Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations

Current report: 10-K

Period ended 2025-01-03; filed 2025-02-25.

0001357615-25-000018

Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 159 previous paragraphs and 124 current paragraphs.

58 unchanged; 56 reworded; 9 added; 44 removed; 1 previous and 1 current paragraphs rearranged.

Tables are not compared: 7 previous and 7 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (9)

Current report

Revenues. Revenues increased by $786 million, or 11%, to $7,742 million in fiscal 2024, compared to $6,956 million in fiscal 2023. The increase was primarily due to growth on high-end defense engineering, classified intelligence and international programs within our GS business, increased revenues from engineering and professional services in our STS business and $181 million in revenue associated with LinQuest. The increase was offset by the final resolution of an outstanding legacy claim associated with a U.S. government project, resulting in a $26 million decrease in fiscal 2024.

Current report

GS revenues increased by $518 million, or 10%, to $5,871 million in fiscal 2024 compared to $5,353 million in fiscal 2023. The increase in revenue is primarily due to growth on high-end defense engineering, classified intelligence and international programs and $181 million in revenue associated with LinQuest. The increase was offset by the final resolution of an outstanding legacy claim associated with a U.S. government program, resulting in a $26 million decrease in fiscal 2024.

Current report

GS operating income increased by $168 million, or 59%, to $453 million in fiscal 2024 compared to $285 million in fiscal 2023. The increase in operating income was primarily driven by the $144 million charge recognized in fiscal 2023 related to the settlement of a legacy legal matter that did not recur in fiscal 2024, $16 million in operating income associated with LinQuest and growth in the areas discussed above. Additionally, in fiscal 2024, we recognized $6 million gain related to the sale of our investment interest in a joint venture. These increases were offset by the final resolution of an outstanding legacy claim associated with a U.S. government project, resulting in a $26 million decrease in fiscal 2024.

Current report

As discussed in Note 11 "Debt and Other Credit Facilities" of our consolidated financial statements, we entered into Amendment No.11 to our Credit Agreement on January 19, 2024. This amendment provided for an incremental Term Loan B facility in an aggregate principal amount of $1 billion and extended the Term Loan B maturity date to January 2031. We borrowed the full $1 billion principal amount available under this loan. We received $24 million in cash proceeds from this borrowing to pay accrued interest and financing fees, $501 million was applied to the outstanding principal under the Term Loan B facility and the remaining $475 million was applied to the outstanding principal under the Revolver. In addition, Amendment No. 11 reduced the interest rate margin applicable to Term Loan B. During fiscal 2024, $7 million in cash was paid on the outstanding Term Loan B principal.

Current report

We entered into Amendment No. 13 to our Credit Agreement on August 14, 2024. This amendment allowed for an incremental delayed draw Term A-2 loan in an aggregate principal amount up to $550 million, which remained available for 180 days to fund the acquisition of LinQuest, maturing August 2027. On August 30, 2024, we borrowed the entire $550 million available under the delayed draw Term A-2 loan upon closing of the LinQuest acquisition. Additionally, under Amendment No. 13, we refinanced outstanding principal amounts under the Company's existing Term B loan facility via a cashless roll into a new Term B loan facility to reduce the interest rate margin applicable to Term Loan B. The applicable interest rate per annum of the new Term B loan facility is term SOFR plus 2.00% (or base rate plus 1.00%)and the maturity date is January 2031. See Note 4. "Acquisition of LinQuest Corporation" to our consolidated financial statements for further discussion around the acquisition of LinQuest.

Current report

Investing Activities. Cash used in investing activities totaled $776 million in fiscal 2024 and was primarily related to the acquisition of LinQuest, net of cash acquired of $738 million, capital expenditures of $77 million and funding in other investment of $5 million. This was offset by a return of equity method investment from JKC in fiscal 2024 of approximately $36 million related to our proportionate share of a tax refund. Additionally, we received $7 million primarily from the sale of our investment interest in a joint venture within our GS segment. See Note 4. "Acquisition of LinQuest Corporation" to our consolidated financial statements for further discussion around the acquisition of LinQuest and Note 9. "Equity Method Investments and Variable Interest Entities" for further details around the return of investment from JKC.

Current report

Financing Activities. Cash provided by financing activities totaled $374 million in fiscal 2024 and was primarily related to $393 million in borrowings on our Revolver and $574 million in borrowings associated with Amendment No. 11 and No. 13 to our Credit Agreement. These increases were offset by $124 million of principal payments related to our Senior Credit Facility, $98 million in payments on the Revolver, $204 million for the repurchase of common stock under our share repurchase program and $14 million for the repurchase of common stock under our "withhold to cover" program. Cash used in financing activities also included a $33 million payment for the settlement of warrants in connection with our Convertible Notes, $79 million of dividend payments to common shareholders, $18 million in debt issuance costs associated with Amendment No. 11, No. 12 and No. 13 to our Credit Agreement for our Senior Credit Facility and $10 million for the acquisition of a noncontrolling interest. See Note 11 "Debt and Other Credit Facilities" for further discussion of our Senior Credit Facility.

Current report

Purchase Price Allocation. We allocate the purchase price of an acquired business to the identifiable assets and liabilities of the acquiree based on estimated fair values. The excess of the purchase price over the amount allocated to the identifiable assets and liabilities, if any, is recorded as goodwill. Fair value estimates are based on the assumptions management believes a market participant would use in pricing the asset and are developed using widely accepted valuation techniques such as discounted cash flows. When determining the fair value of the assets and liabilities of an acquired business, we make judgments and estimates using all available information to us including, but not limited to, quoted market prices, carrying values, expected future cash flows, which includes consideration of future growth rates and margins, attrition rates, future changes in technology and brand awareness, loyalty and position and discount rates. We engage third-party appraisal firms when appropriate to assist in the fair value determination of intangible assets. The purchase price allocation recorded in a business combination may change during the measurement period, which is a period not to exceed one year from the date of acquisition, as additional information about conditions existing at the acquisition date becomes available. Our purchase price allocation is discussed in Note 4. "Acquisition of LinQuest Corporation" in the accompanying consolidated financial statements.
Removed paragraphs (44)

Previous report

•Scientific research such as quantum science and computing; health and human performance; materials science; life science research; and earth sciences;

Previous report

•Defense systems engineering such as rapid prototyping; test and evaluation; aerospace acquisition support; systems and platform integration; and sustainment engineering;

Previous report

•Operational support such as space domain awareness; C5ISR; human spaceflight and satellite operations; integrated supply chain and logistics; and military aviation support;

Previous report

•Information operations such as cyber analytics and cybersecurity; data analytics; mission planning systems; virtual/augmented reality and technical training; and artificial intelligence and machine learning;

Previous report

•Professional advisory services across the defense, renewable energy and critical infrastructure sectors; and

Previous report

•Sustainable decarbonization solutions that accelerate and enable energy transition and climate change solutions such as proprietary, sustainability-focused process licensing; advisory services focused on energy transition; high-end engineering, design and management program offerings; and digitally-enabled asset optimization solutions.

Previous report

Key customers include U.S. DoD agencies such as the U.S. Army, U.S. Navy and U.S. Air Force, Missile Defense Agency, National Geospatial-Intelligence Agency, National Reconnaissance Office and other intelligence agencies; U.S. civilian agencies such as NASA, U.S. Geological Survey and National Oceanic and Atmospheric Administration; the U.K. MoD, London Metropolitan Police, and other U.K. Crown Services; the Royal Australian Air Force, Navy and Army; other national governments; and a wide range of commercial and industrial companies.

