Bit Digital, Inc

For the period ended Mar 31, 2026. Filed May 15, 2026.

View on SEC.gov

About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Mar 31, 2026 · Filed May 15, 2026

BTBT$0.73+3.9%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-Q

Period ended 2025-09-30; filed 2025-11-14.

0001213900-25-110383

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

Current report: 10-Q

Period ended 2026-03-31; filed 2026-05-15.

0001213900-26-057116

Item 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 306 previous paragraphs and 278 current paragraphs.

92 unchanged; 93 reworded; 89 added; 92 removed; 29 previous and 4 current paragraphs rearranged.

Tables are not compared: 21 previous and 13 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (89)

Current report

Bit Digital, Inc. (“BTBT” or the “Company” or “We”), is a holding company incorporated on February 17, 2017, under the laws of the Cayman Islands. The Company is a strategic asset company focused on active participation in Ethereum (ETH)-native treasury and staking strategies. Through our majority equity stake in WhiteFiber Inc. (Nasdaq: WYFI), the Company also engages in high performance computing (“HPC”) business, including cloud services and HPC data center services.

Current report

WhiteFiber’s business model integrates its data center infrastructure and cloud services to provide scalable, high-performance computing solutions for enterprises, research institutions, and AI and ML driven businesses. Its integrated approach aligns specialized data center operations with GPU-focused cloud services, addressing the unique requirements of AI and ML workloads. These workloads demand greater power density, advanced cooling solutions, and robust bandwidth to handle large-scale data transfers. By operating its data centers, it is able to provide the power to support its cloud services and WhiteFiber believes it can better meet the needs of AI and ML workloads and reduce the complexity associated with procuring power and connectivity from external vendors. WhiteFiber can also design its facilities to accommodate the higher heat loads generated by modern GPUs, potentially shortening deployment timelines for customers who require rapid expansion of their computing infrastructure. From a financial standpoint, WhiteFiber’s vertically integrated solution allows it to capture additional margin for both its data center and cloud services businesses, avoiding expenses that would otherwise be due to third-party providers.

Current report

Based on their collective industry experience, WhiteFiber’s data center team is adept at bringing new sites online on an accelerated timeline. WhiteFiber is aggressively pursuing the development pipeline and intend to achieve an estimated 76 MW (gross) of total data center capacity by the end of the fourth quarter of 2026, a target that is underpinned by assets including the MTL-2, MTL-3, and NC-1 facilities. As of March 31, 2026, its pipeline of potential data center projects represents approximately 1,500 MW (gross) under management review. WhiteFiber follows a disciplined process prioritizing projects that are backed by customer lease commitments. In select cases, WhiteFiber may pursue early-stage acquisitions based on strong customer demand signals and defined commercialization pathways. Accordingly, the foregoing timelines and capacities are subject to change based on many factors, many of which are outside of WhiteFiber’s control.

Current report

WhiteFiber uses a well-defined set of criteria to select their data center sites. WhiteFiber typically target sites with proximity to metro areas and partial infrastructure in place, where it is retrofitting rather than developing greenfield projects. Metropolitan areas are positioned for low-latency to address long-term, specialized AI computer inference needs, and smaller sites reduce risks. A retrofit entails sourcing and acquiring an existing industrial building with underutilized, in-place power connectivity. The period of time from when a site is purchased until construction can begin varies from location to location depending upon, among other things, obtaining required permits and the availability of construction supplies and contractors. Average build time for retrofits is intended to be approximately six months from commencement of construction, which WhiteFiber believes is approximately one-third to one-half of the industry average development timeline for greenfield projects. This average building time is based upon senior management’s experience at Enovum prior to its acquisition by the Company, as well as their experience prior to Enovum. WhiteFiber also prioritize sites offering opportunities to increase site power over time, enabling its data centers to grow with customer demand. In addition, WhiteFiber selectively targets certain larger opportunities with 50 MW (gross) of power or more, subject to customer demand, to drive AI-driven compute super-clusters. Finally, WhiteFiber prioritize sites powered by sustainable, green energy sources and locked-in power when available. Additionally, to enhance sustainability of certain WhiteFiber data center projects, WhiteFiber is undertaking heat repurposing projects in connection with sustainability and commercial and residential projects.

Current report

On April 27, 2026, WhiteFiber entered into an amended credit agreement with RBC. This agreement replaces the original credit agreement dated June 18, 2025, as subsequently amended on July 4, 2025. The amended credit agreement provides for an authorized credit facility of CAD $28 million (approximately $20 million). The proceeds have been used as a real estate acquisition bridge loan to finance the acquisition of the MTL-3 facility, at a purchase price of CAD $24.2 million (approximately USD $17.4 million). The closing date occurred on May 8, 2026.

Current report

Borrowings under the facility bear interest, at WhiteFiber’s option, at either Daily Simple CORRA plus 2.75% per annum or Royal Bank Prime plus 1.00% per annum, with the prime-based rate serving as the default option.

Current report

The facility has a six-month term from the date of drawdown and requires interest-only payments during the term, with the outstanding principal due in full at maturity. The specific borrowing terms are established at the time of each drawdown pursuant to a borrowing request submitted by WhiteFiber and accepted by the lender.

Current report

Additionally, RBC is providing a CAD $8 million (approximately $5.8 million) revolving facility in the form of Letters of Credit and Letters of Guarantee. The fees will be determined on a transaction-by-transaction basis, and the facility will be available for a 12-month term.

Current report

WhiteFiber has agreed to certain financial covenants, including a minimum debt service coverage ratio and a maximum Net funded debt to EBITDA ratio.

Current report

As of the reporting date, the April 27, 2026 bridge loan has been authorized and funded by RBC for the MTL-3 facility acquisition. WhiteFiber and RBC are currently in discussions regarding new syndicated credit facilities, including i) a delayed draw term loan facility of CAD $115 million (approximately $82.5 million), which includes the CAD $24.2 million (approximately $17.4 million) bridge loan ii) an accordion facility of CAD $25 million (approximately $17.9 million) and iii) the CAD $8 million (approximately $5.7million) revolving facility.

Current report

In November 2025, WhiteFiber’s wholly owned subsidiary, Enovum NC-1 Bidco, LLC, entered into the Services Agreement with Nscale Services US Inc. and Nscale Global Holdings Limited (collectively, “Nscale”) for the provision of colocation and related services at its NC-1 facility. The agreement represents a significant commercial milestone for the high-density data center platform and provides long-term contracted revenue visibility. The initial Service Order pursuant to the Services Agreement represents approximately $865 million in total contracted revenue over a 10-year term, inclusive of contractual annual rate escalators and non-recurring installation services (“NRCs”). Electricity and certain other operating costs are structured as pass-through charges to Nscale. Billing is expected to commence during the second quarter, subject to completion of construction and commissioning. As a result, WhiteFiber expects full revenue contribution from this agreement to begin during the third quarter of 2026 as the facility reaches its contractual capacity.

Current report

As of the date of this Form 10-Q, WhiteFiber and the Initial Customer are engaged in discussions regarding a potential resolution of the existing service agreements following the agreed pause of services. No definitive termination or settlement agreement has been executed. In connection with these discussions, the parties are negotiating the treatment of the remaining non-refundable prepayment, service deposit, outstanding receivables, and a potential early termination fee, which WhiteFiber believes would be equal to 40% of the fees that would have accrued for services during the remainder of the term of the MSA and applicable purchase orders. Following the service pause, WhiteFiber has redeployed the GPUs previously allocated to the Initial Customer to three other customers and continues to evaluate the related financial and operational implications. There can be no assurance as to the timing, terms, or final outcome of these discussions.

Current report

In February 2026, WhiteFiber entered into another service order with the customer to provide services utilizing a total of 10 H200 GPU servers. The service order has an initial term of 14 months beginning on the services commencement date. The service order represents an aggregate revenue opportunity of approximately $1.3 million. The deployment and revenue generation began in March 2026.

Current report

In March 2026, WhiteFiber entered into another service order with the customer to provide services utilizing a total of 256 H100 GPU servers. The service order has an initial term of 24 months beginning on the services commencement date, with an option to renew for an additional twelve months. The service order represents an aggregate revenue opportunity of approximately $50.2 million. The deployment and revenue generation is expected to begin in April 2026.

Current report

In November 2025, WhiteFiber terminated the MSA and all related purchase orders with DNA Fund in accordance with the terms of the contract. At the time of termination, WhiteFiber had approximately $7.3 million in outstanding accounts receivable. Pursuant to the termination agreement, the customer agreed to repay the outstanding balance. As of the date of this Form 10-Q, WhiteFiber has collected $2.2 million of the outstanding amount.

Current report

In October 2025, WhiteFiber entered into a two-week service order with a new customer to provide services utilizing a total of 72 B200 GPUs. In January 2026, WhiteFiber entered into an additional two-week service order with this customer for 72 B200 GPUs. These contracts were terminated as of February 2026.

Current report

In February 2026, WhiteFiber entered into a further service order with this customer to provide services utilizing a total of 384 B200 GPUs. This service order has an initial term of 24 months commencing on the service commencement date, after which it will automatically renew for successive one-month periods unless terminated by either party. The service order represents an aggregate revenue opportunity of approximately $18.1 million. Deployment and revenue generation commenced on January 27, 2026.

Current report

In February 2026, WhiteFiber entered into a service order with a new customer to provide services utilizing a total of 256 GPUs. The service order has an initial term of 12 months beginning on the services commencement date, after which it automatically renews for successive one-month periods unless terminated by either party. The deployment and revenue generation began on February 1, 2026.

Current report

In March 2026, WhiteFiber entered into a service order with a new customer to provide services utilizing a total of 72 GB200 GPUs. The service order has an initial term of 12 months beginning on the services commencement date, after which it automatically renews for successive one-month periods unless terminated by either party. The deployment and revenue generation began on March 7, 2026.

