Skip to main content

RARE ELEMENT RESOURCES LTD

For the period ended Jun 30, 2024. Filed Aug 7, 2024.

View on SEC.gov

About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Jun 30, 2024 · Filed Aug 7, 2024

REEMFStored price and day change unavailable

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-Q

Period ended 2024-03-31; filed 2024-05-08.

0001419806-24-000010

ITEM 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

Current report: 10-Q

Period ended 2024-06-30; filed 2024-08-07.

0001419806-24-000015

ITEM 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 38 previous paragraphs and 38 current paragraphs.

18 unchanged; 15 reworded; 4 added; 3 removed; 2 previous and 1 current paragraphs rearranged.

Tables are not compared: 0 previous and 0 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (4)

Current report

Since inception, the General Atomics-led consortium has seen increases in the Demonstration Plant project costs, including expected final equipment costs, due to, among other factors, inflation. As a result of these cost pressures, General Atomics, on behalf of the consortium, has recently submitted to the DoE an updated Demonstration Plant construction and operations budget of approximately $53,600, which is approximately 21% higher than the original budget of approximately $43,800. The DoE has been asked to support the growth in this budget increase on the same 50% cost-share basis as previously agreed in the Cooperative Agreement. Irrespective of the DoE’s decision, the Company is prepared to cover the cost increases to ensure the Demonstration Plant can operate for a sufficient amount of time expected necessary for a commercialization decision.

Current report

Our corporate administrative costs remained relatively constant at $623 and $613 for the three months ended June 30, 2024, and 2023, respectively, and $1,322 and $1,355 for the six months ended June 30, 2024 and 2023, respectively. The majority of these expenses are associated with our costs of being a public company.

Current report

Net cash used in investing activities of $52 and $4 for the six months ended June 30, 2024 and 2023, respectively, resulted from the purchase and sale of equipment during each period.

Current report

Due to inflationary cost pressures on labor, equipment, and consumables, as well as cost increases associated with certain optimized plant engineering and design parameters, General Atomics, on behalf of the consortium, has recently submitted to the DoE an updated Demonstration Plant construction and operations budget of approximately $53,600, which is approximately 21% higher than the original budget of approximately $43,800. The DoE has been asked to support the growth in this budget increase on the same 50% cost-share basis as previously agreed in the Cooperative Agreement. Irrespective of the DoE’s decision, the Company is prepared to cover the cost increases to ensure the Demonstration Plant can operate for a sufficient amount of time to gather the information necessary for a commercialization decision. The additional funding for this revised budget and contingency for additional budget adjustments, if necessary, that are not covered by the DoE would come from the proceeds generated by the 2024 Rights Offering. Through June 30, 2024, the Company had advanced funds totaling $24,200 for costs related to the Demonstration Plant.
Removed paragraphs (3)

Previous report

Our corporate administrative costs decreased by $43 over the comparative three-month period, falling from $742 for the three months ended March 31, 2023 to $699 for the three months ended March 31, 2024. This decrease was largely driven by the decrease in our stock-based compensation of $154 over the comparative three-month period, partially offset by an increase in consulting fees.

Previous report

Net cash provided by investing activities of $12 for the three months ended March 31, 2023 resulted from a $12 sale of non-essential equipment. There were no similar transactions during the three months ended March 31, 2024.

Previous report

Inclusive of amounts already advanced of $17,700 through March 31, 2024, the Company’s share of the total costs under the Cost Share Agreement are expected to exceed $22,000 over the life of the Demonstration Plant project. As a result, the project team has commenced discussions with the DoE and other government agencies regarding further cost-sharing opportunities to offset the increase in the anticipated project cost and further project objectives.
Reworded paragraphs (15)

Previous wording

The following management’s discussion and analysis of the consolidated financial results and condition of Rare Element Resources Ltd. (collectively, “we,” “us,” “our,” “Rare Element” or the “Company”) for the three months ended March 31, 2024, has been prepared based on information available to us as of May 8, 2024. This discussion should be read in conjunction with the unaudited Condensed Consolidated Financial Statements and notes thereto included herewith and the audited Consolidated Financial Statements of Rare Element for the year ended December 31, 2023, and the related notes thereto filed with our Annual Report on Form 10-K, which have been prepared in accordance with U.S. GAAP. This discussion and analysis contains forward-looking statements that involve risks, uncertainties, and assumptions. Our actual results, performance, or achievements may differ materially from those anticipated in these forward-looking statements as a result of many factors, including, but not limited to, those set forth elsewhere in this report. See “Cautionary Note Regarding Forward-Looking Statements.”

