ENERGY FUELS INC

For the period ended Mar 31, 2026. Filed May 6, 2026.

View on SEC.gov

About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Mar 31, 2026 · Filed May 6, 2026

UUUU$6.66+1.1%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-Q

Period ended 2025-09-30; filed 2025-11-03.

0001385849-25-000044

ITEM 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

Current report: 10-Q

Period ended 2026-03-31; filed 2026-05-06.

0001385849-26-000021

ITEM 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 273 previous paragraphs and 209 current paragraphs.

60 unchanged; 72 reworded; 74 added; 128 removed; 13 previous and 3 current paragraphs rearranged.

Tables are not compared: 14 previous and 14 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (74)

Current report

The Company mined ore containing approximately 375,000 pounds of U 3 O 8 from the Pinyon Plain mine with an average grade of 1.12% and mined mineralized material containing approximately 50,000 pounds of U 3 O 8 from its La Sal and Pandora mines for a total of approximately 425,000 pounds of contained U 3 O 8 during the three months ended March 31, 2026. Ore grades at Pinyon Plain in Q1 decreased due to moving from one high-grade zone to another and are expected to increase moving forward. Such uranium-bearing ore and mineralized material was processed at the Mill and/or stockpiled at the mines or Mill for future processing, subject to market conditions, contract requirements and the Mill’s processing schedule. Processing at the Mill began in Q4 2025 and is expected to continue through at least Q2 2026, subject to market conditions, contract requirements and the Mill’s processing schedule. Ore and mineralized material that is not processed as part of the Mill’s conventional ore run, which began in Q4 2025 and is expected to continue through Q2 2026, will remain stockpiled at the Mill and is included in the

Current report

Company’s inventories of U 3 O 8 contained in stockpiled ore and mineralized materials. The Company currently expects to process any additional stockpiled and mined ore and mineralized material from its Pinyon Plain, La Sal and Pandora mines with the remainder stockpiled at the mines or Mill for processing during 2026 or 2027, subject to market conditions, contract requirements and the Mill’s schedule. Stockpiled material available at the Mill, which can be processed into finished U 3 O 8 product on a relatively short notice, provides the Company more flexibility in securing sales on the most favorable terms when needed.

Current report

In late 2023 and early 2024, the Company constructed enhancements and modifications to its existing solvent extraction (“SX”) circuits at the Mill for commercial separation of NdPr at the Mill, while at the same time producing “heavy” (Sm+) RE Concentrate. The Company completed these modifications and fully commissioned the project in Q2 2024 and completed its initial run of separated NdPr commercial production in Q3 2024. The modifications made the Mill leach circuits to crack and leach monazite together with the modifications to the Mill’s SX circuits to separate NdPr are referred to as the “Phase 1 Circuit”.

Current report

The existing Phase 1 Circuit has the design capacity to process approximately 8,000 to 10,000 tonnes of monazite per year, producing approximately 4,000 to 6,000 tonnes of TREO, containing approximately 850 to 1,000 tonnes of recoverable separated NdPr per year. Although the modifications to the Mill’s SX circuit comprised in the Phase 1 Circuit are stand-alone and dedicated to REE production and do not interfere with the Mill’s uranium and vanadium production, the Phase 1 Circuit’s crack and leach circuit shares certain circuits with the Mill’s uranium production and as a result, Phase 1 Circuit REE production and conventional uranium production cannot be run at the same time, as the Phase 1 Circuit is currently configured. It is therefore necessary at this time to switch back and forth between conventional uranium and uranium/vanadium production and Phase 1 Circuit REE production from monazite sands, which can be done with modest cost and effort.

Current report

The Phase 1 Circuit as currently configured would allow for the processing of the first phase of the Donald Project monazite production, once that project is developed, for the recovery and separation of NdPr and an Sm+ mixed RE concentrate which could be sold on the market or stockpiled for separation of the heavies upon completion of later expansion of the Phase 1 Circuit and/or the planned Phase 2 Circuit at the Mill.

Current report

The Company is planning further enhancements to expand its heavy REE production at its Phase 1 Circuit for the planned commercial-level recovery of Tb and Dy, along with samarium (“Sm”), europium (“Eu”) and gadolinium (“Gd”), with the ability to separate other heavy REEs such as yttrium (“Y”) and lutetium (“Lu”), if market conditions or customer requirements warrant. Subject to receipt of all required regulatory approvals, financing, the successful development of these enhancements, and the receipt of sufficient quantities of monazite sand feedstock, the expanded Phase 1 Circuit is expected to be operational in 2027 with planned production recovery of up to approximately 14 tonnes of Tb and 48 tonnes of Dy per year, and potentially other heavy REEs, the existing 850 to 1,000 tonnes of NdPr capacity, from processing up to approximately 10,000 tonnes of monazite per year. The Company had previously announced its intention to start commercial production of Dy and Tb by the end of 2026, but has changed those plans in order to expand the enhancements to the Mill’s Phase 1 Circuit to allow for the additional production of Sm, Eu and Gd and to provide the ability to separate other heavy REEs in the 2027 time frame.

Current report

At the same time as these enhancements are being made to the Phase 1 Circuit, the Company plans to make further enhancements to the Phase 1 Circuit to allow for the processing of uranium- and REE-bearing mixed rare earth carbonates (“MREC”) or similar intermediary REE products from third-party sources in the Phase 1 Circuit, subject to receipt of all regulatory approvals, financing and the successful development of these further enhancements. As MREC or similar intermediary REE products would not need to utilize the Phase 1 Circuit’s crack and leach circuits, it is expected that such products could be separated into NdPr and heavy REEs separately from uranium production, thereby allowing such feedstocks to be separated into REE oxides through the Phase 1 Circuit’s SX circuits without interfering with normal Mill conventional uranium ore processing, which could be run simultaneously with the separation of such feedstocks. These enhancements are expected to be made and the Phase 1 Circuit operational to accept MREC and similar intermediary REE products in 2027.

Current report

The Company also plans to expand its NdPr, Dy and Tb production capability, and potentially other REE material production capability, through the development of its proposed stand-alone Phase 2 Circuit, subject to the receipt of regulatory approvals, financing, completion of engineering and the receipt of sufficient feed materials.

Current report

In January 2026, the Company announced the results of a new AACE International Class 3 Bankable Feasibility Study (“BFS”) evaluating the planned Phase 2 Circuit expansion of REE processing capabilities at the Mill. The BFS evaluated the construction of a Phase 2 Circuit designed to materially expand the Mill’s ability to process monazite and other REE-bearing feedstocks into separated REE oxides. Upon commissioning, the Phase 2 Circuit is expected to increase the Mill’s REE oxide production capacity from approximately 850 to 1,000 tpa of NdPr oxide from the Phase 1 Circuit, to over 6,000 tpa of NdPr oxide, along with approximately 80 tpa of Tb and 288 tpa of Dy oxides from the combined Phase 1 Circuit and Phase 2 Circuit. This would provide the capability to produce sufficient NdPr for up to approximately 7.0 million EVs/hybrid EVs per year. The Phase 2 Circuit would also add a dedicated monazite “crack-and-leach” circuit to the Mill’s existing leach circuits, which would allow the Phase 2 Circuit to be run completely independently of (and simultaneously with) the Mill’s conventional uranium and uranium/vanadium production.

Current report

The BFS estimates initial capital costs of approximately $410.0 million and indicates attractive projected economics, including significant expected annual earnings before interest, taxes, depreciation and amortization (“EBITDA”) over the modeled project life. The Phase 2 Circuit expansion is intended to position the Company as a leading domestic processor of both light and heavy REE oxides, supporting a secure U.S.-based REE supply chain. The BFS assumes feedstock supply from the Company’s HMS and monazite projects, as well as third-party sources including MREC and similar feedstocks, subject to permitting, development and market conditions.

Current report

The following table summarizes the Mill’s existing and planned REE circuit capacity:

Current report

The Company has focused primarily on monazite concentrates, as they have superior concentrations of the three critical “magnet” REEs (NdPr, Dy and Tb) compared to many other REE-bearing minerals. Monazite concentrates typically contain higher concentrations of “heavy” REEs, including Dy and Tb, versus many other REE-bearing ores, mainly due to the presence of xenotime, which is another REE-bearing phosphate mineral that is often found with monazite. The monazite feedstock for the Company’s REE production is expected to be procured through Company-owned mines like the Vara Mada Project and Bahia Project, as well as the Company’s joint venture interest in the Donald Project, along with other potential acquisitions, joint ventures, open market offtake (like the Company’s current arrangement with The Chemours Company), and/or other collaborations, in each case upon successful completion of development of the projects and transactions.

Current report

As mentioned above, the Company plans to expand its capability to accept uranium and REE-bearing MREC and other similar feedstock from third-party sources, as available. This will provide more flexibility to receive other types of feedstocks and to utilize the Phase 1 Circuit for REE production without interfering with conventional uranium and uranium/vanadium production at the Mill. To the extent this MREC and similar feedstock originates from the cracking and leaching of monazite sands at other facilities, the MREC is expected to contain similar favorable distributions of heavy REEs as monazite sands themselves.

Current report

On March 25, 2026, the Company announced that it successfully produced its first kilogram of high‑purity Tb oxide at the Mill, representing the first U.S. primary production of this critical “heavy” rare earth material in decades. Using monazite ore sourced from the U.S., the Company achieved a Tb oxide purity of approximately 99.9% at pilot scale, which meets the specifications required by global manufacturers of rare earth permanent magnets. This milestone follows the Company’s recent pilot‑scale production of approximately 30 kg of high‑purity Dy oxide and further demonstrates the technical capability of the Company’s existing rare earth processing infrastructure to produce separated heavy rare earth oxides from primary mineral feedstocks.

Current report

Proposed Acquisition of Australian Strategic Materials Limited

Current report

In accordance with its plans to expand its REE production to include metals and alloys, the Company entered into a definitive agreement on January 20, 2026, as amended on March 12, 2026, to acquire 100% of the issued share capital of ASM by way of a scheme of arrangement under Australian law. ASM is an Australian-based critical materials company with REE mining, processing and metallization assets, including the Dubbo Project in New South Wales, an REE metallization and alloying facility in South Korea, and plans to potentially construct an REE metallization and alloying facility in the U.S. ASM’s Korean metals and alloying plant is one of the few facilities outside of China currently producing REE metals and alloys, including NdPr, Dy and Tb metals and Neodymium Iron Boron (“NdFeB”) and developing Dysprosium-Iron (“FeDy”) alloy production. Upon closing of this transaction, which is expected as early as July 2026, the Company believes it will be the largest, fully integrated REE “mine-to-metal and alloy” producer outside of China closing a critical strategic gap in global supply chains for magnet applications, including automotive, robotic, energy and defense technologies.

Current report

Under the terms of the transaction, ASM shareholders will be entitled to receive 0.053 Common Shares (or CHESS Depositary Interests) for each ASM ordinary share held, and up to AUD$0.13 per ASM share in cash, subject to customary conditions. ASM option holders are expected to receive cash consideration of AUD$0.50 per option under a concurrent option scheme of arrangement.

Current report

The transaction remains subject to court, regulatory and shareholder approval under the Australian scheme of arrangement process. Australian foreign investment approval has been obtained. The Company expects the transaction to close as early as July 2026.

