Skip to main content

Alto Ingredients, Inc.

For the period ended Jun 30, 2025. Filed Aug 8, 2025.

View on SEC.gov

About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Jun 30, 2025 · Filed Aug 8, 2025

ALTO$3.74+1.9%Stored close · as of Nov 6, 2026

What changed in Risk Factors?

Read the current filing

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 100 previous paragraphs and 109 current paragraphs.

90 unchanged; 9 reworded; 10 added; 1 removed; 0 previous and 0 current paragraphs rearranged.

Tables are not compared: 29 previous and 26 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (10)

Current report

ITEM 1A. RISK FACTORS.

Current report

Capital improvement projects require significant outlays of capital and are often subject to material execution risks and delays. Our CCS project in particular requires EPA approval but the EPA’s own projected timeline for approval has lengthened and may lengthen further. Moreover, our Class VI permit application with the EPA for our CCS project contemplates CO 2 sequestration directly through the Mahomet aquifer in Illinois; however, Illinois Senate Bill 1723, which was signed into law on August 1, 2025, prohibits CO 2 sequestration directly through that aquifer. This legislation impacts our current CCS project plans and may necessitate a more costly, or less profitable, carbon capture and storage solution, such as carbon transportation via barge instead of through pipelines.

Current report

We may be unable to qualify for and receive anticipated Section 45Z tax credit benefits available to low carbon fuel producers.

Current report

Section 45Z of the Inflation Reduction Act of 2022 allows low carbon fuel producers to apply for and receive substantial tax credits based on the carbon intensity of the fuel they produce. We expect our Colombia plant and our Pekin Campus dry mill to participate in applying for Section 45Z tax credits. Our ability to qualify for and receive these tax credits will depend on our ability to produce low carbon fuel in anticipated amounts at current and expected carbon intensities. If we are unable to produce low carbon fuel in anticipated amounts, including as a result of plant outages or other reasons, or fail to achieve the required, or our expected, carbon intensities, we will be unable to qualify for and receive Section 45Z tax credits in projected amounts, which may materially and adversely harm our results of operations and financial condition.

Current report

ITEM 2. UNREGISTERED SALES OF EQUITY SECURITIES AND USE OF PROCEEDS.

Current report

We granted to certain employees shares of restricted stock under our 2016 Stock Incentive Plan pursuant to Restricted Stock Agreements dated and effective as of their respective grant dates by and between us and those employees.

Current report

We were obligated to withhold minimum withholding tax amounts with respect to vested shares of restricted stock and upon future vesting of shares of restricted stock granted to our employees. Each employee was entitled to pay the minimum withholding tax amounts to us in cash or to elect to have us withhold a vested amount of shares of restricted stock having a value equivalent to our minimum withholding tax requirements, thereby reducing the number of shares of vested restricted stock that the employee ultimately receives. If an employee failed to timely make such election, we automatically withheld the necessary shares of vested restricted stock.

Current report

For the three months ended June 30, 2025, in connection with satisfying our withholding requirements, we withheld the following number of shares of our common stock and remitted cash payments to cover the minimum withholding tax amounts, thereby effectively repurchasing from the employees such number of shares of our common stock at the following deemed purchase prices:

Current report

ITEM 3. DEFAULTS UPON SENIOR SECURITIES.

Current report

ITEM 4. MINE SAFETY DISCLOSURES.
Removed paragraphs (1)
Reworded paragraphs (9)

Previous wording

For example, in late April 2025, during a period of rapidly rising river levels, our loadout dock at our Pekin Campus was damaged, negatively impacting production and logistics. In addition, in the first quarter of 2024, extreme cold weather conditions in January at our Pekin Campus restricted barge deliveries and increased standby fees. To manage inventory levels, we transported more product by rail, a higher cost mode of transportation. Cold weather conditions also required us to shift to lower margin feed products and reduced our production rates across our Pekin Campus, hindering our ability to produce specialty alcohol at full capacity. In the third quarter of 2023 we experienced unusually high unscheduled production downtime for repairs and maintenance which reduced sales volumes and profits.

