Skip to main content

MAYFAIR GOLD CORP.

For the period ended Dec 31, 2025. Filed Apr 14, 2026.

View on SEC.gov

About this filing

The yearly report of certain Canadian companies, filed under a joint US and Canadian system. It is the main yearly account these companies give US investors, largely as filed in Canada.

FY2025 · Filed Apr 14, 2026

Use the contents to explore the available documents and sections.

MINE$2.39-0.8%Stored close · as of Nov 6, 2026
See the whole filing, with its images and exhibits
Contents

EX-99.3 · Exploration Program

Exploration Program

A 2021 exploration program focused on both infill and step-out drilling, which was intended to identify additional gold mineralization within the Fenn-Gib Deposit area. The Fenn-Gib Phase 1 drill program commenced on January 19, 2021, with one drill rig and ramped up to four drill rigs by mid-July 2021. The 2021 program completed the planned 50,000 meters of drilling by December 31, 2021.

Based on positive results from the Fenn-Gib 2021 Phase 1 drill program, a 30,000-meter Phase 2 drill program continued in 2022. In addition, a 10,000-meter Phase 1 regional exploration program commenced on the Fenn-Gib North and South Blocks. The Fenn-Gib Phase 2 program and Phase 1 regional exploration drill program, comprised of North Block (7,512 meters) and South Block (3,486 meters), were completed in the third quarter of 2022. Based upon assay results from the Fenn-Gib Phase 1 and 2 drill programs received by the end of July 2022, an updated interim resource estimate was completed and announced on October 18, 2022, as described above.

With mineralization at the Fenn-Gib Deposit area remaining open in most directions, a 30,000-meter Phase 3 drill program commenced in the second half of 2022 to continue delineating mineralization. A Phase 2 regional exploration program commenced on the Fenn-Gib North Block. The Fenn-Gib Phase 3 drill program was completed in January 2023. The Company commenced a 30,000-meter Fenn-Gib Phase 4 drill program in the first quarter of 2023, which was completed in the third quarter of 2023.

As drilling continued to identify new mineralization at the Fenn-Gib Deposit, the Company commenced a 20,000-meter Phase 5 drill program in the third quarter of 2023. Drilling for this campaign completed in the fourth quarter of 2023, which reinforced the need for additional drilling. The Company commenced a 26,500-meter Phase 6 drill program at the Fenn-Gib Project in the first quarter of 2024, which was completed in the second quarter of 2024. As of December 31, 2025, the Company has completed a total of 438 surface drill holes on the Fenn-Gib Project, representing 204,771 meters.

A summary of the Company’s drilling program for the Fenn-Gib Project is as follows:

HolesMeters
North Block Surface DDH Drilling#m
2021 Mayfair holes DDH9054,937
2022 Mayfair holes DDH11861,997
2023 Mayfair holes DDH8954,976
2023 Geotech holes DDH73,230
2024 Mayfair holes DDH4218,230
2025 Mayfair holes DDH594,282
405197,650
South Block Surface DDH Drilling
2022 holes DDH183,457
2024 holes DDH153,664
337,121
Total Fenn-Gib Drilling438204,771

During February 2026, the Company reported initial results from its 2025 Grade Control Drilling Program, which comprised 56 tightly spaced (10 m x 10 m) vertical diamond drill holes totaling approximately 4,200 metres within the core of the Phase 1 starter pit. These interim results, representing assays from 36 of the 56 completed holes, indicate a modest positive grade reconciliation relative to the 2026 Pre-Feasibility Study (“PFS”) block model and provide increased confidence in the near-surface grade distribution and ore geometry expected during the early years of mining. The program is designed to validate local grade variability, support improved ore–waste boundary definition, and inform dilution and ore-loss assumptions in advance of construction and project financing. These results were not incorporated into the 2026 PFS, and no conclusions regarding impacts to the mineral resource estimate or mine plan will be drawn until the remaining assays are received and QA/QC procedures are complete.

ContentsView on SEC.gov

The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.