URANIUM ENERGY CORP
For the period ended Oct 31, 2024. Filed Dec 5, 2024.
View on SEC.govAbout this filing
A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.
Oct 31, 2024 · Filed Dec 5, 2024
What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-Q
Period ended 2024-04-30; filed 2024-06-10.
0001437749-24-019731
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsCurrent report: 10-Q
Period ended 2024-10-31; filed 2024-12-05.
0001437749-24-036734
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 101 previous paragraphs and 101 current paragraphs.
38 unchanged; 37 reworded; 26 added; 22 removed; 4 previous and 0 current paragraphs rearranged.
Tables are not compared: 26 previous and 21 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (26)
Current report
In August 2024, we restarted uranium extraction at our fully permitted, and past producing, Christensen Ranch Mine ISR operation in Wyoming. We expect the ramp-up phase will continue while new production areas are being constructed and completing in early 2025. At the same time, we have continued to advance our Roughrider and Burke Hollow Projects with resource expansions and development programs, respectively.
Current report
On September 20, 2024, we entered into a stock purchase agreement (the “Stock Purchase Agreement”) with Rio Tinto America Inc., a Delaware corporation (the “Seller”), pursuant to which we will acquire from the Seller all of the issued and outstanding shares of capital stock (the “Shares”) of (i) Kennecott Uranium Company, a Delaware corporation (“KUC”), which is a joint venture participant of, and owns a 50% ownership interest in, the Green Mountain Mining Venture, an unincorporated Wyoming contractual joint venture (“GMMV”), and (ii) Wyoming Coal Resources Company, a Delaware corporation (“WCRC”), which is a joint participant of, and owns a 50% ownership interest in GMMV (collectively, the “Acquisition”). KUC, WCRC and GMMV, collectively, own or hold the assets, rights and obligations comprised of: (i) the facilities, equipment, improvements and fixtures for the processing of uranium located in Sweetwater County, Wyoming, owned by KUC, WCRC and GMMV, and related facilities and impoundments; (ii) the Jackpot and Big Eagle properties located in Wyoming; (iii) the mineral and real property interests which are owned or leased by KUC, WCRC or GMMV, subject to the permitted encumbrances, including patented and unpatented mining and millsite claims, leaseholds, material easements and rights-of-way of record; and (iv) the other rights and interests in uranium mineralization located in Fremont and Sweetwater Counties, Wyoming, owned or held by any of KUC, WCRC or GMMV (collectively, the “Project”). The consideration for the Acquisition payable at closing of the Stock Purchase Agreement is $175 million in cash, subject to customary working capital adjustments as provided for in the Stock Purchase Agreement, with closing expected to occur during the quarter ending January 31, 2025. Upon completion of the Acquisition, we will replace approximately $25 million in surety bonds securing future reclamation costs relating to the Project. In addition, from and after the completion of the Acquisition we shall continue to indemnify the Seller from most of the liabilities associated with the Project. The closing of the Acquisition is subject to certain conditions customary for an Acquisition of this nature, including that the approval by the Wyoming Nuclear Regulator for the transfer of a Radioactive Materials License to us, which was issued on November 25, 2024.
Current report
On November 7, 2024, we filed an initial assessment technical report summary that includes an economic analysis and mineral resource estimate for our Roughrider Project, located in Northern Saskatchewan, Canada. The economic analysis is included in a technical report summary titled “S-K 1300 Initial Assessment Report – Roughrider Uranium Project, Saskatchewan, Canada”, issued on November 5, 2024 and prepared for the Company by Tetra Tech Canada Inc., Understood Mineral Resources Ltd., Snowden Optiro, Terracon Geotechnique Ltd. and Clifton Engineering Group Inc., in accordance with Item 1302 of S-K 1300.
Current report
Physical Uranium Program
Current report
The Company is investing in building the next generation of low-cost uranium projects that will be competitive on a global basis and which will use the ISR mining process which is expected to reduce the impact on the environment as compared to conventional mining. Despite our focus on low cost ISR mining with its low capital requirements, we saw a unique opportunity to purchase drummed uranium at prevailing spot prices which are below most global industry mining costs. Hence, we established a physical uranium portfolio (the “Physical Uranium Program”) and, as of October 31, 2024, we had 1,256,000 pounds of uranium and had entered into agreements to purchase 700,000 pounds of warehoused uranium from Fiscal 2025 to Fiscal 2026 at conversion facilities located in North America at a volume weighted average price of approximately $38.81 per pound. As of October 31, 2024, we were committed to sell 600,000 pounds of uranium inventory in the amount of $49.75 million for delivery between November 2024 to January 2025. Subsequent to October 31, 2024, we sold 500,000 pounds of uranium inventory for $41.40 million at a weighted average price of $82.80 per pound and we entered into contracts to purchase 300,000 pounds of uranium inventory in the amount of $23.43 million at a weighted average price of $78.08 per pound with delivery in December 2024.
Current report
Our Physical Uranium Program will support three objectives for our Company: (i) to bolster our balance sheet as uranium prices appreciate; (ii) to provide strategic inventory to support future marketing efforts with utilities that could compliment production and accelerate cash flows; and (iii) to increase the availability of our Texas and Wyoming production capacity for emerging U.S. origin specific opportunities which may command premium pricing due to the scarcity of domestic uranium. One such U.S. origin specific opportunity is the Company’s plan to participate in supplying the Uranium Reserve, as outlined in the Nuclear Fuel Working Group report published by the U.S. Department of Energy (“DOE”).
Current report
Seasonality
Current report
The timing of our uranium concentrate sales is dependent upon factors such as extraction results from our mining activities, cash requirements, contractual requirements and perception of the uranium market. As a result, our sales are neither tied to nor dependent upon any particular season. In addition, our ability to extract and process uranium does not change on a seasonal basis. Over the past ten years uranium prices have tended to decline during the calendar third quarter before rebounding during the fourth quarter, but there does not appear to be a strong correlation.
Current report
For the three months ended October 31, 2024, we recorded revenue of $17.09 million and realized gross profit of $6.25 million, which were all related to sales of purchased uranium inventory. For the three months ended October 31, 2023, we recorded revenue of $0.11 million and realized gross profit of $0.02 million, which were all generated from toll processing services.
Current report
As of October 31, 2024, we have 700,000 pounds of uranium inventory purchase commitments outstanding at a volume weighted average price of approximately $38.81 per pound. Various deliveries are scheduled to occur from Fiscal 2025 to Fiscal 2026.
Current report
As of October 31, 2024, the carrying value of our inventories was $66.07 million (July 31, 2024: $75.83 million, of which purchased uranium concentrate inventories was $64.63 million (July 31, 2024: $75.44 million).
Current report
During the three months ended October 31, 2024, development expenditures were primarily spent on the following projects:
Current report
Fair Value Gain (Loss) on Equity Securities
Current report
Interest income (expenses)
Current report
During the three months ended October 31, 2024, interest income totaled $1.12 million, compared to $0.21 million for the three months ended October 31, 2023. The interest earned resulted from the reinvestment of cash proceeds received from our ATM Offering and the sale of equity securities in short-term deposits.
