What changed in Risk Factors?
Read the current filingPrevious report: 10-K
Period ended 2023-12-31; filed 2024-03-26.
0001104659-24-039054
Item 1A. Risk FactorsCurrent report: 10-K
Period ended 2024-12-31; filed 2025-03-19.
0001410578-25-000385
Item 1A. Risk FactorsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 139 previous paragraphs and 154 current paragraphs.
73 unchanged; 52 reworded; 22 added; 6 removed; 8 previous and 7 current paragraphs rearranged.
Tables are not compared: 42 previous and 96 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (22)
Current report
The following is a summary of important risk factors that are specific to our business, industry and our incorporation under the laws of British Columbia:
Current report
Funding under the U.S. EXIM letter of interest is subject to an application and diligence process, and the amount and timing of such funding, if any, is uncertain and subject to conditions outside the Company’s control.
Current report
On April 8, 2024, the Company announced that it received a non-binding and conditional Letter of Interest from the Export-Import Bank of the United States (“U.S. EXIM”) for potential debt financing of up to $1.8 billion through U.S. EXIM’s “Make More in America” and “China and Transformational Exports Program” initiatives. The Company expects to submit a formal application to U.S. EXIM in the second quarter of 2025. Upon receipt of an application for financing, U.S. EXIM will conduct the due diligence necessary
Current report
to determine if a final commitment may be issued. Any final commitment will be dependent on meeting U.S. EXIM’s underwriting criteria, authorization process, finalization and satisfaction of terms and conditions. All final commitments must comply with U.S. EXIM policies as well as program, legal and eligibility requirements.
Current report
There can be no assurance that the Company will be able to successfully satisfy any or all of such conditions. In particular, one condition of funding is that the Company raise a certain amount of equity financing. The Company may be unable to raise such additional financing on acceptable terms, or at all. If such condition is satisfied through an issuance of common shares, shareholders may experience significant dilution (see* Item 1A. Risk Factors – Perpetua Resources will need to raise additional capital through the sale of its securities or other interests, resulting in potential for significant dilution to the existing shareholders and, if such funding is not available, Perpetua Resources’ operations would be adversely affected*.).
Current report
The application process is controlled by U.S. EXIM and is subject to the procedures, priorities and staffing of the agency. As a result, the Company’s application may not be reviewed or processed on the Company’s preferred or expected timeline, and funds may not be available when needed to commence construction. Furthermore, U.S. EXIM funding is subject to the priorities of the federal government, which may result in changes to the amount, timing or conditions of funding. Even if approved, the terms of any U.S. EXIM funding may not be on acceptable terms or may be subject to conditions that the Company is unable to satisfy. If the Company is unable to secure U.S. EXIM financing, it may be unsuccessful in obtaining other project financing when needed or enter into strategic transactions on acceptable terms, or at all.
Current report
A strategic transaction, whether or not consummated, could have an adverse effect on our business, results of operations and financial conditions.
Current report
In 2024, the Company engaged RBC Capital Markets and Endeavour Financial to assist with the evaluation of potential strategic and financing opportunities and to support the Company’s application process in connection with the U.S. EXIM $1.8 billion Letter of Interest received in April 2024. The pursuit of such strategic transactions involve significant risks to the Company’s operations and financial results, whether or not such transaction is ultimately consummated. Such risks could include:
Current report
The negotiation and consummation of any such financing or strategic transaction will require significant expenditures of time, attention and funds. Additionally, we may not control decisions made pursuant to agreements relating to strategic transactions, including joint ventures, to the extent we do not have a controlling interest in the venture or are not an operator under such agreements. The other parties to these arrangements may have economic, business, or legal interests or goals that are inconsistent with the Company’s and, therefore, decisions may be made that the Company does not believe are in its best interest. Moreover, parties to such agreements or ventures may be unable to meet their economic or other obligations, and the Company may be required to fulfill those obligations alone. In either case, the value of the investment and the Company’s business and financial condition may be adversely affected.
Current report
Achievement of the benefits expected from financing or strategic transactions may require us to incur significant costs and could have a material adverse effect on our business, operating results, financial condition and the price of our common shares. In addition, the negotiation and consummation of any such transaction may require significant attention from our management team, which may detract attention from our day-to-day operations. Any one or more of these factors or other risks could cause us not to realize the anticipated benefits of a financing or strategic transaction and could have a material adverse effect on our financial condition.
Current report
We require various permits to commence construction and operation of the Project and any future operations, and delays or a failure to obtain such permits, or a failure to comply with the terms of any such permits that we have obtained, could have a material adverse impact on us.
Current report
Our current and anticipated future operations, including further exploration and development activities and commencement of construction and operations on the Project, require permits from various United States federal, state, and local governmental authorities. There can be no assurance that all permits that we require for the construction of mining facilities and to conduct mining operations will be obtainable on reasonable terms, or at all. Furthermore, permitting requirements can be costly to comply with and involve extended timelines. Permitting delays, failure to obtain such permits, or a failure to comply with the terms of any such permits that we have obtained or successful legal challenges to the issuance of permits we have obtained, could have a material adverse impact on us.
Current report
Additionally, following the USFS’ publication of the ROD and FEIS Errata authorizing the mine plan for the Project, subject to various requirements, claims were filed in the U.S. District Court for the District of Idaho against the USFS and other federal agencies
Current report
on February 18, 2025 by a number of claimants, including Save the South Fork Salmon and the Idaho Conservation League, alleging violations of NEPA and other federal laws in the regulatory process. Among other remedies, the claimants seek to vacate the ROD, FEIS Errata, Final Biological Opinions and Project approvals and enjoin any further implementation of the Project. PRII has filed a motion with the court to intervene in this lawsuit. While the Company believes the federal regulatory process was conducted thoroughly and completely by the relevant federal regulatory agencies, there can be no assurance that the ROD, FEIS, and other Project approvals will be upheld upon judicial review.
Current report
Furthermore, the Corporation’s cost estimates for the Project are driven, in part, by current and anticipated elevated pricing of antimony as a by-product credit. If antimony prices fall due to the availability of new sources of antimony or other conditions that result in a sustained drop in the price of antimony, the Company’s operating costs could materially increase.
Current report
Our business could be negatively impacted by inflationary pressures, which may increase our operating costs and decrease our access to capital required to operate our business.
Current report
The U.S. inflation rate steadily rose in 2021 and into 2022 before eventually declining modestly throughout 2023 and 2024. A sustained increase in inflation may continue to increase our costs for labor, services, and materials, which, in turn, could cause our operating costs and capital expenditures to increase materially and may have an adverse effect on our results of operations and financial condition.
Current report
Additionally, the Federal Reserve and other central banks have implemented policies in an effort to curb inflationary pressure on the costs of goods and services across the U.S., including the significant increases in prevailing interest rates that occurred during 2022 and 2023 as a result of an increase in the federal funds rate, and the associated macroeconomic impact on slowdown in economic growth could negatively impact our business. While the Federal Reserve reduced benchmark interest rates in late 2024, the continuation of rates at the current level could have the effects of raising the cost of capital and depressing economic growth, either of which—or the combination thereof—could hurt the financial and operating results of our business.
Current report
Recently, the Trump Administration announced plans to implement or increase tariffs, and on February 10, 2025 confirmed extension of 25 percent import tariffs on steel globally to go into effect on March 12, 2025. The ultimate impact of this tariff is unknown
Current report
at this time. Additionally, ongoing changes in U.S. and foreign government trade policies, including potential modifications to existing trade agreements and further restrictions on free trade, could introduce additional uncertainty. Any escalation of trade tensions, additional tariffs, retaliatory measures by foreign governments or shifts in U.S. or international trade policies could increase the cost and availability of the raw materials and equipment necessary for the exploration, development, and potential construction of the Project.
Current report
Due to the nature of our business and our status as a publicly traded company, we may be subject to numerous regulatory investigations, claims, lawsuits and other proceedings, including proceedings related to claims brought pursuant to federal securities laws, in the ordinary course of our business. The results of these legal proceedings cannot be predicted with certainty due to the uncertainty inherent in litigation, including the effects of discovery of new evidence or advancement of new legal theories, the difficulty of predicting decisions of judges and juries and the possibility that decisions may be reversed on appeal. There can be no assurances that these matters will not have a material adverse effect on our business.
Removed paragraphs (6)
Previous report
We are subject to NEPA review and may be unable to obtain or retain necessary permits which could adversely affect our operations.
Previous report
Longstanding legal certainty about aspects of the 1872 Mining Law is being challenged in Federal Court.
Previous report
A changing legal environment and court rulings related to the use of unpatented lode mining claims now being reviewed in federal courts may cause the Corporation to make modifications to its current claims management program and strategy.