Current report

Consistent with the MOU, the Company and the Government have been negotiating the terms of an investment agreement to be submitted to the Madagascar Parliament for approval and promulgation as a law. The investment agreement is intended to provide the key pillars for a bankable large-scale project, including mechanisms for ensuring long-term legal and fiscal stability, select tax and customs benefits, adjustments to foreign exchange rules, protections from expropriation and access to international arbitration for dispute resolution. While discussions have focused on an investment agreement as the Stability Mechanism, it is possible that other means of achieving stability will be considered and/or pursued as discussions progress.

Current report

The Company has also been focusing on re-establishment of the Company’s social programs after the five-year hiatus imposed following the lifting of suspension, including re-establishing meaningful community engagement and social programs aimed at securing a firm social license to operate to support safe, secure and reliable surface access to collect baseline, technical and other data necessary to update permit conditions, as well as performing additional mine planning and engineering work, expanding the critical mineral resource base, and progressing other activities necessary to progress the Vara Mada Project and achieve a positive FID.

Current report

On October 17, 2025, a new President of Madagascar was sworn in by the Country’s High Constitutional Court following a period of social unrest and political instability that resulted in the removal of the Country’s prior President. In-country political developments continue to evolve, including with respect to changes and appointments of key governmental ministers. Energy Fuels is working with the new administration to reaffirm the previously negotiated concepts with the prior administration, which had substantially finalized the core investment agreement terms, and otherwise continues to constructively engage with the new administration.

Current report

In January 2026, the Company announced the results of an updated Feasibility Study (“FS”) for the Vara Mada Project, which evaluates the long-term development potential and economic viability of the Vara Mada Project. The FS was prepared in accordance with U.S. Regulation S-K 1300 and Canadian NI 43-101 and confirms the Vara Mada Project’s world-class scale, long mine life and robust economics as a REE and HMS development opportunity. Based on the FS, the Vara Mada Project is expected to have a modeled mine life of approximately 38 years and, at full production capacity, is projected to generate post-tax, pre-debt net present value (10% discount rate) of approximately $1.8 billion and a post-tax internal rate of return of approximately 25%. In addition, the FS indicates that the project could ramp up to over $500 million of annual EBITDA and generate average annual free cash flow of approximately $264 million over the modeled mine life. These projected economics are supported by Proven and Probable mineral reserves and long-term price assumptions for ilmenite, zircon, rutile and monazite. The FS contemplates staged capital development and includes the potential processing of monazite at the Mill; however, downstream REE processing and oxide production are not included in the base FS economics.

Current report

The following discussion provides an overview of market conditions for the commodities relevant to the Company’s operations and development activities. These market conditions influence pricing, demand, sales opportunities, production decisions, inventory strategies and the timing of development and investment activities. Market conditions are subject to volatility and uncertainty and may change based on a variety of factors, including global economic conditions, geopolitical developments, government policies and supply‑and‑demand dynamics.

Current report

The Company believes that world demand is increasing for clean, carbon-free, reliable and affordable baseload electricity, including nuclear energy. Concurrently, the nuclear fuel market remains in deficit, existing uranium mines and inventories are depleting, and geopolitics are putting security of supply into greater focus. In addition, trade issues are injecting uncertainty into U.S. and global markets. As a result, the Company believes the current- and long-term fundamentals of the uranium industry remain positive.

Current report

Vanadium prices during recent periods have reflected a combination of global steel demand conditions, macroeconomic uncertainty and trade‑related developments. While demand for vanadium remains primarily tied to steel production, the Company believes longer‑term demand may also be influenced by infrastructure spending, energy transition initiatives and potential growth in energy storage applications.

Current report

The Company believes that vanadium market fundamentals remain closely linked to global steel demand and that pricing may continue to experience volatility in the near term. The Company continues to maintain vanadium inventory and believes this inventory provides it with flexibility to respond to improved market conditions or sales opportunities, should the Company elect to pursue sales, while managing downside risk during periods of price volatility.

Showing the first 40 of 74 passages. Open the source sections for the rest.

Removed paragraphs (128)

Previous report

The Company has secured its own HMS projects, which are expected to produce titanium and zircon minerals, along with uranium- and REE-bearing monazite sands in furtherance of a fully integrated U.S.-based REE supply chain. These include the Toliara Project in Madagascar, the Donald Project in Australia through the Company’s Donald Project JV and the Bahia Project in Brazil.

Previous report

The Company believes that uranium supply pressure and demand fundamentals point to higher sustained uranium prices in the future and that the advancement of reliable nuclear energy, fueled by uranium, is experiencing a global resurgence with an increased focus by governments, policymakers, technology companies and citizens on decarbonization, electrification and security of energy supply. In addition, a number of factors, including restrictions on Russian uranium products in the U.S., transportation challenges, trade policies, production challenges and financial entities purchasing uranium to hold for an extended period has the potential to result in higher sustained spot and term prices and to potentially induce utilities to enter into additional long-term contracts with non-Russian producers, such as Energy Fuels. Those factors additionally have the potential to foster security of supply, the avoidance of transportation and logistics issues and more certain pricing. Indeed, the past two years have seen the highest levels of long-term contracting by utilities since 2012, according to TradeTech.

Previous report

We have four long-term uranium contracts with major U.S. utilities at this time. The Company also entered into one uranium ore purchase agreement with a third-party miner in the vicinity of the Mill during 2025 and has the potential to enter into additional agreements as market conditions warrant.

Previous report

Production rates at the Pinyon Plain mine have steadily increased over the past several months as the mine has ramped up. During the three months ended September 30, 2025, the Company mined ore containing approximately 415,000 pounds of uranium with an average grade of 1.27% eU 3 O 8 at its Pinyon Plain mine. During the nine months ended September 30, 2025, the Company mined ore containing approximately 1,120,000 pounds of uranium with an average grade of 1.75% eU 3 O 8 at its Pinyon Plain mine, which the Company believes is one of the highest-grade uranium mines in U.S. history. Furthermore, as mined ore grades so far are significantly higher than the gamma probe grades from previous drill programs, the Company believes it will mine considerably more uranium from the Main Zone of the deposit versus what is described in the Technical Report on the Pre-Feasibility Study on the Pinyon Plain Project (“PFS”) prepared in February 2023 in accordance with S-K 1300 and NI 43-101. Ore from Pinyon Plain continues to be shipped to the Mill stockpile. The Mill commenced a processing campaign in Q4 2025 to process stockpiled ore into finished U 3 O 8 product.

Previous report

The Mill currently has the commercial capacity, in its Phase 1 REE separation circuit to process monazite ore concentrates into separated neodymium-praseodymium (“NdPr”) oxide. The Mill is also performing pilot work on production of “heavy” REE oxides, including dysprosium (“Dy”), terbium (“Tb”) and samarium (“Sm”).

Previous report

In its July 17, 2025 news release, the Company also announced that, assuming the current pilot-scale production continues to be successful, the Company could be in a position to produce Dy, Tb and Sm on a commercial scale at its existing Phase 1 REE separation circuit at the Mill, with minor modifications, as early as Q4 2026 from existing feed sources and, if a production decision (which assumes a positive FID) is made in 2025, as early as Q4 2027 from its permitted Donald Project in Australia.

Previous report

On August 21, 2025, the Company announced it successfully completed production of and achieved a purity of 99.9% Dy, which is well in excess of the 99.5% commercial specification, thereby becoming the first U.S. company to publicly report Dy production volumes and purities. The Mill is expected to continue producing approximately two kilograms of Dy oxide per week until 15 kilograms have been produced, at which point pilot production will transition to Tb oxide, targeted for Q4 2025. The Company intends to construct and commission commercial-scale Dy and Tb and potentially other “heavy” REE separation capacity at the Mill, which could be operational as soon as Q4 2026. Multiple magnet manufacturers and original equipment manufacturers have expressed strong interest in obtaining Dy samples, further validating the Company’s strategy to establish a fully non-Chinese rare earth supply chain for commercial and defense applications. Through September 30, 2025, the Mill has produced 29 kg of Dy.

Previous report

Until such time as the Mill completes its stand-alone Phase 2 REE separation facilities, expected in 2028, the Mill can either process uranium and uranium/vanadium ores, or it can process monazite for the recovery of uranium and REEs through its Phase 1 REE separation facilities. It currently cannot do both activities at the same time, due to the use of some shared facilities. The Mill has historically stockpiled mined uranium ore until such time as it has enough stockpiled conventional ore to justify a Mill processing run, after which the Mill can be switched over to other uses, such as monazite processing for uranium and REEs, relatively easily and at low cost. The Mill has a large throughput capacity and can process uranium ore much faster than it is mined, so this has not been an issue to date, but it does require that Mill processing runs be scheduled depending on the timing of conventional uranium ore processing, sales requirements and other needs of the Mill. The Mill may reconfigure the Phase 1 REE separation facilities in the future to separate additional REE oxalates or oxides and/or to allow it to operate without utilizing the Mill's existing leaching and precipitation circuits, thereby allowing the Phase 1 REE separation facilities to operate simultaneously with conventional uranium ore production.

Previous report

On August 26, 2025, the Company announced that it signed a Memorandum of Understanding (“MOU”) with Vulcan Elements to create a secure, ex-China supply chain for rare earth permanent magnets. Under the MOU, the Company will supply high-purity NdPr and Dy oxides produced at its White Mesa Mill from U.S.-sourced monazite concentrates for validation in Vulcan’s magnet production processes. Following validation, the parties intend to negotiate long-term supply agreements. This collaboration is expected to support U.S. commercial and defense applications, including electric vehicles, robotics, AI data centers, and critical military technologies.

Previous report

On September 9, 2025, the Company announced that its high-purity NdPr oxide, produced at the White Mesa Mill from monazite concentrates mined in Florida and Georgia, had been successfully manufactured into commercial-scale rare earth permanent magnets (“REPMs”) by South Korea’s largest manufacturer of EV drive unit motor cores. The REPMs passed all quality assurance and quality control (“QA/QC”) benchmarks and are qualified for use in EV and hybrid drive units for major automotive manufacturers in North America, the EU, Japan, and Korea. Approximately 1.2 metric tonnes of NdPr oxide were processed into 3.0 metric tonnes of REPMs, enough to power approximately 1,500 new vehicles, with first installations expected in the market in Q4 2025. The Company also announced plans to build heavy rare earth oxide production capacity at the White Mesa Mill in 2026, further advancing its strategy to create a complete, U.S.-based “mine-to-magnet” supply chain.

Previous report

On October 3, 2025, the Company announced the closing of its upsized offering of 0.75% Convertible Senior Note due 2031 (the “Notes”) for an aggregate principal amount of US$700.0 million (the “offering”), including the exercise in full by the initial purchasers of their option to purchase an additional US$100.0 million of Notes. The Notes have a cash interest coupon of 0.75% per annum, payable semi-annually in arrears on May 1 and November 1 of each year, beginning May 1, 2026, and a conversion price of approximately $20.34 per common share of Energy Fuels (the “common shares”), which represents a premium of approximately 32.5% to the last reported sale price of the common shares on the NYSE American on September 30, 2025, subject to customary anti-dilution adjustments. The effective conversion price of the Notes was increased to $30.70 (representing a premium of 100% over the last reported sale price of the common shares on the NYSE American on September 30, 2025) through the purchase of capped call options. The purchase price for the capped call options was approximately $53.55 million. Conversions of the Notes may be settled in Energy Fuels common shares, cash, or a combination of common shares and cash, at Energy Fuels' election. Additionally, Energy Fuels will have the right to redeem the Notes in certain circumstances and will be required to offer to repurchase the Notes upon the occurrence of certain events. The Notes will mature on November 1, 2031, unless earlier converted, redeemed, or repurchased. We believe this strategic capital raise strengthens the Company's balance sheet and enhances the Company's ability to accelerate its rare earth initiatives, including the planned Phase 2 expansion at the White Mesa Mill (see “Rare Earth Element Initiatives” below) and development of its Donald Project in Australia. We believe this outcome represents a clear vote of confidence in the Company's team and strategy.

