quantities. The uranium futures market on the New York Mercantile Exchange does not provide for physical delivery of uranium, only cash on settlement, and that trading forum does not offer a formal market but rather facilitates the introduction of buyers to sellers.

Previous report

The pool of potential purchasers and sellers is limited, and each transaction may require the negotiation of specific provisions. Accordingly, a sale may take several weeks or months to complete. If we determine to sell any physical uranium that we have acquired, we may likewise experience difficulties in finding purchasers that are able to accept a material quantity of physical uranium at a price and at a location that is compatible with our interests. The inability to sell on a timely basis in sufficient quantities and at a desired price and location could have a material adverse effect on our securities.

Showing the first 40 of 117 passages. Open the source sections for the rest.

Reworded paragraphs (1)

Previous wording

Pursuant to Section 1503(a) of theDodd-Frank Wall Street Reform and Consumer Protection Act of 2010, issuers that are operators, or that have a subsidiary that is an operator, of a coal or other mine in the United States, and that is subject to regulation by theFederal Mine Safety and Health Administration under the Mine Safety and Health Act of 1977 (the “Mine Safety Act”), are required to disclose in their periodic reports filed with the SEC information regarding specified health and safety violations, orders and citations, related assessments and legal actions, and mining-related fatalities. During the quarter ended April 30, 2025, our ISR Mines were not subject to regulation by the Federal Mine Safety and Health Administration under the Mine Safety Act.

Current wording

Pursuant to Section 1503(a) of theDodd-Frank Wall Street Reform and Consumer Protection Act of 2010, issuers that are operators, or that have a subsidiary that is an operator, of a coal or other mine in the United States, and that is subject to regulation by theFederal Mine Safety and Health Administration under the Mine Safety and Health Act of 1977 (the “Mine Safety Act”), are required to disclose in their periodic reports filed with the SEC information regarding specified health and safety violations, orders and citations, related assessments and legal actions, and mining-related fatalities. During the quarter ended October 31, 2025, we held both ISR and conventional mines. Under U.S. regulation, our ISR Mines were not subject to regulation by the Mine Safety Act but rather fall under oversight by the U.S. Occupational Safety and Health Administration.