For the period ended Sep 30, 2026. Filed Nov 4, 2026.

View on SEC.gov

About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Sep 30, 2026 · Filed Nov 4, 2026

UUUU$7.31+9.8%Stored close · as of Nov 9, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-Q

Period ended 2026-06-30; filed 2026-08-05.

0001385849-26-000029

ITEM 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

Current report: 10-Q

Period ended 2026-09-30; filed 2026-11-04.

0001385849-26-000037

ITEM 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 254 previous paragraphs and 270 current paragraphs.

122 unchanged; 98 reworded; 46 added; 31 removed; 3 previous and 4 current paragraphs rearranged.

Tables are not compared: 19 previous and 19 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (46)

Current report

To accelerate production from its low-cost Pinyon Plain mine in 2026, the Company has transitioned miners from the La Sal Project to the Pinyon Plain Project, and the Company expects to increase mined ore to stockpile at the Mill for processing during Q4 2026 and/or 2027, subject to market conditions, contract requirements and the Mill’s schedule.

Current report

The Mill processed and produced 1.66 million pounds of finished U 3 O 8 during the nine months ended September 30, 2026.

Current report

The Mill’s heavy REE expansion is sized and timed to process the anticipated near-term monazite output from the Company’s Donald Project joint venture in Australia. In October 2026, Export Finance Australia (“EFA”) and the National Reconstruction Fund Corporation (“NRFC”) conditionally approved term loan facilities as part of a proposed AUD 200 million senior project finance debt facility to support construction of Phase 1 of the Donald Project, comprising up to AUD 180 million in aggregate from EFA and NRFC, with the remaining AUD 20 million contemplated from commercial lenders. The Company is targeting a positive FID by the end of 2026. Phase 1 of the Donald Project is expected to produce an average over the first five years of mine life of approximately 9,000 tpa of REE concentrate containing monazite and xenotime, which is planned to be processed at the Mill into NdPr, Tb and Dy oxides. These REE oxides are expected to support the Company’s planned integrated REE supply chain, including the KMP and planned AMP and, subject to completion of the VAC Acquisition, VAC’s REPM manufacturing facilities as early as 2028.

Current report

On August 28, 2026, the ASM Acquisition was completed pursuant to the Deed.

Current report

Under the Deed, at closing, each holder of ordinary shares of ASM received consideration of (i) 0.053 Company common shares for each ASM share held on the Scheme Record Date (being 5 pm Sydney, Australia time on August 21, 2026) (the “Share Consideration”), and (ii) AUD 0.13 in cash. The total Scheme Consideration was approximately $248.49 million, including total Share Consideration issued by Energy Fuels of $217.24 million based on the closing price of the Company’s common shares as of August 28, 2026 and total cash consideration to ASM shareholders of approximately $26.10 million. In addition, ASM option holders received AUD 0.50 per ASM option under a separate, but concurrent, scheme of arrangement, resulting in total cash consideration to ASM option holders of approximately $5.15 million. Holders of ordinary shares of ASM that reside in certain jurisdictions will receive the net proceeds from the sale made by a nominee of the Company’s common shares in lieu of the Share Consideration.

Current report

The KMP, acquired through the ASM Acquisition, is the Company’s current REE metals and alloys metallization facility. It has twelve furnaces installed and one strip caster, with installed alloy nameplate production capacity of approximately 1,300 tpa of neodymium-iron-boron (“NdFeB”) alloy. To support expected customer demand, ASM has initiated a phased expansion. Phase 2 ramp up is progressing toward the facility’s full nameplate capacity of 3,600 tpa of NdFeB alloy through additional furnaces and a second strip caster. Eight additional furnaces were installed in the first half of 2026 to maximize NdPr metal output. The second strip caster has been purchased and is being installed at KMP; together with the existing operational strip caster, it will raise total strip cast capacity to 3,600 tpa. Early planning has also begun for a potential Phase 3 expansion that could increase total nameplate capacity to around 5,600 tpa, positioning KMP as a cornerstone asset in global rare earth supply chains and a key enabler of advanced magnet and manufacturing markets. Phase 3 will be conditional on internal and external demand for metals and alloys, taking into consideration additional capacity available at an AMP if developed as planned.

Current report

Subject to completion of the pending VAC Acquisition, the Company intends to use the KMP’s metal and alloy production capabilities to supply VAC’s REE magnet manufacturing operations. The KMP would provide the metallization and alloying step between separated REE oxide production at the Mill and downstream magnet manufacturing at VAC. Metal and/or alloy production capacity not required for the Company’s internal needs may be available for sales to third-party customers, subject to market conditions.

Current report

The KMP achieved a significant milestone with the first commercial sales of Tb and Dy metal – two of the most technically challenging and strategically important REEs. These products were validated and have contributed to a surge in inquiries from global manufacturers seeking reliable heavy rare earth supply partners. To meet this demand, and to satisfy the Company’s internal demands upon closing of the VAC Acquisition as contemplated, the KMP is actively expanding its heavy REE metal production capacity and is targeting commencement of commercial-scale heavy REE metal production in 2027.

Current report

Further to the operational success of the KMP, ASM has explored the strategic expansion of its metallization capability and the extension of its vertically integrated strategy through the proposed AMP. The AMP is expected to leverage the U.S. government focus on supply chain vulnerability and domestic production capabilities in the rare earth and metallization market to position the Company to address critical U.S. supply chain needs and strengthen the enduring partnership between the U.S. and Australia. The AMP is expected to replicate proprietary alloy production processes, NdPr metallization and advanced heavy rare earth metallization techniques to focus on NdFeB alloy production from separated rare earths (NdPr, Dy, Tb), which are critical to defense, magnet, mobility, manufacturing and clean energy applications and represent acute supply chain vulnerabilities in the U.S. The proposed AMP is expected to have an initial nameplate production capacity of 2,000 tpa (with the ability to expand to 4,000 tpa) of alloy. The Company remains engaged with U.S. and state government agencies and funding bodies to meet relevant permitting and funding requirements, to identify and select the optimal location for the AMP, and to negotiate and understand state incentives available for such facility. If the VAC Acquisition closes as contemplated, the AMP could potentially be located in Sumter, South Carolina, adjacent to VAC’s existing REE magnet-making facility, or another location.

Current report

On August 19, 2026, the Company announced that its Tb oxide produced at the Mill was qualified for use by the largest permanent magnet manufacturer in Japan and one of the largest REPM manufacturers outside of China. The manufacturer informed the Company that the Tb oxide met all applicable specifications and was approved for use in commercial permanent magnet production without further qualification or validation.

Current report

The Company previously announced the qualification of its NdPr and Dy oxides for permanent magnet manufacturing applications.

Current report

Since acquiring the Vara Mada Project, the Company has been in discussions with the Government of Madagascar to establish the necessary legal regime to support development of the Vara Mada Project, which will be required before a positive FID can be made. These discussions have been focused on, among other things, mechanisms for achieving legal and fiscal stability, select tax and custom benefits, necessary adjustments to foreign exchange rules, protections from expropriation and access to international arbitration for dispute resolution. The Company has also been seeking clarification of existing procedures for adding monazite to the Vara Mada Project’s mining permit, which currently allows for the production of ilmenite, rutile, and zircon. Discussions with the Government have focused on addressing these issues through an investment agreement to be approved by Parliament or through revisions to existing Malagasy law applicable to large-scale mining investments.

Current report

The following table summarizes the Company’s investments through September 30, 2026 (in thousands) and ownership interest in the Donald Project JV as of September 30, 2026:

Current report

(1) Stated in AUD per the JV Agreements. Translated as of September 30, 2026 at an exchange ratio of A$1.00 to $0.6963.

Current report

The Bahia Project is an HMS deposit containing monazite that the Company believes has the potential to supply meaningful quantities of REEs to the Mill for processing into high-purity REE oxides. Since acquiring the deposit, the Company has been focused on an exploration program over the 40 kilometer trend of the deposit. Recently, the Company completed its Phase 3 drilling program, where it drilled over 8,000 meters with both its own sonic drill rig and a contract hollow auger rig. Samples from that drilling program are currently being assayed at SGS in Belo Horizonte for total heavy mineral content as well as chemical composition. The Company has completed the permitting on its Phase 4 drilling program that it plans to commence drilling program in late 2026 or early 2027.

Current report

The Company expects global nuclear generating capacity to increase through the construction of new nuclear units and the extension of existing capacity. Meanwhile, primary uranium mine production continues to face challenges from resource depletion, production disruptions, commissioning and logistical issues, and uranium prices that may be insufficient to incentivize the development of new production. The Company believes uranium prices will need to be sufficiently high to support additional primary production to address the resulting supply deficit.

