What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-Q

Period ended 2025-09-30; filed 2025-11-05.

0001296445-25-000012

Item 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

Current report: 10-Q

Period ended 2026-03-31; filed 2026-05-07.

0001296445-26-000008

Item 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 272 previous paragraphs and 228 current paragraphs.

121 unchanged; 74 reworded; 32 added; 59 removed; 18 previous and 1 current paragraphs rearranged.

Tables are not compared: 17 previous and 15 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (32)

Current report

•Our investments in EGS projects involve substantial technical, operational, and geological uncertainties, including risks related to reservoir creation and sustainability, drilling success rates, well productivity, thermal recovery, induced seismicity, permitting, and long-term system performance. There can be no assurance that EGS projects in which we invest will achieve expected technical milestones, operate reliably, or produce energy at commercially viable levels.

Current report

•Competition for power purchase agreements, development sites, interconnection capacity, and skilled personnel may adversely affect our ability to grow our business or maintain favorable contract terms.

Current report

•The absence of new or renewed BLM permits for solar PV projects on U.S. federal lands could impair our development activities, project pipeline and growth prospects.

Current report

•Litigation, legal proceedings, regulatory investigations or other administrative proceedings could expose us to significant liabilities and reputational damage that could have a material adverse effect on us.

Current report

•We may not be able to obtain sufficient insurance coverage to cover damages to our assets and profitability.

Current report

•In April, we signed a long-term Power Purchase Agreement (“PPA”) with NV Energy for the Jersey Valley solar plus storage project, to be located in Lander County, Nevada, subject to Nevada PUC approval. The Jersey Valley project is expected to include approximately 67 MW of solar generation capacity paired with 67 MW / 268 MWh of battery energy storage. The project is expected to achieve commercial operation late in 2027 or early 2028. All output from the project is planned to be sold under the long-term, fixed-price PPA, supporting NV Energy’s clean energy objectives while providing Ormat with predictable, long-term contracted revenues.

Current report

•In March 2026, we closed a private offering of $1.0 billion aggregate principal amount of convertible senior notes. The offering consists of $825 million aggregate principal amount of 1.50% Series A Convertible Senior Notes due 2031 (the “Series A Notes”) and $175 million aggregate principal amount of 0.00% Series B Convertible Senior Notes due 2031 (the “Series B Notes” and, together with the Series A Notes, the “2031 Convertible Notes”). The 2031 Convertible Notes were sold to persons reasonably believed to be qualified institutional buyers pursuant to Rule 144A under the Securities Act of 1933, as amended (the “Securities Act”).The Series A Notes will bear interest at a rate of 1.50% per year, payable semi-annually in arrears, and the Series B Notes will not bear regular interest. Both series of 2031 Convertible Notes will mature on March 15, 2031, unless earlier converted, redeemed or repurchased in accordance with their terms. Holders of the Series B Notes will have the right to require the Company to repurchase all or a portion of their 2031 Convertible Notes on March 15, 2027, at a repurchase price equal to 100% of the principal amount, plus any accrued and unpaid special interest, if any. The initial conversion price for both series reflects a premium of 30% over the Company’s common stock price at the time of pricing.

Current report

•In March 2026, we commenced commercial operations of the Shirk energy storage facility, an 80MW/320MWh Battery Energy Storage System (BESS) located in Visalia, California. The Shirk energy storage facility secures capacity under a 15-year Resource Adequacy Purchase and Sale Agreement (RA Agreement) with the City of Riverside, supporting grid reliability and helping meet California’s growing demand for flexible energy resources.

Current report

The Shirk project qualifies for a 40% Investment Tax Credit (ITC), which the Company monetized the tax benefits as part of the hybrid tax equity partnership with Morgan Stanley Renewables, Inc. that Ormat announced in May 2025, which supports the funding and optimization of the Company’s growing energy storage portfolio.

Current report

•In March 2026, we announced the signing and approval of amendments to the existing power purchase agreements (PPAs) with Central Coast Community Energy (3CE) and Silicon Valley Clean Energy (SVCE) for a portion of the output from the 35MW Casa Diablo-IV (CD4) geothermal power plant, part of our Mammoth geothermal complex in California. The amended agreements cover a total of 15MW of contracted capacity. The remaining output from the CD4 facility is sold to the Southern California Public Power Authority (SCPPA), The amended agreements extend the original PPAs, which were signed in 2022 and scheduled to expire in 2032, by five additional years through 2037. We believe the execution of these contracts is in line with the Company’s “blend-and-extend” strategy, aimed at proactively re-contracting existing agreements ahead of expiration while securing improved, demand-driven economics.

Current report

•In February 2026, we entered into a long-term geothermal portfolio PPA to supply up to 150MW of new geothermal capacity to support Google’s data center’s energy needs, through NV Energy’s Clean Transition Tariff program. The portfolio structure is expected to enable the development of multiple new geothermal projects across Nevada, with energy deliveries anticipated to commence between 2028 and 2030 as projects reach commercial operations. Per the PPA structure, the contract term begins with the first geothermal project achieving commercial operations and extends 15 years beyond the final project’s commercial operations date. The agreement and related energy supply arrangements are subject to approval by the Nevada PUC, which is expected in the second half of 2026.

Current report

•In January 2026, we acquired Hoku, a recently built operational solar-plus-storage facility on the Big Island of Hawaii, from Innergex Renewable Energy Inc. for total cash consideration of $79.3 million. The acquired assets include a 30MW solar PV facility paired with a 30MW/120MWh battery energy storage system, which achieved commercial operation in March 2025 and is fully operational. All output from the facility is sold under a 25-year fixed-price power purchase agreement with HECO.

Current report

•In January 2026, we were awarded the Telaga Ranu geothermal working area concession in Indonesia following a competitive tender process. The concession is located in Halmahera, North Maluku, within one of Indonesia’s highest approved feed-in tariff zones and has the potential to support up to approximately 40MW of baseload geothermal generation capacity. This award strengthens our long-term development pipeline and supports our continued growth strategy in Indonesia.

Current report

•In January 2026, we entered into a new 20-year PPA with Switch, Inc., a leading provider of data center infrastructure, pursuant to which Switch will purchase approximately 13MW of carbon-free geothermal capacity from our Salt Wells geothermal power plant located near Fallon, Nevada. Under the agreement, energy deliveries are scheduled to commence in the first quarter of 2030, following the completion of a planned major upgrade to the Salt Wells facility. As part of the agreement, we also have the rights to further expand the facility’s output through the addition of an approximately 17MW solar PV facility to support the plant’s auxiliary power needs.

Current report

Revenues attributable to our Electricity segment for the three months ended March 31, 2026 were $181.6 million, compared to $180.2 million for the three months ended March 31, 2025. This increase of $1.4 million was mainly attributable to: (i) $3.2 million related to the Blue Mountain power plant which was purchased in June 2025; (ii) $4.3 million related to the Olkaria power plant primarily due increase in generation resulting from a successful drilling of additional wells, reduction in curtailments and better resource utilization; and (iii) $2.8 million related to the Dixie Valley power plant primarily as a result of reduction in curtailments from SCE. This increase was partially offset by: (i) $3.7 million decrease in revenues in our Puna power plant, primarily due to reduction in Puna’s energy rates that are tied to oil prices as well as lower generation due to adverse weather during the first quarter of 2026 which disrupted the power plant operations; (ii) $3.3 million decrease in revenues in our Heber complex primarily due to planned maintenance work. In addition, unfavorable ambient temperatures in the first quarter of 2026 resulted in a decline in generation and, consequently, in revenues across our fleet and primarily in Steamboat with a $1.0 million reduction, the MGH complex with a $0.9 million reduction, and at Stillwater with a $0.4 million reduction.