Current report
Subsequent to October 31, 2024, we received additional net proceeds of $31.04 million under our ATM Offering.
Current report
During the three months ended October 31, 2024, we issued 7,595,626 of the Company’s common stock under the ATM Offering for gross cash proceeds of $62.64 million. The total issuance costs were $1.41 million, all of which were related to compensation paid to the ATM Managers.
Current report
Subsequent to October 31, 2024, we issued 3,920,749 of the Company’s common stock under the ATM Offering for gross cash proceeds of $31.76 million. The total issuance costs were $0.71 million, all of which were related to compensation paid to the ATM Managers.
Current report
During the three months ended October 31, 2024, net cash provided by financing activities totaled $62.01 million, primarily from the net proceeds of $64.65 million from our ATM Offering, as well as the exercises of stock options and share purchase warrants, partially offset by payments of $2.64 million for tax withholding amounts related to RSU and PRSU shares. During the three months ended October 31, 2023, net cash provided by financing activities totaled $55.87 million, primarily from the net proceeds of $56.53 million from our ATM Offering and the exercises of stock options, partially offset by payments of $0.67 million for tax withholding amounts related to RSU and PRSU shares.
Current report
Related party transactions are based on the amounts agreed to by the parties. During the three months ended October 31, 2024 and 2023, the Company did not enter into any material contracts or undertake any significant commitment or obligation with any related parties.
Current report
Material Contractual Obligations and Commitments
Current report
As of October 31, 2024, we were committed to sell 600,000 pounds of uranium inventory in the amount of $49.75 million for delivery between November 2024 to January 2025.
Current report
Subsequent to October 31, 2024,
Current report
a) we received additional net cash proceeds of $31.04 million under our ATM Offering;
Current report
b) we sold 500,000 pounds of uranium inventory for $41.40 million at a weighted average price of $82.80 per pound; and
Current report
c) we entered into contracts to purchase 300,000 pounds of uranium inventory in the amount of $23.43 million at a weighted average price of $78.08 per pound with delivery in December 2024.
Removed paragraphs (22)
Previous report
On January 16, 2024, we announced restarting uranium extraction at our fully permitted, and past producing, Christensen Ranch Mine ISR operation in Wyoming. The first extraction is expected during August 2024 and will be funded with existing cash on the Company’s balance sheet.
Previous report
To enable a faster extraction restart, extensive preparations at the Christensen Ranch Mine wellfields and satellite processing plant were completed in 2023. This included the re-installation of equipment, re-attachment of piping and a variety of electrical testing, repairs and upgrades to the existing facilities. Since that time, additional work has progressed, including the hiring of additional operational personnel, preparation of a detailed wellfield startup plan, final preparations for plant and wellfield operations, and the installation of cased wells in two new wellfield header houses in Mine Unit 10 (Modules 10-7 and 10-8).
Previous report
On August 4, 2023, we acquired a portfolio of exploration-stage projects in the Athabasca Basin for CA$1.5 million from Rio Tinto Exploration Canada Inc., a subsidiary of Rio Tinto Inc. With this acquisition, we added an additional 44,444 acres of prospective ground in the Athabasca Basin to our existing portfolio.
Previous report
For the three and nine months ended April 30, 2024, we recorded sales and service revenue of $Nil and $224, and realized gross profit of $Nil and $37, respectively, from toll processing services. We did not sell purchased uranium inventory to date in Fiscal 2024. For the three and nine months ended April 30, 2023, we recorded sales and service revenue of $20,217 and $125,440 and realized gross profit of $6,219 and $34,647, respectively, from sales of purchased uranium inventory and toll processing services.
Previous report
We established our physical uranium program to purchase drummed uranium at prevailing spot prices which are below most global industry mining costs in Fiscal 2021 (the “Physical Uranium Program”). As of April 30, 2024, we have 1,000,000 pounds of uranium inventory purchase commitments outstanding for a total purchase price of $39,095. Various deliveries are scheduled to occur from Fiscal 2024 into Fiscal 2026 at a weighted average price of $39.10 per pound of uranium.
Previous report
During the three and nine months ended April 30, 2024, as part of our Physical Uranium Program, we purchased 995,000 pounds of uranium concentrates with a total cost of $57,003. As of April 30, 2024, the carrying value of our uranium concentrate inventories was $63,019 (July 31, 2023: $5,801).
Previous report
For the three and nine months ended April 30, 2024, we recorded revenue from toll processing services of $Nil and $224, respectively, which was generated from processing uranium resins.
Previous report
During the three and nine months ended April 30, 2024, property maintenance expenditures were primarily spent on the following projects:
Previous report
Other income (expenses)
Previous report
Subsequent to April 30, 2024, we received additional cash proceeds of $12,824 under our ATM Offerings.
Previous report
On November 26, 2021, we filed a prospectus supplement to our 2021 Shelf with respect to the continuation of the May 2021 ATM Offering Agreement with the 2021 ATM Managers under which we may, if eligible, from time to time, sell shares of our common stock having an aggregate offering price of up to an additional $100 million for a total of $200 million through the 2021 ATM Managers selected by us (the November 2021 ATM Offering; and, collectively with the May 2021 ATM Offering, the 2021 ATM Offering).
Previous report
During the three and nine months ended April 30, 2024, we issued 3,396,370 and 24,584,399 shares of the Company’s common stock under our ATM Offerings for net cash proceeds of $25,543 and $155,050, respectively.
Previous report
During the three and nine months ended April 30, 2024, we received cash proceeds totaling $3,771 and $4,508, respectively, from the exercise of share purchase warrants.
Previous report
During the three and nine months ended April 30, 2024, we received cash proceeds totaling $281 and $681, respectively, from the exercise of stock options.
Previous report
Subsequent to April 30, 2024, we issued a further 1,791,300 shares of the Company’s common stock under our ATM Offerings for net cash proceeds of $12,824.
Previous report
During the nine months ended April 30, 2024, net cash provided by financing activities totaled $159,292, comprised primarily of net proceeds from equity financings. During the nine months ended April 30, 2023, net cash provided by financing activities totaled $64,640, comprised primarily of net proceeds from equity financings.
Previous report
During the three and nine months ended April 30, 2024, we incurred $11 and $54, respectively, in exploration expenditures on behalf of JCU. As at April 30, 2024, the amount receivable from JCU totaled $3 (July 31, 2023: $201).
Previous report
During the three and nine months ended April 30, 2024, we incurred $2 and $27, respectively, and during the three and nine months ended April 30, 2023, we incurred $2 and $84, respectively, in general and administrative costs, paid to Blender Media Inc. (“Blender”), a company controlled by Arash Adnani, a direct family member of our President and Chief Executive Officer, for various services, including information technology, financial subscriptions, corporate branding, media, website design, maintenance and hosting, provided by Blender to the Company. As at April 30, 2024, the amount owing to Blender was $Nil (July 31, 2023: $Nil).
Previous report
Material Commitments
Previous report
Commitments for Management Services
Previous report
As at April 30, 2024, we were committed to paying our key executives a total of $1,065 per year for management services.