Previous report
On July 31, 2019, the U.S. District Court for the District of Arizona issued a decision vacating the Forest Service’s approval of the plan of operations for the proposed Rosemont Mine.See Center for Biological Diversity et al. v. United States Fish and Wildlife Service et al. (the “Rosemont” case). The District Court found that the Forest Service erred when it applied its surface management regulations to approve the proposed mine’s tailings storage facility and waste rock dumps on National Forest lands. According to the District Court, the agency should have considered those facilities under its special use permit regulations. The Forest Service made that error, according to the court, because it did not confirm under the Mining Law that the unpatented mining claims under the ancillary facilities were “valid,” as defined by the court. The outcome of the District Court’s reasoning is that only activities on “valid” claims are regulated under the Forest Service mining regulations, and ancillary facilities require a special use permit.
Previous report
The decision was appealed and on May 12, 2022, a split Ninth Circuit panel remanded the case back to the Forest Service for such further proceedings as it deems appropriate, including application of 36 CFR 228 subpart A to Rosemont’s plan of operation, guided by the Court’s ruling that Section 612 of the Surface Resources and Multiple Use Act of 1955 grants no rights beyond those granted by the 1872 Mining Law. The majority opinion expressly refrained from further interpretation regarding application of the 36 CFR 228A, 36 CFR 251 or other Forest Service regulations in advance of the Forest Service further considering and developing the project record regarding the specifics of the Rosemont plan of operations. In December 2022, the Rosemont defendant announced it would not appeal the Ninth Circuit’s decision.
Previous report
The Corporation closely followed theRosemont proceedings and is following other Mining Law litigation currently pending in the United States Court of Appeals for the District of Columbia. During the pendency of the Rosemont proceedings, the Corporation directed a thorough analysis of its claims management program to support the Project Plan of Restoration and Operations. Notwithstanding that neither the validity of the 36 CFR 228 subpart A regulations was challenged in theRosemont case nor their application to approval of the Rosemont plan of operations were reviewed by the federal courts, the Corporation’s claims management program and strategy was adjusted during the years ended December 31, 2022 and December 31, 2023 relinquishing 53 of the Corporation’s unpatented lode mining claims and re-staking with 205 unpatented mill sites over areas non-mineral in character and suitable for mill sites should a development decision be made.
Reworded paragraphs (52)
Previous wording
Investing in our common shares involves a high degree of risk. An investment in our securities is speculative and involves a high degree of risk due to the nature of our business and the present stage of exploration and development of our mineral properties. You should carefully consider the risks described below, as well as the other information in this Annual Report, including our consolidated financial statements and the related notes and Part II, Item 7. entitled “Management’s Discussion and Analysis of Financial Condition and Results of Operations,” and in any documents incorporated in this Annual Report by reference, before deciding whether to invest in our common shares. The occurrence of any of the events or developments described below could harm our business, financial condition, results of operations, and growth prospects and could cause them to differ materially from the estimates described in forward-looking statements in this Annual Report. In such an event, the market price of our common shares could decline, and you may lose all or part of your investment. Although we have discussed all known material risks, the risks described below are not the only ones that we may face. Additional risks and uncertainties not currently known to us or that we currently deem immaterial may also impair our business operations. Certain statements below are forward-looking statements. See also “Cautionary Note Regarding Forward-Looking Statements” in this Annual Report.
Current wording
Investing in our common shares involves a high degree of risk. An investment in our securities is speculative and involves a high degree of risk due to the nature of our business and the present stage of exploration and development of our mineral properties. You should carefully consider the risks described below, as well as the other information in this Annual Report, including our consolidated financial statements and the related notes and Part II, Item 7. entitled “Management’s Discussion and Analysis of Financial Condition and Results of Operations,” and in any documents incorporated in this Annual Report by reference, before deciding whether to invest in our common shares. The occurrence of any of the events or developments described below could harm our business, financial condition, results of operations, and growth prospects and could cause them to differ materially from the estimates described in forward-looking statements in this Annual Report. In such an event, the market price of our common shares could decline, and you may lose all or part of your investment. Although we have discussed risks we have identified as material risks, the risks described below are not the only ones that we may face. Additional risks and uncertainties not currently known to us or that we currently deem immaterial may also impair our business operations. Certain statements below are forward-looking statements. See also “Cautionary Note Regarding Forward-Looking Statements” in this Annual Report.
Previous wording
We have limited financial resources. We will need external financing to develop and construct the Project and to complete the permitting process. Although the Company’s current capital resources and liquidity include up to $24.8 million in funding awarded in December 2022 under the TIA pursuant to Title III of the DPA and an additional $34.6 million conditionally awarded in February 2024, such funding is available only for the specified costs related to permitting, early restoration activities and advancing construction readiness and is not available to fund the Company’s costs pursuant to its ASAOC obligations and certain corporate expenses. The Company’s latest liquidity forecast indicates that available cash resources are expected to be exhausted in the fourth quarter of 2024.We expect to incur other costs in the foreseeable future that are not eligible for DPA funding reimbursement and may incur unanticipated increases to costs under our ASAOC obligations as a result of inflation, fuel or labor costs or other factors. The Company continues to explore various funding opportunities, which may include the issuance of additional equity, new debt, or project specific debt; government funding; and/or other financing opportunities. Although the Company entered into the Sales Agreement with respect to an ATM Offering, sales under the program are subject to certain conditions, including market conditions, and there is no assurance that the Company will be able to raise funds under the program, at acceptable share prices or at all. If additional financing is not secured before the fourth quarter of 2024, the Company would no longer be able to meet its ongoing obligations or progress critical permitting efforts.
Current wording
We have limited financial resources. We will need external financing to develop and construct the Project and to complete the permitting process. The Company’s latest liquidity forecast indicates that available cash resources for expenses not eligible for reimbursement under the TIA (as defined below) are expected to be exhausted in the third quarter of 2025. We expect to incur other costs in the foreseeable future that are not eligible for reimbursement under the TIA and may incur unanticipated increases to costs as a result of inflation, fuel or labor costs or other factors. Furthermore, only approximately $10 million remained available for reimbursement under the TIA as of December 31, 2024, and costs must be incurred on or before June 16, 2025 to be eligible for reimbursement. Once such funding is exhausted or has expired, the Company will need to seek new funding sources for expenses currently reimbursed through the TIA. The Company continues to explore various funding opportunities, which may include the issuance of additional equity, new debt, or project specific debt; government funding; and/or other financing or strategic opportunities. In particular, the Company has engaged RBC Capital Markets and Endeavour Financial to assist with the evaluation of potential strategic and financing opportunities and to support the Company’s application process in connection with the U.S. EXIM $1.8 billion Letter of Interest received in April 2024. Any such financing or strategic transaction, or any funding commitment from U.S. EXIM, will be subject to due diligence, the negotiation of funding terms and other conditions, and there can be no assurance of the amount, timing or nature of any such financing or strategic transaction, if any, and any such financing or strategic transaction may not be consummated at all. Additionally, the potential costs of obtaining such financing or any strategic transaction can be significant and may put additional strains on our cash flows. Furthermore, in May 2023 the Company entered into the Sales Agreement (as defined herein) with respect to an ATM Offering (as defined herein); however, only $6.2 million remained available under the program as of December 31, 2024. Sales under the program are also subject to certain conditions, including market conditions, and there is no assurance that the Company will be able to raise additional funds under the program, at acceptable stock prices or at all. If additional financing is not secured before the third quarter of 2025, the Company would no longer be able to meet its ongoing obligations or advance construction readiness activities.
Previous wording
Based on the updated schedule published by the USFS in January 2024, the Company anticipates that the USFS will publish a FEIS and a DROD in the second quarter of 2024 and a Final ROD in the fourth quarter of 2024. We have commenced pre-construction engineering and other preparations and, if the DROD and ROD are received on the anticipated schedule, we would seek to commence construction in 2025. According to the TRS, as of December 31, 2020, the total initial capital cost estimate for the Project was approximately $1,263 million. Although we have not updated our capital cost estimates as of December 31, 2023, based on significant inflation and increased financing costs since 2020, we expect the actual cost estimates to be higher than the 2020 estimate. These cost estimates may change materially due to inflation, competition or other unforeseen challenges at the Project site.
Current wording
We have commenced pre-construction engineering and other preparations with the goal of commencing construction of the Project in 2025. According to the Financial Update, as of December 31, 2024, the total initial capital cost estimate for the Project was approximately $2,215 million.
Previous wording
We do not currently have sufficient funds or committed financing to commence construction of the Project. Our ability to obtain sufficient funds or committed financing may be impacted by various factors, including, but not limited to, our ability to raise additional funds at acceptable rates or at all; unfavorable interest rates; the incurrence of additional debt, which may be subject to certain restrictive covenants; restrictions on our use of government funding (seeItem 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations – Department of Defense Funding); dilution resulting from additional equity financing (seeItem 1A. Risk Factors – Global financial markets can have a profound impact on the global economy in general and on the mining industry in particular); our ability to control certain property as a result of our entry into joint ventures or other similar arrangements; and the loss of certain economic benefits of our property as a result of our entry into royalty agreements.