Current report

The Company believes that these uranium supply and demand fundamentals, together with increasing demand for electricity from data centers, artificial intelligence and other technology applications, could support sustained uranium market strength and higher prices. However, the uranium market remains subject to significant uncertainty, including the availability of secondary supplies and inventories and the activities of state-owned enterprises. Russia, and increasingly, China maintain significant capabilities across the nuclear fuel cycle, and changes in geopolitical conditions, trade restrictions or other factors could increase the availability of supplies from these sources and adversely affect uranium market conditions.

Current report

Following the successful ASM Acquisition, the Company is combining the KMP and the planned AMP with REE oxide production from the Mill. The Company also now owns the advanced Dubbo REE Project in Australia.

Current report

Accretion of asset retirement obligations decreased by $0.11 million to $0.58 million for the three months ended September 30, 2026 from $0.69 million for the three months ended September 30, 2025.

Current report

Share-based compensation increased by $0.26 million to $3.56 million for the three months ended September 30, 2026 from $3.30 million for the three months ended September 30, 2025, primarily due to increased headcount coupled with higher grant date fair values.

Current report

Income tax benefit was $0.46 million for the three months ended September 30, 2026 on loss before income taxes of $52.83 million. The income tax benefit in 2026 primarily reflects a decrease in the deferred tax liabilities recognized in connection with the ASM Acquisition, principally related to deferred tax effects associated with the fair value adjustments to intangible assets acquired in South Korea. Income tax expense was $0.08 million for the three months ended September 30, 2025 on loss before income taxes of $16.92 million primarily reflected Brazil income tax arising from transfer-pricing revenue.

Current report

The Company sold 270,000 pounds of U 3 O 8 at a weighted average sales price of $88.79 per pound under long-term contracts for $23.97 million for the three months ended September 30, 2026 compared to 140,000 pounds U 3 O 8 sold at a weighted average sales price of $69.43 per pound under long-term contracts for $9.72 million for the three months ended September 30, 2025.

Current report

Revenues from REE metals and alloys were $0.44 million for the three months ended September 30, 2026 following the ASM Acquisition. Costs applicable to REE metals and alloys revenues were $0.41 million for the three months ended September 30, 2026. There were no revenues or costs applicable to REE revenues for the three months ended September 30, 2025.

Current report

Nine Months Ended September 30, 2026 Compared to Nine Months Ended September 30, 2025

Current report

For the nine months ended September 30, 2026, net loss increased by $31.76 million to $96.93 million or $0.39 per share from $65.17 million or $0.29 per share for the nine months ended September 30, 2025 primarily due to higher mark-to-market losses on marketable securities, interest expense on the Notes and transaction and integration related costs related to the ASM Acquisition and pending acquisition of VAC, partially offset by improved uranium operating results.

Current report

Exploration, development and processing costs (excluding share-based compensation) increased by $0.05 million to $28.02 million for the nine months ended September 30, 2026 from $27.97 million for the nine months ended September 30,

Current report

2025, primarily due to increased exploration and development activities to progress the Company’s projects and a non-recurring charge to write off costs associated with the Company’s decision to no longer pursue permitting of the Wate Project. These increases were largely offset by the capitalization of development costs for the Juniper Zone at Pinyon Plain in 2026 following the release of the updated Pinyon Plain pre-feasibility study effective January 1, 2026 and the absence of the $3.42 million charge recognized in 2025 to write off value-added tax receivables.

Current report

The Company sold 840,000 pounds of U 3 O 8 under long-term contracts for $62.32 million, at a weighted average sales price of $74.19 per pound for the nine months ended September 30, 2026 compared to 140,000 pounds of U 3 O 8 under long-term contracts for $9.72 million at a weighted average sales price of $69.43 per pound for the nine months ended September 30, 2025.

Current report

The Company sold 300,000 pounds of U 3 O 8 on the spot market for $26.80 million at a weighted average sales price of $89.33 per pound for the nine months ended September 30, 2026 compared to 150,000 pounds of U 3 O 8 on the spot market for $11.50 million at a weighted average sales price of $76.67 per pound for the nine months ended September 30, 2025.

Current report

Revenues from REE metals and alloys were $0.44 million for the nine months ended September 30, 2026 following the ASM Acquisition. Costs applicable to REE metals and alloys revenues were $0.41 million for the nine months ended September 30, 2026. There were no revenues or costs applicable to REE alloy revenues for the nine months ended September 30, 2025.

Showing the first 40 of 46 passages. Open the source sections for the rest.

Removed paragraphs (31)

Previous report

Ore grades at Pinyon Plain in the first half of 2026 are lower than 2025 due to moving from one high-grade zone to a lower-grade zone and are expected to increase moving forward as mining moves into higher-grade zones. Processing at the Mill began in Q4 2025 and was completed at the end of Q2 2026. Ore and mineralized material that was not processed will be stockpiled at the Mill and is included in the Company’s inventories of U 3 O 8 contained in stockpiled ore and mineralized materials. Starting in Q3 2026, the Mill expects to process stockpiled Alternate Feed Materials, rebuild ore and mineralized material stockpiles for future processing, and begin construction on planned REE infrastructure. The Company currently expects to process any additional stockpiled and mined ore and mineralized material from its Pinyon Plain, La Sal and Pandora mines during Q4 2026 and/or 2027, subject to market conditions, contract requirements and the Mill’s schedule.

Previous report

The Mill processed stockpiled conventional ore and mineralized materials and Alternate Feed Materials, which resulted in 865,000 and 1,655,000 pounds of finished U 3 O 8 production during the three and six months ended June 30, 2026, respectively. As planned, the Company commenced its conventional ore processing campaign at the Mill in Q4 2025 and completed it in Q2 2026.

Previous report

The Mill’s heavy rare earth expansion is sized and timed to process the anticipated near-term monazite output from the Company’s Donald Project joint venture in Australia. Subject to a positive FID (anticipated as early as Q3 2026, following completion of negotiation of project debt financing for the Donald Project with Export Finance Australia and other lenders targeting AUD$220 million), the Donald Project is expected to produce approximately 8,500 to 9,500 tonnes of monazite concentrate annually beginning in 2028. This volume, along with additional third-party feedstock currently under contract and in discussion, is expected to fully utilize the Mill’s current NdPr oxide capacity, and planned Tb and Dy oxide capacity, which is expected to be commissioned as early as Q4 2027. In turn, subject to successful acquisition of ASM and VAC, these rare earth oxides are expected to supply roughly 70% of the feedstock required for ASM’s existing and planned metal and alloy capacity in South Korea, which itself is expected to supply sufficient magnet alloy to supply over 100% of the 2,000 tonnes of magnet capacity at VAC’s existing magnet manufacturing facility in Sumter, South Carolina – the largest REPM-making facility in the U.S.

Previous report

The Company entered into a definitive agreement on January 20, 2026, as amended on March 12, 2026, to acquire 100% of the issued share capital of ASM by way of a scheme of arrangement under Australian law. ASM is an Australian-based critical materials company with rare earth mining, processing and metallization assets, including the Dubbo Project in New South Wales, an operating metallization and alloying facility in South Korea, and plans to potentially construct a metallization and alloying facility in the U.S.

Previous report

Upon completion of the transaction, the Company expects ASM’s metallization and alloying capabilities to complement the Company’s existing rare earth mining, processing and separation operations and support the development of a more integrated rare earth supply chain serving key end markets, including automotive, robotics, energy and defense applications.

Previous report

Under the terms of the transaction, ASM shareholders will be entitled to receive 0.053 Common Shares (or CHESS Depositary Interests) for each ASM ordinary share held, and up to AUD$0.13 per ASM share in cash, subject to customary conditions. ASM option holders are expected to receive cash consideration of AUD$0.50 per option under a concurrent option scheme of arrangement. The transaction remains subject to court, regulatory and shareholder approval under the Australian scheme of arrangement process. Australian foreign investment approval has been obtained. Subject to the satisfaction of the remaining closing conditions, the Company expects the transaction to close at the end of August 2026.

Previous report

Consistent with the MOU, the Company and the Government have been negotiating the terms of an investment agreement to be submitted to the Madagascar Parliament for approval and promulgation as a law. The investment agreement is intended to provide the key pillars for a bankable large-scale project, including mechanisms for ensuring long-term legal and fiscal stability, select tax and customs benefits, adjustments to foreign exchange rules, protections from expropriation and access to international arbitration for dispute resolution. While discussions have focused on an investment agreement as the Stability Mechanism, it is possible that other means of achieving stability will be considered and/or pursued as discussions progress.

Previous report

The Company has also been focusing on re-establishment of the Company’s social programs after the five-year hiatus imposed following the lifting of suspension, including re-establishing meaningful community engagement and social programs aimed at securing a firm social license to operate to support safe, secure and reliable surface access to collect baseline, technical and other data necessary to update permit conditions, as well as performing additional mine planning and engineering work, expanding the critical mineral resource base, and progressing other activities necessary to progress the Vara Mada Project and achieve a positive FID.