Previous report
Subsequent to April 30, 2024, we received additional cash proceeds of $12,824 under our ATM Offerings. In addition, 39,393 warrants with an expiry date of September 7, 2024 were exercised and proceeds of $93 were received.
Reworded paragraphs (37)
Previous wording
The following management’s discussion and analysis of the Company’s financial condition and results of operations (the“MD&A”) contain forward-looking statements that involve risks, uncertainties and assumptions including, among others, statements regarding our capital needs, business plans and expectations. * In evaluating these statements you should consider various factors, including the risks, uncertainties and assumptions set forth in reports and other documents we have filed with or furnished to the SEC and, including, without limitation, this Form 10-Q Quarterly Report for the nine months ended April 30, 2024, and our Form 10-K Annual Report for Fiscal 2023, including the consolidated financial statements and related notes contained therein.* * These factors, or any one of them, may cause our actual results or actions in the future to differ materially from any forward-looking statement made in this Quarterly Report.* * Refer to*“Cautionary Note Regarding*** *Forward-looking Statements” as disclosed in our Form 10-K Annual Report for Fiscal 2023, and Item 1A, Risk Factors, under Part II - Other Information, of this Quarterly Report.
Current wording
The following management’s discussion and analysis of the Company’s financial condition and results of operations (the“MD&A”) contain forward-looking statements that involve risks, uncertainties and assumptions including, among others, statements regarding our capital needs, business plans and expectations. * In evaluating these statements you should consider various factors, including the risks, uncertainties and assumptions set forth in reports and other documents we have filed with or furnished to the SEC and, including, without limitation, this Form 10-Q Quarterly Report for the three months ended October 31, 2024, and our Form 10-K Annual Report for Fiscal 2024, including the consolidated financial statements and related notes contained therein.* * These factors, or any one of them, may cause our actual results or actions in the future to differ materially from any forward-looking statement made in this Quarterly Report.* * Refer to*“Cautionary Note Regarding*** *Forward-looking Statements” as disclosed in our Form 10-K Annual Report for Fiscal 2024, and Item 1A, Risk Factors, under Part II - Other Information, of this Quarterly Report.
Previous wording
This MD&A is focused on material changes in our financial condition from July 31, 2023, our most recently completed year end, to April 30, 2024, and our results of operations for the three and nine months ended April 30, 2024, and should be read in conjunction with Item 7, Management’s Discussion and Analysis of Financial Condition and Results of Operations, as contained in our Form 10-K Annual Report for Fiscal 2023.
Current wording
This MD&A is focused on material changes in our financial condition from July 31, 2024, our most recently completed year end, to October 31, 2024, and our results of operations for the three months ended October 31, 2024, and should be read in conjunction with Item 7, Management’s Discussion and Analysis of Financial Condition and Results of Operations, as contained in our Form 10-K Annual Report for Fiscal 2024.
Previous wording
Uranium recovered from the Christensen Ranch Mine ISR Project will be processed at our Irigaray central processing plant (“CPP”). The Irigaray CPP is the hub central to our four fully permitted ISR projects located in the Powder River Basin of Wyoming, including our Christensen Ranch Mine, Reno Creek, Moore Ranch and Ludeman projects. An application to increase the licensed capacity of the Irigaray CPP from the 2.5 million pounds U 3 O 8 per year to 4.0 million pounds U 3 O 8 per year was submitted to the Wyoming Department of Environmental Quality in November 2023; and approval is expected later in 2024.
Current wording
Uranium recovered from the Christensen Ranch Mine ISR Project will be processed at our Irigaray central processing plant (“CPP”). The Irigaray CPP is the hub central to our four fully permitted ISR projects located in the Powder River Basin of Wyoming, including our Christensen Ranch Mine, Reno Creek, Moore Ranch and Ludemanp rojects. On October 16, 2024, we received approval from the Wyoming Department of Environmental Quality, Uranium Recovery Program, to increase the licensed production capacity at the Irigaray CPP to 4.0 million pounds of U 3 O 8 annually.
Previous wording
In Texas, our fully-licensed and 100% owned Hobson Processing Facility forms the basis for our regional operating strategy in the State of Texas, specifically the South Texas Uranium Belt where we utilize ISR mining. We utilize a “hub-and-spoke” strategy whereby the Hobson Processing Facility, which has a physical capacity to process uranium-loaded resins up to a total of two million pounds of U 3 O 8 annually and is licensed to process up to four million pounds of U 3 O 8 annually, acts as the central processing site (the “hub”) for our Palangana Mine, and future satellite uranium mining activities, such as our Burke Hollow and Goliad Projects, located within the South Texas Uranium Belt (the “spokes”).
Current wording
In Texas, our fully-licensed and 100% owned Hobson Processing Facility forms the basis for our regional operating strategy in the State of Texas, specifically the South Texas Uranium Belt, where we utilize ISR mining. We utilize a “hub-and-spoke” strategy whereby the Hobson Processing Facility, which has a physical capacity to process uranium-loaded resins of up to a total of two million pounds of U 3 O 8 annually and is licensed to process up to four million pounds of U 3 O 8 annually, acts as the central processing site (the “hub”) for our Palangana Mine, and future satellite uranium mining activities, such as our Burke Hollow and Goliad Projects, located within the South Texas Uranium Belt (the “spokes”).
Previous wording
With the completion of the acquisition of Uranium One Americas, Inc. in December 2021 (the “U1A Acquisition”), we expanded our footprints in Wyoming with our Wyoming hub-and-spoke operations. The acquisition of UEX in August 2022 and the acquisition of Roughrider Mineral Holdings Inc. in October 2022 further expanded our footprint in Canada and, in particular, the Athabasca Basin in Saskatchewan. In the meantime, we continue to establish additional uranium mines through exploration and pre-extraction activities and direct acquisitions in both the U.S. and Paraguay, all of which require us to manage numerous challenges, risks and uncertainties inherent in our business and operations as more fully described in Item 1A. Risk Factors herein.
Current wording
With the completion of the acquisition of Uranium One Americas, Inc. in December 2021 (the “U1A Acquisition”), we expanded our footprints in Wyoming with our Wyoming hub-and-spoke operations. The acquisition of UEX Corporation ("UEX") in August 2022 and the acquisition of Roughrider Mineral Holdings Inc. in October 2022 further expanded our footprints in Canada and, in particular, the Athabasca Basin in Saskatchewan. In the meantime, we continue to establish additional uranium mines through exploration and pre-extraction activities and direct acquisitions in both the U.S. and Paraguay, all of which require us to manage numerous challenges, risks and uncertainties inherent in our business and operations as more fully described in Item 1A. Risk Factors herein.