Current report

Total cost of revenues attributable to our Electricity segment for the three months ended March 31, 2026 was $125.7 million, compared to $119.8 million for the three months ended March 31, 2025, which represents an increase of $5.9 million, or 4.9%. This increase is primarily attributable to $2.0 million related to the Blue Mountain power plant which was purchased in June 2025, $2.4 million increase in power plant depreciation expenses, as a result of our investment in our power plant, and to other smaller amount increases in certain other power plants.

Current report

Impairment of long-lived assets for the three months ended March 31, 2026 of $8.1 million is related to the Pomona 1 battery energy storage facility. During the first quarter of 2026, the Company approved a project to construct the new Pomona 3 storage facility which will replace the existing Pomona 1 storage facility. The Pomona 1 storage facility is scheduled for demolishing in late 2026 to facilitate the construction of the new storage facility. There was no impairment of long-lived assets during the three months ended March 31, 2025.

Current report

Interest expense, net for the three months ended March 31, 2026 was $45.0 million, compared to $34.5 million for the three months ended March 31, 2025. This increase of $10.5 million was primarily attributable to interest expense relating to loan agreements and tax monetization transactions entered into subsequently to the first quarter of 2025, as well as lower amount of interest capitalized due to the completion of certain of construction-in-process projects. This increase was partially offset by lower interest expenses on other existing loans as a result of their scheduled payments.

Current report

Other non-operating income (expense), net for the three months ended March 31, 2026 was an expense of $23.1 million, compared to an income of $0.2 million for the three months ended March 31, 2025. Other non-operating income for the three months ended March 31, 2026 is primarily related to the induced conversion expense of $33.7 million resulting from the repurchase of the 2027 Convertible Notes, offset primarily by a bargain purchase gain of $9.6 million related to the purchase transaction of the Hoku storage and solar facility.

Current report

(*)Holders of the Series B Notes may require the Company to repurchase their Series B Notes for cash on March 15, 2027.

Current report

The 2031 Convertible Notes, including the Series A Notes and the Series B Notes, were issued in March 2026. We issued $825 million aggregate principal amount of Series A Notes and $175 million aggregate principal amount of Series B Notes.

Current report

The Series A Notes bear interest at a rate of 1.50% per year, payable semi-annually in arrears, and the Series B Notes will not bear regular interest. Both series of 2031 Convertible Notes will mature on March 15, 2031, unless earlier converted, redeemed or repurchased. Holders of the Series B Notes will have the right to require the Company to repurchase all or a portion of their 2031 Convertible Notes on March 15, 2027, at a repurchase price equal to 100% of the principal amount, plus any accrued and unpaid special interest, if any.

Current report

Net income for the three months ended March 31, 2026 was $44.6 million, compared to $41.0 million for the three months ended March 31, 2025.

Current report

Stillwater Upgrade (U.S.). We are upgrading the power plant that was purchased in January 2024 to add 5MW. The upgrade has been completed with a partial 2MW contribution to the power plant. We expect the rest of the MW to contribute in Q1 2027.

Current report

Greenfield (U.S.). We are developing a 30MW geothermal power plant in Nevada. Engineering and procurement commenced and we expect commercial operation at the end of 2027 or early 2028.
Removed paragraphs (59)

Previous report

•Responses in various countries where we have business operations to Israel’s ongoing military conflicts on some of its borders or future similar conflicts may adversely affect our operations and may limit our ability to produce and sell our products.

Previous report

•We encounter intense competition from electric utilities, other power producers, power marketers, developers and third-party investors.

Previous report

•The capped call transactions, into which we entered in connection with the issuance of the June 2022 convertible notes, (the "Notes"), may affect the value of the Notes and our common stock and we are subject to counterparty risk with respect to the capped call transactions.

Previous report

•We may issue additional shares of our common stock in connection with conversions of the Notes, and thereby dilute our existing stockholders and potentially adversely affect the market price of our common stock.

Previous report

•The fundamental change provisions of the Notes may delay or prevent an otherwise beneficial takeover attempt of us.

Previous report

Investors are cautioned that these forward-looking statements are inherently uncertain. Should one or more of these risks or uncertainties materialize, or should underlying assumptions prove incorrect, actual results or outcomes may vary materially from those described herein. Other than as required by law, we undertake no obligation to update forward-looking statements even though our situation may change in the future. Given these risks and uncertainties, readers are cautioned not to place undue reliance on such forward-looking statements.

Previous report

•In October 2025, the Company and SLB announced an agreement to fast-track the development and commercialization of integrated geothermal assets, including enhanced geothermal systems (“EGS”). Together, Ormat and SLB intend to streamline project deployment, from concept to power generation. As part of this effort, SLB will develop, pilot and scale EGS solutions to enable wide-scale EGS adoption. This collaboration will include the design and construction of an EGS pilot at an Ormat site.

Previous report

•In September 2025, we successfully commenced the commercial operations of our 60MW/120MWh Lower Rio energy storage facility, located in Texas. This facility will provide energy and ancillary services under a seven-year tolling agreement.

Previous report

•In August 2025, we signed two Geothermal Exploration and Energy Conversion Agreements (“GEECA”), a novel form of power purchase agreement, with Perusahaan Listrik Negara (“PLN”), each covering up to 20 MW of geothermal capacity each in Songa Wayaua and Atadei located in Indonesia. Under the terms of these agreements, the Company, through its project companies, will undertake exploration drilling, finance, design, construct, install, and operate the Geothermal Power Plant on a BOT (“Build, Operate and Transfer”) basis , with a 23 year operating term. PLN will reimburse the cost of successful drilling and retains the option to acquire up to a 30% equity interest in the project companies.

Previous report

•In August 2025, we announced the signing of a 25-year extension to its existing power purchase agreement with the Southern California Public Power Authority (“SCPPA”), for the 52MW from Heber 1 geothermal facility. This long-term agreement, which is effective February 2026, will ensure the continued delivery of clean, baseload geothermal energy to the Los Angeles Department of Water and Power and the Imperial Irrigation District. The

Previous report

Company will supply the SCPPA with electricity from the Ormat Heber 1 geothermal facility, located in the Imperial Valley of Southern California.

Previous report

•In July 2025, we entered into loan agreements with a consortium of French banks pursuant to which we will borrow up to approximately €99.8 million aggregate principal amount in connection with our new Bouillante geothermal power plant in Guadeloupe.

Previous report

•In July 2025, we entered into a tax partnership agreement with a private investor, under which the private investor paid approximately $77.1 million for the tax benefits related to the Heber 1&2 Geothermal power plants that are part of our Heber Complex. The private investor will pay over eight years additional installments that are expected to amount to approximately $25.7 million.

Previous report

•In June, 2025, we entered into loan agreements with the Caribbean Development Bank and Caricom Development Fund pursuant to which we will borrow up to $49.8 million aggregate principal amount in connection with the 10MW Geothermal Project in Dominica.

Previous report

•In June 2025, we closed the acquisition of the Blue Mountain geothermal power plant from Cyrq Energy. The 20MW facility, located in Humboldt County, NV, was purchased for $88.7 million for 100% of the equity interest in the power plant. The power plant, built using Ormat technology, features an existing 51MW interconnection capacity and a PPA with NV Energy (“NVE”) that expires at the end of 2029. The Company plans to upgrade the power plant and increase its capacity by 3.5MW. Additionally, subject to permit and PPA approval, Ormat intends to add a 13MW solar facility to support the plant's auxiliaries.

Previous report

•In May 2025, we announced the signing of a $62.0 million Hybrid Tax Equity partnership with Morgan Stanley Renewables, Inc. The partnership’s transaction covers the Lower Rio 60MW/120MWh storage facility and the Arrowleaf 35MW/140MWh storage and 42MW solar projects, which are expected to achieve Commercial Operation Date (“COD”) by the end of 2025.