Previous report

On October 17, 2025, a new President of Madagascar was sworn in by the Country’s High Constitutional Court following a period of social unrest and political instability that resulted in the removal of the Country’s prior President. In-country political developments continue to evolve, including with respect to changes and appointments of key governmental ministers. Energy Fuels is working with the new administration to reaffirm the previously negotiated concepts with the prior administration, which had substantially finalized the core investment agreement terms, and otherwise continues to constructively engage with the new administration.

Previous report

The Bahia Project is a HMS and REE deposit that the Company believes has the potential to supply 3,000 to 5,000 tonnes of monazite per year to the Mill for decades for processing into high-purity REE oxides. That amount of monazite contains approximately 1,500 to 2,500 tonnes of TREO, including an estimated 300 to 500 tonnes of NdPr per year and significant commercial quantities of Tb and Dy and other “heavy” REEs. While Energy Fuels’ primary interest in acquiring the Bahia Project is the uranium and REE-bearing monazite, the Bahia Project is also expected to produce high-quality ilmenite, rutile and zircon minerals for the production of the critical minerals, titanium and zirconium.

Previous report

The Company continues to believe that uranium prices will continue to rise to levels that support the additional primary production that is expected to be required. We expect more nuclear units to be constructed around the world, along with existing capacity extended and protected, while primary mine production drops due to depletion of resources, reduced production, commissioning challenges, logistic issues, and insufficiently high prices.

Previous report

The Company believes that certain uranium supply and demand fundamentals point to sustained market strength and potentially higher prices in the future, increased demand from utilities and end-users (including data center, AI and technology sectors), financial entities, traders, and producers. However, the Company also believes that while uranium market conditions have improved significantly since 2021, they still could be vulnerable, primarily due to secondary uranium supplies, excess inventories, and non-market activities of state-owned enterprises. While U.S. and European utilities are reducing their exposure to Russian supply, the Company believes that Russia, and increasingly China, maintains significant capabilities across the nuclear fuel cycle, which could re-enter the global market in the future upon resolution of the conflict in Ukraine, circumvention of trade restrictions, a cooling of geopolitical tensions or other factors.

Previous report

Vanadium prices during recent periods have reflected a combination of global steel demand conditions, macroeconomic uncertainty and trade‑related developments. While demand for vanadium remains primarily tied to steel production, the Company believes longer‑term demand may also be influenced by infrastructure spending, energy transition initiatives and potential growth in energy storage applications.

Previous report

The Company believes that vanadium market fundamentals remain closely linked to global steel demand and that pricing may continue to experience volatility in the near term. The Company continues to maintain vanadium inventory and believes this inventory provides it with flexibility to respond to improved market conditions or sales opportunities, should the Company elect to pursue sales, while managing downside risk during periods of price volatility.

Previous report

Share-based compensation increased by $0.75 million to $3.64 million for the three months ended June 30, 2026 from $2.89 million for the three months ended June 30, 2025, primarily due to accelerated vesting of awards in connection with the Company’s executive succession plan.

Previous report

The Company sold 160,000 pounds of U 3 O 8 under existing long-term contracts for $12.21 million, at a weighted average sales price of $76.33 per pound for the three months ended June 30, 2026 compared to no long-term contract sales for the three months ended June 30, 2025.

Previous report

There were no revenues or costs applicable to rare earth element revenues for either of the three months ended June 30, 2026 or 2025.

Previous report

There were no revenues or costs applicable to heavy mineral sands for the three months ended June 30, 2026. Revenues from HMS were $0.28 million and costs applicable to HMS were $1.00 million for the three months ended June 30, 2025.

Previous report

Six Months Ended June 30, 2026 Compared to Six Months Ended June 30, 2025

Previous report

For the six months ended June 30, 2026, net loss decreased by $3.60 million to $44.56 million or $0.18 per share from $48.16 million or $0.23 per share for the six months ended June 30, 2025 primarily due to higher uranium concentrates revenues driven by the timing of uranium sales, partially offset by higher total operating costs and expenses, including transaction and integration related costs associated with the planned acquisitions of ASM and VAC.

Previous report

Exploration, development and processing costs (excluding share-based compensation) increased by $0.69 million to $16.21 million for the six months ended June 30, 2026 from $15.52 million for the six months ended June 30, 2025, primarily due to higher indirect processing costs at the Mill, higher exploration and development costs at the La Sal Complex as well as higher exploration costs at the Bahia Project, partially offset by consumable inventory for reclamation activities at the Kwale Project that was expensed in 2025 and development costs for the Juniper Zone at Pinyon Plain were capitalized in 2026 following the release .

Previous report

The Company sold 250,000 pounds of U 3 O 8 on the spot market for $22.33 million at a weighted average sales price of $89.30 per pound for the six months ended June 30, 2026 compared to 50,000 pounds of U 3 O 8 on the spot market for $3.85 million at a weighted average sales price of $77.00 per pound for the six months ended June 30, 2025.

Previous report

The Company sold 570,000 pounds of U 3 O 8 under existing long-term contracts for $38.35 million, at a weighted average sales price of $67.27 per pound for the six months ended June 30, 2026 compared to no long-term contract sales for the six months ended June 30, 2025.

Previous report

Six Months Ended June 30, 2026 Compared to Six Months Ended June 30, 2025
Reworded paragraphs (98)

Previous wording

We produce several of the critical materials essential to U.S. energy security and advanced technologies, including uranium, REEs, vanadium and HMS, to strengthen domestic supply chains and reduce reliance on foreign sources. The Company owns conventional uranium, uranium/vanadium and REE/HMS properties, projects in various stages of operation, development, exploration and permitting, and fully permitted uranium and uranium/vanadium projects on standby. The Company’s White Mesa Mill near Blanding, Utah, is the only licensed and operating uranium mill and the only uranium mill capable of producing separated REE oxides in the U.S.

Current wording

We produce several of the critical materials essential to U.S. energy security and advanced technologies, including uranium, REEs and HMS, to strengthen domestic supply chains and reduce reliance on foreign sources. We own conventional uranium, uranium/vanadium and REE/HMS properties, projects in various stages of operation, development, exploration and permitting, and fully permitted uranium and uranium/vanadium projects on standby. The Company’s White Mesa Mill near Blanding, Utah, is the only licensed and operating uranium mill and the only uranium mill capable of producing separated REE oxides in the U.S.

Previous wording

The Mill is our key to building a critical materials hub in the U.S. through the production of uranium, REEs, vanadium and potentially radium. Uranium is the strategic fuel powering carbon free, emission free baseload nuclear energy and remains one of the most reliable forms of power supporting U.S. energy independence and decarbonization goals. The REEs we produce are essential to manufacture permanent magnets used in EVs, hybrid EVs, defense systems, robotics and other advanced technologies. The titanium and zirconium products derived from our HMS production are used in national security and other key industries. Titanium is used in pigments, aircraft engines and airframes, spacecraft components, and medical devices, while zirconium is crucial for fuel rod cladding, reactor components, jet engine parts and advanced ceramics in medical, aerospace and chemical applications. The radium that we are evaluating recovering from our REE and uranium processing streams has the potential to provide materials needed for emerging TAT cancer treatments. In addition, Energy Fuels recovers uranium from Alternate Feed Materials at the Mill, recycling valuable resources that would otherwise be discarded and returning them to the fuel cycle to support U.S. nuclear energy and national security objectives.

Current wording

The Mill is our key to building a critical materials processing hub in the U.S. through the production of uranium, REEs, vanadium and potentially radium. Uranium powers carbon and emission free baseload nuclear energy. Nuclear energy is one of the most reliable forms of power to support U.S. energy independence and decarbonization goals. REEs are essential to manufacture permanent magnets used in EVs, hybrid EVs, defense systems, robotics and other advanced technologies. We produce the materials to derive titanium and zirconium products derived from our HMS projects. Titanium is used in pigments, aircraft engines and airframes, spacecraft components, and medical devices, while zirconium is crucial for fuel rod cladding, reactor components, jet engine parts and advanced ceramics in medical, aerospace and chemical applications. We are evaluating recovering radium from our uranium and REE processing streams, which has the potential to provide materials needed for emerging TAT cancer treatments. We also recover uranium from Alternate Feed Materials at the Mill, recycling valuable resources that would otherwise be discarded and returning them to the fuel cycle to support U.S. nuclear energy and national security objectives.

Previous wording

The Company is: mining uranium ore and mineralized material from its Pinyon Plain, La Sal and Pandora mines, located in Arizona and Utah, respectively, and processing and/or stockpiling the material at the Mill; processing stockpiled Alternate Feed Materials at the Mill for the production of finished U 3 O 8 product; completing sales of U 3 O 8 under its portfolio of long-term contracts and on the spot market; performing development activities at its Donald Project in Australia in preparation for an FID, which the Company expects could be made as early as Q3 2026; negotiating fiscal and stability arrangements, seeking government approvals and performing permitting and development activities at its Vara Mada Project in Madagascar in preparation for a potential FID, which will require suitable fiscal and stability arrangements to be finalized with the Government of Madagascar; continuing drilling activities and resource evaluation at its Bahia Project in Brazil; performing various permitting, exploration and development activities across its uranium and uranium/vanadium properties in the U.S.; and completing reclamation and post‑closure monitoring activities at its Kwale Project in Kenya.