Previous wording
Our operations are capital intensive, and we will require significant additional financing to continue with our exploration and pre-extraction activities and acquire additional uranium projects. Historically, we have been reliant primarily on equity financings from the sale of our common stock in order to fund our operations. In the last two fiscal years, we have also relied on cash flows generated from the sales of our purchased uranium inventories under our physical uranium program to fund our operations, which resulted in $57.0 million in gross profits. However, we have yet to achieve consistent profitability or develop consistent positive cash flow from operations. Our reliance on equity and debt financings is expected to continue for the foreseeable future, and their availability whenever such additional financing is required will be dependent on many factors beyond our control including, but not limited to, the market price of uranium, the continuing public support of nuclear power as a viable source of electricity generation, the volatility in the global financial markets affecting our stock price and the status of the worldwide economy, any one of which may cause significant challenges in our ability to access additional financing, including access to the equity and credit markets. We may also be required to seek other forms of financing, such as asset divestitures or additional joint venture arrangements, to continue advancing our uranium projects which would depend entirely on finding a suitable third party willing to enter into such an arrangement, typically involving an assignment of a percentage interest in the mineral project. However, there is no assurance that we will be successful in securing any form of additional financing when required and on terms favorable to us. Our inability to obtain additional financing would have a negative impact on our operations, including delays, curtailment or abandonment of any one or all of our uranium projects.
Current wording
Our operations are capital intensive, and we will require significant additional financing to continue with our exploration, pre-extraction and extraction activities and acquire additional uranium projects. Historically, we have been reliant primarily on equity financings from the sale of our common stock to fund our operations. We have also relied on cash flows generated from the sales of our purchased uranium inventories under our physical uranium program to fund our operations. However, we have yet to achieve consistent profitability or develop consistent positive cash flow from operations. Our reliance on equity financings is expected to continue for the foreseeable future, and their availability whenever such additional financing is required will be dependent on many factors beyond our control including, but not limited to, the market price of uranium, the continuing public support of nuclear power as a viable source of electricity generation, the volatility in the global financial markets affecting our stock price and the status of the worldwide economy, any one of which may cause significant challenges in our ability to access additional financing, including access to the equity and credit markets. We may also be required to seek other forms of financing, such as asset divestitures or additional joint venture arrangements, to continue advancing our uranium projects which would depend entirely on finding a suitable third party willing to enter into such an arrangement, typically involving an assignment of a percentage interest in the mineral project. However, there is no assurance that we will be successful in securing any form of additional financing when required and on terms favorable to us. Our inability to obtain additional financing would have a negative impact on our operations, including delays, curtailment or abandonment of any one or all of our uranium projects.
Previous wording
The economic viability of our mining activities, including the expected duration and profitability of our ISR Mines, of any future satellite ISR mines, such as our Burke Hollow, Goliad, Ludeman, Antelope and Charlie Projects, and of our recently acquired traditional uranium mines in the Athabasca Basin in Saskatchewan, Canada, has many risks and uncertainties. These include, but are not limited to: (i) a significant, prolonged decrease in the market price of uranium; (ii) difficulty in marketing and/or selling uranium concentrates; (iii) significantly higher than expected capital costs to construct a mine and/or processing plant; (iv) significantly higher than expected extraction costs; (v) significantly lower than expected uranium extraction; (vi) significant delays, reductions or stoppages of uranium extraction activities; and (vii) the introduction of significantly more stringent regulatory laws and regulations. Our mining activities may change as a result of any one or more of these risks and uncertainties and there is no assurance that any ore body that we extract mineralized materials from will result in achieving and maintaining profitability and developing positive cash flow.
Current wording
The economic viability of our mining activities, including the expected duration and profitability of our ISR Mines, of any future satellite ISR mines, such as our Burke Hollow, Goliad, Ludeman, Antelope and Charlie Projects, and of our traditional uranium mines in the Athabasca Basin in Saskatchewan, Canada, has many risks and uncertainties. These include, but are not limited to: (i) a significant, prolonged decrease in the market price of uranium; (ii) difficulty in marketing and/or selling uranium concentrates; (iii) significantly higher than expected capital costs to construct a mine and/or processing plant; (iv) significantly higher than expected extraction costs; (v) significantly lower than expected uranium extraction; (vi) significant delays, reductions or stoppages of uranium extraction activities; and (vii) the introduction of significantly more stringent regulatory laws and regulations. Our mining activities may change as a result of any one or more of these risks and uncertainties and there is no assurance that any ore body that we extract mineralized materials from will result in achieving and maintaining profitability and developing positive cash flow.
Previous wording
The uranium market is currently being driven by a macro demand for more electricity generation and an unprecedented global push to decarbonize electrical grids, among other factors. There is noteworthy demand showing substantial growth is Artificial Intelligence and the electricity needed to power Data Centers. In the U.S. demand from this source, measured by power consumption, is expected to reach 35 GWe by 2030, up from 17 GWe in 2022 (Citi Data Center Demand and Nuclear Power: February 2024). There is a growing realization that the highly reliable, safe, baseload power nuclear energy provides should be a part of any clean energy platform. Governments around the globe are also pursuing strategies to increase energy independence for national security interests that dovetail well with nuclear power as a key component in their energy mix.
Current wording
The uranium market is currently being driven by a macro demand for more electricity generation, an unprecedented global push to decarbonize electrical grids and geopolitical situations, among other factors. New electricity demand projections outlined from the "US Data Center Power Outlook" report issued in July 2024 showed new data center demand growth ranging from 60 to 90 gigawatt (“GW”) between 2023 and 2030. There is a growing realization that the highly reliable, safe, baseload power nuclear energy provides should be a part of any clean energy platform. Governments around the globe are also pursuing strategies to increase energy independence for national security interests that dovetail well with nuclear power as a key component in their energy mix. In the U.S. the White House recently announced that “the United States will aim to deploy 200 GW of net new nuclear energy capacity by 2050, at least tripling current U.S. capacity. The net new capacity gains are anticipated to come from multiple sources, including building new nuclear power plants, uprating existing reactors, and restarting reactors that have retired for economic reasons.”
Previous wording
Over the past few years global uranium market fundamentals have improved as the market began a transition from being an inventory driven to a production driven market. The spot market bottomed out in November 2016 at about $17.75 per pound U 3 O 8, but has since shown appreciation, reaching $107.00 per pound U 3 O 8 on February 2, 2024. During the three and nine months ended April 30, 2024, uranium prices averaged $92.80 and $81.64 per pound U 3 O 8, respectively. As at April 30, 2024, the uranium price was $90.00 per pound, representing an approximate 67% increase from April 30, 2023 when the price was $53.85 per pound U 3 O 8. The period from February 2024 through April 2024 was marked by continued volatility as the price fluctuated between $85.00 and $107.00 per pound U 3 O 8 (All price information is sourced from UxC LLC Historical Ux Daily Prices).
Current wording
Over the past few years, global uranium market fundamentals have improved as the market began a transition from being an inventory driven to a production driven market. The spot market bottomed out in November 2016 at about $17.75 per pound U 3 O 8, but has since shown appreciation, reaching $107.00 per pound U 3 O 8 on February 2, 2024. During the three months ended October 31, 2024, uranium prices averaged $81.13 per pound U 3 O 8. As at October 31, 2024, the spot uranium price was $80.00 per pound U 3 O 8, representing an approximate 7.3% increase from October 31, 2023 when the price was $74.55 per pound U 3 O 8. The period from August 2024 through October 2024 was marked by continued spot price fluctuations between $85.00 and $78.00 per pound U 3 O 8 (all price information is sourced from UxC LLC Historical Ux Daily Prices).