Previous report

Our deployment priorities are to fund organic growth, maintain responsible leverage, maintain an attractive dividend, make strategic, accretive acquisitions and repurchase shares. As demonstrated by our acquisitions of Frazer Nash Consultancy Limited, VIMA Group and others in the past few years, our acquisition thesis is centered around moving upmarket, expanding capabilities and broadening customer sets across strategic growth vectors. KBR also develops and prioritizes investment in technologies that are disruptive, innovative and sustainability- and safety-focused. These technologies and engineering solutions enable clients to achieve a cleaner, greener, more energy efficient global future.

Previous report

On June 3, 2023, President Biden signed into law the Fiscal Responsibility Act of 2023, which suspends the public debt ceiling limit through January 2, 2025. This law includes provisions that will impact future fiscal year budgets for the United States. Key provisions in this law include statutory caps on discretionary funding in 2024 and 2025 and limits on discretionary funding for the years 2026 through 2029. The 2024 statutory cap on discretionary funding totals $1.6 trillion, which included $886 million for defense spending and $704 million for non-defense spending. The 2024 statutory cap on defense spending does not impact President Biden's proposed fiscal 2024 budget; however, the 2024 statutory cap on non-defense spending is 14% lower than President Biden's proposed fiscal 2024 budget. The effect of the non-defense discretionary spending statutory cap on individual programs or KBR cannot be predicted at this time.

Previous report

In 2021, the U.S., U.K. and Australia announced AUKUS, a security pact that will promote a free and open Indo-Pacific through a shared long-term investment to strengthen their combined capabilities and enhance their ability to deter aggression. AUKUS’ first major initiative (Pillar 1) is a joint effort to provide Australia with conventionally armed, nuclear powered submarine ("NPS") capability and strengthen the capacity of the submarine workforce and industrial base. In 2023, these countries announced an arrangement for Australia to acquire a NPS through the AUKUS security pact. This arrangement outlines an approach that will provide Australia with the capability to operate and maintain a NPS before the expected sale of these submarines from the United States to Australia in the early 2030s (subject to Congressional approval). Pillar 2 of this security pact will focus on enabling technologies to maintain a secure and stable trade through the region including undersea technologies, quantum technologies, advanced cyber, artificial intelligence and autonomy, hypersonic research and development, electronic warfare and innovation.

Previous report

We expect climate change and energy transition to continue to be areas of priority and investment as many countries, including the U.S., look to boost their economies and invest in a cleaner future. Specifically, on August 16, 2022, the President signed the Inflation Reduction Act into law which includes provisions intended to, among other things, incentivize domestic clean energy, manufacturing and production. Additionally, in March 2023, the Canadian government announced its federal budget which includes billions of dollars for investment in the transition to a low-carbon economy.

Previous report

On December 13, 2022, the Board of Directors approved a change in the fiscal year end from a calendar year ending on December 31 to a 52 – 53 week year ending on the Friday closest to December 31, effective as of the commencement of the Company's fiscal year on January 1, 2023. In a 52 week fiscal year, each of the Company’s quarterly periods will comprise 13 weeks. The additional week in a 53 week fiscal year is added to the fourth quarter, making such quarter consist of 14 weeks. The Company’s first 53 week fiscal year will occur in fiscal year 2024. The Company made the fiscal year change on a prospective basis and will not adjust operating results for prior periods. The change will impact the prior year comparability of each of the fiscal quarters and the annual period for the year ending December 29, 2023; however, the impact will not be material. The Company believes this change will improve comparability between periods by eliminating the year-over-year variability in calendar month productive days and provide a more consistent reporting cadence for operational leaders to aid in strategic decision making.

Previous report

Due to this change in fiscal year, our fiscal year ended on December 29 in 2023 as compared to December 31 in 2022. The years ended December 29, 2023 and December 31, 2022 contained 363 days and 365 days, respectively.

Previous report

Overview of 2023 Financial Results and Significant Bookings

Previous report

2023 was a year of significant achievement for KBR as we continued to execute toward our long-term vision. The Company benefits from a significant base of long-term enduring contracts in our government business, a diverse portfolio of high quality proprietary process technologies, market tailwinds that benefit our capabilities and technologies in areas such as defense modernization, energy transition, energy security and high-end engineering and a truly global client base. Together, these attributes distinguish KBR and have contributed directly to the Company’s growth in earnings during the year.

Previous report

In 2023, revenues and operating income increased for KBR when compared to 2022. These increases were driven by both our GS and STS business segments. Our GS business segment increased revenues in 2023 with contract growth and increased activity to support exercises, training and other activities within the European Command during the year, despite being partially offset by revenue recognized in the previous year related to the OAW program. Our STS business segment increased revenues in 2023 due to increases in technology sales and engineering and professional services. Our teams continued to deliver operational performance, healthy profitability and strong cash flow. Importantly, we drove innovation and extended our footprint through new program wins and technology advances, developments and investments, such as our additional investment in Mura Technology in 2023. 2023 was also an important year for KBR with multiple obligations resolved during the year including the settlement of a legacy legal matter and the maturity and settlement of our Convertible Notes. Our outstanding warrants were also terminated in 2023, with final payment for the warrant terminations being made in January 2024.

Previous report

Our GS business landed new awards, including a $1.9 billion ceiling, 5-year Integrated Mission Operations Contract for the continued support of NASA's human spaceflight programs which includes the International Space Station, Artemis and Low Earth Orbit Commercialization. Additional new awards included an award to a KBR joint venture for the Omnibus Multidiscipline Engineering Services III contract, worth up to $719 million, to aid NASA's development of space orbital systems in its Engineering and Technology Directorate at Goddard Space Flight Center in Maryland. Our STS business landed various awards during the year, including an award for modifications to the Pluto LNG facility in Australia and numerous projects across the ammonia landscape and various projects spanning carbon capture, utilization and storage, hydrogen, biofuels and renewables.

Previous report

Revenues. Revenues increased by $392 million, or 6%, to $6,956 million in 2023, compared to $6,564 million in 2022. The increase was primarily attributed to contract growth across our GS business and increased revenues from technology sales and engineering and professional services in our STS business. Additionally, there was increased activity to support exercises, training and other activities within the European Command. These increases in revenue were offset by approximately $313 million of revenue recognized in 2022 from contingency work associated with the OAW program that wound down and substantially completed in early 2022 and decreases in revenue due to the ramp down of construction work for the Aspire program.

Previous report

Unrealized gain on other investment. In 2022, we recognized an unrealized gain on other investment of $16 million related to the appreciation in the fair value of our Mura Technology investment as a result of a revaluation triggered by our incremental investment commitment. We did not record an unrealized gain on other investment in 2023.

Previous report

Other non-operating income (expense). Other non-operating income (expense) includes interest income, foreign exchange gains and losses and other non-operating income or expense items. The net decrease is primarily driven by foreign exchange gains and losses. In 2023, we recorded approximately $6 million in net foreign exchange losses. In 2022, we recorded approximately $8 million in net foreign exchanges gains primarily related to foreign exchange impacts from the Australian dollar tranche of Term Loan A that was redenominated into U.S. dollars following the execution of an amendment to our existing Credit Agreement in the fourth quarter of 2022.

Previous report

GS revenues increased by $33 million, or 1%, to $5,353 million in 2023 compared to $5,320 million in 2022. This increase was primarily attributable to activity to support exercises, training and other activities within the European Command and continued contract growth across our GS business segment. These increases were partially offset by approximately $313 million of revenue recognized in 2022 from contingency work associated with the OAW program that was wound down and substantially completed in early 2022. Additionally, the increase was offset by the ramp down of construction work for the Aspire program.