Current wording

During Q3 2026, we: mined uranium ore from the Pinyon Plain mine in Arizona and the La Sal Complex in Utah and stockpiled the material at the Mill to process stockpiled ore and Alternate Feed Materials at the Mill to produce finished U 3 O 8 commencing in Q4 2026; performed development activities at the Donald Project in preparation for an FID, which is expected by the end of 2026; continued negotiating fiscal and stability arrangements, seeking government approvals and performing permitting and development activities at the Vara Mada Project to prepare for a potential FID, which requires suitable fiscal and stability arrangements to be finalized with the Government of Madagascar; continued drilling activities and resource evaluation at the Bahia Project; performed various permitting, exploration and development activities across uranium and uranium/vanadium properties in the U.S.; and continued to complete reclamation and post‑closure monitoring activities at the Kwale Project in Kenya.

Previous wording

The Company is rapidly becoming the first western company with geographically diversified commercial capabilities across every critical step of the rare earth value chain. The Company has an REE feedstock supply source at its “shovel ready” Donald Project in Australia, with respect to which the Company expects to make a final investment decision as early as Q3 2026, as well as from its Vara Mada and Bahia HMS and REE projects, once developed, which are in the permitting and development and exploration and permitting phases, respectively; processing of monazite and other REE-bearing feed materials into separated REE oxides at Energy Fuels’ White Mesa Mill (the “White Mesa Mill” or the “Mill”); REE metals and alloy production at ASM’s currently operating Korean Metals Plant and planned American Metals Plant (subject to successful acquisition of ASM, currently planned for the end of August 2026, conditional on ASM shareholder and other approvals); and high-performance permanent magnet manufacturing and assembly at VAC’s European facilities and its recently commissioned Sumter Facility, subject to the successful acquisition of VAC. On July 29, 2026, the Company announced that it had commenced construction of a commercial-scale ‘heavy’ rare earth plant at the Mill for the production of terbium (“Tb”), dysprosium (“Dy”) and other heavy REE oxides, to supply the Company’s planned rare earth metal, alloy and magnet-making capacity, which is one of the final steps in Energy Fuels integrated mine-to-magnet platform.

Current wording

The Company is becoming a leading western company with geographically diversified commercial capabilities across every critical step of the REE value chain from mine to magnet. The Company has REE feedstock supply sources at its “shovel ready” Donald Project and once developed, its Vara Mada and Bahia Projects, which are currently in the permitting and development and exploration and permitting phases, respectively. The Company processes monazite and other REE-bearing feed materials into separated REE oxides at the White Mesa Mill. Following the ASM Acquisition, including its operational KMP, the Company manufactures REE metals and alloys. The Company expects to expand its REE metals and alloys manufacturing capacity upon development of the AMP, subject to financing, permitting and a positive FID. Subject to the successful acquisition of VAC, the Company expects to manufacture high-performance permanent REE magnets at VAC’s European facilities and its recently commissioned Sumter Facility in Sumter, South Carolina, U.S.A. Additionally, during Q3 2026, the Company approved commencement for construction of a commercial-scale ‘heavy’ rare earth circuit at the Mill for the production of Tb, Dy and other heavy REE oxides, intended to supply the Company’s planned REE metal, alloy and magnet manufacturing capabilities and further advance the Company’s mine-to-magnet platform.

Previous wording

The Company is mining ore and mineralized material at its Pinyon Plain, La Sal and Pandora mines. Such uranium-bearing ore and mineralized material is processed at the Mill and/or stockpiled at the mines or Mill for future processing, subject to market conditions, contract requirements and the Mill’s processing schedule. The Company mined contained pounds of U 3 O 8 as follows:

Current wording

The Company continued mining ore and mineralized material at its Pinyon Plain, La Sal and Pandora mines, during Q3 2026. Such uranium-bearing ore and mineralized material was processed at the Mill and/or stockpiled at the mines or Mill for future processing, subject to market conditions, contract requirements and the Mill’s processing schedule. The Company’s estimated mined pounds of U 3 O 8 was as follows:

Previous wording

(1) Weighted average grade for the three and six months ended June 30, 2026 was 0.71% and 0.91%, respectively.

Current wording

(1) Weighted average grade for the three and nine months ended September 30, 2026 was 1.04% and 0.95%, respectively.

Previous wording

(2) Contained pounds of U 3 O 8 within ore or mineralized material from the La Sal and Pandora mines, which constitute a portion of the La Sal Project.

Current wording

(2) Contained pounds of U 3 O 8 within mineralized material from the La Sal and Pandora mines, which constitute a portion of the La Sal Project.

Previous wording

The Company plans to continue to maintain its other uranium projects and facilities in a state of readiness for the purpose of restarting mining activities on an expedited basis, as contract obligations and market conditions may warrant. To this end, the Company expects to continue rehabilitation and development work at its Whirlwind mine in preparation for future production. Although the timing of the Company’s plans for the Whirlwind mine will be based on contract requirements, inventory levels and/or sustained improvements in general market conditions, the Company currently expects the Whirlwind mine, along with the Company’s Nichols Ranch ISR project, to commence uranium production within one (1) year from a “go” decision. With strong market conditions, the Whirlwind and Nichols Ranch mines could potentially increase Energy Fuels’ uranium production by up to approximately 600,000 pounds per year starting as early as 2027.

Current wording

The Company plans to continue to maintain its other uranium projects and facilities in a state of readiness for the purpose of restarting mining activities on an expedited basis, as contract obligations and market conditions may warrant. To this end, the Company completed rehabilitation work at its Whirlwind mine and commenced development work for future production, which, along with the Company’s Nichols Ranch ISR project, could be positioned to commence uranium production within one (1) year from a “go” decision. The Whirlwind and Nichols Ranch mines could potentially increase Energy Fuels’ uranium production by up to approximately 600,000 pounds of U 3 O 8 per year starting as early as 2027.

Previous wording

The Company continued permitting and development on its Roca Honda Project, a large, high-grade conventional project in New Mexico, its Bullfrog Project in Utah, and its EZ Project in Arizona, which together with its Sheep Mountain Project (a large conventional project in Wyoming) could expand the Company’s uranium production to a run-rate of up to five million pounds of U 3 O 8 per year in the coming years. The Company continues to maintain required permits at its other conventional projects, including the Energy Queen mine. These projects serve as important pipeline assets for the Company’s future conventional production capabilities, as market conditions may warrant.

Current wording

The Company continued permitting and development on its Roca Honda Project in New Mexico, its Bullfrog Project in Utah, and its EZ Project in Arizona, which together with its Sheep Mountain Project (a large conventional project in Wyoming) could expand the Company’s uranium production to a run-rate of up to five million pounds of U 3 O 8 per year in the coming years. In addition, the Company has initiated rehabilitation and permitting work at its Energy Queen mine (western end of the La Sal Complex) in an effort to put that portion of the Complex into production in 2028. These projects serve as important pipeline assets for the Company’s future conventional uranium production capabilities, as market conditions may warrant.

Previous wording

The Company currently expects to rebuild its stockpiles to process additional stockpiled and mined ore and mineralized material from its Pinyon Plain, La Sal and Pandora mines during Q4 2026 and/or 2027, subject to market conditions, contract requirements and the Mill’s schedule. Stockpiled material available at the Mill, which can be processed into finished U 3 O 8 product on a relatively short notice, provides the Company more flexibility in securing sales on the most favorable terms when needed.

Current wording

As planned, the Company commenced its conventional ore processing campaign at the Mill in Q4 2025 and completed it in Q2 2026. The Company is currently rebuilding its ore and mineralized material stockpiles in preparation for the next conventional uranium ore run at the Mill, which is currently scheduled to commence in Q4 2026 and run into Q2 2027, followed by a monazite processing campaign for the next several months, subject to market conditions, contract requirements and the Mill’s schedule. Stockpiled material available at the Mill, which can be processed into finished U 3 O 8 product on a relatively short notice, provides the Company more flexibility in securing sales on the most favorable terms when needed.

Previous wording

The Mill also continued to advance its research and development (“R&D”) activities on medical isotopes and engaging in discussions with buyers interested in off-take agreements for the material. The Company is evaluating the potential to recover Ra-226 and Ra-228 from its existing uranium and REE process streams for use in the development of TAT medical isotopes for the treatment of cancer, which is seeing promising results in clinical trials to date. The majority of TAT drugs will require reliable and secure supplies of radium, which pharmaceutical companies use to produce other short half-life, alpha-emitting elements for production of TAT drugs. Currently, there are no commercial supplies of radium at commercial scale. Therefore, Energy Fuels sees significant potential opportunity to become a radium supplier.

