WhiteFiber, Inc.
For the period ended Mar 31, 2026. Filed May 14, 2026.
View on SEC.govAbout this filing
A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.
Mar 31, 2026 · Filed May 14, 2026
What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-Q
Period ended 2025-09-30; filed 2025-11-13.
0001213900-25-109964
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsCurrent report: 10-Q
Period ended 2026-03-31; filed 2026-05-14.
0001213900-26-056212
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 194 previous paragraphs and 197 current paragraphs.
86 unchanged; 51 reworded; 58 added; 38 removed; 19 previous and 2 current paragraphs rearranged.
Tables are not compared: 9 previous and 6 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (58)
Current report
Our business model integrates our data center infrastructure and cloud services to provide scalable, high-performance computing solutions for enterprises, research institutions, and AI and ML driven businesses. Our integrated approach aligns specialized data center operations with GPU-focused cloud services, addressing the unique requirements of AI and ML workloads. These workloads demand greater power density, advanced cooling solutions, and robust bandwidth to handle large-scale data transfers. By operating our data centers, we are able to provide the power to support our cloud services and we believe we can better meet the needs of AI and ML workloads and reduce the complexity associated with procuring power and connectivity from external vendors. We can also design our facilities to accommodate the higher heat loads generated by modern GPUs, potentially shortening deployment timelines for customers who require rapid expansion of their computing infrastructure. From a financial standpoint, our vertically integrated solution allows us to capture additional margin for both our data center and cloud services businesses, avoiding expenses that would otherwise be due to third-party providers.
Current report
Based on their collective industry experience, our data center team is adept at bringing new sites online on an accelerated timeline. We are aggressively pursuing our development pipeline and intend to achieve an estimated 76 MW (gross) of total data center capacity by the end of the fourth quarter of 2026, a target that is underpinned by assets including our MTL-2, MTL-3, and NC-1 facilities. As of March 31, 2026, our pipeline of potential data center projects represents approximately 1,500 MW (gross) under management review. We follow a disciplined process prioritizing projects that are backed by customer lease commitments. In select cases, we may pursue early-stage acquisitions based on strong customer demand signals and defined commercialization pathways. Accordingly, the foregoing timelines and capacities are subject to change based on many factors, many of which are outside of our control.
Current report
We use a well-defined set of criteria to select our data center sites. We typically target sites with proximity to metro areas and partial infrastructure in place, where we are retrofitting rather than developing greenfield projects. Metropolitan areas are positioned for low-latency to address long-term, specialized AI computer inference needs, and smaller sites reduce risks. A retrofit entails sourcing and acquiring an existing industrial building with underutilized, in-place power connectivity. The period of time from when a site is purchased until construction can begin varies from location to location depending upon, among other things, obtaining required permits and the availability of construction supplies and contractors. Average build time for retrofits is intended to be approximately six months from commencement of construction, which we believe is approximately one-third to one-half of the industry average development timeline for greenfield projects. This average building time is based upon senior management’s experience at Enovum prior to its acquisition by the Company, as well as their experience prior to Enovum. We also prioritize sites offering opportunities to increase site power over time, enabling our data centers to grow with customer demand. In addition, we selectively target certain larger opportunities with 50 MW (gross) of power or more, subject to customer demand, to drive AI-driven compute super-clusters. Finally, we prioritize sites powered by sustainable, green energy sources and locked-in power when available. Additionally, to enhance sustainability of certain of our data center projects, we are undertaking heat repurposing projects in connection with sustainability and commercial and residential projects.
Current report
RBC Facility Agreement Executed on June 18, 2025
Current report
RBC Facility Agreement amended on April 27, 2026
Current report
On April 27, 2026, the Company entered into an amended credit agreement with RBC. This agreement replaces the original credit agreement dated June 18, 2025, as subsequently amended on July 4, 2025. The amended credit agreement provides for an authorized credit facility of CAD $28 million (approximately $20 million). The proceeds have been used as a real estate acquisition bridge loan to finance the acquisition of the MTL-3 facility, at a purchase price of CAD $24.2 million (approximately USD $17.4 million). The closing date occurred on May 8, 2026.
Current report
Borrowings under the facility bear interest, at the Company’s option, at either Daily Simple CORRA plus 2.75% per annum or Royal Bank Prime plus 1.00% per annum, with the prime-based rate serving as the default option.
Current report
The facility has a six-month term from the date of drawdown and requires interest-only payments during the term, with the outstanding principal due in full at maturity. The specific borrowing terms are established at the time of each drawdown pursuant to a borrowing request submitted by the Company and accepted by the lender.
Current report
Additionally, RBC is providing a CAD $8 million (approximately $5.8 million) revolving facility in the form of Letters of Credit and Letters of Guarantee. The fees will be determined on a transaction-by-transaction basis, and the facility will be available for a 12-month term.
Current report
The Company has agreed to certain financial covenants, including a minimum debt service coverage ratio and a maximum Net funded debt to EBITDA ratio.
Current report
As of the reporting date, the April 27, 2026 bridge loan has been authorized and funded by RBC for the MTL-3 facility acquisition. The Company and RBC are currently in discussions regarding new syndicated credit facilities, including (i) a delayed draw term loan facility of CAD $115 million (approximately $82.5 million), which includes the CAD $24.2 million (approximately $17.4 million) bridge loan (ii) an accordion facility of CAD $25 million (approximately $17.9 million) and (iii) the CAD $8 million (approximately $5.7million) revolving facility.
Current report
Nscale Services Agreement
Current report
In November 2025, our wholly owned subsidiary, Enovum NC-1 Bidco, LLC, entered into the Services Agreement with Nscale Services US Inc. and Nscale Global Holdings Limited (collectively, “Nscale”) for the provision of colocation and related services at our NC-1 facility. The agreement represents a significant commercial milestone for our high-density data center platform and provides long-term contracted revenue visibility. The initial Service Order pursuant to the Services Agreement represents approximately $865 million in total contracted revenue over a 10-year term, inclusive of contractual annual rate escalators and non-recurring installation services (“NRCs”). Electricity and certain other operating costs are structured as pass-through charges to Nscale. Billing is expected to commence during the second quarter, subject to completion of construction and commissioning. As a result, we expect full revenue contribution from this agreement to begin during the third quarter of 2026 as the facility reaches its contractual capacity.
Current report
As of the date of this Form 10-Q, the Company and the Initial Customer are engaged in discussions regarding a potential resolution of the existing service agreements following the agreed pause of services. No definitive termination or settlement agreement has been executed. In connection with these discussions, the parties are negotiating the treatment of the remaining non-refundable prepayment, service deposit, outstanding receivables, and a potential early termination fee, which the Company believes would be equal to 40% of the fees that would have accrued for services during the remainder of the term of the MSA and applicable purchase orders. Following the service pause, the Company has redeployed the GPUs previously allocated to the Initial Customer to three other customers and continues to evaluate the related financial and operational implications. There can be no assurance as to the timing, terms, or final outcome of these discussions.
Current report
In February 2026, we entered into another service order with the customer to provide services utilizing a total of 10 H200 GPU servers. The service order has an initial term of 14 months beginning on the services commencement date. The service order represents an aggregate revenue opportunity of approximately $1.3 million. The deployment and revenue generation began in March 2026.
Current report
In March 2026, we entered into another service order with the customer to provide services utilizing a total of 256 H100 GPU servers. The service order has an initial term of 24 months beginning on the services commencement date, with an option to renew for an additional twelve months. The service order represents an aggregate revenue opportunity of approximately $50.2 million. The deployment and revenue generation is expected to begin in April 2026.
Current report
In November 2025, we terminated the MSA and all related purchase orders with DNA Fund in accordance with the terms of the contract. At the time of termination, we had approximately $7.3 million in outstanding accounts receivable. Pursuant to the termination agreement, the customer agreed to repay the outstanding balance. As of the date of this Form 10-Q, we have collected $2.2 million of the outstanding amount.
Current report
In October 2025, we entered into a two-week service order with a new customer to provide services utilizing a total of 72 B200 GPUs. In January 2026, we entered into an additional two-week service order with this customer for 72 B200 GPUs. These contracts were terminated as of February 2026. In February 2026, we entered into a further service order with this customer to provide services utilizing a total of 384 B200 GPUs. This service order has an initial term of 24 months commencing on the service commencement date, after which it will automatically renew for successive one-month periods unless terminated by either party. The service order represents an aggregate revenue opportunity of approximately $18.1 million. Deployment and revenue generation commenced on January 27, 2026.