Previous report

GS operating income decreased by $156 million, or 35%, to $285 million in 2023 compared to $441 million in 2022. The decrease was primarily driven by the $144 million charge recorded in the second quarter of 2023 related to the settlement of a legacy legal matter. Additionally, operating income decreased $19 million primarily due to the gain on sale of our investment interest in three U.K. Road investments.

Previous report

Other operating loss remained materially consistent between the years ended December 29, 2023 and December 31, 2022.

Previous report

As a result of U.S. Transportation Command lifting the stop work order on the HomeSafe contract in November 2022, we have recognized $54 million and $39 million in backlog as of December 29, 2023 and December 31, 2022, respectively, for our transition work. Additionally, for the year ended December 29, 2023, we recognized $0.8 billion for our proportionate share of KZJV's backlog and for KBR services to be provided to KZJV as a result of receiving a full notice to proceed with Phase 2 of the Plaquemines LNG project.

Previous report

As discussed in Note 11 "Debt and Other Credit Facilities" of our consolidated financial statements, we entered into Amendment No. 8 on February 6, 2023, to our existing Credit Agreement, dated as of April 25, 2018, as amended ("Credit Agreement"), consisting of a $1 billion revolving credit facility (the "Revolver"), a Term Loan A ("Term Loan A") with debt tranches denominated in U.S. dollars and British pound sterling and a Term Loan B ("Term Loan B" and together with the Revolver and Term Loan A, the "Senior Credit Facility"). Amendment No. 8 (i) replaces the LIBOR-based reference borrowing rate with a SOFR-based reference borrowing rate for the U.S. dollar tranche of Term Loan A and the Revolver and (ii) implements the Company’s recent fiscal year change from a calendar year ending on December 31 to a 52-53 week year ending on the Friday closest to December 31, effective beginning with fiscal year 2023.

Previous report

We entered into Amendment No. 9 to our Credit Agreement on June 6, 2023. Amendment No. 9 replaces the LIBOR-based reference borrowing rate with a SOFR-based reference borrowing rate for Term Loan B. We entered into Amendment No. 10 to our Credit Agreement on July 26, 2023. Amendment No. 10 provided for an additional $200 million loan tranche under Term Loan A. We borrowed the full $200 million principal amount available under this additional loan tranche, and this $200 million borrowing was applied as a partial repayment of the outstanding amounts of principal and accrued interest under the Revolver.

Previous report

Cash provided by investing activities totaled $37 million in 2022 and was primarily due to a return of investment of approximately $190 million from JKC resulting from the receipt of the first payment from the Subcontractor Settlement Agreement, a return of investment from BRIS of $10 million as our cumulative distributions from inception of the joint venture exceeded our cumulative earnings and proceeds of $55 million from the sale of our investment interest in three U.K. Road Projects. See Note 9 "Equity Method Investments and Variable Interest Entities" for further details. This was partially offset by our first payment related to an additional investment of $61 million in Mura Technology, $71 million in capital expenditures, $13 million net cash paid upon divestiture of a joint venture acquired as part of a historical GS acquisition and $73 million net cash used for the acquisition of VIMA. See Note 4 "Acquisitions" for further details

Previous report

Cash used in financing activities totaled $399 million in 2022 and was primarily due to $193 million of repurchases of common stock under our share repurchase program, $66 million of dividend payments to common shareholders, $116 million in net payments on borrowings related to our Senior Credit Facility, $11 million repayment on our finance lease obligations, $10 million for the repurchase of common stock under our "withheld to cover" program and dividends paid to NCI shareholders of $4 million. These decreases were partially offset by $5 million in net proceeds received from the issuance of common stock and $3 million in investments from NCI shareholders.

Showing the first 40 of 44 passages. Open the source sections for the rest.

Reworded paragraphs (56)

Previous wording

KBR Inc., a Delaware corporation ("KBR"), delivers science, technology, engineering and logistics support solutions to governments and companies around the world. Drawing from its rich 100-year history and culture of innovation and mission focus, KBR creates sustainable value by combining deep domain expertise with its full life cycle capabilities to help clients meet their most pressing challenges. Our capabilities and offerings include the following:

Current wording

KBR Inc., a Delaware corporation ("KBR"), delivers science, technology, engineering and logistics support solutions to governments and companies around the world. Drawing from its culture of innovation and mission focus, KBR creates sustainable value by combining deep domain expertise with its full-life cycle capabilities to help clients meet their most pressing challenges.

Previous wording

See additional information on our business segments in Note 2 to our consolidated financial statements and under "Item 1. Business" in this Annual Report on Form 10-K.

Current wording

See additional information on our business segments in Note 2. "Business Segment Information" to our consolidated financial statements and under "Item 1. Business" in this Annual Report on Form 10-K.

Previous wording

In December 2023, President Biden signed into law the National Defense Authorization Act ("NDAA") for fiscal year 2024. The NDAA authorizes programs, projects and policies to be carried out with funds appropriated by Congress as part of the annual budgetary process. The NDAA supports approximately $874 billion in fiscal year 2024 funding for national defense, $841 billion of which is for the DoD. The requested amount is an increase of $27 billion when compared to the authorized defense spending for fiscal year 2023.

Current wording

In December 2024, the National Defense Authorization Act ("NDAA") for fiscal year 2025 was signed into law. The NDAA authorizes programs, projects and policies to be carried out with funds appropriated by Congress as part of the annual budgetary process. The NDAA supports approximately $884 billion in fiscal year 2025 funding for national defense, $850 billion of which is for the DoD. The requested amount is an increase of $9 billion when compared to the authorized defense spending for fiscal year 2024.

Previous wording

The U.S. government has not yet enacted an annual budget for fiscal year 2024; these proposed 2024 budgetary amounts are subject to change. To avert a government shutdown, three continuing resolution funding measures have been enacted to finance all U.S. government activities. The most recent "laddered" continuing resolution passed in January 2024 funds the government through March 2024, depending on the appropriation bill. Under the continuing resolution, partial-year funding at amounts consistent with appropriated levels for fiscal year 2023 are available, subject to certain restrictions, but new spending initiatives are not authorized. Uncertainty continues to exist regarding whether a divided Congress will be able to pass appropriation bills or additional continuing resolutions once the current continuing resolutions expire in March 2024. We believe our key programs will continue to be supported and funded in the continuing resolution financing mechanism. The effect of a potential government shutdown or the finalized fiscal year 2024 budget on KBR or our individual programs cannot be predicted at this time. However, if a government shutdown were to occur and were to continue for an extended period, we could be at risk of program cancellations, schedule delays and other disruptions and nonpayment, which could adversely affect our results of operations. We anticipate the federal budget will continue to be subject to debate and compromise shaped by, among other things, heightened political tensions, the global security environment, inflationary pressures and macroeconomic conditions. The result may be shifting funding priorities, which could have material impacts on defense spending broadly and our programs.

