ENERGY FUELS INC

For the period ended Jun 30, 2024. Filed Aug 2, 2024.

View on SEC.gov

About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Jun 30, 2024 · Filed Aug 2, 2024

UUUU$6.66+1.1%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-Q

Period ended 2024-03-31; filed 2024-05-03.

0001385849-24-000029

ITEM 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

Current report: 10-Q

Period ended 2024-06-30; filed 2024-08-02.

0001385849-24-000048

ITEM 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 139 previous paragraphs and 175 current paragraphs.

70 unchanged; 59 reworded; 39 added; 8 removed; 2 previous and 7 current paragraphs rearranged.

Tables are not compared: 4 previous and 6 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (39)

Current report

The Company completed the following sales for the six months ended June 30, 2024:

Current report

•June 2024: sold 100,000 pounds of U 3 O 8 on the spot market for $8.59 million ($85.90 per pound).

Current report

49% interest in the Donald Project JV, of which approximately $10.6 million is expected to be invested in 2024 in preparation of a final investment decision (“FID”), and, if a positive FID is made, the remainder would be invested to develop the project and to earn into the full 49% interest in the Donald Project JV. In addition, the Company would issue Energy Fuels common shares (“Common Shares”) to Astron having a value of up to $17.5 million, of which $3.5 million of Common Shares would be issued in 2024 upon the satisfaction of certain conditions precedent and the remainder would be issued upon a positive FID.

Current report

The REE market is dominated by China, which produces nearly 90% of refined REE products according to the International Energy Agency. According to Wood Mackenzie, “The rare earths industry is poised for significant growth as global demand, particularly driven by renewable energy technologies like electric vehicles and wind turbines, continues to rise. Efforts to diversify supply chains are intensifying, with new mining projects being explored worldwide. Despite some short-term market pressures, long-term prospects remain strong, with prices for NdPr oxide expected to stabilize as market sentiment is expected to improve through 2024.”

Current report

Net loss increased by $1.53 million to $6.42 million or $0.04 per share for the three months ended June 30, 2024 from $4.89 million or $0.03 per share for the three months ended June 30, 2023 primarily due to transaction and integration related costs for the potential acquisition of Base Resources and formation of the Donald Project JV of $2.54 million, partially offset by increased revenues from the sale of uranium concentrates between periods.

Current report

Revenues from uranium concentrates increased by $4.25 million to $8.59 million for the three months ended June 30, 2024 from $4.34 million for the three months ended June 30, 2023 due to a higher realized sales prices and increased volumes sold. Higher realized sales prices (calculated as the change in the period-to-period average realized price times the current period sales volume sold) accounted for an approximate $3.17 million increase in uranium concentrates revenue between periods. Higher sales volumes (calculated as the change in period-to-period sales volumes times the prior period realized price) accounted for an approximate $1.08 million increase in uranium concentrates revenue between periods.

Current report

Revenues from RE Carbonate were $2.27 million for the three months ended June 30, 2023 due to a completed sale of 127,185 kilograms of our RE Carbonate inventories at a realized sales price of $17.86 per kilogram of RE Carbonate. There were no revenues from RE Carbonate for the three months ended June 30, 2024.

Current report

Costs applicable to uranium concentrates increased by $1.34 million to $3.68 million for the three months ended June 30, 2024 from $2.34 million for the three months ended June 30, 2023 due to higher weighted average costs per pound of U 3 O 8 and higher volumes sold between periods. Higher weighted average costs per pound of U 3 O 8 (calculated as the change in the period-to-period weighted average cost per pound times the current period sales volumes sold) accounted for an approximate $0.76 million increase in costs applicable to uranium concentrates between periods. Higher sales volumes (calculated as the change in period-to-period sales volumes times the prior period weighted average cost per pound) accounted for an approximate $0.58 million increase in costs applicable to uranium concentrates between periods.

Current report

Costs applicable to RE Carbonate were $2.03 million for the three months ended June 30, 2023 due to a completed sale of 127,185 kilograms of our RE Carbonate inventories at a weighted average cost of $15.96 per kilogram of RE Carbonate. There were no costs applicable to RE Carbonate for the three months ended June 30, 2024.

Current report

Standby costs were relatively flat at $1.66 million and $1.61 million for the three months ended June 30, 2024 and 2023, respectively.

Current report

Transactions and integration related costs are for legal, advisory and accounting fees directly related to the potential acquisition of Base Resources and the formation of the Donald Project JV. Transactions and integration related costs were $2.54 million for the three months ended June 30, 2024. There were no transactions and integration related costs incurred during the three months ended June 30, 2023. See Note 3 – Transactions for more information.

Current report

For the three months ended June 30, 2023, we recognized a gain on sale of assets of $2.75 million related to the sale of our Prompt Fission Neutron assets, including the underlying contracts, technology, licenses and intellectual property (collectively, the “PFN Assets”) utilized at Alta Mesa to enCore. See Note 6 – Property, Plant and Equipment and Mineral Properties for more information.

Current report

Other income decreased by $0.35 million to $2.62 million, net for the three months ended June 30, 2024 from $2.97 million, net for the three months ended June 30, 2023 primarily driven by lower market-to-market gains on investments and interest income, net between periods, partially offset by increased market-to-market gains on marketable securities. See Note 12 - Supplemental Financial Information for more information.

Current report

Six Months Ended June 30, 2024 Compared to Six Months Ended June 30, 2023

Current report

Revenues from uranium concentrates increased by $11.09 million to $33.90 million for the six months ended June 30, 2024 from $22.81 million for the six months ended June 30, 2023 primarily due to higher realized sales prices and volumes sold between periods. Higher realized prices (calculated as the change in the period-to-period average realized price times the current period sales volumes sold) accounted for an approximate $9.89 million increase in uranium concentrates revenue between periods. Higher sales volumes (calculated as the change in period-to-period sales volumes times the prior period realized price) accounted for an approximate $1.20 million increase in uranium concentrates revenue between periods.

Current report

Revenues from RE Carbonate were $2.27 million for the six months ended June 30, 2023 due to the completed sale of 127,185 kilograms of our RE Carbonate inventories at a realized sales price of $17.86 per kilogram of RE Carbonate. There were no sales of RE Carbonate for the six months ended June 30, 2024.

Current report

Costs applicable to uranium concentrates increased by $4.68 million to $14.73 million for the six months ended June 30, 2024 from $10.05 million for the six months ended June 30, 2023 due to higher weighted average costs per pound of U 3 O 8 and higher volumes sold between periods. Higher weighted average costs per pound of U 3 O 8 (calculated as the change in the period-to-period weighted average cost per pound times the current period sales volumes sold) accounted for an approximate $4.15 million increase in costs applicable to uranium concentrates between periods. Higher sales volumes (calculated as the change in period-to-period sales volumes times the prior period weighted average cost per pound) accounted for an approximate $0.53 million increase in costs applicable to uranium concentrates between periods.

Current report

Costs applicable to RE Carbonate were $2.03 million for the six months ended June 30, 2023 due to the completed sale of 127,185 kilograms of our RE Carbonate inventories at a weighted average cost of $15.96 per kilogram. There were no costs applicable to RE Carbonate for the six months ended June 30, 2024.

Current report

Exploration, development and processing costs decreased by $1.63 million to $5.29 million for the six months ended June 30, 2024 from $6.92 million for the six months ended June 30, 2023 primarily due to lower costs between periods due to the RE Carbonate production program at the Mill during the six months ended June 30, 2023, which included net realizable value adjustments to RE Carbonate inventory during that period.

Current report

Share-based compensation was relatively flat at $2.76 million and $2.74 million for the six months ended June 30, 2024 and 2023, respectively.

Current report

Transactions and integration related costs are for legal, advisory and accounting fees directly related to the potential acquisition of Base Resources and the formation of the Donald Project JV. Transactions and integration related costs were $3.29 million for the six months ended June 30, 2024. There were no transactions and integration related costs incurred during the six months ended June 30, 2023. See Note 3 – Transactions for more information.

Current report

Other income increased by $3.05 million to $4.24 million, net for the six months ended June 30, 2024 from $1.19 million, net for the six months ended June 30, 2023 primarily due to a gain on market-to-market investment during the current period compared to a loss on the prior period, unrealized loss on convertible notes during the prior period that was not outstanding during the current period, partially offset by a loss on foreign exchange rates in the current period compared to a gain in the prior period. See Note 12 – Supplemental Financial Information for more information.

