Bit Digital, Inc
For the period ended Sep 30, 2025. Filed Nov 14, 2025.
View on SEC.govAbout this filing
A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.
Sep 30, 2025 · Filed Nov 14, 2025
What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-Q
Period ended 2025-06-30; filed 2025-08-14.
0001213900-25-076608
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsCurrent report: 10-Q
Period ended 2025-09-30; filed 2025-11-14.
0001213900-25-110383
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 293 previous paragraphs and 306 current paragraphs.
169 unchanged; 105 reworded; 31 added; 19 removed; 0 previous and 1 current paragraphs rearranged.
Tables are not compared: 21 previous and 21 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (31)
Current report
Colocation/Data center services
Current report
As of the reporting date, the related credit facilities have not been authorized for use by the lender, as both parties are in the process of negotiating revisions to the existing agreement. These negotiations are intended to result in an amendment to the current credit facility, providing the Company with access to a potential additional non-revolving term loan facility of up to CAD 55 million (approximately $39.5 million). Accordingly, no amounts had been drawn, and no borrowings were available under the credit agreement as at the reporting date.
Current report
In October 2025, the Company’s existing parent guaranty arrangement with the Initial Customer was scheduled to expire. Beginning in November 2025, the customer will provide a service deposit to the Company in lieu of the parent guaranty. The deposit will be funded through fifteen consecutive monthly payments of approximately $0.24 million each, totaling $3.6 million, payable from November 2025 through January 2027. The deposit will serve as security for the customer’s performance obligations under the amended service agreements. Each monthly payment is expected to be invoiced on the first day of the month and paid within thirty days. The Company will be required to return the deposit in cash upon termination or expiration of the service agreements, provided that all obligations have been fully satisfied and no payment defaults or material breaches exist.
Current report
In August and September 2025, we entered into three service orders with a new customer. Each order form provides for services utilizing a total of 64 B200 GPUs on a weekly basis, which either party may terminate by not extending it with mutual written agreement. In September, the customer renewed one order form for an additional week for services utilizing a total of 64 B200 GPUs. As of the reporting date, no additional renewals have occurred.
Current report
In September 2025, we entered into a service order with a new customer, which provides services utilizing a total of 16 B200 GPUs on a monthly basis, automatically renewing for an additional one month period unless and until otherwise terminated upon at least seven days’ prior written notice. The deployment commenced and revenue generation began on September 23, 2025.
Current report
In October 2025, we entered into a service order with a new customer to provide services utilizing a total of 48 H200 GPUs. The service order has an initial term of 36 months representing total contracted value of approximately $2.2 million, after which it automatically renews for successive one-month periods unless terminated by either party. The deployment commenced and revenue generation began on October 21, 2025.
Current report
In November 2025, we entered into a service order with a new customer to provide services utilizing a total of 128 B200 GPUs. The service order has an initial term of 12 months, representing total contracted value of approximately $3.0 million, after which it automatically renews for successive one-month periods unless terminated by either party. Deployment and revenue generation is scheduled to begin on December 1, 2025.
Current report
During the third quarter of 2025, the Company received an additional 1,855 miners, of which 410 miners were deployed in July 2025 and 1,445 miners were deployed in August 2025.
Current report
Our revenue from cloud services increased by $5.9 million, or 48.4%, to $18.0 million for the three months ended September 30, 2025 from $12.2 million for the three months ended September 30, 2024. The increase was primarily due to an increase in deployed GPU servers to new and existing customers in the third quarter of 2025, offset by a $2.0 million service credit accrued and expected to be issued to a customer under the terms of the contract.
Current report
In the fourth quarter of 2024, we acquired Enovum which holds our data center business that provides customers with physical space, power, and cooling within data center facilities.
Current report
For the three months ended September 30, 2025, we received 64.9 bitcoins from the Foundry mining pool. As of September 30, 2025, our maximum hash rate was at an aggregate of 2.8 EH/s for our bitcoin miners. For the three months ended September 30, 2025, we recognized revenue of $7.4 million from bitcoin mining services.
Current report
For the three months ended September 30, 2025, we earned 644.3 ETH and 52.9 ETH in native staking and liquid staking, respectively. For the three months ended September 30, 2025, we recognized revenues of $2,649,831 and $218,703 from native staking and liquid staking, respectively.
Current report
For the three months ended September 30, 2025, data center lease expenses increased by $0.4 million, or 35%, compared to the data center lease expenses incurred for the three months ended September 30, 2024. The increase primarily resulted from one additional data center lease entered after the third quarter of 2024.
Current report
For the three months ended September 30, 2025, GPU servers lease expenses decreased by $0.4 million, or 11%. The decrease primarily resulted from the application of a previously issued credit in connection with downtime that occurred in prior periods.
Current report
For the three months ended September 30, 2025, a gain of $168 million was recognized, primarily attributable to the increase in the prices of bitcoin and ETH as of September 30, 2025.
Current report
Our income tax provision was $0.7 million and $0.6 million for the three months ended September 30, 2025 and 2024, respectively. The income tax provision was higher during the three months ended September 30, 2025 compared to the three months ended September 30, 2024 primarily due to increase of $1.2 million in Iceland due to the higher operation profits during the three months ended September 30, 2025 compared to the same period in 2024 and decrease of $0.3 million in the United States due to the rapid investment in infrastructures in Iceland, which results in a lower GILTI tax in the USA, during the three months ended September 30, 2025 compared to the same period in 2024 and decrease of $0.7 million due to the operating loss from Enovum during the three months ended September 30, 2025 compared to the same period in 2024.
Current report
Our revenue from cloud services increased by $16.8 million, or 51.2%, to $49.5 million for the nine months ended September 30, 2025 from $32.7 million for the nine months ended September 30, 2024. The increase was primarily due to an increase in deployed GPU servers to new and existing customers during the first nine months ended September 30, 2025.
Current report
Our revenue from colocation services was $5.1 million and $nil for the nine months ended September 30, 2025 and 2024, respectively.
Current report
For the nine months ended September 30, 2024, we received 820.3 bitcoins from the Foundry mining pool. As of September 30, 2024, our maximum hash rate was at an aggregate of 4.3 EH/s for our bitcoin miners. For the nine months ended September 30, 2024, we recognized revenue of $48.1 million from bitcoin mining services.
Current report
For the nine months ended September 30, 2025, we earned 1,022.1 ETH in native staking and 52.9 ETH in liquid staking, respectively. For the nine months ended September 30, 2025, we recognized revenues of $3,575,804 and $218,703 from native staking and liquid staking, respectively.
Current report
Our revenues from ETH liquid staking increased by $214,200, or 4,756.8%, to $218,703 for the nine months ended September 30, 2025 from $4,503 for the nine months ended September 30, 2024. The increase was due to the resume of liquid staking activities in the third quarter of 2025.