Current wording
We do not currently have sufficient funds or committed financing to commence construction of the Project. Our ability to obtain sufficient funds or committed financing on acceptable terms, or at all, may be impacted by various factors, including, but not limited to, unfavorable market conditions or commodity pricing; unfavorable interest rates; regulatory uncertainty; the incurrence of additional debt, which may be subject to certain restrictive covenants; restrictions on our use of government funding and permitting delays or challenges to our existing permits. The cost and terms of such financing, if obtained, may significantly reduce the expected benefits from development of the Project and/or render such development uneconomic, including by imposing restrictive covenants; limiting our ability to control certain property or development decisions as a result of our entry into joint ventures or other similar arrangements; the loss of certain economic benefits of our property as a result of our entry into royalty or similar agreements; or dilution to existing shareholders resulting from additional equity financing.
Previous wording
Our failure to obtain sufficient financing could result in the delay or indefinite postponement of exploration, permitting, development, construction, or production at the Project. The cost and terms of such financing may significantly reduce the expected benefits from development of the Project and/or render such development uneconomic. There can be no assurance that additional capital or other types of financing will be available when needed or that, if available, the terms of such financing will be favorable. Our failure to obtain financing could have a material adverse effect on our growth strategy and results of operations and financial condition.
Current wording
Our failure to obtain sufficient financing could result in the delay or indefinite postponement of exploration, permitting, development, construction, or production at the Project. There can be no assurance that additional capital or other types of financing will be available when needed or that, if available, the terms of such financing will be favorable. Our failure to obtain financing could have a material adverse effect on our growth strategy and results of operations and financial condition.
Previous wording
In December 2022, Perpetua Resources was awarded an undefinitized TIA of up to $24.8 million under Title III of the DPA. On July 25, 2023, the TIA was definitized with the DOD, establishing the full not-to-exceed amount of $24.8 million. The TIA contains customary terms and conditions for technology investment agreements, including ongoing reporting obligations. If we fail to satisfy these conditions, we will be unable to obtain remaining funds available under the TIA and, under certain circumstances, could be required to disgorge funds already paid. On February 12, 2024, the Corporation announced a conditional award of up to $34.6 million in additional funding under the TIA. Full funding of the additional award is conditioned on modifying the existing TIA to expand the in-scope work for advancing permits and construction readiness and to extend the outside date to June 30, 2025. The amendment will not change any other material terms of the definitized TIA. The modification is anticipated to be completed in the first quarter of 2024, however, there is no assurance that the Corporation will be able to finalize the amendment on the expected timeline or at all.
Current wording
In December 2022, Perpetua Resources was awarded an undefinitized Technology Investment Agreement (“TIA”) of up to $24.8 million under Title III of the DPA. On July 25, 2023, the TIA was definitized with the United States Department of Defense (the “DOD”), establishing the full, not-to-exceed amount of $24.8 million. The TIA contains customary terms and conditions for technology investment agreements, including ongoing reporting obligations. If we fail to satisfy these conditions, we will be unable to obtain remaining funds available under the TIA and, under certain circumstances, could be required to disgorge funds already paid. On May 2, 2024, the TIA was modified with an additional $34.4 million in funding, bringing the total amount of the TIA to $59.2 million.
Previous wording
Under the funding agreement, Perpetua Resources may request reimbursement for certain costs incurred related to environmental baseline data monitoring, environmental and technical studies and other activities related to advancing Perpetua’s construction readiness and permitting process for the Stibnite Gold Project until December 31, 2024. The funds may be used only for the purposes specified in the TIA and are not available to the Corporation for general corporate purposes other than those specified. Furthermore, the TIA contains limitations on the Corporation’s ability to share or sell certain assets, interests or technology to foreign counterparties, which may limit the Corporation’s ability to raise funding from foreign sources or capitalize on business opportunities with foreign companies.
Current wording
Under the TIA, Perpetua Resources may request reimbursement for certain costs incurred through June 16, 2025 related to environmental baseline data monitoring, environmental and technical studies and other activities related to advancing Perpetua’s construction readiness and permitting process for the Stibnite Gold Project, which includes reimbursement of employee wages for activities included in the scope of the TIA. The funds may be used only for the purposes specified in the TIA and are not available to the Corporation for general corporate purposes other than those specified. Furthermore, the TIA contains limitations on the Corporation’s ability to share or sell certain assets, interests or technology to foreign counterparties, which may limit the Corporation’s ability to raise funding from foreign sources or capitalize on business opportunities with foreign companies.
Previous wording
Our mining and exploration development activities are subject to extensive permitting requirements which can be costly to comply with and involve extended timelines. Specifically, we are subject to NEPA review, a federal process which is presently ongoing. Formal review under NEPA is extensive and involves several actions, including public scoping, coordination with cooperating agencies, the release of environmental impact statements followed by public comment, potential administrative objections, and the issuance of a final record of decision. Delays in the NEPA process, such as we are unable to timely obtain a record of decision from the United States Forest Service or fail to obtain requisite ancillary permits, may adversely impact our operations. Additionally, to the extent that we are granted necessary permits, we may be subject to a number of Project requirements or conditions including the installation or undertaking of programs to safeguard protected species and their habitat, sites, or otherwise limit the impacts of our operations. Previously obtained permits may be suspended or revoked for a variety of reasons. While we strive to comply with and conclude the NEPA review process, and obtain and comply with all necessary permits and approvals, any failure to do so may have negative impacts upon our business or financial condition, such as increased delays, curtailment of our operations, increased costs, implementation of mitigation or remediation requirements, the potential for litigation or regulatory action, and damage to our reputation.
Current wording
The duration and success of efforts to obtain and renew permits are contingent upon many variables not within our control. Shortage of qualified and experienced personnel in the various levels of government could result in delays or inefficiencies. Backlog within the permitting agencies could affect the permitting timeline of the various projects. Other factors that could affect the permitting timeline include (i) the number of other large-scale projects currently in a more advanced stage of development which could slow down the review process and (ii) significant public response regarding the Project or any future projects the Corporation undertakes. Additionally, to the extent that we are granted necessary permits, we may be subject to a number of Project requirements or conditions including the installation or undertaking of programs to safeguard protected species and their habitat, sites, or otherwise limit the impacts of our operations. Previously obtained permits may be suspended or revoked for a variety of reasons. While we strive to obtain and comply with all necessary permits and approvals, any failure to do so may have negative impacts upon our business or financial condition, such as increased delays, curtailment of our operations, increased costs, implementation of mitigation or remediation requirements, the potential for litigation or regulatory action, and damage to our reputation.
Previous wording
The costs, timing and complexities of mine construction and development are increased by the remote location of the Project, with additional challenges related thereto, including access, water and power supply, and other support infrastructure. Cost estimates may increase significantly as more detailed engineering work and studies are completed. New mining operations commonly experience unexpected costs, problems and delays during development, construction, and mine start-up. In addition, delays in the commencement of mineral production often occur. Accordingly, there are no assurances that our activities will result in profitable mining operations, that we will successfully establish mining operations, or that we will profitably produce precious metals at the Project.
Current wording
The costs, timing and complexities of mine construction and development are increased by the remote location of the Project, with additional challenges related thereto, including access, water and power supply, and other support infrastructure. The lack of availability of such infrastructure on acceptable terms or the delay in the availability of any one or more of these items could prevent or delay development of the Project. Cost estimates may increase significantly as more detailed engineering work and studies are completed. New mining operations commonly experience unexpected costs, problems and delays during development, construction, and mine start-up. In addition, delays in the commencement of mineral production often occur. Furthermore, a significant drop in commodity prices over a sustained period of time could render the Project not economically viable or limit our ability to maintain operations. Accordingly, there are no assurances that our activities will result in profitable mining operations, that we will successfully establish mining operations, or that we will profitably produce precious metals at the Project.
Previous wording
In addition, there is no assurance that our mineral exploration activities will result in any discoveries of new ore bodies. If further mineralization is discovered there is also no assurance that the mineralized material would be economical for commercial production. Discovery of mineral deposits is dependent upon a number of factors and significantly influenced by the technical skill of the exploration personnel involved. The commercial viability of a mineral deposit is also dependent upon a number of factors which are beyond our control, including the attributes of the deposit, commodity prices, government policies and regulation, and environmental protection requirements.
Current wording
In addition, there is no assurance that our mineral exploration activities will result in any discoveries of new ore bodies. If further mineralization is discovered, there is also no assurance that the commercial production of the mineralized material would be economical. Discovery of mineral deposits is dependent upon a number of factors and significantly influenced by the technical skill of the exploration personnel involved. The commercial viability of a mineral deposit is also dependent upon a number of factors which are beyond our control, including the attributes of the deposit, commodity prices, government policies and regulation, and environmental protection requirements.
Previous wording
Perpetua Resources’ mineral resource and mineral reserve estimates may not be indicative of the actual gold that can be mined.