Current report
In February 2026, we entered into a service order with a new customer to provide services utilizing a total of 256 GPUs. The service order has an initial term of 12 months beginning on the services commencement date, after which it automatically renews for successive one-month periods unless terminated by either party. The deployment and revenue generation began on February 1, 2026.
Current report
In March 2026, we entered into a service order with a new customer to provide services utilizing a total of 72 GB200 GPUs. The service order has an initial term of 12 months beginning on the services commencement date, after which it automatically renews for successive one-month periods unless terminated by either party. The deployment and revenue generation began on March 7, 2026.
Current report
In February 2026, we entered into a service order with a new customer to provide services utilizing a total of 80 H200 GPUs. The service order has an initial term of 12 months beginning on the services commencement date. The deployment and revenue generation began on February 1, 2026.
Current report
Reorganization, Initial Public Offering, and Relationship with Bit Digital
Current report
We were incorporated by Bit Digital as a Cayman Islands exempted company on August 15, 2024 under the name Celer, Inc., as a holding company for the HPC Business. We changed our name to WhiteFiber, Inc. on October 17, 2024.
Current report
On August 8, 2025, we completed our initial public offering (“IPO”) of 9,375,000 Ordinary Shares, at a public offering price of $17.00 per share. The gross proceeds to the Company from the IPO were approximately $159.4 million, before deducting underwriting discounts and commissions and offering expenses of $12.0 million. On September 2, 2025, B. Riley Securities, Inc. and Needham & Company, LLC, as representatives of the several Underwriters of the IPO, fully exercised their option to purchase an additional 1,406,250 Ordinary Shares at the public offering price of $17.00 per share, resulting in additional gross proceeds to the Company of approximately $23.9 million.
Current report
After giving effect to the IPO and the full exercise by the Underwriters of their over-allotment option, Bit Digital held approximately 71.5% of our issued and outstanding Ordinary Shares. As of the date of this Form 10-Q, Bit Digital owns approximately 70.1% of WhiteFiber.
Current report
Following our IPO, certain of our directors, executive officers and other members of senior management continue to serve as directors, officers and employees of Bit Digital. We have added additional executive officers and senior management to our senior executive team apart from those serving as officers and employees of Bit Digital. We have assembled a senior operating team with approximately 15 years of experience on average for each individual in the data center and cloud services industries. We also appointed additional independent directors upon the commencement of trading of our Ordinary Shares on Nasdaq.
Current report
Our revenue from colocation services was $4.8 million and $1.6 million for the three months ended March 31, 2026 and 2025, respectively. The increase was primarily due to the MTL-3 site becoming fully operational and generating revenues beginning November 2025.
Current report
Cost of revenue
Current report
For the three months ended March 31, 2026, data center lease expenses increased $0.1 million, or 10%, compared to the data center lease expense incurred for the three months ended March 31, 2025 due to a new lease entered in March 2025.
Current report
For the three months ended March 31, 2026, GPU server lease expenses remained consistent with the three months ended March 31, 2025.
Current report
Third-party customer support fees. We engaged a third party to provide customer support services.
Current report
For the three months ended March 31, 2026, third-party customer support fees were $0.1 million.
Current report
For the three months ended March 31, 2026, electricity costs increased by $0.6 million, or 273%, compared to the electricity costs incurred for the three months ended March 31, 2025. Since March 31, 2025, the Company has expanded its data center footprint, including the MTL-3 facility. The increase in electricity costs is primarily attributable to the MTL-3 facility, which was operational during the period ended March 31, 2026 but not operational during the period ended March 31, 2025.
Current report
For the three months ended March 31, 2026, datacenter lease expenses increased by $0.3 million, or 210%, compared to the datacenter lease expenses incurred for the three months ended March 31, 2025. The increase primarily resulted from the new MTL-3 lease entered in the second quarter of 2025.
Current report
For the three months ended March 31, 2026, our general and administrative expenses, totaling $17.8 million, were primarily comprised of share-based compensation expenses for employees of $5.1 million, salary and bonus expenses of $2.2 million, professional and consulting expenses of $6.2 million (including $2.2 million of share-based compensation), marketing expenses of $0.4 million, travel expenses of $0.1 million and other expenses of $3.1 million,.
Current report
Our future effective income tax rate depends on various factors, such as tax legislation, the geographic composition of our pre-tax income, the amount of our pre-tax income as business activities fluctuate, non-deductible expenses, non-taxable capital gain in certain jurisdiction, change of valuation allowance and the effectiveness of our tax planning strategies. The Organisation for Economic Co-operation and Development (“OECD”) has introduced a global minimum tax framework (“Pillar Two”) that generally applies to multinational enterprise groups with consolidated annual revenues of €750 million or more and is intended to ensure a minimum effective tax rate of 15% in each jurisdiction in which such groups operate. Certain jurisdictions have enacted, or are considering enacting, legislation implementing these rules. Based on the Company’s current consolidated revenue, for the three months ended March 31, 2026, the Company is not within the scope of the Pillar Two rules. However, the Company continues to monitor developments related to the implementation of these rules, and future growth or changes in the Company’s operations could result in the Company becoming subject to Pillar Two in future periods.
Current report
For more details on the Company’s tax profile, see Note 14.Income Taxes to our condensed consolidated financial statements.
Current report
As of March 31, 2026, the Cloud service equipment and internally developed software had a net book value, including CIP, of $100.0 million. As of December 31, 2025, the Cloud service equipment and internally developed software had a net book value, including CIP, of $124.0 million. Compared with December 31, 2025, the balance as of March 31, 2026 decreased by $24.1 million, mainly due to the sale of H200 servers with carrying value of $24.3 million.
Current report
Lease right-of-use assets and lease liabilities
Current report
As of March 31, 2026, right-of-use assets and lease liabilities were $30.4 million and $29.3 million, respectively. As of December 31, 2025, the Company’s right-of-use assets and lease liabilities were $24.2 million and $23.4 million, respectively.
Showing the first 40 of 58 passages. Open the source sections for the rest.
Removed paragraphs (38)
Previous report
As of the reporting date, the related credit facilities have not been authorized for use by the lender, as both parties are in the process of negotiating revisions to the existing agreement. These negotiations are intended to result in an amendment to the current credit facility, providing the Company with access to a potential additional non-revolving term loan facility of up to CAD 55 million (approximately $39.5 million). Accordingly, no amounts had been drawn, and no borrowings were available under the credit agreement as at the reporting date.
Previous report
On November 14, 2024, we entered into a Terms of Supply and Service Level Agreement (together, the “Agreement”) and an Order Form with a new customer. The order form provides for services utilizing a total of 64 H200 GPUs on a month-to-month basis, which either party may terminate upon at least 14 days’ written notice prior to any renewal date. It represents annual revenue of approximately $1.2 million. The deployment commenced and revenue generation began on November 15, 2024, using the Company’s existing inventory of H200 GPUs. The service under the purchase order concluded in December 2024.
Previous report
Our revenue from cloud services increased by $5.9 million, or 48.4%, to $18.0 million for the three months ended September 30, 2025 from $12.2 million for the three months ended September 30, 2024. The increase was primarily due to an increase in deployed GPU servers to new and existing customers in the third quarter of 2025, offset by a $2.0 million service credit accrued and expected to be issued to a customer under the terms of the contract.
Previous report
Our revenue from colocation services was $1.7 million and $nil for the three months ended September 30, 2025 and 2024, respectively.
Previous report
For the three months ended September 30, 2025, data center lease expenses increased by $0.4 million, or 35%, compared to the data center lease expenses incurred for the three months ended September 30, 2024. The increase primarily resulted from one additional datacenter lease entered after the third quarter of 2024.
Previous report
For the three months ended September 30, 2025, GPU servers lease expenses decreased by $0.4 million, or 11%. The decrease primarily resulted from the application of a previously issued credit in connection with downtime that occurred in prior periods.
Previous report
For the three months ended September 30, 2025, electricity costs totaled $0.3 million. We had no electricity costs for the three months ended September 30, 2024 as we acquired Enovum in the fourth quarter of 2024, which provides colocation services.
