Duke Energy CORP
For the period ended Sep 30, 2024. Filed Nov 7, 2024.
View on SEC.govAbout this filing
A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.
Sep 30, 2024 · Filed Nov 7, 2024
What changed in Risk Factors?
Read the current filingPrevious report: 10-Q
Period ended 2024-06-30; filed 2024-08-06.
0001326160-24-000167
Item 1A. Risk FactorsCurrent report: 10-Q
Period ended 2024-09-30; filed 2024-11-07.
0001326160-24-000181
Item 1A. Risk FactorsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 17 previous paragraphs and 17 current paragraphs.
15 unchanged; 2 reworded; 0 added; 0 removed; 0 previous and 0 current paragraphs rearranged.
Tables are not compared: 0 previous and 0 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Reworded paragraphs (2)
Previous wording
In addition to the other information set forth in this report, careful consideration should be given to the factors discussed in Part I, “Item 1A. Risk Factors” in the Duke Energy's Annual Report on Form 10-K for the year ended December 31, 2023, which could materially affect the Duke Energy Registrants’ financial condition or future results. The information presented below updates, and should be read in conjunction with, the risk factors and information disclosed in Duke Energy's Annual Report on Form 10-K for the year ended December 31, 2023.
Current wording
In addition to the other information set forth in this report, careful consideration should be given to the factors discussed in Part I, “Item 1A. Risk Factors” in Duke Energy's Annual Report on Form 10-K for the year ended December 31, 2023, which could materially affect the Duke Energy Registrants’ financial condition or future results. The information presented below updates, and should be read in conjunction with, the risk factors and information disclosed in Duke Energy's Annual Report on Form 10-K for the year ended December 31, 2023.
Previous wording
During 2015, EPA regulations were enacted related to the management of CCR from power plants. These regulations classify CCR as nonhazardous waste under the RCRA and apply to electric generating sites with new and existing landfills and, new and existing surface impoundments, and establish requirements regarding landfill design, structural integrity design and assessment criteria for surface impoundments, groundwater monitoring, protection and remedial procedures and other operational and reporting procedures for the disposal and management of CCR. In addition to the federal regulations, CCR landfills and surface impoundments will continue to be regulated by existing state laws, regulations and permits, as well as additional legal requirements that may be imposed in the future, such as the settlement reached with the NCDEQ to excavate seven of the nine remaining coal ash basins in North Carolina, and partially excavate the remaining two, and the EPA's January 11, 2022, issuance of a letter interpreting the CCR Rule, including its applicability and closure provisions. Most recently, in April 2024, the EPA issued its final Legacy Surface Impoundment Rule, which significantly expands the scope of the 2015 CCR Rule to apply to legacy CCR surface impoundments (inactive impoundments at retired facilities) and CCR management units (previously unregulated coal ash sources at regulated facilities). These federal and state laws, regulations and other legal requirements may require or result in additional expenditures, including increased operating and maintenance costs, which could affect the results of operations, financial position and cash flows of the Duke Energy Registrants. The Duke Energy Registrants will continue to seek full cost recovery for expenditures through the normal ratemaking process with state and federal utility commissions, who permit recovery in rates of necessary and prudently incurred costs associated with the Duke Energy Registrants’ regulated operations, and through other wholesale contracts with terms that contemplate recovery of such costs, although there is no guarantee of full cost recovery. In addition, the timing for and amount of recovery of such costs could have a material adverse impact on Duke Energy's cash flows.
Current wording
During 2015, EPA regulations were enacted related to the management of CCR from power plants. These regulations classify CCR as nonhazardous waste under the RCRA and apply to electric generating sites with new and existing landfills and, new and existing surface impoundments, and establish requirements regarding landfill design, structural integrity design and assessment criteria for surface impoundments, groundwater monitoring, protection and remedial procedures and other operational and reporting procedures for the disposal and management of CCR. In addition to the federal regulations, CCR landfills and surface impoundments will continue to be regulated by existing state laws, regulations and permits, as well as additional legal requirements that may be imposed in the future, such as the settlement reached with the NCDEQ to excavate seven of the nine remaining coal ash basins in North Carolina, and partially excavate the remaining two, and the EPA's January 11, 2022, issuance of a letter interpreting the CCR Rule, including its applicability and closure provisions. Most recently, in April 2024, the EPA issued its final Legacy Surface Impoundment Rule, which significantly expands the scope of the 2015 CCR Rule to apply to legacy CCR surface impoundments (inactive impoundments at retired facilities) and CCR management units (previously unregulated coal ash sources at regulated facilities). These federal and state laws, regulations and other legal requirements may require or result in additional expenditures, including increased operating and maintenance costs, which could affect the results of operations, financial position and cash flows of the Duke Energy Registrants. The Duke Energy Registrants will continue to seek full cost recovery for expenditures through the normal ratemaking process with state and federal utility commissions, who permit recovery in rates of reasonable and prudently incurred costs associated with the Duke Energy Registrants’ regulated operations, and through other wholesale contracts with terms that contemplate recovery of such costs, although there is no guarantee of full cost recovery. In addition, the timing for and amount of recovery of such costs could have a material adverse impact on Duke Energy's cash flows.