Previous wording
Underinvestment in uranium mining operations over the past decade has been a major factor contributing to a structural deficit between global production and uranium requirements. Reduced production from existing uranium mines has also been a contributing factor with some large producers cutting back and or unable to reach previously planned production levels. In 2024 and 2025 the mid-case gap between production and requirements is projected to be more than 66 million pounds U 3 O 8, and by 2034 accumulates to a total above 400 million pounds U 3 O 8 (UxC 2024 Q1 Uranium Market Outlook). For context, the U.S. reactor fleet consumes about 45 million pounds U 3 O 8 per year (U.S. Energy Information Administration, June 13, 2023 - Uranium Marketing Annual Report). The current gap is being filled with secondary market sources, including finite inventory that has been declining and is projected to decline further in coming years. Secondary supply is also likely to be further reduced with western enrichers reversing operations from underfeeding to overfeeding that requires more uranium to increase the production of enrichment services. As secondary supplies continue to diminish, and as existing mines deplete resources, new production will be needed to meet existing and future utility demand. The timeline for new mining projects can be 10 years or longer and will require prices high enough to stimulate new mining investments.
Current wording
Underinvestment in uranium mining operations over the past decade has been a major factor contributing to a structural deficit between global production and uranium requirements. Reduced production from existing uranium mines has also been a contributing factor with some large producers cutting back and/or unable to reach previously planned production levels. In 2025, the mid-case gap between production and requirements is projected to be more than 58 million pounds of U 3 O 8, and by 2034 accumulates to a total above 355 million pounds of U 3 O 8 (UxC 2024 Q3 Uranium Market Outlook). For context, the U.S. utilities purchased 51.6 million pounds of U 3 O 8 in 2023 (U.S. Energy Information Administration, June 6, 2024 - Uranium Marketing Annual Report). The current gap is being filled with secondary market sources, including finite inventory that has been declining and is projected to decline further in coming years. Secondary supply is also likely to be further reduced with western enrichers reversing operations from underfeeding to overfeeding that requires more uranium to increase the production of enrichment services. As secondary supplies continue to diminish, and as existing mines deplete resources, new production will be needed to meet existing and future utility demand. The timeline for new mining projects can be 10 years or longer and will require prices high enough to stimulate new mining investments.
Previous wording
Since 2022, uranium supply has become more complicated due to Russia's invasion of Ukraine with its State Atomic Energy Corporation, Rosatom, being a significant supplier of nuclear fuel around the globe. Economic sanctions, transportation restrictions and recent U.S. legislation banning the importation of Russian nuclear fuel is causing a fundamental change to the nuclear fuel markets. Additionally, the 2023 coup in Niger, and the new government’s demand for the U.S. and France to vacate the country, has underscored jurisdictional risk with that country accounting for about 5% of global uranium production and about 25% of European Union supply in 2022 (World Nuclear Association - Uranium in Niger May 7, 2024 / Reuters – “Russian troops enter base housing US military in Niger, US official says” - May 3, 2024 and “Niger has not banned uranium exports to France and EU” - August 18, 2023). U.S. and European utilities are shifting more focus to security of supply with production from areas of low geopolitical risk.
Current wording
Since 2022, uranium supply has become more complicated due to Russia's invasion of Ukraine with its State Atomic Energy Corporation, Rosatom, being a significant supplier of nuclear fuel around the globe. Economic sanctions, transportation restrictions and U.S. legislation banning the importation of Russian nuclear fuel is causing a fundamental change to the nuclear fuel markets. The situation has been compounded with a November 15, 2024 announcement from the Russian government stating they have placed “temporary restrictions on the export of enriched uranium to the United States". Additionally, the 2023 coup in Niger, and the new government’s demand for the U.S. and France to vacate the country, as well as the revocation of Canadian and French companies mining rights, operating permits and export capabilities, has underscored jurisdictional risk. Niger is the world's seventh largest producer and accounted for about 5% of global uranium production and about 14% of European Union supply in 2023 (Euratom Supply Agency, World Nuclear Association - Uranium in Niger July 23, 2024, World Nuclear News). As a result of the instability and assurance of supply risks, U.S. and European utilities are shifting more focus to production from areas of low geopolitical risk.
Previous wording
On the demand side of the equation, the global nuclear energy industry continues robust growth, with 70 new reactors connected to the grid from 2014 through April of 2024, and with another 59 reactors under construction. So far in 2024, four new reactors have been connected to the grid, and one reactor has been permanently shut down (International Atomic Energy Association Power Reactor Information System - May 28, 2024). Total nuclear generating capacity for the world’s 440 operable reactors as of May 7, 2024 stands at 396 GWe (World Nuclear Association). At COP28 United Nations Climate Change Conference, 22 countries, including the U.S., Canada, France, Japan and the United Kingdom, signed a declaration to triple nuclear energy by 2050, further supporting additional growth for the nuclear industry and uranium demand.
Current wording
On the demand side of the equation, the global nuclear energy industry continues robust growth, with 69 new reactors connected to the grid in 2014 through October of 2024, and with another 66 reactors under construction. Thus far in 2024, four new reactors have been connected to the grid and two reactors have been permanently shut down (International Atomic Energy Association Power Reactor Information System - November 14, 2024). Total nuclear generating capacity for the world’s 439 operable reactors as of November 4, 2024, stands at 396 GWe (World Nuclear Association). At the COP29 United Nations Climate Change Conference, 6 more countries joined the pledge to triple their nuclear capacity by 2050, bringing the total to 31 countries, further supporting additional growth for the nuclear industry and uranium demand.
Previous wording
In the U.S., H.R. 1042, “The Prohibiting Russian Uranium Imports Act” was signed into law on May 13, 2024, goes into effect on August 11, 2024 and extends through 2040. The legislation bans Russian uranium imports but allows a U.S. Department of Energy (“DOE”) waiver process through 2027 in the event no alternative viable source of low-enriched uranium (“LEU”) is available to: (i) sustain the continued operation of a nuclear reactor or a U.S. nuclear energy company; or (ii) importation of Russian LEU is determined to be in the national interest. In a separate but related action, “The Nuclear Fuel Security Act” (“NFSA”) was enacted as part of the “National Defense Authorization Act” in December of 2023 and was designed to help rebuild the domestic nuclear fuel cycle, including uranium production, conversion and enrichment. The passage of H.R. 1042 unlocks $2.7 billion in funding under the NFSA and will be used by the DOE to acquire LEU and High Assay Low Enriched Uranium (“HALEU”) for advanced reactors. Under this program DOE will acquire LEU and HALEU with priority given to domestic sources of produced uranium, conversion and enrichment. In combination, the passage of these bills will help rebuild and restore a robust domestic fuel cycle in the U.S.