Current report

In February 2026, WhiteFiber entered into a service order with a new customer to provide services utilizing a total of 80 H200 GPUs. The service order has an initial term of 12 months beginning on the services commencement date. The deployment and revenue generation began on February 1, 2026.

Current report

Results of Operations for the Three Months Ended March 31, 2026 and 2025

Current report

Our revenue from colocation services was $4.8 million and $1.6 million for the three months ended March 31, 2026 and 2025, respectively. The increase was primarily due to the MTL-3 site becoming fully operational and generating revenues beginning November 2025.

Current report

For the three months ended March 31, 2026, we received 48.1 bitcoins from the Foundry mining pool. As of March 31, 2026, our active hash rate was at an aggregate of 1.1 EH/s for our bitcoin miners. For the three months ended March 31, 2026, we recognized revenue of $3.7 million from bitcoin mining services.

Current report

For the three months ended March 31, 2025, we received 83.3 bitcoins from the Foundry mining pool. As of March 31, 2025, our active hash rate was at an aggregate of 1.5 EH/s for our bitcoin miners. For the three months ended March 31, 2025, we recognized revenue of $7.8 million from bitcoin mining services.

Current report

Electricity costs. These expenses were incurred by the data centers for the HPC equipment and were closely correlated with the number of deployed GPU servers.

Current report

For the three months ended March 31, 2026, data center lease expenses increased by $0.1 million, or 9.5%, compared to the data center lease expenses incurred for the three months ended March 31, 2025 due to a new lease entered in March 2025.

Current report

For the three months ended March 31, 2026, GPU server lease expenses remained consistent with the three months ended March 31, 2025.

Current report

Third-party customer support fees. We engaged a third party to provide customer support services.

Current report

For the three months ended March 31, 2026, third-party customer support fees were $0.1 million.

Current report

For the three months ended March 31, 2026, electricity costs increased by $0.6 million, or 272.6%, compared to the electricity costs incurred for the three months ended March 31, 2025, Since March 31, 2025, the Company has expanded its data center footprint, including the MTL-3 facility. The increase in electricity costs is primarily attributable to the MTL-3 facility, which was operational during the period ended March 31, 2026 but not operational during the period ended March 31, 2025.

Current report

For the three months ended March 31, 2026, data center lease expenses increased by $0.3 million, or 210.3%, compared to the data center lease expenses incurred for the three months ended March 31, 2025. The increase primarily resulted from the new MTL-3 lease entered in the second quarter of 2025.

Current report

For the three months ended March 31, 2026, a loss of $121.1 million was recognized, primarily attributable to the decrease in the prices of bitcoin and ETH as of March 31, 2026.

Current report

Net gain (loss) from disposal of property, plant and equipment

Current report

For the three months ended March 31, 2026, WhiteFiber sold 126 H200s GPU for a total consideration of approximately $26.1 million. On the date of the transaction, the carrying amount of these GPUs was $24.3 million. The Company recognized a gain of $1.8 million from the sale which was recorded within Net gain (loss) from disposal of property, plant and equipment. As of the date of this report, WhiteFiber has collected the full cash consideration of $26.1 million.

Current report

For the three months ended March 31, 2025, the Company sold 4,828 miners for a total consideration of $906,016. On the dates of the transaction, the total original cost and accumulated depreciation of these miners were $5,362,720 and $4,123,084, respectively. The Company recognized a loss of $333,620 from the sale of miners which was recorded within Net gain (loss) from disposal of property, plant and equipment. As of the date of this report, the Company has not collected the cash considerations.

Showing the first 40 of 89 passages. Open the source sections for the rest.

Removed paragraphs (92)

Previous report

Bit Digital, Inc. or the “Company”, is a global platform for high performance computing (“HPC”) business including cloud services and HPC data center services and digital asset business, including Ethereum (ETH) staking business, with headquarters in New York City. On June 25, 2025, the Company announced that it has initiated a strategic transition to become a pure play Ethereum staking and treasury company. The Company began accumulating ETH and operating staking infrastructure in 2022 and has steadily increased its holdings since that time.

Previous report

On July 30, 2025, we entered into a Contribution Agreement with WhiteFiber, pursuant to which we agreed to contribute our HPC business through the transfer of 100% of the capital shares of our cloud services subsidiary, WhiteFiber AI, Inc. and its wholly-owned subsidiaries WhiteFiber HPC, Inc., WhiteFiber Canada, Inc., WhiteFiber Japan G.K. and WhiteFiber Iceland, ehf, to WhiteFiber, upon the effectiveness of WhiteFiber’s registration statement on Form S-1, as amended (File No. 333-288650) (the “Registration Statement”) on August 6, 2025 in connection with WhiteFiber’s initial public offering (the “IPO”).

Previous report

As of the reporting date, the related credit facilities have not been authorized for use by the lender, as both parties are in the process of negotiating revisions to the existing agreement. These negotiations are intended to result in an amendment to the current credit facility, providing the Company with access to a potential additional non-revolving term loan facility of up to CAD 55 million (approximately $39.5 million). Accordingly, no amounts had been drawn, and no borrowings were available under the credit agreement as at the reporting date.

Previous report

On November 14, 2024, we entered into a Terms of Supply and Service Level Agreement (together, the “Agreement”) and an Order Form with a new customer. The order form provides for services utilizing a total of 64 H200 GPUs on a month-to-month basis, which either party may terminate upon at least 14 days’ written notice prior to any renewal date. It represents annual revenue of approximately $1.2 million. The deployment commenced and revenue generation began on November 15, 2024, using the Company’s existing inventory of H200 GPUs. The service under the purchase order concluded in December 2024.

Previous report

During the first quarter of 2025, the Company deployed an additional 1,441 miners at one of Soluna’s hosting facilities.

Previous report

During the second quarter of 2025, the Company received an additional 1,720 miners, which were deployed in July 2025.

Previous report

During the third quarter of 2025, the Company received an additional 1,855 miners, of which 410 miners were deployed in July 2025 and 1,445 miners were deployed in August 2025.

Previous report

On December 10, 2024, we entered into an agreement with an unaffiliated seller of bitcoin mining computers, from whom we acquired 191 S21 miners. As of the date of this report, all of the miners were delivered.

Previous report

On December 15, 2024, we entered into an agreement with an unaffiliated seller of bitcoin mining computers, from whom we acquired 750 S21 miners. As of the date of this report, all of the miners were delivered.

Previous report

On December 23, 2024, we entered into an agreement with an unaffiliated seller of bitcoin mining computers, from whom we acquired 4,300 S21+ miners. As of the date of this report, 2,630 miners were delivered.

Previous report

For the three and nine months ended September 30, 2025, the Company disposed of 3,072 and 7,900 bitcoin miners.

Previous report

Our revenue from cloud services increased by $5.9 million, or 48.4%, to $18.0 million for the three months ended September 30, 2025 from $12.2 million for the three months ended September 30, 2024. The increase was primarily due to an increase in deployed GPU servers to new and existing customers in the third quarter of 2025, offset by a $2.0 million service credit accrued and expected to be issued to a customer under the terms of the contract.

Previous report

Our revenue from colocation services was $1.7 million and $nil for the three months ended September 30, 2025 and 2024, respectively.

Previous report

For the three months ended September 30, 2025, we received 64.9 bitcoins from the Foundry mining pool. As of September 30, 2025, our maximum hash rate was at an aggregate of 2.8 EH/s for our bitcoin miners. For the three months ended September 30, 2025, we recognized revenue of $7.4 million from bitcoin mining services.

Previous report

For the three months ended September 30, 2024, we received 165.4 bitcoins from the Foundry mining pool. As of September 30, 2024, our maximum hash rate was at an aggregate of 4.3 EH/s for our bitcoin miners. For the three months ended September 30, 2024, we recognized revenue of $10.1 million from bitcoin mining services.

Previous report

For the three months ended September 30, 2025, we earned 644.3 ETH and 52.9 ETH in native staking and liquid staking, respectively. For the three months ended September 30, 2025, we recognized revenues of $2,649,831 and $218,703 from native staking and liquid staking, respectively.

Previous report

Our revenues from ETH liquid staking increased by $218,703, or 100%, to $218,703 for the three months ended September 30, 2025 from $nil for the three months ended September 30, 2024. The increase was due to the resume of liquid staking activities in the third quarter of 2025.

Previous report

Electricity costs. These expenses were incurred by the data center for the high-performance computing equipment and were closely correlated with the number of deployed GPU servers.

Previous report

For the three months ended September 30, 2025, data center lease expenses increased by $0.4 million, or 35%, compared to the data center lease expenses incurred for the three months ended September 30, 2024. The increase primarily resulted from one additional data center lease entered after the third quarter of 2024.

Previous report

For the three months ended September 30, 2025, GPU servers lease expenses decreased by $0.4 million, or 11%. The decrease primarily resulted from the application of a previously issued credit in connection with downtime that occurred in prior periods.

Previous report

For the three months ended September 30, 2025, electricity costs totaled $0.3 million. We had no electricity costs for the three months ended September 30, 2024 as we acquired Enovum in the fourth quarter of 2024, which provides colocation services.

Previous report

For the three months ended September 30, 2025, data center lease expenses totaled $0.2 million. We had no data center lease expenses for the three months ended September 30, 2024 as we acquired Enovum in the fourth quarter of 2024, which provides colocation services.

Previous report

Effective January 1, 2025, we changed our estimate of the useful lives for our cloud service equipment from three to five years. The change was made to better reflect the expected usage patterns and economic benefits of the assets. Refer to Note 2.Summary of Significant Accounting Policies to our condensed consolidated financial statements.

Previous report

For the three months ended September 30, 2025, a gain of $168 million was recognized, primarily attributable to the increase in the prices of bitcoin and ETH as of September 30, 2025.