Previous report

•In February 2025, we won a tender issued by the Israeli Electricity Authority and have been awarded two separate 15-year tolling agreements for two Energy Storage facilities. The facilities under the tolling agreements are expected to have a combined capacity of approximately 300MW/1200MWh. The ownership of the projects will be shared, 50/50 between Ormat and Allied Infrastructure LTD, a leading infrastructure company in Israel.

Previous report

•In February 2025, we announced the successful COD for the Ijen geothermal power plant that is owned jointly with PT Medco Power Indonesia (“Medco Power”). The Ijen Geothermal Power Plant, equipped with Ormat Energy Converter, began operations with its first phase, delivering 35MW of electricity power to the Java grid, Ormat’s share of the facility is 17MW.

Previous report

•In January 2025, we announced the signing of a 10-year PPA with Calpine Energy Solutions, one of North America’s largest energy suppliers. Under this agreement, Calpine Energy Solutions agreed to purchase up to 15MW of clean, renewable energy from the Mammoth 2 geothermal power plant located near Mammoth Lakes, California, to support demand within its retail portfolio. Energy deliveries under the PPA are scheduled to begin in the first quarter of 2027 and will replace the existing PPA with Southern California Edison. The new PPA includes an increase in production capacity and a higher price point.

Previous report

•Throughout 2025, the United States introduced actions to increase import tariffs at various rates, including on certain products imported from almost all countries and individualized higher tariffs on certain other countries, such as China. Other countries have announced retaliatory actions or plans for retaliatory actions in response. Some of these tariff announcements were followed by limited exemptions and temporary pauses. As of the date of this quarterly report, discussions remain ongoing regarding U.S. trade restrictions and tariffs on imports and retaliatory tariffs from numerous countries, and while certain of these tariffs and other trade restrictions have already taken effect, there continues to be significant uncertainty about the future relationship between the United States and other countries regarding such trade policies, treaties, and tariffs. Accordingly, we can make no assurance about the eventual impact on our operating results and business. Our Energy Storage segment growth relies on imported batteries from China, and the growth of projects in the United States in the Electricity segment requires raw materials and equipment from various countries.

Previous report

While there has so far been only limited impact on short-term growth in both of these segments, a significant increase in tariffs may lead to a slowdown in the growth of our Energy Storage segment in the United States if we are unable to pass the price increases from tariffs through to our customers. This could affect our long-term growth targets, specifically in our Energy Storage segment in the United States, and, to a lesser extent, across our business. Additionally, increases in the cost of raw materials and equipment resulting from tariffs could increase our capital expenditures for projects built in the United States under our Electricity segment. We have worked to accelerate imports into the United States and have expedited Chinese imports prior to the potential reinstatement of higher tariffs. However, we can make no assurance that we will succeed in avoiding any of these negative consequences. In addition, current uncertainties about tariffs and their effects on trading relationships may contribute to inflation in the markets in which we operate. For more information, see Part II, Item 1A “Risk Factors”

Previous report

•On July 4, 2025, the OBBB was signed into law by the President of the United States. Rules under the OBBB were updated in August 2025. For more information, see Note 10 of notes to the unaudited condensed consolidated financial statements contained in this quarterly report. The Company is currently evaluating the impact of the OBBBA on its consolidated financial statements, however, it does not expect the impact to be material.

Previous report

Revenues attributable to our Electricity segment for the three months ended September 30, 2025 were $167.1 million, compared to $164.6 million for the three months ended September 30, 2024. This increase of $2.5 million was mainly attributable to: (i) $2.9 million increase related to the Blue Mountain power plant which was purchased in June 2025; and (ii) $4.0 million increase compared to the third quarter of 2024 during which the Dixie Valley power plant had an unscheduled outage. This increase was partially offset by $3.2 million decrease in revenues primarily due to reduction in Puna’s energy rates that are tied to oil prices and by $1.7 million increase in curtailments in the U.S..

Previous report

Total cost of revenues attributable to our Electricity segment for the three months ended September 30, 2025 was $124.6 million, compared to $114.9 million for the three months ended September 30, 2024, which represents an increase of $9.6 million, or 8.4%. This increase is primarily attributable to (i) an increase in the power plant depreciation expenses of $5.8 million, as a results of our investments in our power plants; (ii) an increase of $1.3 million in the Stillwater power plant as a result of maintenance work during the third quarter of 2025; (iii) a $1.4 million increase in the Steamboat complex, primarily as a result of a property tax refund which was recorded in the third quarter of 2024; and (vi) a $0.8 million increase related to the Blue Mountain power plant which was purchased in June 2025.

Previous report

There was no impairment of long-lived assets in the three months ended September 30, 2025. Impairment of long-lived assets for the three months ended September 30, 2024 of $0.3 million is related to the termination of the waste heat agreement between the Company's wholly-owned subsidiary, OREG 4, and Highline Electric Association, Inc., effective May 2024.

Previous report

Interest expense, net for the three months ended September 30, 2025 was $35.7 million, compared to $34.8 million for the three months ended September 30, 2024. This increase of $0.9 million was primarily attributable to interest expense relating to loan agreements entered into during, or subsequently to, the third quarter of 2024 such as: (i) the Discount 2024 II loan entered into in September 2024; (ii) the issuance of the Additional 2.50% Senior Convertible Notes in July 2024; (iii) the Bottleneck Loan entered into in November 2024; (iv) the Mizrahi 2025 Loan entered into in February 2025; (v) the Discount 2025 Loan and Hapoalim 2025 Loan entered into in March 2025; and (vi) the Discount 2025 II Loan entered into in May 2025; (vii) the GB Loan entered into in July 2025; and (vii) the Heber 1 and 2 tax monetization transaction entered into in July 2025. This increase was partially offset by an increase in the amount of interest capitalized due to an increase in the construction-in-process balance, period over period, as well as lower interest expenses on other existing loans as a result of scheduled payments.

Previous report

Other non-operating income (expense), net for the three months ended September 30, 2025 was an income of $0.1 million, compared to an income of $22.0 thousand for the three months ended September 30, 2024.

Previous report

Comparison of the Nine Months Ended September 30, 2025 to the Nine Months Ended September 30, 2024

Previous report

The table below compares revenues for the nine months ended September 30, 2025 to the nine months ended September 30, 2024.

Previous report

Revenues attributable to our Electricity segment for the nine months ended September 30, 2025, were $507.3 million, compared to $522.1 million for the nine months ended September 30, 2024. The decrease of $14.9 million in our Electricity segment revenues was mainly attributable to: (i) a $9.6 million decrease in revenues due to a temporary reduction in generation in our Puna power plant, primarily caused by wellfield issues during the first half of 2025 and lower energy rates in the third quarter; (ii) a $15.6 million decrease in revenues primarily related to curtailments from McGinness Hills, Tungsten and Dixie Valley; (iii) a $3.2 million decrease in revenues related to the Stillwater power plant, primarily due to planned repowering of the power plant; and (iv) an additional reduction in revenues in lower amounts at a number of other power plants. This decrease was partially offset by (i) a $3.3 million increase in revenues related to the Blue Mountain power plant which was purchased in June 2025; (ii) a $4.3 million increase in revenues related to the Beowawe repower project which commenced commercial operation in the second quarter of 2024; and (iii) a $4.2 million increase in revenues in the Dixie Valley power plant, net of curtailment, due to the unscheduled maintenance work in 2024.

Previous report

Power generation in our power plants decreased by 1.8% from 5,437,679 MWh in the nine months ended September 30, 2024 to 5,338,053 MWh in the nine months ended September 30, 2025.

Previous report

Revenues attributable to our Product segment for thenine months ended September 30, 2025 were $153.6 million, compared to $100.0 million for thenine months ended September 30, 2024. This increase of $53.6 million, or 53.6%, is primarily related to the progress in our projects which results in the timing of when revenues are recognized. During thenine months ended September 30, 2025, and 2024, Product revenues included projects primarily in New Zealand and Dominica.

