What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-Q

Period ended 2025-06-30; filed 2025-08-06.

0001385849-25-000027

ITEM 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

Current report: 10-Q

Period ended 2025-09-30; filed 2025-11-03.

0001385849-25-000044

ITEM 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 287 previous paragraphs and 273 current paragraphs.

151 unchanged; 95 reworded; 25 added; 36 removed; 5 previous and 2 current paragraphs rearranged.

Tables are not compared: 14 previous and 14 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (25)

Current report

On August 21, 2025, the Company announced it successfully completed production of and achieved a purity of 99.9% Dy, which is well in excess of the 99.5% commercial specification, thereby becoming the first U.S. company to publicly report Dy production volumes and purities. The Mill is expected to continue producing approximately two kilograms of Dy oxide per week until 15 kilograms have been produced, at which point pilot production will transition to Tb oxide, targeted for Q4 2025. The Company intends to construct and commission commercial-scale Dy and Tb and potentially other “heavy” REE separation capacity at the Mill, which could be operational as soon as Q4 2026. Multiple magnet manufacturers and original equipment manufacturers have expressed strong interest in obtaining Dy samples, further validating the Company’s strategy to establish a fully non-Chinese rare earth supply chain for commercial and defense applications. Through September 30, 2025, the Mill has produced 29 kg of Dy.

Current report

On August 26, 2025, the Company announced that it signed a Memorandum of Understanding (“MOU”) with Vulcan Elements to create a secure, ex-China supply chain for rare earth permanent magnets. Under the MOU, the Company will supply high-purity NdPr and Dy oxides produced at its White Mesa Mill from U.S.-sourced monazite concentrates for validation in Vulcan’s magnet production processes. Following validation, the parties intend to negotiate long-term supply agreements. This collaboration is expected to support U.S. commercial and defense applications, including electric vehicles, robotics, AI data centers, and critical military technologies.

Current report

On September 9, 2025, the Company announced that its high-purity NdPr oxide, produced at the White Mesa Mill from monazite concentrates mined in Florida and Georgia, had been successfully manufactured into commercial-scale rare earth permanent magnets (“REPMs”) by South Korea’s largest manufacturer of EV drive unit motor cores. The REPMs passed all quality assurance and quality control (“QA/QC”) benchmarks and are qualified for use in EV and hybrid drive units for major automotive manufacturers in North America, the EU, Japan, and Korea. Approximately 1.2 metric tonnes of NdPr oxide were processed into 3.0 metric tonnes of REPMs, enough to power approximately 1,500 new vehicles, with first installations expected in the market in Q4 2025. The Company also announced plans to build heavy rare earth oxide production capacity at the White Mesa Mill in 2026, further advancing its strategy to create a complete, U.S.-based “mine-to-magnet” supply chain.

Current report

On October 3, 2025, the Company announced the closing of its upsized offering of 0.75% Convertible Senior Note due 2031 (the “Notes”) for an aggregate principal amount of US$700.0 million (the “offering”), including the exercise in full by the initial purchasers of their option to purchase an additional US$100.0 million of Notes. The Notes have a cash interest coupon of 0.75% per annum, payable semi-annually in arrears on May 1 and November 1 of each year, beginning May 1, 2026, and a conversion price of approximately $20.34 per common share of Energy Fuels (the “common shares”), which represents a premium of approximately 32.5% to the last reported sale price of the common shares on the NYSE American on September 30, 2025, subject to customary anti-dilution adjustments. The effective conversion price of the Notes was increased to $30.70 (representing a premium of 100% over the last reported sale price of the common shares on the NYSE American on September 30, 2025) through the purchase of capped call options. The purchase price for the capped call options was approximately $53.55 million. Conversions of the Notes may be settled in Energy Fuels common shares, cash, or a combination of common shares and cash, at Energy Fuels' election. Additionally, Energy Fuels will have the right to redeem the Notes in certain circumstances and will be required to offer to repurchase the Notes upon the occurrence of certain events. The Notes will mature on November 1, 2031, unless earlier converted, redeemed, or repurchased. We believe this strategic capital raise strengthens the Company's balance sheet and enhances the Company's ability to accelerate its rare earth initiatives, including the planned Phase 2 expansion at the White Mesa Mill (see “Rare Earth Element Initiatives” below) and development of its Donald Project in Australia. We believe this outcome represents a clear vote of confidence in the Company's team and strategy.

Current report

On October 17, 2025, a new President of Madagascar was sworn in by the Country's High Constitutional Court following a period of social unrest and political instability that resulted in the removal of the Country's prior President. On October 20, 2025, a new Prime Minister was appointed, and, on October 28, 2025, a new cabinet was announced. At this time, it is too early to determine whether and to what extent recent social and political developments in Madagascar may impact the Toliara Project, whether positively or negatively, including with respect to the Project's development prospects or timelines, the ability to achieve suitable fiscal or other terms applicable to the Project or the ability to achieve a positive FID. These developments have not had an impact on the financial results of the Company at this time. The Company will continue to monitor events as they unfold. See “Heavy Mineral Sands Initiatives — Toliara Project” below for more information.

Current report

On October 21, 2025, Export Finance Australia (“EFA”) issued a non-binding, conditional Letter of Support to Energy Fuels and Astron Limited for up to AUD$80 million of senior debt financing for the Donald Project. The Donald Project, which is expected to require approximately AUD$520 million in total funding with a targeted 50:50 debt-to-equity ratio structure, is planned to commence production in the second half of 2027 and is expected to produce ~7,200 tonnes per annum of rare earth oxide concentrate, including ~1,000 tonnes of NdPr oxide, ~92 tonnes of Dy oxide, and ~16 tonnes of Tb oxide. The Company expects to purchase 100% of the rare earth concentrate under a life-of-mine offtake agreement for processing at the Mill. This conditional support from EFA marks a significant step toward advancing project financing and reinforces the strategic importance of the Donald Project in strengthening the Australia–U.S. critical minerals supply chain.

Current report

(2) Does not include any sales of inventory into the spot market, which the Company may make depending on market conditions. The Company expects to exceed the high end of the range following its 100,000 pound spot sale in Q3 2025 that was not incorporated into this range.

Current report

During Phase 1 commissioning, the Company produced approximately 38 tonnes of separated NdPr. On September 9, 2025, the Company announced its NdPr had been manufactured into commercial scale REPMs by South Korea's largest manufacturer of drive unit motor cores, pursuant to a previously announced MOU, and has passed all QA/QC benchmarks for use in EV drive unit motors sold to major automotive manufacturers. This includes the successful manufacture of Energy Fuels' NdPr oxide into NdPr metal, NdFeB alloy sintered blocks (45H grade), and high-performance, high-temperature NdFeB REPMs. The successful production of REPMs from Energy Fuels' NdPr oxide marks a decisive breakthrough in building a “mine-to-magnet” supply chain independent of China, using rare earth oxides (REOs) produced in the United States. Energy Fuels' NdPr oxide has now been qualified for use in high temperature drive units, which are installed in EV and hybrid vehicles manufactured by major automotive companies across North America, the EU, Japan, and Korea. Now that Energy Fuels' NdPr has been validated, Energy Fuels intends to engage in negotiations for a potential longer-term supply arrangement that is expected to enable future offtake of the Company’s separated REE products expected to be produced at the Mill from monazite feedstocks originating at the Toliara, Donald and Bahia Projects (subject to all required licenses, permits and permissions being obtained), in addition to third-party feedstocks that may be purchased from third parties. The Company also plans to continue to evaluate potential opportunities in REE metal, alloy and magnet-making as they may arise.

Current report

During the three months ended September 30, 2025, the Company sold 100,000 pounds of uranium on the spot market at a sales price of $76.50 per pound for realized sales of $7.65 million and 140,000 pounds of uranium under its long-term utility contracts at a sales price of $69.43 per pound for realized sales of $9.72 million. During the nine months ended September 30, 2025, the Company sold 150,000 pounds of uranium on the spot market for a weighted average realized sales price of $76.67 per pound for realized sales of $11.50 million and 140,000 pounds of uranium under its long-term utility contracts at a sales price of $69.43 per pound for realized sales of $9.72 million.

Current report

On October 17, 2025, a new President of Madagascar was sworn in by the Country's High Constitutional Court following a period of social unrest and political instability that resulted in the removal of the Country's prior President, and, on October 20, 2025, a new Prime Minister was appointed. At this time, it is too early to determine whether and to what extent, recent social and political developments in Madagascar may impact the Toliara Project, whether positively or negatively, including with respect to the Project's development prospects or timelines, the ability to achieve suitable fiscal or other terms applicable to the Project or the ability to achieve a positive FID. These developments have not had an impact on the financial results of the Company at this time. The Company will continue to monitor events as they unfold.

Current report

The Company has made the decision to install further modifications and enhancements to the Mill's existing SX circuits to produce separated Dy, Tb, and potentially Sm oxides from its existing Phase 1 monazite processing capacity. These SX circuits are expected to be constructed and operations as soon as Q4 2026.

Current report

The Mill may also reconfigure the existing Phase 1 REE separation circuit in the future to allow it to operate without utilizing the Mill's existing leaching and precipitation circuits, thereby allowing the Phase 1 REE separation circuit to operate simultaneously with both conventional uranium ore production and the Phase 2 REE separation circuit.

Current report

Monazite prices have been on an upward trend through Q3 2025 due to an improvement in REE pricing linked to Chinese government-imposed restrictions on REE exports from China.

Current report

Revenues increased by $13.66 million to $17.71 million for the three months ended September 30, 2025 from $4.05 million for the three months ended September 30, 2024 primarily due to higher uranium sales between periods as a result of contract delivery timing, the Mill schedule and market conditions.

Current report

Costs applicable to revenue increased by $10.93 million to $12.78 million for the three months ended September 30, 2025 from $1.85 million for the three months ended September 30, 2024. The increase was due to higher uranium volumes sold at higher cost per pound of U 3 O 8.

