Evolution Metals & Technologies Corp.
For the period ended Sep 30, 2026. Filed Oct 6, 2026.
View on SEC.govAbout this filing
A notice of a major event between regular reports, such as results, a deal or a change of executives. It is often the first formal record of the news.
Sep 30, 2026 · Filed Oct 6, 2026
Contents
EX-99.1 · FOR IMMEDIATE RELEASE
FOR IMMEDIATE RELEASE
Evolution Metals & Technologies Selects INERGX to Power Planned 5 GW U.S. Facility, With Capacity Equivalent to Approximately 4 Million American Homes
Planned at the output of five nuclear reactors, with a China-free battery supply chain designed to feed EM&T’s own critical materials recovery
MIAMI, FL, October 6, 2026– Evolution Metals & Technologies Corp. (“EM&T” or the “Company”) (NASDAQ: EMAT) is moving to generate and control its own power at industrial scale. The Company today announced a Strategic Partnership Letter of Intent (“LOI”) with UK-based INERGX Energy Optimisation Ltd. (“INERGX”) to engineer, supply, integrate and service the energy storage and power optimization systems for EM&T’s planned critical materials and battery black mass recovery facility in the United States (the “Facility”) — a site planned at approximately 1 GW of on-site capacity within two years and up to approximately 5 GW at full build-out, powered by on-site LNG generation.
To put that in perspective: a typical U.S. nuclear reactor produces about 1 GW, according to the U.S. Department of Energy. EM&T’s First Phase alone is planned at the output of a full nuclear reactor. At full build-out, the Facility is planned at the equivalent of five. Run at full output, that capacity is equivalent to the annual electricity use of approximately 4 million American homes — and the First Phase alone to approximately 800,000 — based on U.S. Energy Information Administration data on average annual residential use.
The text of this filing, as the company filed it with the SEC, without its images or exhibits. This is not investment advice.