Previous report

Revenues attributable to our Energy Storage segment for the nine months ended September 30, 2025 were $52.6 million compared to $26.8 million for the nine months ended September 30, 2024. The increase of$25.8 millionis primarily related to (i)the East Flemington energy storage facility which commenced commercial operations during the first quarter of 2024; (ii) the Bottleneck, Montague, and Lower Rio energy storage facilities which commenced commercial operation in the fourth quarter of 2024 or later; and (iii) higher energy rates at PJM storage facilities in the nine months ended September 30, 2025, compared to the same period in the previous year.

Previous report

The table below compares cost of revenues for the nine months ended September 30, 2025 to the nine months ended September 30, 2024.

Previous report

Total cost of revenues attributable to our Electricity segment for the nine months ended September 30, 2025 was $365.7 million, compared to $342.2 million for the nine months ended September 30, 2024, which represents an increase of $23.5 million, or 6.9%. This increase is primarily attributable to (i) an increase in power plants depreciation expenses of $15.9 million, as a result of our investments in our power plants; (ii) an increase of $3.8 million and $2.0 million, in the CD4 power plant and the Heber complex, respectively, primarily associated with property tax expenses relating to prior years which were recorded in 2025; (iii) an increase of $1.3 million in the Stillwater power plant as a result of maintenance work during the third quarter of 2025; and (iv) additional increases in lower amounts in our other power plants.

Previous report

Cost of revenues attributable to our Energy Storage segment for the nine months ended September 30, 2025 was $37.4 million compared to $23.7 million for the nine months ended September 30, 2024. This increase of $13.7 million includes an increase of $7.3 million in depreciation and amortization expenses, and is primarily related to the new energy storage facilities which commenced commercial operation in the fourth quarter of 2024 or later such as Bottleneck, Montague, and Lower Rio.

Previous report

Research and development expenses for the nine months ended September 30, 2025 were $5.3 million, compared to $5.1 million for the nine months ended September 30, 2024. The increase in research and development expenses is mainly attributable to the timing of when we allocate resources to research and development projects.

Showing the first 40 of 59 passages. Open the source sections for the rest.

Reworded paragraphs (74)

Previous wording

•Our exploration, development, and operation of geothermal energy resources are subject to geological risks and uncertainties, which may result in insufficient prospects to support our growth, decreased performance or increased costs for our power plants.

Current wording

•Our exploration, development, and operation of geothermal energy resources are subject to geological risks and uncertainties.

Previous wording

•Our investments in BESS technology involves new technologies and expected advanced technologies with relatively limited history with respect to reliability and performance and may not perform as expected. In addition, our investments and profitability may be negatively affected by a number of factors, including increases in storage costs, expanded trade restrictions, risk of fire and volatility in merchant prices.

Current wording

•Our investments and profitability in Battery Energy Storage System (BESS) may be negatively affected by a number of factors, including increases in storage costs, expanded trade restrictions, risk of fire, volatility in merchant prices and competition.

Previous wording

•Conditions in and around Israel, where the majority of our senior management and our main production and manufacturing facilities are located, may adversely affect our operations and may limit our ability to produce and sell our products, and support our Electricity segment.

Current wording

•Conditions in and around Israel (including conflicts involving Iran and its proxies) where much of our senior management and our main Product segment production and manufacturing facilities are located, may adversely affect our operations and may limit our ability to produce and sell our products, and may limit our ability to support our operations.

Previous wording

•Some of our leases will terminate if we do not extract geothermal resources in “commercial quantities” or if we fail to comply with the terms or stipulations of such leases or any of the provisions of the Geothermal Steam Act or if the lessor under any such lease defaults on any debt secured by the relevant property, thus requiring us to enter into new leases or secure rights to alternate geothermal resources, none of which may be available on terms as favorable to us as any such terminated lease, if at all.

Current wording

•Some of our leases will terminate if we do not extract geothermal resources in “commercial quantities” or fail to comply with such leases or applicable law or if the lessor under any such lease defaults on any debt secured by the relevant property.

Previous wording

•Our business development activities may not be successful and our projects under construction or facilities undergoing enhancement and repowering may encounter delays.

Current wording

•Our business development activities may not be successful and our projects under construction or facilities undergoing enhancement and repowering may be delayed due to permitting, regulatory, interconnection and other factors.

Previous wording

•The reduction, elimination or inability to monetize government incentives could adversely affect our business, financial condition, future results and cash flows.

Current wording

•The reduction, elimination or inability to monetize government incentives and tax credits could adversely affect our business, financial condition, future results and cash flows.

Previous wording

•We are a holding company and our cash depends substantially on the performance of our subsidiaries and the power plants they operate, most of which are subject to restrictions and taxation on dividends and distributions.

Current wording

•Our operations are primarily conducted through our subsidiaries, which are separate legal entities, and our ability to generate cash depends substantially on the performance of our subsidiaries and the power plants they operate, most of which are subject to restrictions and taxation on dividends and distributions.

Previous wording

•The costs of compliance with federal, state, local and foreign environmental laws and our ability to obtain and maintain environmental permits and governmental approvals required for development, construction and/or operation may result in liabilities, costs and delays in construction (as well as any fines or penalties that may be imposed upon us in the event of any non-compliance or delays with such laws or regulations).

Current wording

•The costs of compliance with federal, state, local and foreign environmental laws and our ability to obtain and maintain environmental permits and governmental approvals required for development, construction and/or operation, may result in liabilities, increased costs and delays in construction (as well as fines or penalties that may be imposed upon us in the event of non-compliance with such laws or regulations).

Previous wording

•Our power plants have generally been financed through a combination of our corporate funds and limited or non-recourse project finance debt and lease financing. If our project subsidiaries default on their obligations under such limited or non-recourse debt or lease financing, we may be required to make certain payments to the relevant debt holders, and if the collateral supporting such leveraged financing structures is foreclosed upon, we may lose certain of our power plants.

Current wording

•If our project subsidiaries default on their obligations under debt or lease financing arrangements, we may be required to make payments to the relevant debt holders, and if the collateral is foreclosed upon, we may lose certain of our power plants.

Previous wording

We are a leading vertically integrated company that is primarily engaged in the geothermal energy power business. We leverage our core capabilities and global presence to expand our activity in recovered energy generation and into different energy storage services and solar PV (including hybrid geothermal and solar PV as well as solar plus energy storage). Our objective is to become a leading global provider of renewable energy and help to mitigate climate change by providing a replacement to carbon-intensive energy sources. We have adopted a strategic plan to focus on several key initiatives to expand our business.

Current wording

We are a leading vertically integrated company primarily engaged in the geothermal power business. We leverage our core capabilities, proprietary technologies, and global presence to expand our activities in conventional geothermal development, recovered energy generation and emerging geothermal technologies, including piloting of new EGS technologies. In addition, we are expanding into different complementary energy solutions, including stand-alone utility scale energy storage services and solar PV generation (including hybrid geothermal and solar PV as well as solar plus energy storage). Our objective is to become a leading global provider of renewable energy and to help mitigate climate change by providing reliable base-load and flexible alternatives to carbon-intensive energy sources. To support this objective, we have adopted a strategic plan focused on several key initiatives to expand our business, including advancing EGS through collaborations and pilot projects, diversifying our renewable energy offerings, and leveraging our operational expertise to drive long-term growth.

Previous wording

•Electricity Segment. In the Electricity segment, we develop, build, own and operate geothermal, solar PV and recovered energy-based power plants in the United States and geothermal power plants in other countries around the world and sell the electricity they generate. In the three and nine months ended September 30, 2025, we derived 70.8% and 71.8%, respectively, of our Electricity segment revenues from our operations in the United States, and 29.2% and 28.2%, respectively, from the rest of the world.