Current report
For the nine months ended September 30, 2025 and 2024, the cost of revenue from cloud services was comprised of the following:
Current report
In the fourth quarter of 2024, we acquired Enovum which provides colocation services. For the nine months ended September 30, 2025 and 2024, the cost of revenue from colocation services was comprised of the following:
Current report
For the nine months ended September 30, 2025, our general and administrative expenses, totaling $61.0 million, were primarily comprised of professional and consulting expenses of $23.3 million, shared-based compensation expenses of $18.0 million, salary and bonus expenses of $8.1 million, marketing expenses of $2.6 million, travel expenses of $0.7 million, and directors and officers insurance expenses of $0.8 million.
Current report
Gains on digital assets
Current report
For the nine months ended September 30, 2025, a gain of $146 million was recognized, primarily attributable to the increase in the prices of bitcoin and ETH as of September 30, 2025.
Current report
On September 29, 2025, the Company entered into an underwriting agreement with certain financial institutions (collectively the “Underwriters”), pursuant to which the Company agreed to sell $135 million aggregate principal amount of its 4.00% Convertible Notes due 2030. Subsequently, the greenshoe option was exercised under which additional $15 million was sold to the Underwriters, making a total of $150 million aggregate principal amount of the Convertible Notes. The Convertible Notes closed on October 1, 2025 and will mature on October 1, 2030, unless earlier converted, redeemed or repurchased in accordance with their terms as stipulated in the Agreement.
Current report
On October 31, 2025, the Company filed an automatically effective shelf registration statement on Form S-3 (File No. 333-291205) with the SEC to register an indeterminate amount of its ordinary shares, which included a sales agreement prospectus supplement covering the offering, issuance and sale by the Company of up to a maximum aggregate offering price of up to $2.5 billion of the Company’s ordinary shares that may be issued and sold from time to time pursuant to the Sales Agreement.
Current report
In October 2025, we entered into a service order with a new customer to provide services utilizing a total of 48 H200 GPUs. The service order has an initial term of 36 months, representing total contracted value of approximately $2.2 million, after which it automatically renews for successive one-month periods unless terminated by either party. The deployment commenced and revenue generation began on October 21, 2025.
Current report
Off-Balance Sheet Arrangements
Current report
During the periods presented, we did not have any off-balance sheet arrangements.
Removed paragraphs (19)
Previous report
Data centers
Previous report
During the three and six months ended June 30, 2025, our hosting partners continued to prepare sites to deliver our contracted hosting capacity, bringing additional power online for our miners.
Previous report
Our revenues from cloud services increased by $4.1 million, or 32.8%, to $16.6 million for the three months ended June 30, 2025 from $12.5 million for the three months ended June 30, 2024. The increase was primarily due to an increase in deployed GPU servers in the first quarter of 2025 and the $1.3 million service credit issued to the customer as compensation for decreased utilization during the initial deployment period, which included testing and optimization phases, in the first quarter of 2024.
Previous report
For the three months ended June 30, 2025, we received 68.2 bitcoins from the Foundry mining pool. As of June 30, 2025, our maximum hash rate was at an aggregate of 2.7 EH/s for our bitcoin miners. For the three months ended June 30, 2025, we recognized revenue of $6.6 million from bitcoin mining services.
Previous report
For the three months ended June 30, 2024, we received 244.2 bitcoins from the Foundry mining pool. As of June 30, 2024, our maximum hash rate was at an aggregate of 4.2 EH/s for our bitcoin miners. For the three months ended June 30, 2024, we recognized revenue of $16.1 million from bitcoin mining services.
Previous report
For the three months ended June 30, 2025, we earned 166.8 ETH in native staking. For the three months ended June 30, 2025, we recognized revenues of $365,332 from native staking.
Previous report
For the three months ended June 30, 2024, we earned 109.4 ETH in native staking. For the three months ended June 30, 2024, we recognized revenues of $373,812 from native staking.
Previous report
For the three months ended June 30, 2025, GPU servers lease expenses were relatively consistent with the same period in 2024, with a slight decrease of $0.1 million, or 2%.
Previous report
For the three months ended June 30, 2024, our general and administrative expenses, totaling $5.5 million, were primarily comprised of shared-based compensation expenses of $0.4 million, salary and bonus expenses of $1.0 million, professional and consulting expenses of $2.3 million, directors and officers insurance expenses of $0.2 million, marketing expenses of $0.4 million, and travel expenses of $0.3 million.
Previous report
For the three months ended June 30, 2025, a gain of $27.2 million was recognized, primarily attributable to the increase in the prices of bitcoin and ETH as of June 30, 2025.
Previous report
Our income tax provision was $1.6 million and $0.5 million for the three months ended June 30, 2025 and 2024, respectively. The income tax provision was higher during the three months ended June 30, 2025 compared to the three months ended June 30, 2024 primarily due to increase of $0.9 million in Canada due to the higher unrealized gain resulted from increased Bitcoin price and increase of $0.2 million in the United States due to higher taxable profits from digital assets sales.
Previous report
Our revenues from cloud services increased by $10.9 million, or 52.9%, to $31.4 million for the six months ended June 30, 2025 from $20.6 million for the six months ended June 30, 2024. The increase was primarily due to an increase in deployed GPU servers for the six months ended June 30, 2025 and the $1.3 million service credit issued to the customer as compensation for decreased utilization during the initial deployment period, which included testing and optimization phases, in the first quarter of 2024.
Previous report
Our revenue from colocation services was $3.4 million for the six months ended June 30, 2025. We had no revenue from colocation services for the six months ended June 30, 2024. In the fourth quarter of 2024, we acquired Enovum which provides customers with physical space, power, and cooling within the data center facility.
Previous report
For the six months ended June 30, 2025 and 2024, the cost of revenue from cloud services was comprised of the following:
Previous report
For the six months ended June 30, 2025, datacenter lease expenses increased by $1.3 million, or 102%, compared to the datacenter lease expenses incurred for the six months ended June 30, 2024. The increase primarily resulted from two additional datacenter leases entered into after the second quarter of 2024.
Previous report
In the fourth quarter of 2024, we acquired Enovum which provides colocation services. For the six months ended June 30, 2025 and 2024, the cost of revenue from colocation services was comprised of the following:
Previous report
Gains (losses) on digital assets
Previous report
For the six months ended June 30, 2025, a loss of $22.1 million was recognized, primarily attributable to the decreases in the price of ETH as of June 30, 2025, partially offset by an increase in the price of bitcoin as of June 30, 2025.
Previous report
We have sold from time to time in one or more offerings at the market (ATM) at prices and on terms which the Company will then determine for an initial aggregate offering price of $500 million pursuant to a registration statement on Form F-3 declared effective by the SEC on May 4, 2022.