Current report

Revenues from Alternate Feed Materials, processing and other increased by $0.29 million to $0.34 million for the three months ended September 30, 2025 from $0.05 million for the three months ended September 30, 2024 primarily due to additional billings for lower grade ore than contracted from a customer.

Current report

There were no revenues or costs applicable to rare earth element revenues for either of the three months ended September 30, 2025 or 2024.

Current report

Nine Months Ended September 30, 2025 Compared to Nine Months Ended September 30, 2024

Current report

For the nine months ended September 30, 2025, net loss increased by $50.31 million to $65.17 million or $0.29 per share from $14.86 million or $0.09 per share for the nine months ended September 30, 2024 primarily due to higher operating costs following the acquisition of Base Resources on October 2, 2024 and higher costs applicable to revenue, partially offset by asset sales for equipment no longer needed for reclamation activities at the Kwale Project and market-to-market gains on our marketable securities.

Current report

On October 3, 2025, the Company closed its upsized offering of $700.00 million aggregate principal amount of 0.75% Convertible Senior Notes due 2031 for aggregate gross proceeds of $700.00 million. The Notes bear interest at 0.75% per annum, payable semi-annually on May 1 and November 1, beginning May 1, 2026, and mature on November 1, 2031, unless earlier converted, redeemed, or repurchased. The initial conversion price of the Notes is approximately $20.34 per common share, representing a 32.5% premium to the last reported sale price of the Common Shares on the NYSE American on September 30, 2025. The conversion price is subject to customary adjustments.

Current report

In connection with the offering, the Company entered into capped call transactions that are expected generally to reduce the potential dilution to the Common Shares upon any conversion of the Notes and/or offset potential cash payments the Company may be required to make in excess of the principal amount of converted Notes, with such reduction and/or offset subject to a cap initially equal to $30.70 per share (which represents a premium of 100% over the last reported sale price of Common Shares on the NYSE American on September 30, 2025), and is subject to certain adjustments under the terms of the capped call transactions.

Current report

Net proceeds from the offering are intended to support rare earth element initiatives, including expansion at the White Mesa Mill and the Donald Project, as well as general corporate purposes.

Current report

Nine Months Ended September 30, 2025 Compared to Nine Months Ended September 30, 2024
Removed paragraphs (36)

Previous report

On April 17, 2025, the Company announced it has successfully developed the technology it believes is required to produce samarium, gadolinium, dysprosium, terbium, lutetium and yttrium, at scale at the Mill, which are six (6) of the seven (7) rare earth oxides that are now subject to newly enacted Chinese export controls, amid increasing trade tensions between the U.S. and China and at the same time President Trump commenced a Section 232 investigation on imports of processed critical minerals, including the rare earth, uranium, and vanadium oxides produced by the Company. The Company also announced on July 17, 2025, that it is in pilot-scale production of “heavy” REE oxides and is expected to have a one (1) kilogram sample of dysprosium (“Dy”) oxide within thirty (30) days (mid-August 2025) and fifteen (15) kilograms by September 30, 2025. The Company also expects to produce a one (1) kilogram sample of terbium (“Tb”) oxide by the end of November 2025 and if progress continues as planned, the Company expects to be able to start producing samarium (“Sm”) oxide on a pilot scale at the Mill in January of 2026.

Previous report

The major U.S. utility company to which the Company is obligated to deliver 250,000 pounds of U 3 O 8 in 2025, plus or minus 20%, has recently specified that it has opted to take delivery of 140,000 pounds of U 3 O 8, for delivery in Q3 2025 and 160,000 pounds of U 3 O 8 in Q4 2025, under its contract for 2025, thereby providing more certainty to the Company’s contractual uranium sales obligations in 2025. This is reflected in the Company's uranium sales guidance for 2025 as revised at the end of Q2 2025 (see “Guidance” below).

Previous report

(2) The Company has not elected not to sell inventory into the sport market at this time but may do so subject to market conditions.

Previous report

The Company continues to mine and stockpile ore from its Pinyon Plain, La Sal and Pandora mines, located in Arizona and Utah, which is expected to contain 875,000 to 1,435,000 pounds of U 3 O 8 contained in approximately 55,000 to 80,000 tons of ore from these mines during 2025, subject to market conditions, mining rates and other factors. This mined ore is expected to be stockpiled at the mines and Mill pending processing at the Mill, which is up from the Company’s initial 2025 published guidance of 730,000 to 1,170,000 pounds of U 3 O 8 in 2025. In addition, the Company expects to receive additional Alternate Feed Materials, AUM cleanup material from the Navajo Nation and ore purchased from third-party mining companies containing approximately 160,000 to 200,000 pounds of U 3 O 8, which, when combined with the ore mined/to be mined by the Company at its own projects, is expected to result in total inventories (uranium-contained-in-ore inventories, work-in-process and finished U 3 O 8 inventory) of approximately 1,985,000 to 2,585,000 pounds of U 3 O 8, subject to any additional spot sales that may be made in 2025. Uranium processing activities are currently expected to result in total uranium production of 700,000 to 1,000,000 pounds of finished U 3 O 8 for 2025, which (combined with existing finished goods inventories) is expected to be sufficient to complete all currently contracted uranium sales in 2025 and 2026 and a portion of currently contracted uranium sales in 2027.

Previous report

The final mix between quantities of U 3 O 8 contained in ore inventories and finished product inventories at the end of 2025 will depend on the timing of processing stockpiled uranium ore at the Mill (which is currently scheduled to include a conventional ore Mill run commencing in Q4 2025), on any additional ore purchases from third-party mining companies, on any Alternate Feed Materials and other cleanup materials received and on any spot uranium sales or purchases the Company may elect to complete in 2025 in response to uranium prices, market conditions, contract requirements and other factors. Generally, at current spot prices the Company plans to continue to mine uranium ore from its mines, to stockpile the mined ore for future processing, and to process the mined ore only as required to fill deliveries under its long-term contracts, and maintain flexibility for potential spot sales to generate higher margins upon processing, subject to market conditions. This is consistent with the Company’s approach in 2024, during which all the Company’s uranium ore mined in 2024 was stockpiled at the Mill, and none of that ore was processed into finished uranium product or sold in 2024, resulting in no revenues or margins from uranium ore mined in 2024. Instead, the Company elected to stockpile the uranium ore mined in 2024 for processing in 2025 for sale at higher margins into the Company’s 2025 and 2026 deliveries under its long-term sales contracts. Uranium sales in 2024 were limited to sales from pre-existing inventories and only for delivery under the Company’s long-term contracts in 2024.

Previous report

Currently, the Company plans to process stockpiled and mined ore from its Pinyon Plain, La Sal and Pandora mines during Q4 2025, containing up to 670,000 pounds of U 3 O 8, subject to market conditions, contract requirements and the Mill’s schedule, which, along with the production of 330,000 pounds of U 3 O 8 during the first half of 2025, result in expected total finished product uranium production in 2025 at the high end of the 700,000 to 1,000,000 range. The finished U 3 O 8 inventory from this planned Q4 2025 processing campaign, which is expected to continue through Q1 2026, along with existing finished goods inventories, is expected to be sufficient to satisfy the Company’s 2025, 2026 and a large portion of its 2027 delivery requirements, at higher margins than would be expected compared to spot sales at this time. The Company currently plans to process this larger amount of uranium ore in 2025, rather than deferring a portion of the Company’s processing requirements to 2026 and 2027, in order to allow the Company to be able to complete an REE processing campaign in 2026.

Previous report

Of the 700,000 to 1,000,000 pounds of uranium currently expected to be produced in Q4 2025, approximately 300,000 pounds are expected to be sold under the Company’s long-term contracts in 2025 and the remainder is expected to be sold under the Company’s long-term contracts in 2026 and 2027, resulting in an expected increase in the Company’s finished goods inventory to approximately 925,000 to 1,225,000 pounds of finished U 3 O 8 by the end of 2025, subject to any additional spot sales that may be made in 2025. As with 2024, this will result in a deferral of sales and the expected higher realized sales and margins in connection with the Company’s mined ore and other inventories from 2025 to 2026 and 2027, into the Company’s higher priced long-term contract deliveries in 2026 and 2027. The Company may sell additional uranium inventories on the spot market in 2025, depending on market conditions.

Previous report

We continually evaluate the optimal mix of production, inventory and purchases in order to retain the flexibility to deliver long-term value.

Previous report

During the six months ended June 30, 2025, the Company increased its working capital from $170.90 million to $253.23 million, thereby maintaining the strong balance sheet necessary for the Company to develop its ongoing projects.

Previous report

During the second half of 2025, the Company expects to receive additional Alternate Feed Materials and AUM cleanup material and to purchase ore from third-party mining companies for a total combined U 3 O 8 content of approximately 160,000 to 200,000 pounds. In addition, the Company expects to process stockpiled and mined ore from its Pinyon Plain, La Sal and Pandora mines along with Alternate Feed Materials in Q4 2025, which would be expected to result in total uranium production during 2025 of up to 1,000,000 pounds of finished U 3 O 8 depending on market conditions, contract requirements and the Mill’s processing schedule. This uranium processing run is expected to extend through Q1 2026.

Previous report

The Company also plans to continue to pursue additional Alternate Feed Materials, third-party processing, ore purchases and other sources of feed for the Mill (including potential material recovered from AUMs and other land cleanup work) and, when market conditions warrant, to pursue the recovery of uranium and/or vanadium dissolved in the Mill’s tailings pond solutions.