Current wording

•Electricity Segment. In the Electricity segment, we develop, build, own and operate geothermal, solar PV and recovered energy-based power plants in the United States and geothermal power plants in other countries around the world and sell the electricity they generate. In the three months ended March 31, 2026, we derived 72.5% of our Electricity segment revenues from our operations in the United States and 27.5% from the rest of the world.

Previous wording

•Product Segment. In the Product segment, we design, manufacture and sell equipment for geothermal and recovered energy-based electricity generation and provide services relating to the engineering, procurement and construction of geothermal and recovered energy-based power plants. In the three and nine months ended September 30, 2025, we derived 4.9% and 6.4%, respectively, of our Product segment revenues from our operations in the United States and 95.1% and 93.6%, respectively, from the rest of the world.

Current wording

•Product Segment. In the Product segment, we design, manufacture and sell equipment for geothermal and recovered energy-based electricity generation and provide services relating to the engineering, procurement and construction of geothermal and recovered energy-based power plants. In the three months ended March 31, 2026, we derived 1.2% of our Product segment revenues from our operations in the United States and 98.8% from the rest of the world.

Previous wording

•Energy Storage Segment. In the Energy Storage segment, we own and operate grid connected In Front of the Meter BESS, which provide capacity, energy and/or ancillary services directly to the electric grid. In the three and nine months ended September 30, 2025, we derived all of our Energy Storage segment revenues from our operations in the United States.

Current wording

•Energy Storage Segment. In the Energy Storage segment, we own and operate grid connected, stand alone In Front of the Meter BESS facilities, which provide capacity, energy and/or ancillary services directly to the electric grid. We operate our facilities in three main areas in the U.S., California, Texas and the East Coast (mainly in the PJM market) and generate our revenues mainly from the sale of ancillary services in the merchant market and /or tolling agreements and RA contracts. In the three months ended March 31, 2026, we derived all of our Energy Storage segment revenues from our operations in the United States.

Previous wording

•In August 2025, we announced the signing of a strategic commercial agreement with Sage Geosystems Inc. (“Sage”), a pioneer in next-generation geothermal and energy storage technology. Under the terms of the agreement, Sage will pilot its advanced pressure geothermal technology to extract geothermal heat energy from hot dry rock at an existing Ormat power plant. This collaboration aims to significantly reduce the time needed to bring geothermal energy to market and is expected to enhance the Company’s operational efficiency while accelerating the implementation of next-generation geothermal solutions. The strategic commercial agreement is expected to close by the end of 2025.

Current wording

•In January 2026, we made a $25 million investment in Sage Geosystems Inc. (“Sage”) as part of Sage’s Series B financing round. This investment represents an important milestone in our strategy to expand our EGS portfolio and capabilities and supports the continued development and commercialization of next-generation geothermal technology. In August 2025, we also announced the signing of a strategic commercial agreement with Sage. Under the terms of the agreement, Sage will pilot its advanced pressure geothermal technology to extract geothermal heat energy from hot dry rock at an existing Ormat power plant. This collaboration aims to significantly reduce the time needed to bring geothermal energy to market and is expected to enhance the Company’s operational efficiency while accelerating the implementation of next-generation geothermal solutions. The strategic commercial agreement was closed.

Previous wording

For the nine months ended September 30, 2025, 93.6% of our Electricity segment revenues were derived from PPAs with fixed energy rates, which are not affected by fluctuations in energy commodity prices. We have a variable price PPA in Hawaii, which provides for payments based on the local utilities’ avoided cost, which is the incremental cost that the power purchaser avoids by not having to generate such electrical energy itself or purchase it from others. In Hawaii, the prices paid for electricity pursuant to the 25MW PPA for the Puna Complex in Hawaii change primarily as a result of variations in the price of oil, as well as other commodities. In 2024, the HPUC approved a new PPA related to Puna with fixed prices, increased capacity and an extension of the term until 2052.

Current wording

For the three months ended March 31, 2026, 94.7% of our Electricity segment revenues were derived from PPAs with fixed energy rates, which are not affected by fluctuations in energy commodity prices. We have a variable price PPA in Hawaii, which provides for payments based on the local utilities’ avoided cost, which is the incremental cost that the power purchaser avoids by not having to generate such electrical energy itself or purchase it from others. In Hawaii, the prices paid for electricity pursuant to the 25MW PPA for the Puna Complex in Hawaii change primarily as a result of variations in the price of oil, as well as other commodities. In 2024, the HPUC approved a new PPA related to Puna with fixed prices, increased capacity and an extension of the term until 2052, which we expect to be in effect in 2027.

Previous wording

Revenues attributable to our Energy Storage segment are generated by several grid-connected BESS facilities that we own and operate that sell energy, capacity and/or ancillary services in merchant markets like PJM Interconnect, ISO New England, ERCOT and CAISO or under tolling agreements that have fixed revenues. The revenues fluctuate over time since a large portion of such revenues are generated in the merchant markets, where price volatility is inherent. We are seeking to reduce volatility by increasing the amount of long-term tolling agreements in our portfolio.

Current wording

Revenues attributable to our Energy Storage segment are generated by several grid-connected BESS facilities that we own and operate from selling energy, capacity and/or ancillary services in merchant markets like PJM Interconnect, ISO New England, ERCOT and CAISO or under tolling agreements that have fixed revenues. The revenues fluctuate over time since a large portion of such revenues are generated in the merchant markets, where price volatility is inherent. We are seeking to reduce volatility by increasing the amount of long-term tolling agreements in our portfolio. In the two solar PV plus energy storage facilities, although the solar capacity is included in the Electricity Segment portfolio, 100% of the revenues are recorded under the Energy Storage segment.

Previous wording

In the nine months ended September 30, 2025 and 2024, 40.2% and 36.4% of our total revenues, respectively, were derived from foreign locations, and 43.2% and 38.7%, for the three months ended September 30, 2025 and 2024, respectively. Our foreign operations had higher Electricity gross margins than our U.S. operations in each of those periods. A substantial portion of Electricity segment foreign revenues came from Kenya and to a lesser extent, from Honduras, Guadeloupe and Guatemala. Our operations in Kenya contributed disproportionately to gross profit and net income. The contribution to combined pre-tax income of our domestic and foreign operations within our Electricity segment and Product segment differ in a number of ways, as summarized below.

Current wording

In the three months ended March 31, 2026 and 2025, 55.8% and 32.4% of our total revenues, respectively, were derived from foreign locations. Our foreign operations had higher Electricity gross margins than our U.S. operations in each of those periods. A substantial portion of Electricity segment foreign revenues came from Kenya and to a lesser extent, from Honduras, Guadeloupe and Guatemala. Our operations in Kenya contributed disproportionately to gross profit and net income. The contribution to combined pre-tax income of our domestic and foreign operations within our Electricity segment and Product segment differ in a number of ways, as summarized below.

Previous wording

Electricity Segment. Our Electricity segment domestic revenues were approximately 71.8% and 72.9% of our total Electricity segment revenues for the nine months ended September 30, 2025 and 2024, respectively, and 70.8% and 71.0%, for the three months ended September 30, 2025 and 2024, respectively. Our Electricity segment foreign revenues were approximately 28.2% and 27.1% of our total Electricity segment revenues for the nine months ended September 30, 2025 and 2024, respectively and 29.2% and 29.0%, for the three months ended September 30, 2025 and 2024, respectively. However, domestic operations have higher costs of revenues and expenses than our foreign operations. Our foreign power plants are located in lower-cost regions, like Kenya, Guatemala, and Honduras, which favorably impact payroll, maintenance expenses and other items. Our power plants in those foreign locations are also newer than most of our domestic power plants and therefore tend to have lower maintenance costs and higher availability factors than our domestic power plants. Consequently, in the nine months ended September 30, 2025 and 2024, our foreign operations of the segment accounted for 40.7% and 40.2%, respectively, of our total gross profits, 78.6% and 79.7%, respectively, of our net income (assuming the majority of corporate operating expenses and financing are recorded under our domestic jurisdiction), and 29.2% and 31.2%, respectively, of our EBITDA.

