Jaguar Uranium Corp.
For the period ended Oct 13, 2026. Filed Oct 19, 2026.
View on SEC.govAbout this filing
A notice of a major event between regular reports, such as results, a deal or a change of executives. It is often the first formal record of the news.
Oct 13, 2026 · Filed Oct 19, 2026
Use the contents to explore the available documents and sections.
Contents
EX-99.1 · Resource Estimation Methodology
Resource Estimation Methodology
The resource estimation workflow (see Figure 5) was executed using an integrated software suite (Geobank™, Leapfrog Geo™, Micromine™, Leapfrog Edge™, and Datamine NPV Scheduler) across three flat-lying hard-bounded domains: Pampa de Arroqui, Laguna Salada, and Buried Lake. Defined at a 25 ppm uranium threshold, the 3D domain wireframes were modeled using an unrotated block model (100 m x 100 m x 1 m) with sub-blocking down to 25 m x 25 m x 0.25 m to accurately resolve thin 1-4 m mineralized horizons. After compositing on a per-sample-location basis, domain-specific high-grade top-cuts were applied to U 3 O 8 (ranging from 290 ppm at Laguna Salada to 1,110 ppm at Buried Lake, affecting <1.5% of data), while V 2 O 5 required no capping due to low variability. Grade estimation was carried out using Ordinary Kriging in a strict 2D planar framework (dip 0°, azimuth 0°) validated against Nearest Neighbor models, utilizing Quantitative Kriging Neighborhood Analysis (QKNA) to define multi-pass search radii for classifying Indicated resources (Pass 2) and Inferred resources (Pass 3), followed by a 5,000 m global fill pass for unclassified volume (Figure 6).
Figure 5. Overview of Laguna Salada Modelling - Distribution of U₃O₈ (25 ppm U threshold).
Figure 6. Plan View – Laguna Salada Mineral Resource Model (Indicated & Inferred).
The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.