Previous report

49 core holes were completed in the Juniper Zone drilling program in February 2025. Drill core has been sampled and is undergoing analytical testing, which is expected to be completed by the end of Q3 2025. Highlights from the drilling program include the following intercepts:

Previous report

•PPCH-028: 13.4 ft with an average grade of 7.02% eU 3 O 8

Previous report

•PPCH-029: 7.5 ft with an average grade of 7.50% eU 3 O 8

Previous report

•PPCH-033: 9.3 ft with an average grade of 2.02% eU 3 O 8

Previous report

•PPCH-034: 17.5 ft with an average grade of 5.70% eU 3 O 8

Previous report

◦including 4.0 ft with an average grade of 20.11% eU 3 O 8

Previous report

•PPCH-035: 5.0 ft with an average grade of 5.15% eU 3 O 8

Previous report

•PPCH-036: 7.5 ft with an average grade of 3.17% eU 3 O 8

Previous report

•PPCH-043: 11.0 ft with an average grade of 1.89% eU 3 O 8

Previous report

†All drill holes were logged with calibrated Mt. Sopris gamma probes owned or rented by the Company. All probes were calibrated at the U.S. Department of Energy test pits in Grand Junction, CO. Equivalent U 3 O 8 grades (“eU 3 O 8”) are calculated using indirect readings of contained in-situ uranium based on gamma radiation emitted by uranium daughter products.

Previous report

During the three and six months ended June 30, 2025, the Company sold 50,000 pounds of uranium in the spot market for a realized sales price of $3.85 million, or $77.00 per pound.

Previous report

During the three months ended June 30, 2025, the Company sold 202 tonnes of rutile for total sales of $0.28 million.

Previous report

The Government of Madagascar has also been working on a new law establishing a special regime for large scale investments in the Malagasy mining sector, referred to as the “LGPEM” (which will replace the current law known as the “LGIM”). The Company has provided detailed comments on the LGPEM, however the timing of when the LGPEM will be finalized and ready for consideration by the Madagascar Parliament is uncertain. If approved, the Company may elect to seek clarification under the LGPEM. Depending on the final form of the law, a separate agreement approved by the Madagascar Parliament may be required to supplement the LGPEM and ultimately support the development of the Toliara Project. While this is considered a viable pathway to achieving Project stability, the current focus of both the Government of Madagascar and the Company remains finalizing the investment agreement.

Previous report

Monazite prices remain subdued and, after recovering from a slight dip in April, were relatively stable through Q2 2025.

Previous report

Costs applicable to revenue were relatively consistent at $3.66 million and $3.68 million for the three months ended June 30, 2025 and 2024, respectively.

Previous report

Revenues from Alternate Feed Materials, processing and other decreased by $0.05 million to $0.08 million for the three months ended June 30, 2025 from $0.13 million for the three months ended June 30, 2024 primarily due to fewer services provided to IsoEnergy Ltd., as successor in interest to CUR, under our mine operating agreement with CUR.

Previous report

Revenues from HMS were $0.28 million for the three months ended June 30, 2025. The final HMS product produced from the Kwale mine was shipped in April 2025. There were no revenues from HMS for the three months ended June 30, 2024 as the acquisition of Base Resources occurred on October 2, 2024. See Note 3 – Transactions to the consolidated financial statements for more information.

Previous report

Costs applicable to HMS were $1.00 million for the three months ended June 30, 2025 due to higher unit costs related to mining the lower grade ore at the end of the Kwale mine life, which was completed as of December 31, 2024. The final HMS product sales from the Kwale mine was shipped in April 2025. There were no costs applicable to HMS the three months ended June 30, 2024 as the acquisition of Base Resources occurred on October 2, 2024. See Note 3 – Transactions to the consolidated financial statements for more information.

Previous report

Six Months Ended June 30, 2025 Compared to Six Months Ended June 30, 2024

Previous report

For the six months ended June 30, 2025, we incurred a net loss of $48.16 million or $0.23 per share compared to net loss of $2.78 million or $0.02 per share for the six months ended June 30, 2024 primarily due to lower revenues between periods driven by timing of our uranium contract deliveries, Company's decision to retain uranium in inventory at current spot price levels and higher operating costs following the acquisition of Base Resources on October 2, 2024.

Previous report

Revenues decreased by $13.04 million to $21.11 million for the six months ended June 30, 2025 from $34.15 million for the six months ended June 30, 2024 primarily due to lower uranium sales between periods as a result of contract delivery timing and Company's decision to retain uranium in inventory at current spot price levels, partially offset by HMS sales during the current period. As the lower grade HMS are more costly to produce, the Company did not realize a gross profit related to its HMS sales during the three or six months ended June 30, 2025.

Previous report

Six Months Ended June 30, 2025 Compared to Six Months Ended June 30, 2024
Reworded paragraphs (95)

Previous wording

We responsibly produce several of the critical materials essential to U.S. energy security and advanced technologies, including uranium, vanadium, REEs and HMS—helping to reduce reliance on foreign sources and strengthen domestic supply chains. The Company owns conventional uranium, uranium/vanadium and HMS/REE properties and projects in various stages of operation, development, exploration and permitting, as well as fully permitted uranium and uranium/vanadium projects on standby.

Current wording

We responsibly produce several of the critical materials essential to United States (“U.S.”) energy security and advanced technologies, including uranium, vanadium, REEs and HMS—helping to reduce reliance on foreign sources and strengthen domestic supply chains. The Company owns conventional uranium, uranium/vanadium and HMS/REE properties and projects in various stages of operation, development, exploration and permitting, as well as fully permitted uranium and uranium/vanadium projects on standby. The Company's White Mesa Mill, near Blanding, Utah, is the only licensed and operating uranium mill and the only uranium mill capable of producing separated REE oxides in the United States.

Previous wording

The Company has also secured its own HMS sources of uranium- and REE-bearing monazite sands in furtherance of a fully integrated U.S.-based REE supply chain, which include the Toliara Project in Madagascar, the Donald Project in Australia through the Company’s Donald Project JV and the Bahia Project in Brazil.

Current wording

The Company has secured its own HMS projects, which are expected to produce titanium and zircon minerals, along with uranium- and REE-bearing monazite sands in furtherance of a fully integrated U.S.-based REE supply chain. These include the Toliara Project in Madagascar, the Donald Project in Australia through the Company’s Donald Project JV and the Bahia Project in Brazil.

Previous wording

The Company is currently: ramping up the mining of uranium ore from its Pinyon Plain, La Sal and Pandora mines, located in Arizona and Utah and stockpiling the mined ore at the Mill; processing stockpiled uranium ore and Alternate Feed Materials at the Mill for the recovery of U 3 O 8 finished product; performing permitting and exploration activities at its Bahia HMS/REE project in Brazil; negotiating stability arrangements, seeking final government approvals and performing permitting and development activities at its Toliara HMS/REE project in Madagascar in preparation for an FID, which the Company expects could be made as early as 2026 if stability arrangements are finalized; performing permitting and development activities at its Donald Project in Australia in preparation for an FID, which the Company expects could be made as early as December 31, 2025; performing various permitting, exploration, and development activities at its uranium and uranium/vanadium properties in the United States; and performing final reclamation activities at its Kwale Project in Kenya.

Current wording

The Company is currently: mining uranium ore from its Pinyon Plain, La Sal and Pandora mines, located in Arizona and Utah, respectively, and stockpiling the mined ore at the Mill; processing stockpiled uranium ore and Alternate Feed Materials at the Mill for the recovery of U 3 O 8 finished product; completing sales of U 3 O 8 under its portfolio of long-term contracts and on the spot market; performing exploration activities at its Bahia HMS/REE project in Brazil; negotiating fiscal and stability arrangements, seeking government approvals and performing permitting and development activities at its Toliara HMS/REE project in Madagascar in preparation for an FID, which the Company expects could be made as early as 2026 if fiscal and stability arrangements are finalized; performing permitting and development activities at its Donald Project in Australia in preparation for an FID, which the Company expects could be made as early as December 31, 2025 or Q1 2026; performing various permitting, exploration, and development activities at its uranium and uranium/vanadium properties in the United States; and performing final reclamation activities at its Kwale Project in Kenya.

Previous wording

The Company believes that uranium supply pressure and demand fundamentals point to higher sustained uranium prices in the future and that the advancement of reliable nuclear energy, fueled by uranium, is experiencing a global resurgence with an increased focus by governments, policymakers, technology companies and citizens on decarbonization, electrification and security of energy supply. In addition, a number of factors, including restrictions on Russian uranium products in the U.S., transportation challenges, trade policies, production challenges and financial entities purchasing uranium on the spot market to hold for an extended period has the potential to result in higher sustained spot and term prices and to potentially induce utilities to enter into additional long-term contracts with non-Russian producers, such as Energy Fuels. Those factors additionally have the potential to foster security of supply, the avoidance of transportation and logistics issues and more certain pricing. Indeed, the past two years have seen the highest levels of long-term contracting by utilities since 2012, according to TradeTech.

Current wording

The Company believes that uranium supply pressure and demand fundamentals point to higher sustained uranium prices in the future and that the advancement of reliable nuclear energy, fueled by uranium, is experiencing a global resurgence with an increased focus by governments, policymakers, technology companies and citizens on decarbonization, electrification and security of energy supply. In addition, a number of factors, including restrictions on Russian uranium products in the U.S., transportation challenges, trade policies, production challenges and financial entities purchasing uranium to hold for an extended period has the potential to result in higher sustained spot and term prices and to potentially induce utilities to enter into additional long-term contracts with non-Russian producers, such as Energy Fuels. Those factors additionally have the potential to foster security of supply, the avoidance of transportation and logistics issues and more certain pricing. Indeed, the past two years have seen the highest levels of long-term contracting by utilities since 2012, according to TradeTech.

Previous wording

Production rates at the Pinyon Plain mine have steadily increased over the past several months as the mine has ramped up. During the three months ended June 30, 2025, the Company mined ore containing roughly 635,000 pounds of uranium with an average grade of 2.23% eU 3 O 8 at its Pinyon Plain mine, which the Company believes is one of the highest-grade uranium mines in U.S. history. Furthermore, as mined ore grades so far are significantly higher than the gamma probe grades from previous drill programs, the Company believes it will mine considerably more uranium from the Main Zone of the deposit versus what is described in the Technical Report on the Pre-Feasibility Study on the Pinyon Plain Project (“PFS”) prepared in February 2023 in accordance with S-K 1300 and NI 43-101.