Previous report

On October 21, 2025, Export Finance Australia (“EFA”) issued a non-binding, conditional Letter of Support to Energy Fuels and Astron Limited for up to AUD$80 million of senior debt financing for the Donald Project. The Donald Project, which is expected to require approximately AUD$520 million in total funding with a targeted 50:50 debt-to-equity ratio structure, is planned to commence production in the second half of 2027 and is expected to produce ~7,200 tonnes per annum of rare earth oxide concentrate, including ~1,000 tonnes of NdPr oxide, ~92 tonnes of Dy oxide, and ~16 tonnes of Tb oxide. The Company expects to purchase 100% of the rare earth concentrate under a life-of-mine offtake agreement for processing at the Mill. This conditional support from EFA marks a significant step toward advancing project financing and reinforces the strategic importance of the Donald Project in strengthening the Australia–U.S. critical minerals supply chain.

Previous report

(1) Other includes ore purchases from 3 rd party miners and potential cleanup from abandoned uranium mine (“AUM”) materials.

Previous report

(2) Does not include any sales of inventory into the spot market, which the Company may make depending on market conditions. The Company expects to exceed the high end of the range following its 100,000 pound spot sale in Q3 2025 that was not incorporated into this range.

Previous report

The Company continually seeks to maximize capacity utilization at the Mill and add new sources of revenue, including through its emerging REE/HMS and potential TAT radioisotopes business lines, as well as new sources of Alternate Feed Materials and new feed processing opportunities at the Mill that can be processed without reliance on uranium sales prices. The Company also entered into an agreement with the Navajo Nation in January 2025, which could open the door to the Company assisting in the cleanup of AUM materials left over from Cold War era government programs predating the Company while recycling uranium from ore historically lost to direct disposal.

Previous report

The Company also believes the long-term fundamentals of the REE sector point to higher sustained pricing. According to industry forecaster Adamas Intelligence, the demand for REEs is expected to be primarily driven by increased demand for neodymium-iron-boron (“NdFeB”) magnets used in robotics, advanced air mobility and EVs (including hybrid EVs). Adamas forecasts demand for separated NdPr, Dy and Tb to grow at a compound annual growth rate (“CAGR”) of 8.7% through 2040, while global production is expected to grow at a slower rate of 5.1%. Robotics are expected to become the largest demand driver for NdFeB magnets through 2040. The Company is also observing significant interest in creating new REE supply chains that are not connected to China, further compounding the REE opportunity for Energy Fuels.

Previous report

The Company has significantly advanced its REE programs, including the commissioning of commercial and pilot REE (NdPr and Dy) separation capabilities at the Mill while securing HMS/REE mines that are expected to supply significant quantities of monazite sands feedstock to the Mill for processing into separated REE products. The monazite is expected to be produced as a low-cost byproduct of primarily ilmenite, rutile and zircon from HMS mining. This includes the Company’s Bahia Project, Toliara Project, and through its joint venture with Astron to jointly develop the Donald Project.

Previous report

The Company completed commissioning its Phase 1 REE separation circuit at the Mill during Q2-2024, which is capable of processing 8,000 to 10,000 tonnes of monazite per year into 850 to 1,000 tonnes of separated NdPr per year, plus a samarium plus (“Sm+”) heavy RE Carbonate. The Company also produced pilot-scale (kilogram) quantities of Dy and expects to produce pilot-scale Tb oxides in Q4-2025 and Sm oxides in 2026. Assuming the current pilot-scale production continues to be successful, the Company is evaluating producing Dy, Tb and potentially Sm on a commercial scale at its existing Phase 1 REE separation circuit at the Mill, with minor modifications, as early as Q4 2026 from existing feed sources and, if a production decision (which assumes a positive FID) is made in 2025, as early as Q4 2027 from its permitted Donald Project in Australia. The Company is also advancing engineering and permitting on its Phase 2 separation facilities at the Mill to enable the processing of up to 60,000 tonnes of monazite and the production of up to 4,000 to 6,000 tonnes of separated NdPr, along with separated Dy, Tb and other REE materials (see “Rare Earth Element Initiatives” below).

Previous report

During Phase 1 commissioning, the Company produced approximately 38 tonnes of separated NdPr. On September 9, 2025, the Company announced its NdPr had been manufactured into commercial scale REPMs by South Korea's largest manufacturer of drive unit motor cores, pursuant to a previously announced MOU, and has passed all QA/QC benchmarks for use in EV drive unit motors sold to major automotive manufacturers. This includes the successful manufacture of Energy Fuels' NdPr oxide into NdPr metal, NdFeB alloy sintered blocks (45H grade), and high-performance, high-temperature NdFeB REPMs. The successful production of REPMs from Energy Fuels' NdPr oxide marks a decisive breakthrough in building a “mine-to-magnet” supply chain independent of China, using rare earth oxides (REOs) produced in the United States. Energy Fuels' NdPr oxide has now been qualified for use in high temperature drive units, which are installed in EV and hybrid vehicles manufactured by major automotive companies across North America, the EU, Japan, and Korea. Now that Energy Fuels' NdPr has been validated, Energy Fuels intends to engage in negotiations for a potential longer-term supply arrangement that is expected to enable future offtake of the Company’s separated REE products expected to be produced at the Mill from monazite feedstocks originating at the Toliara, Donald and Bahia Projects (subject to all required licenses, permits and permissions being obtained), in addition to third-party feedstocks that may be purchased from third parties. The Company also plans to continue to evaluate potential opportunities in REE metal, alloy and magnet-making as they may arise.

Previous report

With respect to its HMS activities, the Company plans to continue advancing each of its Donald and Toliara Projects to a FID by as early as late-2025 and 2026, respectively. The Company is also updating the 2021 Australian Joint Ore Reserves Committee (“JORC”)-compliant Toliara Definitive Feasibility Study (“DFS”) and 2024 JORC-compliant Toliara Prefeasibility Study (“PFS”) into a combined S-K 1300 and NI 43-101-compliant feasibility study (“FS”), and the 2023 Donald Project JORC-compliant DFS into an S-K 1300 and NI 43-101-compliant FS, both of which are expected to be completed later in 2025. The Company also obtained its exploration permit and plans to restart its drilling program at the Bahia Project in Q4-2025 with the goal of getting enough information to declare an S-K 1300-compliant initial assessment and NI 43-101-compliant technical report in 2026.

Previous report

Mining at the Kwale Project commenced in 2013 and concluded at the end of December 2024 following depletion of the remaining ore reserves previously reported in accordance with the JORC standards. Processing activities concluded in early January 2025. The sale of all remaining product inventories was completed during 2025. Additional costs of winding-down activities and mining lower mineral grades were incurred during the fourth quarter of 2024 and included in product inventories that were sold during the first quarter of 2025. As a result, the Company incurred a loss in connection with its 2025 sales. Reclamation has been ongoing throughout the life of the Kwale Project and will continue until all mining areas are fully reclaimed in accordance with all applicable legal standards. Reclamation of the South Dune mining area was completed in 2024, with the reclamation of the Central Dune, North Dune and Bumamani mining areas expected to be completed in Q4 2025. Reclamation of the tailings storage facility has commenced and is expected to be completed by 2027, with ongoing management and monitoring expected to continue through 2038.

Previous report

During the nine months ended September 30, 2025, the Mill focused on processing stockpiled Alternate Feed Materials and conventional ores, which resulted in production of 330,000 pounds of U 3 O 8. In Q4 2025, the Company commenced its planned conventional ore processing campaign at the Mill that is expected to last at least through Q1 2026.

Previous report

During the nine months ended September 30, 2025, the Company continued ore production at the Pinyon Plain mine, La Sal mine and Pandora mine.

Previous report

During the three months ended September 30, 2025, the Company mined ore containing approximately 465,000 pounds of U 3 O 8 from the Pinyon Plain, La Sal and Pandora mines for a total of approximately 1,245,000 pounds of contained U 3 O 8 through the nine months ended September 30, 2025. With the addition of ore expected to be mined in Q4 2025, this puts the Company in a strong position to meet or exceed the high end of its current guidance of mining ore containing up to approximately 1,435,000 pounds of contained U 3 O 8 from its Pinyon Plain, Pandora and La Sal mines during 2025. Such uranium-bearing ore will be stockpiled at the mines or Mill for processing during the remainder of 2025 and into 2026 (or at a future date), subject to market conditions, contract requirements and the Mill’s processing schedule. The Company also expects to continue to seek to purchase uranium ore from third-party miners in the region, and there is the potential to receive additional Alternate Feed Materials and mine cleanup materials, expected to total approximately 160,000 to 200,000 pounds of additional contained uranium in ore inventories.

Previous report

The Company currently expects to process stockpiled and mined ore from its Pinyon Plain, La Sal and Pandora mines in Q4 2025 containing up to 670,000 pounds of U 3 O 8, with the remainder of the mined ore and Alternate Feed Materials stockpiled at the mines or Mill for processing during 2026 or 2027, subject to market conditions, contract requirements, and the Mill’s schedule. This is expected to result in the production of an additional 670,000 pounds of finished U 3 O 8 in Q4 2025 from stockpiled and mined ore from the Company’s Pinyon Plain, La Sal and Pandora mines, which when added to the Company’s production of approximately 330,000 pounds of finished U 3 O 8 through Q3 2025 from existing conventional ore inventories and Alternate Feed Materials, would result in the production of up to 1,000,000 pounds of finished U 3 O 8 product in 2025.

Previous report

Ore mined during 2025 that is not processed in Q4 2025 will remain stockpiled at the Mill and included in the Company’s inventories of U 3 O 8 contained in stockpiled ore at the end of 2025. Having stockpiled mined ore available at the Mill, which can be processed into finished U 3 O 8 product on relatively short notice, gives the Company more flexibility in securing long-term sales contracts on the most favorable terms when needed, rather than merely accepting contracts at current prices when the fundamentals suggest higher prices in the future may be expected. It also provides more flexibility to make spot sales if market conditions warrant.

Previous report

During Q2 2025, the Company obtained the initial results from its 2024 – 2025 underground drill program in another area of mineralization at the Pinyon Plain mine called the “Juniper Zone.” The February 2023 Pre-Feasibility Study for the Pinyon Plain mine includes a Mineral Resource estimate for the Juniper Zone of 703,000 pounds of U 3 O 8 at an average grade of 0.95% contained in 37,000 tons of Indicated Mineral Resources, in addition to a small amount of Inferred Mineral Resources. New drill results show numerous additional high-grade intercepts within the Juniper Zone and other zones within the deposit, which together have the potential to significantly increase the mineable uranium resources at the mine.

Previous report

The Company is planning to conduct additional drilling in the Juniper Zone as it continues development of that area. The Company plans to incorporate these results into an updated S-K 1300/NI 43-101 technical report for the Pinyon Plain mine later this year, which the Company believes will significantly increase the uranium reserves and resources at the Pinyon Plain mine and result in a lower mining and milling cost per pound.