Current report

Six Months Ended June 30, 2024 Compared to Six Months Ended June 30, 2023
Removed paragraphs (8)

Previous report

The REE market is dominated by China, which produces nearly 90% of refined REE products according to the International Energy Agency. According to Wood Mackenzie, “The rare earth industry continues to evolve under the energy transition. Decarbonisation of key sectors such as transport and increasing renewable energy generation is driving demand for rare earth permanent magnets. Global supply also remains strong with diversification high on the agenda for governments around the world. Prices for NdPr oxide were comparatively low for much of 2023. This was caused by adequate supply and sustained market uncertainty caused by challenging economic conditions, particularly within China. As we move into 2024, short term prices remain under pressure, though we expect market sentiment to improve.”

Previous report

Revenues from uranium concentrates increased by $6.84 million to $25.31 million for the three months ended March 31, 2024 from $18.47 million for the three months ended March 31, 2023 due to a higher realized sales price, which increased to $84.38 per pound of U 3 O 8 from $61.57 per pound of U 3 O 8 between periods.

Previous report

Costs applicable to uranium concentrates increased by $3.34 million to $11.05 million for the three months ended March 31, 2024 from $7.72 million for the three months ended March 31, 2023 due to higher weighted average costs per pound of U 3 O 8. The weighted average cost per pound of U 3 O 8 increased to $36.84 for the three months ended March 31, 2024 from $25.72 per pound U 3 O 8 for the three months ended March 31, 2023 primarily due to the purchase of 100,000 pounds U 3 O 8 at $81.00 per pound during the fourth quarter of 2023.

Previous report

Other income was $1.62 million, net for the three months ended March 31, 2024. This balance primarily consisted of interest income, net of $1.57 million, mark-to-market gains on our marketable securities of $0.54 million and realized gains for settlements of our debt marketable securities of $0.21 million, partially offset by foreign exchange rate losses of $0.70 million. Other loss was $1.78 million, net for the three months ended March 31, 2023. This balance primarily consisted of mark-to-market losses on our investments accounted for at fair value of $2.96 million and convertible note of $0.20 million, partially offset by interest income, net of $1.03 million, mark-to-market gains on marketable securities of $0.33 million and foreign exchange rate gains of $0.03 million.
Reworded paragraphs (59)

Previous wording

The Company believes that uranium supply pressure and demand fundamentals point to higher sustained uranium prices in the future. The Company believes that the advancement of reliable nuclear energy, fueled by uranium, is experiencing a global resurgence with an increased focus by governments, policymakers, and citizens on decarbonization, electrification, and security of energy supply. In addition, Russia’s invasion of Ukraine and the entry into the uranium market by financial entities purchasing uranium on the spot market to hold for the long-term has the potential to result in higher sustained spot and term prices and, perhaps, induce utilities to enter into more long-term contracts with non-Russian producers, like Energy Fuels, to foster security of supply, avoid transportation and logistic issues, and ensure more certain pricing.

Current wording

The Company believes that uranium supply pressure and demand fundamentals point to higher sustained uranium prices in the future. The Company believes that the advancement of reliable nuclear energy, fueled by uranium, is experiencing a global resurgence with an increased focus by governments, policymakers, and citizens on decarbonization, electrification, and security of energy supply. In addition, Russia’s invasion of Ukraine, restrictions on Russian uranium products in the U.S. and the entry into the uranium market by financial entities purchasing uranium on the spot market to hold for the long-term has the potential to result in higher sustained spot and term prices and, perhaps, induce utilities to enter into more long-term contracts with non-Russian producers, like Energy Fuels, to foster security of supply, avoid transportation and logistics issues, and ensure more certain pricing.

Previous wording

In 2022, we entered into three long-term uranium contracts with major U.S. utilities. To deliver under these contracts, the Company commenced ore production at three of its permitted and developed conventional uranium mines, Pinyon Plain, La Sal and Pandora, located in Arizona and Utah for uranium production. Once production is fully ramped up to commercial levels at Pinyon Plain, La Sal and Pandora, expected by mid- to late-2024, the Company expects to be producing uranium ore at a run-rate of approximately 1.1 to 1.4 million pounds per year. The Company will stockpile ore from production at these three conventional mines to process in late 2024 or in 2025, subject to market conditions, contract requirements and the Mill’s schedule. The Company will continue to produce uranium from its alternate feed recycling program, which is expected to total approximately 150,000 pounds of finished U 3 O 8 in 2024. Total uranium production for 2024 is expected to be between 150,000 to 500,000 pounds of finished U 3 O 8, depending on the timing of ramp up of production at the Company's Pinyon Plain, La Sal and Pandora mines and the Mill's schedule.

Current wording

In 2022, we entered into three long-term uranium contracts with major U.S. utilities. To deliver under these contracts, the Company commenced ore production at three of its permitted and developed conventional uranium mines, Pinyon Plain, La Sal and Pandora, located in Arizona and Utah for uranium production. Once production is fully ramped up to commercial levels at Pinyon Plain, La Sal and Pandora, expected by late-2024, the Company expects to be producing uranium ore at a run-rate of approximately 1.1 to 1.4 million pounds per year. The Company will stockpile ore from production at these three conventional mines to process in late 2024 or in 2025, subject to market conditions, contract requirements and the Mill’s schedule. The Company will continue to produce uranium from its alternate feed recycling program, which is expected to total approximately 150,000 pounds of finished U 3 O 8 in 2024. Total uranium production for 2024 is expected to be between 150,000 to 500,000 pounds of finished U 3 O 8, depending on the timing of ramp up of production at the Company's Pinyon Plain, La Sal and Pandora mines and the Mill's schedule.

Previous wording

Additionally, the Company is preparing two additional mines in Colorado and Wyoming (Whirlwind and Nichols Ranch) for expected production within one year and advancing several other large-scale U.S. mine projects in order to increase uranium production in the coming years in response to strong uranium market conditions. If strong market conditions continue as expected, the Whirlwind and Nichols Ranch mines could potentially increase Energy Fuels' uranium production to a run-rate of over two million pounds of U 3 O 8 per year as early as 2025. In 2024, the Company plans to advance permitting and development on the Roca Honda, Sheep Mountain and Bullfrog projects, which could expand the Company's uranium production to a run-rate of up to five million pounds of U 3 O 8 per year in the coming years. The Company also expects to commence an ore buying program from third-party miners in 2024, which is expected to further increase the Company's uranium production profile. Until such time when the Company has ramped back up to commercial uranium production, it can rely on its uranium inventories and potential purchases of U.S. origin uranium on the spot market to fulfill its contract requirements.

Current wording

Additionally, the Company is preparing two additional mines in Colorado and Wyoming (Whirlwind and Nichols Ranch) for expected production within one year from a “go” decision and is advancing several other large-scale U.S. mine projects in order to increase uranium production in the coming years in response to potentially strong uranium market conditions. With strong market conditions, the Whirlwind and Nichols Ranch mines could potentially increase Energy Fuels’ uranium production to a run-rate of over two million pounds of U 3 O 8 per year as early as 2026. In 2024, the Company plans to advance permitting and development on the Roca Honda, Sheep Mountain and Bullfrog projects, which could expand the Company’s uranium production to a run-rate of up to five million pounds of U 3 O 8 per year in the coming years, as market conditions warrant. The Company also expects to commence an ore buying program from third-party miners in 2024, which is expected to further increase the Company's uranium production profile. As the Company is ramping up its commercial uranium production, it can rely on its uranium inventories and potential purchases of U.S. origin uranium on the spot market to supplement its uranium production if necessary to fulfill its contract requirements.

Previous wording

The Company continually seeks to maximize capacity utilization at the Mill and new sources of revenue, including through its emerging REE business, as well as new sources of Alternate Feed Materials and new feed processing opportunities at the Mill that can be processed without reliance on uranium sales prices. The Company also expects to produce at a run-rate of 1.0 – 2.0 million pounds of vanadium per year starting as early as 2025, assuming the La Sal and Whirlwind mines are brought into production as contemplated, which could be held as in-process inventory or processed into finished V 2 O 5 available for sale into improving markets.

Current wording

The Company continually seeks to maximize capacity utilization at the Mill and new sources of revenue, including through its emerging REE business, as well as new sources of Alternate Feed Materials and new feed processing opportunities at the Mill that can be processed without reliance on uranium sales prices. The Company also expects to produce vanadium at a run-rate of 1.0 – 2.0 million pounds per year starting as early as 2025, assuming the La Sal mine ramps up to full production in 2024 as contemplated and the Whirlwind mine is brought into production in 2025, which could be held as in-process inventory or processed into finished V 2 O 5 available for sale into improving markets.