Previous report
For the three months ended September 30, 2025 , data center lease expenses totaled $0.2 million. We had no data center lease expenses for the three months ended September 30, 2024 as we acquired Enovum in the fourth quarter of 2024, which provides colocation services.
Previous report
Effective January 1, 2025, we changed our estimate of the useful lives for our cloud service equipment from three to five years. The change was made to better reflect the expected usage patterns and economic benefits of the assets. Refer to Note 2.Summary of Significant Accounting Policies to our condensed consolidated financial statements.
Previous report
For the three months ended September 30, 2025, our general and administrative expenses, totaling $21.3 million, were primarily comprised of share-based compensation expenses of $6.4 million, salary and bonus expenses of $1.5 million, professional and consulting expenses of $9.6 million, other expenses of $2.5 million, commission expenses of $0.3 million, marketing expenses of $0.7 million, and travel expenses of $0.2 million.
Previous report
Our income tax provision was $0.1 million and $0.4 million for the three months ended September 30, 2025 and 2024, respectively. The income tax provision during the three months ended September 30, 2025 was lower compared to the three months ended September 30, 2024 primarily due to the income tax benefits of $1.0 million generated from Enovum’s operating loss and partially offset by an increase of income tax expenses due to the higher operating profits from White Fiber Iceland.
Previous report
Results of operations for the nine months ended September 30, 2025 and 2024
Previous report
Revenue
Previous report
Revenue from cloud services
Previous report
Revenue from colocation services
Previous report
Our revenue from colocation services was $5.1 million and $nil for the nine months ended September 30, 2025 and 2024, respectively.
Previous report
Cost of revenue — cloud services
Previous report
For the nine months ended September 30, 2025 and 2024, the cost of revenue from cloud services was comprised of the following:
Previous report
For the nine months ended September 30, 2025, data center lease expenses increased by $1.7 million, or 73%, compared to the data center lease expenses incurred for the nine months ended September 30, 2024. The increase primarily resulted from two additional datacenter leases entered into after the second quarter of 2024.
Previous report
For the nine months ended September 30, 2025, GPU servers lease expenses increased by $1.2 million, or 12%, compared to the GPU servers lease expenses incurred for the nine months ended September 30, 2024. The increase primarily resulted from a higher average number of GPU servers leased.
Previous report
Cost of revenue — Colocation Services
Previous report
For the nine months ended September 30, 2025, electricity costs totaled $0.8 million. We had no electricity costs for the nine months ended September 30, 2024 as we acquired Enovum in the fourth quarter of 2024, which provides colocation services.
Previous report
For the nine months ended September 30, 2025, data center lease expenses totaled $0.5 million. We had no data center lease expenses for the nine months ended September 30, 2024 as we acquired Enovum in the fourth quarter of 2024, which provides colocation services.
Previous report
For the nine months ended September 30, 2025, wage expenses totaled $0.3 million. We had no wage expenses for the nine months ended September 30, 2024 as we acquired Enovum in the fourth quarter of 2024, which provides colocation services.
Previous report
Depreciation and amortization expenses
Previous report
Effective January 1, 2025, we changed our estimate of the useful lives for our cloud service equipment from three to five years. The change was made to better reflect the expected usage patterns and economic benefits of the assets. Refer to Note 2.Summary of Significant Accounting Policies to our condensed consolidated financial statements
Previous report
General and administrative expenses
Previous report
For the nine months ended September 30, 2025, our general and administrative expenses, totaling $41.1 million, were primarily comprised of share based compensation expenses of $13.0 million, salary and bonus expenses of $4.0 million, professional and consulting expenses of $17.1 million, other expenses of $4.3 million, marketing expenses of $1.5 million, commission expenses of $0.8 million and travel expenses of $0.4 million.
Previous report
For the nine months ended September 30, 2024, our general and administrative expenses, totaling $5.8 million, were primarily comprised of share based compensation expenses of $1.3 million, salary and bonus expenses of $1.2 million, professional and consulting expenses of $1.3 million, commission expense of $0.9 million, marketing expenses of $0.5 million, other expenses of $0.4 million and travel expenses of $0.2 million.
Previous report
Income tax expenses
Previous report
Our income tax provision was $1.1 million and $1.1 million for the nine months ended September 30, 2025 and 2024 respectively. The income tax provision is materially consistent between nine months ended September 30, 2025 and 2024.
Previous report
Operating lease right-of-use assets and operating lease liability
Previous report
As of September 30, 2025, operating right-of-use assets and operating lease liabilities were $42.2 million and $41.4 million, respectively. As of December 31, 2024, the Company’s operating lease right-of-use assets and operating lease liability were $14.5 million and $13.4 million, respectively.
Previous report
Investment security
Previous report
As of September 30, 2025 and December 31, 2024, our portfolio consists of an investment in a privately held company via a simple agreement for future equity (“SAFE”). The total balance of our investment security was $1.0 million and $1.0 million as of September 30, 2025 and December 31, 2024, respectively.
Previous report
Deferred revenue pertains to prepayments received from customers for HPC business.
Previous report
Net cash provided by financing activity was $327.0 million for the nine months ended September 30, 2025, attributable to net transfers from parent of $157.4 million, $147.4 million proceeds from issuance of ordinary shares at initial public offering and $22.2 million proceeds from issuance of ordinary shares at the exercise of the over-allotment option.
Previous report
On June 18, 2025, the Company entered into a definitive credit agreement with the Royal Bank of Canada (“RBC”), the largest bank in Canada, to finance its data centers business. The facility provides up to CAD $60 million (approximately USD $43.8) in aggregate financing. Proceeds will be used to support the continued buildout of the Company’s HPC data center portfolio. As of the reporting date, the facility had not yet been authorized for use, as the Company and RBC are negotiating amendments to the existing agreement, including a potential additional non-revolving term loan of up to CAD $55 million (approximately USD $39.5 million). Refer to the Overview section above for further details.
Reworded paragraphs (51)
Previous wording
The following information should be read in conjunction with the consolidated financial statements and related notes included elsewhere in this Quarterly Report on Form 10-Q for the period ended September 30, 2025 as well as Management’s Discussion and Analysis of Financial Condition and Results of Operations included in our prospectus dated August 6, 2025. Except for the statements of historical fact, this report contains “forward-looking information” and “forward-looking statements reflecting our current expectations that involve risks and uncertainties (collectively, “forward-looking information”) that is based on expectations, estimates and projections as at the date of this report. All statements, other than statements of historical fact, included herein are “forward-looking statements.” These forward-looking statements are often identified by the use of forward-looking terminology such as “believes,” “intends,” “expects,” or similar expressions, involving known and unknown risks and uncertainties. Although the Company believes that the expectations reflected in these forward-looking statements are reasonable, they do involve assumptions, risks and uncertainties, and these expectations may prove to be incorrect. Investing in our securities involves a high degree of risk. The following discussion may contain forward-looking statements that reflect WhiteFiber, Inc.’s plans, estimates and beliefs. WhiteFiber, Inc.’s actual results could differ materially from those discussed in these forward-looking statements. Factors that could cause or contribute to these differences include those factors discussed below, in the IPO Prospectus and in Part II, Item 1.A of this Form 10-Q, particularly in the sections entitled “Cautionary Statement Regarding Forward-Looking Statements” and “Risk Factors.” Before making an investment decision, you should carefully consider these risks, uncertainties and forward-looking statements.
Current wording
The following information should be read in conjunction with the condensed consolidated financial statements and related notes included elsewhere in this Quarterly Report on Form 10-Q for the period ended March 31, 2026 as well as Management’s Discussion and Analysis of Financial Condition and Results of Operations included in our Annual Report on Form 10-K for the year ended December 31, 2025 (Annual Report). Except for the statements of historical fact, this Form 10-Q contains “forward-looking information” and “forward-looking statements reflecting our current expectations that involve risks and uncertainties (collectively, “forward-looking information”) that is based on expectations, estimates and projections as at the date of this Form 10-Q. All statements, other than statements of historical fact, included herein are “forward-looking statements.” These forward-looking statements are often identified by the use of forward-looking terminology such as “believes,” “intends,” “expects,” or similar expressions, involving known and unknown risks and uncertainties. Although the Company believes that the expectations reflected in these forward-looking statements are reasonable, they do involve assumptions, risks and uncertainties, and these expectations may prove to be incorrect. Investing in our securities involves a high degree of risk. The following discussion may contain forward-looking statements that reflect WhiteFiber, Inc.’s plans, estimates and beliefs. WhiteFiber, Inc.’s actual results could differ materially from those discussed in these forward-looking statements. Factors that could cause or contribute to these differences include those factors discussed below, in the Annual Report and in Part II, Item 1.A of this Form 10-Q, particularly in the sections entitled “Cautionary Statement Regarding Forward-Looking Statements” and “Risk Factors.” Before making an investment decision, you should carefully consider these risks, uncertainties and forward-looking statements.