Current wording

Electricity Segment. Our Electricity segment domestic revenues were approximately 72.5% and 74.5% of our total Electricity segment revenues for the three months ended March 31, 2026 and 2025, respectively. Our Electricity segment foreign revenues were approximately 27.5% and 25.5% of our total Electricity segment revenues for the three months ended March 31, 2026 and 2025, respectively. However, domestic operations have higher costs of revenues and expenses than our foreign operations. Our foreign power plants are located in lower-cost regions, like Kenya, Guatemala, and Honduras, which favorably impact payroll, maintenance expenses and other items. Our power plants in those foreign locations are also newer than most of our domestic power plants and therefore tend to have lower maintenance costs and higher availability factors than our domestic power plants. Consequently, in the three months ended March 31, 2026 and 2025, our foreign operations of the segment accounted for 22.6% and 34.8%, respectively, of our total gross profits, 30.1% and 38.1%, respectively, of our net income (assuming the majority of corporate operating expenses and financing are recorded under our domestic jurisdiction), and 26.3% and 26.5%, respectively, of our EBITDA.

Previous wording

Product Segment. Our Product segment foreign revenues were approximately 93.6% and 94.3% of our total Product segment revenues for the nine months ended September 30, 2025 and 2024, respectively, and 95.1% and 91.4%, for the three months ended September 30, 2025 and 2024, respectively.

Current wording

Product Segment. Our Product segment foreign revenues were approximately 98.8% and 89.8% of our total Product segment revenues for the three months ended March 31, 2026 and 2025, respectively.

Previous wording

Energy Storage Segment. Our Energy Storage segment domestic revenues were 100% of our total Energy Storage segment revenues for each of the three and nine months ended September 30, 2025 and 2024.

Current wording

Energy Storage Segment. Our Energy Storage segment domestic revenues were 100% of our total Energy Storage segment revenues for each of the three months ended March 31, 2026 and 2025.

Previous wording

Electricity generation from some of our geothermal power plants is subject to seasonal variations. In the winter, our power plants produce more energy primarily attributable to the lower ambient temperature, which has a favorable impact on the energy component of our Electricity segment revenues as the prices under many of our contracts are fixed throughout the year with no time-of-use impact. The prices paid for electricity under the PPAs for the Mammoth Complex and the North Brawley power plant in California, the Raft River power plant in Idaho, the Neal Hot Springs power plant in Oregon and the Dixie Valley power plant in Nevada are higher in the months of June through September. The higher payments payable under these PPAs in the summer months partially offset the negative impact on our revenues from lower generation in the summer attributable to a higher ambient temperature. As a result, we expect the revenues and gross profit in the winter months to be higher than the revenues and gross profit in the summer months and in general we expect the first and fourth quarters to generate higher revenues than the second and third quarters. In the Energy Storage segment pursuant to the Bottleneck tolling agreement, approximately 45% of the revenues are generated in the third quarter, and the rest is nearly even between the first, second and fourth quarters.

Current wording

Electricity generation from some of our geothermal power plants is subject to seasonal variations. In the winter, our power plants produce more energy primarily attributable to the lower ambient temperature, which has a favorable impact on the energy component of our Electricity segment revenues as the prices under many of our contracts are fixed throughout the year with no time-of-use impact. The prices paid for electricity under the PPAs for the Mammoth Complex and the North Brawley power plant in California, the Raft River power plant in Idaho, the Neal Hot Springs power plant in Oregon and Dixie Valley power plant in Nevada, are higher in the months of June through September. The higher payments payable under these PPAs in the summer months partially offset the negative impact on our revenues from lower generation in the summer attributable to a higher ambient temperature. As a result, we expect the revenues and gross profit in the winter months to be higher than the revenues and gross profit in the summer months and in general we expect the first and fourth quarters to generate higher revenues than the second and third quarters. In the Energy Storage segment pursuant to the Bottleneck tolling agreement, approximately 45% of the revenues are generated in the third quarter, and the rest is roughly even between the first, second and fourth quarters. In addition, we see in the last two years higher revenues during the first quarter and fourth quarter due to high merchant pricing at PJM market.

Previous wording

Power generation in our power plants increased by 1.9% from 1,616,634 MWh in the three months ended September 30, 2024 to 1,647,912 MWh in the three months ended September 30, 2025.

Current wording

Power generation in our power plants increased by 2.6% from 1,978,078 MWh in the three months ended March 31, 2025 to 2,029,630 MWh in the three months ended March 31, 2026.

Previous wording

Revenues attributable to our Product segment for the three months ended September 30, 2025 were $62.2 million, compared to $37.4 million for the three months ended September 30, 2024. This increase of $24.9 million, or 66.6%, is primarily related to the progress in our projects and timing of when revenues are recognized during the period. During the three months ended September 30, 2025 and 2024, Product revenues included projects primarily in New Zealand and Dominica.

Current wording

Revenues attributable to our Product segment for the three months ended March 31, 2026 were $177.4 million, compared to $31.8 million for the three months ended March 31, 2025. This increase of $145.6 million, or 458.4%, is primarily related to: (i) the sale of the TOPP2 power plant in New Zealand for which revenues of $105.1 million were recognized in the first quarter of 2026 upon meeting all revenue recognition criteria during that quarter; and (ii) the progress in our other projects and timing of when revenues are recognized during the period. During the three months ended March 31, 2026, Product revenues included projects primarily in New Zealand and Turkey, and during the three months ended March 31, 2025, projects in New Zealand and Dominica.

Previous wording

Revenues attributable to our Energy Storage segment for the three months ended September 30, 2025 were $20.4 million compared to $9.8 million for the three months ended September 30, 2024. This increase of $10.6 million is primarily related to $9.2 million from new energy storage facilities which commenced commercial operation in the fourth quarter of 2024 or later such as Bottleneck, Montague, and Lower Rio, as well as higher energy rates at PJM storage facilities in the three months ended September 30, 2025, compared to the same period in the previous year.

Current wording

Revenues attributable to our Energy Storage segment for the three months ended March 31, 2026 were $44.9 million compared to $17.8 million for the three months ended March 31, 2025. This increase of $27.2 million is primarily related to higher energy rates at PJM storage facilities in the three months ended March 31, 2026, compared to the same period in the previous year, and $3.9 million from new energy storage facilities such as Arrowleaf which commenced commercial operation in December 2025 and Hoku which was acquired in January 2026.

Previous wording

Our total Electricity segment cost of revenues for the three months ended September 30, 2025 was 74.6% of Electricity segment revenues, compared to 69.8% for the three months ended September 30, 2024. The cost of revenues attributable to our international power plants for the three months ended September 30, 2025 was 17.6% of our total Electricity segment cost of revenues for this period compared to 16.9% for the same period in the prior year.

Current wording

Our total Electricity segment cost of revenues for the three months ended March 31, 2026 was 69.2% of Electricity segment revenues, compared to 66.5% for the three months ended March 31, 2025. The cost of revenues attributable to our international power plants for the three months ended March 31, 2026 was 18.1% of our total Electricity segment cost of revenues for this period compared to 17.2% for the same period in the prior year.

Previous wording

Total cost of revenues attributable to our Product segment for the three months ended September 30, 2025 was $48.8 million, compared to $30.2 million for the three months ended September 30, 2024, which represented a 61.7% increase. This increase is primarily attributable to the increase in Product segment revenues, as discussed above. As a percentage of total Product segment revenues, total cost of revenues attributable to our Product segment for the three months ended September 30, 2025, and 2024, was 78.3% and 80.8%, respectively, which results from the different profitability of the different projects included in each period.