Previous wording

The Company is seeking additional sources of natural monazite sands to supply feedstock to its emerging REE business at the Mill, including the recently announced non-binding memorandum of understanding to form a joint venture with Astron Corporation Limited (the “Astron”) to jointly develop the Donald HMS and rare earth project, located in Australia (the “Donald Project”) and the recently announced proposed acquisition of Base Resources Limited (ASX: BSE) (AIM: BSE) (“Base Resources”), which owns the Toliara HMS and monazite project in Madagascar (the “Toliara Project”) (in addition to the acquisition of the Bahia Project discussed in Note 5 – Property, Plant and Equipment and Mineral Properties). The Company is currently in the process of commissioning its Phase 1 REE separation circuit at the Mill and is advancing engineering on its Phase 2 and 3 separation facilities at the Mill (see “Rare Earth Element Initiatives” below). The Company is also evaluating the potential to recover radioisotopes from its existing process streams for use in the development of TAT medical isotopes for the treatment of cancer and continues its support of U.S. governmental activities to assist the U.S. uranium mining industry, supporting efforts to restore domestic nuclear fuel capabilities and advocating for the responsible sourcing of uranium and nuclear fuel.

Current wording

The Company is seeking additional sources of natural monazite sands to supply feedstock to its emerging REE business at the Mill, including its recently formed joint venture with Astron Corporation Limited (“Astron”) to jointly develop the Donald HMS and rare earth project, located in Australia (the “Donald Project”), and the recently announced proposed acquisition of Base Resources Limited (ASX: BSE) (AIM: BSE) (“Base Resources”), which owns the Toliara HMS and monazite project in Madagascar (the “Toliara Project”) (in addition to the acquisition of the Bahia Project discussed in Note 6 – Property, Plant and Equipment and Mineral Properties). The Company completed commissioning its Phase 1 REE separation circuit at the Mill during Q2-2024 and is advancing engineering on its Phase 2 and 3 separation facilities at the Mill (see “Rare Earth Element Initiatives” below). The Company is also evaluating the potential to recover radioisotopes from its existing process streams for use in the development of TAT medical isotopes for the treatment of cancer and continues its support of U.S. governmental activities to assist the U.S. uranium mining industry, supporting efforts to restore domestic nuclear fuel capabilities and advocating for the responsible sourcing of uranium and nuclear fuel.

Previous wording

During the three months ended March 31, 2024, the Mill focused on development of its Phase 1 REE separation circuit, which upon successful commissioning will be capable of producing separated NdPr and a “heavies” samarium plus (“Sm+”) RE Carbonate. The Company purchased an additional 480 tonnes of monazite from Chemours in late 2023 that it received in early 2024, which the Company expects to process for the recovery of 25 – 35 tonnes of separated NdPr oxide and 10 – 20 tonnes of Sm+ RE Carbonate, along with uranium, in 2024 upon commissioning of the Mill’s Phase 1 REE separation circuit, which is expected to be completed in Q2-2024 (see “Rare Earth Element Initiatives” below). After completion of this REE production, which is expected to be in Q2-2024, the Mill will turn to uranium production for the remainder of 2024. No vanadium production is currently planned during 2024, though the Company continually monitors its inventory and vanadium markets to guide future potential vanadium production.

Current wording

During the three months ended June 30, 2024, the Mill focused on development of its Phase 1 REE separation circuit, which has now been successfully commissioned. This Phase 1 REE separation circuit is capable of producing separated NdPr and a “heavy” samarium plus (“Sm+”) RE Carbonate (see “Rare Earth Element Initiatives” below). In late 2023, the Company purchased an additional 480 tonnes of monazite from Chemours that it received in early 2024, which the Company is currently processing for the recovery of 25 – 35 tonnes of separated NdPr oxide and 10 – 20 tonnes of Sm+ RE Carbonate, along with uranium. As of June 30, 2024, the Mill had produced approximately 12 tonnes of separated NdPr. With the completion of this REE production in early Q3-2024, the Mill intends to turn to uranium production for the remainder of 2024. No vanadium production is currently planned during 2024, though the Company continually monitors its inventory and vanadium markets to guide future potential vanadium production.

Previous wording

During the three months ended March 31, 2024, the Company continued ore production at the La Sal mine, Pinyon Plain Project and Pandora mine. Once production is fully ramped up to commercial levels at the three mines, which is currently planned for mid- to late-2024, the Company expects to be producing uranium at a run-rate of approximately 1.1 to 1.4 million pounds per year. Ore mined from these three mines during 2024 will be stockpiled at the Mill for processing that is anticipated to start in late 2024 or in 2025, subject to market conditions, contract requirements and the Mill’s schedule.

Current wording

During the three months ended June 30, 2024, the Company continued ore production at the La Sal mine, Pinyon Plain Project and Pandora mine. As of April 1, 2024, the Company had achieved material production levels at the Pinyon Plain Project, having mined ore from the project during the three months ended June 30, 2024 containing 95,000 pounds of U 3 O 8. Once production is fully ramped up to commercial levels at the three mines, which is currently planned for later in 2024, the Company expects to be producing uranium at a run-rate of approximately 1.1 to 1.4 million pounds per year. Ore mined from these three mines during 2024 will be stockpiled at the Mill for processing that is anticipated to start in late 2024 or in 2025, subject to market conditions, contract requirements and the Mill’s schedule.

Previous wording

The Company expects to continue rehabilitation and development work at its Whirlwind mine in preparation for future production. Although the timing of the Company’s plans to extract and process mineralized materials from the Whirlwind mine will be based on contract requirements, inventory levels, and/or sustained improvements in general market conditions, the Company currently expects the Whirlwind mine, along with the Company’s Nichols Ranch ISR project, to commence uranium production within one (1) year, which could increase Energy Fuels' uranium production to a run-rate of over two (2) million pounds of U 3 O 8 per year starting in 2025, if strong market conditions continue as expected.

Current wording

The Company expects to continue rehabilitation and development work at its Whirlwind mine in preparation for future production. Although the timing of the Company’s plans to extract and process mineralized materials from the Whirlwind mine will be based on contract requirements, inventory levels, and/or sustained improvements in general market conditions, the Company currently expects the Whirlwind mine, along with the Company’s Nichols Ranch ISR project, to commence uranium production within one (1) year from a “go” decision, which could increase Energy Fuels' uranium production to a run-rate of over two (2) million pounds of U 3 O 8 per year starting in 2026, as market conditions may warrant.

Previous wording

Although the Company does not expect to produce significant quantities of U 3 O 8 in 2024 from Nichols Ranch, the Company plans to undertake exploration and development activities in 2024 to expand the resources at the Nichols Ranch Project and to further develop wellfields to be ready for potential recommencement of production in late 2024 or in 2025, if strong market conditions continue as expected. The Company currently holds 34 fully permitted, undeveloped wellfields at Nichols Ranch, including four additional wellfields at the Nichols Ranch wellfields, 22 wellfields at the adjacent Jane Dough wellfields, and eight wellfields at the Hank Project, which is fully permitted to be constructed as a satellite facility to the Nichols Ranch Plant.

Current wording

Although the Company does not expect to produce significant quantities of U 3 O 8 in 2024 from Nichols Ranch, the Company plans to undertake exploration and development activities in 2024 to expand the resources at the Nichols Ranch Project and to further develop wellfields to be ready for potential recommencement of production within one year from a “go” decision, as market conditions warrant. At Nichols Ranch the Company currently holds 34 fully permitted, undeveloped wellfields, including four additional wellfields at the Nichols Ranch wellfields, 22 wellfields at the adjacent Jane Dough wellfields and eight wellfields at the Hank Project, which is fully permitted to be constructed as a satellite facility to the Nichols Ranch Plant.

Previous wording

As of March 31, 2024, the Company had approximately 385,000 pounds of finished uranium inventories located at conversion facilities in North America. Additionally, the Company has approximately 495,000 pounds of additional U 3 O 8 contained in stockpiled Alternate Feed Materials and other ore inventory at the Mill that can potentially be recovered relatively quickly in the future, as general market conditions may warrant. During the three months ended March 31, 2024, the Company sold 200,000 pounds of uranium under one of its term contracts and 100,000 pounds on the spot market.