Previous report

Our income tax provision was $0.7 million and $0.6 million for the three months ended September 30, 2025 and 2024, respectively. The income tax provision was higher during the three months ended September 30, 2025 compared to the three months ended September 30, 2024 primarily due to increase of $1.2 million in Iceland due to the higher operation profits during the three months ended September 30, 2025 compared to the same period in 2024 and decrease of $0.3 million in the United States due to the rapid investment in infrastructures in Iceland, which results in a lower GILTI tax in the USA, during the three months ended September 30, 2025 compared to the same period in 2024 and decrease of $0.7 million due to the operating loss from Enovum during the three months ended September 30, 2025 compared to the same period in 2024.

Previous report

Our revenue from colocation services was $5.1 million and $nil for the nine months ended September 30, 2025 and 2024, respectively.

Previous report

The Company enters in contracts with mining pool operators to provide computing power to digital asset mining pools. Providing computing power for digital asset transaction verification services is an output of the Company’s ordinary activities. The provision of such computing power is the only performance obligation in the Company’s contracts with mining pool operators.

Previous report

For the nine months ended September 30, 2025, we received 216.4 bitcoins from the Foundry USA Pool (“Foundry”) mining pool. As of September 30, 2025, our maximum hash rate was at an aggregate of 2.8 EH/s for our bitcoin miners. For the nine months ended September 30, 2025, we recognized revenue of $21.8 million from bitcoin mining services.

Previous report

For the nine months ended September 30, 2024, we received 820.3 bitcoins from the Foundry mining pool. As of September 30, 2024, our maximum hash rate was at an aggregate of 4.3 EH/s for our bitcoin miners. For the nine months ended September 30, 2024, we recognized revenue of $48.1 million from bitcoin mining services.

Previous report

Our revenues from digital asset mining services decreased by $26.3 million, or 54.6%, to $21.8 million for the nine months ended September 30, 2025 from $48.1 million for the nine months ended September 30, 2024. The decrease was primarily due to a decrease of 603.9 bitcoins generated from our mining business and partially offset by a higher average BTC price for the nine months ended September 30, 2025, compared to the same period in 2024.

Previous report

For the nine months ended September 30, 2025, we earned 1,022.1 ETH in native staking and 52.9 ETH in liquid staking, respectively. For the nine months ended September 30, 2025, we recognized revenues of $3,575,804 and $218,703 from native staking and liquid staking, respectively.

Previous report

For the nine months ended September 30, 2024, we earned 382.4 ETH in native staking and 1.3 ETH in liquid staking, respectively. For the nine months ended September 30, 2024, we recognized revenues of $1,142,059 and $4,503 from native staking and liquid staking, respectively.

Showing the first 40 of 92 passages. Open the source sections for the rest.

Reworded paragraphs (93)

Previous wording

The following discussion should be read in conjunction with our interim Condensed Consolidated Financial Statements and the related notes and other financial information appearing elsewhere in this Quarterly Report on Form 10-Q for the period ended September 30, 2025 as well as Management’s Discussion and Analysis of Financial Condition and Results of Operations included in our Form 10-K for the year ended December 31, 2024 (“Form 10-K”).

Current wording

The following discussion and analysis of our financial condition and results of operations should be read in conjunction with our condensed consolidated financial statements and the related notes included elsewhere in this Quarterly Report on Form 10-Q for the period ended March 31, 2026 as well as Management’s Discussion and Analysis of Financial Condition and Results of Operations included in our Form 10-K for the year ended December 31, 2025 (“Form 10-K”). This discussion contains forward-looking statements reflecting our current expectations that involve risks and uncertainties. See “Forward Looking Statements and Risk Factor Summary” for a discussion of the uncertainties, risks, and assumptions associated with these statements. Actual results and the timing of events could differ materially from those discussed in our forward-looking statements as a result of many factors, including those set forth under “Risk Factors” and elsewhere in this Quarterly Report.

Previous wording

We believe we are a leading provider of artificial intelligence (“AI”) infrastructure solutions. We own high-performance computing (“HPC”) data centers and provide cloud-based HPC graphics processing units (“GPU”) services, which we term cloud services, for customers such as AI application and machine learning (“ML”) developers (the “HPC Business”). Our Tier-3 data centers provide hosting and colocation services. Our cloud services support generative AI workstreams, especially training and inference.

Current wording

The Company’s HPC business operates under the WhiteFiber brand. WhiteFiber believes it is a leading provider of artificial intelligence (“AI”) infrastructure solutions. WhiteFiber owns high-performance computing (“HPC”) data centers and provides cloud-based HPC graphics processing units (“GPU”) services, which it terms cloud services, for customers such as AI application and machine learning (“ML”) developers (the “HPC Business”). Its Tier-3 data centers provide hosting and colocation services. WhiteFiber cloud services support generative AI workstreams, especially training and inference.

Previous wording

We design, develop, and operate data centers, through which we offer our hosting and colocation services. Our operational data centers meet the requirements of the Tier-3 standard, including N+1 redundancy architecture, concurrent maintainability, uninterruptible power supply, advanced and highly reliable cooling systems, strict monitoring and management systems, 9.982% uptime and no more than 1.6 hours of downtime annually, service organization control, SOC 2 Type 2, differentiated software supporting AI workloads, high density and robust bandwidth, and infrastructure to support AI workloads.

Current wording

WhiteFiber designs, develops, and operates data centers, through which it offers its hosting and colocation services. WhiteFiber’s operational data centers meet the requirements of the Tier-3 standard, including N+1 redundancy architecture, concurrent maintainability, uninterruptible power supply, advanced and highly reliable cooling systems, strict monitoring and management systems, 99.982% uptime and no more than 1.6 hours of downtime annually, service organization control, SOC 2 Type 2, differentiated software supporting AI workloads, high density and robust bandwidth, and infrastructure to support AI workloads.

Previous wording

We acquired Enovum Data Centers Corp (“Enovum”) on October 11, 2024. The transaction included the lease to MTL-1, a fully operational and fully leased to customers 4 MW (gross) Tier-3 data center headquartered in Montreal, Canada.

Current wording

WhiteFiber acquired Enovum on October 11, 2024. The transaction included the lease of MTL-1, its 4 MW (gross) Tier-3 high-performance computing (“HPC”) data center in Montreal, Canada, which was fully operational and fully leased to customers at the time of acquisition.

Previous wording

On December 27, 2024, we acquired the real estate and building for a build-to-suit 5 MW (gross) Tier-3 data center (“MTL-2”) expansion project near Montreal, Canada which we refer to as MTL-2. MTL-2 is a 160,000 square foot site that was previously used as an encapsulation manufacturing facility, is located in Pointe-Claire, Quebec. We initially funded the purchase of CAD $33.5 million (approximately USD $23.3) million with cash on hand. We expect to invest approximately USD $23.6 million to develop the site to Tier-3 standards with an initial load of 5 MW (gross). However, we have prioritized other builds and preserved capital for more time sensitive projects.

Current wording

On December 27, 2024, WhiteFiber acquired the real estate and building for a build-to-suit 5 MW (gross) Tier-3 data center expansion project near Montreal, Canada which it refers to as MTL-2. MTL-2, a 160,000 square foot site that was previously used as an encapsulation manufacturing facility, is located in Pointe-Claire, Quebec. WhiteFiber initially funded the purchase of CAD 33.5 million (approximately $23.3 million) with cash on hand. WhiteFiber expected to invest approximately $23.6 million to develop the site to Tier-3 standards with an initial load of 5 MW (gross). However, WhiteFiber has prioritized other builds and preserved capital for more time sensitive projects.

Previous wording

On April 11, 2025, we entered into a lease for a new data center site in Saint-Jerome, Quebec, a suburb of Montreal, MTL-3. The MTL-3 facility spans approximately 202,000 square feet on 7.7 acres and is being developed as a 7 MW (gross) Tier-3 data center. It will support current contracted capacity, with Cerebras (5 MW IT Load), with future expansion potential subject to utility approvals. The transaction was executed under a lease-to-own structure, which includes a fixed-price purchase option of CAD 24.2 million (approximately $17.3 million) exercisable by December 2025. The lease term is 20 years, with two 5-year extensions at the Company’s option. Subject to our receipt of all required permits, the facility is being retrofitted to Tier-3 standards, with development costs expected to total approximately $41 million. Construction at the site was substantially completed by October 2025. The site has commenced billing Cerebras as of November 1, 2025, in the amount of CAD 1.4 million (approximately $979 thousand) monthly for the duration of the five-year contract.

Current wording

On April 11, 2025, WhiteFiber entered into a lease for a new data center site in Saint-Jerome, Quebec, a suburb of Montreal, MTL-3. The MTL-3 facility spans approximately 202,000 square feet on 7.7 acres and is being developed into a 7 MW (gross) Tier-3 data center. It will support current contracted capacity, with Cerebras (5 MW IT Load), with future expansion potential subject to utility approvals. The transaction was executed under a lease-to-own structure, which includes a fixed-price purchase option of CAD 24.2 million (approximately $17.3 million) exercisable by December 2025. The lease term is 20 years, with two 5-year extensions at the Company’s option. In December 2025, WhiteFiber became reasonably certain to exercise the purchase option and notified the lessor of its intent to exercise the purchase option. WhiteFiber had 90 days to complete the purchase, after which the purchase option would expire. The option was exercised on January 14, 2026 and the purchase of MTL-3 closed on May 8, 2026. The facility has been retrofitted to Tier-3 standards and was completed and operational in November 2025. The site has commenced billing Cerebras as of November 1, 2025, in the amount of CAD 1.4 million (approximately 979 thousand USD) monthly for the duration of the five-year contract.