Previous wording
We acquired Enovum Data Centers Corp (“Enovum”) on October 11, 2024. The transaction included the lease to MTL-1, a fully operational and fully leased to customers 4 MW (gross) Tier-3 datacenter headquartered in Montreal, Canada.
Current wording
We acquired Enovum on October 11, 2024. The transaction included the lease of MTL-1, our 4 MW (gross) Tier-3 high-performance computing (“HPC”) data center in Montreal, Canada, which was fully operational and fully leased to customers at the time of acquisition.
Previous wording
On December 27, 2024, we acquired the real estate and building for a build-to-suit 5 MW (gross) Tier-3 data center expansion project near Montreal, Canada which we refer to as MTL-2. MTL-2, a 160,000 square foot site that was previously used as an encapsulation manufacturing facility, is located in Pointe-Claire, Quebec. We initially funded the purchase of CAD 33.5 million (approximately $23.3 million) with cash on hand. We expect to invest approximately $23.6 million to develop the site to Tier-3 standards with an initial load of 5 MW (gross). However, we have prioritized other builds and preserved capital for more time sensitive projects.
Current wording
On December 27, 2024, we acquired the real estate and building for a build-to-suit 5 MW (gross) Tier-3 data center expansion project near Montreal, Canada which we refer to as MTL-2. MTL-2, a 160,000 square foot site that was previously used as an encapsulation manufacturing facility, is located in Pointe-Claire, Quebec. We initially funded the purchase of CAD 33.5 million (approximately $23.3 million) with cash on hand. We expected to invest approximately $23.6 million to develop the site to Tier-3 standards with an initial load of 5 MW (gross). However, we have prioritized other builds and preserved capital for more time sensitive projects.
Previous wording
On April 11, 2025, we entered into a lease for a new data center site in Saint-Jerome, Quebec, a suburb of Montreal, MTL-3. The MTL-3 facility spans approximately 202,000 square feet on 7.7 acres and is being developed to as a 7 MW (gross) Tier-3 data center. It will support current contracted capacity, with Cerebras (5 MW IT Load), with future expansion potential subject to utility approvals. The transaction was executed under a lease-to-own structure, which includes a fixed-price purchase option of CAD 24.2 million (approximately $17.3 million) exercisable by December 2025. The lease term is 20 years, with two 5-year extensions at the Company’s option. Subject to our receipt of all required permits, the facility is being retrofitted to Tier-3 standards, with development costs expected to total approximately $41 million. Construction at the site was substantially completed by October 2025. The site has commenced billing Cerebras as of November 1, 2025, in the amount of CAD 1.4 million (approximately $979 thousand) monthly for the duration of the five-year contract.
Current wording
On April 11, 2025, we entered into a lease for a new data center site in Saint-Jerome, Quebec, a suburb of Montreal, MTL-3. The MTL-3 facility spans approximately 202,000 square feet on 7.7 acres and is being developed into a 7 MW (gross) Tier-3 data center. It will support current contracted capacity, with Cerebras (5 MW IT Load), with future expansion potential subject to utility approvals. The transaction was executed under a lease-to-own structure, which includes a fixed-price purchase option of CAD 24.2 million (approximately $17.3 million) exercisable by December 2025. The lease term is 20 years, with two 5-year extensions at the Company’s option. In December 2025, we became reasonably certain to exercise the purchase option and notified the lessor of our intent to exercise the purchase option. We had 90 days to complete the purchase, after which the purchase option would expire. The option was exercised on January 14, 2026 and the purchase of MTL-3 closed on May 8, 2026. The facility has been retrofitted to Tier-3 standards and was completed and operational in November 2025. The site has commenced billing Cerebras as of November 1, 2025, in the amount of CAD 1.4 million (approximately 979 thousand USD) monthly for the duration of the five-year contract.
Previous wording
On May 20, 2025 (the “Closing Date”), we completed the purchase of a former industrial/manufacturing building from Unifi Manufacturing, Inc. (“UMI”). Pursuant to the Purchase Agreement we agreed to purchase from UMI, an industrial/manufacturing building together with the underlying land (“NC-1”) located in Madison, North Carolina, as well as certain machinery and equipment located thereon for a cash purchase price of $45 million. The purchase price will increase by (i) $8 million, if Duke Energy actually provides, or provides an Electric Services Agreement providing for, at least 99 MW (gross) within two years of the Closing Date, or (ii) $5 million, if Duke Energy actually provides, or provides an Electric Services Agreement providing for, at least 99 MW (gross) more than two years but less than three years after the Closing Date. Additionally, the purchase price will increase by an additional $200,000 per MW over 99 MW (gross) up to a maximum of $5 million if at least 99 MW (gross) are actually delivered, or Duke Energy provides an Electric Services Agreement for the provision of at least 99 MW (gross), within four years of the Closing Date. Separately, the Company entered into a Capacity Agreement with Duke Energy pursuant to which Duke Energy agreed to use commercially reasonable efforts to achieve 24 MW (gross) of service to the Property by September 1, 2025, 40 MW (gross) by April 1, 2026, and 99 MW (gross) within four years of May 16, 2025. Management believes based upon its review of the site and a Duke Energy preliminary transmission study, that the Property may receive and support up to 200 MW (gross) of total electrical supply over an extended period of time, subject to infrastructure upgrades, such as developing new substations and other conditions. On August 4, 2025, Enovum NC-1 Bidco LLC, a subsidiary of the Company, entered into an Assignment and Assumption Agreement with Unifi Manufacturing and Duke Energy Carolinas, LLC, pursuant to which Enovum assumed Unifi’s rights and obligations under certain electric service agreements for facilities located in North Carolina. Duke Energy consented to the assignment. Refer to Note17. Commitments and contingenciesfor further detail.
Current wording
On May 20, 2025, we completed the purchase of a former industrial/manufacturing building from UMI. Pursuant to the Purchase Agreement we agreed to purchase from UMI, an industrial/manufacturing building together with the underlying land located in Madison, North Carolina, which we refer to as “NC-1”, as well as certain machinery and equipment located thereon for a cash purchase price of $45 million. The purchase price will increase by (i) $8 million, if Duke Energy actually provides, or provides an Electric Services Agreement providing for, at least 99 MW (gross) within two years of May 20, 2025, or (ii) $5 million, if Duke Energy actually provides, or provides an Electric Services Agreement providing for, at least 99 MW (gross) more than two years but less than three years after May 20, 2025. Additionally, the purchase price will increase by an additional $200,000 per MW over 99 MW (gross) up to a maximum of $5 million if at least 99 MW (gross) are actually delivered, or Duke Energy provides an Electric Services Agreement for the provision of at least 99 MW (gross), within four years of May 20, 2025. Separately, the Company entered into a Capacity Agreement with Duke Energy pursuant to which Duke Energy agreed to use commercially reasonable efforts to achieve 24 MW (gross) of service to NC-1 by September 1, 2025, 40 MW (gross) by April 1, 2026, and 99 MW (gross) within four years of May 16, 2025. Management believes based upon its review of the site and a Duke Energy preliminary transmission study, that NC-1 may receive and support up to 200 MW (gross) of total electrical supply over an extended period of time, subject to infrastructure upgrades, such as developing new substations and other conditions. On August 4, 2025, Enovum NC-1 Bidco LLC, a subsidiary of the Company, entered into an Assignment and Assumption Agreement with Unifi Manufacturing and Duke Energy Carolinas, LLC, pursuant to which Enovum assumed Unifi’s rights and obligations under certain electric service agreements for facilities located in North Carolina. Duke Energy consented to the assignment. Refer to Note 18.Commitments and contingencies to our condensed consolidated financial statements for further detail.