Current wording

As of June 30, 2024, the Company had approximately 285,000 pounds of finished uranium inventories located at conversion facilities in North America. Additionally, the Company has approximately 653,000 pounds of additional U 3 O 8 contained in stockpiled Alternate Feed Materials and other ore inventory at the Mill or nearby mine sites that can potentially be recovered relatively quickly in the future, as market conditions and contract requirements may warrant. During the six months ended June 30, 2024, the Company sold 200,000 pounds of uranium under one of its term contracts and 200,000 pounds on the spot market.

Previous wording

As of March 31, 2024, the Company holds approximately 905,000 pounds of finished V 2 O 5 in inventory, and there remains an estimated 1.0 to 3.0 million pounds of additional solubilized recoverable V 2 O 5 remaining in tailings solutions awaiting future recovery, as market conditions may warrant.

Current wording

As of June 30, 2024, the Company holds approximately 905,000 pounds of finished V 2 O 5 in inventory, and there remains an estimated 1.0 to 3.0 million pounds of additional solubilized recoverable V 2 O 5 remaining in tailings solutions at the Mill awaiting future recovery, as market conditions may warrant.

Previous wording

The Company has three long term contracts with major U.S. nuclear utilities and entered into spot sale agreements with two customers during the three months ended March 31, 2024. Under these contracts, the Company sold 300,000 pounds of U 3 O 8 during the three months ended March 31, 2024 with a weighted-average sales price of $84.38 per pound, which was partially subject to the then-prevailing market prices at the time of delivery.

Current wording

The Company has three long term contracts with major U.S. nuclear utilities and entered into spot sale agreements with three customers during the six months ended June 30, 2024. Under these contracts, the Company sold 400,000 pounds of U 3 O 8 during the six months ended June 30, 2024 with a weighted-average sales price of $84.76 per pound.

Previous wording

The three utility contracts require deliveries of uranium between 2023 and 2030, with base quantities totaling 2.50 million pounds of uranium sales remaining over the period, and up to 3.70 million pounds of uranium, if all remaining options are exercised. Having observed a marked uptick in interest from nuclear utilities seeking long-term uranium supply, the Company remains actively engaged in pursuing additional selective long-term uranium sales contracts.

Current wording

The Company recently entered into a fourth long-term utility contract. The four long-term utility contracts require future deliveries of uranium between 2025 and 2030, with base quantities totaling 2.80 million pounds of uranium sales remaining over the period, and up to 4.25 million pounds of uranium, if all remaining options are exercised. Having observed a marked uptick in interest from nuclear utilities seeking long-term uranium supply, the Company remains actively engaged in pursuing additional selective long-term uranium sales contracts.

Previous wording

In January 2024, the Company sold 200,000 pounds of U 3 O 8 for $15.03 million ($75.13 per pound) into its existing portfolio of long-term contracts. In March 2024, the Company sold an additional 100,000 pounds of U 3 O 8 on the spot market for $10.29 million ($102.88 per pound). One of the Company's utility customers has the option to purchase an additional 100,000 pounds of uranium from Energy Fuels in 2024. The Company holds uncommitted inventory and, with the benefit of future production, will continue to evaluate additional spot and/or long-term uranium sales opportunities during 2024 and beyond.

Current wording

•January 2024: sold 200,000 pounds of U 3 O 8 for $15.03 million ($75.13 per pound) into its existing portfolio of long-term contracts.

Previous wording

The Company did not have any vanadium sales during the three months ended March 31, 2024. The Company expects to sell its remaining finished vanadium product when justified into the metallurgical industry, as well as other markets that demand a higher purity product, including the aerospace, chemical, and potentially the vanadium battery industries. The Company expects to sell to a diverse group of customers in order to maximize revenues and profits. The vanadium produced in the 2018/19 Pond Return campaign was a high-purity vanadium product of 99.6%-99.7% V 2 O 5. The Company believes there may be opportunities to sell certain quantities of this high-purity material at a premium to reported spot prices, which it has historically.

Current wording

The Company did not sell any vanadium during the six months ended June 30, 2024. The Company expects to sell its remaining finished vanadium product when justified into the metallurgical industry, as well as other markets that demand a higher purity product, including the aerospace, chemical, and potentially the vanadium battery industries. The Company expects to sell to a diverse group of customers in order to maximize revenues and profits. The vanadium produced in the 2018/19 Pond Return campaign was a high-purity vanadium product of 99.6%-99.7% V 2 O 5. The Company believes there may be opportunities to sell certain quantities of this high-purity material at a premium to reported spot prices, which it has done from time-to-time in the past.

Previous wording

During the three months ended March 31, 2024, the Company did not have any rare earth sales. At the current time, the Company expects to produce roughly 25 – 35 tonnes of NdPr oxide, plus approximately 10 – 20 tonnes of Sm+ RE Carbonate in Q2 2024, as it commissions and ramps-up the Mill’s newly installed Phase 1 separation circuit, all of which it intends to sell to Neo Performance Materials (“Neo”) under existing contractual arrangements.

Current wording

During the six months ended June 30, 2024, the Company did not have any rare earth sales. During the three months ended June 30, 2024, the Company completed the commissioning of the Mill’s newly installed Phase 1 separation circuit, from which it expects to produce roughly 25 – 35 tonnes of separated NdPr, plus approximately 10 – 20 tonnes of Sm+ RE Carbonate in 2024, all of which it intends to sell to Neo Performance Materials (“Neo”) under existing contractual arrangements. As of June 30, 2024, the Company had produced approximately 12 tonnes of finished separated NdPr in inventory.

Previous wording

While the Company continues to make progress on its mixed RE Carbonate and separated REE oxide production and additional funds are spent on process enhancements, improving recoveries, product quality and other optimization, profits from this initiative are expected to be minimal until such time when monazite throughput rates are increased and optimized. Throughout this process, the Company is gaining important knowledge, experience and technical information, all of which are valuable for current and future mixed RE Carbonate production and planned future production of separated REE oxides and other advanced REE materials at the Mill or elsewhere.

Current wording

While the Company continues to make progress on its mixed RE Carbonate and separated REE production and additional capital is spent on process enhancements, improving recoveries, product quality and other optimization, profits from this initiative are expected to be minimal until such time when monazite throughput rates are increased and optimized. Throughout this process, the Company is gaining important knowledge, experience and technical information, all of which are valuable for current and future mixed RE Carbonate production and planned future production of separated REE oxides and other advanced REE materials at the Mill or elsewhere.

Previous wording

On April 21, 2024, the Company announced that it has executed a definitive Scheme Implementation Deed (the “SID”) with Base Resources pursuant to which Energy Fuels has agreed to acquire 100% of the issued shares of Base Resources (the “Transaction”) in consideration for (i) 0.0260 Energy Fuels common shares (the “Share Consideration”) and (ii) AUS$0.065 in cash, payable by way of a special dividend by Base Resources to its shareholders (the “Cash Consideration”, and together with the Share Consideration, the “Scheme Consideration”) for each Base Resources ordinary share held, for a total equity value of approximately AUS$375 million. The Transaction will be effected by way of a scheme of arrangement under Australia's Corporations Act (the “Scheme”) and is subject to a number of conditions precedent, including receipt of certain government approvals, approval of Base Resources’ shareholders and Australian court approvals.

Current wording

On April 21, 2024, the Company announced that it had executed a definitive Scheme Implementation Deed (the “SID”) with Base Resources pursuant to which Energy Fuels has agreed to acquire 100% of the issued shares of Base Resources (the “Transaction”) in consideration for (i) 0.0260 Energy Fuels Common Shares (the “Share Consideration”) and (ii) AUS$0.065 in cash, payable by way of a special dividend by Base Resources to its shareholders (the “Cash Consideration,” and together with the Share Consideration, the “Scheme Consideration”) for each Base Resources ordinary share held, for a total value of approximately AUS$375 million. The Transaction will be effected by way of a scheme of arrangement under Australia’s Corporations Act (the “Scheme”) and is subject to a number of conditions precedent, including receipt of certain government approvals, approval of Base Resources’ shareholders and Australian court approvals. Base Resources owns the Toliara HMS and monazite project in Madagascar (the “Toliara Project”).

Previous wording

Base Resources’ Toliara Project is a world-class, advanced-stage, low-cost, and large-scale HMS project. In addition to its stand-alone, ilmenite, rutile (titanium) and zircon (zirconium) production capability, the Toliara Project also contains large quantities of monazite, which is a rich source of the 'magnetic’ REEs used in electric vehicles (“EVs”) and a variety of clean energy and advanced technologies, as well as a source of recoverable uranium. The Toliara Project is subject to negotiation of fiscal terms with the Madagascar government and the receipt of certain Madagascar government approvals and actions before development may occur.