Current wording

Production rates at the Pinyon Plain mine have steadily increased over the past several months as the mine has ramped up. During the three months ended September 30, 2025, the Company mined ore containing approximately 415,000 pounds of uranium with an average grade of 1.27% eU 3 O 8 at its Pinyon Plain mine. During the nine months ended September 30, 2025, the Company mined ore containing approximately 1,120,000 pounds of uranium with an average grade of 1.75% eU 3 O 8 at its Pinyon Plain mine, which the Company believes is one of the highest-grade uranium mines in U.S. history. Furthermore, as mined ore grades so far are significantly higher than the gamma probe grades from previous drill programs, the Company believes it will mine considerably more uranium from the Main Zone of the deposit versus what is described in the Technical Report on the Pre-Feasibility Study on the Pinyon Plain Project (“PFS”) prepared in February 2023 in accordance with S-K 1300 and NI 43-101. Ore from Pinyon Plain continues to be shipped to the Mill stockpile. The Mill commenced a processing campaign in Q4 2025 to process stockpiled ore into finished U 3 O 8 product.

Previous wording

The Mill currently has the commercial capacity, in its Phase 1 REE separation circuit to process monazite ore concentrates into separated neodymium-praseodymium (“NdPr”) oxide. Through its ongoing test work at the Mill, the Company believes it now has the technical knowhow to design, construct, and commission the expansion of its existing infrastructure, including an expansion of its Phase 1 REE separation circuit, to produce these six (6) rare earth oxides from monazite relatively quickly given appropriate market conditions. In its July 17, 2025 news release, the Company announced that, assuming the current pilot-scale production continues to be successful, the Company could be in a position to produce Dy, Tb and Sm on a commercial scale at its existing Phase 1 REE separation circuit at the Mill, with minor modifications, as early as Q4 2026 from existing feed sources and, if a production decision (which assumes a positive FID) is made in 2025, as early as Q4 2027 from its permitted Donald Project in Australia.

Current wording

In its July 17, 2025 news release, the Company also announced that, assuming the current pilot-scale production continues to be successful, the Company could be in a position to produce Dy, Tb and Sm on a commercial scale at its existing Phase 1 REE separation circuit at the Mill, with minor modifications, as early as Q4 2026 from existing feed sources and, if a production decision (which assumes a positive FID) is made in 2025, as early as Q4 2027 from its permitted Donald Project in Australia.

Previous wording

Until such time as the Mill completes its stand-alone Phase 2 REE separation facilities, expected in 2028, the Mill can either process uranium and uranium/vanadium ores or it can process monazite for the recovery of uranium and REEs through its Phase 1 REE separation facilities, but it cannot do both activities at the same time, due to the use of some shared facilities for those activities. The Mill has historically stockpiled mined uranium ore until such time as it has enough stockpiled conventional ore to justify a Mill processing run, after which the Mill can be switched over to other uses, such as monazite processing for uranium and REEs, relatively easily and at low cost. The Mill has a large throughput capacity and can process uranium ore much faster than it is mined, so this has not been an issue to date, but it does require that Mill processing runs be scheduled depending on the timing of conventional uranium ore processing and other needs of the Mill.

Current wording

Until such time as the Mill completes its stand-alone Phase 2 REE separation facilities, expected in 2028, the Mill can either process uranium and uranium/vanadium ores, or it can process monazite for the recovery of uranium and REEs through its Phase 1 REE separation facilities. It currently cannot do both activities at the same time, due to the use of some shared facilities. The Mill has historically stockpiled mined uranium ore until such time as it has enough stockpiled conventional ore to justify a Mill processing run, after which the Mill can be switched over to other uses, such as monazite processing for uranium and REEs, relatively easily and at low cost. The Mill has a large throughput capacity and can process uranium ore much faster than it is mined, so this has not been an issue to date, but it does require that Mill processing runs be scheduled depending on the timing of conventional uranium ore processing, sales requirements and other needs of the Mill. The Mill may reconfigure the Phase 1 REE separation facilities in the future to separate additional REE oxalates or oxides and/or to allow it to operate without utilizing the Mill's existing leaching and precipitation circuits, thereby allowing the Phase 1 REE separation facilities to operate simultaneously with conventional uranium ore production.

Previous wording

In light of the higher mining rate expected at the Pinyon Plain mine for the remainder of 2025 and in subsequent years, and in order to produce enough uranium finished U 3 O 8 in 2025 to allow the Company to fulfill its contract deliveries in 2025, 2026 and a good portion of 2027 and to thereby allow the Company to free-up the Mill to complete an REE processing campaign in 2026 and/or to make any process changes at the Mill in 2026 if needed to help the U.S. government meet its critical minerals requirements, the Company currently plans to commence a conventional ore processing campaign at the Mill in Q4 2025, which is currently expected to continue into March 2026, whereas under its previous guidance it assumed the current uranium ore processing run at the Mill would cease at the end of Q2 2025 to be resumed in a later year. As a result of the addition of this planned conventional ore Mill run commencing in Q4 2025, the Company previously increased its finished U 3 O 8 production guidance for 2025 (see “Guidance” below). The timing of this planned Q4 2025 uranium ore Mill run could change, depending on the Company’s involvement in any government activities aimed at increasing U.S. REE processing capability in 2025 that could dictate a change in Mill scheduling and a change to the Company’s guidance.

Current wording

The Company commenced a conventional ore processing campaign at the Mill in Q4 2025 as planned, which is expected to continue at least into March 2026 due to: (i) the previously announced higher mining rate expected at the Pinyon Plain mine for the remainder of 2025 and in subsequent years; (ii) the desire to produce enough finished U 3 O 8 in 2025 to allow the Company to fulfill its contract deliveries in 2025, 2026 and a portion of 2027; and (iii) the desire to thereby allow the Company to free-up the Mill to complete a REE processing campaign in 2026 and/or to make any process changes at the Mill in 2026 if needed to help the U.S. government meet its critical minerals requirements.

Previous wording

As a result of the spot sale of 50,000 pounds of U 3 O 8 during Q2 2025 and the flex-up by the Company’s utility customers of deliveries under the Company’s long-term contracts from 220,000 pounds of U 3 O 8 to 300,000 pounds of U 3 O 8 in 2025, the Company is changing its sales guidance for 2025 from 220,000 pounds to 350,000 pounds of U 3 O 8, not counting additional spot sales the Company may make depending on market conditions. No other changes have been made to the Company’s previously published guidance. The Company’s revised guidance for 2025 is as follows:

Previous wording

The Company plans to begin processing low-cost Pinyon Plain mine ores commencing in Q4 2025 through Q1 2026, during which we expect to produce 1.1 to 1.4 million pounds of finished U 3 O 8. During that Mill run, the average mining and transportation costs to the Mill for Pinyon Plain ore are expected to be $10 to $14 per pound of recovered U 3 O 8, which together with an expected milling cost of approximately $13 to $16 per pound U 3 O 8, are expected to result in a total weighted average cost of goods sold of approximately $23 to $30 per pound of U 3 O 8 recovered, ranking among the lowest costs for mined uranium production in the world. These high-grade Pinyon Plain ores will be blended and processed with the lower grade, higher cost, La Sal/Pandora ores through early 2026, after which the Company can choose to process Pinyon Plain ores alone to maximize absolute margin, or in conjunction with La Sal/Pandora ores, purchased ores, and alternate feed materials at the Company’s discretion.

Current wording

The Company commenced processing low-cost Pinyon Plain mine ores in Q4 2025 which is expected to continue through Q1 2026, during which we expect to produce 1.1 to 1.4 million pounds of finished U 3 O 8. During that Mill run, the average mining and transportation costs to the Mill for Pinyon Plain ore are expected to be $10 to $14 per pound of recovered U 3 O 8, which together with an expected milling cost of approximately $13 to $16 per pound U 3 O 8, are expected to result in a total weighted average cost of goods sold of approximately $23 to $30 per pound of U 3 O 8 recovered (assuming royalty costs based on current market prices), ranking among the lowest costs for mined uranium production in the world. These high-grade Pinyon Plain ores will be blended and processed with the lower grade, higher cost, La Sal/Pandora ores through early 2026, after which the Company can choose to process Pinyon Plain ores alone to maximize absolute margin, or in conjunction with La Sal/Pandora ores, purchased ores, and Alternate Feed Materials, to maximize pounds produced, at the Company’s discretion.

Previous wording

The Company’s inventories of finished U 3 O 8 had an approximate weighted average cost of $53.00 per pound U 3 O 8 as of June 30, 2025, reflecting the weighted average cost of production and purchase of finished inventories from various sources over the years, as the Company continues to ramp up production and maximize economies of scale, including from alternate feed materials, the La Sal/Pandora mines, low-grade mine clean-up materials, and spot purchases of uranium on the open market. These costs do not reflect the expected lower costs of recently mined ores from the Pinyon Plain mine, which have not yet been processed. As the Company accounts for cost of goods sold as the weighted average cost of its finished product inventories, sales of uranium produced in 2025 and into 2026 will reflect the blended average of the existing 725,000 pounds of U 3 O 8 finished inventories, plus the cost of additional finished U 3 O 8 produced from blended stockpiled Pinyon Plain and La Sal/Pandora ores. This is expected to result in costs of goods sold of approximately $50 to $55 per pound for U 3 O 8 sales through the end of 2025, which is expected to drop to the $30 to $40 per pound range in Q1 2026, depending on the quantity of any additional spot sales of inventory that may be made in Q3 and Q4 2025. The Company’s ability to blend and match various sources of uranium feeds to satisfy contract delivery requirements is a unique element of the Company’s production capabilities that no other producer has in North America.