Previous report

The Company producedde minimus quantities of U 3 O 8 at its Nichols Ranch ISR Project during the three months ended September 30, 2025, as it remained on standby. Although the Company does not expect to produce significant quantities of U 3 O 8 through the remainder of 2025 from Nichols Ranch, the Company is undertaking exploration and development activities during the remainder of 2025 to expand the resources at the Nichols Ranch Project and to further develop wellfields to be ready for potential recommencement of production within one year from a “go” decision, as market conditions warrant. At Nichols Ranch, the Company currently holds 34 fully permitted, undeveloped wellfields, including four wellfields at the Nichols Ranch wellfields, 22 wellfields at the adjacent Jane Dough wellfields and eight wellfields at the Hank Project, which is fully permitted to be constructed as a satellite facility to the Nichols Ranch Plant.

Previous report

As of September 30, 2025, the Company held approximately 485,000 pounds of finished uranium inventories located at the Mill and at conversion facilities in North America. Additionally, as of September 30, 2025, the Company held approximately 1,640,000 pounds of additional U 3 O 8 contained in stockpiled ore, Alternate Feed Materials and work-in-process at the Mill or nearby mine sites that can potentially be processed and recovered expediently in the future, as market conditions and contract requirements may warrant.

Previous report

The Company produced approximately 330,000 pounds of U 3 O 8 through Q3 2025 and, during a conventional ore Mill run that commenced in early October 2025, currently expects to produce up to another 670,000 pounds of finished U 3 O 8 from stockpiled and mined ore from the Company’s Pinyon Plain, La Sal and Pandora mines in Q4 2025. As a result, total inventories of finished product available for sale in 2025 are currently expected to total approximately 925,000 to 1,225,000 pounds of finished U 3 O 8.

Showing the first 40 of 128 passages. Open the source sections for the rest.

Reworded paragraphs (72)

Previous wording

The following discussion and analysis should be read in conjunction with our unaudited condensed consolidated financial statements and related notes, which have been prepared in accordance with U.S. GAAP, included elsewhere in this Quarterly Report on Form 10-Q. Additionally, the following discussion and analysis should be read in conjunction with Management’s Discussion and Analysis of Financial Condition and Results of Operations and the audited consolidated financial statements included in Part II of our Annual Report on Form 10-K for the year ended December 31, 2024. This Discussion and Analysis contains forward-looking statements and forward-looking information that involve risks, uncertainties and assumptions. Our actual results may differ materially from those anticipated in these forward-looking statements as a result of many factors. See “Cautionary Statement Regarding Forward-Looking Statements.”

Current wording

The following discussion and analysis should be read in conjunction with our unaudited condensed consolidated financial statements and related notes thereto included elsewhere in this Quarterly Report on Form 10‑Q. Additionally, the following discussion and analysis should be read in conjunction with Management’s Discussion and Analysis of Financial Condition and Results of Operations and the audited consolidated financial statements included in Part II of our Annual Report on Form 10‑K for the year ended December 31, 2025. This Discussion and Analysis contains forward‑looking statements and forward‑looking information that involve risks, uncertainties and assumptions. Our actual results may differ materially from those anticipated in these forward‑looking statements as a result of many factors. See “Cautionary Statement Regarding Forward‑Looking Statements.”

Previous wording

We responsibly produce several of the critical materials essential to United States (“U.S.”) energy security and advanced technologies, including uranium, vanadium, REEs and HMS—helping to reduce reliance on foreign sources and strengthen domestic supply chains. The Company owns conventional uranium, uranium/vanadium and HMS/REE properties and projects in various stages of operation, development, exploration and permitting, as well as fully permitted uranium and uranium/vanadium projects on standby. The Company's White Mesa Mill, near Blanding, Utah, is the only licensed and operating uranium mill and the only uranium mill capable of producing separated REE oxides in the United States.

Current wording

We produce several of the critical materials essential to U.S. energy security and advanced technologies, including uranium, REEs, vanadium and HMS, strengthening domestic supply chains and reducing reliance on foreign adversarial sources. The Company owns conventional uranium, uranium/vanadium and REE/HMS properties, projects in various stages of operation, development, exploration and permitting and fully permitted uranium and uranium/vanadium projects on standby. The Company’s White Mesa Mill near Blanding, Utah, is the only licensed and operating uranium mill and the only uranium mill capable of producing separated REE oxides in the U.S.

Previous wording

The Company is working to establish itself as a critical minerals hub in the U.S. with its uranium, vanadium, REE product, HMS product and potential radioisotopes production. Uranium is the strategic fuel powering carbon-free, emission-free baseload nuclear energy, and one of the most reliable forms of power supporting U.S. energy independence and decarbonization goals. The REEs we are now producing are essential to manufacture permanent magnets used in EVs, hybrid EVs, defense systems, robotics and other advanced technologies. The titanium and zirconium products derived from our HMS production are vital to national security and high-performance industries. Titanium is used in aircraft engines and frames, spacecraft components, medical devices and pigments; while zirconium is crucial for fuel rod cladding, reactor components, jet engine parts and advanced ceramics in a wide range of applications in the medical, aerospace and chemical industries. The radioisotopes that we are evaluating recovering from our REE and uranium processing streams have the potential to provide materials needed for emerging TAT cancer treatments.

Current wording

The Mill is our key to building a critical materials hub in the U.S. through the production of uranium, REEs, vanadium and potentially radium. Uranium is the strategic fuel powering carbon free, emission free baseload nuclear energy and remains one of the most reliable forms of power supporting U.S. energy independence and decarbonization goals. The REEs we produce are essential to manufacture permanent magnets used in EVs, hybrid EVs, defense systems, robotics and other advanced technologies. The titanium and zirconium products derived from our HMS production are used in national security and other key industries. Titanium is used in aircraft engines and airframes, spacecraft components, medical devices and pigments, while zirconium is crucial for fuel rod cladding, reactor components, jet engine parts and advanced ceramics in medical, aerospace and chemical applications. The radium that we are evaluating recovering from our REE and uranium processing streams have the potential to provide materials needed for emerging TAT cancer treatments. In addition, Energy Fuels recovers uranium from Alternate Feed Materials at the Mill, recycling valuable resources that would otherwise be discarded and returning them to the fuel cycle to support U.S. nuclear energy and national security objectives.

Previous wording

The Company is currently: mining uranium ore from its Pinyon Plain, La Sal and Pandora mines, located in Arizona and Utah, respectively, and stockpiling the mined ore at the Mill; processing stockpiled uranium ore and Alternate Feed Materials at the Mill for the recovery of U 3 O 8 finished product; completing sales of U 3 O 8 under its portfolio of long-term contracts and on the spot market; performing exploration activities at its Bahia HMS/REE project in Brazil; negotiating fiscal and stability arrangements, seeking government approvals and performing permitting and development activities at its Toliara HMS/REE project in Madagascar in preparation for an FID, which the Company expects could be made as early as 2026 if fiscal and stability arrangements are finalized; performing permitting and development activities at its Donald Project in Australia in preparation for an FID, which the Company expects could be made as early as December 31, 2025 or Q1 2026; performing various permitting, exploration, and development activities at its uranium and uranium/vanadium properties in the United States; and performing final reclamation activities at its Kwale Project in Kenya.

Current wording

The Company is: mining uranium ore and mineralized material from its Pinyon Plain, La Sal and Pandora mines, located in Arizona and Utah, respectively, and processing and/or stockpiling the material at the Mill; processing stockpiled Alternate Feed Materials at the Mill for the production of finished U 3 O 8 product; completing sales of U 3 O 8 under its portfolio of long-term contracts and on the spot market; performing development activities at its Donald Project in Australia in preparation for a FID, which the Company expects could be made as early as Q2 2026; negotiating fiscal and stability arrangements, seeking government approvals and performing permitting and development activities at its Vara Mada Project in Madagascar in preparation for a potential FID, which the Company believes could be made as early as 2027 if fiscal and stability arrangements are finalized; continuing drilling activities and resource evaluation at its Bahia Project in Brazil; performing various permitting, exploration and development activities across its uranium and uranium/vanadium properties in the U.S; and completing reclamation and post‑closure monitoring activities at its Kwale Project in Kenya.

Previous wording

The Company plans to continue to maintain its other uranium projects and facilities in a state of readiness for the purpose of restarting mining activities on an expedited basis, as contract obligations and market conditions may warrant. To this end, the Company expects to continue rehabilitation and development work at its Whirlwind mine in preparation for future production. Although the timing of the Company’s plans to extract and process mineralized materials from the Whirlwind mine will be based on contract requirements, inventory levels and/or sustained improvements in general market conditions, the Company currently expects the Whirlwind mine, along with the Company’s Nichols Ranch ISR project, to be able to commence uranium production within one (1) year from a “go” decision, which could increase Energy Fuels’ uranium production to a run-rate of over 2.5 million pounds of U 3 O 8 per year starting as early as 2026, as market conditions may warrant.

Current wording

The Company plans to continue to maintain its other uranium projects and facilities in a state of readiness for the purpose of restarting mining activities on an expedited basis, as contract obligations and market conditions may warrant. To this end, the Company expects to continue rehabilitation and development work at its Whirlwind mine in preparation for future production. Although the timing of the Company’s plans to extract and process mineralized materials from the Whirlwind mine will be based on contract requirements, inventory levels and/or sustained improvements in general market conditions, the Company currently expects the Whirlwind mine, along with the Company’s Nichols Ranch ISR project, to be able to commence uranium production within one (1) year from a “go” decision. With strong market conditions, the Whirlwind and Nichols Ranch mines could potentially increase Energy Fuels’ uranium production by up to approximately 600,000 pounds per year starting as early as 2027.

Previous wording

Through the remainder of 2025, the Company also plans to continue advancing permitting and development on its Roca Honda Project, a large, high-grade conventional project in New Mexico, its Bullfrog Project in Utah, and its EZ Project in Arizona, which together with its Sheep Mountain Project (a large conventional project in Wyoming) could expand the Company’s uranium production to a run-rate of up to five million pounds of U 3 O 8 per year in the coming years. The Company is also continuing to maintain required permits at its other conventional projects, including the Energy Queen mine. These projects serve as important pipeline assets for the Company’s future conventional production capabilities, as market conditions may warrant.

Current wording

The Company also accelerated permitting and development on its Roca Honda Project, a large, high-grade conventional project in New Mexico, its Bullfrog Project in Utah, and its EZ Project in Arizona, which together with its Sheep Mountain Project (a large conventional project in Wyoming) could expand the Company’s uranium production to a run-rate of up to five million pounds of U 3 O 8 per year in the coming years. The Company is also continuing to maintain required permits at its other conventional projects, including the Energy Queen mine. These projects serve as important pipeline assets for the Company’s future conventional production capabilities, as market conditions may warrant.

Previous wording

The Company commenced a conventional ore processing campaign at the Mill in Q4 2025 as planned, which is expected to continue at least into March 2026 due to: (i) the previously announced higher mining rate expected at the Pinyon Plain mine for the remainder of 2025 and in subsequent years; (ii) the desire to produce enough finished U 3 O 8 in 2025 to allow the Company to fulfill its contract deliveries in 2025, 2026 and a portion of 2027; and (iii) the desire to thereby allow the Company to free-up the Mill to complete a REE processing campaign in 2026 and/or to make any process changes at the Mill in 2026 if needed to help the U.S. government meet its critical minerals requirements.