Current wording

The U.S. government has not yet enacted an annual budget for its fiscal year 2025. To avert a government shutdown, a continuing resolution funding measure has been enacted to finance all U.S. government activities through March 14, 2025. Under the continuing resolution, partial-year funding at amounts consistent with appropriated levels for fiscal year 2024 are available, subject to certain restrictions, but new spending initiatives are not authorized. Uncertainty continues to exist regarding the 2025 fiscal year budget and the impacts that the new legislative and executive branch will have on the final fiscal year 2025 budget. We believe our key programs will continue to be supported and funded in the continuing resolution financing mechanism. The effect of a potential government shutdown or the ultimate fiscal year 2025 budget on KBR or our individual programs cannot be predicted at this time. However, if a government shutdown were to occur and were to continue for an extended period, we could be at risk of program cancellations, schedule delays and other disruptions and nonpayment, which could adversely affect our results of operations. We anticipate the federal budget will continue to be subject to debate and compromise shaped by, among other things, the new Administration and Congress, efficiency initiatives such as the Department of Government Efficiency, the global security environment, inflationary pressures and macroeconomic conditions. The result may be shifting funding priorities, which could have material impacts on defense spending broadly and our programs.

Previous wording

Internationally, our Government Solutions work is performed primarily for the U.K. MoD and the Australian Department of Defence. In March 2023, the U.K. government announced its intent to increase its defense budget by £11 billion over the next five years, increasing the defense budget to 2.25% of GDP by 2025. Recognizing the importance of strong defense and the role the U.K. plays across the globe, the U.K. has prioritized investment in military research and investment in key areas to advance and develop capabilities around artificial intelligence, cyber security and space superiority. It is expected the next general election in the United Kingdom will occur in 2024 (and no later than January 28, 2025). The effect of the next general election in the United Kingdom on KBR or our individual programs cannot be predicted at this time. The Australian government continues to invest in defense spending, with particular focus on enhancing regional security, modernizing defense capabilities, strengthening cyber defenses and promoting broader economic stability. The fiscal year budget for Australia for the

Current wording

Labour Party becoming the primary governing party of the House of Commons. The Labour Party has committed to increasing defense spending to 2.5% of GDP in the future, which is an increase from the previous commitment to increase defense spending to 2.25%. The Labour Party has commissioned a strategic defense review to determine future defense spending priorities. Recognizing the importance of strong defense and the role the U.K. plays across the globe, the U.K. has prioritized investment in military research and investment in key areas to advance and develop capabilities around artificial intelligence, cyber security and space superiority. The Australian government continues to invest in defense spending, with particular focus on enhancing regional security, modernizing defense capabilities, strengthening cyber defenses and promoting broader economic stability. The fiscal year budget for Australia for the 2024 - 2025 financial year was finalized, with the Australian government increasing defense spending to AUD 55.7 billion, or approximately 2.00% of GDP.

Previous wording

Long-range commercial market fundamentals are supported by global population growth, expanding global development and an acceleration of demand for energy transition, renewable energy sources and climate change solutions. The globe is in search of the solution to the energy trilemma, the balance between energy affordability, ensuring energy security and achieving environmental sustainability. Clients are prioritizing their efforts to solve the energy trilemma by investing in digital solutions to optimize operations, increase end-product flexibility and energy efficiency, reduce unplanned downtime and minimize environmental footprint. As the global focus on energy security intensifies and companies continue to commit to near-term carbon neutrality and longer-range net-zero carbon emissions, we expect spending to continue in areas such as decarbonization; carbon capture, utilization and sequestration; biofuels; and circular economy. Further, leading companies across the world are proactively evaluating clean energy alternatives, including hydrogen and green ammonia which complements KBR's proprietary process technologies, solutions and capabilities.

Current wording

Long-range commercial market fundamentals are supported by global population growth, expanding global development and an acceleration of demand for energy transition, renewable energy sources and climate-related solutions. The globe is in search of the solution to the energy trilemma, the balance between energy affordability, ensuring energy security and achieving environmental sustainability. Clients are prioritizing their efforts to solve the energy trilemma by investing in digital solutions to optimize operations, increase end-product flexibility and energy efficiency, reduce unplanned downtime and minimize environmental footprint. As the global focus on energy security intensifies and companies continue to commit to near-term carbon neutrality and longer-range net-zero carbon emissions, we expect spending to continue in areas such as decarbonization; carbon capture, utilization and sequestration; biofuels; and circular economy. Further, leading companies across the world are proactively evaluating clean energy alternatives, including hydrogen and green ammonia, which complements KBR's proprietary process technologies, solutions and capabilities. We expect climate protection, energy security and energy transition to continue to be areas of priority and investment as many countries, including the U.S., look to boost their economies and invest in a cleaner, more secure future.

Previous wording

The following tables set forth our results of operations for the periods presented, including by segment. A discussion regarding our financial condition and results of operations for the years ended December 31, 2022 and 2021 is included in Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations of our Annual Report on Form 10-K for the year ended December 31, 2022, as filed with the SEC on February 17, 2023.

Current wording

The following tables set forth our results of operations for the periods presented, including by segment. A discussion regarding our financial condition and results of operations for the years ended December 29, 2023 and December 31, 2022 is included in Item 7. Management’s Discussion and Analysis of Financial Condition and Results of Operations of our Annual Report on Form 10-K for the year ended December 29, 2023 ("fiscal 2023"), as filed with the SEC on February 20, 2024.

Previous wording

Gross profit. The increase in overall gross profit of $149 million, or 18%, was primarily driven by items increasing revenues discussed above, favorable STS licensing mix and resolutions on various legacy matters in the current year. These increases were offset by reduced volume from contingency work associated with the OAW program.

Current wording

Gross profit. The increase in overall gross profit of $126 million, or 13%, was primarily driven by items increasing revenues discussed above and $32 million in gross profit associated with LinQuest. This was partially offset by favorable resolutions on various legacy matters in fiscal 2023 that did not recur in fiscal 2024.

Previous wording

Equity in earnings (losses) of unconsolidated affiliates. Equity in earnings (losses) of unconsolidated affiliates increased by $194 million to $114 million in earnings for the year ended December 29, 2023 compared to $80 million in losses for the year ended December 31, 2022. In 2022, a non-cash charge in the amount of $137 million was recorded associated with the settlement agreement with the consortium of subcontractors of the Combined Cycle Power Plant for the Ichthys LNG Project that did not recur in 2023. In 2022, we also recorded a charge on a joint venture in our GS business segment that did not recur in 2023. Further, the increase in 2023 is attributed to equity in earnings from services on an LNG project that commenced in the second quarter of 2022.

Current wording

Equity in earnings (losses) of unconsolidated affiliates. Equity in earnings (losses) of unconsolidated affiliates decreased by $7 million to $107 million in earnings in fiscal 2024 compared to $114 million in earnings in fiscal 2023, primarily due to decreased equity in earnings from services on an LNG project within our STS segment.

Previous wording

Selling, general and administrative expenses. Selling, general and administrative expenses were $68 million higher in 2023 compared to 2022, which was primarily driven by growth in the business and favorable settlements and credits received in the first quarter of 2022 that did not recur in 2023.

Current wording

Selling, general and administrative expenses. Selling, general and administrative expenses were $56 million higher in fiscal 2024 compared to fiscal 2023, which was primarily driven by additional expenses incurred to support the growth in both our GS and STS business segments.

Previous wording

Legal settlement of legacy matter. In 2023 we recorded a charge of $144 million related to the settlement of a legacy legal matter.

Current wording

Legal settlement of legacy matter. In fiscal 2023, we recorded a charge of $144 million related to the settlement of a legacy legal matter that did not recur in fiscal 2024.

Previous wording

Gain (loss) on disposition of assets and investments. In 2023, we recognized a loss on disposition of assets and investments of $7 million related to the sale of our operations in Russia. This loss was primarily due to $10 million in accumulated foreign currency adjustments that were reclassified from AOCL. In 2022, we recognized a gain on disposition of assets and investments of $16 million primarily from the sale of our investment interest in three U.K. Road investments.