Previous wording
On June 18, 2025, we entered into a definitive credit agreement (the “Facility”) with the Royal Bank of Canada (“RBC”). The Facility provides for an aggregate of up to approximately CAD 60 million (approximately $43.8 million) of financing. The proceeds are to be used primarily to refinance the buildout of Tier-3 AI data center at 7300 Trans Canada Highway, Pointe-Claire, Quebec (“MTL-2”) as well as $5.8 million of revolving term financing (the “Revolver”). The Facility is non-recourse to the Company. We entered into a three-year USD $18.5 million non-revolving lease facility to finance equipment costs and building improvements to build out the site. The lease facility provides for straight-line amortization of six years and capital moratorium of six months after disbursement is complete. RBC may cancel any unutilized portion of the facility after March 31, 2026. The interest rate is fixed based on the rental rate determined by RBC for the three-year term of the lease.
Current wording
On June 18, 2025, we entered into the Credit Facility with RBC. The Credit Facility provides for an aggregate of up to approximately CAD 60 million (approximately $43.8 million) of financing. The proceeds are to be used primarily to refinance the buildout of MTL-2 as well as $5.8 million of revolving term financing (the “Revolver”). The Credit Facility is non-recourse to the Company. We entered into a three-year USD $18.5 million non-revolving lease facility to finance equipment costs and building improvements to build out the site. The lease facility provides for straight-line amortization of six years and capital moratorium of six months after disbursement is complete. RBC may cancel any unutilized portion of the Credit Facility after March 31, 2026. The interest rate is fixed based on the rental rate determined by RBC for the three-year term of the lease.
Previous wording
As part of the Facility, we entered into a three-year $19.6 million non-revolving real estate term loan facility. The purpose of this facility is to refinance the Company’s purchase of MTL-2. The interest rate of the real estate term loan facility will be determined at the time of borrowing, or a floating interest rate ranging from RBP plus 0.75% to CORRA (“Canadian Overnight Repo Rate Average”) plus 250 bps. Payment of principal and interest is due 30 days after drawdown and is repayable in full on the last day of the three-year term.
Current wording
As part of the Credit Facility, we entered into a three-year $19.6 million non-revolving real estate term loan facility. The purpose of this facility is to refinance the Company’s purchase of MTL-2. The interest rate of the real estate term loan facility will be determined at the time of borrowing, or a floating interest rate ranging from RBP plus 0.75% to CORRA (“Canadian Overnight Repo Rate Average”) plus 250 bps. Payment of principal and interest is due 30 days after drawdown and is repayable in full on the last day of the three-year term.
Previous wording
We expect to leverage a global network of data centers for hosting capacity for our GPU business, in many instances, by negotiating with third-party providers to seamlessly integrate our cloud services at data centers across key regions in Europe, North America and Asia. Our initial data center partnership through which we lease capacity is at Blönduós Campus, Iceland, offering a world-class operations team with certified technicians and reliable engineers. The facility has a 45 kW rack density and 6 MW (gross) total capacity. We have executed contracts for 5.5 MW IT load at the data center. The center’s energy source is 100% renewable energy, mainly from Blanda Hydro PowerStation, the winner of an IHA Blue Planet Award in 2017.
Current wording
We expect to leverage a global network of data centers for hosting capacity for our GPU business, in many instances, by negotiating with third-party providers to seamlessly integrate our cloud services at data centers across key regions in Europe, North America and Asia. Our initial data center partnership through which we lease capacity is at Blönduós Campus, Iceland, offering a world-class operations team with certified technicians and reliable engineers. The facility has a 45 kW rack density and 6 MW (gross) total capacity. We have executed contracts for 5.5 MW IT load at the data center. The center’s energy source is 100% renewable energy, mainly from Blanda Hydro PowerStation, the winner of an IHA Blue Planet Award in 2017. In addition, we have leased additional capacity to install our data center in Atlanta, Georgia, USA to expand our cloud services offering. The capacity leases commenced in February 2026. We also intend to lease additional capacity to expand our cloud services offering.
Previous wording
On November 6, 2024, we entered into a Master Services Agreement (“MSA”) with a minimum purchase commitment of 16 GPUs, along with an associated purchase order, from a new customer. The purchase order provides for services utilizing a total of 16 H200 GPUs over a minimum of a six-month period, representing total contracted value of approximately $160,000 for the term. The deployment commenced on November 7, 2024, using the Company’s existing inventory of H200 GPUs. The service under the purchase order concluded in May 2025. Between May 2025 and September 2025, the Company signed six additional agreements on a month-to-month basis for a total of 88 H200 GPUs, of which 80 remained in deployment as of the date of this report.
Current wording
On November 6, 2024, we entered into a Master Services Agreement (“MSA”) with a minimum purchase commitment of 16 GPUs, along with an associated purchase order, from a new customer. The purchase order provides for services utilizing a total of 16 H200 GPUs over a minimum of a six-month period, representing total contracted value of approximately $160,000 for the term. The deployment commenced on November 7, 2024, using the Company’s existing inventory of H200 GPUs. The service under the purchase order concluded in May 2025. Between May 2025 and September 2025, the Company signed six additional agreements on a month-to-month basis for a total of 88 H200 GPUs, which were terminated in January 2026.
Previous wording
On December 30, 2024, we entered into a Master Services Agreement (“MSA”) with a minimum purchase commitment of 32 GPUs, along with an associated purchase order, from a new customer, an AI Compute Fund managed by DNA Holdings Venture Inc. (“DNA Fund”). The purchase order provides for services utilizing a total of 576 H200 GPUs over a 25-month period and terminable by either party upon at least 90 days’ written notice prior to any renewal date. It represents an aggregate revenue opportunity of approximately $20.2 million. Concurrently, we placed a purchase order for 130 H200 servers for approximately $30 million. The deployment commenced in February 2025.
Current wording
On December 30, 2024, we entered into a Master Services Agreement (“MSA”) with an AI Compute Fund managed by DNA Holdings Venture Inc. (“DNA Fund”). The MSA had a minimum purchase commitment of 32 GPUs, along with an associated purchase order. The purchase order provides for services utilizing a total of 576 H200 GPUs over a 25-month period and terminable by either party upon at least 90 days’ written notice prior to any renewal date. Concurrently, we placed a purchase order for 130 H200 servers for approximately $30 million. The deployment commenced in February 2025.
Previous wording
In April 2025, the Company signed two additional cloud services agreements with DNA Fund. The first agreement includes 104 NVIDIA H200 GPUs under a 23-month term and was deployed in May 2025. The second agreement includes 512 H200 GPUs under a 24-month term and was deployed in July 2025. With these additions, DNA Fund’s total contracted deployment increased to 1,192 GPUs. Combined, the agreements represent approximately $20.8 million of annualized revenue.
Current wording
In April 2025, the Company signed two additional cloud services agreements with DNA Fund. The first agreement includes 104 NVIDIA H200 GPUs under a 23-month term and was deployed in May 2025. The second agreement includes 512 H200 GPUs under a 24-month term and was deployed in July 2025. With these additions, DNA Fund’s total contracted deployment increased to 1,192 GPUs.
Previous wording
On January 30, 2025, we entered into a Master Services Agreement (“MSA”) with a minimum purchase commitment of 40 GPUs, along with an associated purchase order, from a new customer. The purchase orders provide for services utilizing a total of 40 H200 GPUs over a minimum of 12 month period, representing total revenue of approximately $750,000 for the term. The deployment commenced and revenue generation began on January 24, 2025, using the Company’s existing inventory of H200 GPUs. In October 2025, the purchase order was amended to reduce the number of H200 GPUs from 40 to 8 and to extend the term of service through May 2027. Between April and July 2025, the Company signed four additional agreements on a month-to-month basis for a total of 184 H200 GPUs, which were terminated in August 2025.
Current wording
On January 30, 2025, we entered into a Master Services Agreement (“MSA”) with a minimum purchase commitment of 40 GPUs, along with an associated purchase order, from a new customer. The purchase orders provide for services utilizing a total of 40 H200 GPUs over a minimum of 12 month period, representing total revenue of approximately $750,000 for the term. The deployment commenced and revenue generation began on January 24, 2025, using the Company’s existing inventory of H200 GPUs. In October 2025, the purchase order was amended to reduce the number of H200 GPUs from 40 to 8 and to extend the term of service through May 2027. This contract was terminated in January 2026. Between April and July 2025, the Company signed four additional agreements on a month-to-month basis for a total of 184 H200 GPUs, which were terminated in August 2025.