Current wording
Perpetua Resources’ mineral resource and mineral reserve estimates may not be indicative of the actual gold or other minerals that can be mined.
Previous wording
Assay results from core drilling or reverse circulation drilling can be subject to errors at the laboratory analyzing the drill samples. In addition, reverse circulation or core drilling may lead to samples which may not be representative of the gold or other metals in the entire deposit. Mineral resource and mineral reserve estimates are based on interpretation of available facts and extrapolation or interpolation of data and may not be representative of the actual deposit. In the context of mineral exploration and future development, there is inherent variability between duplicate samples taken adjacent to each other and between sampling points that cannot be reasonably eliminated. There may also be unknown geologic details that have not been identified or correctly appreciated at the current level of delineation in these types of investigations. This results in uncertainties that cannot be reasonably eliminated from the estimation process. Some of the resulting variances can have a positive effect and others can have a negative effect on mining and processing operations. The calculations of amounts of mineralized material within Mineral Resources and Mineral Reserves are estimates only. Actual recoveries of gold and other potential by-products from Mineral Resources and Mineral Reserves may be lower than those indicated by test work. Any material change in the quantity of mineralization, grade, tonnage or stripping ratio, or the price of gold and other potential by-products, may affect the economic viability of a mineral property. In addition, there can be no assurance that the recoveries of gold and other potential by-products in small-scale laboratory tests will be duplicated in larger scale pilot plant tests under on-site conditions or during production. Notwithstanding the results of any metallurgical testing or pilot plant tests for metallurgy and other factors, there remains the possibility that the ore may not react in commercial production in the same manner as it did in testing.
Current wording
Assay results from core drilling or reverse circulation drilling can be subject to errors at the laboratory analyzing the drill samples. In addition, reverse circulation or core drilling may lead to samples which may not be representative of the gold, antimony or other metals in the entire deposit. Mineral resource and mineral reserve estimates are based on interpretation of available facts and extrapolation or interpolation of data and may not be representative of the actual deposit. In the context of mineral exploration and future development, there is inherent variability between duplicate samples taken adjacent to each other and between sampling points that cannot be reasonably eliminated. There may also be unknown geologic details that have not been identified or correctly appreciated at the current level of delineation in these types of investigations. This results in uncertainties that cannot be reasonably eliminated from the estimation process. Some of the resulting variances can have a positive effect and others can have a negative effect on mining and processing operations. The calculations of amounts of mineralized material within Mineral Resources and Mineral Reserves are estimates only. Actual recoveries of gold, antimony and other potential by-products from Mineral Resources and Mineral Reserves may be lower than those indicated by test work. Any material change in the quantity of mineralization, grade, tonnage or stripping ratio, or the price of gold, antimony and other potential by-products, may affect the economic viability of a mineral property. In addition, there can be no assurance that the recoveries of gold, antimony and other potential by-products in small-scale laboratory tests will be duplicated in larger scale pilot plant tests under on-site conditions or during production. Notwithstanding the results of any metallurgical
Previous wording
Mining and metallurgy are an inexact science and, accordingly, there always remains an element of risk that a mine may not prove to be commercially viable. Until a deposit is actually mined and processed, the quantity of Mineral Reserves, Mineral Resources and grades must be considered as estimates only. In addition, the determination and valuation of Mineral Reserves and Mineral Resources is based on, among other things, assumed metal prices. Market fluctuations and metal prices may render Mineral Resources and Mineral Reserves uneconomic. Any material change in quantity of Mineral Reserves, Mineral Resources, grade, tonnage, percent extraction of those mineral reserves recoverable by underground mining techniques or stripping ratio for those Mineral Reserves recoverable by open pit mining techniques may affect the economic viability of a mining project, including the Project and any future operations in which the Corporation has a direct or indirect interest. Any or all of these factors may lead to mineral resource and/or
Current wording
Mining and metallurgy are an inexact science and, accordingly, there always remains an element of risk that a mine may not prove to be commercially viable. Until a deposit is actually mined and processed, the quantity of Mineral Reserves, Mineral Resources and grades must be considered as estimates only. In addition, the determination and valuation of Mineral Reserves and Mineral Resources is based on, among other things, assumed metal prices. Market fluctuations and metal prices may render the development or extraction of Mineral Resources and Mineral Reserves uneconomic. Any material change in quantity of Mineral Reserves, Mineral Resources, grade, tonnage, percent extraction of those mineral reserves recoverable by underground mining techniques or stripping ratio for those Mineral Reserves recoverable by open pit mining techniques may affect the economic viability of a mining project, including the Project and any future operations in which the Corporation has a direct or indirect interest. Any or all of these factors may lead to mineral resource and/or mineral reserve estimates being overstated, the mineable gold that can be received from the Project being less than the mineral resource and mineral reserve estimates, and the Project not being a viable project.
Previous wording
If the Corporation’s mineral resource and mineral reserve estimates for the Project are not indicative of actual grades of gold and other potential by-products, Perpetua Resources will have to continue to explore for a viable deposit or cease operations.
Current wording
If the Corporation’s mineral resource and mineral reserve estimates for the Project are not indicative of actual grades of gold, antimony and other potential by-products, Perpetua Resources will have to continue to explore for a viable deposit or cease operations.
Previous wording
Information concerning our mining properties inItem 2, Properties has been prepared in accordance with the requirements of S-K 1300. A mineral is economically recoverable when the price at which it can be sold exceeds the costs and expenses of mining, processing and selling the mineral. Mineral reserve and mineral resource estimates of the gold, silver and antimony in our mining properties are based on many factors, including engineering, economic and geological data assembled and analyzed by internal staff and third parties, which includes various engineers and geologists, the area and volume covered by mining rights, assumptions regarding extraction rates and duration of mining operations, and the quality of in-place mineral reserves and mineral resources. The mineral reserve and mineral resource estimates as to both quantity and quality are updated from time to time to reflect, among other matters, new data received. According to the TRS, as of December 31, 2020, the total initial capital cost estimate for the Project was approximately $1,263 million. The Corporation has not updated its capital cost estimates as of December 31, 2023, however, based on significant inflation and increased financing costs since 2020, the Corporation expects the actual cost estimates to be higher than the 2020 estimate. These cost estimates may change materially due to inflation, competition or other unforeseen challenges at the Project site.
Current wording
Information concerning our mining properties inItem 2, Properties has been prepared in accordance with the requirements of Regulation S-K subpart 1300. A mineral is economically recoverable when the price at which it can be sold exceeds the costs and expenses of mining, processing and selling the mineral. Mineral reserve and mineral resource estimates of the gold, silver and antimony in our mining properties are based on many factors, including engineering, economic and geological data assembled and analyzed by internal staff and third parties, which includes various engineers and geologists, the area and volume covered by mining rights, assumptions regarding extraction rates and duration of mining operations, and the quality of in-place mineral reserves and mineral resources. The mineral reserve and mineral resource estimates as to both quantity and quality are updated from time to time to reflect, among other matters, new data received.
Previous wording
There are numerous uncertainties inherent in estimating quantities and qualities of minerals and costs to mine recoverable mineral reserves and mineral resources, including many factors beyond the Corporation’s control. Estimates of mineral reserves and mineral resources necessarily depend upon a number of variable factors and assumptions, any one of which may, if incorrect, result in an estimate that varies considerably from actual results. These factors and assumptions include, among others:
Current wording
There are numerous uncertainties inherent in estimating quantities and qualities of minerals and costs to mine recoverable mineral reserves and mineral resources, including many factors beyond the Company’s control. Estimates of mineral reserves and mineral resources necessarily depend upon a number of variable factors and assumptions, any one of which may, if incorrect, result in an estimate that varies considerably from actual results. These factors and assumptions include, among others:
Previous wording
The validity of mining rights may, in certain cases, be uncertain and subject to being contested. The Corporation’s mining rights, claims and other land titles, particularly title to undeveloped properties, may be defective and open to being challenged by governmental authorities and local communities.
Current wording
The validity of mining rights may, in certain cases, be uncertain and subject to being contested. The Company’s mining rights, claims and other land titles, particularly title to undeveloped properties, may be defective and open to being challenged by governmental authorities, local communities, and other third parties.
Previous wording
Perpetua Resources’ properties consist of various mining concessions in the United States. Under U.S. law, the concessions may be subject to prior unregistered agreements or transfers, which may affect the validity of the Corporation’s ownership of such concessions. A claim by a third party asserting prior unregistered agreements or transfer on any of Perpetua Resources’ mineral properties, especially where commercially viable Mineral Reserves have been located, could adversely result in Perpetua Resources losing commercially viable Mineral Reserves. Even if a claim is unsuccessful, it may potentially affect Perpetua Resources’ current activities due to the high costs of defending against such claims and its impact on senior management’s time. If the Corporation loses a commercially viable Mineral Reserve, such a loss could lower Perpetua Resources’ revenues or cause it to cease operations if this Mineral Reserve represented all or a significant portion of Perpetua Resources’ operations at the time of the loss.