Previous wording

On May 20, 2025 (the “Closing Date”), we completed the purchase of a former industrial/manufacturing building from Unifi Manufacturing, Inc. (“UMI”). Pursuant to the Purchase Agreement we agreed to purchase from UMI, an industrial/manufacturing building together with the underlying land (“NC-1”) located in Madison, North Carolina, as well as certain machinery and equipment located thereon for a cash purchase price of $45 million. The purchase price will increase by (i) $8 million, if Duke Energy actually provides, or provides an Electric Services Agreement providing for, at least 99 MW (gross) within two years of the Closing Date or (ii) $5 million, if Duke Energy actually provides, or provides an Electric Services Agreement providing for, at least 99 MW (gross) more than two years but less than three years after the Closing Date. Additionally, the purchase price will increase by an additional $200,000 per MW over 99 MW (gross) up to a maximum of $5 million if at least 99 MW (gross) are actually delivered, or Duke Energy provides an Electric Services Agreement for the provision of at least 99 MW (gross), within four years of the Closing Date. Separately, the Company entered into a Capacity Agreement with Duke Energy pursuant to which Duke Energy agreed to use commercially reasonable efforts to achieve 24 MW (gross) of service to the Property by September 1, 2025, 40 MW (gross) by April 1, 2026 and 99 MW (gross) within four years of May 16, 2025. Management believes based upon its review of the site and a Duke Energy preliminary transmission study, that the Property may receive and support up to 200 MW (gross) of total electrical supply over an extended period of time, subject to infrastructure upgrades, such as developing new substations and other conditions. On August 4, 2025, Enovum NC-1 Bidco LLC, a subsidiary of the Company, entered into an Assignment and Assumption Agreement with Unifi Manufacturing and Duke Energy Carolinas, LLC, pursuant to which Enovum assumed Unifi’s rights and obligations under certain electric service agreements for facilities located in North Carolina. Duke Energy consented to the assignment. Refer to Note19. Commitments and contingenciesfor further detail.

Current wording

On May 20, 2025, WhiteFiber completed the purchase of a former industrial/manufacturing building from UMI. Pursuant to the Purchase Agreement WhiteFiber agreed to purchase from UMI, an industrial/manufacturing building together with the underlying land located in Madison, North Carolina, which WhiteFiber refers to as “NC-1”, as well as certain machinery and equipment located thereon for a cash purchase price of $45 million. The purchase price will increase by (i) $8 million, if Duke Energy actually provides, or provides an Electric Services Agreement providing for, at least 99 MW (gross) within two years of May 20, 2025, or (ii) $5 million, if Duke Energy actually provides, or provides an Electric Services Agreement providing for, at least 99 MW (gross) more than two years but less than three years after May 20, 2025. Additionally, the purchase price will increase by an additional $200,000 per MW over 99 MW (gross) up to a maximum of $5 million if at least 99 MW (gross) are actually delivered, or Duke Energy provides an Electric Services Agreement for the provision of at least 99 MW (gross), within four years of May 20, 2025. Separately, the Company entered into a Capacity Agreement with Duke Energy pursuant to which Duke Energy agreed to use commercially reasonable efforts to achieve 24 MW (gross) of service to NC-1 by September 1, 2025, 40 MW (gross) by April 1, 2026, and 99 MW (gross) within four years of May 16, 2025. Management believes based upon its review of the site and a Duke Energy preliminary transmission study, that NC-1 may receive and support up to 200 MW (gross) of total electrical supply over an extended period of time, subject to infrastructure upgrades, such as developing new substations and other conditions. On August 4, 2025, Enovum NC-1 Bidco LLC, a subsidiary of WhiteFiber, entered into an Assignment and Assumption Agreement with Unifi Manufacturing and Duke Energy Carolinas, LLC, pursuant to which Enovum assumed Unifi’s rights and obligations under certain electric service agreements for facilities located in North Carolina. Duke Energy consented to the assignment. Refer to Note 21.Commitments and contingencies to our condensed consolidated financial statements for further detail.

Previous wording

On June 18, 2025, the Company entered into a definitive credit agreement (the “Facility”) with the Royal Bank of Canada (“RBC”). The Facility provides for an aggregate of up to approximately CAD $60 million (approximately USD $43.8 million) of financing. The proceeds are to be used primarily to refinance the buildout of Tier-3 AI data center at 7300 Trans Canada Highway, Pointe-Claire, Quebec (“MTL-2”) as well as USD $5.8 million of revolving term financing (the “Revolver”). The Facility is non-recourse to the Company. The Company entered into a three-year USD $18.5 million non-revolving lease facility to finance equipment costs and building improvements to build out the site. The lease facility provides for straight-line amortization of six years and capital moratorium of six months after disbursement is complete. RBC may cancel any unutilized portion of the facility after March 31, 2026. The interest rate is fixed based on the rental rate determined by RBC for the three-year term of the lease.

Current wording

On June 18, 2025, WhiteFiber entered into the Credit Facility with RBC. The Credit Facility provides for an aggregate of up to approximately CAD 60 million (approximately $43.8 million) of financing. The proceeds are to be used primarily to refinance the buildout of MTL-2 as well as $5.8 million of revolving term financing (the “Revolver”). The Credit Facility is non-recourse to the Company. WhiteFiber entered into a three-year USD $18.5 million non-revolving lease facility to finance equipment costs and building improvements to build out the site. The lease facility provides for straight-line amortization of six years and capital moratorium of six months after disbursement is complete. RBC may cancel any unutilized portion of the Credit Facility after March 31, 2026. The interest rate is fixed based on the rental rate determined by RBC for the three-year term of the lease.

Previous wording

As part of the Facility, the Company entered into a three-year USD $19.6 million non-revolving real estate term loan facility. The purpose of this facility is to refinance the Company’s purchase of MTL-2. The interest rate of the real estate term loan facility will be determined at the time of borrowing, or a floating interest rate ranging from RBP plus 0.75% to CORRA (“Canadian Overnight Repo Rate Average”) plus 250 bps. Payment of principal and interest is due 30 days after drawdown and is repayable in full on the last day of the three-year term.

Current wording

As part of the Credit Facility, WhiteFiber entered into a three-year $19.6 million non-revolving real estate term loan facility. The purpose of this facility is to refinance WhiteFiber’s purchase of MTL-2. The interest rate of the real estate term loan facility will be determined at the time of borrowing, or a floating interest rate ranging from RBP plus 0.75% to CORRA (“Canadian Overnight Repo Rate Average”) plus 250 bps. Payment of principal and interest is due 30 days after drawdown and is repayable in full on the last day of the three-year term.

Previous wording

The Revolver is being provided by RBC by way of Letters of Credit and Letters of Guaranty with fees to be determined on a transaction by transaction basis. This facility will be available for the 36 month term subject to the issuance of the EDC (Export and Development Canada) Performance Security Guaranty in the amount of USD $5.8 million and other related supporting documents. The Company agreed to certain financial covenants included maintaining on a combined basis between MTL-1 and MTL-2: fixed charge coverage of not less than 1.20:1 and a ratio of Net Funded Debt to EBITDA of not greater than 4.25:1 and decreasing to 3.50:1 from December 31, 2027.

Current wording

The Revolver is being provided by RBC by way of Letters of Credit and Letters of Guaranty with fees to be determined on a transaction by transaction basis. This facility will be available for the 36 month term subject to the issuance of the EDC (Export and Development Canada) Performance Security Guaranty in the amount of $5.8 million and other related supporting documents. WhiteFiber agreed to certain financial covenants included maintaining on a combined basis between MTL-1 and MTL-2: fixed charge coverage of not less than 1.20:1 and a ratio of Net Funded Debt to EBITDA of not greater than 4.25:1 and decreasing to 3.50:1 from December 31, 2027.

Previous wording

We provide specialized cloud services to support generative AI workstreams, especially training and inference, emphasizing cost-effective utility and tailor-made solutions for each client. We are an authorized NVIDIA Preferred Partner through the NVIDIA Partner Network (“NPN”), an authorized partner with SuperMicro Computer Inc.®, an authorized Communications Service Provider (“CSP”) with Dell (through Dell’s exclusive distributor in Iceland, Advania), an official partnership with Hewlett Packard Enterprise and a commercial relationship with Quanta Computer Inc. (“QCT”). Based on Management’s knowledge of the industry, we are proud to be among the first service providers to offer H200, B200, and GB200 servers. We provide a high-standard service lease with an Uptime percentage > 99.5%.

Current wording

WhiteFiber provides specialized cloud services to support generative AI workstreams, especially training and inference, emphasizing cost-effective utility and tailor-made solutions for each client. WhiteFiber is an authorized NVIDIA Preferred Partner through the NVIDIA Partner Network (“NPN”), an authorized partner with SuperMicro Computer Inc.®, an authorized Communications Service Provider (“CSP”) with Dell (through Dell’s exclusive distributor in Iceland, Advania), an official partnership with Hewlett Packard Enterprise and a commercial relationship with Quanta Computer Inc. (“QCT”). Based on management’s knowledge of the industry, WhiteFiber is proud to be among the first service providers to offer H200, B200, and GB200 servers. WhiteFiber provides a high-standard service lease with an Uptime percentage> 99.5%.

Previous wording

We expect to leverage a global network of data centers for hosting capacity for our GPU business, in many instances, by negotiating with third-party providers to seamlessly integrate our cloud services at data centers across key regions in Europe, North America and Asia. Our initial data center partnership through which we lease capacity is at Blönduós Campus, Iceland, offering a world-class operations team with certified technicians and reliable engineers. The facility has 45kW rack density and 6 MW (gross) total capacity. We have executed contracts for 5.5 MW IT load at the data center. The center’s energy source is 100% renewable energy, mainly from Blanda Hydro PowerStation, the winner of an IHA Blue Planet Award in 2017.

Current wording

WhiteFiber expects to leverage a global network of data centers for hosting capacity for its GPU business, in many instances, by negotiating with third-party providers to seamlessly integrate its cloud services at data centers across key regions in Europe, North America and Asia. WhiteFiber’s initial data center partnership through which it leases capacity is at Blönduós Campus, Iceland, offering a world-class operations team with certified technicians and reliable engineers. The facility has a 45 kW rack density and 6 MW (gross) total capacity. WhiteFiber has executed contracts for 5.5 MW IT load at the data center. The center’s energy source is 100% renewable energy, mainly from Blanda Hydro PowerStation, the winner of an IHA Blue Planet Award in 2017. In addition, WhiteFiber has leased additional capacity to install our data center in Atlanta, Georgia, USA to expand its cloud services offering. The capacity leases commenced in February 2026. WhiteFiber also intend to lease additional capacity to expand its cloud services offering.