Reworded paragraphs (105)
Previous wording
Bit Digital, Inc. or the “Company”, is a global platform for high performance computing (“HPC”) business including cloud services and HPC data center services and digital asset business, including Etherum (ETH) staking business, with headquarters in New York City. On June 25, 2025, the Company announced that it has initiated a strategic transition to become a pure play Ethereum staking and treasury company. The Company began accumulating ETH and operating staking infrastructure in 2022 and has steadily increased its holdings since that time.
Current wording
Bit Digital, Inc. or the “Company”, is a global platform for high performance computing (“HPC”) business including cloud services and HPC data center services and digital asset business, including Ethereum (ETH) staking business, with headquarters in New York City. On June 25, 2025, the Company announced that it has initiated a strategic transition to become a pure play Ethereum staking and treasury company. The Company began accumulating ETH and operating staking infrastructure in 2022 and has steadily increased its holdings since that time.
Previous wording
We design, develop, and operate data centers, through which we offer our hosting and colocation services. Our operational data centers meet the requirements of the Tier-3 standard, including N+1 redundancy architecture, concurrent maintainability, uninterruptible power supply, advanced and highly reliable cooling systems, strict monitoring and management systems, SOC 2 Type 2, differentiated software supporting AI workloads, high density and robust bandwidth, and infrastructure to support AI workloads.
Current wording
We design, develop, and operate data centers, through which we offer our hosting and colocation services. Our operational data centers meet the requirements of the Tier-3 standard, including N+1 redundancy architecture, concurrent maintainability, uninterruptible power supply, advanced and highly reliable cooling systems, strict monitoring and management systems, 9.982% uptime and no more than 1.6 hours of downtime annually, service organization control, SOC 2 Type 2, differentiated software supporting AI workloads, high density and robust bandwidth, and infrastructure to support AI workloads.
Previous wording
On July 30, 2025, we entered into a Contribution Agreement with WhiteFiber, pursuant to which we agreed to contribute our HPC business through the transfer of 100% of the capital shares of our cloud services subsidiary, WhiteFiber AI, Inc. and its wholly-owned subsidiaries WhiteFiber HPC, Inc., WhiteFiber Canada, Inc., WhiteFiber Japan G.K. and WhiteFiber Iceland, ehf, to WhiteFiber, upon the effectiveness of WhiteFiber’s registration statement on Form S-1 in connection with WhiteFiber’s initial public offering. For more information, see Note 21.Subsequent Events in our Notes to Unaudited Condensed Consolidated Financial Statements included elsewhere herein.
Current wording
On July 30, 2025, we entered into a Contribution Agreement with WhiteFiber, pursuant to which we agreed to contribute our HPC business through the transfer of 100% of the capital shares of our cloud services subsidiary, WhiteFiber AI, Inc. and its wholly-owned subsidiaries WhiteFiber HPC, Inc., WhiteFiber Canada, Inc., WhiteFiber Japan G.K. and WhiteFiber Iceland, ehf, to WhiteFiber, upon the effectiveness of WhiteFiber’s registration statement on Form S-1, as amended (File No. 333-288650) (the “Registration Statement”) on August 6, 2025 in connection with WhiteFiber’s initial public offering (the “IPO”).
Previous wording
We acquired Enovum Data Centers Corp (“Enovum”) on October 11, 2024. The transaction included the lease to MTL-1, a fully operational and fully leased to customers 4 MW (gross) Tier-3 datacenter headquartered in Montreal, Canada.
Current wording
We acquired Enovum Data Centers Corp (“Enovum”) on October 11, 2024. The transaction included the lease to MTL-1, a fully operational and fully leased to customers 4 MW (gross) Tier-3 data center headquartered in Montreal, Canada.
Previous wording
On December 27, 2024, we acquired the real estate and building for a build-to-suit 5 MW (gross) Tier-3 data center (“MTL-2”) expansion project near Montreal, Canada which we refer to as MTL-2. MTL-2 is a 160,000 square foot site that was previously used as an encapsulation manufacturing facility, is located in Pointe-Claire, Quebec. We initially funded the purchase of CAD $33.5 million (approximately USD $23.3) million with cash on hand. We expect to invest approximately USD $23.6 million to develop the site to Tier-3 standards with an initial load of 5 MW (gross). MTL-2 is expected to be completed and operational in the fourth quarter of 2025, with a one-month delay before it begins to generate revenue.
Current wording
On December 27, 2024, we acquired the real estate and building for a build-to-suit 5 MW (gross) Tier-3 data center (“MTL-2”) expansion project near Montreal, Canada which we refer to as MTL-2. MTL-2 is a 160,000 square foot site that was previously used as an encapsulation manufacturing facility, is located in Pointe-Claire, Quebec. We initially funded the purchase of CAD $33.5 million (approximately USD $23.3) million with cash on hand. We expect to invest approximately USD $23.6 million to develop the site to Tier-3 standards with an initial load of 5 MW (gross). However, we have prioritized other builds and preserved capital for more time sensitive projects.
Previous wording
On April 11, 2025, we entered into a lease for a new data center site in Saint-Jerome, Quebec, a suburb of Montreal, MTL-3. The MTL-3 facility spans approximately 202,000 square feet on 7.7 acres and is being developed to as a 7 MW (gross) Tier-3 data center. It will support current contracted capacity, with Cerebras (5 MW IT Load), with future expansion potential subject to utility approvals. The transaction was executed under a lease-to-own structure, which includes a fixed-price purchase option of CAD $24.2 million (approximately USD $17.3 million) exercisable by December 2025. The lease term is 20 years, with two 5-year extensions at the Company’s option. Subject to our receipt of all required permits, the facility is being retrofitted to Tier-3 standards, with development costs expected to total approximately USD $41 million, and is expected to be completed and operational in the fourth quarter of 2025, with a one-month delay before we expect to begin to generate revenue.
Current wording
On April 11, 2025, we entered into a lease for a new data center site in Saint-Jerome, Quebec, a suburb of Montreal, MTL-3. The MTL-3 facility spans approximately 202,000 square feet on 7.7 acres and is being developed as a 7 MW (gross) Tier-3 data center. It will support current contracted capacity, with Cerebras (5 MW IT Load), with future expansion potential subject to utility approvals. The transaction was executed under a lease-to-own structure, which includes a fixed-price purchase option of CAD 24.2 million (approximately $17.3 million) exercisable by December 2025. The lease term is 20 years, with two 5-year extensions at the Company’s option. Subject to our receipt of all required permits, the facility is being retrofitted to Tier-3 standards, with development costs expected to total approximately $41 million. Construction at the site was substantially completed by October 2025. The site has commenced billing Cerebras as of November 1, 2025, in the amount of CAD 1.4 million (approximately $979 thousand) monthly for the duration of the five-year contract.