Current wording

The Toliara Project is a world-class, advanced-stage, low-cost, and large-scale HMS project. In addition to its stand-alone, ilmenite, rutile (titanium) and zircon (zirconium) production capability, the Toliara Project also contains large quantities of monazite, which is a rich source of the ‘magnetic’ REEs used in electric vehicles (“EVs”) and a variety of clean energy, defense and advanced technologies, as well as a source of recoverable uranium, which would be shipped to the Mill for the recovery of REEs and the contained uranium. The Toliara Project is subject to negotiation of fiscal terms with the Madagascar government and the receipt of certain Madagascar government approvals and actions before a current suspension on activities at the Toliara Project will be lifted and development may occur. Base Resources also owns the Kwale HMS project in Kenya, which is nearing completion of its mine life and commencement of reclamation activities.

Previous wording

On December 27, 2023, the Company announced that it had entered into a non-binding Memorandum of Understanding (“MOU”) with Astron Corporation Limited (“Astron”) to jointly develop the Donald Project in Australia. The Donald Project is a well-known HMS and rare earth deposit that the Company believes could provide it with another near-term, low-cost, and large-scale source of monazite sand that would be transported to the Mill for the recovery of REE oxides along with the contained uranium. The Donald Project has most licenses and permits in place(or at an advanced stage of completion). The MOU sets out in broad terms the basis upon which the parties would enter into an Australian incorporated Venture under which Energy Fuels would invest up to AUS$180 million (approximately $117 million at current exchange rates) to earn up to a 49% interest in the Venture. In addition, the Company would issue to Astron common shares having a value of up to $17.5 million. Although the Company is currently in the process of completing due diligence and negotiating definitive agreements with Astron, there can be no assurance that the Company will enter into definitive agreements to govern the Venture, or if entered into, that the terms will be as set out in the MOU.

Current wording

On June 3, 2024, the Company executed binding agreements (collectively, the “JV Agreements”) with Astron Corporation Limited (“Astron”) creating a joint venture (the “Donald Project JV”) to jointly develop and operate the Donald Rare Earth and Mineral Sands Project in Australia (the “Donald Project”). The Donald Project is a well-known HMS and rare earth deposit that the Company believes could provide it with another near-term, low-cost, and large-scale source of monazite sand that would be transported to the Mill for the recovery of separated REE products along with the contained uranium. The Donald Project has most licenses and permits in place (or at an advanced stage of completion). The JV Agreement provides Energy Fuels the right to invest up to AUS$183 million (approximately $122 million at June 30, 2024 exchange rates) to earn up to a

Previous wording

The Company continues to make progress toward full REE separation capabilities at the Mill to produce both “light” and “heavy” separated REE oxides in the coming years. Energy Fuels also completed the modification and enhancement of its infrastructure at the Mill (“Phase 1”) to be capable of producing commercial quantities of separated NdPr oxide in early 2024, followed by planned further enhancements to expand NdPr production capability (“Phase 2”) and to produce separated dysprosium (“Dy”), terbium (“Tb”) and potentially other REE materials in the future (“Phase 3”) from monazite and potentially other REE process streams. The Company is focused on monazite at the current time, as it has superior concentrations of these four critical REEs (NdPr, Dy and Tb) compared to many other REE-bearing minerals. These REEs are used in the powerful neodymium-iron-boron (“NdFeB”) magnets that power the most efficient EVs, along with uses in other clean energy and defense technologies. For reference, a typical EV utilizes approximately one (1) to two (2) kilograms of NdPr oxide in its drivetrain. The uranium contained in the monazite, which is generally comparable to typical Colorado Plateau uranium deposits, will also be recovered at the Mill.

Current wording

The Company continues to make progress toward full REE separation capabilities at the Mill to produce both “light” and “heavy” separated REE products in the coming years. The Company has been producing a mixed RE Carbonate from monazite sands at the Mill since 2021. Energy Fuels has recently completed the modification and enhancement of its infrastructure at the Mill (“Phase 1”), which is now capable of producing commercial quantities of separated NdPr. The Company is also planning further enhancements to expand its NdPr production capability (“Phase 2”) and to produce separated dysprosium (“Dy”), terbium (“Tb”) and potentially other REE materials in the future (“Phase 3”) from monazite and potentially other REE process streams. The Company is focused on monazite at the current time, as it has superior concentrations of these four critical REEs (NdPr, Dy and Tb) compared to many other REE-bearing minerals. These REEs are used in the powerful neodymium-iron-boron (“NdFeB”) magnets that power the most efficient EVs, along with uses in other clean energy and defense technologies. For reference, a typical EV utilizes approximately one (1) to two (2) kilograms of NdPr oxide in its drivetrain. The uranium contained in the monazite, which is generally comparable to typical Colorado Plateau uranium deposits, will also be recovered at the Mill.

Previous wording

In 2022, the Company began development of its “Phase 1” REE separation facilities, which involves modifications and enhancements to the existing solvent extraction (“SX”) circuits at the Mill. “Phase 1” is expected to have the capacity to process approximately 8,000 to 10,000 tonnes of monazite per year, producing roughly 4,000 to 6,000 tonnes of total rare earth oxides (“TREO”), containing roughly 800 to 1,000 tonnes of recoverable separated NdPr oxide per year. Because Energy Fuels is utilizing existing infrastructure at the Mill, “Phase 1” capital including commissioning is expected to total between $16 million and $18 million, or approximately $7 million to $9 million less than our initial $25 million budget. Development of “Phase 1” was completed in late Q1-2024 and is expected to be operational in 2024, subject to receipt of sufficient monazite supply and successful commissioning.

Current wording

In 2022, the Company began development of its Phase 1 REE separation facilities at the Mill, which were completed in late Q1-2024 and fully commissioned in Q2-2024. The Phase 1 REE separation facilities involve modifications and enhancements to the existing solvent extraction (“SX”) circuits at the Mill and have the design capacity to process approximately 8,000 to 10,000 tonnes of monazite per year, producing roughly 4,000 to 6,000 tonnes of total rare earth oxides (“TREO”), containing roughly 850 to 1,000 tonnes of recoverable separated NdPr per year. Because Energy Fuels is utilizing existing infrastructure at the Mill, Phase 1 capital including commissioning is expected to total between $16 million and $18 million (depending on the offset value of NdPr production during the commissioning process, which has yet to be sold), or approximately $7 million to $9 million less than our initial $25 million budget.

Previous wording

During “Phase 2,” Energy Fuels expects to expand its NdPr separation capabilities, with an expected capacity to process approximately 30,000 to 60,000 tonnes of monazite per year, containing approximately 15,000 to 25,000 tonnes of TREO, containing approximately 3,000 to 6,000 tonnes of NdPr oxide per year, or sufficient NdPr for 1.5 to 6.0 million EVs per year. “Phase 2” is also expected to add a dedicated monazite “crack-and-leach” circuit to the Mill’s existing leach circuits, which may be developed as the first stage of Phase 2, prior to construction of the expanded NdPr separation capabilities. The Company expects to complete “Phase 2” in 2027, subject to licensing, financing, and receipt of sufficient monazite feed.

Current wording

During Phase 2, Energy Fuels expects to expand its NdPr separation capabilities at the Mill, with an expected capacity to process approximately 30,000 to 60,000 tonnes of monazite per year, containing approximately 15,000 to 25,000 tonnes of TREO, containing approximately 3,000 to 6,000 tonnes of NdPr per year, or sufficient NdPr for 1.5 to 6.0 million EVs per year. Phase 2 is also expected to add a dedicated monazite “crack-and-leach” circuit to the Mill’s existing leach circuits, which may be developed as the first stage of Phase 2, prior to construction of the expanded NdPr separation capabilities. The Company expects to complete Phase 2 in 2027, subject to licensing, financing, and receipt of sufficient monazite feed.

