Skip to main content

FOX FACTORY HOLDING CORP

For the period ended Jun 28, 2024. Filed Aug 2, 2024.

View on SEC.gov

About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Jun 28, 2024 · Filed Aug 2, 2024

FOXF$17.80+5.2%Stored close · as of Nov 6, 2026

What changed in Risk Factors?

Read the current filing

Previous report: 10-Q

Period ended 2024-03-29; filed 2024-05-03.

0001424929-24-000057

Item 1A. Risk Factors

Current report: 10-Q

Period ended 2024-06-28; filed 2024-08-02.

0001424929-24-000109

Item 1A. Risk Factors

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 5 previous paragraphs and 5 current paragraphs.

4 unchanged; 1 reworded; 0 added; 0 removed; 0 previous and 0 current paragraphs rearranged.

Tables are not compared: 0 previous and 0 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Reworded paragraphs (1)

Previous wording

A portion of our goods move through ports on the coasts of the U.S. We have a global supply chain, and we import products from our third-party vendors and our Fox Taiwan facility into the U.S. largely through these ports. Dockworkers, none of whom are our employees, must offload freight from ships arriving at these ports. We do not control the activities of these employees or seaports, and we could suffer supply chain disruptions due to any disputes, capacity shortages, slowdowns, or shutdowns that may occur, as was experienced in February 2015, in relation to certain ports on the West Coast of the U.S. The 2015 strike lasted longer than we forecasted, and any similar labor dispute in the future or any slowdown or stoppage relating to the ongoing labor agreement negotiations could potentially have a negative effect on both our financial condition and results of operations. Additionally, the Baltimore Francis Scott Key bridge accident in March 2024 leading to the suspension of activity in the Port of Baltimore caused rerouting of shipping vessels, which may create congestion and delays in other ports, including certain East Coast ports through which we import products, increase fuel costs for shipping, and have long-standing impacts on supply chains in the retail and manufacturing industries. Furthermore, the ongoing effects of the COVID-19 pandemic increased uncertainty for global supply chains, as port congestion and shipping container shortages have become exacerbated, which could adversely affect our operating results.

Current wording

A portion of our goods move through ports on the coasts of the U.S. We have a global supply chain, and we import products from our third-party vendors and our Fox Taiwan facility into the U.S. largely through these ports. Dockworkers, none of whom are our employees, must offload freight from ships arriving at these ports. We do not control the activities of these employees or seaports, and we could suffer supply chain disruptions due to any disputes, capacity shortages, slowdowns, or shutdowns that may occur, as was experienced in February 2015, in relation to certain ports on the West Coast of the U.S. The 2015 strike lasted longer than we forecasted, and any similar labor dispute in the future or any slowdown or stoppage relating to the ongoing labor agreement negotiations could potentially have a negative effect on both our financial condition and results of operations. Additionally, the Baltimore Francis Scott Key bridge accident in March 2024 leading to the suspension of activity in the Port of Baltimore caused rerouting of shipping vessels, which may create congestion and delays in other ports, including certain East Coast ports through which we import products, increase fuel costs for shipping, and have long-standing impacts on supply chains in the retail and manufacturing industries. While the Port of Baltimore opened up to maritime traffic on June 10, 2024, the bridge that is not expected to be rebuilt until late 2028 and further work to clear out wreckage and continue maintenance of the port may continue to cause delays in the Port of Baltimore and other East Coast ports where activities are rerouted. Furthermore, the ongoing effects of the COVID-19 pandemic increased uncertainty for global supply chains, as port congestion and shipping container shortages have become exacerbated, which could adversely affect our operating results.