Current wording
In the U.S., H.R. 1042,The Prohibiting Russian Uranium Imports Act, was signed into law and went into effect on August 11, 2024 and extends through 2040. The legislation bans Russian uranium imports but allows a U.S. DOE waiver process through 2027 in the event no alternative viable source of low-enriched uranium (“LEU”) is available to: (i) sustain the continued operation of a nuclear reactor or a U.S. nuclear energy company; or (ii) importation of Russian LEU is determined to be in the national interest. However, the waiver process will be moot if Russia follows through on their recent announcement to suspend exports of enriched uranium to the U.S. In other U.S. legislation,The Nuclear Fuel Security Act (“NFSA”) was enacted as part of theNational Defense Authorization Act in December of 2023 and was designed to help rebuild the domestic nuclear fuel cycle, including uranium production, conversion and enrichment. The passage of H.R. 1042 unlocks $3.4 billion in funding under the NFSA and will be used by the DOE to acquire LEU and High Assay Low Enriched Uranium (“HALEU”) for advanced reactors. Under this program DOE will acquire LEU and HALEU with priority given to domestic sources of produced uranium, conversion and enrichment. In combination, the passage of these bills will help rebuild and restore a robust domestic fuel cycle in the U.S.
Previous wording
Additional upside market pressure is also occurring as utilities continue their return to a longer-term contracting cycle to replace expiring contracts. Cumulative uncommitted demand through 2034 totals approximately 926 million pounds U 3 O 8 (UxC Uranium Market Overview Q1 2024). Increasing demand is also evident from financial entities and various producers continuing to purchase significant quantities of drummed uranium inventory, further removing near term supply and adding to the strong fundamentals supporting the uranium market.
Current wording
Additional upside market pressure is also occurring as utilities continue their return to a longer-term contracting cycle to replace expiring contracts. Cumulative uncommitted demand through 2034 is more than 865 million pounds of U 3 O 8 (UxC Uranium Market Overview Q3 2024). This utility demand, along with that from financial entities, government programs and various producers, as well as the increasing interest in nuclear energy for data centers, are adding to the strong fundamentals supporting the uranium market.
Previous wording
For the three and nine months ended April 30, 2024, we recorded a net loss of $19,677 ($0.05 per share) and $14,106 ($0.04 per share), and losses from operations of $13,841 and $37,345, respectively. During the three and nine months ended April 30, 2023, we recorded net loss of $10,960 ($0.03 per share) and $3,824 ($0.01 per share) and loss from operations of $3,484 and income from operations of $5,197, respectively.
Current wording
For the three months ended October 31, 2024, we recorded a net loss of $20.16 million ($0.05 per share) and loss from operations of $13.20 million. During the three months ended October 31, 2023, we recorded net income of $3.32 million ($0.01 per share) and loss from operations of $11.39 million.
Previous wording
While we remain in a state of operational readiness, uranium extraction expenditures incurred at our ISR Mines, which are directly related to regulatory/mine permit compliance, lease maintenance obligations and maintaining a necessary labor force, are being charged to our consolidated statement of operations.
Current wording
While we have commenced uranium extraction at Christensen Ranch in August 2024, we are still ramping up our mining activities during the three months ended October 31, 2024. We expect the ramp-up phase will continue while new production areas are being constructed and completing in early 2025. The rest of our uranium projects are expected to remain in a state of operational readiness and the relevant expenditures, which are directly related to regulatory/mine permit compliance, lease maintenance obligations and maintaining a necessary labor force, are being charged to our consolidated statement of operations.
Previous wording
During the three and nine months ended April 30, 2024, exploration expenditures, such as drilling and preliminary economic assessments, were primarily spent on the following projects:
Current wording
During the three months ended October 31, 2024, exploration expenditures, such as drilling and preliminary economic assessments, were primarily spent on the following projects:
Previous wording
During the three and nine months ended April 30, 2024, extraction readiness expenditures were primarily spent on the following projects:
Current wording
During the three months ended October 31, 2024, extraction readiness expenditures were primarily spent on the following projects:
Previous wording
During the three and nine months ended April 30, 2024, general and administrative expenses (“G&A”) totaled $4,219 and $14,314, respectively, compared to $3,745 and $14,296 for the three and nine months ended April 30, 2023. G&A expenses were comprised of the following:
Current wording
General and Administrative expenses were comprised of the following:
Previous wording
During the three and nine months ended April 30, 2024 and 2023, we recorded a gain on dilution of ownership interest in URC as a result of URC issuing more shares from its equity financing and exercises of warrants and/or stock options. On October 17, 2023 and February 9, 2024, we participated in URC’s equity financings, which increased our ownership in URC from 15,000,000 shares to 16,930,750 shares and to 17,978,364 shares, respectively. As at April 30, 2024, we had a 14.9% of equity interest in URC compared to 14.9% as at July 31, 2023.
Current wording
During the three months ended October 31, 2024 and 2023, we recorded a gain on dilution of ownership interest in URC as a result of URC issuing more shares from its equity financing and exercises of warrants and/or stock options. As at October 31, 2024, we had a 14.4% equity interest in URC compared to a 14.8% equity interest as at July 31, 2024.
Previous wording
During the three and nine months ended April 30, 2024, we recorded a share of URC’s income of $520 and $2,397, respectively. During the three and nine months ended April 30, 2024, we also recorded a share of JCU’s losses of $416 and $1,072, respectively.
Current wording
During the three months ended October 31, 2024, we recorded a share of URC’s loss of $0.06 million (three months ended October 31, 2023: income of $1.32 million) and a share of JCU’s loss of $0.42 million (three months ended October 31, 2023: $0.28 million).
Previous wording
As at April 30, 2024, our investments in certain equity securities were revalued using the market values at period end, which resulted in an unrealized loss of $13,804 and gain of $23,585 on revaluation of equity securities, respectively, for the three and nine months ended April 30, 2024.
Current wording
As at October 31, 2024, our investments in certain equity securities were revalued using the market values at period end, which resulted in a fair value loss of $10.35 million on revaluation of equity securities for the three months ended October 31, 2024 (three months ended October 31, 2023: gain of $17.31 million).
Previous wording
In connection with the UEX Acquisition, we issued Replacement Warrants, which are accounted for as derivative liabilities as the exercise prices of the UEX warrants are denominated in Canadian dollars which differs from the functional currency of the Company. As at April 30, 2024, the Replacement Warrants were revalued, which resulted in a gain of $2,071 and a loss of $9,892, respectively, for the three and nine months ended April 30, 2024. Changes in fair value of derivative liabilities were primarily due to changes in our share price. During the three and nine months ended April 30, 2023, we recorded a gain on revaluation of derivative liabilities of $5,550 and $4,651, respectively.
Current wording
In connection with the UEX Acquisition, we issued Replacement Warrants, which are accounted for as derivative liabilities as the exercise prices of the UEX warrants were denominated in Canadian dollars which differs from the functional currency of the Company. As at October 31, 2024, the Replacement Warrants that had not been exercised expired. A gain of $1.71 million on revaluation of derivative liabilities was recorded for the three months ended October 31, 2024 due to the decrease in time value of the Replacement Warrants as they expired in the quarter. During the three months ended October 31, 2023, we recorded a loss on revaluation of derivative liabilities of $6.90 million primarily due to changes in our share price.