Previous wording

During “Phase 3,” Energy Fuels expects to add “heavy” REE separation capabilities, including the production of Dy, Tb, and potentially other REE oxides and advanced materials. The Company will also evaluate the potential to produce lanthanum (“La”) and cerium (“Ce”) products. Monazite naturally contains higher concentrations of “heavy” REEs, including Dy and Tb, versus many other REE-bearing ores, like bastnaesite, mainly due to the presence of another REE-bearing phosphate mineral called “xenotime.” “Phase 3” is expected to enable Energy Fuels to produce separated Dy, Tb, and potentially other “light” and “heavy” products. The Company also expects to have additional “heavy” REE feedstock stockpiled from “Phase 1” and “Phase 2.” During these earlier phases, the Company expects to produce NdPr oxide and a “heavy” Sm+ RE carbonate, which the Company will either sell or stockpile as feed for “Phase 3” REE separation. The Company expects to complete “Phase 3” in 2028, subject to licensing, financing, and receipt of sufficient feed. Alternatively, the Company may delay Phase 2 and combine Phase 2 and Phase 3 separation capability.

Current wording

During Phase 3, Energy Fuels expects to add “heavy” REE separation capabilities at the Mill, including the production of Dy, Tb, and potentially other separated REE’s and advanced materials. The Company will also evaluate the potential to produce lanthanum (“La”) and cerium (“Ce”) products. Monazite naturally contains higher concentrations of “heavy” REEs, including Dy and Tb, versus many other REE-bearing ores, mainly due to the presence of another REE-bearing phosphate mineral called “xenotime.” Phase 3 is expected to enable Energy Fuels to produce separated Dy, Tb, and potentially other “light” and “heavy” products. Prior to the construction of Phase 3, the “heavy” Sm+ RE carbonate produced during Phases 1 and 2 will either be sold on the market or stockpiled at the Mill as feed for separation into Dy and Tb and potentially other separated REE's and advanced materials at the Mill once the Phase 3 separation circuit is available. The Company expects to complete Phase 3 in 2028, subject to licensing, financing, and receipt of sufficient feed. Alternatively, the Company may delay Phase 2 and combine Phase 2 and Phase 3 separation capability.

Previous wording

In addition to the pending transactions with Base and Astron described above, the Company completed its purchase of the Bahia Project in Brazil on February 10, 2023. The Bahia Project is a well-known HMS deposit that has the potential to supply 3,000 – 10,000 tonnes of natural monazite sand concentrate per year to the Mill for decades for processing into high-purity REE oxides and other materials. 3,000 – 10,000 tonnes of monazite contains approximately 1,500 – 5,000 tonnes of TREO, including 300 – 1,000 tonnes of NdPr and significant commercial quantities of Dy and Tb. The Bahia Project alone would be expected to supply enough NdPr oxide to power 150,000 to 1 million EVs per year. While Energy Fuels’ primary interest in acquiring the Bahia Project is the REE-bearing monazite, the Bahia Project is also expected to produce large quantities of high-quality ilmenite and rutile (titanium) and zircon (zirconium) minerals that are also in high demand.

Current wording

In addition to the pending transaction with Base and the Donald Project JV with Astron described above, the Company completed its purchase of the Bahia Project in Brazil on February 10, 2023. The Bahia Project is a well-known HMS deposit that has the potential to supply 3,000 – 10,000 tonnes of natural monazite per year to the Mill for decades for processing into high-purity REE oxides and other materials. 3,000 – 10,000 tonnes of monazite contains approximately 1,500 – 5,000 tonnes of TREO, including 300 – 1,000 tonnes of NdPr and significant commercial quantities of Dy and Tb. The Bahia Project alone would be expected to supply enough NdPr oxide to power 150,000 to 1 million EVs per year. While Energy Fuels’ primary interest in acquiring the Bahia Project is the REE-bearing monazite, the Bahia Project is also expected to produce large quantities of high-quality ilmenite and rutile (titanium) and zircon (zirconium) minerals that are also in high demand.

Previous wording

The acquisition of the Bahia Project is a part of the Company’s efforts to build a large and diverse book of monazite supply for its rapidly advancing REE processing business. The Company expects to procure monazite through Company-owned mines like the Bahia Project, joint ventures or other collaborations, and open market purchases, like the Company’s current arrangement with The Chemours Company, its planned acquisition of Base Resources and the Toliara Project and its potential joint venture interest in the Donald Project.

Current wording

The acquisition of the Bahia Project is a part of the Company’s efforts to build a large and diverse book of monazite supply for its rapidly advancing REE processing business. The Company expects to procure monazite through Company-owned mines like the Bahia Project, joint ventures or other collaborations, and open market purchases, like the Company’s current arrangement with The Chemours Company, its planned acquisition of Base Resources and the Toliara Project and its joint venture interest in the Donald Project.

Previous wording

Since July 2021, the Company has been evaluating the feasibility of recovering Th-232, and Ra-226 from its existing RE Carbonate/uranium and uranium process streams at the Mill and the feasibility of recovering Ra-228 from the Th-232, Th-228 from the Ra-228 and concentrating Ra-226 at the Mill. Recovered Ra-228, Th-228 and/or Ra-226 would then be sold to pharmaceutical companies and others to produce Pb-212, Ac-225, Bi-213, Ra-224 and/or Ra-223, which are the leading medically attractive TAT isotopes for the treatment of cancer. Existing supplies of these isotopes for TAT applications are in short supply, and methods of production are costly and currently cannot be scaled to meet the demand created as new drugs are developed and approved. This is a major roadblock in the research and development of new TAT drugs as pharmaceutical companies wait for scalable and affordable production technologies to become available. Under this initiative, the Company has the potential to recover valuable isotopes from its existing process streams, thereby recycling back into the market for use in treating cancer material that would otherwise be lost to disposal.

Current wording

Since July 2021, the Company has been evaluating the feasibility of recovering Th-232, and Ra-226 from its existing uranium process streams at the Mill and the feasibility of recovering Ra-228 from the Th-232, Th-228 from the Ra-228 and concentrating Ra-226 at the Mill. Recovered Ra-228, Th-228 and/or Ra-226 would then be sold to pharmaceutical companies and others to produce Pb-212, Ac-225, Bi-213, Ra-224 and/or Ra-223, which are the leading medically attractive TAT isotopes for the treatment of cancer. Existing supplies of these isotopes for TAT applications are in short supply, and methods of production are costly and currently cannot be scaled to meet the demand created as new drugs are developed and approved. This is a major roadblock in the research and development of new TAT drugs as pharmaceutical companies wait for scalable and affordable production technologies to become available. Under this initiative, the Company has the potential to recover valuable isotopes from its existing process streams, thereby recycling back into the market for use in treating cancer material that would otherwise be lost to disposal.

Previous wording

On September 16, 2021, the Company announced its establishment of the Foundation, a fund specifically designed to contribute to the communities surrounding the Mill in southeastern Utah. Energy Fuels deposited an initial $1 million into the Foundation at the time of formation and now provides ongoing funding equal to 1% of the Mill’s revenues, thereby providing an ongoing source of funding to support local priorities. The Foundation focuses on supporting education, the environment, health/wellness, and local economic development in the City of Blanding, San Juan County, the White Mesa Ute Community, the Navajo Nation and other area communities.

Current wording

On September 16, 2021, the Company announced its establishment of the San Juan County Clean Energy Foundation, a fund specifically designed to contribute to the communities surrounding the Mill in southeastern Utah. Energy Fuels deposited an initial $1 million into the Foundation at the time of formation and now provides ongoing funding equal to 1% of the Mill’s revenues, thereby providing an ongoing source of funding to support local priorities. The Foundation focuses on supporting education, the environment, health/wellness, and local economic development in the City of Blanding, San Juan County, the White Mesa Ute Community, the Navajo Nation and other area communities.

Previous wording

A seven-person Advisory Board, comprised of local citizens from San Juan County, evaluates grant applications on a quarterly basis and makes recommendations to the Foundation’s Managers for final review and approval. As of March 31, 2024, the Foundation has awarded 18 grants totaling $333,000, of which $251,070 was committed to American Indian initiatives.

Current wording

An Advisory Board, comprised of local citizens from San Juan County, evaluates grant applications on a quarterly basis and makes recommendations to the Foundation’s Managers for final review and approval. As of June 30, 2024, the Foundation has awarded 20 grants totaling $0.42 million, of which $0.25 million was committed to American Indian initiatives.

Previous wording

According to monthly price data from TradeTech LLC (“TradeTech”), uranium spot prices decreased by 4% during the three months ended March 31, 2024 from $91.00 per pound as of December 31, 2023 to $87.00 per pound as of March 31, 2024. Weekly uranium spot prices per TradeTech during the first quarter ranged from a high of $107.00 per pound during the week of February 2, 2024 to a low of $86.00 per pound during the week of March 15, 2024. TradeTech price data indicates that long-term U 3 O 8 prices increased from $68.00 as of December 31, 2023 to $80.00 as March 31, 2024. On May 1, 2024, TradeTech reported a spot price of $92.00 per pound and a long-term price of $80.00 per pound U 3 O 8.