Previous wording
In September 2025, we entered into a service order with a new customer, which provides services utilizing a total of 16 B200 GPUs on a monthly basis, automatically renewing for an additional one month period unless and until otherwise terminated upon at least seven days’ prior written notice. The deployment commenced and revenue generation began on September 23, 2025.
Current wording
In September 2025, we entered into a service order with a new customer, which provides services utilizing a total of 16 B200 GPUs on a monthly basis, automatically renewing for an additional one month period unless and until otherwise terminated upon at least seven days’ prior written notice. The deployment commenced and revenue generation began on September 23, 2025. The agreement was not renewed after the initial term.
Previous wording
In October 2025, we entered into a service order with a new customer to provide services utilizing a total of 48 H200 GPUs. The service order has an initial term of 36 months, representing total contracted value of approximately $2.2 million, after which it automatically renews for successive one-month periods unless terminated by either party. The deployment commenced and revenue generation began on October 21, 2025.
Current wording
In October 2025, we entered into a service order with a new customer to provide services utilizing a total of 48 H200 GPUs. The service order had an initial term of 36 months. The deployment commenced and revenue generation began on October 21, 2025. The contract was terminated in December 2025.
Previous wording
In November 2025, we entered into a service order with a new customer to provide services utilizing a total of 128 B200 GPUs. The service order has an initial term of 12 months, representing total contracted value of approximately $3.0 million, after which it automatically renews for successive one-month periods unless terminated by either party. Deployment and revenue generation is scheduled to begin on December 1, 2025.
Current wording
In November 2025, we entered into a service order with a new customer to provide services utilizing a total of 128 B200 GPUs. The service order has an initial term of 12 months, representing total contracted value of approximately $3.0 million, after which it automatically renews for successive one-month periods unless terminated by either party. Deployment and revenue generation began on December 1, 2025.
Previous wording
On July 30, 2025, we entered into a Contribution Agreement with Bit Digital, pursuant to which Bit Digital agreed to contribute its HPC business through the transfer of 100% of the capital shares of its cloud services subsidiary, WhiteFiber AI, Inc. and its wholly-owned subsidiaries WhiteFiber HPC, Inc., WhiteFiber Canada, Inc., WhiteFiber Japan G.K. and WhiteFiber Iceland, ehf, to WhiteFiber, upon the effectiveness of WhiteFiber’s registration statement on Form S-1, as amended (File No. 333-288650) (the “Registration Statement”), on August 6, 2025 in connection with WhiteFiber’s initial public offering (the “IPO”).
Current wording
On August 6, 2025, we issued 27,043,749 ordinary shares, par value $0.01 per share (our “Ordinary Shares”, and such shares, the “Contribution Shares”), to Bit Digital pursuant to the terms of a Section 351 Contribution Agreement (the “Contribution Agreement”) entered into with Bit Digital on July 30, 2025. Pursuant to the Contribution Agreement, Bit Digital contributed its HPC Business through the transfer of 100% of the capital shares of its cloud services subsidiary, WhiteFiber AI, Inc. and its wholly-owned subsidiaries WhiteFiber HPC, Inc., WhiteFiber Canada, Inc., WhiteFiber Japan G.K. and WhiteFiber Iceland, ehf, to us, upon the effectiveness of the registration statement filed in connection with our IPO and prior to the consummation of the IPO, in exchange for the Contribution Shares. We refer to this transaction as the “Reorganization”. WhiteFiber AI became a wholly-owned subsidiary of WhiteFiber, Inc. and Bit Digital became the direct shareholder of WhiteFiber after the Reorganization.
Previous wording
We believe that the growth of our business and our future success are dependent upon many factors including those described under “Risk Factors” included elsewhere in this report and under the heading “Risk Factors” in our IPO Prospectus. While these factors present significant opportunities for us, they also pose challenges that we must successfully address in order to sustain the growth of our business and enhance our results of operations.
Current wording
We believe that the growth of our business and our future success are dependent upon many factors including those described under “Risk Factors” included elsewhere in our Annual Report. While these factors present significant opportunities for us, they also pose challenges that we must successfully address in order to sustain the growth of our business and enhance our results of operations.
Previous wording
Our future revenue growth is, in part, dependent on our ability to leverage our development capabilities at our data center sites. We substantially completed construction of our MTL-3 facility by the end of October 2025. The site has commenced billing its customer, Cerebras, as of November 1, 2025, in the amount of CAD 1.4 million (approximately $979 thousand) monthly for the duration of the five-year contract. We intend to complete the first phase of construction 24 MW (gross) of NC-1 facility in the first quarter of 2026. Management expects NC-1 to start generating revenue in May of 2026. Management expects the second phase of construction 30 MW (gross) to be completed in the second quarter of 2026 and start generating revenues 30 days after completion. We have prioritized these projects and put a hold on the build for MTL-2. We expect to increase revenue from our existing sites by securing additional allocations of utility power, subject to our receipt of funding and required permits through ongoing engagement with the utility and relevant authorities. In addition, at certain new and existing sites, we intend to deploy natural gas fuel cell generation technology to increase available power and revenue potential. Our ability to secure the required funding and permits in accordance with our implementation plans may cause variability in our revenue growth in future quarters.
Current wording
Management expects to begin delivering capacity to Nscale during the second quarter and for NC-1 to start generating revenues 30 days after completion. We have prioritized these projects and put a hold on the build for MTL-2. We expect to increase revenue from our existing sites by securing additional allocations of utility power, subject to our receipt of funding and required permits through ongoing engagement with the utility and relevant authorities. In addition, at certain new and existing sites, we intend to deploy natural gas fuel cell generation technology to increase available power and revenue potential. Our ability to secure the required funding and permits in accordance with our implementation plans may cause variability in our revenue growth in future quarters.
Previous wording
The following discussion summarizes the results of operations for the three months ended September 30, 2025 and 2024. This information should be read together with our condensed consolidated financial statements and related notes included elsewhere in this report.
Current wording
The following discussion summarizes the results of operations for the three months ended March 31, 2026 and 2025. This information should be read together with our condensed consolidated financial statements and related notes included elsewhere in this Form 10-Q.
Previous wording
Our revenue from cloud services increased by $16.8 million, or 51.2%, to $49.5 million for the nine months ended September 30, 2025 from $32.7 million for the nine months ended September 30, 2024. The increase was primarily due to an increase in deployed GPU servers to new and existing customers during the first nine months ended September 30, 2025.
Current wording
Our revenue from cloud services increased by $1.9 million, or 13.0%, to $16.8 million for the three months ended March 31, 2026 from $14.8 million for the three months ended March 31, 2025. The increase was primarily due to an increase in deployed GPU servers to new and existing customers in the first quarter of 2026.
Previous wording
The Company’s cost of revenue consists primarily of direct production costs associated with its core operations, excluding depreciation and amortization, which are separately stated in the Company’s consolidated statements of operations. Specifically, these costs consist of: (i) cloud services operations — electricity costs, datacenter lease expense, GPU servers lease expense, and other relevant costs and (ii) colocation services — electricity costs, lease costs, data center employees’ wage expenses, and other relevant costs.
Current wording
The Company’s cost of revenue consists primarily of direct production costs associated with its core operations, excluding depreciation and amortization, which are separately stated in the Company’s condensed consolidated statements of operations. Specifically, these costs consist of: (i) cloud services operations — electricity costs, datacenter lease expense, GPU servers lease expense, third-party customer support fees and other relevant costs and (ii) colocation services — electricity costs, lease costs, data center employees’ wage expenses, and other relevant costs.
Previous wording
For the three months ended September 30, 2025, electricity costs increased by $0.4 million, or 200%, compared to the electricity costs incurred for the three months ended September 30, 2024. The increase primarily resulted from an increase in the number of deployed GPU servers.
Current wording
For the three months ended March 31, 2026, electricity costs increased by $0.3 million, or 53%, compared to the electricity costs incurred for the three months ended March 31, 2025. The increase primarily resulted from an increase in the number of GPU servers deployed.
Previous wording
For the three months ended September 30, 2025, wage expenses totaled $0.1 million. We had no wage expenses for the three months ended September 30, 2024 as we acquired Enovum in the fourth quarter of 2024, which provides colocation services.
Current wording
For the three months ended March 31, 2026, wage expenses were $0.2 million.
Previous wording
For the three months ended September 30, 2025 and 2024, depreciation and amortization expenses were $6.4 million and $4.3 million, respectively, based on an estimated useful life of property, plant, and equipment and intangible assets.