Previous wording
During the nine months ended April 30, 2024, we received net proceeds of $160,239 from our ATM Offerings and from exercises of stock options and share purchase warrants.
Current wording
During the three months ended October 31, 2024, we received net proceeds of $64.65 million (three months ended October 31, 2023: $56.53 million) from our ATM Offering and from exercises of stock options and share purchase warrants.
Previous wording
We have a history of operating losses resulting in an accumulated deficit balance since inception. We recorded net losses in Fiscal 2023 and in all prior years, and we had an accumulated deficit balance of $303,786 as at April 30, 2024. Furthermore, we may not achieve and maintain profitability or develop positive cash flow from our operations in the near term.
Current wording
We have a history of operating losses resulting in an accumulated deficit balance since inception. We had an accumulated deficit balance of $339.06 million as at October 31, 2024. Furthermore, we may not achieve and maintain profitability or develop positive cash flow from our operations in the near term.
Previous wording
Historically, we have been reliant primarily on equity financings from the sale of our common stock and on debt financing in order to fund our operations. We have yet to achieve consistent profitability or develop consistent positive cash flow from operations. Currently, we also rely on cash flows generated from the sales of our purchased uranium concentrates to fund our operations. Our reliance on equity and debt financings is expected to continue for the foreseeable future, and their availability whenever such additional financing is required will be dependent on many factors beyond our control and including, but not limited to, the market price of uranium, the continuing public support of nuclear power as a viable source of electricity generation, the volatility in the global financial markets affecting our stock price and the status of the worldwide economy, any one of which may cause significant challenges in our ability to access additional financing, including access to the equity and credit markets. We may also be required to seek other forms of financing, such as asset divestitures or joint venture arrangements, to continue advancing our uranium projects which would depend entirely on finding a suitable third party willing to enter into such an arrangement, typically involving an assignment of a percentage interest in the mineral project. However, there is no assurance that we will be successful in securing any form of additional financing when required and on terms favorable to us.
Current wording
Historically, we have been reliant primarily on equity financings from the sale of our common stock and on debt financing in order to fund our operations. We have yet to achieve consistent profitability or develop consistent positive cash flow from operations. Currently, we also rely on cash flows generated from the sales of our purchased uranium concentrates to fund our operations. Our reliance on equity is expected to continue for the foreseeable future, and their availability whenever such additional financing is required will be dependent on many factors beyond our control and including, but not limited to, the market price of uranium, the continuing public support of nuclear power as a viable source of electricity generation, the volatility in the global financial markets affecting our stock price and the status of the worldwide economy, any one of which may cause significant challenges in our ability to access additional financing, including access to the equity and credit markets. We may also be required to seek other forms of financing, such as asset divestitures or joint venture arrangements, to continue advancing our uranium projects which would depend entirely on finding a suitable third party willing to enter into such an arrangement, typically involving an assignment of a percentage interest in the mineral project. However, there is no assurance that we will be successful in securing any form of additional financing when required and on terms favorable to us.
Previous wording
Our operations are capital intensive and future capital expenditures are expected to be substantial. We will require significant additional financing to fund our operations, including continuing with our exploration and pre-extraction activities and acquiring additional uranium projects. In the absence of such additional financing, we would not be able to fund our operations, including continuing with our exploration and pre-extraction activities, which may result in delays, curtailment or abandonment of any one or all of our uranium projects.
Current wording
Our operations are capital intensive and future capital expenditures are expected to be substantial. We will require significant additional financing to fund our operations, including continuing with our exploration, pre-extraction and extraction activities and acquiring additional uranium projects. In the absence of such additional financing, we would not be able to fund our operations, including continuing with our exploration, pre-extraction and extraction activities, which may result in delays, curtailment or abandonment of any one or all of our uranium projects.
Previous wording
We hold mineral rights in the States of Arizona, New Mexico, Texas and Wyoming, in Canada and in the Republic of Paraguay, with annual land-related payments totaling $4.8 million to maintain these rights in good standing.
Current wording
We hold mineral rights in the States of Arizona, New Mexico, Texas and Wyoming, in Canada and in the Republic of Paraguay, with annual land-related payments totaling $5.93 million to maintain these rights in good standing.
Previous wording
Our anticipated operations, including exploration and pre-extraction activities, however, will be dependent on and may change as a result of our financial position, the market price of uranium and other considerations, and such changes may include accelerating the pace or broadening the scope of reducing our operations. Our ability to secure adequate funding for these activities will be impacted by our operating performance, other uses of cash, the market price of uranium, the market price of our common stock and other factors which may be beyond our control. Specific examples of such factors include, but are not limited to:
Current wording
Our anticipated operations, including exploration, pre-extraction and extraction activities, however, will be dependent on and may change as a result of our financial position, the market price of uranium and other considerations, and such changes may include accelerating the pace or broadening the scope of reducing our operations. Our ability to secure adequate funding for these activities will be impacted by our operating performance, other uses of cash, the market price of uranium, the market price of our common stock and other factors which may be beyond our control. Specific examples of such factors include, but are not limited to:
Previous wording
We believe our existing cash resources and, if necessary, cash generated from the sale of the Company’s liquid assets, will provide sufficient funds to carry out our planned operations for 12 months from the date that this Quarterly Report is issued. Our continuation as a going concern for a period beyond those 12 months will be dependent upon our ability to generate cash flow from the sales of our uranium inventories under our Physical Uranium Program and to obtain adequate additional financing, as our operations are capital intensive and future capital expenditures are expected to be substantial.
Current wording
We believe our existing cash resources and net proceeds of $31.04 million received from the issuance of common stock under the ATM Offering subsequent to October 31, 2024, and if necessary, cash generated from the sale of the Company’s liquid assets, will provide sufficient funds to carry out our planned operations for 12 months from the date that this Quarterly Report is issued. Our continuation as a going concern for a period beyond those 12 months will be dependent upon our ability to generate cash flow from the sales of our uranium inventories under our Physical Uranium Program and to obtain adequate additional financing, as our operations are capital intensive and future capital expenditures are expected to be substantial.
Previous wording
Our long-term success, including the recoverability of the carrying values of our assets and our ability to acquire additional uranium projects and continue with exploration and pre-extraction activities and mining activities on our existing uranium projects, will depend ultimately on our ability to achieve and maintain profitability and positive cash flow from our operations by establishing ore bodies that contain commercially recoverable uranium and to develop these into profitable mining activities.
Current wording
Our long-term success, including the recoverability of the carrying values of our assets and our ability to acquire additional uranium projects and continue with exploration, pre-extraction, extraction and mining activities on our existing uranium projects, will depend ultimately on our ability to achieve and maintain profitability and positive cash flow from our operations by establishing ore bodies that contain commercially recoverable uranium and to develop these into profitable mining activities.