Current wording

The Mill processed stockpiled conventional ore and mineralized materials and Alternate Feed Materials, which resulted in 790,000 pounds of finished U 3 O 8 production during Q1 2026. The Company commenced its conventional ore processing campaign at the Mill in Q4 2025 as planned, which is expected to continue through at least Q2 2026 due to: (i) the previously announced higher mining rate expected at the Pinyon Plain mine in 2025 and in subsequent years; (ii) the desire to produce enough finished U 3 O 8 from this Mill run to allow the Company to fulfill its contract deliveries in 2026 and 2027, along with maintaining the flexibility to complete opportunistic spot sales; and (iii) the desire to allow the Company to allow the Mill to make its planned expanded Phase 1 Circuit process changes at the Mill in 2026.

Previous wording

The Mill also continued to advance its research and development (“R&D”) activities on medical isotopes throughout Q3 2025 while engaging in discussions with buyers interested in off-take agreements for the material (see “Recovering Medical Isotopes for Advanced TAT Cancer Treatments” below).

Current wording

The Mill also continued to advance its research and development (“R&D”) activities on medical isotopes and engaging in discussions with buyers interested in off-take agreements for the material.

Previous wording

Additionally, the Company is continuing to prepare two additional mines in Colorado and Wyoming (Whirlwind and Nichols Ranch, respectively) for expected production within one year from a “go” decision and is advancing several other of its large-scale U.S. mine projects in order to increase uranium production in the coming years, as market conditions warrant. With strong market conditions, the Whirlwind and Nichols Ranch mines could potentially increase Energy Fuels’ uranium production to a run-rate of up to approximately 2.5 million pounds of U 3 O 8 per year in as early as 2026. The exact timing for resumption of production from each of these projects will be subject to current and future uranium market conditions and/or the procurement of additional long-term contracts. In 2025, the Company also plans to continue advancing its permitting and development on the Roca Honda, Bullfrog, and EZ Projects, which together with the Company’s Sheep Mountain Project, could expand the Company’s uranium production to a run-rate of up to five million pounds of U 3 O 8 per year in the coming years, as market conditions warrant. As the Company is ramping up its commercial uranium production, it can rely on its uranium inventories and potential purchases of uranium on the spot market to supplement its uranium production if necessary to fulfill existing contract requirements.

Current wording

The Company continues to prepare two additional mines in Colorado and Wyoming (Whirlwind and Nichols Ranch, respectively) for expected production within one year from a “go” decision and is advancing several other of its large-scale U.S. mine projects in order to increase uranium production in the coming years, as market conditions warrant. With strong market conditions, the Whirlwind and Nichols Ranch mines could potentially increase Energy Fuels’ uranium production by up to 600,000 pounds of U 3 O 8 per year as early as 2027. The exact timing for resumption of production from each of these projects will be subject to current and future uranium market conditions and/or the procurement of additional long-term contracts. In 2026, the Company also plans to continue advancing its permitting and development on the Roca Honda, Bullfrog, and EZ Projects, which together with the Company’s Sheep Mountain Project, could expand the Company’s uranium production by over five million pounds of U 3 O 8 per year in the coming years, as market conditions warrant. As the Company is ramping up its commercial uranium production, it can rely on its uranium inventories and potential purchases of uranium on the spot market to supplement its uranium production if necessary to fulfill existing contract requirements.

Previous wording

The Company is also evaluating the potential to recover radioisotopes from its existing uranium and REE process streams for use in the development of TAT medical isotopes for the treatment of cancer, which is seeing promising results in clinical trials to date. TAT requires reliable and secure supplies of radium, which pharmaceutical companies use to extract other short half-life, alpha-emitting elements for the production of TAT drugs. Currently, there is no domestic supplier of radium. Therefore, Energy Fuels sees a potentially significant opportunity to become the U.S. radium supplier of choice, as TAT treatments advance through clinical trials and later into widespread use.

Current wording

The Company is also evaluating the potential to recover Ra-226 and Ra-228 from its existing uranium and REE process streams for use in the development of TAT medical isotopes for the treatment of cancer, which is seeing promising results in clinical trials to date. TAT requires reliable and secure supplies of radium, which pharmaceutical companies use to extract other short half-life, alpha-emitting elements for production of TAT drugs. Currently, there is no domestic supplier of radium. Therefore, Energy Fuels sees a potentially significant opportunity to become the U.S. radium supplier of choice, as TAT treatments advance through clinical trials and later into widespread use.

Previous wording

The Phase 2 REE separation facility is expected to expand the Company's NdPr separation capabilities at the Mill with an expected processing capacity of approximately 50,000 tonnes of monazite per year containing approximately 25,000 tonnes of TREO and approximately 5,000 tonnes of NdPr per year. Phase 2 is also expected to add a dedicated monazite “crack-and-leach” circuit to the Mill’s existing leach circuits, which may be developed as the first stage of Phase 2 prior to construction of the expanded NdPr separation capabilities. During Phase 2, Energy Fuels expects to add “heavy” REE separation capabilities at the Mill, including the production of Dy and Tb, each of which has a commercial market at this time due to its importance in the production of permanent magnets for EVs, robotics and other uses, and potentially: Sm, Gd, Lu and/or Y, each of which does not currently have a commercial market but is of interest to the U.S. government for national security purposes. The Company will also evaluate the potential to produce lanthanum (La) and cerium (Ce) products, along with potentially other REE products. The Company expects to complete Phase 2 in 2028, subject to licensing, financing and receipt of sufficient monazite feed. It is expected that the Mill could run its Phase 1 and Phase 2 REE separation circuits simultaneously, resulting in a combined throughput of up to approximately 60,000 tonnes of monazite per year.

Current wording

The Company expects to complete Phase 2 by mid-2029, subject to licensing, financing, and receipt of sufficient feedstock.

Previous wording

The Company made the strategic decision to enter the HMS sector in order to control the Company’s internal costs and supply chains for its primary REE feedstock: monazite. Monazite is a superior REE mineral, as it contains excellent distributions of the “magnet” REEs (NdPr, Dy and Tb) and other “heavy” REEs such as Sm, gadolinium (“Gd”), lutetium (“Lu”) and yttrium (“Y”) which are in short supply and used in a number of technological and defense applications. Notably, monazite can be processed at the Company’s Mill by leveraging existing licenses, infrastructure and expertise. HMS mines (titanium and zirconium minerals, including ilmenite, rutile and zircon) also present an attractive future opportunity for the Company by providing an expected low-cost and large-scale monazite feedstock that the Company may then process into separated REE products at the Mill. To date, the Company has acquired 100% interests in the Toliara (Madagascar) and Bahia (Brazil) Projects, and has the right to earn up to a 49% joint venture interest with Astron Corporation in the Donald Project (Australia) pursuant to which Energy Fuels expects to offtake all REE-monazite.

Current wording

The Company strategically entered the HMS sector to control the Company’s internal costs and supply chains for its primary REE feedstock: monazite concentrates. Monazite concentrate is a superior REE mineral concentrate, as it contains excellent distributions of the “magnet” REEs (NdPr, Dy and Tb) and other “heavy” REEs such as Sm, Gd, Lu and Y which are in short supply and used in a number of technological and defense applications. Notably, monazite concentrates can be processed at the Company’s Mill by leveraging existing licenses, infrastructure and expertise. HMS mines (titanium and zirconium minerals, including ilmenite, rutile and zircon) also present an attractive future opportunity for the Company by providing an expected low-cost and large-scale monazite feedstock that the Company may then process into separated REE products at the Mill. The Company owns 100% interests in the Vara Mada (Madagascar) and Bahia (Brazil) Projects and has the right to earn up to a 49% joint venture interest in the Donald Project (Australia) pursuant to which Energy Fuels expects to offtake all REE-monazite.

Previous wording

The Company acquired control over the Toliara Project on October 2, 2024 through its acquisition of Base Resources. At the time of the acquisition, the Project had, since November 2019, been suspended by the Government of Madagascar. Shortly after the acquisition, on November 28, 2024, the Government lifted the suspension, and on December 5, 2024, the Company entered into an MOU with the Government of Madagascar setting forth certain key terms applicable to the Project. Following lifting of the suspension and entry of the MOU, the Company has been in the process of re-commencing development and investment in the Project, re-establishing community and social programs, and advancing the technical, environmental, social and other activities necessary to achieve a positive FID, which the Company expects could be made as early as 2026 if fiscal and stability arrangements are finalized.

Current wording

The Company acquired control over the Vara Mada Project on October 2, 2024. At the time of the acquisition, the Vara Mada Project had, since November 2019, been suspended by the Government of Madagascar. Shortly after the acquisition, on November 28, 2024, the Government lifted the suspension, and on December 5, 2024, the Company entered into a MOU with the Government of Madagascar setting forth certain key terms applicable to the Vara Mada Project. The lifting of the suspension by the Malagasy Government was a significant step in the development of the Vara Mada Project as it enabled the Company to re-commence development and other technical activities on the ground after a five-year hiatus, including the re-establishment of the Company’s social programs, additional mine planning and engineering, expanding the critical mineral resource base, and progressing other activities as necessary to progress the Vara Mada Project and achieve a positive FID, which the Company expects could be made as early as 2027 if fiscal and stability arrangements are finalized.

Previous wording

On October 17, 2025, a new President of Madagascar was sworn in by the Country's High Constitutional Court following a period of social unrest and political instability that resulted in the removal of the Country's prior President, and, on October 20, 2025, a new Prime Minister was appointed. At this time, it is too early to determine whether and to what extent, recent social and political developments in Madagascar may impact the Toliara Project, whether positively or negatively, including with respect to the Project's development prospects or timelines, the ability to achieve suitable fiscal or other terms applicable to the Project or the ability to achieve a positive FID. These developments have not had an impact on the financial results of the Company at this time. The Company will continue to monitor events as they unfold.

Current wording

At this time, it is too early to determine whether and to what extent these recent social and political developments in Madagascar may impact the Vara Mada Project, whether positively or negatively, including with respect to the Vara Mada Project’s development prospects or timelines, the ability to achieve suitable fiscal or other terms applicable to the Vara Mada Project or the ability to achieve a positive FID. There can be no assurance of achieving sufficient legal and fiscal stability or the timing thereof or obtaining approval of the addition of monazite to the mining permit or the timing thereof. If a stability mechanism and necessary approvals to support the Vara Mada Project are not obtained, or are obtained on terms less favorable than expected, this could delay any FID in relation to the Vara Mada Project or prevent or otherwise have a significant effect on the development of the Vara Mada Project or the Company’s ability to recover monazite from the Vara Mada Project. These developments have not had an impact on the financial results of the Company at this time. The Company will continue to monitor events as they unfold.

Previous wording

The Company has a joint venture with Astron, the Donald Project JV, to jointly develop and operate the Donald Project in Australia, which is a well-known REE and HMS deposit that the Company believes could provide it with another near-term, low-cost, and large-scale source of monazite sand that, upon development, would be transported to the Mill for the recovery of separated REE products. The Donald Project has in place all major regulatory approvals required to construct and operate the project. The Donald Project is notable in that the monazite concentrates expected to be produced at the project contain elevated concentrations of the “heavy” REE oxides, including Dy and Tb.

Current wording

The Company has a joint venture with Astron, the Donald Project JV, to jointly develop and operate the Donald Project in Australia, which is a well-known REE and HMS deposit that the Company believes could provide it with another near-term, low-cost, and large-scale source of monazite sand that, upon development, would be transported to the Mill for the recovery of separated REE products. The Donald Project has all major regulatory approvals required to construct and operate the project. The Donald Project is notable in that the monazite concentrates expected to be produced at the project contain elevated concentrations of the “heavy” REE oxides, including Dy and Tb.