Previous wording
On May 20, 2025 (the “Closing Date”), we completed the purchase of a former industrial/manufacturing building from Unifi Manufacturing, Inc. (“UMI”). Pursuant to the Purchase Agreement we agreed to purchase from UMI, an industrial/manufacturing building together with the underlying land (“NC-1”) located in Madison, North Carolina, as well as certain machinery and equipment located thereon for a cash purchase price of $45 million. The purchase price will increase by (i) $8 million, if Duke Energy actually provides, or provides an Electric Services Agreement providing for, at least 99 MW (gross) within two years of the Closing Date or (ii) $5 million, if Duke Energy actually provides, or provides an Electric Services Agreement providing for, at least 99 MW (gross) more than two years but less than three years after the Closing Date. Additionally, the purchase price will increase by an additional $200,000 per MW over 99 MW (gross) up to a maximum of $5 million if at least 99 MW (gross) are actually delivered, or Duke Energy provides an Electric Services Agreement for the provision of at least 99 MW (gross), within four years of the Closing Date. Separately, the Company entered into a Capacity Agreement with Duke Energy pursuant to which Duke Energy agreed to use commercially reasonable efforts to achieve 24 MW (gross) of service to the Property by September 1, 2025, 40 MW (gross) by April 1, 2026 and 99 MW (gross) within four years of May 16, 2025. Management believes based upon its review of the site and a Duke Energy preliminary transmission study, that the Property may receive and support up to 200 MW (gross) of total electrical supply over an extended period of time, subject to infrastructure upgrades, such as developing new substations and other conditions.
Current wording
On May 20, 2025 (the “Closing Date”), we completed the purchase of a former industrial/manufacturing building from Unifi Manufacturing, Inc. (“UMI”). Pursuant to the Purchase Agreement we agreed to purchase from UMI, an industrial/manufacturing building together with the underlying land (“NC-1”) located in Madison, North Carolina, as well as certain machinery and equipment located thereon for a cash purchase price of $45 million. The purchase price will increase by (i) $8 million, if Duke Energy actually provides, or provides an Electric Services Agreement providing for, at least 99 MW (gross) within two years of the Closing Date or (ii) $5 million, if Duke Energy actually provides, or provides an Electric Services Agreement providing for, at least 99 MW (gross) more than two years but less than three years after the Closing Date. Additionally, the purchase price will increase by an additional $200,000 per MW over 99 MW (gross) up to a maximum of $5 million if at least 99 MW (gross) are actually delivered, or Duke Energy provides an Electric Services Agreement for the provision of at least 99 MW (gross), within four years of the Closing Date. Separately, the Company entered into a Capacity Agreement with Duke Energy pursuant to which Duke Energy agreed to use commercially reasonable efforts to achieve 24 MW (gross) of service to the Property by September 1, 2025, 40 MW (gross) by April 1, 2026 and 99 MW (gross) within four years of May 16, 2025. Management believes based upon its review of the site and a Duke Energy preliminary transmission study, that the Property may receive and support up to 200 MW (gross) of total electrical supply over an extended period of time, subject to infrastructure upgrades, such as developing new substations and other conditions. On August 4, 2025, Enovum NC-1 Bidco LLC, a subsidiary of the Company, entered into an Assignment and Assumption Agreement with Unifi Manufacturing and Duke Energy Carolinas, LLC, pursuant to which Enovum assumed Unifi’s rights and obligations under certain electric service agreements for facilities located in North Carolina. Duke Energy consented to the assignment. Refer to Note19. Commitments and contingenciesfor further detail.
Previous wording
We expect to leverage a global network of data centers for hosting capacity for our GPU business, in many instances, by negotiating with third-party providers to seamlessly integrate our cloud services at data centers across key regions in Europe, North America and Asia. Our initial data center partnership through which we lease capacity is at Blönduós Campus, Iceland, offering a world-class operations team with certified technicians and reliable engineers. The facility has 45kW rack density and 6 MW (gross) total capacity. We have executed contracts for 5.5 MW at the data center. The center’s energy source is 100% renewable energy, mainly from Blanda Hydro PowerStation, the winner of an IHA Blue Planet Award in 2017.
Current wording
We expect to leverage a global network of data centers for hosting capacity for our GPU business, in many instances, by negotiating with third-party providers to seamlessly integrate our cloud services at data centers across key regions in Europe, North America and Asia. Our initial data center partnership through which we lease capacity is at Blönduós Campus, Iceland, offering a world-class operations team with certified technicians and reliable engineers. The facility has 45kW rack density and 6 MW (gross) total capacity. We have executed contracts for 5.5 MW IT load at the data center. The center’s energy source is 100% renewable energy, mainly from Blanda Hydro PowerStation, the winner of an IHA Blue Planet Award in 2017.
Previous wording
In January 2025, the Company entered into a new agreement to supply its Initial Customer with an additional 464 GPUs for a period of eighteen months. This new agreement replaces the prior agreement whereby the Company was to provide the customer with an incremental 2,048 H100 GPUs. The contract represents approximately $15 million of annualized revenue and features a two-month prepayment from the customer. The customer has elected to defer the commencement date until August 20, 2025, which is the latest allowable date under the agreement.
Current wording
In January 2025, the Company entered into a new agreement to supply its Initial Customer with an additional 464 GPUs for a period of 18 months. This new agreement replaces the prior agreement whereby the Company was to provide the customer with an incremental 2,048 H100 GPUs. The contract represents approximately $15 million of annualized revenue and features a two-month prepayment from the customer. The customer elected to defer the commencement date until August 20, 2025, which is the latest allowable date under the agreement. Deployment commenced on August 20, 2025, using the Company’s inventory of B200 GPUs.
Previous wording
On November 6, 2024, we entered into a Master Services Agreement (“MSA”) with a minimum purchase commitment of 16 GPUs, along with an associated purchase order, from a new customer. The purchase order provides for services utilizing a total of 16 H200 GPUs over a minimum of a six month period, representing total contracted value of approximately $160,000 for the term. The deployment commenced on November 7, 2024, using the Company’s existing inventory of H200 GPUs. The service under the purchase order concluded in May 2025. Between May and August 2025, the Company signed four additional agreements on a month-to-month basis for a total of 64 H200 GPUs.
Current wording
On November 6, 2024, we entered into a Master Services Agreement (“MSA”) with a minimum purchase commitment of 16 GPUs, along with an associated purchase order, from a new customer. The purchase order provides for services utilizing a total of 16 H200 GPUs over a minimum of a six month period, representing total contracted value of approximately $160,000 for the term. The deployment commenced on November 7, 2024, using the Company’s existing inventory of H200 GPUs. The service under the purchase order concluded in May 2025. Between May 2025 and September 2025, the Company signed six additional agreements on a month-to-month basis for a total of 88 H200 GPUs, of which 80 remained in deployment as of the date of this report.