Previous wording

In April 2025, we received our first shipment of NVIDIA GB200 Grace Blackwell Superchip powered NVIDIA GB200 NVL72 system chips, from Quanta Cloud Technology, a leading provider of data center solutions. We believe that support with proof of concept (POC) access from Quanta will enable us to meet and exceed expectations around delivery and timeline, performance and reliability.*** ***

Current wording

In April 2025, WhiteFiber received its first shipment of NVIDIA GB200 Grace Blackwell Superchip powered NVIDIA GB200 NVL72 system chips, from Quanta Cloud Technology, a leading provider of data center solutions. WhiteFiber believes that support with proof of concept (POC) access from Quanta will enable it to meet and exceed expectations around delivery and timeline, performance and reliability.*** ***

Previous wording

The following summaries reflect selected GPU cloud service agreements that we consider to be material or representative. We have entered into additional agreements that are not individually material and are not included below.

Current wording

The following summaries reflect selected GPU cloud service agreements that WhiteFiber considers to be material or representative. WhiteFiber has entered into additional agreements that are not individually material and are not included below.

Previous wording

On October 23, 2023, Bit Digital announced that it had commenced AI operations by signing a binding term sheet with a customer (the “Initial Customer”) to support the customer’s GPU workloads. On December 12, 2023, we finalized a Master Services and Lease Agreement (“MSA”), as amended, with our Initial Customer for the provision of cloud services from a total of 2,048 GPUs over a three-year period. To finance this operation, we entered into a sale-leaseback agreement with a third party, selling 96 AI servers (equivalent to 768 GPUs) and leasing them back for three years. The total contract value with the Initial Customer for the aggregated 2,048 GPUs was estimated to be worth more than $50 million of annualized revenue. On January 22, 2024, approximately 192 servers (equivalent to 1,536 GPUs) were deployed at a specialized data center and began generating revenue, and subsequently on February 2, 2024, approximately an additional 64 servers (equivalent to 512 GPUs) also started to generate revenue.

Current wording

On October 23, 2023, Bit Digital announced that it had commenced AI operations by signing a binding term sheet with a customer (the “Initial Customer”) to support the customer’s GPU workloads. On December 12, 2023, WhiteFiber finalized a Master Services and Lease Agreement (“MSA”), as amended, with its Initial Customer for the provision of cloud services from a total of 2,048 GPUs over a three-year period. To finance this operation, WhiteFiber entered into a sale-leaseback agreement with a third party, selling 96 AI servers (equivalent to 768 GPUs) and leasing them back for three years. The total contract value with the Initial Customer for the aggregated 2,048 GPUs was estimated to be worth more than $50 million of annualized revenue. On January 22, 2024, approximately 192 servers (equivalent to 1,536 GPUs) were deployed at a specialized data center and began generating revenue, and subsequently on February 2, 2024, approximately an additional 64 servers (equivalent to 512 GPUs) also started to generate revenue.

Previous wording

In the second quarter of 2024, we finalized an agreement to supply our Initial Customer with an additional 2,048 GPUs over a three-year period. To finance this operation, we entered into a sale-leaseback agreement with a third party, agreeing to sell 128 AI servers (equivalent to 1,024 GPUs) and leasing them back for three years. In late July, at the customer’s request, we agreed with the customer to temporarily delay the purchase order so the customer could evaluate an upgrade to newer generation Nvidia GPUs. Consequently, the Company and manufacturer postponed the purchase order. In early August, the customer made a non-refundable prepayment of $30.0 million for the services to be rendered under this agreement.

Current wording

In the second quarter of 2024, WhiteFiber finalized an agreement to supply its Initial Customer with an additional 2,048 GPUs over a three-year period. To finance this operation, WhiteFiber entered into a sale-leaseback agreement with a third party, agreeing to sell 128 AI servers (equivalent to 1,024 GPUs) and leasing them back for three years. In late July, at the customer’s request, WhiteFiber agreed with the customer to temporarily delay the purchase order so the customer could evaluate an upgrade to newer generation Nvidia GPUs. Consequently, WhiteFiber and manufacturer postponed the purchase order. In early August, the customer made a non-refundable prepayment of $30.0 million for the services to be rendered under this agreement.

Previous wording

In January 2025, the Company entered into a new agreement to supply its Initial Customer with an additional 464 GPUs for a period of 18 months. This new agreement replaces the prior agreement whereby the Company was to provide the customer with an incremental 2,048 H100 GPUs. The contract represents approximately $15 million of annualized revenue and features a two-month prepayment from the customer. The customer elected to defer the commencement date until August 20, 2025, which is the latest allowable date under the agreement. Deployment commenced on August 20, 2025, using the Company’s inventory of B200 GPUs.

Current wording

In January 2025, WhiteFiber entered into a new agreement to supply its Initial Customer with an additional 464 GPUs for a period of 18 months. This new agreement replaces the prior agreement whereby WhiteFiber was to provide the customer with an incremental 2,048 H100 GPUs. The contract represents approximately $15 million of annualized revenue and features a two-month prepayment from the customer. The customer elected to defer the commencement date until August 20, 2025, which is the latest allowable date under the agreement. Deployment commenced on August 20, 2025, using WhiteFiber’s inventory of B200 GPUs.

Previous wording

In October 2025, the Company’s existing parent guaranty arrangement with the Initial Customer was scheduled to expire. Beginning in November 2025, the customer will provide a service deposit to the Company in lieu of the parent guaranty. The deposit will be funded through fifteen consecutive monthly payments of approximately $0.24 million each, totaling $3.6 million, payable from November 2025 through January 2027. The deposit will serve as security for the customer’s performance obligations under the amended service agreements. Each monthly payment is expected to be invoiced on the first day of the month and paid within thirty days. The Company will be required to return the deposit in cash upon termination or expiration of the service agreements, provided that all obligations have been fully satisfied and no payment defaults or material breaches exist.

Current wording

In October 2025, Bit Digital’s existing guaranty arrangement with the Initial Customer was scheduled to expire. Beginning in November 2025, the customer will provide a service deposit to WhiteFiber in lieu of the Bit Digital parent guaranty. The deposit will be funded through fifteen consecutive monthly payments of approximately $0.24 million each, totaling $3.6 million, payable from November 2025 through January 2027. The deposit will serve as security for the customer’s performance obligations under the amended service agreements. Each monthly payment is expected to be invoiced on the first day of the month and paid within thirty days. WhiteFiber will be required to return the deposit in cash upon termination or expiration of the service agreements, provided that all obligations have been fully satisfied and no payment defaults or material breaches exist.

Previous wording

On November 6, 2024, we entered into a Master Services Agreement (“MSA”) with a minimum purchase commitment of 16 GPUs, along with an associated purchase order, from a new customer. The purchase order provides for services utilizing a total of 16 H200 GPUs over a minimum of a six month period, representing total contracted value of approximately $160,000 for the term. The deployment commenced on November 7, 2024, using the Company’s existing inventory of H200 GPUs. The service under the purchase order concluded in May 2025. Between May 2025 and September 2025, the Company signed six additional agreements on a month-to-month basis for a total of 88 H200 GPUs, of which 80 remained in deployment as of the date of this report.

Current wording

On November 6, 2024, WhiteFiber entered into a Master Services Agreement (“MSA”) with a minimum purchase commitment of 16 GPUs, along with an associated purchase order, from a new customer. The purchase order provides for services utilizing a total of 16 H200 GPUs over a minimum of a six-month period, representing total contracted value of approximately $160,000 for the term. The deployment commenced on November 7, 2024, using WhiteFiber’s existing inventory of H200 GPUs. The service under the purchase order concluded in May 2025. Between May 2025 and September 2025, WhiteFiber signed six additional agreements on a month-to-month basis for a total of 88 H200 GPUs, which were terminated in January 2026.

Previous wording

On December 30, 2024, we entered into a Master Services Agreement (“MSA”) with a minimum purchase commitment of 32 GPUs, along with an associated purchase order, from a new customer, an AI Compute Fund managed by DNA Holdings Venture Inc. (“DNA Fund”). The purchase order provides for services utilizing a total of 576 H200 GPUs over a 25 month period and terminable by either party upon at least 90 days’ written notice prior to any renewal date. It represents an aggregate revenue opportunity of approximately $20.2 million. Concurrently, we placed a purchase order for 130 H200 servers for approximately $30 million. The deployment commenced in February 2025.

Current wording

On December 30, 2024, WhiteFiber entered into a Master Services Agreement (“MSA”) with an AI Compute Fund managed by DNA Holdings Venture Inc. (“DNA Fund”). The MSA had a minimum purchase commitment of 32 GPUs, along with an associated purchase order. The purchase order provides for services utilizing a total of 576 H200 GPUs over a 25-month period and terminable by either party upon at least 90 days’ written notice prior to any renewal date. Concurrently, WhiteFiber placed a purchase order for 130 H200 servers for approximately $30 million. The deployment commenced in February 2025.

Previous wording

In April 2025, the Company signed two additional cloud services agreements with DNA Fund. The first agreement includes 104 NVIDIA H200 GPUs under a 23-month term and was deployed in May 2025. The second agreement includes 512 H200 GPUs under a 24-month term and was deployed in July 2025. With these additions, DNA Fund’s total contracted deployment increased to 1,192 GPUs. Combined, the agreements represent approximately $20.8 million of annualized revenue.

Current wording

In April 2025, WhiteFiber signed two additional cloud services agreements with DNA Fund. The first agreement includes 104 NVIDIA H200 GPUs under a 23-month term and was deployed in May 2025. The second agreement includes 512 H200 GPUs under a 24-month term and was deployed in July 2025. With these additions, DNA Fund’s total contracted deployment increased to 1,192 GPUs.