Current wording

The Company’s inventories of finished U 3 O 8 had a weighted average cost of approximately $53 per pound U 3 O 8 as of September 30, 2025, reflecting the weighted average cost of production and purchase of finished inventories from various sources over the years, as the Company continues to ramp up production and maximize economies of scale, including from Alternate Feed Materials, the La Sal/Pandora mines, low-grade mine clean-up materials, and purchases of uranium on the spot market. These costs do not reflect the expected lower costs of recently mined ores from the Pinyon Plain mine, which had not yet been processed as of September 30, 2025 (a conventional ore processing run, including Pinyon Plain and La Sal/Pandora ores, commenced at the Mill in early October 2025). As the Company accounts for cost of goods sold as the weighted average cost of its finished product inventories, sales of uranium produced in 2025 and into 2026 will reflect the blended average of the existing 485,000 pounds of U 3 O 8 finished inventories, plus the cost of additional finished U 3 O 8 produced from blended stockpiled Pinyon Plain and La Sal/Pandora ores. This is expected to result in costs of goods sold of approximately $50 to $55 per pound for U 3 O 8 sales through the end of 2025, which is expected to drop to the $30 to $40 per pound range in Q1 2026, depending on the quantity of any additional spot sales of inventory that may be made in Q4 2025. The Company’s ability to blend and match various sources of uranium feeds to satisfy contract delivery requirements is a unique element of the Company’s production capabilities that no other producer has in North America.

Previous wording

Based on expected decreasing cost of goods sold and conservative uranium price forecasts, gross margins from the Company’s uranium sales are expected to increase over time.

Current wording

Based on expected decreasing cost of goods sold and conservative uranium price forecasts, gross margins from the Company’s uranium sales are expected to increase over time through 2026, subject to the pricing of its contracts at the time of sale.

Previous wording

Additionally, the Company is continuing to prepare two additional mines in Colorado and Wyoming (Whirlwind and Nichols Ranch, respectively) for expected production within one year from a “go” decision and is advancing several other of its large-scale U.S. mine projects in order to increase uranium production in the coming years, as market conditions warrant. With strong market conditions, the Whirlwind and Nichols Ranch mines could potentially increase Energy Fuels’ uranium production to a run-rate of over two million pounds of U 3 O 8 per year in as early as 2026. The exact timing for resumption of production from each of these projects will be subject to current and future uranium market conditions and/or the procurement of additional long-term contracts. In 2025, the Company also plans to continue advancing its permitting and development on the Roca Honda, Bullfrog, and EZ Projects, which together with the Company’s Sheep Mountain Project, could expand the Company’s uranium production to a run-rate of up to five million pounds of U 3 O 8 per year in the coming years, as market conditions warrant. As the Company is ramping up its commercial uranium production, it can rely on its uranium inventories and potential purchases of uranium on the spot market to supplement its uranium production if necessary to fulfill existing contract requirements.

Current wording

Additionally, the Company is continuing to prepare two additional mines in Colorado and Wyoming (Whirlwind and Nichols Ranch, respectively) for expected production within one year from a “go” decision and is advancing several other of its large-scale U.S. mine projects in order to increase uranium production in the coming years, as market conditions warrant. With strong market conditions, the Whirlwind and Nichols Ranch mines could potentially increase Energy Fuels’ uranium production to a run-rate of up to approximately 2.5 million pounds of U 3 O 8 per year in as early as 2026. The exact timing for resumption of production from each of these projects will be subject to current and future uranium market conditions and/or the procurement of additional long-term contracts. In 2025, the Company also plans to continue advancing its permitting and development on the Roca Honda, Bullfrog, and EZ Projects, which together with the Company’s Sheep Mountain Project, could expand the Company’s uranium production to a run-rate of up to five million pounds of U 3 O 8 per year in the coming years, as market conditions warrant. As the Company is ramping up its commercial uranium production, it can rely on its uranium inventories and potential purchases of uranium on the spot market to supplement its uranium production if necessary to fulfill existing contract requirements.

Previous wording

The Company has significantly advanced its REE programs, including the commissioning of commercial REE (NdPr) separation capabilities at the Mill while securing HMS/REE mines that are expected to supply significant quantities of monazite sands feedstock to the Mill for processing into separated REE products. The monazite is expected to be produced as a low-cost byproduct of primarily ilmenite, rutile and zircon from HMS mining. This includes the Company’s October 2, 2024 acquisition of Base Resources and the Toliara Project, and through its joint venture with Astron to jointly develop the Donald Project (in addition to the Bahia Project, which the Company acquired in 2023).

Current wording

The Company has significantly advanced its REE programs, including the commissioning of commercial and pilot REE (NdPr and Dy) separation capabilities at the Mill while securing HMS/REE mines that are expected to supply significant quantities of monazite sands feedstock to the Mill for processing into separated REE products. The monazite is expected to be produced as a low-cost byproduct of primarily ilmenite, rutile and zircon from HMS mining. This includes the Company’s Bahia Project, Toliara Project, and through its joint venture with Astron to jointly develop the Donald Project.

Previous wording

The Company completed commissioning its Phase 1 REE separation circuit at the Mill during Q2-2024, which is capable of processing 8,000 to 10,000 tonnes of monazite per year into 850 to 1,000 tonnes of separated NdPr per year, plus a samarium plus (“Sm+”) heavy RE Carbonate. The Company also expects to produce pilot-scale (kilogram) quantities of Dy and Tb oxides in 2025 and Sm in 2026. Assuming the current pilot-scale production continues to be successful, the Company is evaluating producing Dy, Tb and Sm on a commercial scale at its existing Phase 1 REE separation circuit at the Mill, with minor modifications, as early as Q4 2026 from existing feed sources and, if a production decision (which assumes a positive FID) is made in 2025, as early as Q4 2027 from its permitted Donald Project in Australia. The Company is also advancing engineering and permitting on its Phase 2 separation facilities at the Mill to enable the processing of up to 60,000 tonnes of monazite and the production of up to 4,000 to 6,000 tonnes of separated NdPr, along with separated Dy, Tb and other REE materials (see “Rare Earth Element Initiatives” below). During Phase 1 commissioning, the Company produced approximately 38 tonnes of separated NdPr, which is currently being qualified by REE metal and magnet manufacturers to enable future offtake of the Company’s separated REE products expected to be produced at the Mill from monazite feedstocks originating at the Toliara, Donald and Bahia Projects (subject to all required licenses, permits and permissions being obtained), in addition to third-party feedstocks that may be purchased from third parties. The Company also plans to continue to evaluate potential opportunities in REE metal, alloy and magnet-making as they may arise.

Current wording

The Company completed commissioning its Phase 1 REE separation circuit at the Mill during Q2-2024, which is capable of processing 8,000 to 10,000 tonnes of monazite per year into 850 to 1,000 tonnes of separated NdPr per year, plus a samarium plus (“Sm+”) heavy RE Carbonate. The Company also produced pilot-scale (kilogram) quantities of Dy and expects to produce pilot-scale Tb oxides in Q4-2025 and Sm oxides in 2026. Assuming the current pilot-scale production continues to be successful, the Company is evaluating producing Dy, Tb and potentially Sm on a commercial scale at its existing Phase 1 REE separation circuit at the Mill, with minor modifications, as early as Q4 2026 from existing feed sources and, if a production decision (which assumes a positive FID) is made in 2025, as early as Q4 2027 from its permitted Donald Project in Australia. The Company is also advancing engineering and permitting on its Phase 2 separation facilities at the Mill to enable the processing of up to 60,000 tonnes of monazite and the production of up to 4,000 to 6,000 tonnes of separated NdPr, along with separated Dy, Tb and other REE materials (see “Rare Earth Element Initiatives” below).

Previous wording

With respect to its HMS activities, the Company plans to continue advancing each of its Donald and Toliara Projects to a FID by as early as late-2025 and 2026, respectively. The Company is also updating the 2021 Australian Joint Ore Reserves Committee (“JORC”)-compliant Toliara Definitive Feasibility Study (“DFS”) and 2024 JORC-compliant Toliara Prefeasibility Study (“PFS”) into a combined S-K 1300 and NI 43-101-compliant feasibility study (“FS”), and the 2023 Donald Project JORC-compliant DFS into an S-K 1300 and NI 43-101-compliant FS, both of which are expected to be completed later in 2025. The Company also plans to advance its permitting efforts and restart its drilling program at the Bahia Project in 2025, once the appropriate permits and surface access arrangements are in place, with the goal of getting enough information to declare an S-K 1300-compliant initial assessment and NI 43-101-compliant technical report in early 2026.

Current wording

With respect to its HMS activities, the Company plans to continue advancing each of its Donald and Toliara Projects to a FID by as early as late-2025 and 2026, respectively. The Company is also updating the 2021 Australian Joint Ore Reserves Committee (“JORC”)-compliant Toliara Definitive Feasibility Study (“DFS”) and 2024 JORC-compliant Toliara Prefeasibility Study (“PFS”) into a combined S-K 1300 and NI 43-101-compliant feasibility study (“FS”), and the 2023 Donald Project JORC-compliant DFS into an S-K 1300 and NI 43-101-compliant FS, both of which are expected to be completed later in 2025. The Company also obtained its exploration permit and plans to restart its drilling program at the Bahia Project in Q4-2025 with the goal of getting enough information to declare an S-K 1300-compliant initial assessment and NI 43-101-compliant technical report in 2026.

Previous wording

Mining at the Kwale Project commenced in 2013 and concluded at the end of December 2024 following depletion of the remaining ore reserves previously reported in accordance with the JORC standards. Processing activities concluded in early January 2025. The sale of all remaining product inventories was completed during 2025. Additional costs of winding-down activities and mining lower mineral grades were incurred during the fourth quarter of 2024 and included in product inventories that were sold during the first quarter of 2025. As a result, the Company incurred a loss in connection with its 2025 sales. Reclamation has been ongoing throughout the life of the Kwale Project and will continue until all mining areas are fully reclaimed in accordance with all applicable legal standards. Reclamation of the South Dune mining area was completed in

Current wording

Mining at the Kwale Project commenced in 2013 and concluded at the end of December 2024 following depletion of the remaining ore reserves previously reported in accordance with the JORC standards. Processing activities concluded in early January 2025. The sale of all remaining product inventories was completed during 2025. Additional costs of winding-down activities and mining lower mineral grades were incurred during the fourth quarter of 2024 and included in product inventories that were sold during the first quarter of 2025. As a result, the Company incurred a loss in connection with its 2025 sales. Reclamation has been ongoing throughout the life of the Kwale Project and will continue until all mining areas are fully reclaimed in accordance with all applicable legal standards. Reclamation of the South Dune mining area was completed in 2024, with the reclamation of the Central Dune, North Dune and Bumamani mining areas expected to be completed in Q4 2025. Reclamation of the tailings storage facility has commenced and is expected to be completed by 2027, with ongoing management and monitoring expected to continue through 2038.

