EX-99.1 · Microtec Program Update
Microtec Program Update
The Microtec UTM 1200 Turbo Mill program moved from the planning stage into physical execution during and after the quarter. As announced on June 25, 2026, the Company booked ocean freight for the mill while site crews began clearing and grading the installation area at Myakka City. Through the summer, the Company established the compacted sub-base and reinforced concrete foundations for the equipment, funded the utility transformer installation, and continued fabrication of supporting system components with its equipment partners. On August 11, 2026, the Company announced that the mill had departed Germany and is on the water, with live vessel tracking made available to shareholders, and with U.S. arrival expected in the third quarter of 2026.
Commissioning remains on track for the second half of 2026. The UTM 1200 is a high-efficiency milling and processing technology designed to enhance the throughput and output quality of the Company’s existing organics processing operations, including the production of engineered soils and mulch products, with Phase 1 deployment targeted for the second half of 2026, which is expected to meaningfully expand processing capacity at Myakka City. Management believes the mill is the Company’s most significant margin catalyst, unlocking production of locally manufactured engineered substrate at gross margins meaningfully above the Company’s current blended margin. Once the installation is complete, the mill will operate at the center of an integrated campus that combines organics processing, advanced milling, blending, and in-house logistics on a single permitted 80+ acre site. Management believes this combination will make Myakka City one of the few facilities in the United States capable of taking raw organic material through to precision-milled, specification-grade growing media in one location, replacing mined and imported inputs with locally produced substrate. There can be no assurance that the UTM 1200 system will be deployed on the anticipated timeline or that it will perform as expected upon installation. As previously announced, the Company will continue to work with its advisor, Robert Jacobson, on discussions with prospective bulk purchasers of the engineered substrate as commissioning advances.