Previous wording

The JV Agreement provides Energy Fuels with the right to invest up to AUD$183.00 million (approximately $120.90 million at September 30, 2025 exchange rates) to earn up to a 49% interest in the Donald Project JV. In addition, the Company has agreed to issue Common Shares to Astron having a value of up to $17.50 million, of which $3.50 million of Common Shares were issued on September 24, 2024 and the remainder will be issued upon a positive FID. As of September 30, 2025, the Company has contributed $17.63 million in cash to the Donald Project JV and issued $3.50 million of Common Shares to Astron for total contributions of $21.13 million. As a result, the Company has a 7.49% ownership interest in the Donald Project. Astron, through its subsidiary Dickson & Johnson Pty Ltd, holds the remaining 92.51% interest. See Note 3 – Transactions for further information.

Current wording

The JV Agreement provides Energy Fuels with the right to invest up to AUD$183.00 million (approximately $125.75 million at March 31, 2026 exchange rates) to earn up to a 49% interest in the Donald Project JV. In addition, the Company has agreed to issue Common Shares to Astron having a value of up to $17.50 million. The Company has invested AUD$39.56 million in cash into the Donald Project through March 31, 2026. The remaining $14.00 million of Common Shares will be issued upon a positive FID. As of March 31, 2026, the Company has a 10.50% ownership interest in the Donald Project. Astron, through its subsidiary Dickson & Johnson Pty Ltd, holds the remaining 89.50% interest.

Previous wording

The Bahia Project is an HMS/REE deposit that the Company believes has the potential to supply 3,000 to 10,000 tonnes of monazite per year to the Mill for decades for processing into high-purity REE oxides. That amount of monazite contains approximately 1,500 to 5,000 tonnes of total rare earth oxides (“TREO”), including an estimated 300 to 1,000 tonnes of NdPr per year and significant commercial quantities of Dy and Tb and other “heavy” REEs. While Energy Fuels’ primary interest in acquiring the Bahia Project is the uranium and REE-bearing monazite, the Bahia Project is also expected to produce large quantities of high-quality ilmenite and rutile and zircon minerals also in high demand for the production of the critical minerals, titanium and zirconium.

Current wording

The Bahia Project is an HMS and REE deposit that the Company believes has the potential to supply 3,000 to 10,000 tonnes of monazite per year to the Mill for decades for processing into high-purity REE oxides. That amount of monazite contains approximately 1,500 to 5,000 tonnes of total rare earth oxides (“TREO”), including an estimated 300 to 500 tonnes of NdPr per year and significant commercial quantities of Dy and Tb and other “heavy” REEs. While Energy Fuels’ primary interest in acquiring the Bahia Project is the uranium and REE-bearing monazite, the Bahia Project is also expected to produce large quantities of high-quality ilmenite and rutile and zircon minerals also in high demand for the production of the critical minerals, titanium and zirconium.

Previous wording

The acquisition of the Toliara and Bahia Projects, and the Donald Project JV, are the culmination of the Company’s efforts to date toward building a significant, secure and diverse book of monazite supply for its rapidly advancing REE processing and critical minerals business, which in the meantime is expected to be supplemented by third-party purchases.

Current wording

The Vara Mada and Bahia Projects, and the Donald Project JV offer a diverse book of monazite supply for the Company’s REE processing and critical minerals initiatives, which in the meantime are expected to be supplemented by third-party purchases.

Previous wording

According to weekly and monthly price data from TradeTech LLC (“TradeTech”), the following table sets forth uranium spot prices (dollars per pound) for the three months ended September 30, 2025 and fluctuation during the period:

Current wording

The following table sets forth weekly spot and monthly long-term uranium prices (dollars per pound) from TradeTech LLC (“TradeTech”):

Previous wording

The Company believes that world demand for clean, carbon-free, reliable and affordable baseload electricity is growing. As a result of the expected growth of nuclear energy, the depletion of existing uranium mines and inventories and geopolitical events putting a greater focus by buyers on security of supply, the Company believes the current- and long-term fundamentals of the uranium industry remain positive. Uranium spot prices increased modestly during Q3 2025, and strong fundamentals appear to underpin the market, including global clean energy goals, significant new demand for electricity (preferably clean electricity) from the technology sector, including for artificial intelligence and data centers, and trade restrictions. Therefore, while the spot market has experienced some periodic weakness, particularly since the second half of 2024 due to uncertainty surrounding waivers on the prohibition of Russian nuclear fuel imports into the U.S. and the potential for imports of uranium from China, the Company continues to believe that uranium prices should rise to higher levels to support the additional primary production that will be required to meet the increasing demand. We continue to expect to see more nuclear units constructed around the world, along with existing capacity to be extended and protected, while primary mine production drops due to depletion of resources, reduced production and low prices. As a result, long-term uranium prices have remained fairly resilient ($84.00 per pound as of September 30, 2025). According to TradeTech, “[a] significant share of end-user demand has drifted into the long-term market.” “TradeTech expects term demand to emerge and retreat in cycles through 2025, largely on the expectation that government policy development will be unpredictable. However, the upward momentum on uranium demand generated by global net-zero and artificial intelligence-development initiatives is expected to underpin renewed appetite to secure uranium supply in 2025.” TradeTech, Uranium Market Study, 2024: Issue 4.

Current wording

Uranium spot prices increased modestly during the first quarter of 2026, due to several factors, including continued western bans on Russian uranium and nuclear fuel, accelerated nuclear plant restarts, life extensions, new builds including interest in using nuclear to power data centers and artificial intelligence (“AI”), uranium mine supply tightness, and entities such as the Sprott Physical Uranium Trust speculatively purchasing and sequestering material. The Company continues to believe that uranium prices will continue to rise to higher levels to support the additional primary production that will be required. We continue to expect to see more nuclear units constructed around the world, along with existing capacity extended and protected, while primary mine production drops due to depletion of resources, reduced production, commissioning challenges, logistic issues, and insufficiently high prices.

Previous wording

According to TradeTech, world uranium requirements continue to exceed primary mine production with the gap being bridged by dwindling secondary supplies and excess uranium inventories in various forms that have already been mined. At the same time, a large portion of global uranium production remains state-owned and state-subsidized and, therefore, not subject to normal market fundamentals, which the Company believes presents risks to the current strong market. However, Russia’s invasion of Ukraine and continued attacks on civilian populations has increased demand for non-Russian uranium. As a result, the Company has observed significantly more interest in both spot transactions and long-term contracts for U 3 O 8 from utilities.

Current wording

According to TradeTech, world uranium requirements continue to exceed primary mine production, with the gap being bridged by dwindling secondary supplies and excess uranium inventories in various forms that have already been mined. At the same time, a large portion of global uranium production remains state-owned and state-subsidized, and therefore not subject to normal market fundamentals, which the Company believes present risks to current and future markets. However, Russia’s invasion of Ukraine, and the upcoming halt of waivers under the U.S. uranium ban on December 31, 2027, has increased demand for non-Russian uranium. Geopolitical tensions continue to increase between the U.S. and China, and Kazakhstan and Uzbekistan maintain close commercial and political ties with Russia, which the Company believes places future uranium and nuclear supplies from those nations at some risk. As a result, the Company has observed significantly more interest in both spot transactions and long-term contracts for U 3 O 8 from utilities.

Previous wording

The Company believes that certain uranium supply and demand fundamentals point to sustained market strength and potentially higher prices in the future, increased demand from utilities and end-users (including the technology sector), financial entities, traders and producers. However, the Company also believes that, while uranium market conditions have improved significantly since 2021, they still could be vulnerable, primarily as a result of secondary uranium supplies, excess inventories and non-market activities of state-owned enterprises. While U.S. and European utilities are reducing their exposure to Russian supply, the Company believes that Russia maintains significant capabilities across the nuclear fuel cycle, which could re-enter the global market in the future upon resolution of the conflict in Ukraine, circumvention of trade restrictions or other factors.

Current wording

The Company believes that certain uranium supply and demand fundamentals point to sustained market strength and potentially higher prices in the future, increased demand from utilities and end-users (including the technology sector), financial entities, traders, and producers. However, the Company also believes that while uranium market conditions have improved significantly since 2021, they still could be vulnerable, primarily due to secondary uranium supplies, excess inventories, and non-market activities of state-owned enterprises. While U.S. and European utilities are reducing their exposure to Russian supply, the Company believes that Russia, and increasingly China, maintains significant capabilities across the nuclear fuel cycle, which could re-enter the global market in the future upon resolution of the conflict in Ukraine, circumvention of trade restrictions, a cooling of geopolitical tensions or other factors.

Previous wording

Vanadium is a metallic element that, when converted into ferrovanadium (“FeV”) (an alloy of vanadium and iron), is used primarily as an additive to strengthen and harden steel and make it anti-corrosive. According to market consultant FastMarkets, over 90% of FeV is used in the steel industry. In addition, vanadium is used in the aerospace and chemical industries and continues to see interest in energy storage technologies, including vanadium redox flow batteries. China is the largest global producer of vanadium, with additional production coming from Russia, South Africa, and Brazil (Roskill).

Current wording

Vanadium is a metallic element that, when converted into ferrovanadium (“FeV”) (an alloy of vanadium and iron), is used primarily as an additive to strengthen and harden steel and make it anti-corrosive. According to market consultant FastMarkets, over 90% of FeV is used in the steel industry. In addition, vanadium is used in the aerospace and chemical industries and continues to see interest in energy storage technologies, including vanadium redox flow batteries. China is the largest global producer of vanadium, with additional production coming from Russia, South Africa, and Brazil (according to Wood MacKenzie).

Previous wording

The Company believes one of the main drivers of V 2 O 5 prices is demand for steel, including global prospects for economic growth, construction, infrastructure and auto manufacturing. According to Fastmarkets, “The imposition of tariffs and counter-tariffs has slowed down trade between the US and China, which are two of the large markets for steel and ferro-alloys. This has led to reduced demand for ferro-alloys in some sectors, particularly in industries such as automotive and appliances, which are sensitive to trade policies, sources said.” Fastmarkets, US-China trade war - What's next for Asia's ferro-alloys sector? - Part March 28, 2025. The Company believes that V 2 O 5 prices will increase once confidence in the Chinese and global economy returns.

Current wording

The Company believes that one of the primary drivers of vanadium pentoxide (“V 2 O 5”) prices is demand for steel, including global prospects for economic growth, construction, infrastructure and automotive manufacturing. According to Fastmarkets, the imposition of tariffs and counter‑tariffs has slowed trade between the U.S. and China, which are two of the larger markets for steel and ferro‑alloys. This has led to reduced demand for ferro‑alloys in certain end‑markets, particularly industries such as automotive and appliances, which are sensitive to trade policies. The Company expects V₂O₅ prices could rise with stronger global economic confidence or greater demand from U.S. critical mineral initiatives.