Previous wording

During the six months ended June 30, 2025, the Mill focused on processing stockpiled Alternate Feed Materials and conventional ores, which resulted in production of 330,000 pounds of U 3 O 8.

Current wording

During the nine months ended September 30, 2025, the Mill focused on processing stockpiled Alternate Feed Materials and conventional ores, which resulted in production of 330,000 pounds of U 3 O 8. In Q4 2025, the Company commenced its planned conventional ore processing campaign at the Mill that is expected to last at least through Q1 2026.

Previous wording

The Mill also continued to advance its research and development (“R&D”) activities on medical isotopes throughout Q2 2025 while engaging in discussions with buyers interested in off-takes for the material (see “Recovering Medical Isotopes for Advanced TAT Cancer Treatments” below).

Current wording

The Mill also continued to advance its research and development (“R&D”) activities on medical isotopes throughout Q3 2025 while engaging in discussions with buyers interested in off-take agreements for the material (see “Recovering Medical Isotopes for Advanced TAT Cancer Treatments” below).

Previous wording

During the six months ended June 30, 2025, the Company continued ore production at the Pinyon Plain mine, La Sal mine and Pandora mine.

Current wording

During the nine months ended September 30, 2025, the Company continued ore production at the Pinyon Plain mine, La Sal mine and Pandora mine.

Previous wording

During the three months ended June 30, 2025, the Company mined ore containing approximately 665,000 pounds of U 3 O 8 from the Pinyon Plain, La Sal and Pandora mines for a total of approximately 780,000 pounds of contained U 3 O 8 through the first half of 2025. Subject to market conditions, the Company currently expects to mine ore containing approximately 875,000 to 1,435,000 pounds of contained U 3 O 8 from its Pinyon Plain, Pandora and La Sal mines during 2025. Such uranium-bearing ore will be stockpiled at the mines or Mill for processing during the remainder of 2025 and into 2026 (or at a future date), subject to market conditions, contract requirements and the Mill’s processing schedule. The Company also expects to continue to purchase uranium ore from third-party miners in the region, and there is the potential to receive additional Alternate Feed

Current wording

During the three months ended September 30, 2025, the Company mined ore containing approximately 465,000 pounds of U 3 O 8 from the Pinyon Plain, La Sal and Pandora mines for a total of approximately 1,245,000 pounds of contained U 3 O 8 through the nine months ended September 30, 2025. With the addition of ore expected to be mined in Q4 2025, this puts the Company in a strong position to meet or exceed the high end of its current guidance of mining ore containing up to approximately 1,435,000 pounds of contained U 3 O 8 from its Pinyon Plain, Pandora and La Sal mines during 2025. Such uranium-bearing ore will be stockpiled at the mines or Mill for processing during the remainder of 2025 and into 2026 (or at a future date), subject to market conditions, contract requirements and the Mill’s processing schedule. The Company also expects to continue to seek to purchase uranium ore from third-party miners in the region, and there is the potential to receive additional Alternate Feed Materials and mine cleanup materials, expected to total approximately 160,000 to 200,000 pounds of additional contained uranium in ore inventories.

Previous wording

The Company currently expects to process stockpiled and mined ore from its Pinyon Plain, La Sal and Pandora mines in Q4 2025 containing up to 670,000 pounds of U 3 O 8, with the remainder of the mined ore and Alternate Feed Materials stockpiled at the mines or Mill for processing during 2026 or 2027, subject to market conditions, contract requirements, and the Mill’s schedule. This is expected to result in the production of an additional 670,000 pounds of finished U 3 O 8 in Q4 2025 from stockpiled and mined ore from the Company’s Pinyon Plain, La Sal and Pandora mines, which when added to the Company’s production of approximately 330,000 pounds of finished U 3 O 8 through the first half of 2025 from existing conventional ore inventories and Alternate Feed Materials, would result in the production of up to 1,000,000 pounds of finished U 3 O 8 product in 2025.

Current wording

The Company currently expects to process stockpiled and mined ore from its Pinyon Plain, La Sal and Pandora mines in Q4 2025 containing up to 670,000 pounds of U 3 O 8, with the remainder of the mined ore and Alternate Feed Materials stockpiled at the mines or Mill for processing during 2026 or 2027, subject to market conditions, contract requirements, and the Mill’s schedule. This is expected to result in the production of an additional 670,000 pounds of finished U 3 O 8 in Q4 2025 from stockpiled and mined ore from the Company’s Pinyon Plain, La Sal and Pandora mines, which when added to the Company’s production of approximately 330,000 pounds of finished U 3 O 8 through Q3 2025 from existing conventional ore inventories and Alternate Feed Materials, would result in the production of up to 1,000,000 pounds of finished U 3 O 8 product in 2025.

Previous wording

The Company plans to continue to maintain its other uranium projects and facilities in a state of readiness for the purpose of restarting mining activities on an expedited basis, as contract obligations and market conditions may warrant. To this end, the Company expects to continue rehabilitation and development work at its Whirlwind mine in preparation for future production. Although the timing of the Company’s plans to extract and process mineralized materials from the Whirlwind mine will be based on contract requirements, inventory levels and/or sustained improvements in general market conditions, the Company currently expects the Whirlwind mine, along with the Company’s Nichols Ranch ISR project, to be able to commence uranium production within one (1) year from a “go” decision, which could increase Energy Fuels’ uranium production to a run-rate of over two (2) million pounds of U 3 O 8 per year starting as early as 2026, as market conditions may warrant.

Current wording

The Company plans to continue to maintain its other uranium projects and facilities in a state of readiness for the purpose of restarting mining activities on an expedited basis, as contract obligations and market conditions may warrant. To this end, the Company expects to continue rehabilitation and development work at its Whirlwind mine in preparation for future production. Although the timing of the Company’s plans to extract and process mineralized materials from the Whirlwind mine will be based on contract requirements, inventory levels and/or sustained improvements in general market conditions, the Company currently expects the Whirlwind mine, along with the Company’s Nichols Ranch ISR project, to be able to commence uranium production within one (1) year from a “go” decision, which could increase Energy Fuels’ uranium production to a run-rate of over 2.5 million pounds of U 3 O 8 per year starting as early as 2026, as market conditions may warrant.

Previous wording

In addition to the increase in mined ore grades at the Pinyon Plain mine in Q2 2025 (see “Recent Activities” above), the Company has obtained initial results from its 2024 – 2025 underground drill program in another area of mineralization at the Pinyon Plain mine called the “Juniper Zone.” The February 2023 Pre-Feasibility Study for the Pinyon Plain mine includes a Mineral Resource estimate for the Juniper Zone of 703,000 pounds of U 3 O 8 at an average grade of 0.95% contained in 37,000 tons of Indicated Mineral Resources, in addition to a small amount of Inferred Mineral Resources. New drill results show numerous additional high-grade intercepts within the Juniper Zone and other zones within the deposit, which together have the potential to significantly increase the mineable uranium resources at the mine.

Current wording

During Q2 2025, the Company obtained the initial results from its 2024 – 2025 underground drill program in another area of mineralization at the Pinyon Plain mine called the “Juniper Zone.” The February 2023 Pre-Feasibility Study for the Pinyon Plain mine includes a Mineral Resource estimate for the Juniper Zone of 703,000 pounds of U 3 O 8 at an average grade of 0.95% contained in 37,000 tons of Indicated Mineral Resources, in addition to a small amount of Inferred Mineral Resources. New drill results show numerous additional high-grade intercepts within the Juniper Zone and other zones within the deposit, which together have the potential to significantly increase the mineable uranium resources at the mine.

Previous wording

All drill holes targeted the Juniper Zone and were completed from two underground drill stations. The Company believes these drill results confirm that the Juniper Zone is another high-grade zone of uranium mineralization. The Company is planning to conduct additional drilling in the Juniper Zone as it continues development of that area. The Company plans to incorporate these results into an updated S-K 1300/NI 43-101 technical report for the Pinyon Plain mine later this year, which the Company believes will significantly increase the uranium reserves and resources at the Pinyon Plain mine and result in a lower mining and milling cost per pound.

Current wording

The Company is planning to conduct additional drilling in the Juniper Zone as it continues development of that area. The Company plans to incorporate these results into an updated S-K 1300/NI 43-101 technical report for the Pinyon Plain mine later this year, which the Company believes will significantly increase the uranium reserves and resources at the Pinyon Plain mine and result in a lower mining and milling cost per pound.

Previous wording

As of June 30, 2025, the Company held approximately 725,000 pounds of finished uranium inventories located at the Mill and at conversion facilities in North America. Additionally, as of June 30, 2025, the Company held approximately 1,150,000 pounds of additional U 3 O 8 contained in stockpiled ore, Alternate Feed Materials and work-in-process at the Mill or nearby mine sites that can potentially be processed and recovered expediently in the future, as market conditions and contract requirements may warrant.

Current wording

As of September 30, 2025, the Company held approximately 485,000 pounds of finished uranium inventories located at the Mill and at conversion facilities in North America. Additionally, as of September 30, 2025, the Company held approximately 1,640,000 pounds of additional U 3 O 8 contained in stockpiled ore, Alternate Feed Materials and work-in-process at the Mill or nearby mine sites that can potentially be processed and recovered expediently in the future, as market conditions and contract requirements may warrant.