Current wording

The Mill also continued to advance its research and development (“R&D”) activities on medical isotopes and to engage in discussions with buyers interested in off-take agreements for the material. The Company is evaluating the potential to recover Ra-226 and Ra-228 from its existing uranium and REE process streams for use in the development of TAT medical isotopes for the treatment of cancer, which is seeing promising results in clinical trials to date. The majority of TAT drugs will require reliable and secure supplies of radium, which pharmaceutical companies use to produce other short half-life, alpha-emitting elements for production of TAT drugs. Currently, there are no commercial supplies of radium at commercial scale. Therefore, Energy Fuels sees significant potential opportunity to become a radium supplier.

Previous wording

The existing Phase 1 Circuit has the design capacity to process approximately 8,000 to 10,000 tonnes of monazite per year, producing approximately 4,000 to 6,000 tonnes of total rare earth oxides (“TREO”), containing approximately 850 to 1,000 tonnes of recoverable separated NdPr per year. Although the modifications to the Mill’s SX circuit comprised in the Phase 1 Circuit are stand-alone and dedicated to REE production and do not interfere with the Mill’s uranium and vanadium production, the Phase 1 Circuit’s crack and leach circuit shares certain circuits with the Mill’s uranium production and as a result, Phase 1 Circuit REE production and conventional uranium production cannot be run at the same time, as currently configured. It is therefore necessary at this time to switch back and forth between conventional uranium and uranium/vanadium production and Phase 1 Circuit REE production from monazite sands, which can be done with modest cost and effort.

Current wording

The existing Phase 1 Circuit has the design capacity to process approximately 8,000 to 10,000 tonnes of monazite per year, producing approximately 4,000 to 6,000 tonnes of total rare earth oxides (“TREO”), containing approximately 850 to 1,000 tonnes of recoverable separated NdPr oxide per year. Although the modifications to the Mill’s SX circuit in the Phase 1 Circuit are stand-alone, dedicated to REE production, and do not interfere with the Mill’s uranium and vanadium production, the Phase 1 Circuit’s crack and leach circuit shares certain infrastructure with the Mill’s uranium circuits, and as a result, Phase 1 Circuit REE production and conventional uranium production cannot be run at the same time, as currently configured. It is therefore necessary at this time to switch back and forth between conventional uranium and uranium/vanadium production and Phase 1 Circuit REE production from monazite sands, which can be done with modest cost and effort. The Company is also seeking other sources of REE feedstock, including MREC, which, upon receipt of required licensing approvals, can be fed directly into the Mill’s dedicated REE SX circuits and not interfere with uranium production.

Previous wording

As currently configured, the Phase 1 Circuit allows for the processing of the first phase of the Donald Project monazite production (once developed) for the recovery and separation of NdPr and an Sm+ mixed RE concentrate. Separated NdPr and a mixed RE concentrate may either be sold on the market or stockpiled for separation of the heavies upon completion of later expansion of the Phase 1 Circuit as described below and/or the planned Phase 2 Circuit at the Mill.

Current wording

As currently configured, the Phase 1 Circuit has the capacity to process the first phase of the Donald Project monazite production (once developed) for the recovery and separation of NdPr oxide and an Sm+ mixed RE concentrate. Separated NdPr oxide and a mixed RE concentrate may either be sold on the market or stockpiled for separation of the heavy REEs, including Tb and Dy, upon completion of the expansion of the Phase 1 Circuit as described below and/or the planned Phase 2 Circuit at the Mill.

Previous wording

On July 29, 2026, the Company announced that construction had begun on an expansion of its REE separation capabilities at the Mill to enable the large-scale production of heavy rare earth oxides, in addition to its existing 850 to 1,000 tpa production capacity for NdPr. The planned expansion is expected to add the capacity to produce up to approximately 20 tpa of Tb, 120 tpa of Dy, 140 tpa of samarium (“Sm”), 20 tpa of europium (“Eu”), and 140 tpa of gadolinium (“Gd”) oxides, along with other rare earth elements (SEG Carbonates (Sm, Eu, and Gd, pending commissioning of separation circuits for those elements) and Ho+ Carbonate (holmium, erbium, thulium, ytterbium, lutetium and yttrium)). Tb and Dy are heavy rare earths added to most high-end rare earth permanent magnets (“REPMs”) to increase coercivity (resistance to demagnetization) and high-temperature performance, and to enable smaller, lighter, more powerful, and more electric motors. The planned expansion is expected to be completed by the end of 2027, with respect to the addition of the Tb and Dy circuits by the end of 2028 with respect to the addition of the Sm, Eu and Gd circuits, depending on market needs.

Current wording

During Q3 2026, the Company approved commencement of construction to expand its Phase 1 REE separation capabilities at the Mill to enable the large-scale production of heavy rare earth oxides, which is expected to add the capacity to produce up to approximately 21 tpa of Tb, 122 tpa of Dy, 148 tpa of Sm, 21 tpa of Eu, and 143 tpa of Gd oxides, along with other rare earth elements (SEG Carbonates (Sm, Eu, and Gd, pending commissioning of separation circuits for those elements) and Ho+ Carbonate (holmium, erbium, thulium, ytterbium, Lu and Y)). Tb and Dy are heavy rare earths added to most high-end rare earth permanent magnets (“REPMs”) to increase coercivity (resistance to demagnetization) and high-temperature performance, and to enable smaller, lighter, and more powerful electric motors. The planned expansion is expected to be completed as early as Q1 2028, with respect to the addition of the Tb and Dy circuits, and by the end of 2028 with respect to the addition of the Sm, Eu and Gd circuits, depending on market needs.

Previous wording

At the same time as these enhancements are being made to the Phase 1 Circuit, the Company plans to make further enhancements to the Phase 1 Circuit to allow for the processing of uranium- and REE-bearing mixed rare earth carbonates (“MREC”) or similar intermediate REE products from third-party sources in the Phase 1 Circuit, subject to receipt of all regulatory approvals. As MREC or similar intermediate REE products would not need to utilize the Phase 1 Circuit’s crack and leach circuits, it is expected that such products could be separated into NdPr, Tb, Dy and other heavy REEs without interfering with uranium production, thereby allowing the simultaneous production of uranium and separated REE products.

Current wording

Concurrently, the Company plans to make further enhancements to the Phase 1 Circuit to allow for the processing of uranium- and REE-bearing MREC or similar intermediate REE products from third-party sources in the Phase 1 Circuit, subject to receipt of all regulatory approvals. As MREC or similar intermediate REE products would not need to utilize the Phase 1 Circuit’s crack and leach circuits, it is expected that such products could be separated into NdPr, Tb, Dy and other heavy REEs without interfering with uranium production, thereby allowing the simultaneous production of uranium and separated REE products.

Previous wording

This Phase 1 Circuit expansion project is estimated to have a total capital expenditure of approximately $104 million, which is expected to be supported in large part through various government grants and loans. The debt component for the heavy rare earth expansion is planned to be covered by a previously announced conditional loan commitment from the U.S. government. The equity component will be covered out of the Company’s working capital, which totaled approximately $996 million as of June 30, 2026. The Company has also applied for grant funding from other U.S. government agencies for the Phase 1 Circuit expansion.

Current wording

This Phase 1 Circuit expansion project is estimated to have a total capital expenditure of approximately $104 million. The debt component for the heavy rare earth expansion is currently planned to be covered by a previously announced conditional loan commitment from the U.S. government. The equity component will be covered out of the Company’s working capital, which was approximately $932 million as of September 30, 2026. The Company has also applied for grant funding from other U.S. government agencies for the Phase 1 Circuit expansion.

Previous wording

The Company also plans to expand its NdPr, Tb and Dy production capability, and potentially other REE material production capability, through the development of its proposed stand-alone Phase 2 Circuit, subject to the receipt of regulatory approvals, financing, completion of engineering and the receipt of sufficient feed materials.

Current wording

The Company also plans to expand its NdPr, Tb and Dy production capability, and potentially other REE production capability, through the development of its proposed stand-alone Phase 2 Circuit, subject to the receipt of regulatory approvals, financing, completion of engineering and the receipt of sufficient feed materials.

Previous wording

In January 2026, the Company announced the results of a new AACE International Class 3 Bankable Feasibility Study (“BFS”) evaluating the planned Phase 2 Circuit expansion of REE processing capabilities at the Mill. The BFS evaluated the construction of a Phase 2 Circuit designed to materially expand the Mill’s ability to process monazite and other REE-bearing feedstocks into separated REE oxides. Upon commissioning, the Phase 2 Circuit is expected to increase the Mill’s REE oxide production capacity from approximately 850 to 1,000 tpa of NdPr oxide from the Phase 1 Circuit, to over 6,000 tpa of NdPr oxide, along with approximately 80 tpa of Tb and 288 tpa of Dy oxides from the combined Phase 1 Circuit and Phase 2 Circuit. The Phase 2 Circuit would also add a dedicated monazite “crack-and-leach” circuit to the Mill’s existing leach circuits, which would allow the Phase 2 Circuit to be run completely independently of (and simultaneously with) the Mill’s conventional uranium and uranium/vanadium production.