Current wording

The following management’s discussion and analysis of the consolidated financial results and condition of Rare Element Resources Ltd. (collectively, “we,” “us,” “our,” “Rare Element” or the “Company”) for the three and six months ended June 30, 2024, has been prepared based on information available to us as of August 7, 2024. This discussion should be read in conjunction with the unaudited Condensed Consolidated Financial Statements and notes thereto included herewith and the audited Consolidated Financial Statements of Rare Element for the year ended December 31, 2023, and the related notes thereto filed with our Annual Report on Form 10-K, which have been prepared in accordance with U.S. GAAP. This discussion and analysis contains forward-looking statements that involve risks, uncertainties, and assumptions. Our actual results, performance, or achievements may differ materially from those anticipated in these forward-looking statements as a result of many factors, including, but not limited to, those set forth elsewhere in this report. See “Cautionary Note Regarding Forward-Looking Statements.”

Previous wording

Our primary focus has been and continues to be the engineering, permitting, licensing, construction, and operation of the Demonstration Plant. If successful, this Demonstration Plant will show that our propriety extraction technology is able to process and separate certain REEs from high grade sample materials extracted from our Bear Lodge REE Project in a more efficient and economical manner than traditional processing methods and will serve as a precursor to inform the design and estimated cost for a future full-scale production facility.

Current wording

Our primary focus has been and continues to be the engineering, permitting, licensing, construction, and operation of the Demonstration Plant. If successful, this Demonstration Plant will show that our propriety extraction technology is able to process and separate certain REEs from high grade sample materials extracted from our Bear Lodge REE Project in a more efficient and economical manner than traditional REE processing methods and will serve as a precursor to inform the design and estimated cost for a future full-scale production facility.

Previous wording

During 2024, the Company, along with the other consortium members, continued their work on the Demonstration Plant project, and this work is expected to continue until the project’s expected completion of operations in 2025. In December 2022, the Demonstration Plant achieved its final engineering design milestone, marking the completion of the DoE’s first go/no-go decision point. The completion of this milestone was a gating event for the DoE’s continued funding of the project, as provided for in the 2021 award grant. A second milestone was achieved with the completion of permitting activities in the fourth quarter of 2023, allowing for the Demonstration Plant’s construction, which is currently underway. Operations to process and separate the REE from the stockpiled mineral sample are expected to follow the completion of the Demonstration Plant’s construction for an additional approximately 12- to 15- month period.

Current wording

During the first six months of 2024, the Company, along with the other consortium members, continued their work on the Demonstration Plant project, and this work is expected to continue until the project’s expected completion of operations in 2025. In December 2022, the Demonstration Plant achieved its final engineering design milestone, marking the completion of the DoE’s first go/no-go decision point. The completion of this milestone was a gating event for the DoE’s continued funding of the project, as provided for in the 2021 award grant. A second milestone was achieved with the completion of permitting activities in the fourth quarter of 2023, allowing for the Demonstration Plant’s construction, which is currently nearing completion. Operations to process and separate the REE from the stockpiled mineral sample are expected to follow the completion of the Demonstration Plant’s construction for a term of up to 12 months.

Previous wording

In June 2023, the Company entered into the WEA Funding Agreement for its previously announced award of a $4,400 grant from the WEA to be used toward the advancement of the Demonstration Plant. This award, along with funds contributed by the Company, will be used to fund the Company’s 50% share of the Demonstration Plant’s originally estimated cost of approximately $43,800 with the other fifty percent of the funding coming from the DoE. Through March 31, 2024, the Company had paid a total of $17,700 toward its share of the expected cost of the Demonstration Plant (see Note 4 to our Consolidated Financial Statements for further discussion). As of December 31, 2023, the Company had met the conditions allowing for the invoicing of $2,000 of the $4,400 WEA grant total. This $2,000 was subsequently received on January 31, 2024. The remaining $2,400 of the $4,400 grant total, which is conditioned on the achievement of other, future milestones, will be invoiced to the WEA once those milestones have been achieved (expected in 2024).