Previous wording

REEs are a group of 17 chemical elements (the 15 elements in the lanthanum series, plus yttrium and scandium) that are used in a variety of clean energy and advanced technologies, including wind turbines, EVs, robotics, cell phones, computers, flat panel displays, advanced optics, catalysts, medicine and national defense applications. Monazite, the source of REEs currently utilized by the Company, also contains significant recoverable quantities of uranium, which fuels the production of carbon-free electricity using nuclear technology. According to industry analyst Wood-Mackenzie, most demand for REEs is in the form of separated REEs, “as most end-use applications require only one or two separated rare earth compounds or products.” (Wood Mackenzie, Rare Earths, Outlook to 2030, 20 th Edition). The main uses for REEs include: (i) battery alloys; (ii) catalysts; (iii) ceramics, pigments and glazes; (iv) glass polishing powders and additives; (v) metallurgy and alloys; (vi) permanent magnets; (vii) phosphors; and (viii) others (Adamas Intelligence). By volume, REEs used for permanent magnets within a plug-in hybrid EV (PHEV) and EV drive unit motor (NdPr, Dy, and Tb) and catalysts (cerium (Ce) and lanthanum (La)) comprised 60% of total consumption, yet over 90% of the value consumed.

Current wording

REEs are a group of 17 chemical elements (the 15 elements in the lanthanum series, plus yttrium and scandium) that are used in a variety of clean energy and advanced technologies, including EVs, robotics, wind energy, cell phones, computers, flat panel displays, advanced optics, catalysts, medicine and national defense applications. Monazite, the primary source of REEs currently utilized by the Company, also contains significant recoverable quantities of uranium, which fuels the production of carbon‑free electricity using nuclear technology. According to industry analyst Wood‑Mackenzie, most demand for REEs is in the form of separated REEs, “as most end‑use applications require only one or two separated rare earth compounds or products.” (Wood Mackenzie, Rare Earths, Outlook to 2030, 20th Edition). The main uses for REEs include: (i) battery alloys; (ii) catalysts; (iii) ceramics, pigments and glazes; (iv) glass polishing powders and additives; (v) metallurgy and alloys; (vi) permanent magnets; (vii) phosphors; and (viii) others (according to Adamas Intelligence). By volume, NdPr, Dy and Tb used for permanent magnets in drive unit motors for EVs and plug‑in hybrid EVs (“PHEV”), and lanthanum (“La”) and cerium (“Ce”) used in catalysts comprised 60% of total consumption, yet over 90% of the value consumed.

Previous wording

Typical monazite sands from the southeast U.S. average approximately 55% TREO and 0.20% uranium, which is the typical grade of uranium found in uranium mines that have historically fed the Mill. Of the 55% TREO typically found in the monazite sands, the NdPr comprises approximately 22% of the TREO. NdPr is among the most valuable of the REEs, as it is the key ingredient in the manufacture of high-strength permanent magnets, which are essential to the lightweight and powerful synchronous motors required in EVs and permanent magnet wind turbines used for renewable energy generation, as well as in an array of other modern technologies, including mobile devices and defense applications. Monazite also contains higher concentrations of “heavy” REEs than other REE-bearing minerals, including Dy and Tb used in permanent magnets, each of which has a commercial market at this time due to its importance in the production of permanent magnets for EVs and other uses, and Sm, Gd, Lu and/or Y, each of which currently does not have a commercial market but is of interest to the U.S. government for national security purposes.

Current wording

Typical monazite sands from the southeast U.S. average approximately 55% TREO and 0.20% uranium, which is the typical grade of uranium found in mines that have historically fed the Mill. Of the 55% TREO, the NdPr typically comprises approximately 22% of the TREO. NdPr is among the most valuable of the REEs, as it is the key ingredient in the manufacture of high-strength permanent magnets, which are essential to the lightweight and powerful synchronous motors required in EVs, PHEVs, and permanent magnet used in wind turbines for renewable energy generation, as well as in an array of other modern technologies, including mobile devices and defense applications. Monazite also contains higher concentrations of “heavy” REEs than other REE-bearing minerals, including Dy and Tb used in permanent magnets used in EVs, PHEVs, defense and other applications, and Sm, Gd, Lu and/or Y, which are currently in limited demand, but are seeing growing interest by the U.S. government for national security purposes and manufacturers for commercial production.

Previous wording

The Company remains primarily focused on NdPr, Tb, and Dy, along with other “heavies”, but has the capability to separate other REEs, such as Sm, Gd, Lu and Y, should market conditions and/or government demand support such activities. The REE supply chain starts at a mine. REEs are mined both as a primary target, like the Mountain Pass REE mine in California, and as a coproduct of HMS mining, which is the case for Chemours’ Offerman Mineral Sand Plant, the Donald Project, Toliara Project and Bahia Project, where the natural monazite sands are physically separated from the other mined sands. Mining creates an ore, which in the case of the Chemours, Donald, Toliara and Bahia material is the natural monazite sands that are physically separated from the other mined mineral sands. The ore then goes through a process of cracking and cleaning at the Mill that may include acids or caustic solutions, elevated temperature and pressure to recover the uranium and free the REEs from the mineral matrix. After removal of the uranium, which will be sold into the commercial nuclear fuel cycle for the creation of carbon-free nuclear energy, this solution is cleaned of any remaining deleterious elements (including remaining radioactive elements) and made into an RE Carbonate, which is a form acceptable as an SX feedstock for REE separation. SX facilities then use solvents and a series of mixer-settlers for the separation of the REEs in the RE Carbonate from each other and to create the desired purified REE products (often as oxides) for the market or particular end user. Separated REE products are typically sold to various markets, depending on the use. Separated REE products can be made into REE metals and metal-alloys, which are used for magnets and other applications.

Current wording

The Company is currently focused primarily on NdPr, Tb and Dy, but has the capability to separate other REEs such as Sm, Eu, Gd, Lu and Y should market conditions and/or government demand support such activities. REEs are mined both as a primary target and as a co-product of HMS mining where the natural monazite sands are physically separated from the other mined sands. The ore then goes through a process of cracking and cleaning at the Mill that may include acids or caustic solutions, elevated temperature and pressure to recover the uranium and free the REEs from the mineral matrix. After removal of the uranium, this solution is cleaned of any remaining deleterious elements (including remaining radioactive elements) and sent to SX circuits that have the primary role to separate the REEs into separate individual REEs by extraction, scrubbing stripping and washing. SX facilities then use solvents and a series of mixer-settlers for the separation of the REEs from each other and to create the desired purified REE products (often as oxides) for the market or particular end user. Separated REE products are typically sold to various markets, depending on the use. Separated REE products can be made into REE metals and metal-alloys, which are used to produce permanent magnets and other applications.

Previous wording

REEs are commercially transacted in a number of forms and purities. Therefore, there is no single price for REEs collectively, but numerous prices for various REE compounds and materials. The primary value that the Company expects to generate in the short- to medium-term will come from NdPr oxide and, upon completion of the additional Phase 1 capacity or Phase 2 expansion at the Mill, Tb and Dy oxides. In addition, as discussed above, the Company commenced production of separated NdPr in 2024. The following table sets forth certain REE compounds and materials mid-point prices in RMB¥/kg and their approximate value in USD$/kg, according to date from Asian Metal:

Current wording

REEs are commercially transacted in a number of forms and purities. Therefore, there is no single price for REEs collectively but numerous prices for various REE compounds and materials. The primary value that the Company expects to generate in the short- to medium-term will come from NdPr, Dy, and Tb oxides as those are the REEs the Company plans to target for high purity separation. In addition, as discussed above, the Company commenced production of separated NdPr in 2024. Furthermore, if the Company successfully completes the acquisition of Australian Strategic Materials, the Company will have the potential to generate value from the production of REE metals and alloys.

Previous wording

Monazite is a source of REEs, uranium and thorium. REEs are used in a wide variety of applications including, but not limited to, clean energy applications, permanent magnets, EVs, robotics, electronics, glass polishing, catalysts and defense applications. Recently, REEs, specifically the magnetic REEs NdPr, Tb, and Dy, have received significant attention for their applications in permanent magnets for EVs and other green technologies and robotics. Monazite is particularly rich in magnetic REEs when compared to other REE-bearing minerals. The uranium in monazite can be used for nuclear power, and thorium can be used for thorium salt reactors and medical isotope production.

Current wording

Monazite concentrates are an excellent source of REEs, uranium and thorium, and particularly the magnetic REEs (NdPr, Sm, Tb and Dy) when compared to other REE-bearing minerals. The uranium in monazite can be used for nuclear power, and thorium can potentially be used for thorium salt reactors and medical isotope production.

Previous wording

Most monazite produced from heavy mineral sands is in the form of either a separated monazite concentrate or as monazite contained in HMC. Currently, most monazite produced globally is shipped to China.

Current wording

Most monazite produced from HMS is in the form of either a separated monazite concentrate or as monazite contained in HMC. Currently, most monazite concentrates produced globally are shipped to China. Current demand growth for monazite is closely linked to the growing push for clean energy technologies, such as EVs and wind turbines.

Previous wording

Monazite prices have been on an upward trend through Q3 2025 due to an improvement in REE pricing linked to Chinese government-imposed restrictions on REE exports from China.

Current wording

Monazite prices have been on an upward trend since mid-2025 due to an improvement in REE pricing linked to Chinese government-imposed restrictions on REE exports from China. Prices continued to move upward through Q1 2026.

Previous wording

While China consumes the most REEs in its manufacturing industries, much of it is consumed in the manufacture of end-use goods for export and by non-Chinese companies operating within China. REE separation facilities are additionally located in Vietnam, India and Estonia and use a variety of feedstocks and sources with small-scale or experimental operational facilities located elsewhere (Russia included).

Current wording

The REE magnet market is expected to see significant growth through 2040 per Adamas Intelligence, driven by increasing demand for NdFeB magnets in EVs, PHEVs, robotics, advanced air mobility, and defense. While China consumes the most REEs in its manufacturing industries, much of it is consumed in the manufacture of end-use goods for export and by non-Chinese companies operating within China. REE separation facilities are additionally located in Vietnam, India, as well as Neo Performance Materials’ Silmet facility in Estonia, processing a variety of feedstocks and sources. In addition, there are small-scale or experimental operational facilities located elsewhere (Russia included).

Previous wording

The Company sees its prior commercial production of RE Carbonate, its recent commercial production of separated NdPr in 2024 and ongoing pilot production of Dy, Tb, and Sm oxides as the first steps in an effort to restore the REE supply chain in the U.S., where one currently does not exist. By acquiring the Bahia Project, the Toliara Project and the right to earn up to a 49% interest in the Donald Project, the Company has secured what it believes will be low-cost feedstock that can be processed in the U.S. into competitive separated REE products available for sale to U.S. and allied customers. Upon successful development of those projects, expected to be in the 2027-2028 time frame, the Company will have secured monazite sources capable of producing up to approximately 4,500 tonnes per year of separated NdPr, of which up to 1,000 tonnes per year can be produced utilizing existing Mill facilities. The Company’s next step in restoring the REE supply chain in the U.S. will be the development of the Mill’s planned Phase 2 REE separation circuit, also expected in the 2027-2028 time frame, which would have the capacity to allow the Mill to produce up to 6,000 tonnes per year of separated NdPr, along with 200 to 300 tonnes per year of separated Dy and Tb, and potentially other REEs, which would utilize all the monazite expected to be mined from the Company’s Bahia, Toliara and Donald Projects, along with additional monazite expected to be sourced from Chemours’ mines on the east coast of the U.S. and others. As demand for clean energy technologies and other advanced technologies increases in the coming years, the Company expects demand and prices for REEs to increase. Increases in supply sources for REEs are expected in conjunction with this anticipated rising demand.