Current wording

In January 2026, the Company announced the results of a new AACE International Class 3 Bankable Feasibility Study (“BFS”) evaluating the planned Phase 2 Circuit expansion of REE processing capabilities at the Mill. The BFS evaluated the construction of a Phase 2 Circuit designed to materially expand the Mill’s ability to process monazite and other REE-bearing feedstocks into separated REE oxides. Upon commissioning, the Phase 2 Circuit is expected to increase the Mill’s REE oxide production capacity from approximately 850 to 1,000 tpa of NdPr oxide from the Phase 1 Circuit, to over 6,000 tpa of NdPr oxide, along with approximately 87 tpa of Tb and 362 tpa of Dy oxides from the combined Phase 1 Circuit and Phase 2 Circuit. The Phase 2 Circuit would also add a dedicated monazite “crack-and-leach” circuit to the Mill’s existing leach circuits, which would allow the Phase 2 Circuit to be run completely independently of (and simultaneously with) the Mill’s conventional uranium and uranium/vanadium production.

Previous wording

This Phase 2 Circuit expansion is expected to process monazite supplied largely by the Company’s current and development projects, including all phases of the Donald, Vara Mada, and Bahia Projects, along with third-party monazite concentrates and MRECs. The oxides produced at the Mill from these monazites would support more than 100% of the expected internal demand of the planned expansion of ASM’s metal and alloy facility in South Korea and its planned new facility in the U.S., assuming the successful acquisition of ASM. This in turn would produce sufficient magnet alloy to supply more than 100% of the internal demand for VAC’s planned U.S. and European magnet manufacturing expansions, subject to the successful acquisition of VAC, resulting in a total integrated mine-to-magnet supply chain capable of producing 15,700 tonnes of REPMs per year in the coming years, or sufficient magnets to supply up to six million electric/hybrid-electric vehicles per year, four million humanoid robots per year, 31 million internal combustion engine vehicles per year, 3,140 offshore wind turbines per year, or 7.8 billion iPhones per year (quantities of end-use products are highly dependent on specific designs and applications – the numbers presented here are for illustrative purposes only, to give an idea of the scale of Energy Fuels’ proposed expansions).

Current wording

This Phase 2 Circuit expansion is expected to process monazite supplied largely by the Company’s current and development projects, including all phases of the Donald, Vara Mada, and Bahia Projects, along with third-party monazite concentrates and other feedstocks. The oxides produced at the Mill from these monazites and other feedstocks would support more than 100% of the expected internal demand of the planned expansion of the KMP and its planned AMP in the U.S. This in turn would produce sufficient magnet alloy to supply more than 100% of the internal demand for VAC’s planned U.S. and European magnet manufacturing expansions, subject to the successful acquisition of VAC, resulting in a total integrated mine-to-magnet supply chain capable of producing 15,700 tonnes of REPMs per year in the coming years, or sufficient magnets to supply up to six million electric/hybrid-electric vehicles per year, four million humanoid robots per year, 31 million internal combustion engine vehicles per year, 3,140 offshore wind turbines per year, or 7.8 billion iPhones per year (quantities of end-use products are highly dependent on specific designs and applications – the numbers presented here are for illustrative purposes only, to generally describe the scale of Energy Fuels’ proposed expansions).

Previous wording

The BFS estimates initial capital costs for the Phase 2 Circuit expansion of approximately $410.0 million (+/- 15%) and indicates attractive projected economics, including significant expected annual earnings before interest, taxes, depreciation and amortization (“EBITDA”) over the modeled project life. The debt component for these capital costs are included in a previously announced conditional loan commitment from the U.S. government.

Current wording

The BFS estimates initial capital costs for the Phase 2 Circuit expansion of approximately $410.0 million (+/- 15%) and indicates attractive project economics, including significant expected annual earnings before interest, taxes, depreciation and amortization (“EBITDA”) over the modeled project life. The debt component for these capital costs is included in a previously announced conditional loan commitment from the U.S. government.

Previous wording

The Company expects to complete the Phase 2 Circuit expansion by mid-2029, subject to licensing, financing, receipt of sufficient feedstock and a positive FID.

Current wording

The Company currently expects to complete the Phase 2 Circuit expansion by mid-2029, subject to licensing, financing, receipt of sufficient feedstock and a positive FID.

Previous wording

The Company has focused primarily on monazite concentrates, as they have superior concentrations of the three critical “magnet” REEs (NdPr, Tb and Dy) compared to many other REE-bearing minerals. Monazite concentrates typically contain higher concentrations of “heavy” REEs, including Tb and Dy, versus many other REE-bearing ores, mainly due to the presence of xenotime, which is another REE-bearing phosphate mineral that is often found with monazite. The monazite feedstock for the Company’s REE production is expected to be procured through Company-owned mines like the Vara Mada Project and Bahia Project, as well as the Company’s joint venture interest in the Donald Project, along with other potential acquisitions, joint ventures, open market offtake (like the Company’s current arrangement with The Chemours Company), and/or other collaborations, in each case upon successful completion of development of the projects and transactions.

Current wording

The Company has focused primarily on monazite concentrates due to the superior concentrations of the three critical “magnet” REEs (NdPr, Tb and Dy) compared to many other REE-bearing minerals, mainly due to the presence of xenotime, which is another REE-bearing phosphate mineral that is often found with monazite. Monazite feedstock for the Company’s REE production is expected to be procured through Company-owned mines like the Vara Mada Project and Bahia Project, as well as the Company’s joint venture interest in the Donald Project, along with other potential acquisitions, joint ventures, open market offtake (like the Company’s current arrangement with The Chemours Company), and/or other collaborations, in each case upon successful completion of development of the projects and transactions.

Previous wording

As mentioned above, the Company plans to expand its capability to accept uranium and REE-bearing MREC and other similar feedstock from third-party sources, as available. This will provide more flexibility to receive other types of feedstocks and to utilize the Phase 1 Circuit for REE production without interfering with conventional uranium and uranium/vanadium production at the Mill. To the extent this MREC and similar feedstock originates from the cracking and leaching of monazite sands at other facilities, the MREC is expected to contain similar favorable distributions of heavy REEs as monazite sands themselves.

Current wording

As mentioned above, the Company also plans to expand its capability to accept uranium and REE-bearing MREC and other similar feedstock from third-party sources, as available. This will provide more flexibility to receive other types of feedstocks and to utilize the Phase 1 Circuit for REE production without interfering with conventional uranium and vanadium production at the Mill. To the extent this MREC and similar feedstock originates from the cracking and leaching of monazite sands at other facilities, the MREC is expected to contain similar or more favorable distributions of heavy REEs as monazite sands themselves.

Previous wording

On March 25, 2026, the Company announced that it successfully produced its first kilogram of high‑purity Tb oxide at the Mill. Using monazite ore sourced from the U.S., the Company achieved a Tb oxide purity of approximately 99.9% at pilot scale, which meets the specifications required by global manufacturers of rare earth permanent magnets. This milestone follows the Company’s recent pilot‑scale production of approximately 30 kg of high‑purity Dy oxide and further demonstrates the technical capability of the Company’s existing rare earth processing infrastructure to produce separated heavy rare earth oxides from primary mineral feedstocks. The Company is currently in the process of piloting Gd separation at the Mill.

Current wording

On March 25, 2026, the Company announced that it successfully produced its first kilogram of high‑purity Tb oxide at the Mill. Using monazite ore sourced from the U.S., the Company achieved a Tb oxide purity of approximately 99.9% at pilot scale, which meets the specifications required by many global manufacturers of REPMs. This milestone follows the Company’s recent pilot‑scale production of approximately 30 kg of high‑purity Dy oxide and further demonstrates the technical capability of the Company’s existing rare earth processing infrastructure to produce separated heavy rare earth oxides from primary mineral feedstocks. The Company is currently in the process of piloting Gd separation at the Mill.

Previous wording

On June 23, 2026, the Company announced that it had entered into a definitive agreement to acquire 100% of Vacuumschmelze GmbH & Co. KG, Ara VAC TopCo US LLC and their respective consolidated subsidiaries (collectively, “VAC”) from Ara Partners. VAC is a global producer of advanced magnetic materials and permanent magnet solutions. The transaction values VAC at approximately $1.9 billion, based on Energy Fuels’ closing share price of $16.12 as of June 22, 2026, and is expected to substantially increase the Company’s participation in the global rare earth value chain by offering downstream magnetic materials and magnet manufacturing capabilities.