Current wording
For the three months ended March 31, 2026 and 2025, depreciation and amortization expenses were $6.4 million and $3.8 million, respectively, based on an estimated useful life of property, plant, and equipment and intangible assets. The increase in depreciation and amortization expenses is attributable to additional assets placed in service since March 31, 2025, specifically cloud equipment, resulting in higher expense being recognized.
Previous wording
For the three months ended September 30, 2024, our general and administrative expenses, totaling $3.3 million, were primarily comprised of share-based compensation expenses of $1.3 million, salary and bonus expenses of $0.5 million, professional and consulting expenses of $0.9 million, commission expense of $0.3 million, marketing expenses of $0.2 million, and travel expenses of $0.1 million.* *
Current wording
For the three months ended March 31, 2025, our general and administrative expenses, totaling $4.2 million, were primarily comprised of shared based compensation expenses of $0.1 million, salary and bonus expenses of $1.2 million, professional and consulting expenses of $1.7 million, marketing expenses of $0.3 million, and travel expenses of $0.1 million
Previous wording
The General and administrative expenses during the three months ended September 30, 2025 was significantly higher compared to the three months ended September 30, 2024 primarily attributable to higher share-based compensation expenses. In addition, salary and bonus expenses increased due to additional employees hired following the IPO. Professional and consulting fees were also higher, reflecting consulting costs charged by Bit Digital to WhiteFiber per the TSA agreement. The increase further included start-up and development costs that did not qualify for capitalization.
Current wording
The general and administrative expenses during the three months ended March 31, 2026 was significantly higher compared to the three months ended March 31, 2025 primarily attributable to higher share-based compensation expenses. In addition, salary and bonus expenses increased due to additional employees hired following the IPO. Professional and consulting fees were also higher, reflecting share-based compensation expenses for consultants as well as consulting costs charged by Bit Digital to WhiteFiber pursuant to the Transition Service Agreement. The increase further included start-up and development costs that did not qualify for capitalization.
Previous wording
Provision for income taxes consists of federal, state and foreign income taxes. Our income tax provision for the three months ended September 30, 2025 is primarily attributable to the mix of earnings and losses in countries with differing statutory tax rates, and the valuation allowance applied to the Company’s deferred tax assets in the United States. We continue to maintain a valuation allowance against the deferred tax assets in United States as the Company does not expect those deferred tax assets are “more likely than not” to be realized in the near future, particularly due to the uncertainty on macroeconomics, politics and profitability of the business.
Current wording
Provision for income taxes consists of federal, state and foreign income taxes. Our income tax provision for the three months ended March 31, 2026 is primarily attributable to the mix of earnings and losses in countries with differing statutory tax rates, and the valuation allowance applied to the Company’s deferred tax assets in Canada and Japan. We continue to maintain a valuation allowance against the deferred tax assets in Canada and Japan as the Company does not expect those deferred tax assets are “more likely than not” to be realized in the near future, particularly due to the uncertainty on macroeconomy, politics and profitability of the business.
Previous wording
The following table sets forth selected information from our condensed consolidated balance sheets as of September 30, 2025 and December 31, 2024. This information should be read together with our condensed consolidated financial statements and related notes included elsewhere in this report.
Current wording
The following table sets forth selected information from our condensed consolidated balance sheets as of March 31, 2026 and December 31, 2025. This information should be read together with our condensed consolidated financial statements and related notes included elsewhere in this Form 10-Q.
Previous wording
Cash and cash equivalents primarily consist of funds deposited with banks, which are highly liquid and are unrestricted to withdrawal or use. The total balance of cash and cash equivalents were $166.5 million and $11.7 million as of September 30, 2025 and December 31, 2024, respectively. The increase in the balance of cash and cash equivalents was a result of net cash of $327.0 million provided by financing activities, partially offset by net cash of $11.3 million used in operating activities and net cash of $160.8 million used in investing activities.
Current wording
Cash and cash equivalents primarily consist of funds deposited with banks, which are highly liquid and are unrestricted to withdrawal or use. The total balance of cash and cash equivalents were $75.8 million and $114.4 million as of March 31, 2026 and December 31, 2025, respectively. The decrease in the balance of cash and cash equivalents was a result of net cash of $141.7 million used in investing activities, partially offset by net cash of $101.8 million provided by financing activities and net cash of $1.8 million provided by operating activities.
Previous wording
Restricted cash represents cash balances that support an outstanding letter of credit to third parties related to security deposits and are restricted from withdrawal. As of September 30, 2025 and December 31, 2024, the fixed maximum amount guaranteed under the letter of credit was $3.7 million and $3.7 million, respectively.
Current wording
Restricted cash represents cash balances that support an outstanding letter of credit to third parties related to security deposits and other purposes and are restricted from withdrawal. As of March 31, 2026 and December 31, 2025, restricted cash, which includes amounts supporting the letter of credit, was $4.3 million and $3.9 million, respectively.
Previous wording
Accounts receivable, net consists of amounts due from our customers. The total balance of accounts receivable, net was $17.4 million and $5.3 million as of September 30, 2025 and December 31, 2024, respectively. The increase in the balance of accounts receivable is attributable to unpaid invoices from our customers.
Current wording
Accounts receivable, net consists of amounts due from our customers. The total balance of accounts receivable, net was $91.7 million and $23.9 million as of March 31, 2026 and December 31, 2025, respectively. The increase in the balance of accounts receivable is attributable to unpaid invoices from our customers due to the timing of invoicing and cash collections. The increase further included activity with a new customer, including certain non-recurring charges recognized during the period.
Previous wording
Net investment in lease, net represents the present value of the lease payments not yet received from lessees. The current and non-current balance of net investment in lease was $4.1 million and $10.8 million, respectively as of September 30, 2025 due to sales-type lease agreements as a lessor for its cloud service equipment. The current and non-current balance of net investment in lease was $2.5 million and $6.8 million, respectively as of December 31, 2024.
Current wording
Net investment in lease, net represents the present value of the lease payments not yet received from lessees. The current and non-current balance of net investment in lease was $3.9 million and $9.0 million, respectively as of March 31, 2026 due to sales-type lease agreements as a lessor for its cloud service equipment. The current and non-current balance of net investment in lease was $4.3 million and $9.7 million, respectively as of December 31, 2025. The decrease in the balance of net investment in lease was a result of $1.4 million of lease payments collected from equipment leasing customers, partially offset by $0.4 million in interest income earned.
Previous wording
Other current assets, net were $19.8 million and $23.3 million as of September 30, 2025 and December 31, 2024, respectively. The decrease in the balance of other current assets was mainly attributable to a decrease in prepayment to third parties of $7.2 million, partially offset by an increase in prepaid consulting services of $2.0 million, an increase in contract assets of $0.8 million, and an increase in receivable from third parties of $0.8 million.
Current wording
Other current assets, net were $20.0 million and $21.3 million as of March 31, 2026 and December 31, 2025, respectively. The decrease in the balance of other current assets was mainly attributable to a decrease in receivable from third parties of $0.6 million, prepaid consulting services of $0.7 million, and deferred contract costs of $0.4 million, partially offset by $0.5 million in prepayment to third parties.
Previous wording
Compared with December 31, 2024, the balance as of September 30, 2025 decreased by $25.9 million, mainly due to the reclassification of property and equipment of $103.5 million offset by prepayment of $77.6 million for property and equipment.
Current wording
Compared with December 31, 2025, the balance as of March 31, 2026 increased by $15.1 million, mainly due to the reclassification of property, plant, and equipment of $6.5 million offset by prepayment of $21.6 million for property, plant, and equipment.
Previous wording
Property, plant, and equipment primarily consisted of equipment used in our HPC businesses as well as construction in progress representing assets received but not yet put into service.
Current wording
Property, plant, and equipment primarily consist of service equipment used in our Cloud services and Colocation businesses, internally developed software used in our Cloud services business, and construction in progress (“CIP”) representing assets received but not yet put into service in our Cloud services and Colocation businesses.
Previous wording
As of September 30, 2025, the HPC equipment had a net book value of $244.1 million. As of December 31, 2024, the HPC equipment had a net book value of $89.2 million. Compared with December 31, 2024, the balance as of September 30, 2025 increased by $154.9 million, mainly due to the reclassification of property and equipment of $103.5 million from deposits for property, plant and equipment; the real estate acquisition of $45.0 million in North Carolina; and development costs incurred for the construction of MTL-3 in Montreal of $29.1 million offset, in part, by increase in accumulated depreciation of $14.8 million and reclassification of servers and network equipment of $7.9 million to net investment in leases upon commencement of leases of this equipment to customers.