Previous wording
On December 30, 2024, we entered into a Master Services Agreement (“MSA”) with a minimum purchase commitment of 32 GPUs, along with an associated purchase order, from a new customer, an AI Compute Fund managed by DNA Holdings Venture Inc. (“DNA Fund”). The purchase order provides for services utilizing a total of 576 H200 GPUs over a twenty-five month period and terminable by either party upon at least 90 days’ written notice prior to any renewal date. It represents an aggregate revenue opportunity of approximately $20.2 million. Concurrently, we placed a purchase order for 130 H200 servers for approximately $30 million. The deployment commenced in February 2025.
Current wording
On December 30, 2024, we entered into a Master Services Agreement (“MSA”) with a minimum purchase commitment of 32 GPUs, along with an associated purchase order, from a new customer, an AI Compute Fund managed by DNA Holdings Venture Inc. (“DNA Fund”). The purchase order provides for services utilizing a total of 576 H200 GPUs over a 25 month period and terminable by either party upon at least 90 days’ written notice prior to any renewal date. It represents an aggregate revenue opportunity of approximately $20.2 million. Concurrently, we placed a purchase order for 130 H200 servers for approximately $30 million. The deployment commenced in February 2025.
Previous wording
In January 2025, we entered into a Master Services Agreement (“MSA”), along with two associated purchase orders, from a new customer. The purchase orders provide for services utilizing a total of 24 H200 GPUs over a minimum twelve (12) month period, representing total revenue of approximately $450,000 for the term. The deployment commenced and revenue generation began on January 27, 2025, using the Company’s existing inventory of H200 GPUs. The service under the purchase order concluded in March 2025 after the customer ceased operations.
Current wording
In January 2025, we entered into a Master Services Agreement (“MSA”), along with two associated purchase orders, from a new customer. The purchase orders provide for services utilizing a total of 24 H200 GPUs over a minimum 12 month period, representing total revenue of approximately $450,000 for the term. The deployment commenced and revenue generation began on January 27, 2025, using the Company’s existing inventory of H200 GPUs. The service under the purchase order concluded in March 2025 after the customer ceased operations.
Previous wording
On January 30, 2025, we entered into a Master Services Agreement (“MSA”) with a minimum purchase commitment of 40 GPUs, along with an associated purchase order, from a new customer. The purchase orders provide for services utilizing a total of 40 H200 GPUs over a minimum of 12 month period, representing total revenue of approximately $750,000 for the term. The deployment commenced and revenue generation began on January 24, 2025, using the Company’s existing inventory of H200 GPUs. Between April and July 2025, the Company signed four additional agreements on a month-to-month basis for a total of 184 H200 GPUs including one purchase order for 32 GPUs that was terminated in August 2025.
Current wording
On January 30, 2025, we entered into a Master Services Agreement (“MSA”) with a minimum purchase commitment of 40 GPUs, along with an associated purchase order, from a new customer. The purchase orders provide for services utilizing a total of 40 H200 GPUs over a minimum of 12 month period, representing total revenue of approximately $750,000 for the term. The deployment commenced and revenue generation began on January 24, 2025, using the Company’s existing inventory of H200 GPUs. In October 2025, the purchase order was amended to reduce the number of H200 GPUs from 40 to 8 and to extend the term of service through May 2027. Between April and July 2025, the Company signed four additional agreements on a month-to-month basis for a total of 184 H200 GPUs which were terminated in August 2025.
Previous wording
In June of 2025, the Company announced that it had initiated a strategic transition to become a pure play ETH staking and treasury company. In connection with the transition, the Company intends to convert its BTC holdings into ETH over time and has commenced a strategic alternatives process for its bitcoin mining operations, which is expected to result in a sale or wind-down, with any net proceeds to be re-deployed into ETH.
Current wording
In June 2025, the Company announced that it had initiated a strategic transition to become a pure play ETH staking and treasury company. In connection with the transition, the Company intends to convert its BTC holdings into ETH over time and has commenced a strategic alternatives process for its bitcoin mining operations, which is expected to result in a sale or wind-down, with any net proceeds to be re-deployed into ETH.
Previous wording
We have signed service agreements with third-party hosting partners in North America and Iceland. These partners operate specialized mining data centers, where they install and operate the miners and provide IT consulting, maintenance, and repair work on site for us. Our mining facilities in New York are maintained by Digihost Technologies Inc. (“Digihost”). Our mining facilities in Texas are maintained by Dory Creek, LLC, a subsidiary of Bitdeer Technologies Group (“Bitdeer”) and A.R.T. Digital Holdings Corp (“KaboomRacks”). Soluna Computing, Inc and DVSL ComputeCo, LLC (collectively “Soluna”) maintained our mining facilities in Kentucky and Texas. Our mining facility in Iceland is maintained by GreenBlocks ehf, an Icelandic private limited company (“GreenBlocks”). We have relocated our miners from our mining facility in Canada maintained by Blockbreakers Inc. (“Blockbreakers”) to Soluna and Coinmint after our service agreement expired in November 2024.
Current wording
We have signed service agreements with third-party hosting partners in North America and Iceland. These partners operate specialized mining data centers, where they install and operate the miners and provide IT consulting, maintenance, and repair work on site for us. Our mining facilities in New York are maintained by Digihost Technologies Inc. (“Digihost”). Our mining facilities in Texas are maintained by Dory Creek, LLC, a subsidiary of Bitdeer Technologies Group (“Bitdeer”) and A.R.T. Digital Holdings Corp (“KaboomRacks”). Soluna Computing, Inc and DVSL ComputeCo, LLC (collectively “Soluna”) maintained our mining facilities in Kentucky and Texas. Our mining facility in Iceland is maintained by GreenBlocks ehf, an Icelandic private limited company (“GreenBlocks”).
Previous wording
As of June 30, 2025, the Company’s active hash rate totals approximately 1.2 EH/s, with operations in North America and Iceland.
Current wording
As of September 30, 2025, the Company’s active hash rate totals approximately 1.9 EH/s, with operations in North America and Iceland.
Previous wording
In May 2025, we amended the Services Agreement with Greenblocks, originally executed in May 2023 and previously amended in June 2023. Pursuant to the terms of the amended agreement, Greenblocks shall provide services to support 8.9 MW of power capacity from March 1, 2025 through April 30, 2025 and 5 MW of computational capacity starting May 1, 2025 through December 31, 2025. The Company will pay power costs of $0.067 per kilowatt hour and a pod fee of $10,000 per pod per month, subject to pro rata adjustment if usage falls below 2 MW. All other provisions of the original agreement and previous appendices remain in effect. The amended terms may be modified by mutual agreement, and either party may terminate with one month’s notice. As of June 30, 2025, GreenBlocks provided approximately 5.0 MW of capacity for our miners at their facility.