Current wording

On June 23, 2026, as amended on October 13, 2026, the Company entered into a definitive agreement to acquire 100% of Vacuumschmelze GmbH & Co. KG, Ara VAC TopCo US LLC and their respective consolidated subsidiaries (collectively, “VAC”) from Ara Partners. VAC is a global producer of advanced magnetic materials and permanent magnet solutions. The transaction valued VAC at approximately $1.9 billion, based on Energy Fuels’ closing share price of $16.12 as of June 22, 2026, and is expected to substantially increase the Company’s value in the global rare earth supply chain by offering downstream magnetic materials and magnet manufacturing capabilities.

Previous wording

VAC operates REPM facilities in the U.S. (Sumter, South Carolina), Germany and Finland, as well as other magnet facilities in Slovakia, Malaysia and China. VAC is a leading producer of permanent magnet materials and magnetic solutions serving a variety of end markets, including automotive, industrial, energy, robotics, aerospace and defense applications.

Current wording

VAC operates REPM facilities in the U.S. (Sumter, South Carolina), Germany (Hanau) and Finland (Ulvila), as well as other soft magnetic facilities in Slovakia, Malaysia and China. VAC is a leading manufacturer of permanent magnet materials and magnetic solutions serving a variety of end markets, including automotive, industrial, energy, robotics, aerospace and defense applications.

Previous wording

The acquisitions of ASM and VAC are expected to complement the Company’s existing rare earth mining, processing and separation operations, to create an integrated platform from REE mines to magnets.

Current wording

The ASM Acquisition and pending acquisition of VAC are expected to complement the Company’s existing rare earth mining, processing and separation operations, to create an integrated platform from REE mines to magnets.

Previous wording

The Company strategically entered the HMS sector to strengthen the security and reliability of the Company’s internal costs and supply chains for its primary REE feedstock: monazite concentrates. Monazite concentrate is a superior REE mineral concentrate, as it contains excellent distributions of the “magnet” REEs (NdPr, Tb and Dy) and other “heavy” REEs such as Sm, Gd, Lu and Y which are in short supply and used in a number of technological and defense applications. Notably, monazite concentrates can be processed at the Company’s Mill by leveraging existing licenses, infrastructure and expertise. HMS mines (titanium and zirconium minerals, including ilmenite, rutile and zircon) also present an attractive future opportunity for the Company by providing an expected low-cost and large-scale monazite feedstock that the Company may then process into separated REE products at the Mill. The Company owns 100% interests in the Vara Mada (Madagascar) and Bahia (Brazil) Projects and has the right to earn up to a 49% joint venture interest in the Donald Project (Australia) pursuant to which Energy Fuels expects to offtake all REE-monazite.

Current wording

The Company strategically entered the HMS sector to enhance the security, reliability and cost efficiency of its monazite concentrate supply chain. Monazite concentrate is the Company’s primary REE feedstock and contains favorable concentrations of the “magnet” REEs (NdPr, Tb and Dy) and other “heavy” REEs such as Sm, Gd, Lu and Y, which are in short supply and used in a number of technological and defense applications. The Company can process monazite concentrate at the Mill using its existing licenses, infrastructure and expertise. HMS mines also produce titanium and zirconium minerals, including ilmenite, rutile and zircon. The Company owns 100% of the Vara Mada and Bahia Projects and has the right to earn up to a 49% joint venture interest in the Donald Project pursuant to which Energy Fuels expects to offtake all monazite.

Previous wording

The Company acquired control of the Vara Mada Project on October 2, 2024. At the time of the acquisition, the Vara Mada Project had, since November 2019, been suspended by the Government of Madagascar. Shortly after the acquisition, on November 28, 2024, the Government lifted the suspension, and on December 5, 2024, the Company entered into a MOU with the Government of Madagascar setting forth certain key terms applicable to the Vara Mada Project. The lifting of the suspension enabled the Company to re-commence development and other technical activities on the ground after a five-year hiatus, including the re-establishment of the Company’s social programs, additional mine planning and engineering, expanding the critical mineral resource base, and progressing other activities as necessary to progress the Vara Mada Project and achieve a positive FID, which will require suitable fiscal and stability arrangements to be finalized with the Government of Madagascar.

Current wording

The Company acquired control over the Vara Mada Project on October 2, 2024 through its acquisition of Base Resources. At the time of the acquisition, the Project had, since November 2019, been suspended by the Government of Madagascar. Shortly after the acquisition, on November 28, 2024, the Government lifted the suspension and on December 5, 2024, the Company entered into the Madagascar memorandum of understanding (“MOU”) setting forth certain key terms applicable to the Project. Following lifting of the suspension and entry of the Madagascar MOU, the Company has been in the process of re-commencing development efforts and investment in the Project, re-establishing community and social programs, and advancing technical, environmental, social and other activities necessary to achieve a positive FID.

Previous wording

At this time, it is too early to determine whether and to what extent social and political developments in Madagascar may impact the Vara Mada Project, whether positively or negatively, including with respect to the Vara Mada Project’s development prospects or timelines, the ability to achieve suitable fiscal or other terms applicable to the Vara Mada Project or the ability to achieve a positive FID. There can be no assurance of achieving sufficient legal and fiscal stability or the timing thereof or obtaining approval of the addition of monazite to the mining permit or the timing thereof. If a stability mechanism and necessary approvals to support the Vara Mada Project are not obtained, or are obtained on terms less favorable than expected, this could delay any FID in relation to the Vara Mada Project or prevent or otherwise have a significant effect on the development of the Vara Mada Project or the Company’s ability to recover monazite from the Vara Mada Project. These developments have not had an impact on the financial results of the Company at this time.

Current wording

The Company monitors political, social and economic conditions in Madagascar, including political stability and social unrest, that may impact the Vara Mada Project, including with respect to the Vara Mada Project’s development prospects or timelines, the ability to achieve suitable fiscal or other terms applicable to the Vara Mada Project or the ability to achieve a positive FID. There can be no assurance of achieving sufficient legal and fiscal stability or the timing thereof or obtaining approval of the addition of monazite to the mining permit or the timing thereof. If a stability mechanism and necessary approvals to support the Vara Mada Project are not obtained, or are obtained on terms less favorable than expected, this could delay any FID in relation to the Vara Mada Project or prevent or otherwise have a significant effect on the development of the Vara Mada Project or the Company’s ability to recover monazite from the Vara Mada Project. These developments have not had an impact on the financial results of the Company at this time.

Previous wording

In January 2026, the Company announced the results of an updated Feasibility Study (“FS”) for the Vara Mada Project, which evaluates the long-term development potential and economic viability of the Vara Mada Project. The FS was prepared in accordance with U.S. Regulation S-K 1300 and Canadian NI 43-101 and confirms the Vara Mada Project’s world-class scale, long mine life and robust economics as a REE and HMS development opportunity. Based on the FS, the Vara Mada Project is expected to have a modeled mine life of approximately 38 years and, at full production capacity, is projected to generate post-tax, pre-debt net present value (10% discount rate) of approximately $1.8 billion and a post-tax internal rate of return of approximately 25%. In addition, the FS indicates that the project could ramp up to over $500 million of annual EBITDA and generate average annual free cash flow of approximately $264 million over the modeled mine life. These projected economics are supported by Proven and Probable mineral reserves and long-term price assumptions for ilmenite, zircon, rutile and monazite. The FS contemplates staged capital development and includes the potential processing of monazite at the Mill; however, downstream REE processing and oxide production are not included in the base FS economics.

Current wording

In January 2026, the Company announced the results of an updated Feasibility Study (“FS”) for the Vara Mada Project, which evaluated the long-term development potential and economic viability of the Vara Mada Project. The FS was prepared in accordance with U.S. Regulation S-K 1300 and Canadian NI 43-101 and confirms the Vara Mada Project’s world-class scale, long mine life and robust economics as a REE and HMS development opportunity. Based on the FS, the Vara Mada Project is expected to have a modeled mine life of approximately 38 years and, at full production capacity, is projected to generate post-tax, pre-debt net present value (10% discount rate) of approximately $1.8 billion and a post-tax internal rate of return of approximately 25%. In addition, the FS indicates that the project could ramp up to over $500 million of annual EBITDA and generate average annual free cash flow of approximately $264 million over the modeled mine life. These projected economics are supported by Proven and Probable mineral reserves and long-term price assumptions for ilmenite, zircon, rutile and monazite. The FS contemplates staged capital development and includes the potential processing of monazite at the Mill; however, downstream REE processing and oxide production are not included in the base FS economics.

Previous wording

The Company has a joint venture with Astron, the Donald Project JV, to jointly develop and operate the Donald Project in Australia, which is a well-known REE and HMS deposit that the Company believes could provide it with a near-term, low-cost, and large-scale source of monazite sand that, upon development, would be transported to the Mill for the recovery of separated REE products. The Donald Project has all major regulatory approvals required to construct and operate the project. The Donald Project is notable in that the monazite concentrates expected to be produced at the project contain elevated concentrations of the “heavy” REE oxides, including Tb and Dy. The Donald Project JV currently expects to make an FID on the Donald Project in Q3 2026, subject to market conditions and financing.