Current wording

In June 2023, the Company entered into the WEA Funding Agreement for its previously announced award of a $4,400 grant from the WEA to be used toward the advancement of the Demonstration Plant. This award, along with funds contributed by the Company, will be used to fund the Company’s 50% share of the Demonstration Plant’s originally estimated cost of approximately $43,800 with the other fifty percent of the funding coming from the DoE. Through June 30, 2024, the Company had advanced a total of $24,200 toward its share of the expected cost of the Demonstration Plant (see Note 4 to our Consolidated Financial Statements for further discussion). As of December 31, 2023, the Company had met the conditions allowing for the invoicing of $2,000 of the $4,400 WEA grant total. This $2,000 was subsequently received on January 31, 2024. The remaining $2,400 of the $4,400 grant total, which is conditioned on the achievement of other, future milestones, will be invoiced to the WEA once those milestones have been achieved (expected in the fourth quarter of 2024).

Previous wording

Since inception, the General Atomics-led consortium has seen increases in the Demonstration Plant project costs, including expected final equipment costs, due to, among other factors, inflation. Accordingly, the project team has commenced discussions with the DoE and other government agencies regarding further cost-sharing opportunities to offset the increase in the anticipated project costs and further project objectives. In part to fund the Company’s share of these cost increases, the Company announced, during December 2023, its intention to launch the 2024 Rights Offering to raise approximately $36,000 in gross proceeds. In March 2024, the Company completed the 2024 Rights Offering for gross proceeds of approximately $35,800 in which each holder of the Company’s common shares as of the record date of December 15, 2023 was eligible to participate. The proceeds from the 2024 Rights Offering will be used to progress the Company’s business strategy to support commercialization and fund activities to support the advancement of the Bear Lodge REE Project, which includes funding the operation of the Demonstration Plant for a period of time that is expected to be sufficient to provide the information to support a commercialization decision, acquiring real property, updating the mineral resource model and technical reports, and advancing permitting, environmental support, and basic engineering, as well as for other general corporate purposes. Even with these funds, however, the Company will still require substantial additional funds for the full permitting, development, and buildout of the Bear Lodge REE Project. Ultimately, in the event the Company cannot secure additional financial resources, or complete a strategic transaction in the longer term, the Company may need to curtail or suspend its operational plans

Current wording

In part to fund the Company’s share of these cost increases, the Company announced, during December 2023, its intention to launch the 2024 Rights Offering to raise approximately $36,000 in gross proceeds. In March 2024, the Company completed the 2024 Rights Offering for gross proceeds of approximately $35,800 in which each holder of the Company’s common shares as of the record date of December 15, 2023 was eligible to participate. The proceeds from the 2024 Rights Offering will be used to progress the Company’s business strategy to support commercialization, which includes funding the operation of the Demonstration Plant for a period of time

Previous wording

During the first quarter of 2024, we continued to monitor the general U.S. political climate and actions taken by the U.S. government to secure a domestic, rare earth supply chain. Due to the dominance of China over the REE supply chain, the U.S. federal government issued two Presidential Executive Orders in 2017 to encourage and support the establishment of a domestic rare earth supply chain and to strengthen the defense industrial base with respect to critical minerals including rare earths. In June 2019, the Department of Commerce released its report entitled “Federal strategy to ensure secure and reliable supplies of critical minerals.” This was followed by four U.S. Presidential Determinations on July 22, 2019, directed to the Secretary of Defense. One Presidential Determination declared that “the domestic production capability for rare earth metals and alloys is essential to the national defense.” Since then, four more Presidential Determinations/Waivers have been signed that support the critical mineral industry, which include rare earth elements. The “Supply Chain Resilience (Waiver)” signed on February 27, 2023 allows funds to be directed towards industrial base supply chains critical to the Department of Defense, including rare earth mineral extraction, processing, and separation. These initiatives have increased the federal government’s level of interest in the rare earth industry and our potential rare earth products as a critical upstream segment of the supply chain, particularly considering China’s dominance in the global rare earth market.

Current wording

During the first half of 2024, we continued to monitor the general U.S. political climate and actions taken by the U.S. government to secure a domestic, rare earth supply chain. Due to the dominance of China over the REE supply chain, the U.S. federal government issued two Presidential Executive Orders in 2017 to encourage and support the establishment of a domestic rare earth supply chain and to strengthen the defense industrial base with respect to critical minerals including rare earths. In June 2019, the Department of Commerce released its report entitled “Federal strategy to ensure secure and reliable supplies of critical minerals.” This was followed by four U.S. Presidential Determinations on July 22, 2019, directed to the Secretary of Defense. One Presidential Determination declared that “the domestic production capability for rare earth metals and alloys is essential to the national defense.” Since then, four more Presidential Determinations/Waivers have been signed that support the critical mineral industry, which include rare earth elements. The “Supply Chain Resilience (Waiver)” signed on February 27, 2023 allows funds to be directed towards industrial base supply chains critical to the Department of Defense, including rare earth mineral extraction, processing, and separation. These initiatives have increased the federal government’s level of interest in the rare earth industry and our potential rare earth products as a critical upstream segment of the supply chain, particularly considering China’s dominance in the global rare earth market.