Current wording

Gain (loss) on disposition of assets and investments. In fiscal 2024, we recognized a gain on disposition of assets and investments of $7 million primarily due to the sale of our investment interest in a joint venture within our GS segment. In fiscal 2023, we recognized a loss on disposition of assets and investments of $7 million related to the sale of our operations in Russia. This loss was primarily due to $10 million in accumulated foreign currency adjustments that were reclassified from AOCL.

Previous wording

Interest Expense. The increase in interest expense was primarily driven by increases in the U.S. federal reserve funds rate from 2022 to 2023.

Current wording

Interest Expense. The increase in interest expense was primarily driven by increases in the U.S. federal reserve funds rate and increased outstanding debt principal from fiscal 2023 to fiscal 2024.

Previous wording

Charges associated with Convertible Notes. In 2023, we recognized a loss of $494 million related to the cash election and repurchase of Convertible Notes and Warrant Unwind Agreements.

Current wording

Charges associated with Convertible Notes. In fiscal 2023, we recognized a loss of $494 million related to the cash election and repurchase of our Convertible Notes and the agreements to terminate and settle our outstanding warrants in fiscal 2023 that did not recur in fiscal 2024.

Previous wording

Provision for income taxes. The provision for income taxes for the year ended December 29, 2023 reflects a (57)% tax rate as compared to a 32% tax rate for the year ended December 31, 2022. The effective tax rate of (57)%, as compared to the U.S. statutory rate of 21%, for the year ended December 29, 2023 was primarily impacted by the non-deductible portion of a legal settlement on a legacy matter and the non-deductible charge associated with the cash election and Convertible Notes repurchase discussed in Note 22. The implication of these non-deductible items were partially offset by the release of a previously reserved position based on developments associated with the ongoing IRS examination and appeals process for certain years. The effective tax rate of 32% for the year ended December 31, 2022 was primarily driven by the non-deductibility of losses incurred with respect to the settlement of outstanding matters related to the Ichthys LNG project to which KBR is a JV partner. Excluding the tax impact of these items, our tax rate would be 26% and 24% for the year ended December 29, 2023 and December 31, 2022, respectively. See Note 12 "Income Taxes" to our consolidated financial statements for further discussion on income taxes, including our reconciliation of the U.S. statutory tax rate to our effective tax rate.

Current wording

Provision for income taxes. The provision for income taxes for fiscal 2024 reflects a 25% tax rate as compared to a (57)% tax rate for fiscal 2023. The effective tax rate of 25%, as compared to the U.S. statutory rate of 21%, for fiscal 2024 was primarily impacted by the rate differential on our foreign earnings and the impact of state and local taxes in the U.S. The effective tax rate of (57)%, as compared to the U.S. statutory rate of 21%, for fiscal 2023 was primarily impacted by the non-deductible portion of a legal settlement on a legacy matter and the non-deductible charge associated with the cash election and Convertible Notes repurchase in fiscal 2023. The impacts of these non-deductible items were partially offset by the release of a previously reserved position based on developments associated with the ongoing IRS examination and appeals process for certain years. See Note 12 "Income Taxes" to our consolidated financial statements for further discussion on income taxes, including our reconciliation of the U.S. statutory tax rate to our effective tax rate.

Previous wording

We analyze the financial results of our two core business segments and one non-core business segment. The business segments presented are consistent with our reportable segments discussed in Note 2 to our consolidated financial statements.

Current wording

We analyze the financial results of our two core business segments and one non-core business segment. The business segments presented are consistent with our reportable segments discussed in Note 2. "Business Segment Information" to our consolidated financial statements.

Previous wording

STS revenues increased by $359 million, or 29%, to $1,603 million in 2023 compared to $1,244 million in 2022. The increase from 2022 to 2023 was primarily driven by increased revenues from technology sales and engineering and professional services.

Current wording

STS revenues increased by $268 million, or 17%, to $1,871 million in fiscal 2024 compared to $1,603 million in fiscal 2023. This increase is primarily driven by increased revenues from engineering and professional services.

Previous wording

STS operating income increased by $277 million to $324 million in 2023 compared to $47 million in 2022. The increase was primarily related to the Ichthys LNG project. In 2022, a non-cash charge in the amount of $137 million was recorded for the settlement agreement with the consortium of subcontractors of the Combined Cycle Power Plant that did not recur in 2023. Additionally, the increase was related to increased technology sales and engineering and professional services, increased equity in earnings from services on an LNG project, a favorable resolution on a legacy matter in 2023 and a non-cash impact in 2022 that did not recur in 2023. The increases in 2023 were offset by a $7 million loss related to the sale of our operations in Russia. This loss was primarily due to $10 million in accumulated foreign currency adjustments that were reclassified from AOCL.

Current wording

STS operating income increased by $46 million, or 14%, to $370 million in fiscal 2024 compared to $324 million in fiscal 2023. The increase from fiscal 2023 to fiscal 2024 is primarily due to the items discussed above and a $7 million loss related to the sale of our operations in Russia in fiscal 2023 that did not recur in fiscal 2024, offset by decreased equity in earnings from services on an LNG project within our STS segment and a favorable resolution on a legacy matter in 2023 that did not recur in 2024.

Previous wording

Backlog represents the estimated dollar amount of revenues we expect to realize in the future as a result of performing work on contracts and our pro-rata share of work to be performed by our unconsolidated joint ventures. We include total estimated revenues in backlog when a contract is awarded under a legally binding agreement. In many instances, arrangements included in backlog are complex, nonrepetitive and may fluctuate over the contract period due to the release of contracted work in phases by the customer. Additionally, nearly all contracts allow customers to terminate the agreement at any time for convenience, and from time to time customers may dispute or try to renegotiate existing contracts. These and other factors may result in delays in our recognition of revenue from our backlog, and in differences between the amounts we book as backlog and the amounts we recognize as revenue. Certain contracts provide maximum dollar limits, with actual authorization to perform work under the contract agreed upon on a periodic basis with the customer. In these arrangements, only the amounts authorized are included in backlog. For projects where we act solely in a project management capacity, we only include the expected value of our services in backlog.

Current wording

Backlog represents the estimated dollar amount of revenues we expect to realize in the future as a result of performing work on contracts and our pro-rata share of work to be performed by our unconsolidated joint ventures. We include total estimated revenues in backlog when a contract is awarded under a legally binding agreement. In many instances, arrangements included in backlog are complex, nonrepetitive and may fluctuate over the contract period due to the release of contracted work in phases by the customer. Additionally, nearly all contracts allow customers to terminate the agreement at any time for convenience, and from time to time customers may dispute or try to renegotiate existing contracts. These and other factors may result in delays or changes in our recognition of revenue from our backlog versus amounts we book as backlog. Certain contracts provide maximum dollar limits, with actual authorization to perform work under the contract agreed upon on a periodic basis with the customer. In these arrangements, only the amounts authorized and probable are included in backlog. For projects where we act solely in a project management capacity, we only include the expected value of our services in backlog.

Previous wording

We have included in the table below our proportionate share of unconsolidated joint ventures' estimated backlog. As these projects are accounted for under the equity method, only our share of future earnings from these projects will be recorded in our results of operations. Our proportionate share of backlog for projects related to unconsolidated joint ventures totaled $4.1 billion at December 29, 2023, and $3.9 billion at December 31, 2022.