Current wording

Total cost of revenues attributable to our Product segment for the three months ended March 31, 2026 was $139.4 million, compared to $24.7 million for the three months ended March 31, 2025, which represented a 464.8% increase. This increase is primarily attributable to the increase in Product segment revenues, including the sale of the TOPP2 power plant, as discussed above. As a percentage of total Product segment revenues, total cost of revenues attributable to our Product segment for the three months ended March 31, 2026, and 2025, was 78.6% and 77.7%, respectively, which results from the different profitability of the different projects included in each period.

Previous wording

Cost of revenues attributable to our Energy Storage segment for the three months ended September 30, 2025 was $12.3 million compared to $7.8 million for the three months ended September 30, 2024. This increase of $4.5 million includes an increase of $2.7 million in depreciation and amortization expenses, and is primarily related to the new energy storage facilities which commenced commercial operation in the fourth quarter of 2024, or later such as Bottleneck, Montague, and Lower Rio.

Current wording

Cost of revenues attributable to our Energy Storage segment for the three months ended March 31, 2026 was $18.4 million compared to $12.3 million for the three months ended March 31, 2025. This increase of $6.1 million includes an increase of $2.5 million in depreciation and amortization expenses, and is primarily related to the new energy storage facilities such as Arrowleaf, Lower Rio and Hoku as described above under the Energy Storage segment revenues caption.

Previous wording

Research and development expenses for the three months ended September 30, 2025 were $1.3 million, compared to $1.8 million for the three months ended September 30, 2024. The decrease in research and development expenses, net is primarily related to the timing of when we allocate resources to research and development projects.

Current wording

Research and development expenses for the three months ended March 31, 2026 were $1.1 million, compared to $2.5 million for the three months ended March 31, 2025. The decrease in research and development expenses, net is primarily related to the timing of when we allocate resources to research and development projects.

Previous wording

Selling and marketing expenses for the three months ended September 30, 2025 were $4.9 million compared to $4.2 million for the three months ended September 30, 2024. Selling and marketing expenses for the three months ended September 30, 2025 and 2024 constituted 2.0% and 2.0% of total revenues, respectively.

Current wording

Selling and marketing expenses for the three months ended March 31, 2026 were $5.6 million compared to $4.2 million for the three months ended March 31, 2025. Selling and marketing expenses for the three months ended March 31, 2026 and 2025 constituted 1.4% and 1.8% of total revenues, respectively.

Previous wording

General and administrative expenses for the three months ended September 30, 2025 were $20.2 million compared to $23.0 million for the three months ended September 30, 2024. General and administrative expenses for the three months ended September 30, 2025 and 2024 constituted 8.1% and 10.8% of total revenues, respectively. The decrease in general and administrative expenses of $2.8 million is primarily attributable to consulting fees related to a settlement agreement with a third-party battery systems supplier of $4.8 million which was recorded in the third quarter of 2024. This decrease was partially offset by higher consulting fees in the three months ended September 30, 2025 of $1.3 million, out of which $0.5 million is related to the Blue Mountain purchase transaction, and the remainder is related to the timing of when we incur services from our vendors.

Current wording

General and administrative expenses for the three months ended March 31, 2026 were $27.3 million compared to $17.9 million for the three months ended March 31, 2025. General and administrative expenses for the three months ended March 31, 2026 and 2025 constituted 6.8% and 7.8% of total revenues, respectively. The increase in general and administrative expenses of $9.4 million is primarily attributable to: (i) higher consulting fees in the three months ended March 31, 2026 of $1.6 million, out of which $0.8 million is related to the Hoku purchase transaction, compared to the three months ended March 31, 2025, and (ii) the settlement agreement amount related to the Engie Resources, LLC lawsuit, which was recorded in the first quarter of 2026, compared to $0.9 million related to a different legal settlement which was included in the same period of the previous year.

Previous wording

Other operating income for the three months ended September 30, 2025 was $3.1 million compared to $6.3 million for the three months ended September 30, 2024. Other operating income primarily represents the non-refundable portion of the recovery of damages received from a third-party battery systems supplier as part of a settlement agreement entered into in August 2024, for which contingency conditions have been met.

Current wording

Other operating income for the three months ended March 31, 2026 was $4.1 million compared to $3.1 million for the three months ended March 31, 2025. Other operating income primarily represents the non-refundable portion of the recovery of damages received from a third-party battery systems supplier as part of a settlement agreement entered into in August 2024, for which contingency conditions have been met.

Previous wording

Write-off of unsuccessful exploration and storage activities for the three months ended September 30, 2025 was $0.4 million compared to $0.1 million for the three months ended September 30, 2024. These write-offs are primarily related to geothermal exploration and storage projects that the Company decided to no longer pursue.

Current wording

Write-off of unsuccessful exploration and storage activities for the three months ended March 31, 2026 was $2.1 million compared to $0.5 million for the three months ended March 31, 2025. These write-offs are primarily related to geothermal exploration and storage projects that the Company decided to no longer pursue.

Previous wording

Interest Income for the three months ended September 30, 2025 was $1.6 million, compared to $2.1 million for the three months ended September 30, 2024. Interest income is primarily related to interest earned on cash and cash equivalents held by the Company during the period. The decrease in interest income is primarily related to lower average balances of cash and cash equivalents period over period.

Current wording

Interest Income for the three months ended March 31, 2026 was $1.4 million, compared to $1.3 million for the three months ended March 31, 2025. Interest income is primarily related to interest earned on cash and cash equivalents held by the Company during the period.

Previous wording

Derivatives and foreign currency transaction gains and losses for the three months ended September 30, 2025 was a loss of $0.9 million, compared to a gain of $2.0 million for the three months ended September 30, 2024. Derivatives and foreign currency transaction gains and losses primarily include gain and losses from foreign currency forward contracts which were not accounted for as hedge transactions, and the impact of changes in foreign currency exchange rates against the U.S. Dollar.

Current wording

Derivatives and foreign currency transaction gains and losses for the three months ended March 31, 2026 was a loss of $1.5 million, compared to a gain of $2.1 million for the three months ended March 31, 2025. Derivatives and foreign currency transaction gains and losses primarily include gain and losses from foreign currency forward and option contracts which were not accounted for as hedge transactions, and the impact of changes in foreign currency exchange rates against the U.S. Dollar.

Previous wording

Income attributable to the sale of tax benefits for the nine months ended September 30, 2025 was $48.2 million, compared to $53.0 million for the nine months ended September 30, 2024. This income primarily represents the value of PTCs and taxable income or loss generated by certain of our power plants which are allocated to investors under tax equity transactions, and to income related to the expected sale of transferable production tax credits under the IRA regulations.

Current wording

Income attributable to the sale of tax benefits for the three months ended March 31, 2026 was $16.6 million, compared to $17.6 million for the three months ended March 31, 2025. This income primarily represents the value of PTCs and taxable income or loss generated by certain of our power plants which are allocated to investors under tax equity transactions, and to income related to the expected sale of transferable PTCs under the existing IRA regulations.

Previous wording

Income tax benefit for the three months ended September 30, 2025 was $4.3 million compared to income tax benefit of $1.2 million for the three months ended September 30, 2024. This change primarily relates to the generation of additional investment tax credits, and the change in “Income from operations before income tax and equity in earnings of investees”. Our effective tax rate for the three months ended September 30, 2025 and 2024, was (21.4)% and (4.8)%, respectively.