Previous wording

Our consolidated net loss for the three months ended March 31, 2024 was $3,626, or $0.01 per share, compared with our consolidated net loss of $2,222, or $0.01 per share, for the same period in 2023. See our discussion below for the primary drivers of this change. As an exploration stage company, we had no properties in production and generated no revenues during either period.

Current wording

For the three and six months ended June 30, 2024, we experienced net losses of $6,179 ($0.01 per share) and $9,805 ($0.02 per share), respectively, compared with net losses of $2,744 ($0.01 per share) and $4,966 ($0.02 per share) for the three and six months ended June 30, 2023, respectively. See our discussion below for the primary drivers of these changes. As an exploration stage company, we had no properties in production and generated no revenues during either period.

Previous wording

Our exploration and evaluation costs totaled $2,903 for the three months ended March 31, 2024, compared with $1,510 for the same period in 2023. This increase of $1,393 was largely attributable to the activities associated with our Demonstration Plant project as work progressed under the Cost Share Agreement. See Note 4 to the Consolidated Financial Statements for a detailed discussion of this Cost Share Agreement.

Current wording

Our exploration and evaluation costs increased by $3,656 over the comparative three-month period, rising from $2,165 for the three months ended June 30, 2023 to $5,821 for the three months ended June 30, 2024, and by $5,049 over the comparative six-month period, rising from $3,675 for the six months ended June 30, 2023 to $8,724 for the six months ended June 30, 2024. These increases were largely attributable to the activities associated with our Bear Lodge REE Project and the Demonstration Plant as work progressed under the Cost Share Agreement. See Note 4 to the Consolidated Financial Statements for a more complete discussion of this Cost Share Agreement.

Previous wording

For the three months ended March 31, 2024 and 2023, the Company generated interest income of $81 and $122, respectively, from investments of the remaining proceeds from the Rights Offerings. This $41 decrease from period to period was primarily the result of the lower average cash balances available for investment during the three-month period ended March 31, 2024.

Current wording

For the three months ended June 30, 2024 and 2023, the Company generated interest income of $371 and $139, respectively, and $452 and $261 for the six months ended June 30, 2024 and 2023, respectively, from investments of its cash holdings. These increases from period to period were primarily the result of the higher average cash balances available for investment during the three- and six-month periods ended June 30, 2024 due to the funds raised from the 2024 Rights Offering.

Previous wording

We recorded accretion expense of $71 for each of the three months ended March 31, 2024 and 2023, in each case related to the Company’s option to repurchase approximately 640 acres of non-core real property in Wyoming for not less than $1,200 nor greater than $1,850 in the form of cash, or a combination of cash and common shares of the Company. Accretion expense is recorded each reporting period to increase the repurchase option liability to the maximum exercise price of $1,850, less any annual option payments of $25. See Note 8 to the Consolidated Financial Statements for a discussion of the repurchase option.

Current wording

We recorded accretion expense of $71 for each of the three months ended June 30, 2024 and 2023, and $142 for each of the six months ended June 30, 2024 and 2023,in each case related to the Company’s option to repurchase approximately 640 acres of non-core real property in Wyoming for not less than $1,200 nor greater than $1,850 in the form of cash, or a combination of cash and common shares of the Company. Accretion expense is recorded each reporting period to increase the repurchase option liability to the maximum exercise price of $1,850, less any annual option payments of $25. See Note 8 to the Consolidated Financial Statements for a discussion of the repurchase option.

Previous wording

Net cash used in operating activities was $784 for the three months ended March 31, 2024, compared with $1,543 for the same period in 2023. This decrease of $759 was largely attributable to the collection of the $2,000 WEA grant receivable balance during the first quarter of 2024 being partially offset by a $1,000 increase in amounts advanced by the Company to General Atomics under the Cost Share Agreement for work on the Demonstration Plant.

Current wording

Net cash used in operating activities was $8,287 for the six months ended June 30, 2024, compared with $4,072 for the same period in 2023. This increase of $4,215 was largely attributable to a $5,500 increase in amounts advanced by the Company to General Atomics under the Cost Share Agreement for work on the Demonstration Plant, partially offset by the collection of the $2,000 WEA grant receivable balance.