Current wording
In May 2025, we amended the Services Agreement with Greenblocks, originally executed in May 2023 and previously amended in June 2023. Pursuant to the terms of the amended agreement, Greenblocks shall provide services to support 8.9 MW of power capacity from March 1, 2025 through April 30, 2025 and 5 MW of computational capacity starting May 1, 2025 through December 31, 2025. The Company will pay power costs of $0.067 per kilowatt hour and a pod fee of $10,000 per pod per month, subject to pro rata adjustment if usage falls below 2 MW. All other provisions of the original agreement and previous appendices remain in effect. The amended terms may be modified by mutual agreement, and either party may terminate with one month’s notice. As of September 30, 2025, GreenBlocks provided approximately 9.1 MW of capacity for our miners at their facility.
Previous wording
In February 2025, we entered into two hosting services agreements with A.R.T. Digital Holdings Corp (“KaboomRacks”) for terms of nine (9) months and three years automatically renewing on an annual basis unless terminated by either party. Pursuant to the terms of the agreements, KaboomRacks provides maintenance and operation services to Bit Digital to support 6 MW and 13 MW of capacity. On July 1, 2025, we entered into the first amendment to the hosting service agreement for 13 MW of capacity. The amendment modified the existing agreement, identifying the two facilities that will provide maintenance and operations service to Bit Digital to support 5 MW and 8 MW of capacity. KaboomRacks shall also be entitled to respective 40%, 14.75% and 22.5% of the net profit generated by the miners. As of June 30, 2025, KaboomRacks provided approximately 4.5 MW of capacity for our miners at their facility.
Current wording
On July 1, 2025, we entered into the first amendment to the hosting service agreement for 13 MW of capacity. The amendment modified the existing agreement, identifying the two facilities that will provide maintenance and operations service to Bit Digital to support 5 MW and 8 MW of capacity. KaboomRacks shall also be entitled to respective 40%, 14.75% and 22.5% of the net profit generated by the miners. As of September 30, 2025, KaboomRacks provided approximately 16.8 MW of capacity for our miners at their facility. On November 12, 2025, we received communication regarding a change in the contracting entity under its existing hosting arrangements. Effective immediately, Digital Energy Partners LLC (“DEP”) replaced KaboomRacks as the sole contracting counterparty. Under the updated terms, KaboomRacks will return all deposits previously held by it, and we will remit a one-month deposit related to electricity costs to DEP. In connection with the transition, DEP assumed the remaining portion of the $1.3 million loan, with an outstanding balance of approximately $1.1 million as of November 13, 2025.
Previous wording
In May 2022, our hosting partner Blockfusion advised us that the substation at its Niagara Falls, New York facility was damaged by an explosion and fire, and power was cut off to approximately 2,515 of the Company’s bitcoin miners and approximately 710 ETH miners that had been operating at the site immediately prior to the incident. The explosion and fire are believed to have been caused by faulty equipment owned by the power utility. Blockfusion and the Company have entered into a common interest agreement to jointly pursue any claims evolving from the explosion and fire. Prior to the incident, our facility with Blockfusion in Niagara Falls, provided approximately 9.4 MW to power our miners. Power was restored to the facility in September 2022. However, we received a notice dated October 4, 2022 (the “Notice”), from the City of Niagara Falls, which ordered the cease and desist from any cryptocurrency mining or related operations at the facility until such time as Blockfusion complies with Section 1303.2.8 of the City of Niagara Falls Zoning Ordinance (the “Ordinance”), in addition to all other City ordinances and codes. Blockfusion has advised us that the Ordinance came into effect on October 1, 2022, following the expiration of a related moratorium on September 30, 2022. Blockfusion has further advised that it has submitted applications for new permits based on the Ordinance’s new standards and that the permits may take several months to process. Pursuant to the Mining Services Agreement between Bit Digital and Blockfusion dated August 25, 2021, Blockfusion represents, warrants and covenants that it “possesses, and will maintain, all licenses, registrations, authorizations and approvals required by any governmental agency, regulatory authority or other party necessary for it to operate its business and engage in the business relating to its provision of the Services.” On October 5, 2022, Bit Digital further advised Blockfusion that it expects it to comply with the directives of the Notice. Our service agreement with Blockfusion ended in September 2023. On June 3, 2024, the Company filed suit in Delaware Superior Court against Blockfusion alleging claims for breach of contract, conversion, and related claims in connection with, among other things, certain deposits and advances paid to Blockfusion, the return of which is owed to the Company. The Company is seeking in excess of $4.3 million. On October 22, 2024, Blockfusion denied the Company’s claims and brought reciprocal breach of contract and related counterclaims. Following limited discovery, the court entered a stipulation and order on June 18, 2025, amending the Case Management Order to extend multiple discovery deadlines and vacate the previously scheduled trial date. On August 1, 2025, the Company moved for leave to file a Second Amended Complaint, which adds claims for fraud and related causes of action arising out of Blockfusion’s, conduct both at the inception of and during the parties…
Excerpt shortened here; the source contains the full paragraph.
Current wording
In May 2022, our hosting partner Blockfusion advised us that the substation at its Niagara Falls, New York facility was damaged by an explosion and fire, and power was cut off to approximately 2,515 of the Company’s bitcoin miners and approximately 710 ETH miners that had been operating at the site immediately prior to the incident. The explosion and fire are believed to have been caused by faulty equipment owned by the power utility. Blockfusion and the Company have entered into a common interest agreement to jointly pursue any claims evolving from the explosion and fire. Prior to the incident, our facility with Blockfusion in Niagara Falls, provided approximately 9.4 MW to power our miners. Power was restored to the facility in September 2022. However, we received a notice dated October 4, 2022 (the “Notice”), from the City of Niagara Falls, which ordered the cease and desist from any cryptocurrency mining or related operations at the facility until such time as Blockfusion complies with Section 1303.2.8 of the City of Niagara Falls Zoning Ordinance (the “Ordinance”), in addition to all other City ordinances and codes. Blockfusion has advised us that the Ordinance came into effect on October 1, 2022, following the expiration of a related moratorium on September 30, 2022. Blockfusion has further advised that it has submitted applications for new permits based on the Ordinance’s new standards and that the permits may take several months to process. Pursuant to the Mining Services Agreement between Bit Digital and Blockfusion dated August 25, 2021, Blockfusion represents, warrants and covenants that it “possesses, and will maintain, all licenses, registrations, authorizations and approvals required by any governmental agency, regulatory authority or other party necessary for it to operate its business and engage in the business relating to its provision of the Services.” On October 5, 2022, Bit Digital further advised Blockfusion that it expects it to comply with the directives of the Notice. Our service agreement with Blockfusion ended in September 2023. On June 3, 2024, the Company filed suit in Delaware Superior Court against Blockfusion alleging claims for breach of contract, conversion, and related claims in connection with, among other things, certain deposits and advances paid to Blockfusion, the return of which is owed to the Company. The Company is seeking in excess of $4.3 million. On October 22, 2024, Blockfusion denied the Company’s claims and brought reciprocal breach of contract and related counterclaims. Following limited discovery on June 18, 2025, the court entered a stipulation and order amending the Case Management Order to extend multiple discovery deadlines and vacate the previously scheduled trial date. On August 1, 2025, the Company moved for leave to file a Second Amended Complaint, which adds claims for fraud and related causes of action arising out of Blockfusion’s, conduct both at the inception of and during the parties’…
Excerpt shortened here; the source contains the full paragraph.