Current wording

We have included in the table below our proportionate share of unconsolidated joint ventures' estimated backlog. As these projects are accounted for under the equity method, only our share of future earnings from these projects will be recorded in our results of operations. Our proportionate share of backlog for projects related to unconsolidated joint ventures totaled $2.8 billion at January 3, 2025, and $4.1 billion at December 29, 2023.

Previous wording

The following table summarizes our backlog by business segment for the years ended December 29, 2023 and December 31, 2022, respectively:

Current wording

The following table summarizes our backlog by business segment as of January 3, 2025 and December 29, 2023, respectively:

Previous wording

We estimate that as of December 29, 2023, 30% of our backlog will be executed within one year. Of this amount, we estimate that 87% will be recognized in revenues on our consolidated statement of operations and 13% will be recorded by our unconsolidated joint ventures. As of December 29, 2023, $164 million of our backlog relates to active contracts that are in a loss position.

Current wording

We estimate that as of January 3, 2025, 40% of our backlog will be executed within one year. Of this amount, we estimate that 89% will be recognized in revenues on our consolidated statement of operations and 11% will be recorded by our unconsolidated joint ventures. As of January 3, 2025, $193 million of our backlog relates to active contracts that are in a loss position.

Previous wording

As of December 29, 2023, 10% of our backlog was attributable to fixed-price contracts, 39% was attributable to PFIs, 36% was attributable to cost-reimbursable contracts and 15% was attributable to time-and-materials contracts. For contracts that contain fixed-price, cost-reimbursable and time-and-materials components, we classify the individual components as either fixed-price, cost-reimbursable or time-and materials according to the composition of the contract; however, for smaller contracts, we characterize the entire contract based on the predominant component. As of December 29, 2023, $9.2 billion of our GS backlog was currently funded by our customers.

Current wording

As of January 3, 2025, 17% of our backlog was attributable to fixed-price contracts, 36% was attributable to PFIs, 30% was attributable to cost-reimbursable contracts and 17% was attributable to time-and-materials contracts. For contracts that contain fixed-price, cost-reimbursable and time-and-materials components, we classify the individual components as either fixed-price, cost-reimbursable or time-and materials according to the composition of the contract; however, for smaller contracts, we characterize the entire contract based on the predominant component. As of January 3, 2025, $9.1 billion of our GS backlog was currently funded by our customers.

Previous wording

As of December 29, 2023, we had approximately $4.4 billion of priced option periods not yet exercised by the customer for U.S. government contracts that are not included in the backlog amounts presented above.

Current wording

As of January 3, 2025, we had approximately $4.0 billion of priced option periods not yet exercised by the customer for U.S. government contracts that are not included in the backlog amounts presented above.

Previous wording

The difference between backlog of $17.3 billion and the remaining performance obligations as defined by ASC 606 of $12.7 billion is primarily due to our proportionate share of backlog related to unconsolidated joint ventures which is not included in our remaining performance obligations. See Note 3 "Revenue" to our consolidated financial statements for discussion of the remaining performance obligations.

Current wording

The difference between backlog of $17.3 billion and the remaining performance obligations as defined by ASC 606 of $13.8 billion is primarily due to our proportionate share of backlog related to unconsolidated joint ventures which is not included in our remaining performance obligations. See Note 3 "Revenue" to our consolidated financial statements for discussion of the remaining performance obligations.

Previous wording

Liquidity is provided by available cash and cash equivalents, cash generated from operations, our Senior Credit Facility (as defined below) and access to capital markets. Our operating cash flow can vary significantly from year to year and is affected by the mix, terms, timing and stage of completion of our projects. We often receive cash in advance on certain of our sustainable technology projects. On time-and-material and cost reimbursable contracts, we may utilize cash on hand or availability under our Senior Credit Facility to satisfy any periodic operating cash requirements for working capital, as we incur costs and subsequently invoice our customers.

Current wording

Liquidity is provided by available cash and cash equivalents, cash generated from operations, our Senior Credit Facility (as defined below), sale or divestiture of assets and access to capital markets. Our operating cash flow can vary significantly from year to year and is affected by the mix, terms, timing and stage of completion of our projects. We often receive cash in advance on certain of our sustainable technology projects. On time-and-material and cost reimbursable contracts, we may utilize cash on hand or availability under our Senior Credit Facility to satisfy any periodic operating cash requirements for working capital, as we incur costs and subsequently invoice our customers.

Previous wording

Certain STS services projects may require us to provide credit support for our performance obligations to our customers in the form of letters of credit, surety bonds or guarantees. Our ability to obtain new project awards in the future may be dependent on our ability to maintain or increase our letter of credit and surety bonding capacity, which may be further dependent on the timely release of existing letters of credit and surety bonds. As the need for credit support arises, letters of credit may be issued under the Revolver (as defined below) or with lending counterparties on a bilateral, syndicated or other basis.

Current wording

Certain STS services projects may require us to provide credit support for our performance obligations to our customers in the form of letters of credit, surety bonds or guarantees. Our ability to obtain new project awards in the future may be dependent on our letter of credit and surety bonding capacity, which may be further dependent on the timely release of existing letters of credit and surety bonds. As the need for credit support arises, letters of credit may be issued under the Revolver (as defined below) or with lending counterparties on a bilateral, syndicated or other basis.

Previous wording

We entered into Amendment No.11 to our Credit Agreement on January 19, 2024. This amendment provides for an incremental Term Loan B facility in an aggregate principal amount of $1 billion and extends the Term Loan B maturity date to January 2031. We borrowed the full $1 billion principal amount available under this loan and primarily used the proceeds to repay all amounts of outstanding principal and accrued interest under the Company’s Term Loan B facility at December 29, 2023 and to partially repay outstanding principal and accrued interest under the Company’s Revolver. We entered into Amendment No.12 to our Credit Agreement on February 7, 2024. This amendment consolidated the USD denominated Term A-1, Term A-2 and Term A-4 loan facilities under our Credit Agreement into the amended USD denominated Term A-1 loan facility and continued the GBP denominated Term A-3 loan facility outstanding at December 29, 2023. Additionally, this amendment extended the maturity date of the $1 billion Revolver, amended Term A-1 loan facility and Term A-3 loan facility to February 2029. Immediately following execution of Amendment No. 12, we had approximately $500 million outstanding related to the remaining Term Loan A facilities and $117 million outstanding on our Revolver.

Current wording

We entered into Amendment No.12 to our Credit Agreement on February 7, 2024. This amendment consolidated all USD denominated Term Loans A including: Term A-1, Term A-2 and Term A-4 loan facilities under our Credit Agreement into the amended singular USD denominated Term A-1 loan facility and continued the GBP denominated Term A-3 loan facility outstanding at December 29, 2023. During fiscal 2024, $117 million in cash was paid on the outstanding Term Loan A principal and accrued interest and $20 million was applied to the Term Loan A principal using proceeds of a borrowing on our Revolver. Additionally, this amendment extended the maturity date of the $1 billion Revolver, amended Term A-1 loan facility and Term A-3 loan facility to February 2029.

Previous wording

We believe that existing cash balances, internally generated cash flows, availability under our Senior Credit Facility and other lines of credit are sufficient to support our business operations for the next 12 months. As of December 29, 2023, we were in compliance with all financial covenants related to our debt agreements.

Current wording

We believe that existing cash balances, internally generated cash flows, availability under our Senior Credit Facility and other lines of credit are sufficient to support our business operations for the next 12 months. As of January 3, 2025, we are in compliance with all financial covenants related to our debt agreements.