Previous wording

Net cash provided by financing activities of $35,286 for the three months ended March 31, 2024 stemmed from the receipt of the net proceeds from the 2024 Rights Offering. There were no similar transactions during the three months ended March 31, 2023.

Current wording

Net cash provided by financing activities of $35,286 for the six months ended June 30, 2024 stemmed from the receipt of the net proceeds from the 2024 Rights Offering. Net cash provided by financing activities of $7 for the six months ended June 30, 2023 stemmed from the exercise of 100,000 stock options.

Previous wording

At March 31, 2024, we had a working capital balance of $39,494 which represented an increase of $31,685 from our December 31, 2023 working capital balance of $7,809. This increase was largely the result of the $35,286 in net proceeds received from the 2024 Rights Offering, partially offset by amounts paid by the Company during the three months ended March 31, 2024 under the Cost Share Agreement and for the payment of other ongoing expenses.

Current wording

At June 30, 2024, we had a working capital balance of $33,130 which represented an increase of $25,321 from our December 31, 2023 working capital balance of $7,809. This increase was largely the result of the $35,286 in net proceeds received from the 2024 Rights Offering, partially offset by amounts paid by the Company during the six months ended June 30, 2024 under the Cost Share Agreement and for the payment of other ongoing expenses.

Previous wording

In June 2023, the Company entered into the WEA Funding Agreement for its previously announced award of a $4,400 grant from the WEA to be used toward the advancement of the Demonstration Plant. The WEA grant is a cost-reimbursement award that is available to the Company for the reimbursement of Demonstration Plant expenses. As of December 31, 2023, the WEA had been invoiced for the first $2,000 of the $4,400 grant total for the achievement of the first milestone under the WEA Funding Agreement. The Company received payment of this $2,000 in January 2024. The remaining $2,400, which is conditioned on the achievement of other, future milestones, will be invoiced to the WEA upon achievement of those milestones.

Current wording

In June 2023, the Company entered into the WEA Funding Agreement for its previously announced award of a $4,400 grant from the WEA to be used toward the advancement of the Demonstration Plant. Following the achievement of the first milestone under the WEA Funding Agreement, the Company received in January 2024 the first $2,000 of the $4,400 grant. The remaining $2,400, which is conditioned on the achievement of other, future milestones, will be invoiced to the WEA upon achievement of those milestones.

Previous wording

will still require substantial additional funds to complete the permitting and licensing, and ultimate construction and operation of a commercial mine and plant for the Bear Lodge REE Project. Ultimately, in the event the Company cannot secure additional financial resources, or complete a strategic transaction in the longer term, the Company may need to curtail or suspend its operational plans regarding the Bear Lodge REE Project or other initiatives, or potentially liquidate its business interests, and investors may lose all or part of their investment.

Current wording

With the funds raised from the 2024 Rights Offering, the Company will have sufficient funds to complete construction and operation of the Demonstration Plant; however, even with these funds and the expected receipt of the remaining WEA grant monies, the Company will still require substantial additional funds to complete the permitting and licensing, and ultimate construction and operation of a commercial mine and plant for the Bear Lodge REE Project. Ultimately, in the event the Company cannot secure additional financial resources, or complete a strategic transaction in the longer term, the Company may need to curtail or suspend its operational plans regarding the Bear Lodge REE Project or other initiatives, or potentially liquidate its business interests, and investors may lose all or part of their investment.
Rearranged current paragraphs (1)

Current report — wording carried from elsewhere

that is expected to be sufficient to provide the information to support a commercialization decision, as well as for other general corporate purposes. Even with these funds, however, the Company will still require substantial additional funds for the permitting, development, and buildout of the Bear Lodge REE Project. Ultimately, in the event the Company cannot secure additional financial resources, or complete a strategic transaction in the longer term, the Company may need to curtail or suspend its operational plans regarding the Bear Lodge REE Project or other initiatives, or potentially liquidate its business interests, and investors may lose all or part of their investment.
Rearranged previous paragraphs (2)

Previous report — wording carried elsewhere

regarding the Bear Lodge REE Project or other initiatives, or potentially liquidate its business interests, and investors may lose all or part of their investment.

Previous report — wording carried elsewhere

With the funds raised from the 2024 Rights Offering, the Company will have sufficient funds to complete construction and operation of the Demonstration Plant; however, even with these funds and the expected receipt of the remaining WEA grant monies, the Company