Previous wording

On January 6, 2025, we entered into a Master Services Agreement (“MSA”) with a minimum purchase commitment of 32 GPUs, along with an associated purchase order, from a new customer. The purchase order provided for services utilizing a total of 32 H200 GPUs over a minimum of six month period, representing total revenue of approximately $300,000 for the term. The deployment commenced and revenue generation began on January 8, 2025, using the Company’s existing inventory of H200 GPUs. The service under the purchase order concluded in April 2025 following a change in the customer’s ownership, and the customer paid the remaining contract value as an early termination penalty.

Current wording

On January 6, 2025, WhiteFiber entered into a Master Services Agreement (“MSA”) with a minimum purchase commitment of 32 GPUs, along with an associated purchase order, from a new customer. The purchase order provided for services utilizing a total of 32 H200 GPUs over a minimum of six-month period, representing total revenue of approximately $300,000 for the term. The deployment commenced and revenue generation began on January 8, 2025, using WhiteFiber’s existing inventory of H200 GPUs. The service under the purchase order concluded in April 2025 following a change in the customer’s ownership, and the customer paid the remaining contract value as an early termination penalty.

Previous wording

In January 2025, we entered into a Master Services Agreement (“MSA”), along with two associated purchase orders, from a new customer. The purchase orders provide for services utilizing a total of 24 H200 GPUs over a minimum 12 month period, representing total revenue of approximately $450,000 for the term. The deployment commenced and revenue generation began on January 27, 2025, using the Company’s existing inventory of H200 GPUs. The service under the purchase order concluded in March 2025 after the customer ceased operations.

Current wording

In January 2025, WhiteFiber entered into a Master Services Agreement (“MSA”), along with two associated purchase orders, from a new customer. The purchase orders provide for services utilizing a total of 24 H200 GPUs over a minimum 12-month period, representing total revenue of approximately $450,000 for the term. The deployment commenced and revenue generation began on January 27, 2025, using WhiteFiber’s existing inventory of H200 GPUs. The service under the purchase order concluded in March 2025 after the customer ceased operations.

Previous wording

On January 30, 2025, we entered into a Master Services Agreement (“MSA”) with a minimum purchase commitment of 40 GPUs, along with an associated purchase order, from a new customer. The purchase orders provide for services utilizing a total of 40 H200 GPUs over a minimum of 12 month period, representing total revenue of approximately $750,000 for the term. The deployment commenced and revenue generation began on January 24, 2025, using the Company’s existing inventory of H200 GPUs. In October 2025, the purchase order was amended to reduce the number of H200 GPUs from 40 to 8 and to extend the term of service through May 2027. Between April and July 2025, the Company signed four additional agreements on a month-to-month basis for a total of 184 H200 GPUs which were terminated in August 2025.

Current wording

On January 30, 2025, WhiteFiber entered into a Master Services Agreement (“MSA”) with a minimum purchase commitment of 40 GPUs, along with an associated purchase order, from a new customer. The purchase orders provide for services utilizing a total of 40 H200 GPUs over a minimum of 12 month period, representing total revenue of approximately $750,000 for the term. The deployment commenced and revenue generation began on January 24, 2025, using WhiteFiber’s existing inventory of H200 GPUs. In October 2025, the purchase order was amended to reduce the number of H200 GPUs from 40 to 8 and to extend the term of service through May 2027. This contract was terminated in January 2026. Between April and July 2025, WhiteFiber signed four additional agreements on a month-to-month basis for a total of 184 H200 GPUs, which were terminated in August 2025.

Previous wording

In March 2025, we entered a strategic partnership with Shadeform, Inc., the premier multi-cloud GPU marketplaces, to bring on-demand NVIDIA B200 GPUs to customers beginning in May 2025.

Current wording

In March 2025, WhiteFiber entered a strategic partnership with Shadeform, Inc., the premier multi-cloud GPU marketplaces, to bring on-demand NVIDIA B200 GPUs to customers beginning in May 2025.

Previous wording

In August and September 2025, we entered into three service orders with a new customer. Each order form provides for services utilizing a total of 64 B200 GPUs on a weekly basis, which either party may terminate by not extending it with mutual written agreement. In September, the customer renewed one order form for an additional week for services utilizing a total of 64 B200 GPUs. As of the reporting date, no additional renewals have occurred.

Current wording

In August and September 2025, WhiteFiber entered into three service orders with a new customer. Each order form provides for services utilizing a total of 64 B200 GPUs on a weekly basis, which either party may terminate by not extending it with mutual written agreement. In September, the customer renewed one order form for an additional week for services utilizing a total of 64 B200 GPUs. As of the reporting date, no additional renewals have occurred.

Previous wording

In September 2025, we entered into a service order with a new customer, which provides services utilizing a total of 16 B200 GPUs on a monthly basis, automatically renewing for an additional one month period unless and until otherwise terminated upon at least seven days’ prior written notice. The deployment commenced and revenue generation began on September 23, 2025.

Current wording

In September 2025, WhiteFiber entered into a service order with a new customer, which provides services utilizing a total of 16 B200 GPUs on a monthly basis, automatically renewing for an additional one month period unless and until otherwise terminated upon at least seven days’ prior written notice. The deployment commenced and revenue generation began on September 23, 2025. The agreement was not renewed after the initial term.

Previous wording

In October 2025, we entered into a service order with a new customer to provide services utilizing a total of 48 H200 GPUs. The service order has an initial term of 36 months representing total contracted value of approximately $2.2 million, after which it automatically renews for successive one-month periods unless terminated by either party. The deployment commenced and revenue generation began on October 21, 2025.

Current wording

In October 2025, WhiteFiber entered into a service order with a new customer to provide services utilizing a total of 48 H200 GPUs. The service order had an initial term of 36 months. The deployment commenced and revenue generation began on October 21, 2025. The contract was terminated in December 2025.

Previous wording

In November 2025, we entered into a service order with a new customer to provide services utilizing a total of 128 B200 GPUs. The service order has an initial term of 12 months, representing total contracted value of approximately $3.0 million, after which it automatically renews for successive one-month periods unless terminated by either party. Deployment and revenue generation is scheduled to begin on December 1, 2025.

Current wording

In November 2025, WhiteFiber entered into a service order with a new customer to provide services utilizing a total of 128 B200 GPUs. The service order has an initial term of 12 months, representing total contracted value of approximately $3.0 million, after which it automatically renews for successive one-month periods unless terminated by either party. Deployment and revenue generation began on December 1, 2025.

Previous wording

In August 2024, we executed a binding term sheet with Boosteroid Inc. (“Boosteroid”), a global cloud gaming provider pursuant to which, we finalized initial orders of 489 GPUs, projected to generate approximately $7.9 million in contracted value in the aggregate through November 2029. The GPUs were delivered to respective data centers across the U.S. and Europe and began earning fees in November 2024. On October 9, 2024, we executed a Master Services and Lease Agreement (the “MSA”) with Boosteroid, pursuant to which Boosteroid may, from time to time, lease certain equipment, including GPUs, from the Company upon delivery of a purchase order. The MSA provides the general terms and conditions for such equipment leases. Pursuant to the MSA, we are granted a right of first refusal with respect to the next 5,000 servers that Boosteroid leases during the term of the MSA. The MSA provides Boosteroid with the option to expand in increments of 100 servers, up to 50,000 servers, representing a potential contract value of approximately $700 million over the five-year term assuming Boosteroid utilizes the GPUs and services at full capacity for the duration of the contract. Expansion depends upon the internal development roadmap of Boosteroid, Boosteroid has full discretion to decide when and the quantity to pursue separate source orders (for GPU servers) under the MSA. In the third quarter of 2025, the Company finalized additional purchase orders for 302, 120, and 279 GPUs, totaling approximately $10.4 million in contracted value over a five-year term.

Current wording

In August 2024, WhiteFiber executed a binding term sheet with Boosteroid Inc. (“Boosteroid”), a global cloud gaming provider pursuant to which, WhiteFiber finalized initial orders of 489 GPUs, projected to generate approximately $7.9 million in contracted value in the aggregate through November 2029. The GPUs were delivered to respective data centers across the U.S. and Europe and began earning fees in November 2024. On October 9, 2024, WhiteFiber executed a Master Services and Lease Agreement (the “MSA”) with Boosteroid, pursuant to which Boosteroid may, from time to time, lease certain equipment, including GPUs, from the Company upon delivery of a purchase order. The MSA provides the general terms and conditions for such equipment leases. Pursuant to the MSA, WhiteFiber is granted a right of first refusal with respect to the next 5,000 servers that Boosteroid leases during the term of the MSA. The MSA provides Boosteroid with the option to expand in increments of 100 servers, up to 50,000 servers, representing a potential contract value of approximately $700 million over the five-year term assuming Boosteroid utilizes the GPUs and services at full capacity for the duration of the contract. Expansion depends upon the internal development roadmap of Boosteroid, Boosteroid has full discretion to decide when and the quantity to pursue separate source orders (for GPU servers) under the MSA. In the third quarter of 2025, WhiteFiber finalized additional purchase orders for 302, 120, and 279 GPUs, totaling approximately $10.4 million in contracted value over a five-year term.

Previous wording

The digital asset business is comprised primarily of two distinct but highly complementary operations: (i) digital asset mining (the “Digital Asset Mining Operations”); and (ii) ETH staking (the “ETH Staking Operations”).

Current wording

The digital asset business is comprised primarily of two distinct but highly complementary operations: (i) ETH staking (the “ETH Staking Operations”); and (ii) digital asset mining (the “Digital Asset Mining Operations”).

Previous wording

In June 2025, the Company announced that it had initiated a strategic transition to become a pure play ETH staking and treasury company. In connection with the transition, the Company intends to convert its BTC holdings into ETH over time and has commenced a strategic alternatives process for its bitcoin mining operations, which is expected to result in a sale or wind-down, with any net proceeds to be re-deployed into ETH.