Current wording
Perpetua Resources’ properties consist of various mining concessions in the United States that provide both mineral and surface rights. Under U.S. law, the concessions may be subject to prior unregistered agreements or transfers, which may affect the validity of the Company’s ownership of such concessions. For example, the Company does not hold surface rights on portions of six of the patented mill sites within the boundaries of the Project site. The Company has engaged in discussions with the owner of the property to acquire those lands and holds a right of first refusal with predefined terms, but there is no certainty that a transaction will be finalized. A claim by a third party asserting prior unregistered agreements or transfers on any of Perpetua Resources’ mineral properties, especially where commercially viable Mineral Reserves have been located, could adversely result in Perpetua Resources losing commercially viable Mineral Reserves. Even if a claim is unsuccessful, it may potentially affect Perpetua Resources’ current activities due to the high costs of defending against such claims and its impact on senior management’s time. If the Company loses a commercially viable Mineral Reserve, such a loss could lower Perpetua Resources’ revenues or cause it to cease operations if this Mineral Reserve represented all or a significant portion of Perpetua Resources’ operations at the time of the loss.
Previous wording
develop or, in potentially the future, operate its mining properties. In certain circumstances, consultation with such stakeholders may be required and the outcome may affect the Corporation’s ability to explore, develop or operate its mining properties.
Current wording
Certain of Perpetua Resources’ properties may be subject to the rights or the asserted rights of various community stakeholders, including federally-recognized Indian tribes. The presence of community stakeholders may also impact the Company’s ability to explore, develop or, in potentially the future, operate its mining properties. In certain circumstances, consultation with such stakeholders may be required and the outcome may affect the Company’s ability to explore, develop or operate its mining properties.
Previous wording
Certain of the Corporation’s mineral rights consist of unpatented mining claims. Unpatented mining claims present unique title risks due to the rules for validity and the opportunities for third-party challenge. These claims are also subject to legal uncertainty.
Current wording
Certain of the Company’s mineral rights consist of unpatented mining claims. Unpatented mining claims present unique title risks due to the potential requirements for validity under Unites States law and the opportunities for third-party challenge. In the lawsuit filed in February 2025 in the U.S. District Court for the District of Idaho challenging the validity of the USFS FEIS and ROD for the Project, the plaintiffs have alleged that certain of the unpatented mining claims held by Perpetua Resources are not valid under U.S. law for certain proposed used approved in the ROD. While the Company believes that USFS has properly determined that Perpetua Resources’ unpatented mining claims included within the proposed Project are valid under U.S. law, there can be no assurance the Company will successfully defend against this challenge.
Previous wording
We have a history of net losses and we expect to incur net losses for the foreseeable future. The Project has not advanced to the commercial production stage and we have no history of earnings or cash flow from operations. We expect to continue to incur net losses unless and until such time the Project commences commercial production and generates sufficient revenues to fund continuing operations. The development of our mineral properties to achieve production will require the commitment of substantial financial resources. The amount and timing of expenditures will depend on a number of factors, including the progress of ongoing exploration and development, the results of consultants’ analyses and recommendations, the rate at which operating losses are incurred, the process
Current wording
We have a history of net losses and we expect to incur net losses for the foreseeable future. The Project has not advanced to the commercial production stage and we have no history of earnings or cash flow from operations. We expect to continue to incur net losses unless and until such time as the Project commences commercial production and generates sufficient revenues to fund continuing operations. The development of our mineral properties to achieve production will require the commitment of substantial financial resources. The amount and timing of expenditures will depend on a number of factors, including the progress of ongoing exploration and development, the results of consultants’ analyses and recommendations, the rate at which operating losses are incurred, the process of obtaining required government permits and approvals, responding to opposition to the Project, including potential litigation, the availability and cost of financing, the participation of our partners, and the execution of any sale or joint venture agreements with strategic partners. These factors, and others, are beyond our control. There is no assurance that we will be profitable in the future.
Previous wording
At present, our only material mineral property is the interest that we hold through our subsidiary in the Project. Unless we acquire or develop additional mineral properties, we will be solely dependent upon this property. If no additional mineral properties are acquired by us, any adverse development affecting our operations and further development at the Project may have a material adverse effect on our financial condition and results of operations.
Current wording
At present, our only material mineral properties are interests that we hold through our subsidiary in the Project. Unless we acquire or develop additional mineral properties, we will be solely dependent upon these properties. If no additional mineral properties are acquired by us, any adverse development affecting our operations and further development of the mineral properties within the Project may have a material adverse effect on our financial condition and results of operations.
Previous wording
The mineral resource industry is intensively competitive in all of its phases, and Perpetua Resources competes with many companies possessing much greater financial and technical research resources. Competition is particularly intense with respect to the acquisition of desirable undeveloped gold properties. The principal competitive factors in the acquisition of such undeveloped properties include the staff and data necessary to identify, investigate and purchase such properties, and the financial resources necessary to acquire and develop such properties. Competition could adversely affect the Corporation’s ability to advance the Project or to acquire suitable prospects for exploration in the future on terms it considers acceptable. Increased competition could adversely affect the Corporation’s ability to attract necessary capital funding or acquire an interest in additional properties.
Current wording
intense with respect to the acquisition of desirable undeveloped gold and critical mineral properties. The principal competitive factors in the acquisition of such undeveloped properties include the staff and data necessary to identify, investigate and purchase such properties, and the financial resources necessary to acquire and develop such properties. Competition could adversely affect the Corporation’s ability to advance the Project or to acquire suitable prospects for exploration in the future on terms it considers acceptable. The Corporation’s competitive strength is due, in part, to having the only antimony reserves in the United States. If additional accessible sources of antimony become available or demand is reduced, the Corporation’s ability to access funding or government support may be affected. Increased competition could adversely affect the Corporation’s ability to attract necessary capital funding or acquire an interest in additional properties.
Previous wording
Our mining, exploration, and development operations are subject to extensive environmental, health, and safety laws and regulations in the jurisdictions in which we operate and include those relating to the discharge and remediation of materials in the environment, waste management, and natural resource protection and preservation. Numerous governmental authorities, such as the U.S. EPA, and analogous state agencies, have the authority to enforce compliance with these laws and regulations and the permits issued thereunder, oftentimes requiring difficult and costly response actions. Certain environmental laws, such as CERCLA, impose strict, joint and several liability for costs required to remediate and restore sites where hazardous substances have been stored or released, including sites subject to legacy contamination. We may be required to remediate contaminated properties currently owned and operated by us regardless of whether such contamination resulted from our actions or from the conduct of others. Additionally, claims for damages to persons or property, including damages to natural resources, may result from the environmental, health, and safety impacts of our operations.
Current wording
Our mining, exploration, and development operations are subject to extensive environmental, health, and safety laws and regulations in the jurisdictions in which we operate and include those relating to the discharge and remediation of materials in the environment, waste management, and natural resource protection and preservation. Numerous governmental authorities, such as the U.S. EPA and analogous state agencies, have the authority to enforce compliance with these laws and regulations and the permits issued thereunder, oftentimes requiring difficult and costly response actions. Certain environmental laws, such as CERCLA, can impose strict, joint and several liability for costs required to remediate and restore sites where hazardous substances have been stored or released, including sites subject to legacy contamination. We may be required to remediate contaminated properties currently owned and operated by us regardless of whether such contamination resulted from our actions or from the conduct of others. Additionally, claims for damages to persons or property, including damages to natural resources, may result from the environmental, health, and safety impacts of our operations.
Previous wording
We may incur substantial costs to maintain compliance with environmental, health, and safety laws and regulations and such costs could increase if existing laws and regulations are revised or reinterpreted or if new laws or regulations become applicable to our operations. Failure to comply with these environmental, health, and safety laws and regulations may result in the imposition of restrictions on our operations, administrative civil or criminal liabilities, injunctions, third-party property damage or personal injury claims, investigatory cleanup or other remedial obligations, or other adverse effects on our business, financial condition, or operations. Current and future legislative, regulatory, and judicial action could result in changes to operating permits, material changes in operations, and increased capital and operating expenditures, among others.
Current wording
We may incur substantial costs to maintain compliance with environmental, health, and safety laws and regulations and such costs could increase if existing laws and regulations are revised or reinterpreted or if new laws or regulations applicable to our operations are enacted. Failure to comply with these environmental, health, and safety laws and regulations may result in the imposition of restrictions on our operations, administrative civil or criminal liabilities, injunctions, third-party property damage or personal injury claims, investigatory cleanup or other remedial obligations, or other adverse effects on our business, financial condition, or operations. Current and future legislative, regulatory, and judicial action could result in changes to operating permits, material changes in operations, and increased capital and operating expenditures, among others.