Previous wording

The Company produced approximately 330,000 pounds of U 3 O 8 during the first half of 2025 and currently expects to produce up to another 670,000 pounds of finished U 3 O 8 from stockpiled and mined ore from the Company’s Pinyon Plain, La Sal and Pandora mines in Q4 2025, subject to market conditions, contract requirements, and the Mill’s schedule. As a result, total inventories of finished product available for sale in 2025 are currently expected to total approximately 925,000 to 1,225,000 pounds of finished U 3 O 8, depending on whether the Company processes the Pinyon Plain, La Sal and Pandora ore in Q4 2025, as currently expected.

Current wording

The Company produced approximately 330,000 pounds of U 3 O 8 through Q3 2025 and, during a conventional ore Mill run that commenced in early October 2025, currently expects to produce up to another 670,000 pounds of finished U 3 O 8 from stockpiled and mined ore from the Company’s Pinyon Plain, La Sal and Pandora mines in Q4 2025. As a result, total inventories of finished product available for sale in 2025 are currently expected to total approximately 925,000 to 1,225,000 pounds of finished U 3 O 8.

Previous wording

The Company expects to sell 300,000 pounds of uranium during the remainder of 2025, under the Company's existing long-term contracts with utilities. As a result of these sales, the Company currently expects that finished U 3 O 8 inventory will total approximately 925,000 to 1,225,000 pounds U 3 O 8 at the end of 2025 and contained uranium in stockpiled uranium ore inventories will total approximately 1,060,000 to 1,360,000 pounds of U 3 O 8, totaling 1,985,000 to 2,585,000 pounds of contained uranium in ore inventories plus finished product at the end of 2025. Again, the mix between increased contained uranium in ore inventories and finished U 3 O 8 product inventory at the end of 2025 will depend on the timing of the processing of stockpiled uranium ore at the Mill, of which a quantity of ore containing up to 670,000 pounds of U 3 O 8 is currently expected to be processed in Q4 2025 with the remainder (if any) deferred to subsequent years, and any spot uranium sales or purchases the Company may elect to complete during the remainder of 2025.

Current wording

The Company expects to sell 160,000 pounds of uranium during the remainder of 2025, under the Company's existing long-term contracts with utilities. As a result of these sales, the Company currently expects that finished U 3 O 8 inventory will total approximately 925,000 to 1,225,000 pounds U 3 O 8 at the end of 2025, and contained uranium in stockpiled uranium ore inventories will total approximately 1,060,000 to 1,360,000 pounds of U 3 O 8, totaling 1,985,000 to 2,585,000 pounds of contained uranium in ore inventories plus finished product at the end of 2025. The mix between increased contained uranium in ore inventories and finished U 3 O 8 product inventory at the end of 2025 will depend on the timing of the processing of stockpiled uranium ore at the Mill, of which a quantity of ore containing up to 670,000 pounds of U 3 O 8 is currently expected to be processed in Q4 2025 with the remainder (if any) deferred to subsequent years, and any spot uranium sales or purchases the Company may elect to complete during the remainder of 2025.

Previous wording

Under the current portfolio of contracts, the Company expects to sell 140,000 pounds of uranium during Q3 2025, 160,000 pounds of uranium in Q4, and between 620,000 and 880,000 pounds of uranium in 2026. The Company holds uncommitted inventory and, with the benefit of production in 2025 and planned production in the future, will continue to evaluate additional spot and/or long-term uranium sales opportunities during 2025 and beyond. The Company may also evaluate the purchase of uranium on the spot market, subject to market conditions, contract requirements and the Mill’s schedule for processing uranium ore stockpiles at the Mill.

Current wording

Under the current portfolio of contracts, the Company expects to sell 160,000 pounds of uranium in Q4 2025, and between 620,000 and 880,000 pounds of uranium in 2026. The Company holds uncommitted inventory and, with the benefit of production in 2025 and planned production in the future, will continue to evaluate additional spot and/or long-term uranium sales opportunities during 2025 and beyond. The Company may also evaluate the purchase of uranium on the spot market, subject to market conditions, contract requirements and the Mill’s schedule for processing uranium ore stockpiles at the Mill.

Previous wording

During the six months ended June 30, 2025, the Company sold 1.2 tonnes of its NdPr produced from the Mill’s newly installed and commissioned Phase 1 separation circuit to POSCO International (“POSCO”) for sampling to validate that the material meets POSCO’s applicable specifications, which the Company’s NdPr met. The Company offset $0.04 million from the sale of NdPr against commissioning costs capitalized related to the Company’s Phase 1 separation circuit. As of June 30, 2025, approximately 37 tonnes of separated NdPr remain in inventory. Additionally, the Company has approximately 28 tonnes of NdPr, plus approximately 4 tonnes of Sm+ RE Carbonate in solution in its Phase 1 separation circuit. Samples of the Company’s NdPr product have been sent to permanent magnet and other companies around the world for product qualification. Initial testing responses have been positive.

Current wording

During the nine months ended September 30, 2025, the Company sold 1.2 tonnes of its NdPr produced from the Mill’s newly installed and commissioned Phase 1 REE separation circuit to POSCO International (“POSCO”) for sampling to validate that the material meets POSCO’s applicable specifications, which the Company’s NdPr met. The Company offset $0.04 million from the sale of NdPr against commissioning costs capitalized related to the Company’s Phase 1 REE separation circuit. As of September 30, 2025, approximately 37 tonnes of separated NdPr remain in inventory. Additionally, the Company has approximately 28 tonnes of NdPr, plus approximately 4 tonnes of Sm+ RE Carbonate in solution in its Phase 1 separation circuit. Samples of the Company’s NdPr oxide, produced at the White Mesa Mill from monazite concentrates mined in Florida and Georgia, were successfully manufactured into commercial-scale REPMs by South Korea's largest manufacturer of EV drive unit motor cores in Q4 2025.

Previous wording

The Company’s finished HMS products to date were mined from its Kwale Project, which the Company acquired through the acquisition of Base Resources on October 2, 2024. Mining at the Kwale Project commenced in 2013 and concluded at the end of December 2024 with lower grade ore mined at the end of the Kwale mine life. Processing activities concluded in early January 2025, and the sale of the remaining product stockpiles was substantially completed during the first quarter of 2025 and fully completed during the second quarter of 2025. As the lower grade ore is more costly to process into finished product, the Company did not realize a gross profit related to its HMS sales during the three or six months ended June 30, 2025.

Current wording

The Company’s finished HMS products to date were mined from its Kwale Project, which the Company acquired through the acquisition of Base Resources on October 2, 2024. Mining at the Kwale Project commenced in 2013 and concluded at the end of December 2024 with lower grade ore mined at the end of the Kwale mine life. Processing activities concluded in early January 2025, and the sale of the remaining product stockpiles was substantially completed during the first quarter of 2025 and fully completed during the second quarter of 2025. As the lower grade ore is more costly to process into finished product, the Company did not realize a gross profit related to its HMS sales during the nine months ended September 30, 2025.

Previous wording

During the six months ended June 30, 2025, the Company sold 12,852 tonnes of ilmenite, 7,038 tonnes of rutile and 1,429 tonnes of zircon and low-grade products for total sales of $15.82 million.

Current wording

During the nine months ended September 30, 2025, the Company sold 12,852 tonnes of ilmenite, 7,038 tonnes of rutile and 1,429 tonnes of zircon and low-grade products for total sales of $15.82 million.

Previous wording

The Company does not expect further HMS sales during the remainder of 2025 or until such time its other HMS properties are in production, if at all.

Current wording

The Company does not expect further HMS sales during the remainder of 2025 or until such time as its other HMS properties are in production, if at all.

Previous wording

The Company did not sell any vanadium during the six months ended June 30, 2025. The Company expects to sell its remaining finished vanadium product when justified into the metallurgical industry, as well as other markets that demand a higher purity product, including the aerospace, chemical and potentially the vanadium battery industries. The Company expects to sell to a diverse group of customers in order to maximize revenues and profits. The vanadium produced in the 2018/2019 Pond Return campaign was a high-purity vanadium product of 99.6%-99.7% V 2 O 5. The Company believes there may be opportunities to sell certain quantities of this high-purity material at a premium to reported spot prices, which it has done from time-to-time in the past.

Current wording

The Company did not sell any vanadium during the nine months ended September 30, 2025. The Company expects to sell its remaining finished vanadium product when justified into the metallurgical industry, as well as other markets that demand a higher purity product, including the aerospace, chemical and potentially the vanadium battery industries. The Company expects to sell to a diverse group of customers in order to maximize revenues and margins. The vanadium produced in the 2018/2019 Pond Return campaign was a high-purity vanadium product of 99.6%-99.7% V 2 O 5. The Company believes there may be opportunities to sell certain quantities of this high-purity material at a premium to reported spot prices, which it has done from time-to-time in the past.

Previous wording

The Company acquired control over the Toliara Project on October 2, 2024 through its acquisition of Base Resources. At the time of the acquisition, the Project had, since November 2019, been suspended by the Government of Madagascar. Shortly after the acquisition, on November 28, 2024, the Government lifted the suspension, and on December 5, 2024, the Company entered into an MOU with the Government of Madagascar setting forth certain key terms applicable to the Project. Following lifting of the suspension and entry of the MOU, the Company has been in the process of re-commencing development and investment in the Project, re-establishing community and social programs, and advancing the technical, environmental, social and other activities necessary to achieve a positive FID, which the Company expects could be made as early as 2026.

Current wording

The Company acquired control over the Toliara Project on October 2, 2024 through its acquisition of Base Resources. At the time of the acquisition, the Project had, since November 2019, been suspended by the Government of Madagascar. Shortly after the acquisition, on November 28, 2024, the Government lifted the suspension, and on December 5, 2024, the Company entered into an MOU with the Government of Madagascar setting forth certain key terms applicable to the Project. Following lifting of the suspension and entry of the MOU, the Company has been in the process of re-commencing development and investment in the Project, re-establishing community and social programs, and advancing the technical, environmental, social and other activities necessary to achieve a positive FID, which the Company expects could be made as early as 2026 if fiscal and stability arrangements are finalized.