Current wording

According to monthly price data from TradeTech LLC (“TradeTech”), uranium spot prices decreased by 2% during the three months ended June 30, 2024 from $87.00 per pound as of March 31, 2024 to $85.00 per pound as of June 30, 2024. Weekly uranium spot prices per TradeTech during the second quarter ranged from a high of $92.15 per pound during the week of May 3, 2024 to a low of $83.25 per pound during the week of June 21, 2024. TradeTech price data indicates that long-term U 3 O 8 prices remained consistent at $80.00 as of March 31, 2024 and June 30, 2024. On July 31, 2024, TradeTech reported a spot price of $86.50 per pound and a long-term price of $80.00 per pound U 3 O 8.

Previous wording

The Company continues to believe that certain uranium supply and demand fundamentals point to higher sustained uranium prices in the future, including significant production cuts in recent years, along with significant increased demand from utilities, financial entities, traders and producers. Globally, the Company believes that nuclear energy is seeing greater acceptance by governments and policymakers as a solution to addressing the issues of climate change and energy security. The Company believes that financial entities purchasing uranium on the spot market for long-term investment continue to represent a fundamental shift in the uranium market due to increasing demand and removing readily available material from the market that would otherwise serve as supply to utilities, traders and others. Further, the Company believes that Russia’s ongoing invasion of Ukraine has sparked a widespread trend away from Russian-sourced nuclear fuel supply. On April 30, 2024, the U.S. Senate approved by unanimous consent the Prohibiting Russian Uranium Imports Act, which bans the import of Russian uranium products into the U.S. Under the ban, which commences 90 days after enactment and terminates in 2040, all imports of uranium products from Russia will be banned, subject to waivers in the event “no alternative viable source of low-enriched uranium is available to sustain the continued operation of a nuclear reactor or U.S. nuclear energy company.” The Company expects President Joe Biden to sign the bill into law in the coming days.

Current wording

The Company continues to believe that certain uranium supply and demand fundamentals point to higher sustained uranium prices in the future, including significant production cuts in recent years, along with significant increased demand from utilities, financial entities, traders and producers. Globally, the Company believes that nuclear energy is seeing greater acceptance by governments and policymakers as a solution to addressing the issues of climate change and energy security. The Company believes that financial entities purchasing uranium on the spot market for long-term investment continue to represent a fundamental shift in the uranium market due to increasing demand and removing readily available material from the market that would otherwise serve as supply to utilities, traders and others. Further, the Company believes that Russia’s ongoing invasion of Ukraine has sparked a widespread trend away from Russian-sourced nuclear fuel supply. On May 13, 2024, President Joe Biden signed the Prohibiting Russian Uranium Imports Act, which bans the import of Russian uranium products into the U.S. Under the ban, which commences 90 days after enactment and terminates in 2040, all imports of uranium products from Russia will be banned, subject to waivers in the event “no alternative viable source of low-enriched uranium is available to sustain the continued operation of a nuclear reactor or U.S. nuclear energy company.” However, the DOE is currently granting waivers to the ban.

Previous wording

REEs are a group of 17 chemical elements (the 15 elements in the lanthanum series, plus yttrium and scandium) that are used in a variety of clean energy and advanced technologies, including wind turbines, EVs, cell phones, computers, flat panel displays, advanced optics, catalysts, medicine and national defense applications. Monazite, the source of REEs currently utilized by the Company, also contains significant recoverable quantities of uranium, which fuels the production of carbon-free electricity using nuclear technology. According to industry analyst Wood-Mackenzie, most demand for REEs is in the form of separated REEs, “as most end-use applications require only one or two separated rare earth compounds or products.” (Wood Mackenzie,

Current wording

REEs are a group of 17 chemical elements (the 15 elements in the lanthanum series, plus yttrium and scandium) that are used in a variety of clean energy and advanced technologies, including wind turbines, EVs, cell phones, computers, flat panel displays, advanced optics, catalysts, medicine and national defense applications. Monazite, the source of REEs currently utilized by the Company, also contains significant recoverable quantities of uranium, which fuels the production of carbon-free electricity using nuclear technology. According to industry analyst Wood-Mackenzie, most demand for REEs is in the form of separated REEs, “as most end-use applications require only one or two separated rare earth compounds or products.” (Wood Mackenzie, Rare Earths, Outlook to 2030, 20 th Edition). The main uses for REEs include: (i) battery alloys; (ii) catalysts; (iii) ceramics, pigments and glazes; (iv) glass polishing powders and additives; (v) metallurgy and alloys; (vi) permanent magnets; (vii) phosphors; and (viii) others (Adamas Intelligence). By volume, REEs used for permanent magnets within a plug-in hybrid EV (PHEV) and EV drive unit motor (neodymium (Nd), praseodymium (Pr), dysprosium (Dy), and terbium (Tb)) and catalysts (cerium (Ce) and lanthanum (La)) comprised 60% of total consumption, yet over 90% of the value consumed.

Previous wording

Typical natural monazite sands from the southeast U.S. average approximately 55% TREO and 0.20% uranium, which is the typical grade of uranium found in uranium mines that have historically fed the Mill. Of the 55% TREO typically found in the monazite sands, the NdPr comprises approximately 22% of the TREO. NdPr is among the most valuable of the REEs, as it is the key ingredient in the manufacture of high-strength permanent magnets, which are essential to the lightweight and powerful motors required in EVs and permanent magnet wind turbines used for renewable energy generation, as well as in an array of other modern technologies, including mobile devices and defense applications. Monazite concentrates also contain higher concentrations of “heavy” REEs, including dysprosium (Dy) and terbium (Tb) used in permanent magnets, relative to other common REE ores.

Current wording

Typical natural monazite sands from the southeast U.S. average approximately 55% TREO and 0.20% uranium, which is the typical grade of uranium found in uranium mines that have historically fed the Mill. Of the 55% TREO typically found in the monazite sands, the NdPr comprises approximately 22% of the TREO. NdPr is among the most valuable of the REEs, as it is the key ingredient in the manufacture of high-strength permanent magnets, which are essential to the lightweight and powerful synchronous motors required in EVs and permanent magnet wind turbines used for renewable energy generation, as well as in an array of other modern technologies, including mobile devices and defense applications. Monazite concentrates also contain higher concentrations of “heavy” REEs, including dysprosium (Dy) and terbium (Tb) used in permanent magnets, relative to other common REE ores.

Previous wording

The Company is currently primarily focused on NdPr, Tb, Dy and, to a lesser extent, La, Ce and Sm. The REE supply chain starts at a mine. REEs are mined both as a primary target, like the Mountain Pass REE mine in California, and as a byproduct, which is the case of Chemours’ Offerman Mineral Sand Plant, where the natural monazite sands are physically separated from the other mined sands. Mining creates an ore, which in the case of the Chemours material is the natural monazite sands that are physically separated from the other mined mineral sands. The ore then goes through a process of cracking and cleaning at the Mill that may include acids or caustic solutions, elevated temperature and pressure to recover the uranium and free the REEs from the mineral matrix. After removal of the uranium, which will be sold into the commercial nuclear fuel cycle for the creation of carbon-free nuclear energy, this solution is cleaned of any remaining deleterious elements (including remaining radioactive elements) and made into an RE Carbonate, which is a form acceptable as an SX feedstock for REE separation. SX facilities then use solvents and a series of mixer-settlers for the separation of the REEs in the RE Carbonate from each other and to create the desired purified REE products (often as oxides) for the market or particular end user. Separated REE products are typically sold to various markets, depending on the use. Separated REE products can be made into REE metals and metal-alloys, which are used for magnets and other applications.

