EX-99.1 · Colocation AI Data Center:
Colocation AI Data Center:
| ● | Bitdeer recently acquired 200 acres near existing 563 MW Rockdale facility to support AI/HPC infrastructure development. Outright ownership provides the long-term site control required to develop and finance AI/HPC data center infrastructure. Bitdeer believes its Rockdale site, with its existing large-load interconnection and established transmission infrastructure, is well positioned to receive additional power allocations over the coming years. |
| ● | Bitdeer announced a 16-Year AI/HPC Data Center Lease for its Tydal, Norway Campus, representing approximately $4.7 billion of total contract value over the initial base term, with the potential to reach a total contract value of approximately $8.0 billion if the tenant exercises its one-time 8-year lease extension. |
| ● | Tydal, Norway AI Data Center expected to be among Norway’s largest and most efficient AI data centers upon completion. With a PUE of approximately 1.1 and running on 100% renewable energy, it sets a compelling standard for data center performance, at scale. |