Previous wording

While the Company is progressing towards an FID, it has been working with the Government of Madagascar to formalize the terms and conditions set out in the MOU and to establish the necessary legal regime that will support development of the Project and is required before a positive FID can be made for the project. To achieve this, the Company and the Government of Madagascar have been negotiating the terms of an investment agreement that would be submitted to the Madagascar Parliament for approval as a law. The investment agreement is intended to provide the key pillars for a bankable large-scale project, including legal and fiscal stability, select tax and customs benefits, necessary adjustments to foreign exchange rules, protections from expropriation and access to international arbitration for dispute resolution. The investment agreement under discussions would also clarify existing procedures for adding monazite to the Project's mining permit, which currently allows for the production of ilmenite, rutile, and zircon.

Current wording

Since acquiring the Project, the Company has been in discussions with the Government of Madagascar to establish the necessary legal regime to support development of the Project, which will be required before a positive FID can be made. These discussions have been focused on, among other things, mechanisms for achieving legal and fiscal stability, select tax and customs benefits, necessary adjustments to foreign exchange rules, protections from expropriation and access to international arbitration for dispute resolution. The Company has also been seeking clarification of existing procedures for adding monazite to the Project's mining permit, which currently allows for the production of ilmenite, rutile, and zircon. Recent discussions with the Government have focused on addressing these issues through an investment agreement to be approved by Parliament or through revisions to existing Malagasy law applicable to large scale mining investments.

Previous wording

The Company has a joint venture with Astron, the Donald Project JV, to jointly develop and operate the Donald Project in Australia, which is a well-known REE and HMS deposit that the Company believes could provide it with another near-term, low-cost, and large-scale source of monazite sand that, upon development, would be transported to the Mill for the recovery of separated REE products. The Donald Project has in place all major regulatory approvals required to construct and operate the project. The Donald Project is notable in that the monazite concentrates expected to be produced at the project contains elevated concentrations of the “heavy” REE oxides, including Dy and Tb.

Current wording

The Company has a joint venture with Astron, the Donald Project JV, to jointly develop and operate the Donald Project in Australia, which is a well-known REE and HMS deposit that the Company believes could provide it with another near-term, low-cost, and large-scale source of monazite sand that, upon development, would be transported to the Mill for the recovery of separated REE products. The Donald Project has in place all major regulatory approvals required to construct and operate the project. The Donald Project is notable in that the monazite concentrates expected to be produced at the project contain elevated concentrations of the “heavy” REE oxides, including Dy and Tb.

Previous wording

The JV Agreement provides Energy Fuels with the right to invest up to AUD$183.00 million (approximately $119.89 million at June 30, 2025 exchange rates) to earn up to a 49% interest in the Donald Project JV. In addition, the Company has agreed to issue Common Shares to Astron having a value of up to $17.50 million, of which $3.50 million of Common Shares were issued on September 24, 2024 and the remainder will be issued upon a positive FID. As of June 30, 2025, the Company has contributed $18.66 million in cash to the Donald Project JV and issued $3.50 million of Common Shares to Astron for total contributions of $22.16 million. As a result, the Company has a 6.61% ownership interest in the Donald Project. Astron, through its subsidiary Dickson & Johnson Pty Ltd, holds the remaining 93.39% interest. See Note 3 – Transactions for further information.

Current wording

The JV Agreement provides Energy Fuels with the right to invest up to AUD$183.00 million (approximately $120.90 million at September 30, 2025 exchange rates) to earn up to a 49% interest in the Donald Project JV. In addition, the Company has agreed to issue Common Shares to Astron having a value of up to $17.50 million, of which $3.50 million of Common Shares were issued on September 24, 2024 and the remainder will be issued upon a positive FID. As of September 30, 2025, the Company has contributed $17.63 million in cash to the Donald Project JV and issued $3.50 million of Common Shares to Astron for total contributions of $21.13 million. As a result, the Company has a 7.49% ownership interest in the Donald Project. Astron, through its subsidiary Dickson & Johnson Pty Ltd, holds the remaining 92.51% interest. See Note 3 – Transactions for further information.

Previous wording

The Company completed its purchase of the Bahia Project in Brazil on February 10, 2023. The Bahia Project is an HMS/REE deposit that the Company believes has the potential to supply 3,000 to 10,000 tonnes of monazite per year to the Mill for decades for processing into high-purity REE oxides. That amount of monazite contains approximately 1,500 to 5,000 tonnes of total rare earth oxides (“TREO”), including an estimated 300 to 1,000 tonnes of NdPr per year and significant commercial quantities of Dy and Tb and other “heavy” REEs. While Energy Fuels’ primary interest in acquiring the Bahia Project is the uranium and REE-bearing monazite, the Bahia Project is also expected to produce large quantities of high-quality ilmenite and rutile and zircon minerals also in high demand for the production of the critical minerals, titanium and zirconium.

Current wording

The Bahia Project is an HMS/REE deposit that the Company believes has the potential to supply 3,000 to 10,000 tonnes of monazite per year to the Mill for decades for processing into high-purity REE oxides. That amount of monazite contains approximately 1,500 to 5,000 tonnes of total rare earth oxides (“TREO”), including an estimated 300 to 1,000 tonnes of NdPr per year and significant commercial quantities of Dy and Tb and other “heavy” REEs. While Energy Fuels’ primary interest in acquiring the Bahia Project is the uranium and REE-bearing monazite, the Bahia Project is also expected to produce large quantities of high-quality ilmenite and rutile and zircon minerals also in high demand for the production of the critical minerals, titanium and zirconium.

Previous wording

The Company continues to make progress at the Mill to produce both “light” and “heavy” separated REE products in the coming years. The Company completed and commissioned its Phase 1 REE separation circuit at the Mill during 2024 which is now capable of producing commercial quantities of separated NdPr (the Company produced 38 tonnes of high-purity NdPr during commissioning). The Phase 1 REE separation circuit involved modifications and enhancements to the existing solvent extraction (“SX”) circuits at the Mill and has the design capacity to process approximately 8,000 to 10,000 tonnes of monazite per year, producing approximately 4,000 to 6,000 tonnes of TREO, containing approximately 850 to 1,000 tonnes of separated NdPr per year. With the commissioning of the Phase 1 REE separation circuit, the Mill is able to produce separated NdPr and an Sm+ mixed RE Carbonate that contains only the “heavy” REEs (including Dy, Tb, Sm, Gd, Lu and Y). The Sm+ mixed RE Carbonate can be sold on the market to other facilities to separate the “heavy” REEs or stockpiled at the Mill for separation of the heavies upon completion of the Mill's Phase 2 REE separation facility.

Current wording

The Company continues to make progress at the Mill to produce both “light” and “heavy” separated REE products in the coming years. The Company completed and commissioned its Phase 1 REE separation circuit at the Mill during 2024 which is now capable of producing commercial quantities of separated NdPr (the Company produced 38 tonnes of high-purity NdPr during commissioning). The Phase 1 REE separation circuit involved modifications and enhancements to the existing solvent extraction (“SX”) circuits at the Mill and has the design capacity to process approximately 8,000 to 10,000 tonnes of monazite per year, producing approximately 4,000 to 6,000 tonnes of TREO, containing approximately 850 to 1,000 tonnes of separated NdPr per year. With the commissioning of the Phase 1 REE separation circuit, the Mill is able to produce separated NdPr and an Sm+ mixed RE Carbonate that contains only the “heavy” REEs (including Dy, Tb, Sm, Gd, Lu and Y). The Sm+ mixed RE Carbonate can be sold on the market to other facilities to separate the “heavy” REEs or stockpiled at the Mill for separation of the heavies upon completion of the Mill's Phase 1 and/or Phase 2 heavy REE separation facilities.

Showing the first 40 of 95 pairs. Open the source sections for the rest.

Rearranged current paragraphs (2)

Current report — wording carried from elsewhere

The Mill currently has the commercial capacity, in its Phase 1 REE separation circuit to process monazite ore concentrates into separated neodymium-praseodymium (“NdPr”) oxide. The Mill is also performing pilot work on production of “heavy” REE oxides, including dysprosium (“Dy”), terbium (“Tb”) and samarium (“Sm”).

Current report — wording carried from elsewhere

At the same time, parallel with its Ra-226 process development activities, the Company has applied for a license to concentrate R&D quantities of Ra-228 at the Mill and is currently performing engineering on its process development and R&D pilot facility for Ra-228 production. The Company’s current R&D activities are being conducted using existing Mill facilities without the need for capital improvements of any significance. Capital development for future commercial production capabilities, upon successful production at the R&D level, would be expected to be supported by future offtake agreements for radium production.
Rearranged previous paragraphs (5)

Previous report — wording carried elsewhere

2024, with the reclamation of the Central Dune, North Dune and Bumamani mining areas scheduled for completion in 2025. Reclamation of the tailings storage facility onsite has commenced and is expected to be completed by 2027, with ongoing management and monitoring expected to continue through 2037.

Previous report — wording carried elsewhere

Following expected contract uranium sales, the Company expects to have a total of 1,985,000 to 2,585,000 pounds of contained uranium in ore inventories including finished product at the end of 2025. Having stockpiled mined ore available at the Mill, which can be processed into finished U 3 O 8 product on relatively short notice, gives the Company more flexibility in securing uranium sales contracts on the most favorable terms when needed rather than merely accepting contracts at current prices when the fundamentals suggest higher prices in the future may be expected. It also provides more flexibility to make spot sales if market conditions warrant.

Previous report — wording carried elsewhere

Materials and mine cleanup materials, expected to total approximately 160,000 to 200,000 pounds of additional contained uranium in ore inventories.

Previous report — wording carried elsewhere

Monazite is a source of REEs, uranium and thorium. REEs are used in a wide variety of applications including, but not limited to, clean energy applications, permanent magnets, EVs, robotics, electronics, glass polishing, catalysts and defense applications.

Previous report — wording carried elsewhere

There were no revenues or costs applicable to revenues for either the six months ended June 30, 2025 or 2024.