Current wording
As of March 31, 2026, the Colocation service equipment had a net book value, including CIP, of $332.0 million. As of December 31, 2025, the Colocation service equipment had a net book value, including CIP, of $212.6 million. Compared with December 31, 2025, the balance as of March 31, 2026 increased by $119.4 million, mainly due to $117.8 million of development costs for the construction of NC-1 facility as well as infrastructure costs incurred for MTL-3 in Montreal of $2.5 million, in part, by an increase in accumulated depreciation of $0.9 million.
Previous wording
The increase in operating lease right-of-use assets and total operating lease liability of $27.7 million and $28.0 million respectively, were due to the additional leases of $31.2 million, partially offset by the amortization of the operating lease right-of-use assets totaling $3.7 million for the nine months ended September 30, 2025.
Current wording
The increase in right-of-use assets of $6.2 million was due to the addition of $8.1 million for five operating leases, partially offset by the amortization of the right-of-use assets totaling $1.7 million for the three months ended March 31, 2026.
Previous wording
Goodwill represents the excess of the purchase price over the fair value of the net assets acquired in relation of in Enovum acquisition. Refer to Note 12.Goodwill And Intangible Assets of our condensed consolidated financial statements for further information. As of September 30, 2025 and December 31, 2024, the Company recorded goodwill in the amount of $19.8 million and $19.4 million, respectively.
Current wording
Goodwill represents the excess of the purchase price over the fair value of the net assets acquired in relation to the Enovum acquisition. As of March 31, 2026 and December 31, 2025, the Company recorded goodwill in the amount of $19.8 million and $20.1 million, respectively, with the change attributable to foreign currency translation adjustments.
Previous wording
Intangible assets pertain to customer relationships acquired in connection with the acquisition of Enovum. Refer to Note 12.Goodwill and Intangible Assets for further information. As of September 30, 2025 and December 31, 2024, the total balance of intangible assets was $12.8 million and $13.0 million, respectively.
Current wording
Intangible assets pertain to customer relationships acquired in connection with the acquisition of Enovum. Refer to Note 13.Goodwill and Intangible Assets to our condensed consolidated financial statements for further information. As of March 31, 2026 and December 31, 2025, the total balance of intangible assets was $12.4 million and $12.8 million, respectively, with the change attributable to accumulated amortization.
Previous wording
Accounts payable primarily consists of amounts due for costs related to HPC services. Compared with December 31, 2024, the balance of accounts payable increased by $3.0 million in the nine months ended September 30, 2025, largely due to the unpaid bills for our cloud services in the nine months ended September 30, 2025.
Current wording
Accounts payable primarily consists of amounts due for costs related to HPC services. Compared with December 31, 2025, the balance of accounts payable as of March 31, 2026 remained consistent.
Showing the first 40 of 51 pairs. Open the source sections for the rest.
Rearranged current paragraphs (2)
Current report — wording carried from elsewhere
Our future revenue growth is, in part, dependent on our ability to leverage our development capabilities at our data center sites.
Current report — wording carried from elsewhere
We substantially completed construction of our MTL-3 facility by the end of October 2025. The site has commenced billing its customer, Cerebras, as of November 1, 2025, in the amount of CAD 1.4 million (approximately $979 thousand USD) monthly for the duration of the five-year contract.
Rearranged previous paragraphs (19)
Previous report — wording carried elsewhere
The following discussion summarizes the results of operations for the nine months ended September 30, 2025 and 2024. This information should be read together with our condensed consolidated financial statements and related notes included elsewhere in this report.
Previous report — wording carried elsewhere
We generate revenues primarily from providing cloud services and colocation services. Refer to Note 3.Revenue from Contracts with Customers for further information.
Previous report — wording carried elsewhere
Cloud services revenue is derived from providing customers with access to high-performance computing infrastructure, including GPU clusters optimized for AI workloads. Our contracts are structured as usage-based or committed-capacity agreements, typically with pricing based on the type and quantity of GPUs deployed, duration of use, and associated infrastructure. Key factors that impact cloud services revenue include the number and performance class of GPUs deployed, hardware utilization, power availability at hosting sites, and the timing of new customer onboarding.
Previous report — wording carried elsewhere
Colocation services revenue is generated from leasing data center space, power, and related infrastructure to customers who operate their own hardware. These contracts are generally multi-year agreements with fixed monthly or annual fees based on committed power capacity (typically measured in kilowatts). Factors that affect colocation revenue include timing of site development and energization, contracted power levels, and customer expansion activity.
Previous report — wording carried elsewhere
In the fourth quarter of 2023, we established our cloud-based HPC graphics processing units services, which we term cloud services, a new business line to provide cloud services to support generative AI workstreams. The Company commenced offering cloud services to customers in January 2024.
Previous report — wording carried elsewhere
In the fourth quarter of 2024, we acquired Enovum which provides customers with physical space, power, and cooling within data center facilities.
Previous report — wording carried elsewhere
We incur cost of revenue from cloud services and colocation services.
Previous report — wording carried elsewhere
The Company’s cost of revenue consists primarily of direct production costs associated with its core operations, excluding depreciation and amortization, which are separately stated in the Company’s consolidated statements of operations. Specifically, these costs consist of: (i) cloud services operations — electricity costs, datacenter lease expense, GPU servers lease expense, and other relevant costs and (ii) colocation services — electricity costs, lease costs, data center employees’ wage expenses, and other relevant costs.
Previous report — wording carried elsewhere
*Electricity costs.*These expenses were incurred by the data centers for the HPC equipment and were closely correlated with the number of deployed GPU servers.
Previous report — wording carried elsewhere
For the nine months ended September 30, 2025, electricity costs increased by $1.4 million, or 317%, compared to the electricity costs incurred for the nine months ended September 30, 2024. The increase primarily resulted from an increase in the number of deployed GPU servers.
Previous report — wording carried elsewhere
*Datacenter lease expenses.*We entered into data center lease agreements for fixed monthly recurring costs.
Previous report — wording carried elsewhere
*GPU servers lease expenses.*We entered into a GPU servers lease agreement to support our cloud services. The lease payment depends on the usage of the GPU servers.
Previous report — wording carried elsewhere
In the fourth quarter of 2024, we acquired Enovum which provides colocation services. For the nine months ended September 30, 2025 and 2024, the cost of revenue from colocation services was comprised of the following:
Previous report — wording carried elsewhere
Electricity costs. These expenses were closely correlated with the number of deployed servers hosted by the data center.
Previous report — wording carried elsewhere
*Lease expenses.*These expenses were incurred by the data center for lease agreement for a fixed monthly recurring cost.
Previous report — wording carried elsewhere
Wage expenses. These expenses represent the salaries and benefits of data center employees involved in the operation of our facilities.
Previous report — wording carried elsewhere
For the nine months ended September 30, 2025 and 2024, depreciation and amortization expenses were $15.3 million and $11.5 million, respectively, based on an estimated useful life of property, plant, and equipment and intangible assets.
Previous report — wording carried elsewhere
The General and administrative expenses during the nine months ended September 30, 2025 were higher compared to the nine months ended September 30, 2024 primarily attributable to higher share-based compensation. In addition, salary and bonus expenses increased due to additional employees hired following the IPO. Professional and consulting fees were also higher, reflecting RSUs granted to consultants, consulting costs charged by Bit Digital to WhiteFiber per the TSA agreement. The increase further included start-up costs that do not meet the criteria for capitalization. These increases reflect the Company’s expanded operations and personnel base following the IPO and continued investment in infrastructure and technology development.
Previous report — wording carried elsewhere
Provision for income taxes consists of federal, state and foreign income taxes. Our income tax provision for the nine months ended September 30, 2025 is primarily attributable to the mix of earnings and losses in countries with differing statutory tax rates, and the valuation allowance applied to the Company’s deferred tax assets in the United States. We continue to maintain a valuation allowance against the deferred tax assets in United States as the Company does not expect those deferred tax assets are “more likely than not” to be realized in the near future, particularly due to the uncertainty on macroeconomics, politics and profitability of the business.