Previous wording

Cash and cash equivalents totaled $304 million at December 29, 2023 and $389 million at December 31, 2022 and consisted of the following:

Current wording

Cash and cash equivalents totaled $350 million at January 3, 2025 and $304 million at December 29, 2023 and consisted of the following:

Previous wording

Our cash balances are held in numerous accounts throughout the world to fund our global activities, including acquisitions, joint ventures and other business partnerships. Domestic cash relates to cash balances held by U.S. entities and is largely used to support project activities of those businesses as well as general corporate needs such as the payment of dividends to shareholders, repayment of debt and potential repurchases of our outstanding common stock.

Current wording

Our cash balances are held in numerous accounts throughout the world to fund our global activities, including acquisitions, joint ventures and other business partnerships. Domestic cash relates to cash balances held by U.S. entities and is largely used to support project activities of those businesses as well as general corporate needs such as the payment of dividends to shareholders, repayment of debt and potential repurchases of our outstanding common stock. Additionally, domestic cash and cash equivalents includes $12 million held by our wholly-owned captive insurance company as of January 3, 2025 which is generally not available to KBR to utilize to support its other operations.

Previous wording

Operating Activities. Cash provided by operations totaled $331 million and $396 million in 2023 and 2022, respectively, as compared to a net loss of $261 million and net income of $192 million in 2023 and 2022, respectively. Cash flows from operating activities result primarily from earnings and are affected by changes in operating assets and liabilities, which consist primarily of working capital balances for projects. Working capital levels vary from year to year and are primarily affected by the Company's volume of work. These levels are also impacted by the mix, stage of completion and commercial terms of projects. Working capital requirements also vary by project depending on the type of client and location throughout the world.

Current wording

Operating Activities. Cash provided by operations totaled $462 million and $331 million in fiscal 2024 and fiscal 2023, respectively, as compared to net income of $381 million and net loss of $261 million in fiscal 2024 and fiscal 2023, respectively. Cash flows from operating activities result primarily from earnings and are affected by changes in operating assets and liabilities, which consist primarily of working capital balances for projects. Working capital levels vary from year to year and are primarily affected by our volume of work. These levels are also impacted by the mix, stage of completion and commercial terms of projects. Working capital requirements also vary by project depending on the type of client and location throughout the world.

Previous wording

The decrease in operating cash flows in 2023 compared to 2022 is primarily attributed to the $144 million payment made in the third quarter of 2023 related to the settlement of a legacy legal matter. This decrease was offset by increases in operating cash flows from changes in our pension funding amounts in the 2023. In 2022, we made an advance payment in October 2022 to our U.K. pension plan for approximately £29 million of the £33 million required minimum annual contributions. No similar advance payments were made in 2023. Additionally, there were increases in operating cash flows from changes in the primary components of our working capital. The primary components of our working capital accounts are accounts receivable, contract assets, accounts payable and contract liabilities. These components are impacted by the size and changes in the mix of our cost-reimbursable and time-and-materials projects versus fixed price projects, and as a result, fluctuations in these components are not uncommon in our business.

Current wording

The increase in operating cash flows in fiscal 2024 compared to fiscal 2023 is primarily related to the $144 million payment made in fiscal 2023 related to the settlement of a legacy legal matter that did not recur in fiscal 2024 and increased distributions of earnings from unconsolidated affiliates. In fiscal 2024, we received $163 million in distributions of earnings from unconsolidated affiliates compared to $74 million in fiscal 2023. The increase in operating cash flows was primarily offset by increased employer pension contributions in fiscal 2024. In fiscal 2024, we made an advance payment to our U.K. defined benefit pension plan for approximately £17 million ($21 million at the current exchange rate). Additionally, we made an advance payment to our U.K pension plan in fiscal 2022 that resulted in decreased employer pension contributions in fiscal 2023. Further, there were decreases in operating cash flows in fiscal 2024 from changes in the primary components of our working capital. The primary components of our working capital accounts are accounts receivable, contract assets, accounts payable and contract liabilities. These components are impacted by the size and changes in the mix of our cost-reimbursable and time-and-materials projects versus fixed price projects, and as a result, fluctuations in these components are not uncommon in our business.

Previous wording

Investing Activities. Cash used in investing activities totaled $70 million in 2023 and was primarily related to the second payment for an additional investment of $39 million in Mura Technology and capital expenditures of $80 million. This was offset by a return of investment of approximately $61 million from JKC resulting from the receipt of the second payment from the Subcontractor Settlement Agreement. See Note 9 "Equity Method Investments and Variable Interest Entities" for further details.

Current wording

Cash used in investing activities totaled $70 million in fiscal 2023 and was primarily related to the second payment for an additional investment of $39 million in Mura Technology and capital expenditures of $80 million. This was offset by a return of equity method investment of approximately $61 million from JKC resulting from the receipt of the second payment from the Subcontractor Settlement Agreement. See Note 9 "Equity Method Investments and Variable Interest Entities" for further details.

Previous wording

Financing activities. Cash used in financing activities totaled $359 million in 2023 and was primarily due to a net cash outflow of $567 million for the settlement and maturity of our outstanding Convertible Notes, corresponding Note Hedge and warrants settled and paid during the year. Cash used in financing activities also included $72 million of dividend payments to common shareholders, $125 million for the repurchase of common stock under our share repurchase program, $13 million for the repurchase of common stock under our "withhold to cover" program, $340 million in payments on our revolving credit facility and $17 million of principal payments related to our Senior Credit Facility. These decreases were partially offset by $785 million in borrowings related to our revolving credit facility and $5 million in net proceeds from the issuance of common stock. See Note 11 "Debt and Other Credit Facilities" for further discussion of our Senior Credit Facility.

Current wording

Cash used in financing activities totaled $359 million in fiscal 2023 and was primarily due to a net cash outflow of $567 million for the settlement and maturity of our outstanding Convertible Notes, corresponding note hedge and warrants settled and paid during the year. Cash used in financing activities also included $72 million of dividend payments to common shareholders, $125 million for the repurchase of common stock under our share repurchase program, $13 million for the repurchase of common stock under our "withhold to cover" program, $340 million in payments on our revolving credit facility and $17 million of principal payments related to our Senior Credit Facility. These decreases were partially offset by $785 million in borrowings related to our Revolver. See Note 11 "Debt and Other Credit Facilities" for further discussion of our Senior Credit Facility.

Previous wording

U.K. pension obligation. We have recognized on our consolidated balance sheets a funding deficit of approximately $15 million (calculated as the excess of the projected benefit obligations over the fair value of plan assets) as of December 29, 2023) for our frozen U.K. defined benefit pension plan. The total amount of employer pension contributions paid for the year ended December 29, 2023 is $9 million for our defined benefit plan in the U.K. On October 17, 2022, we made an advance payment to our U.K. pension plan for approximately £29 million of the £33 million required minimum annual contributions for the year ending December 29, 2023. The funding requirements for our U.K. pension plan are determined based on the U.K. Pensions Act 1995. Annual minimum funding requirements are based on a binding agreement with the Trustee of the U.K. pension plan that is negotiated on a triennial basis. In June 2022, KBR and the Trustee executed an agreement requiring minimum annual contributions of approximately £33 million (approximately $42 million at current exchange rates) for the period through March 2028. This schedule of contributions will be reviewed by the Trustee and KBR no later than 15 months after the effective date of each actuarial valuation, due every three years. In the future, pension funding may increase or decrease depending on changes in the levels of interest rates, pension plan asset return performance and other factors. A significant increase in our funding requirements for the U.K. pension plan could result in a material adverse impact on our financial position.