Previous wording
On November 16, 2022, we filed a Form S-3 automatic shelf registration statement under the Securities Act, which became effective upon filing, providing for the public offer and sale of certain securities of the Company from time to time, at our discretion, of an undetermined dollar value of common stock, debt securities, warrants to purchase common stock or debt securities, subscription receipts for and units which include common stock, debt securities, warrants or any combination thereof (the 2022 Shelf), which included an at-the-market offering agreement prospectus (the 2022 ATM Offering; and, collectively, with the 2021 ATM Offering, the ATM Offerings) covering the offering, issuance and sale of up to a maximum offering of $300 million under the 2022 Shelf.
Current wording
On November 16, 2022, we filed a Form S-3 automatic shelf registration statement under the Securities Act, which became effective upon filing, providing for the public offer and sale of certain securities of the Company from time to time, at our discretion, of an undetermined dollar value of common stock, debt securities, warrants to purchase common stock or debt securities, subscription receipts for and units which include common stock, debt securities, warrants or any combination thereof (the 2022 Shelf), which included an at-the-market offering agreement prospectus (the ATM Offering) covering the offering, issuance and sale of up to a maximum offering of $300 million under the 2022 Shelf.
Previous wording
On May 14, 2021, we entered into an at-the-market offering agreement (the 2021 ATM Offering Agreement) with H.C. Wainwright & Co., LLC and certain co-managers (collectively, the 2021 ATM Manager) as set forth in the 2021 ATM Offering Agreement under which we may, from time to time, sell shares of our common stock having an aggregate offering price of up to $100 million through the 2021 ATM Managers selected by us.
Current wording
On November 16, 2022, we also entered into an at-the-market offering agreement (the ATM Offering Agreement) with H.C. Wainwright & Co., LLC and certain co-managers (collectively, the ATM Manager) as set forth in the ATM Offering Agreement under which we may, from time to time, sell shares of our common stock having an aggregate offering price of up to $300 million through the ATM Managers selected by us.
Previous wording
During the nine months ended April 30, 2024, net cash used in operating activities was $93,871, of which $57,179 was from the purchases of uranium concentrate inventory. During the nine months ended April 30, 2023, net cash provided by operating activities was $43,778, of which $39,933 was for the change in uranium concentrate inventory. Other significant operating expenditures included mineral property expenditures and G&A expenses.
Current wording
During the three months ended October 31, 2024, net cash used in operating activities totaled to $11.45 million, which was primarily related to mineral property expenditures incurred in this quarter of $13.51 million, general and administrative expenses of $5.34 million and change in operating assets and liabilities, partially offset by a gross profit from sale of purchased uranium inventory of $6.25 million. During the three months ended October 31, 2023, net cash used in operating activities was $45.73 million, of which $36.73 million was for the change in uranium concentrate inventory.
Previous wording
During the nine months ended April 30, 2024, net cash used in investing activities totaled $23,282, comprised of cash used in the acquisition of the Henday, Milliken and Carswell Projects of $1,334, a capital contribution to JCU of $2,388, cash used to purchase an additional interest in URC of $9,238, cash used in investment in equity securities of $12,115, proceeds from sale of equity securities of $3,008 and cash used for investment in mineral properties and the purchase of equipment of $2,557. During the nine months ended April 30, 2023, net cash used in investing activities totaled $123,333, comprised of cash used in the Roughrider Acquisition of $82,117, a capital contribution to JCU of $595, cash used in investment in equity securities of $42,219, cash used for investment in mineral properties and the purchase of equipment of $388 and net cash of $1,984 received from the UEX Acquisition.
Current wording
During the three months ended October 31, 2024, net cash provided by investing activities totaled $52.51 million, comprised of proceeds from the sale of equity securities of $54.37 million, cash used for the capital contribution to JCU of $0.54 million and investment in mineral properties and the purchase of equipment for a total of $1.33 million. During the three months ended October 31, 2023, net cash used in investing activities totaled $5.48 million, comprised of cash used for the capital contribution to JCU of $0.65 million, investment in equity securities of $0.81 million, additional investment in URC of $5.68 million, and cash from the sale of equity securities of $3.43 million.
Previous wording
As of April 30, 2024, we had in-the-money stock options outstanding representing 6,249,671 shares at a weighted-average exercise price of $2.07 per share, and in-the-money share purchase warrants outstanding representing 2,404,116 shares at a weighted-average exercise price of $3.38 per share. As of April 30, 2024, outstanding in-the-money stock options and warrants represented a total 8,653,787 shares issuable for gross proceeds of approximately $21.1 million should these stock options and warrants be exercised in full on a cash basis. The exercise of stock options and warrants is at the discretion of their respective holders and, accordingly, there is no assurance that any of the stock options or warrants will be exercised in the future.
Current wording
As of October 31, 2024, we had in-the-money stock options outstanding representing 4,932,317 shares at a weighted-average exercise price of $2.66 per share, and in-the-money share purchase warrants outstanding representing 159,091 shares at a weighted-average exercise price of $4.13 per share. As of October 31, 2024, outstanding in-the-money stock options and warrants represented a total 5,091,408 shares issuable for gross proceeds of approximately $13.8 million should these stock options and warrants be exercised in full on a cash basis. The exercise of stock options and warrants is at the discretion of their respective holders and, accordingly, there is no assurance that any of the stock options or warrants will be exercised in the future.
Previous wording
As of April 30, 2024, we were renting or leasing office premises in the States of Texas, Arizona and Wyoming, British Columbia and Saskatchewan, Canada, and Paraguay, for total monthly payments of $34. Office lease agreements for the U.S. and Canada expire between July 2026 and November 2029.
Current wording
As of October 31, 2024, we were renting or leasing office premises in the States of Texas, Arizona and Wyoming, British Columbia and Saskatchewan, Canada, and Paraguay, for total monthly payments of $0.04 million. Office lease agreements for the U.S. and Canada expire between July 2026 and November 2029.
Rearranged previous paragraphs (4)
Previous report — wording carried elsewhere
Gain (Loss) on Revaluation of Equity Securities
Previous report — wording carried elsewhere
The following summary provides a discussion of the major categories of other income (expenses) including analyses of the factors that caused significant variances compared to the same period last year:
Previous report — wording carried elsewhere
On May 17, 2021, we filed a Form S-3 shelf registration statement under the Securities Act which was declared effective by the SEC on June 1, 2021, providing for the public offer and sale of certain securities of the Company from time to time, at our discretion, of up to an aggregate offering amount of $200 million (the 2021 Shelf), which included an at-the-market offering agreement prospectus (the May 2021 ATM Offering) covering the offering, issuance and sale of up to a maximum offering of $100 million as part of the $200 million under the 2021 Shelf.
Previous report — wording carried elsewhere
On November 16, 2022, we entered into an at-the-market offering agreement (the 2022 ATM Offering Agreement) with H.C. Wainwright & Co., LLC and certain co-managers (collectively, the 2022 ATM Managers) as set forth in the 2022 ATM Offering Agreement under which we may, from time to time, sell shares of our common stock having an aggregate offering price of up to $300 million through the 2022 ATM Managers selected by us.