Previous wording
For the three and six months ended June 30, 2025, the Company disposed of nil and 4,828 bitcoin miners. In July 2025, the Company disposed of 2,972 bitcoin miners.
Current wording
For the three and nine months ended September 30, 2025, the Company disposed of 3,072 and 7,900 bitcoin miners.
Previous wording
As of June 30, 2025, we had 22,574 miners owned or operating (in Iceland) for bitcoin mining with a total maximum hash rate of 2.7 EH/s.
Current wording
As of September 30, 2025, we had 21,357 miners owned or operating (in Iceland) for bitcoin mining with a total maximum hash rate of 2.8 EH/s.
Previous wording
From the inception of our bitcoin mining business in February 2020 to June 30, 2025, we earned an aggregate of 7,431.6 bitcoins.
Current wording
From the inception of our bitcoin mining business in February 2020 to September 30, 2025, we earned an aggregate of 7,496.5 bitcoins.
Previous wording
The following table presents our bitcoin mining activities for the six months ended June 30, 2025:
Current wording
The following table presents our bitcoin mining activities for the nine months ended September 30, 2025:
Previous wording
We started participating in liquid staking via Liquid Collective protocol on the Coinbase platform in the first quarter of 2023. Liquid staking allows participants to achieve greater capital efficiency by utilizing their staked ETH as collateral and trading their staked ETH tokens on the secondary market. In the first quarter of 2024, we have reclaimed all the liquid staked ETH from Liquid Collective protocol. In July 2025, we resumed liquid staking through the Liquid Collective protocol with 5,120 ETH. This approach provides flexibility to engage in both staking and restaking through a broader range of strategies and platforms.
Current wording
We started participating in liquid staking via Liquid Collective protocol on the Coinbase platform in the first quarter of 2023. Liquid staking allows participants to achieve greater capital efficiency by utilizing their staked ETH as collateral and trading their staked ETH tokens on the secondary market. In the first quarter of 2024, we have reclaimed all the liquid staked ETH from Liquid Collective protocol. In July 2025, we resumed liquid staking through the Liquid Collective protocol with 5,120 ETH. This approach provides flexibility to engage in both staking and restaking through a broader range of strategies and platforms. Subsequently, we ceased our liquid staking activities with Liquid Collective protocol in October 2025.
Previous wording
The following table summarizes the results of our operations during the six months ended June 30, 2025 and 2024, respectively, and provides information regarding the dollar increase or (decrease) during the period.
Current wording
The following table summarizes the results of our operations during the three months ended September 30, 2025 and 2024, respectively, and provides information regarding the dollar increase or (decrease) during the period. This information should be read together with our condensed consolidated financial statements and related notes included elsewhere in this report.
Previous wording
In the fourth quarter of 2023, we initiated WhiteFiber, a new business line to provide cloud services to support generative AI workstreams. The Company commenced the cloud services in January 2024.
Current wording
In the fourth quarter of 2023, we established our cloud-based HPC graphics processing unit services, which we term cloud services, a new business line to provide services to support generative AI workstreams. The Company commenced offering cloud services to customers in January 2024.
Previous wording
Our revenue from colocation services was $1.7 million and $nil for the three months ended June 30, 2025. We had no revenue from colocation services for the three months ended June 30, 2024.
Current wording
Our revenue from colocation services was $1.7 million and $nil for the three months ended September 30, 2025 and 2024, respectively.
Previous wording
For the six months ended June 30, 2024, we received 654.9 bitcoins from the Foundry mining pool. As of June 30, 2024, our maximum hash rate was at an aggregate of 4.3 EH/s for our bitcoin miners. For the six months ended June 30, 2024, we recognized revenue of $38.0 million from bitcoin mining services.
Current wording
For the three months ended September 30, 2024, we received 165.4 bitcoins from the Foundry mining pool. As of September 30, 2024, our maximum hash rate was at an aggregate of 4.3 EH/s for our bitcoin miners. For the three months ended September 30, 2024, we recognized revenue of $10.1 million from bitcoin mining services.
Previous wording
Our revenues from digital asset mining services decreased by $9.4 million, or 58.8%, to $6.6 million for the three months ended June 30, 2025 from $16.1 million for the three months ended June 30, 2024. The decrease was primarily due to a decrease of 176.0 bitcoins generated from our mining business and partially offset by a higher average BTC price in the second quarter of 2025, compared to the same period in 2024.
Current wording
Our revenues from digital asset mining services decreased by $2.7 million, or 26.7%, to $7.4 million for the three months ended September 30, 2025 from $10.1 million for the three months ended September 30, 2024. The decrease was primarily due to a lower BTC generated from our mining business and partially offset by a higher average BTC price in the third quarter of 2025, compared to the same period in 2024.
Previous wording
For the liquid staking business, the Company has deployed ETH into Portara protocol (formerly known as Harbour) supported by liquid staking solution provider under the consortium of Blockdaemon and Stakewise, and Liquid Collective protocol supported by Coinbase. By staking, we receive receipt tokens for the ETH staked which could be redeemed to ETH or can be traded or collateralized elsewhere, at any time. In addition, we receive rETH-h for rewards earned from Portara protocol. With the introduction of staked ETH withdrawals in April 2023, we have reassessed our Ethereum network staking approaches, weighing the advantages of traditional staking against liquid staking solutions. The withdrawal feature in native staking, coupled with yields that are on par with those of liquid staking, has encouraged us to expand our collaborations with other service providers in this domain. As a result, we terminated all liquid staking activities with StakeWise in the third quarter of 2023, reclaiming all staked Ethereum along with the accumulated rewards. In the first quarter of 2024, we ceased our liquid staking activities with Liquid Collective protocol and reclaimed all our staked Ethereum. In July 2025, we resumed liquid staking through the Liquid Collective protocol with 5,120 ETH.