Current wording

The Donald Project is a well-known REE and HMS deposit that the Company believes could provide it with a near-term, low-cost, and large-scale source of monazite sand. Upon development, monazite is expected to be transported to the Mill for recovery of separated REE products. The Donald Project has all major regulatory approvals required to construct and operate the project. It is expected that monazite that would be produced from the Donald Project contains elevated concentrations of the “heavy” REE oxides, including Tb and Dy. The Company currently expects to make an FID on the Donald Project by the end of 2026, subject to market conditions and financing.

Previous wording

The JV Agreement provides Energy Fuels with the right to invest up to AUD$183.00 million (approximately $126.17 million at June 30, 2026 exchange rates) to earn up to a 49% interest in the Donald Project JV and the right to offtake all monazite/xenotime produced from the project. In addition, the Company has agreed to issue Common Shares to Astron having a value of up to $17.50 million. The Company has invested AUD$48.83 million ($32.87 million at June 30, 2026 exchange rates) in cash into the Donald Project through June 30, 2026. Further, the Company advanced AUD$37.06 million ($25.79 million) in cash to the Donald Project to purchase land, properties and certain equipment (“Advances”), which are secured by the underlying assets and do not bear interest unless in the case of default. If a positive FID is made on the Donald Project, the outstanding Advances are expected to be applied to the Company’s earn-in interest in the Donald Project JV. If a positive FID is not made, the Advances shall become due and payable subject to the terms of the JV Agreements, as amended. If a positive FID is made, the Company will have remaining cash contributions of AUD$97.11 million to complete its 49% interest earn-in after considering previous cash contributions and the conversion of the Advances to equity. The remaining $14.00 million of Common Shares will be issued upon a positive FID. As of June 30, 2026, the Company has a 12.7% ownership interest in the Donald Project. Astron, through its subsidiary Dickson & Johnson Pty Ltd, holds the remaining 87.3% interest.

Current wording

The JV Agreements provide Energy Fuels with the right to invest up to AUD 183 million in cash to earn up to a 49% interest in the Donald Project JV along with issuing Common Shares having a value up to $17.50 million. The JV Agreements provide the Company the right to offtake all monazite/xenotime produced from the Donald Project.

Previous wording

The following table sets forth weekly spot and monthly long-term uranium prices (dollars per pound) from TradeTech LLC (“TradeTech”):

Current wording

The following table sets uranium prices (dollars per pound) from TradeTech LLC (“TradeTech”):

Previous wording

The Company believes that world demand is increasing for clean, carbon-free, reliable and affordable baseload electricity, including nuclear energy. Concurrently, the nuclear fuel market remains in deficit, existing uranium mines and inventories are depleting, and geopolitics are putting security of supply into greater focus. In addition, trade issues are injecting uncertainty into U.S. and global markets. As a result, the Company believes the current- and long-term fundamentals of the uranium industry remain positive.

Current wording

The Company believes that demand for clean, carbon-free, reliable and affordable baseload electricity, including nuclear energy, is increasing. Concurrently, the nuclear fuel market remains in a supply deficit as existing uranium mines and inventories decline and geopolitical developments increase concerns regarding security of supply. Accordingly, the Company believes the current- and long-term fundamentals of the uranium industry remain positive.

Previous wording

According to TradeTech, world uranium requirements continue to exceed primary mine production, with the gap being bridged by dwindling secondary supplies and excess uranium inventories in various forms that have already been mined. At the same time, a large portion of global uranium production remains state-owned and state-subsidized, and therefore not subject to normal market fundamentals, which the Company believes present risks to current and future markets. However, Russia’s invasion of Ukraine, and the upcoming halt of waivers under the U.S. uranium ban on December 31, 2027, has increased demand for non-Russian uranium. Geopolitical tensions remain between the U.S. and China, and Kazakhstan and Uzbekistan maintain close commercial and political ties with Russia, which the Company believes places future uranium and nuclear supplies from those nations at risk. As a result, the Company has observed more interest in both spot transactions and long-term contracts for U 3 O 8 from utilities.

Current wording

According to TradeTech, world uranium requirements continue to exceed primary mine production, with the shortfall being met by secondary supplies and inventories of previously mined uranium. In addition, a significant portion of global uranium production is state-owned and state-subsidized and may not respond to conventional market forces. Geopolitical developments, including Russia’s invasion of Ukraine and the scheduled expiration on December 31, 2027, of waivers under the U.S. prohibition on imports of Russian uranium, have increased the focus of U.S. and European utilities on non-Russian sources of uranium. Tensions between the U.S. and China, as well as Kazakhstan’s and Uzbekistan’s commercial and political ties with Russia, may also affect the security and availability of future nuclear fuel supplies. As a result, the Company has observed more interest in both spot transactions and long-term contracts for U 3 O 8 from utilities.

Previous wording

Vanadium is a metallic element that, when converted into ferrovanadium (“FeV”) (an alloy of vanadium and iron), is used primarily as an additive to strengthen and harden steel and make it anti-corrosive. According to market consultant FastMarkets, over 90% of FeV is used in the steel industry. In addition, vanadium is used in the aerospace and chemical industries and continues to see interest in energy storage technologies, including vanadium redox flow batteries. China is the largest global producer of vanadium, with additional production coming from Russia, South Africa, and Brazil (according to Wood Mackenzie).

Current wording

Vanadium is a metallic element that, when converted into ferrovanadium (“FeV”), an alloy of vanadium and iron, is used primarily as an additive to strengthen and harden steel and make it anti-corrosive. According to market consultant FastMarkets, over 90% of FeV is used in the steel industry. Vanadium is also used in the aerospace and chemical industries and continues to attract interest for energy storage applications, including vanadium redox flow batteries. China is the largest global producer of vanadium, with additional production coming from Russia, South Africa, and Brazil (according to Wood Mackenzie).

Previous wording

The Company believes that one of the primary drivers of vanadium pentoxide (“V 2 O 5”) prices is demand for steel, including global prospects for economic growth, construction, infrastructure and automotive manufacturing. According to FastMarkets, the imposition of tariffs and counter‑tariffs has slowed trade between the U.S. and China, which are two of the larger markets for steel and ferro‑alloys. This has led to reduced demand for ferro‑alloys in certain end‑markets, particularly industries such as automotive and appliances, which are sensitive to trade policies. The Company expects V₂O₅ prices could rise with stronger global economic confidence or greater demand from U.S. critical mineral initiatives.

Current wording

The Company believes demand for steel is the primary driver of vanadium pentoxide (“V 2 O 5”) prices and is influenced by global economic conditions and activity in construction, infrastructure and automotive sectors. According to FastMarkets, tariffs and counter‑tariffs have slowed trade between the U.S. and China, two significant markets for steel and ferro‑alloys contributing to reduced ferroalloy demand in certain end markets, including the automotive and appliance industries. The Company expects V₂O₅ prices could rise with stronger global economic confidence or greater demand from U.S. critical mineral initiatives.

Showing the first 40 of 98 pairs. Open the source sections for the rest.

Rearranged current paragraphs (4)

Current report — wording carried from elsewhere

Korean Metals Plant and Potential American Metals Plant

Current report — wording carried from elsewhere

(3) The exchange ratios were fixed upon payments. The Advances are secured by the underlying assets and do not bear interest unless an event of default occurs. If a positive FID is made on the Donald Project, the outstanding Advances are expected to be applied to the Company’s earn-in interest in the Donald Project JV. If a positive FID is not made, the Advances become due and payable subject to the terms of the JV Agreements, as amended.

Current report — wording carried from elsewhere

The Company has an ATM in place, which allows the Company to make Common Share distributions to the extent qualified under a U.S. shelf registration statement on Form S-3 (“Shelf Registration Statement”) and one or more prospectus supplements. The Company’s current Shelf Registration Statement went effective on March 22, 2024 and permits the Company to sell any combination of its common shares, warrants, rights, subscriptions receipts, preferred shares, debt securities and/or units in one or more offerings.

Current report — wording carried from elsewhere

We provide expanded discussion of our more significant accounting policies, estimates and judgments in the Annual Report on Form 10-K for the year ended December 31, 2025. We believe these accounting policies reflect our more significant estimates and assumptions used in preparation of our financial statements.
Rearranged previous paragraphs (3)

Previous report — wording carried elsewhere

ITEM 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS.

Previous report — wording carried elsewhere

The Company sells uranium into its long-term contract portfolio and as well as a portion of its inventories on the spot market depending on uranium price movements and inventories.

Previous report — wording carried elsewhere

Accretion of asset retirement obligations increased by $2.37 million to $4.31 million for the six months ended June 30, 2026 from $1.94 million for the six months ended June 30, 2025. The increase was primarily attributable to a revision of a portion of the Kwale Project asset retirement obligation as reclamation neared completion and the timing of remaining monitoring and end-of-life expenditures was reassessed, resulting in an accelerated accretion charge of $3.10 million. Asset retirement obligation settlements also decreased significantly compared to the prior-year period.