Current wording

In June 2025, the Company announced that it had initiated a strategic transition to become a pure play ETH staking and treasury company. In connection with the transition, the Company has been converting its BTC holdings into ETH over time and has been winding down its bitcoin mining operations, with any net proceeds to be re-deployed into ETH.

Previous wording

We have signed service agreements with third-party hosting partners in North America and Iceland. These partners operate specialized mining data centers, where they install and operate the miners and provide IT consulting, maintenance, and repair work on site for us. Our mining facilities in New York are maintained by Digihost Technologies Inc. (“Digihost”). Our mining facilities in Texas are maintained by Dory Creek, LLC, a subsidiary of Bitdeer Technologies Group (“Bitdeer”) and A.R.T. Digital Holdings Corp (“KaboomRacks”). Soluna Computing, Inc and DVSL ComputeCo, LLC (collectively “Soluna”) maintained our mining facilities in Kentucky and Texas. Our mining facility in Iceland is maintained by GreenBlocks ehf, an Icelandic private limited company (“GreenBlocks”).

Current wording

We have signed service agreements with third-party hosting partners in North America and Iceland. These partners operate specialized mining data centers, where they install and operate the miners and provide IT consulting, maintenance, and repair work on site for us. Our mining facilities in New York are maintained by Digihost Technologies Inc. (“Digihost”). Our mining facilities in Texas are maintained by Dory Creek, LLC, a subsidiary of Bitdeer Technologies Group (“Bitdeer”) and Digital Energy Partner LLC (“DEP”). Soluna Computing, Inc. and DVSL ComputeCo, LLC (collectively, “Soluna”) previously maintained our mining facilities in Kentucky and Texas, and GreenBlocks ehf, an Icelandic private limited company (“GreenBlocks”), previously maintained our mining facility in Iceland. The Company’s partnership with Soluna and GreenBlocks concluded at the end of February 2026.

Previous wording

During the three months ended September 30, 2025, we continued to work with our hosting partners to deploy our miners in North America and Iceland.

Current wording

During the three months ended March 31, 2026, we continued to work with our hosting partners to deploy our miners in North America.

Previous wording

As of September 30, 2025, the Company’s active hash rate totals approximately 1.9 EH/s, with operations in North America and Iceland.

Current wording

As of March 31, 2026, the Company’s active hash rate totals approximately 1.1 EH/s, with operations in North America.

Previous wording

The Company’s subsidiary, Bit Digital Canada, Inc., entered into a Mining Services Agreement effective September 1, 2022, for Blockbreakers, Inc. to provide five MW of incremental hosting capacity at its facility in Canada. The facility utilizes an energy source that is primarily hydroelectric.

Current wording

The Company’s subsidiary, Bit Digital Canada, Inc., entered into a Mining Services Agreement effective September 1, 2022, for Blockbreakers, Inc. to provide five (5) MW of incremental hosting capacity at its facility in Canada. The facility utilizes an energy source that is primarily hydroelectric.

Previous wording

On May 8, 2023, the Company entered into a Master Mining Services Agreement with Blockbreakers, pursuant to which Blockbreakers agreed to provide the Company with four (4) MW of additional mining capacity at its hosting facility in Canada. The agreement is for two (2) years automatically renewable for additional one (1) year terms unless either party gives at least 60 days’ advance written notice. The performance fee is 15% of the net profit. Additionally, Bit Digital has secured a side letter agreement with Blockbreakers, granting the Company the right of first refusal for any future mining hosting services offered by Blockbreakers in Canada. This agreement brought the Company’s total contracted hosting capacity with Blockbreakers to approximately 9 MW. Our service agreement with Blockbreakers expired in November 2024. A portion of the miners were transferred to other hosting facilities, and the inefficient units were sold.

Current wording

On May 8, 2023, the Company entered into a Master Mining Services Agreement with Blockbreakers, pursuant to which Blockbreakers agreed to provide the Company with four (4) MW of additional mining capacity at its hosting facility in Canada. The agreement is for two (2) years automatically renewable for additional one (1) year terms unless either party gives at least 60 days’ advance written notice. The performance fee is 15% of the net profit. This new agreement brought the Company’s total contracted hosting capacity with Blockbreakers to approximately 9 MW. Our service agreement with Blockbreakers expired in November 2024. A portion of the miners were transferred to other hosting facilities, and the inefficient units were sold.

Previous wording

On June 7, 2022, we entered into a Master Mining Services Agreement (the “MMSA”) with Coinmint LLC, pursuant to which Coinmint will provide the required mining colocation services for a one-year period automatically renewing for three-month periods unless earlier terminated. The Company paid Coinmint electricity costs, plus operating costs required to operate the Company’s mining equipment, as well as a performance fee equal to 27.5% of the net profit, subject to a 10% reduction if Coinmint fails to provide uptime of 98% or better for any period. We were not privy to the emissions rate at the Coinmint facility or at any other hosting facility. However, the Coinmint facility operated in an upstate New York region that reportedly utilized power that is 99% emissions-free, as determined based on the 2023 Load & Capacity Data Report published by the New York Independent System Operator, Inc. (“NYISO”).

Current wording

On June 7, 2022, we entered into a Master Mining Services Agreement (the “MMSA”) with Coinmint LLC, pursuant to which Coinmint will provide the required mining colocation services for a one-year period automatically renewing for three-month periods unless earlier terminated. The Company will pay Coinmint electricity costs, plus operating costs required to operate the Company’s mining equipment, as well as a performance fee equal to 27.5% of the net profit, subject to a 10% reduction if Coinmint fails to provide uptime of 98% percent or better for any period. We are not privy to the emissions rate at the Coinmint facility or at any other hosting facility. However, the Coinmint facility operated in an upstate New York region that reportedly utilized power that is 99% emissions-free, as determined based on the 2023 Load & Capacity Data Report published by the New York Independent System Operator, Inc. (“NYISO”).

Previous wording

On April 5, 2023, the Company entered into a letter agreement and MMSA Amendment with Coinmint pursuant to which Coinmint agreed to provide the Company with up to ten (10) MW of additional mining capacity to energize the Company’s mining equipment at Coinmint’s hosting facility in Plattsburgh, New York. The agreement was for two years automatically renewing for three (3) months unless terminated by either party on at least ninety (90) days prior written notice. The performance fees under this letter agreement range from 30% to 33% of the net profit. This agreement brought the Company’s total contracted hosting capacity with Coinmint to approximately 30 MW at this facility.

Current wording

On April 5, 2023, the Company entered into a letter agreement and MMSA Amendment, as subsequently amended, with Coinmint pursuant to which Coinmint agreed to provide the Company with up to ten (10) MW of additional mining capacity to energize the Company’s mining equipment at Coinmint’s hosting facility in Plattsburgh, New York. The agreement is for two (2) years automatically renewing for three (3) months unless terminated by either party on at least ninety (90) days prior written notice. The performance fees under this letter agreement range from 30% to 33% of the net profit. This new agreement brings the Company’s total contracted hosting capacity with Coinmint to approximately 30 MW at this facility.

Previous wording

In June 2021, we entered into a strategic co-mining agreement with Digihost Technologies in North America. Pursuant to the terms of the agreement, Digihost provides certain premises to Bit Digital for the purpose of the operation and storage of a 20 MW bitcoin mining system to be delivered by Bit Digital. Digihost provides services to maintain the premises for a term of two years. Digihost shall also be entitled to 20% of the net profit generated by the miners.

Current wording

In June 2021, we entered into a strategic co-mining agreement with Digihost Technologies in North America. Pursuant to the terms of the agreement, Digihost provides certain premises to Bit Digital for the purpose of the operation and storage of a twenty (20) MW bitcoin mining system to be delivered by Bit Digital. Digihost provides services to maintain the premises for a term of two (2) years. Digihost shall also be entitled to 20% of the net profit generated by the miners.

Showing the first 40 of 93 pairs. Open the source sections for the rest.

Rearranged current paragraphs (4)

Current report — wording carried from elsewhere

We initiated our native staking operations with MarsLand Global Limited (“MarsLand”) in August 2023. Subsequently, we have ceased our native staking with MarsLand in the first quarter of 2024 and initiated our native staking with Figment Inc.

Current report — wording carried from elsewhere

We started participating in liquid staking via Liquid Collective protocol on the Coinbase platform in the first quarter of 2023. Liquid staking allows participants to achieve greater capital efficiency by utilizing their staked ETH as collateral and trading their staked ETH tokens on the secondary market. In the first quarter of 2024, we have reclaimed all the liquid staked ETH from Liquid Collective protocol. In July 2025, we resumed liquid staking through the Liquid Collective protocol with 5,120 ETH. This approach provided flexibility to engage in both staking and restaking through a broader range of strategies and platforms. Subsequently, we ceased our liquid staking activities with Liquid Collective protocol in October 2025.

Current report — wording carried from elsewhere

In the fourth quarter of 2022, we formally commenced Ethereum staking operations. We delegate or stake our ETH holdings to an Ethereum validator node to help secure and strengthen the blockchain network. Stakers are compensated for this commitment in the form of a reward of the native network token.

Current report — wording carried from elsewhere

For the three months ended March 31, 2025, we earned 211.0 ETH and nil ETH in native staking and liquid staking, respectively. For the three months ended March 31, 2025, we recognized revenues of $560,641 and $nil from native staking and liquid staking, respectively.
Rearranged previous paragraphs (29)

Previous report — wording carried elsewhere

The following table summarizes the results of our operations during the nine months ended September 30, 2025 and 2024, respectively, and provides information regarding the dollar increase or (decrease) during the period.

Previous report — wording carried elsewhere

We generate revenues from cloud services, colocation services, digital asset mining, and ETH staking businesses.

Previous report — wording carried elsewhere

In the fourth quarter of 2023, we established our cloud-based HPC graphics processing units services, which we term cloud services, a new business line to provide cloud services to support generative AI workstreams. The Company commenced offering cloud services to customers in January 2024.