Current wording
For the liquid staking business, the Company has deployed ETH into Portara protocol (formerly known as Harbour) supported by liquid staking solution provider under the consortium of Blockdaemon and Stakewise, and Liquid Collective protocol supported by Coinbase. By staking, we receive receipt tokens for the ETH staked which could be redeemed to ETH or can be traded or collateralized elsewhere, at any time. In addition, we receive rETH-h for rewards earned from Portara protocol. With the introduction of staked ETH withdrawals in April 2023, we have reassessed our Ethereum network staking approaches, weighing the advantages of traditional staking against liquid staking solutions. The withdrawal feature in native staking, coupled with yields that are on par with those of liquid staking, has encouraged us to expand our collaborations with other service providers in this domain. As a result, we terminated all liquid staking activities with StakeWise in the third quarter of 2023, reclaiming all staked Ethereum along with the accumulated rewards. In the first quarter of 2024, we ceased our liquid staking activities with Liquid Collective protocol and reclaimed all our staked Ethereum. In July 2025, we resumed liquid staking through the Liquid Collective protocol with 5,120 ETH. Subsequently, we ceased our liquid staking activities with Liquid Collective protocol in October 2025.
Previous wording
For the six months ended June 30, 2025, we earned 377.8 ETH in native staking and nil ETH in liquid staking, respectively. For the six months ended June 30, 2025, we recognized revenues of $925,973 and $0 from native staking and liquid staking, respectively.
Current wording
For the three months ended September 30, 2024, we earned 161.9 ETH and nil ETH in native staking and liquid staking, respectively. For the three months ended September 30, 2024, we recognized revenues of $447,004 and $nil from native staking and liquid staking, respectively.
Previous wording
Our revenues from ETH native staking decreased by $8,480, or 2.3%, to $365,332 for the three months ended June 30, 2025 from $373,812 for the three months ended June 30, 2024. The decrease was primarily due to an increase of 57.4 ETH earned from staking services partially offset by a decrease in the average price of ETH for the three months ended June 30, 2025 compared to the three months ended June 30, 2024.
Current wording
Our revenues from ETH native staking increased by $2,202,827, or 492.8%, to $2,649,831 for the three months ended September 30, 2025 from $447,004 for the three months ended September 30, 2024. The increase was primarily due to an increase of 482.4 ETH earned from staking services and the increase in the average price of ETH for the three months ended September 30, 2025 compared to the three months ended September 30, 2024.
Previous wording
Our revenues from ETH liquid staking decreased by $4,503, or 100%, to $0 for the six months ended June 30, 2025 from $4,503 for the six months ended June 30, 2024. The decrease was due to the termination of liquid staking activities in the first quarter of 2024.
Current wording
Our revenues from ETH liquid staking increased by $218,703, or 100%, to $218,703 for the three months ended September 30, 2025 from $nil for the three months ended September 30, 2024. The increase was due to the resume of liquid staking activities in the third quarter of 2025.
Previous wording
For the three months ended June 30, 2025, electricity costs increased by $0.5 million, or 321%, compared to the electricity costs incurred for the three months ended June 30, 2024. The increase primarily resulted from an increase in the number of deployed GPU servers.
Current wording
For the three months ended September 30, 2025, electricity costs increased by $0.4 million, or 200%, compared to the electricity costs incurred for the three months ended September 30, 2024. The increase primarily resulted from an increase in the number of deployed GPU servers.
Previous wording
Datacenter lease expenses. We entered into datacenter lease agreements for fixed monthly recurring costs.
Current wording
Data center lease expenses. We entered into data center lease agreements for fixed monthly recurring costs.
Previous wording
For the three months ended June 30, 2025, wage expenses totaled $0.2 million. We had no wage expenses for the three months ended June 30, 2024 as we acquired Enovum in the fourth quarter of 2024, which provides colocation services.
Current wording
For the three months ended September 30, 2025, wage expenses totaled $0.1 million. We had no wage expenses for the three months ended September 30, 2024 as we acquired Enovum in the fourth quarter of 2024, which provides colocation services.
Previous wording
For the three months ended June 30, 2025, electricity costs decreased by $2.8 million, or 40%, compared to the electricity costs incurred for the three months ended June 30, 2024. The decrease primarily resulted from a decrease in the number of deployed miners.
Current wording
For the three months ended September 30, 2025, electricity costs decreased by $4.9 million, or 57%, compared to the electricity costs incurred for the three months ended September 30, 2024. The decrease primarily resulted from a decrease in the number of deployed miners.
Previous wording
For the three months ended June 30, 2025, profit-sharing fees decreased by $1.7 million, or 61%, compared to profit-sharing fees incurred in the three months ended June 30, 2024. The decrease in profit-sharing fees was primarily due to a lower bitcoin production and partially offset by the higher average BTC price for three months ended June 30, 2025.
Current wording
For the three months ended September 30, 2025, profit-sharing fees increased by $0.1 million, or 10%, compared to profit-sharing fees incurred in the three months ended September 30, 2024. The increase in profit-sharing fees was primarily due to the higher average BTC price and partially offset by the lower bitcoin production for three months ended September 30, 2025
Previous wording
For the three months ended June 30, 2025, cost of revenue from ETH staking business increased by $5,177, or 21%, compared to the cost of revenue incurred for the three months ended June 30, 2024. The increase was primarily driven by an increased number of staked ETH from 17,184 ETH in the three months ended June 30, 2024 to 21,568 ETH in the three months ended June 30, 2025.
Current wording
For the three months ended September 30, 2025, cost of revenue from ETH staking business increased by $101,540, or 875%, compared to the cost of revenue incurred for the three months ended September 30, 2024. The increase was primarily driven by an increased number of staked ETH from 21,568 ETH in the three months ended September 30, 2024 to 99,936 ETH in the three months ended September 30, 2025.
Previous wording
For the three months ended June 30, 2025 and 2024, depreciation and amortization expenses were $8.2 million and $8.3 million, respectively, based on an estimated useful life of property, plant, and equipment.
Current wording
For the three months ended September 30, 2025 and 2024, depreciation and amortization expenses were $9.6 million and $8.4 million, respectively, based on an estimated useful life of property, plant, and equipment.
Showing the first 40 of 105 pairs. Open the source sections for the rest.
Rearranged current paragraphs (1)
Current report — wording carried from elsewhere
In February 2025, we entered into two hosting services agreements with A.R.T. Digital Holdings Corp (“KaboomRacks”) for terms of nine (9) months and three years automatically renewing on an annual basis unless terminated by either party. Pursuant to the terms of the agreements, KaboomRacks provides maintenance and operation services to Bit Digital to support 6 MW and 13 MW of capacity. In accordance with the agreements, we paid a refundable advance of $1.3 million, which will be applied against monthly hosting charges over an 18-month period.