Current wording

Income tax benefit for the three months ended March 31, 2026 was $15.5 million compared to income tax benefit of $3.8 million for the three months ended March 31, 2025. This change primarily relates to the generation of additional investment tax credits, the jurisdictional mix of earnings at differing tax rate, and the change in “Income from operations before income tax and equity in earnings of investees”. Our effective tax rate for the three months ended March 31, 2026 and 2025, was (54.0)% and (10.1)%, respectively. The effective rate differs from the federal statutory rate of 21% primarily due to the generation of investment tax credits, the non-deductible induced conversion expense on the 2027 Convertible Notes, the permanent difference of the bargain purchase gain related to the purchase of Hoku, and the jurisdictional mix of earnings at differing tax rates.

Previous wording

Equity in earnings of investees, net for the three months ended September 30, 2025 was earnings of $0.5 million, compared to losses of $1.6 million for the three months ended September 30, 2024. Equity in earnings (losses) of investees, net is derived from our 12.75% share in the earnings or losses in the Sarulla Consortium (“Sarulla”) and our 49% share in the earnings or losses in the Ijen geothermal project.

Current wording

Equity in earnings of investees, net for the three months ended March 31, 2026 was earnings of $0.5 million, compared to losses of $0.4 million for the three months ended March 31, 2025. Equity in earnings (losses) of investees, net is derived from our 12.75% share in the earnings or losses in the Sarulla Consortium (“Sarulla”) and our 49% share in the earnings or losses in the Ijen geothermal project.

Previous wording

Net income attributable to the Company’s stockholders for the three months ended September 30, 2025 was $24.1 million, compared to $22.1 million for the three months ended September 30, 2024, which represents an increase of $2.1 million. This increase is attributable to a increase of $0.4 million in net income which was affected by the explanations described above, and a decrease of $1.6 million in net income attributable to noncontrolling interest, which is primarily related to the noncontrolling share in the net results of the Puna and Guadeloupe power plants.

Current wording

Net income attributable to the Company’s stockholders for the three months ended March 31, 2026 was $44.1 million, compared to $40.4 million for the three months ended March 31, 2025, which represents an increase of $3.7 million. This increase is attributable to an increase of $3.6 million in net income which was affected by the explanations described above, and a decrease of $0.1 million in net income attributable to noncontrolling interest, which is primarily related to the noncontrolling share in the net results of the Puna and Guadeloupe power plants.

Previous wording

As of September 30, 2025, we had access to (i) $79.6 million in cash and cash equivalents, of which $28.1 million is held by our foreign subsidiaries; and (ii) $387.1 million of unused corporate borrowing capacity under existing committed lines for credit and letters of credit with different commercial banks.

Current wording

As of March 31, 2026, we had access to (i) $654.6 million in cash and cash equivalents, of which $183.4 million is held by our foreign subsidiaries; and (ii) $385.4 million of unused corporate borrowing capacity under existing committed lines for credit and letters of credit with different commercial banks.

Showing the first 40 of 74 pairs. Open the source sections for the rest.

Rearranged current paragraphs (1)

Current report — wording carried from elsewhere

For the Three Months Ended March 31, 2026
Rearranged previous paragraphs (18)

Previous report — wording carried elsewhere

Income attributable to the sale of tax benefits for the three months ended September 30, 2025 was $14.4 million, compared to $19.8 million for the three months ended September 30, 2024. This income primarily represents the value of

Previous report — wording carried elsewhere

PTCs and taxable income or loss generated by certain of our power plants which are allocated to investors under tax equity transactions, as well as to income related to the expected sale of transferable PTCs under the IRA regulations.

Previous report — wording carried elsewhere

Our total Electricity segment cost of revenues for the nine months ended September 30, 2025 was 72.1% of Electricity revenues, compared to 65.5% for the nine months ended September 30, 2024. The cost of revenues attributable to our international power plants for the nine months ended September 30, 2025 was 17.6% of our total Electricity segment cost of revenues for this period, compared to 18.0% for the same period in the prior year.

Previous report — wording carried elsewhere

Total cost of revenues attributable to our Product segment for the nine months ended September 30, 2025 was $116.6 million, compared to $84.0 million for the nine months ended September 30, 2024, which represented a 38.8% increase. This increase was primarily attributable to the increase in Product segment revenues as discussed above. As a percentage of total Product segment revenues, our total cost of revenues attributable to our Product segment for the nine months ended September 30, 2025, and 2024, was 75.9% and 84.0%, respectively, which results from the different profitability of the different projects included in each period.

Previous report — wording carried elsewhere

Other operating income for the nine months ended September 30, 2025 was $10.5 million compared to $6.3 million for the nine months ended September 30, 2024. Other operating income primarily represents the non-refundable portion of the recovery of damages received from a third-party battery systems supplier as part of a settlement agreement entered into in August 2024, for which contingency conditions have been met.

Previous report — wording carried elsewhere

Write-off of Unsuccessful Exploration and Storage Activities

Previous report — wording carried elsewhere

Write-off of unsuccessful exploration and storage activities for the nine months ended September 30, 2025 was $1.1 million, compared to $1.5 million for the nine months ended September 30, 2024. These write-offs are related to accumulated costs of geothermal exploration and storage projects that the Company decided to no longer pursue.

Previous report — wording carried elsewhere

Interest Income for the nine months ended September 30, 2025 was $4.9 million, compared to $6.5 million for the nine months ended September 30, 2024. Interest income is primarily related to interest earned on cash and cash equivalents held by the Company during the period. The decrease in interest income is primarily related to lower average balances of cash and cash equivalents period over period.

Previous report — wording carried elsewhere

Derivatives and Foreign Currency Transaction Gains (Losses)

Previous report — wording carried elsewhere

Derivatives and foreign currency transaction gains and losses for the nine months ended September 30, 2025 was a gain of $6.2 million, compared to a gain of $0.1 million for the nine months ended September 30, 2024. Derivatives and foreign currency transaction gains and losses primarily includes losses from foreign currency forward contracts which were not accounted for as hedge transactions, and the impact of changes in foreign currency exchange rates against the U.S. Dollar.

Previous report — wording carried elsewhere

Income Attributable to Sale of Tax Benefits

Previous report — wording carried elsewhere

Other Non-Operating Income (Expense), Net

Previous report — wording carried elsewhere

Income tax benefit for the nine months ended September 30, 2025 was $13.5 million compared to income tax benefit of $4.5 million for the nine months ended September 30, 2024. This change primarily relates to the generation of additional investment tax credits. Our effective tax rate for the nine months ended September 30, 2025 and 2024, was (17.0)% and (5.4)%, respectively.

Previous report — wording carried elsewhere

Equity in Earnings (Losses) of Investees, Net

Previous report — wording carried elsewhere

Equity in earnings and losses of investees, net for the nine months ended September 30, 2025 was earnings of $0.9 million, compared to earnings of $0.4 million for the nine months ended September 30, 2024. Equity in earnings and losses of investees, net is mainly derived from our 12.75% share in the earnings or losses in the Sarulla consortium and our 49% share in the earnings or losses from the Ijen geothermal project. The increase in equity in earnings of investees is primarily related to the increase in net income generated by the Ijen project.

Previous report — wording carried elsewhere

Net Income Attributable to the Company’s Stockholders

Previous report — wording carried elsewhere

Net income attributable to the Company’s stockholders for the nine months ended September 30, 2025 was $92.5 million, compared to $82.9 million for the nine months ended September 30, 2024, which represents an increase of $9.6 million. This increase was attributable to the increase of $5.3 million in net income which was affected by the explanations described above, as well as a decrease of $4.3 million in net income attributable to noncontrolling interest, which is primarily related to the noncontrolling share in the net results of the Puna and Guadeloupe power plants.

Previous report — wording carried elsewhere

2027, unless earlier converted, redeemed or repurchased. In July 2024, the Company issued an additional $45.2 million aggregate principal amount of its 2.50% Original Convertible Notes.