Previous wording
Our operations are also subject to extensive laws and regulations governing worker health and safety and require us to ensure our employees receive adequate training and guidance to follow applicable environmental, health, and safety policies, procedures, and programs. Failure to comply with applicable legal requirements may cause us to incur significant legal liability, penalties, or fines, result in reputational damage, and negatively impact our employee retention. Our mines will be inspected on a regular basis by government regulators who may issue orders and citations if they believe a violation of applicable mining health and safety laws has occurred. In such cases, we may be subject to fines, penalties, or sanctions, and our operations temporarily shut down. Additionally, future changes in applicable laws and regulations, including more rigorous enforcement, could have an adverse impact on operations and result in increased material expenditures to achieve compliance.
Current wording
Our operations are also subject to extensive laws and regulations governing worker health and safety and require us to ensure our employees receive adequate training and guidance to follow applicable environmental, health, and safety policies, procedures, and programs. Failure to comply with applicable legal requirements may cause us to incur significant legal liability, penalties, or fines, result in reputational damage, and negatively impact our employee retention. Our mines will be inspected on a regular basis by government regulators who may issue orders and citations if they believe a violation of applicable mining health and safety laws has occurred. In such cases, we may be subject to fines, penalties, or sanctions, and our operations may be temporarily shut down. Additionally, future changes in applicable laws and regulations, including more rigorous enforcement, could have an adverse impact on operations and result in increased material expenditures to achieve compliance.
Previous wording
Our operations, including permitting, may be subject to legal challenges which could result in adverse impacts to our business and financial condition.
Current wording
Our operations, including permitting, currently are and in the future may be subject to legal challenges, which could result in adverse impacts to our business and financial condition.
Previous wording
Our mining, exploration, and development operations, and the permits required for such activities, may be subject to legal challenges at the international, federal, state, and local level by various parties. Such legal challenges may allege non-compliance with laws and regulations. For example, in August 2019, the Nez Perce Tribe filed a complaint in the United States District Court for the District of Idaho seeking to hold the Corporation responsible for alleged violations of the CWA through declaratory and injunctive relief. Following the execution of the voluntary ASAOC with the U.S. EPA and the United States Department of Agriculture, the Corporation and the Nez Perce Tribe agreed to stay the litigation and explore alternative dispute resolution through court-ordered mediation. The mediation effort was successful, and the Corporation and the Nez Perce Tribe filed the Settlement Agreement and Stipulation for Dismissal with the United States District Court on August 8, 2023 and the case was dismissed without prejudice on October 2, 2023. Under the Settlement Agreement, a dismissal with full prejudice will follow after completion of our required payments. Once we have satisfied our payment obligations under the Settlement Agreement, the parties will submit a Stipulation of Dismissal with Prejudice to the court.
Current wording
Our mining, exploration, and development operations, and the permits required for such activities, may be subject to legal challenges at the international, federal, state, and local level by various parties. Such legal challenges may allege non-compliance with laws and regulations or may seek to invalidate permits or regulatory actions regarding the Project or future projects undertaken by the Corporation. For example, in August 2019, the Nez Perce Tribe filed a complaint in the U.S. District Court for the District of Idaho seeking to hold the Company responsible for alleged violations of the CWA through declaratory and injunctive relief. Following the execution of the voluntary ASAOC with the U.S. EPA and the United States Department of Agriculture, the Corporation and the Nez Perce Tribe agreed to stay the CWA litigation and explore alternative dispute resolution through court-ordered mediation. The mediation effort was successful, and the Company and the Nez Perce Tribe filed the Settlement Agreement and Stipulation for Dismissal with the U.S. District Court on August 8, 2023 and the case was dismissed without prejudice on October 2, 2023. Under the settlement, a dismissal with prejudice may occur after completion of our required payments. Once we have satisfied our payment obligations under the settlement, the Company anticipates that the parties will submit a stipulation of dismissal with prejudice to the court.
Previous wording
Legal challenges such as described may result in adverse impacts to our planned operations such as increased defense costs, the performance of additional mitigation and remedial activities, or significant delays to our Project. We may also be subject to more localized opposition, including efforts by environmental groups, which could attract negative publicity or have an adverse impact on our reputation.
Current wording
Legal challenges such as those described above and elsewhere in this Annual Report may result in adverse impacts to our planned operations such as increased defense costs (to the extent we are a party to such challenges), the performance of additional mitigation and remedial activities, or significant delays to our Project. We may also be subject to more localized opposition, including efforts by environmental groups, which could attract negative publicity or have an adverse impact on our reputation.
Previous wording
Additionally, our Project is located in a district with significant impacts from legacy mining operations prior to our acquisition of and tenure at the sites. Pursuant to CERCLA, we may be subject to liability and remediation responsibilities as current owners of certain areas of the sites under applicable law, consent decrees or similar agreements.
Current wording
Additionally, our Project is located in a mining district with significant impacts from legacy mining operations prior to our acquisition of and legal interests in certain properties. Pursuant to CERCLA and other statutes, we may be subject to liability and remediation responsibilities with respect to these sites under applicable law, consent decrees or similar agreements.
Previous wording
Moreover, while we may create and publish voluntary disclosures regarding ESG matters from time to time, certain statements in those voluntary disclosures may be based on hypothetical expectations and assumptions that may or may not be representative of current or actual risks or events or forecasts of expected risks or events, including the costs associated therewith. Mandatory ESG-related disclosure is also emerging as an area where we may be, or may become, subject to required disclosures in certain jurisdictions, and any such mandatory disclosures may similarly necessitate the use of hypothetical, projected or estimated data, some of which is not controlled by us and is inherently subject to imprecision. Disclosures reliant upon such expectations and assumptions are necessarily uncertain and may be prone to error or subject to misinterpretation given the long timelines involved and the lack of an established single approach to identifying, measuring and reporting on many ESG matters. Additionally, while we may announce various voluntary ESG targets in the future, due to our status as a development stage company, such targets are aspirational. Also, we may not be able to meet such targets in the manner or on such a timeline as initially contemplated and we cannot guarantee that such targets will improve our ESG profile, including, but not limited to, as a result of unforeseen costs or technical difficulties associated with achieving such results. Further, despite any voluntary actions, we may receive pressure from certain investors, lenders, employees or other groups to adopt more aggressive ESG-related targets or policies, but we cannot guarantee that we will be able to implement such targets because of potential costs or technical or operational obstacles. Furthermore, we could be criticized by various anti-ESG stakeholders for the scope of our ESG-related goals or policies, our strategic choices regarding ESG matters as they may impact our operations now or in the future, or for any revisions to the same, as well as initiatives we may pursue or any public statements we may make. We could be subjected to negative responses by governmental actors (such as anti-ESG legislation or retaliatory legislative or administrative treatment) or
Current wording
Moreover, while we may create and publish voluntary disclosures regarding ESG matters from time to time, certain statements in those voluntary disclosures may be based on hypothetical expectations and assumptions that may or may not be representative of current or actual risks or events or forecasts of expected risks or events, including the costs associated therewith. Mandatory ESG-related disclosure is also emerging as an area where we may be, or may become, subject to required disclosures in certain jurisdictions, and any such mandatory disclosures may similarly necessitate the use of hypothetical, projected or estimated data, some of which is not controlled by us and is inherently subject to imprecision. Disclosures reliant upon such expectations and assumptions are necessarily uncertain and may be prone to error or subject to misinterpretation given the long timelines involved and the lack of an established single approach to identifying, measuring and reporting on many ESG matters. Additionally, while we may announce various voluntary ESG targets in the future, due to our status as a development stage company, such targets are aspirational. Also, we may not be able to meet such targets in the manner or on such a timeline as initially contemplated and we cannot guarantee that such targets will improve our ESG profile, including, but not limited to, as a result of unforeseen costs or technical difficulties associated with achieving such results. Further, despite any voluntary actions, we may receive pressure from certain investors, lenders, employees or other groups to adopt more aggressive ESG-related targets or policies, but we cannot guarantee that we will be able to implement such targets because of potential costs or technical or operational obstacles. Furthermore, we could be criticized by various anti-ESG stakeholders for the scope of our ESG-related goals or policies, our strategic choices regarding ESG matters as they may impact our operations now or in the future, or for any revisions to the same, as well as initiatives we may pursue or any public statements we may make. We could be subjected to negative responses by governmental actors (such as anti-ESG legislation or retaliatory legislative or administrative treatment) or consumers (such as boycotts or negative publicity campaigns), which could adversely affect our reputation, business, financial performance, market access and growth.