Current wording

The Company views its commercial production of separated NdPr, pilot production of separated Dy and Tb, and planned future production of separated Sm, Eu, and Gd, from both monazite concentrates (current) and MREC (future), as important first steps toward restoring a REE supply chain controlled by the U.S. where one currently does not exist. By acquiring the Vara Mada Project, Bahia Project, and the right to earn into a 49% interest in the Donald Project, the Company has secured what it believes will be low-cost monazite feedstocks that can be processed in the U.S. into separated REE products available for sale to U.S. and allied customers on a competitive basis. Upon successful development of those projects, expected to be in the 2028 to 2030 time frame, the Company will have secured monazite sources capable of producing up to approximately 4,500 tonnes per year of separated NdPr along with 200 to 300 tonnes per year of separated Dy and Tb.

Previous wording

Multiple potential domestic sources of mined HMS, including monazite, exist in North America and are potential feedstocks for the Mill; in addition, there is one producer of REE oxides from hard rock mining in California. On a global level, there is a potential to acquire monazite sands from the following locations: Australia, South Africa, Madagascar, New Zealand, the Philippines, Indonesia, Brazil, Malaysia, Thailand, India, Russia and others.

Current wording

To further restore a U.S.-controlled REE supply chain, the Company expects to develop the Mill’s planned Phase 2 Circuit (expected in the 2028-to-2029 timeframe), which would have the capacity to allow the Mill to produce in total (from the Phase 1 Circuit and the Phase 2 Circuit) up to 6,000 tonnes per year of separated NdPr along with 200 to 300 tonnes per year of separated Dy and Tb, which would utilize all the monazite concentrates expected to be mined from the Company’s Vara Mada, Bahia, and Donald Projects and any additional monazite expected to be sourced from Chemours’ mines on the U.S. East Coast and others. Multiple potential domestic sources of mined HMS, including monazite, exist in North America and are potential feedstocks for the Mill. On a global level, there is a potential to acquire natural monazite sands from the following locations: Australia, South Africa, Madagascar, New Zealand, the Philippines, Indonesia, Brazil, Malaysia, Thailand, India, Russia and others.

Previous wording

As demand for clean energy technologies and other advanced technologies increases in the coming years, the Company expects demand and prices for REEs to increase. Increases in supply sources for REEs are expected in conjunction with this anticipated rising demand.

Current wording

Upon the successful acquisition of ASM, which is expected to occur as soon as July 2026, the Company will combine ASM’s Korean Metals Plant and its planned American Metals Plant with REE oxide production at the Mill. The Company will also own the advanced Dubbo REE Project in Australia. This transaction is expected to create what the Company believes would be the largest fully integrated REE “mine-to-metal and alloy” producer outside of China to close a critical strategic gap in the global supply chains for magnet applications, including automotive, robotic, energy and defense technologies. As demand for these advanced technologies increases in the coming years, the Company expects demand and prices for REEs to increase. Increases in supply sources for REEs are expected in conjunction with this anticipated rising demand.

Previous wording

HMS is typically categorized into titanium dioxide-bearing minerals such as ilmenite and rutile (but also including leucoxene and upgraded products such as slag and synthetic rutile), zircon and monazite.

Current wording

HMS is typically categorized into titanium dioxide-bearing minerals such as ilmenite and rutile (but also including leucoxene and upgraded products such as slag and synthetic rutile), zircon, monazite and xenotime.

Previous wording

Western pigment producers are the main source of demand for chloride ilmenite and high-grade feedstocks including rutile. Major western pigment producers have experienced challenging conditions from the weak and uncertain economic conditions in their major markets and have modified their production rates to reduce pressure from growing inventory levels. One major global pigment producer entered administration through the quarter. The tariffs imposed on Chinese pigment in the key markets mentioned above are expected to result in a shift of some demand from Chinese pigment producers to western pigment producers, which should support demand for rutile and chloride ilmenite. However, until now, a switch from Chinese pigment to western pigment has been limited due to the overall weakness in those key markets and continued aggressive competition from Chinese producers in these and other, alternative export, markets. This has maintained downward pressure on high-grade feedstock, including rutile, prices through Q3 2025. The suspension of production of synthetic rutile by a major producer from December 1, 2025 may help to alleviate pressure on the high-grade feedstock market through 2026. Chloride ilmenite, regarded as a niche feedstock for western pigment production with a high relative economic value, is typically purchased under long-term offtake arrangements and generally experiences limited short-term price fluctuations.

Current wording

Western pigment producers are the main source of demand for chloride ilmenite and high-grade feedstocks including rutile. Major western pigment producers continue to experience challenges from the weak and uncertain economic conditions. However, the idling of a number of pigment plants (owned by a major global pigment producer who entered administration) across Europe and Asia has taken some pressure off the market and pigment inventories have recently been decreasing. Western pigment producers are competing to gain market share from the idled facilities as well as from Chinese producers in those markets in which tariffs have been applied to Chinese pigment imports. The idled pigment operations, as well as low production utilization rates at other production facilities, have eroded demand and pricing for rutile and chloride ilmenite. However, if western pigment producers succeed in gaining market share, and increasing their rates of production, demand for rutile and chloride ilmenite is expected to improve. The suspension of production of synthetic rutile by a major producer from December 1, 2025 may help to alleviate pressure on the high-grade feedstock market through 2026. Chloride ilmenite, regarded as a niche feedstock for western pigment production with a high relative economic value, is typically purchased under long-term offtake arrangements and generally experiences limited short-term price fluctuations. An incident at a major mineral sands mining operation in Africa during Q1 2026 is likely to impact chloride ilmenite supply for a significant part of 2026.

Previous wording

Demand for rutile into the welding and titanium metal sectors remains firm. The main drivers of demand have been the shipbuilding and aerospace industries combined with sanctions on Russian-supply of raw materials. The extent of the rutile price premium into these sectors (above pigment sector pricing) is being eroded due to an excess of global supply including the increase in production of premium rutile in China from concentrates being imported into China from Africa.

Current wording

Demand for rutile from the welding and titanium metal sectors remains firm. The main drivers of demand have been the shipbuilding and aerospace industries combined with sanctions on Russian-supply of raw materials. However, the extent of the rutile price premium into these sectors (above pigment sector pricing) has eroded due to an excess of global supply including the increase in production of premium rutile in China from concentrates being imported into China from Africa.

Previous wording

The Company believes that longer-term fundamentals for rutile and all grades of ilmenite are positive. Pigment demand, driving consumption of rutile and ilmenite, is expected to resume growing at the rate of global GDP and should recover from current levels with growth in housing and building sectors across major markets. Supply of TiO 2 feedstock to meet future demand is dependent on a significant amount of new supply entering the market from new projects.

Current wording

The Company believes that longer-term fundamentals for rutile and all grades of ilmenite are positive. Long-term pigment demand, driving consumption of rutile and ilmenite, is expected to grow at the rate of global GDP and should recover from the subdued conditions of recent years as more certainty returns to markets and we see a return to sustainable growth in housing and building sectors. Supply of TiO 2 feedstock to meet future demand remains dependent on a significant amount of new supply entering the market from new projects.

Previous wording

The following table sets forth certain HMS prices in USD$/t, according to TZ Minerals International Pty Ltd.'s (“TZMI’s”) estimated market prices published in September 2025:

Current wording

The following table sets forth certain HMS prices in USD$/t (freight on board basis), according to TZ Minerals International Pty Ltd.’s estimated market prices published in March 2026:

Showing the first 40 of 72 pairs. Open the source sections for the rest.

Rearranged current paragraphs (3)

Current report — wording carried from elsewhere

The following tables set forth the prices for certain REE compounds and materials mid-point prices in RMB¥/kg and their approximate value in USD$/kg, according to data from Benchmark Mineral Intelligence (“Benchmark”) (X-China pricing) and Asian Metal (Chinese pricing):

Current report — wording carried from elsewhere

The Company’s inventories of finished U 3 O 8 had a weighted average cost of approximately $36 per pound U 3 O 8 as of March 31, 2026, reflecting the weighted average cost of production and purchases of finished inventories from various sources over the years, as the Company continued to ramp up production and maximize economies of scale, including from Alternate Feed Materials, the La Sal/Pandora mines, low-grade mine clean-up materials, and purchases of uranium on the spot market. These costs do not fully reflect the expected lower costs of recently mined ores from the Pinyon Plain mine, which had only been processed and added to inventories commencing in early October (a conventional ore processing run, including Pinyon Plain and La Sal/Pandora ores, commenced at the Mill in early October 2025).

Current report — wording carried from elsewhere

Three Months Ended March 31, 2026 Compared to Three Months Ended March 31, 2025
Rearranged previous paragraphs (13)

Previous report — wording carried elsewhere

In addition, Energy Fuels recovers uranium from Alternate Feed Materials at its Mill, recycling valuable resources that would otherwise be discarded and returning them to the fuel cycle to support U.S. nuclear energy and national security objectives.

Previous report — wording carried elsewhere

On October 17, 2025, a new President of Madagascar was sworn in by the Country's High Constitutional Court following a period of social unrest and political instability that resulted in the removal of the Country's prior President. On October 20, 2025, a new Prime Minister was appointed, and, on October 28, 2025, a new cabinet was announced. At this time, it is too early to determine whether and to what extent recent social and political developments in Madagascar may impact the Toliara Project, whether positively or negatively, including with respect to the Project's development prospects or timelines, the ability to achieve suitable fiscal or other terms applicable to the Project or the ability to achieve a positive FID. These developments have not had an impact on the financial results of the Company at this time. The Company will continue to monitor events as they unfold. See “Heavy Mineral Sands Initiatives — Toliara Project” below for more information.

Previous report — wording carried elsewhere

There can be no assurance of achieving sufficient legal and fiscal stability or the timing thereof, or obtaining approval of the addition of monazite to the mining permit or the timing thereof. If such approvals are not obtained, or obtained on terms less favorable than expected, this could delay any final investment decision in relation to the Toliara Project or prevent or otherwise have a significant effect on the development of the Toliara Project or ability to recover monazite from the Toliara Project.

Previous report — wording carried elsewhere

Current demand growth for monazite is closely linked to the growing push for clean energy technologies, such as EVs and wind turbines.

Previous report — wording carried elsewhere

The consolidated results of operations were as follows (in thousands):

Previous report — wording carried elsewhere

Exploration, development and processing (excluding share-based compensation)

Previous report — wording carried elsewhere

While we expect exploration and development costs related to our mineral properties to provide future value to the Company, the Company expenses these costs in part due to the fact that the Company has not established Proven Mineral Reserves or Probable Mineral Reserves as defined by S-K 1300 or NI 43-101 through the completion of a feasibility or pre-feasibility study for any of the Company’s projects as of September 30, 2025, with the exception of its Sheep Mountain and Pinyon Plain Projects.

Previous report — wording carried elsewhere

Standby costs are related to the care and maintenance of the standby mines and are expensed as incurred. Standby costs increased by $1.53 million to $6.17 million for the nine months ended September 30, 2025 from $4.64 million for the nine months ended September 30, 2024 primarily due to advancing permitting and development on its Roca Honda Project in 2025 and higher general maintenance costs as a result of inflation.

Previous report — wording carried elsewhere

Selling, general and administrative (excluding share-based compensation)

Previous report — wording carried elsewhere

The operating results of our reportable segments were as follows (in thousands):

Previous report — wording carried elsewhere

The following table sets forth selected operating data and financial metrics:

Previous report — wording carried elsewhere

Alternate Feed Materials, processing and other

Previous report — wording carried elsewhere

Costs applicable to heavy mineral sands