Current wording

U.K. pension obligation. We have recognized on our consolidated balance sheets a funding surplus of approximately $82 million (calculated as the excess of the fair value of plan assets over projected benefit obligations) as of January 3, 2025 for our frozen U.K. defined benefit pension plan. The total amount of employer pension contributions paid for the year ended January 3, 2025 is $61 million for our defined benefit plan in the U.K. The funding requirements for our U.K. pension plan are determined based on the U.K. Pensions Act 1995. Annual minimum funding requirements are based on a binding agreement with the Trustee of the U.K. pension plan that is negotiated on a triennial basis. This schedule of contributions will be reviewed by the Trustee and KBR no later than 15 months after the effective date of each actuarial valuation, due every three years. In 2024, the Trustee of the U.K. defined benefit pension plan commenced the triennial actuarial valuation of the plan. At this time, we do not anticipate contributing additional funding to this plan at least until the next triennial valuation. In the future, pension funding may increase or decrease depending on changes in the levels of interest rates, pension plan asset return performance and other factors. A significant increase in our funding requirements for the U.K. pension plan could result in a material adverse impact on our financial position.

Previous wording

Sales of Receivables. From time to time, we sell certain receivables to unrelated third-party financial institutions under various accounts receivable monetization programs. One such program is with MUFG Bank, Ltd. (“MUFG”) under a Master Accounts Receivable Purchase Agreement (the “RPA”), which provides the sale to MUFG of certain of our designated eligible receivables, with a significant portion of such receivables being owed by the U.S. government. We plan to continue to utilize these programs to ensure we have flexibility in regards to meeting our capital needs. Refer to Note 20 "Fair Value of Financial Instruments and Risk Management" to our consolidated financial statements for further discussion on our sales of receivables.

Current wording

Sales of Receivables. From time to time, we sell certain receivables to unrelated third-party financial institutions under various accounts receivable monetization programs. One such program is with MUFG Bank, Ltd. (“MUFG”) under a Master Accounts Receivable Purchase Agreement, which provides the sale to MUFG of certain of our designated eligible receivables, with a significant portion of such receivables being owed by the U.S. government. We plan to continue to utilize these programs to ensure we have flexibility to meet our capital needs. Refer to Note 20 "Fair Value of Financial Instruments and Risk Management" to our consolidated financial statements for further discussion on our sales of receivables.

Previous wording

In our joint venture arrangements, the liability of each partner is usually joint and several. This means that each joint venture partner may become liable for the entire risk of performance guarantees provided by each partner to the customer. Typically, each joint venture partner indemnifies the other partners for any liabilities incurred in excess of the liabilities the other party is obligated to bear under the respective joint venture agreement. We are unable to estimate the maximum potential amount of future payments that we could be required to make under outstanding performance guarantees related to joint venture projects due to a number of factors, including but not limited to, the nature and extent of any contractual defaults by our joint venture partners, resource availability, potential performance delays caused by the defaults, the location of the projects and the terms of the related contracts. See “Item 1A. Risk Factors” contained in Part I of this Annual Report on Form 10-K for information regarding our fixed-price contracts and operations through joint ventures and partnerships.

Current wording

In our joint venture arrangements, the liability of each partner is usually joint and several. This means that each joint venture partner may become liable for the entire risk of performance guarantees provided by each partner to the customer. Typically, each joint venture partner indemnifies the other partners for any liabilities incurred in excess of the liabilities the other party is obligated to bear under the respective joint venture agreement. We are unable to estimate the maximum potential amount of future payments that we could be required to make under outstanding performance guarantees related to joint venture projects due to a number of factors, including but not limited to, the nature and extent of any contractual defaults by our joint venture partners, resource availability, potential performance delays caused by the defaults, the location of the projects and the terms of the related contracts. In May 2024, a partner in one of our project-based joint ventures voluntarily filed for Chapter 11 bankruptcy reorganization. Our joint venture operations have not been materially impacted by these bankruptcy proceedings. See “Item 1A. Risk Factors” contained in Part I of this Annual Report on Form 10-K for information regarding our fixed-price contracts and operations through joint ventures and partnerships.

Previous wording

As of December 29, 2023, we had $1 billion in a committed line of credit on the Revolver under our Senior Credit Facility and $392 million of bilateral and uncommitted lines of credit to support the issuance of letters of credit. As of December 29, 2023, with respect to our Revolver, we had $505 million of outstanding borrowings. We also have $14 million of outstanding letters of credit on our Senior Credit Facility. With respect to our $392 million of bilateral and uncommitted lines of credit, we utilized $298 million for letters of credit as of December 29, 2023. The total remaining capacity of these committed and uncommitted lines of credit was approximately $575 million. Information relating to our letters of credit is described in Note 11 "Debt and Other Credit Facilities" to our consolidated financial statements in Part II, Item 8 of this Annual Report on Form 10-K and the information discussed therein is incorporated by reference into this Part II, Item 7. Other than as discussed in this report, we have not engaged in any material off-balance sheet financing arrangements through special purpose entities.

Current wording

In connection with certain projects, we are required to provide letters of credit, surety bonds or guarantees to our customers in the ordinary course of business as credit support for contractual performance guarantees, advanced payments received from customers and future funding commitments. As of January 3, 2025, we had a $1 billion committed line of credit on the Revolver under our Senior Credit Facility and $466 million of bilateral and uncommitted lines of credit. As of January 3, 2025, with respect to our Revolver, we had $345 million of outstanding borrowings. We also have $14 million of outstanding letters of credit on our Senior Credit Facility. With respect to our $466 million of bilateral and uncommitted lines of credit, we utilized $284 million for letters of credit as of January 3, 2025. The total remaining capacity of these committed and uncommitted lines of credit was approximately $823 million as of January 3, 2025, all of which can be used toward issuing letters of credit. Information relating to our letters of credit is described in Note 11 "Debt and Other Credit Facilities" to our consolidated financial statements in Part II, Item 8 of this Annual Report on Form 10-K and the information discussed therein is incorporated by reference into this Part II, Item 7. Other than as discussed in this report, we have not engaged in any material off-balance sheet financing arrangements through special purpose entities.

Previous wording

(b)Determined based on long-term debt borrowings outstanding at the end of 2023 using the interest rates in effect for the individual borrowings as of December 29, 2023, including the effects of interest rate swaps. The payments due for interest reflect the cash interest that will be paid, which includes interest on outstanding borrowings and commitment fees. These amounts exclude the amortization of discounts or debt issuance costs.

Current wording

(a)Determined based on long-term debt borrowings outstanding at January 3, 2025 using the interest rates in effect for the individual borrowings as of January 3, 2025, including the effects of interest rate swaps. The payments due for interest reflect the cash interest that will be paid, which includes interest on outstanding borrowings and commitment fees. These amounts exclude the amortization of discounts or debt issuance costs.

Showing the first 40 of 56 pairs. Open the source sections for the rest.

Rearranged current paragraphs (1)

Current report — wording carried from elsewhere

Internationally, our Government Solutions work is performed primarily for the U.K. MoD and the Australian Department of Defence. In March 2024, the U.K. government announced the defense budget, with the defense budget remaining consistent with the defense budget from the prior fiscal year. A general election was held in the United Kingdom in July 2024, with the
Rearranged previous paragraphs (1)

Previous report — wording carried elsewhere

2023 - 2024 financial year was finalized, with the Australian government increasing defense spending by 5% to AUD 51.0 billion, or approximately 2.00% of GDP.