Previous wording
Some capital markets participants are increasingly using certain components of ESG as a factor in their assessments, which could impact our cost of capital or access to financing. There has also been an acceleration in investor demand for ESG investing opportunities, and many institutional investors have committed to increasing the percentage of their portfolios that are allocated towards ESG-focused investments. As a result, there has been a proliferation of ESG-focused investment funds and market participants seeking ESG-oriented investment products. There has also been an increase in third-party providers of company ESG ratings and rankings, and an increase in ESG-focused voting policies among proxy advisory firms, portfolio managers, and institutional investors. For example, organizations that provide information to investors on corporate governance and related matters have developed ratings processes for evaluating companies on their approach to ESG matters. Currently, there are no universal standards for such ratings, rankings and voting policies, they often differ based on the provider and the data they prioritize and they are continually changing. However, such ratings, rankings and voting policies may be used by some investors to inform their investment and voting decisions. Additionally, certain investors may use these ratings or rankings to benchmark companies against their peers, and if a company is perceived as lagging, these investors may engage with companies to require improved ESG disclosure or performance. Moreover, certain members of the broader investment community may consider a company’s sustainability score rating or ranking as a reputational or other factor in making an investment decision. Consequently, unfavorable ESG ratings could lead to increased negative investor sentiment toward us and could impact our stock price and access to and costs of capital. Additionally, to the extent ESG matters negatively impact our reputation, we may not be able to compete as effectively to recruit or retain employees, which may adversely impact our business. Furthermore, there has recently been backlash from certain governments and investors against ESG funds and investment practices has resulted in increased scrutiny and withdrawals from such funds. Such backlash has also resulted in “anti-ESG” focused activism and investment funds, which may result in additional strains on our resources. If we are unable to meet the often conflicting ESG standards or investment, lending, ratings, or voting criteria and policies set by these parties, we may lose investors, investors may allocate a portion of their capital away from us, we may face increased ESG- or anti-ESG-focused activism, our cost of capital may increase, and our reputation may also be negatively affected.
Current wording
organizations that provide information to investors on corporate governance and related matters have developed ratings processes for evaluating companies on their approach to ESG matters. Currently, there are no universal standards for such ratings, rankings and voting policies, they often differ based on the provider and the data they prioritize and they are continually changing. However, such ratings, rankings and voting policies may be used by some investors to inform their investment and voting decisions. Additionally, certain investors may use these ratings or rankings to benchmark companies against their peers, and if a company is perceived as lagging, these investors may engage with companies to require improved ESG disclosure or performance. Moreover, certain members of the broader investment community may consider a company’s sustainability score rating or ranking as a reputational or other factor in making an investment decision. Consequently, unfavorable ESG ratings could lead to increased negative investor sentiment toward us and could impact our stock price and access to and costs of capital. Additionally, to the extent ESG matters negatively impact our reputation, we may not be able to compete as effectively to recruit or retain employees, which may adversely impact our business. Furthermore, there has recently been backlash from certain governments and investors against ESG funds and investment practices that has resulted in increased scrutiny and withdrawals from such funds. Such backlash has also resulted in “anti-ESG” focused activism and investment funds, which may result in additional strains on our resources. If we are unable to meet the often conflicting ESG standards or investment, lending, ratings, or voting criteria and policies set by these parties, we may lose investors, investors may allocate a portion of their capital away from us, we may face increased ESG- or anti-ESG-focused activism, our cost of capital may increase, and our reputation may also be negatively affected.
Previous wording
Our reputation, as well as our stakeholder relationships, could be adversely impacted as a result of, among other things, any failure to meet our ESG plans or targets or stakeholder perceptions of statements made by us, our employees and executives, agents, or other third parties or public pressure from investors or policy groups to change our policies. Furthermore, public statements with respect to ESG matters—for example, emission reduction goals, other environmental targets, or other commitments addressing certain social issues—are becoming increasingly subject to heightened scrutiny from public and governmental authorities related to the risk of potential “greenwashing,”i.e., misleading information or false claims overstating potential ESG benefits. We may face increased litigation risk from private parties and governmental authorities related to our ESG efforts. Additionally, any such alleged claims of greenwashing against us or others in our industry could lead to negative sentiment and the diversion of investment. To the extent that we are unable to respond timely and appropriately to any negative publicity, our reputation could be harmed. Damage to our overall reputation could have a negative impact on our financial results and require additional resources to rebuild our reputation.
Current wording
Our reputation, as well as our stakeholder relationships, could be adversely impacted as a result of, among other things, any failure to meet our ESG plans or targets or stakeholder perceptions of statements made by us, our employees and executives, agents, or other third parties or public pressure from investors or policy groups to change our policies. Furthermore, public statements with respect to ESG matters—for example, emission reduction goals, other environmental targets, or other commitments addressing certain social issues—are becoming increasingly subject to heightened scrutiny from public and governmental authorities related to the risk of potential “greenwashing,” i.e., misleading information or false claims overstating potential ESG benefits. We may face increased litigation risk from private parties and governmental authorities related to our ESG efforts, including the perception that we are doing too much or too little on ESG issues. Additionally, any alleged claims of greenwashing against us or others in our industry could lead to negative sentiment and the diversion of investment. To the extent that we are unable to respond timely and appropriately to any negative publicity, our reputation could be harmed. Damage to our overall reputation could have a negative impact on our financial results and require additional resources to rebuild our reputation.
Previous wording
Perpetua Resources does not have a full staff of technical people and relies upon outside consultants to provide critical services.
Current wording
Perpetua Resources does not have a full staff of technical experts and relies upon outside consultants to provide critical services.
Previous wording
Perpetua Resources has a relatively small staff and depends upon its ability to hire consultants with the appropriate background and expertise. Perpetua Resources’ inability to hire the appropriate consultants at the appropriate time could adversely impact Perpetua Resources’ ability to advance its exploration and permitting activities. For example, Perpetua Resources will need to hire additional staff and consultants in order to commence construction of the Project. See sectionItem 1A, Risk Factors - Perpetua Resources faces substantial competition within the mining industry from other mineral companies with much greater financial and technical resources and Perpetua Resources may not be able to effectively compete.
Current wording
Perpetua Resources has a relatively small staff and depends upon its ability to hire consultants with the appropriate background and expertise. Perpetua Resources’ inability to hire the appropriate consultants at the appropriate time could adversely impact Perpetua Resources’ ability to advance its exploration and permitting activities. For example, Perpetua Resources will need to hire additional staff and consultants in order to commence construction of the Project. SeeItem 1A, Risk Factors - Perpetua Resources faces substantial competition within the mining industry from other mineral companies with much greater financial and technical resources and Perpetua Resources may not be able to effectively compete.
Previous wording
Resource exploration and development is a speculative business, characterized by a high number of failures. Substantial expenditures are required to discover new deposits and to develop the infrastructure, mining and processing facilities at any site chosen for mining. Resource exploration and development also involves a high degree of risk, which even a combination of experience, knowledge and careful evaluation may not be able to adequately mitigate. Few properties that are explored are ultimately developed into producing mines, and there is no assurance that commercial quantities of ore will be discovered on any of the Corporation’s exploration properties. There is also no assurance that, even if commercial quantities of ore are discovered, a mineral property will be brought into commercial production, or if brought into production, that it will be profitable. The discovery of mineral deposits is dependent upon a number of factors, including the technical skill of the exploration personnel involved. The commercial viability of a mineral deposit is also dependent upon, among a number of other factors, its size, grade, proximity to infrastructure, current metal prices, and government regulations, including regulations relating to required permits, royalties, allowable production, importing and exporting of minerals and environmental protection. The exact effect of these factors cannot be accurately predicted, but any one of these factors, or the combination of any of these factors, may prevent Perpetua Resources from receiving an adequate return on invested capital. In addition, depending on the type of mining operation involved, several years can elapse from the initial phase of drilling until commercial operations are commenced. Some ore reserves may become unprofitable to develop if there are unfavourable long-term market price fluctuations in gold or other metals, or if there are significant increases in operating or capital costs. Most of the above factors are beyond the Corporation’s control, and it is difficult to ensure that the exploration or development programs proposed by Perpetua Resources will result in a profitable commercial mining operation. Please also see, among other things, the risk factor found under the subheading “Perpetua Resources’ future exploration and development efforts may be unsuccessful” below.
Current wording
Resource exploration and development is a speculative business, characterized by a high number of failures. Substantial expenditures are required to discover new deposits and to develop the infrastructure, mining and processing facilities at any site chosen for mining. Resource exploration and development also involves a high degree of risk, which even a combination of experience, knowledge and careful evaluation may not be able to adequately mitigate. Few properties that are explored are ultimately developed into producing mines, and there is no assurance that commercial quantities of ore will be discovered on any of the Company’s exploration properties. There is also no assurance that, even if commercial quantities of ore are discovered, a mineral property will be brought into commercial production, or if brought into production, that it will be profitable. The discovery of mineral deposits is dependent upon a number of factors, including the technical skill of the exploration personnel involved. The commercial viability of a mineral deposit is also dependent upon, among a number of other factors, its size, grade, proximity to infrastructure, current metal prices, and government regulations, including regulations relating to required permits, royalties, allowable production, importing and exporting of minerals and environmental protection. The exact effect of these factors cannot be accurately predicted, but any one of these factors, or the combination of any of these factors, may prevent Perpetua Resources from receiving an adequate return on invested capital. In addition, depending on the type of mining operation involved, several years can elapse from the initial phase of drilling until commercial operations are commenced. Some ore reserves may become unprofitable to develop if there are unfavourable long-term market price fluctuations in gold or other metals, or if there are significant increases in operating or capital costs. Most of the above factors are beyond the Company’s control, and it is difficult to ensure that the exploration or development programs proposed by Perpetua Resources will result in a profitable commercial mining operation. Please also see, among other things, sectionItem 1A, Risk Factors - Perpetua Resources’ future exploration and development efforts may be unsuccessful above.