Current wording

The Company is currently primarily focused on NdPr, Tb, Dy and, to a lesser extent, La, Ce and Sm. The REE supply chain starts at a mine. REEs are mined both as a primary target, like the Mountain Pass REE mine in California, and as a byproduct, which is the case of Chemours’ Offerman Mineral Sand Plant as well as HMS from the Donald Project, Toliara Project and Bahia Project, where the natural monazite sands are physically separated from the other mined sands. Mining creates an ore, which in the case of the Chemours, Donald, Toliara and Bahia material is the natural monazite sands that are physically separated from the other mined mineral sands. The ore then goes through a process of cracking and cleaning at the Mill that may include acids or caustic solutions, elevated temperature and pressure to recover the uranium and free the REEs from the mineral matrix. After removal of the uranium, which will be sold into the commercial nuclear fuel cycle for the creation of carbon-free nuclear energy, this solution is cleaned of any remaining deleterious elements (including remaining radioactive elements) and made into an RE Carbonate, which is a form acceptable as an SX feedstock for REE separation. SX facilities then use solvents and a series of mixer-settlers for the separation of the REEs in the RE Carbonate from each other and to create the desired purified REE products (often as oxides) for the market or particular end user. Separated REE products are typically sold to various markets, depending on the use. Separated REE products can be made into REE metals and metal-alloys, which are used for magnets and other applications.

Previous wording

To date, substantially all RE Carbonate produced by the Mill has been sold to Neo. The Company is also currently evaluating the potential to produce other downstream REE materials, including REE metals and alloys, in the future at the Mill or elsewhere in the U.S.

Current wording

To date, substantially all RE Carbonate produced by the Mill has been sold to Neo. The Company also recently commissioned its Phase 1 circuit capable of producing up to 850 to 1,000 tonnes of separated NdPr per year directly from leach solutions at the Mill (without the need to prepare an RE Carbonate) and is designing facilities capable of producing up to 4,000 to 6,000 tonnes of separated NdPr per year, along with separated Dy, Tb and other REEs. The Company is also evaluating the potential to produce other downstream REE materials, including REE metals and alloys, in the future at the Mill or elsewhere in the U.S.

Previous wording

REEs are commercially transacted in a number of forms and purities. Therefore, there is no single price for REEs collectively, but numerous prices for various REE compounds and materials. The primary value that the Company expects to generate in the short- to medium-term will come from NdPr, Dy, Tb, Ce and La, as the price the Company receives from the sale of its RE Carbonate is tied to the prices of those REE oxides. In addition, as discussed above, the Company expects to produce separated REE oxides in the future commencing with NdPr expected in 2024. The following table sets forth certain REE compounds and materials mid-point prices in RMB¥/kg and their approximate value in USD$/kg, according to date from Asian Metal:

Current wording

REEs are commercially transacted in a number of forms and purities. Therefore, there is no single price for REEs collectively, but numerous prices for various REE compounds and materials. The primary value that the Company expects to generate in the short- to medium-term will come from NdPr, Dy, Tb, Ce and La, as the price the Company receives from the sale of its RE Carbonate is tied to the prices of those REE oxides. In addition, as discussed above, the Company commenced production of separated NdPr in 2024. The following table sets forth certain REE compounds and materials mid-point prices in RMB¥/kg and their approximate value in USD$/kg, according to date from Asian Metal:

Previous wording

The Company sees its commercial production of RE Carbonate to date and its expected production of separated NdPr oxide in 2024 as the first steps in an effort to restore the REE supply chain in the U.S., where one currently does not exist. Multiple potential domestic sources of mined mineral sands, including monazite, exist in North America and are potential feedstocks for the Mill; in addition, there is one producer of REEs from hard rock mining in California, which currently ships its material to Asia. On a global level, there is a potential to acquire natural monazite sands from the following locations: Australia, South Africa, Madagascar, New Zealand, the Philippines, Indonesia, Brazil, Malaysia, Thailand, India, Russia and others.

Current wording

The Company sees its commercial production of RE Carbonate to date and its recent commercial production of separated NdPr in 2024 as the first steps in an effort to restore the REE supply chain in the U.S., where one currently does not exist. Multiple potential domestic sources of mined mineral sands, including monazite, exist in North America and are potential feedstocks for the Mill; in addition, there is one producer of REEs from hard rock mining in California, which currently ships its material to Asia. On a global level, there is a potential to acquire natural monazite sands, including from the Bahia, Donald and Toliara Projects.

Previous wording

The Company believes one of the main drivers of V 2 O 5 prices is demand for steel, including global prospects for economic growth, construction, infrastructure and auto manufacturing. According to Fastmarkets, demand for “vanadium has been falling in China”. The same report indicated that “steel production cuts in China had affected both supply and demand, especially because China is the largest producer of ferro-vanadium globally.”European FeV prices dip on lack of demand, weakness in China, April 8, 2024.

Current wording

The Company believes one of the main drivers of V 2 O 5 prices is demand for steel, including global prospects for economic growth, construction, infrastructure and auto manufacturing. According to Fastmarkets, demand for vanadium has been week due to “the downstream steel sector in the traditional off season, the operation rate of vanadium nitrogen producers in China was also lower”. The same report indicated that a “weak vanadium pentoxide market put downward pressure on the spot ferrovanadium market, with thin deals made and less active inquiries heard.”Chinese vanadium prices fall on weak downstream demand, June 27, 2024.

Previous wording

During the three months ended March 31, 2024, the mid-point price of vanadium in Europe decreased by 4% from $6.53 per pound V 2 O 5 as of December 31, 2023 to $6.25 per pound V 2 O 5 as of March 31, 2024. The price of vanadium has ranged from a high of $6.88 per pound V 2 O 5 between March 22, 2024 and March 27, 2024 and a low of $5.90 per pound V 2 O 5 between February 16, 2024 and February 22, 2024. As of May 1, 2024, the price of vanadium is $5.87 per pound V 2 O 5.

Current wording

During the three months ended June 30, 2024, the mid-point price of vanadium in Europe decreased by 4% from $6.25 per pound V 2 O 5 as of March 31, 2024 to $6.00 per pound V 2 O 5 as of June 30, 2024. The price of vanadium has ranged from a high of $6.25 per pound V 2 O 5 between April 1, 2024 and April 4, 2024 and a low of $5.84 per pound V 2 O 5 between May 17, 2024 and May 30, 2024. As of July 31, 2024, the price of vanadium was $6.00 per pound V 2 O 5.

Showing the first 40 of 59 pairs. Open the source sections for the rest.

Rearranged current paragraphs (7)

Current report — wording carried from elsewhere

•March 2024: sold 100,000 pounds of U 3 O 8 on the spot market for $10.29 million ($102.88 per pound).

Current report — wording carried from elsewhere

The Company holds uncommitted inventory and, with the benefit of future production, will continue to evaluate additional spot and/or long-term uranium sales opportunities during 2024 and beyond.

Current report — wording carried from elsewhere

Selling, general and administrative expenses (excluding share-based compensation) decreased by $0.23 million to $5.67 million for the three months ended June 30, 2024 from $5.90 million for the three months ended June 30, 2023 primarily due to lower general legal and professional advisory fees, partially offset by salaries and benefits in connection with additional headcount associated with the Company’s efforts to enhance its business processes to prepare for the current and future growth in activity in our uranium and REE operations between periods. Our headcount increased to 179 full-time employees as of June 30, 2024 from 130 full-time employees as of June 30, 2023.

Current report — wording carried from elsewhere

The following table summarizes the results of operations for the six months ended June 30, 2024 and 2023 (in thousands of U.S. dollars):

Current report — wording carried from elsewhere

The following table sets forth selected operating data and financial metrics for the six months ended June 30, 2024 and 2023.

Current report — wording carried from elsewhere

While we expect the amounts relative to the items listed above to have added future value to the Company, the Company expenses these costs in part due to the fact that the Company has not established Proven Mineral Reserves or Probable Mineral Reserves as defined by S-K 1300 or NI 43-101 through the completion of a feasibility or pre-feasibility study for any of the Company’s projects as of June 30, 2024, with the exception of its Sheep Mountain and Pinyon Plain Projects.

Current report — wording carried from elsewhere

Selling, general and administrative (excluding share-based compensation)
Rearranged previous paragraphs (2)

Previous report — wording carried elsewhere

Rare Earths, Outlook to 2030, 20 th Edition). The main uses for REEs include: (i) battery alloys; (ii) catalysts; (iii) ceramics, pigments and glazes; (iv) glass polishing powders and additives; (v) metallurgy and alloys; (vi) permanent magnets; (vii) phosphors; and (viii) others (Adamas Intelligence). By volume, REEs used for permanent magnets (neodymium (Nd), praseodymium (Pr), dysprosium (Dy), and terbium (Tb)) and catalysts (cerium (Ce) and lanthanum (La)) comprised 60% of total consumption, yet over 90% of the value consumed.

Previous report — wording carried elsewhere

Three Months Ended March 31, 2024 Compared to Three Months Ended March 31, 2023