Previous report — wording carried elsewhere

In the fourth quarter of 2024, we acquired Enovum which provides customers with physical space, power, and cooling within data center facilities.

Previous report — wording carried elsewhere

During the fourth quarter of 2022, we commenced ETH staking business, in both native staking and liquid staking.

Previous report — wording carried elsewhere

For the ETH native staking business, we previously partnered with Blockdaemon, Marsprotocol and MarsLand. Currently, we stake ETH with Figment, using network-based smart contracts, on a node for the purpose of validating transactions and adding blocks to the network. Through these contracts, the Company stakes ETH on nodes for the purpose of validating transactions and adding blocks to the Ethereum blockchain network. The Company is able to withdraw staked ETH under contracted staking since April 12, 2023 when the announced Shanghai upgrade was completed. In exchange for staking the ETH and validating transactions on blockchain networks, the Company is entitled to block rewards and transaction fees for successfully validating or adding a block to the blockchain. These rewards are received by the Company directly from the Ethereum network and are calculated approximately based on the proportion of the Company’s stake to the total ETH staked by all validators.

Previous report — wording carried elsewhere

In the fourth quarter of 2023, the Company terminated the native staking activities and reclaimed all staked Ethereum with Blockdaemon. Our native staking operations with Marsprotocol commenced in the first quarter of 2023 and concluded in July 2023. After ceasing operations with Marsprotocol, we initiated our native staking operations with MarsLand in August 2023. In the first quarter of 2024, we concluded our operations with MarsLand and initiated our native staking operations with Figment. As of December 31, 2024, all of our native staking operations are with Figment.

Previous report — wording carried elsewhere

For the liquid staking business, the Company has deployed ETH into Portara protocol (formerly known as Harbour) supported by liquid staking solution provider under the consortium of Blockdaemon and Stakewise, and Liquid Collective protocol supported by Coinbase. By staking, we receive receipt tokens for the ETH staked which could be redeemed to ETH or can be traded or collateralized elsewhere, at any time. In addition, we receive rETH-h for rewards earned from Portara protocol. With the introduction of staked ETH withdrawals in April 2023, we have reassessed our Ethereum network staking approaches, weighing the advantages of traditional staking against liquid staking solutions. The withdrawal feature in native staking, coupled with yields that are on par with those of liquid staking, has encouraged us to expand our collaborations with other service providers in this domain. As a result, we terminated all liquid staking activities with StakeWise in the third quarter of 2023, reclaiming all staked Ethereum along with the accumulated rewards. In the first quarter of 2024, we ceased our liquid staking activities with Liquid Collective protocol and reclaimed all our staked Ethereum. Since the first quarter of 2024, the Company has no liquid staking activities. In July 2025, we resumed liquid staking through the Liquid Collective protocol with 5,120 ETH. This approach provides flexibility to engage in both staking and restaking through a broader range of strategies and platforms. Subsequently, we ceased our liquid staking activities with Liquid Collective protocol in October 2025.

Previous report — wording carried elsewhere

In the first quarter of 2024, the Company has restaked 3,008 ETH into EigenLayer, a protocol built on Ethereum that enables restaking of the already-staked ETH, through Figment. To mitigate potential risks, we restake our ETH without delegating to any operator and the Company received 33,568 EigenLayer in the fourth quarter of 2024 from this restaking activity. As of the date of this report, the reward earned in 2025 from this restaking activity is not significant.

Previous report — wording carried elsewhere

We incur cost of revenue from digital asset mining, cloud services, colocation services, and ETH staking businesses.

Previous report — wording carried elsewhere

The Company’s cost of revenue consists primarily of direct production costs associated with its core operations, excluding depreciation and amortization, which are separately stated in the Company’s consolidated statements of operations. Specifically, these costs consist of:

Previous report — wording carried elsewhere

Data center lease expenses. We entered into data center lease agreements for fixed monthly recurring costs.

Previous report — wording carried elsewhere

GPU servers lease expenses. We entered into a GPU servers lease agreement to support our cloud services. The lease payment depends on the usage of the GPU servers.

Previous report — wording carried elsewhere

Electricity costs*.* These expenses were closely correlated with the number of deployed servers hosted by the data center.

Previous report — wording carried elsewhere

Lease expenses. These expenses were incurred by the data center for lease agreement for a fixed monthly recurring cost.

Previous report — wording carried elsewhere

Wage expenses. These expenses represent the salaries and benefits of data center employees involved in the operation of our facilities.

Previous report — wording carried elsewhere

Cost of revenue - digital asset mining

Previous report — wording carried elsewhere

For the nine months ended September 30, 2025 and 2024, the cost of revenue from digital asset mining was comprised of the following:

Previous report — wording carried elsewhere

***Electricity costs.***These expenses were incurred by mining facilities for the miners in operation and were closely correlated with the number of deployed miners.

Previous report — wording carried elsewhere

***Profit-sharing fees.***We enter into hosting agreements with certain mining facilities, which included performance fees calculated as a fixed percentage of net profit generated by the miners. We refer to these fees as profit-sharing fees.

Previous report — wording carried elsewhere

For the nine months ended September 30, 2025, profit-sharing fees decreased by $4.6 million, or 59%, compared to profit-sharing fees incurred in the nine months ended September 30, 2024. The decrease in profit-sharing fees was primarily due to a lower bitcoin production and partially offset by the higher average BTC price for nine months ended September 30, 2025.

Previous report — wording carried elsewhere

For the nine months ended September 30, 2025, cost of revenue from ETH staking business increased by $122,852, or 234%, compared to the cost of revenue incurred for the nine months ended September 30, 2024. The increase was primarily driven by an increased number of staked ETH from 21,568 ETH in the nine months ended September 30, 2024 to 99,936 ETH in the nine months ended September 30, 2025.

Previous report — wording carried elsewhere

For the nine months ended September 30, 2025 and 2024, depreciation and amortization expenses were $25.1 million and $23.6 million, respectively based on an estimated useful life of property, plant, and equipment.

Previous report — wording carried elsewhere

Provision for income taxes consists of federal, state and foreign income taxes. Our income tax provision for the nine months ended September 30, 2025 is primarily attributable to the mix of earnings and losses in countries with differing statutory tax rates, and the valuation allowance applied to the Company’s deferred tax assets in the United States, Singapore and Hong Kong. We continue to maintain a valuation allowance against the deferred tax assets in United States, Singapore and Hong Kong as the Company does not expect those deferred tax assets are “more likely than not” to be realized in the near future, particularly due to the uncertainty on macroeconomics, politics and profitability of the business.

Previous report — wording carried elsewhere

On October 23, 2023, Bit Digital announced that it had commenced AI operations by signing a binding term sheet with a customer (the “Initial Customer”) to support the customer’s GPU workloads. On December 12, 2023, we finalized a Master Services and Lease Agreement (“MSA”), as amended, with our Initial Customer for the provision of cloud services from a total of 2,048 GPUs over a three-year period. To finance this operation, we entered into a sale-leaseback agreement with a third party, selling 96 AI servers (equivalent to 768 GPUs) and leasing them back for three years. The total contract value with the Initial Customer for the aggregated 2,048 GPUs was estimated to be worth more than $50 million of annualized revenue. On January 22, 2024, approximately 192 servers (equivalent to 1,536 GPUs) were deployed at a specialized data center and began generating revenue, and subsequently on February 2, 2024, approximately an additional 64 servers (equivalent to 512 GPUs) also started to generate revenue.

Previous report — wording carried elsewhere

In the second quarter of 2024, we finalized an agreement to supply our Initial Customer with an additional 2,048 GPUs over a three-year period. To finance this operation, we entered into a sale-leaseback agreement with a third party, agreeing to sell 128 AI servers (equivalent to 1,024 GPUs) and leasing them back for three years. In late July, at the customer’s request, we agreed with the customer to temporarily delay the purchase order so the customer could evaluate an upgrade to newer generation Nvidia GPUs. Consequently, the Company and manufacturer postponed the purchase order. In early August, the customer made a non-refundable prepayment of $30.0 million for the services to be rendered under this agreement.

Previous report — wording carried elsewhere

In January 2025, the Company entered into a new agreement to supply its Initial Customer with an additional 464 GPUs for a period of eighteen months. This new agreement replaces the prior agreement whereby the Company was to provide the customer with an incremental 2,048 H100 GPUs. The contract represents approximately $15 million of annualized revenue and features a two-month prepayment from the customer. The customer has elected to defer the commencement date until August 20, 2025, which is the latest allowable date under the agreement. Deployment commenced on August 20, 2025, using the Company’s inventory of B200 GPUs.

Previous report — wording carried elsewhere

On October 9, 2024, we executed a Master Service Agreement (the “MSA”) with Boosteroid Inc. (“Boosteroid”), a global cloud gaming provider. Following execution of a binding term sheet with Boosteroid on August 19, 2024, we finalized initial orders of 489 GPUs, projected to generate approximately $7.9 million in contracted value in the aggregate through November 2029. The GPUs have been delivered to respective data centers across the U.S. and Europe and began earning fees in November 2024. The MSA provides Boosteroid with the option to expand in increments of 100 servers, up to 50,000 servers, representing a potential contract value of approximately $700 million over the five-year term assuming Boosteroid utilizes the GPUs and services at full capacity for the duration of the contract. Expansion depends upon the internal development roadmap of Boosteroid, Boosteroid has full discretion to decide when and the quantity to pursue separate source orders (for GPU servers) under the MSA. In the third quarter of 2025, the Company finalized additional purchase orders for 302, 120, and 279 GPUs, totaling approximately $10.4 million in contracted value over a five-year term.

Previous report — wording carried elsewhere

In October 2025, we entered into a service order with a new customer to provide services utilizing a total of 48 H200 GPUs. The service order has an initial term of 36 months, representing total contracted value of approximately $2.2 million, after which it automatically renews for successive one-month periods unless terminated by either party. The deployment commenced and revenue generation began on October 21, 2025.