Previous wording
The Project, and any future operations in which Perpetua Resources has a direct or indirect interest, will be subject to all the hazards and risks normally incidental to resource companies and mining in general. Environmental hazards, unusual or unexpected geological operating conditions, such as rock bursts, structural cave-ins and landslides, fires, earthquakes and flooding, power outages, labor disruptions, industrial accidents such as explosions, unexpected mining dilution, metallurgical and other processing issues, metal losses and periodic interruptions due to inclement or hazardous weather conditions, and the inability to obtain suitable or adequate machinery, equipment or labor, are some of the industry operating risks involved in the conduct of exploration programs and the operation of mines. If any of these events were to occur, they could cause injury or loss of life, environmental damage, operational delays, monetary losses and/or severe damage to or destruction of mineral properties, production facilities or other properties. As a result, Perpetua Resources could be the subject of a regulatory investigation, potentially leading to penalties and suspension of operations. In addition, Perpetua Resources may have to make expensive repairs and could be subject to legal liability as an outcome of regulatory enforcement. The occurrence of any of these operating risks and hazards may have an adverse effect on Perpetua Resources’ financial condition and operations, and correspondingly on the value and price of Perpetua Resources’ common shares.
Current wording
losses and periodic interruptions due to inclement or hazardous weather conditions, and the inability to obtain suitable or adequate machinery, equipment or labor, are some of the industry operating risks involved in the conduct of exploration programs and the operation of mines. If any of these events were to occur, they could cause injury or loss of life, environmental damage, operational delays, cost overruns or other monetary losses and/or severe damage to or destruction of mineral properties, production facilities or other properties. As a result, Perpetua Resources could be the subject of a regulatory investigation, potentially leading to penalties and suspension of operations. In addition, Perpetua Resources may have to make expensive repairs and could be subject to legal liability as an outcome of regulatory enforcement. The occurrence of any of these operating risks and hazards may have an adverse effect on Perpetua Resources’ financial condition and operations, and correspondingly on the value and price of Perpetua Resources’ common shares.
Previous wording
Future revenues, if any, are expected to be in large part derived from the future mining and sale of gold and other potential by-products or interests related thereto. The prices of these commodities fluctuate and are affected by numerous factors beyond Perpetua Resources’ control, including, among others:
Current wording
Future revenues, if any, are expected to be in large part derived from the future mining and sale of gold, antimony and other potential by-products or interests related thereto. The prices of these commodities fluctuate and are affected by numerous factors beyond Perpetua Resources’ control, including, among others:
Previous wording
While the price of gold has recently been strong, there can be no assurance that gold prices will remain at such levels or be such that the Project, and any future operations in which Perpetua Resources has a direct or indirect interest, will be mined at a profit. Some credible industry experts are predicting that gold will continue to increase in price during 2024 and the next several years. However, other credible industry experts expect that the price of gold has generally peaked during the recent pandemic and resulting economic crisis, and that as economies slowly recover over the next few years, the price of gold will decrease and be worth much less per ounce than it is today.
Current wording
While the price of gold has recently been strong, there can be no assurance that gold prices will remain at such levels or be such that the Project, and any future operations in which Perpetua Resources has a direct or indirect interest, will be mined at a profit. Some credible industry experts are predicting that gold will continue to increase in price during 2025 and the next several years. However, other credible industry experts expect that the price of gold has generally peaked and be worth much less per ounce than it is today.
Previous wording
high volatility in global and specifically mining equity markets, commodity, foreign exchange and precious metal markets, and a lack of market liquidity. A slowdown in the financial markets or other economic conditions, including but not limited to, reduced consumer spending, increased unemployment rates, deteriorating business conditions, inflation, deflation, volatile fuel and energy costs, increased consumer debt levels, lack of available credit, lack of future financing, a prolonged recession, changes in interest rates and tax rates may adversely affect the Corporation’s growth and profitability potential. Specifically:
Current wording
Many industries, including the precious metal mining industry, are impacted by global market conditions. Some of the key impacts of financial market turmoil can include contraction in credit markets resulting in a widening of credit risk, devaluations and high volatility in global and specifically mining equity markets, commodity, foreign exchange and precious metal markets, and a lack of market liquidity. A slowdown in the financial markets or other economic conditions, including but not limited to, reduced consumer spending, increased unemployment rates, deteriorating business conditions, inflation, deflation, volatile fuel and energy costs, increased consumer debt levels, lack of available credit, lack of future financing, a prolonged recession, the implementation of certain tariffs, changes in interest rates and tax rates may adversely affect the Corporation’s growth and profitability potential. Specifically:
Showing the first 40 of 52 pairs. Open the source sections for the rest.
Rearranged current paragraphs (7)
Current report — wording carried from elsewhere
testing or pilot plant tests for metallurgy and other factors, there remains the possibility that the ore may not react in commercial production in the same manner as it did in testing.
Current report — wording carried from elsewhere
The mineral resource industry is intensively competitive in all of its phases, and Perpetua Resources competes with many companies possessing much greater financial and technical research resources for the acquisition of mineral claims, leases and other mineral interests, as well as for the recruitment and retention of qualified employees and other personnel. Competition is particularly
Current report — wording carried from elsewhere
Some capital markets participants are increasingly using certain components of ESG as a factor in their assessments, which could impact our cost of capital or access to financing. There has also been an acceleration in investor demand for ESG investing opportunities, and many institutional investors have committed to increasing the percentage of their portfolios that are allocated towards ESG-focused investments. As a result, there has been a proliferation of ESG-focused investment funds and market participants seeking ESG-oriented investment products. There has also been an increase in third-party providers of company ESG ratings and rankings, and an increase in ESG-focused voting policies among proxy advisory firms, portfolio managers, and institutional investors. For example,
Current report — wording carried from elsewhere
The Project, and any future operations in which Perpetua Resources has a direct or indirect interest, will be subject to all the hazards and risks normally incidental to resource companies and mining in general. Environmental hazards, unusual or unexpected geological operating conditions, such as rock bursts, structural cave-ins and landslides, fires, earthquakes and flooding, power outages, labor disruptions, industrial accidents such as explosions, unexpected mining dilution, metallurgical and other processing issues, metal
Current report — wording carried from elsewhere
not less than 10% of our common shares. Andrew Cole and Marcelo Kim are Paulson’s nominees to the Board and Marcelo Kim was appointed Chairman of our Board in March of 2020.
Current report — wording carried from elsewhere
In the future, we may be subject to legal proceedings.
Current report — wording carried from elsewhere
until deployed. We may also be unable to investigate or remediate incidents as attackers are increasingly using techniques and tools designed to circumvent controls, to avoid detection, and to remove or obfuscate forensic evidence.
Rearranged previous paragraphs (8)
Previous report — wording carried elsewhere
mineral reserve estimates being overstated, the mineable gold that can be received from the Project being less than the mineral resource and mineral reserve estimates, and the Project not being a viable project.
Previous report — wording carried elsewhere
of obtaining required government permits and approvals, responding to opposition to the Project, including potential litigation, the availability and cost of financing, the participation of our partners, and the execution of any sale or joint venture agreements with strategic partners. These factors, and others, are beyond our control. There is no assurance that we will be profitable in the future.
Previous report — wording carried elsewhere
consumers (such as boycotts or negative publicity campaigns), which could adversely affect our reputation, business, financial performance, market access and growth.
Previous report — wording carried elsewhere
Certain of Perpetua Resources’ properties may be subject to the rights or the asserted rights of various community stakeholders, including federally-recognized tribes. The presence of community stakeholders may also impact on the Corporation’s ability to explore,
Previous report — wording carried elsewhere
Many industries, including the precious metal mining industry, are impacted by global market conditions. Some of the key impacts of financial market turmoil can include contraction in credit markets resulting in a widening of credit risk, devaluations and
Previous report — wording carried elsewhere
As a public company in the United States, we need to comply with federal and state laws, regulations and requirements, certain corporate governance provisions of Sarbanes-Oxley, related regulations of the SEC and the requirements of Nasdaq, with which we are
Previous report — wording carried elsewhere
only being required to provide two years of audited financial statements in annual reports. Decreased disclosures in our SEC filings due to our status as an “emerging growth company” or “smaller reporting company” may make it harder for investors to analyze the Company’s results of operations and financial prospects.
Previous report — wording carried elsewhere
reduced rate of withholding tax under the United States-Canada income tax treaty. In addition, a foreign tax credit or a deduction in respect of any U.S. federal withholding tax may not be available under Canadian law.