Current wording

For example, in late April 2025, during a period of rapidly rising river levels, our loadout dock at our Pekin Campus was damaged, negatively impacting production and logistics, and requiring our use of more costly third-party river transload vendors to minimize business interruption. In addition, in the first quarter of 2024, extreme cold weather conditions in January at our Pekin Campus restricted barge deliveries and increased standby fees. To manage inventory levels, we transported more product by rail, a higher cost mode of transportation. Cold weather conditions also required us to shift to lower margin feed products and reduced our production rates across our Pekin Campus, hindering our ability to produce specialty alcohol at full capacity. In the third quarter of 2023 we experienced unusually high unscheduled production downtime for repairs and maintenance which reduced sales volumes and profits.

Previous wording

We have incurred significant losses and negative operating cash flow in the past. For example, for the years ended December 31, 2024, 2023 and 2022, we incurred consolidated net losses of approximately $59.0 million, $28.0 million and $41.6 million, respectively. For the year ended December 31, 2024, we incurred negative operating cash flow of $3.5 million. We may incur losses and negative operating cash flow in the future. We expect to rely on cash on hand, cash, if any, generated from our operations, borrowing availability under our lines of credit and proceeds from our future financing activities, if any, to fund all of the cash requirements of our business. Additional losses and negative operating cash flow may hamper our operations and impede us from expanding our business.

Current wording

We have incurred significant losses and negative operating cash flow in the past. For example, for the three and six months ended June 30, 2025, we incurred consolidated net losses of approximately $11.3 million and $23.3 million, respectively, and for the six months ended June 30, 2025, we incurred negative operating cash flow of approximately $19.1 million. For the years ended December 31, 2024, 2023 and 2022, we incurred consolidated net losses of approximately $59.0 million, $28.0 million and $41.6 million, respectively. For the year ended December 31, 2024, we incurred negative operating cash flow of $3.5 million. We may incur losses and negative operating cash flow in the future. We expect to rely on cash on hand, cash, if any, generated from our operations, borrowing availability under our lines of credit and proceeds from our future financing activities, if any, to fund all of the cash requirements of our business. Additional losses and negative operating cash flow may hamper our operations and impede us from expanding our business.

Previous wording

We are engaged in multiple capital improvement projects. These projects, and their financing, costs, timing and effects, are based on our plans, expectations and various assumptions that may not eventuate. We may therefore be unable to timely achieve, or achieve at all, the results we expect, including as to projected additional EBITDA and Adjusted EBITDA.

Current wording

We are engaged in multiple capital improvement projects. These projects, and their financing, costs, timing and effects, are based on our plans, expectations and various assumptions that may not eventuate. We may therefore be unable to timely achieve, or achieve at all, the results we expect.

Previous wording

In addition, our CCS project may be adversely affected by the SAFE CCS Act, proposed legislation in Illinois or the United States Supreme Court’s decision in the case of Chevron U.S.A., Inc. v. Natural Resources Defense Council, Inc., or any of them, as discussed below. The timing and economics of our CCS project may also be adversely affected by new rules proposed by the U.S. Department of Transportation’s Pipeline and Hazardous Materials Safety Administration that impose stronger standards for CO 2 pipelines and establish new standards for transporting CO 2 in a gaseous state via pipeline, adding additional requirements and costs to the project.

Current wording

In addition, our CCS project may be adversely affected by the SAFE CCS Act or the United States Supreme Court’s decision in the case of Chevron U.S.A., Inc. v. Natural Resources Defense Council, Inc., or any of them. If we continue with a pipeline solution for our CCS project, the timing and economics of the project may also be adversely affected by new rules proposed by the U.S. Department of Transportation’s Pipeline and Hazardous Materials Safety Administration that impose stronger standards for CO 2 pipelines and establish new standards for transporting CO 2 in a gaseous state via pipeline, adding additional requirements and costs to the project.

Previous wording

Capital improvement projects require significant outlays of capital and are often subject to material execution risks and delays. Our CCS project in particular requires EPAapproval but the EPA’s own projected timeline for approval has lengthened and may lengthen further. We may have insufficient financial resources, and we may be unable to raise sufficient capital, to complete our projects timely or at all. Although we intend to use reputable third-party contractors with expertise in their fields to implement our projects, adverse conditions and events as well as delays in capital projects are not uncommon. Moreover, the projects’ interaction with existing processes may result in the degradation of other plant operations. For example, operation of our corn oil and high protein system at our Magic Valley facility previously resulted in inconsistent product quality and degraded other operations at the plant, including production rates. In the past, we have extended our expected completion dates for various projects and, as circumstances require, may have to do so again.

Current wording

We may have insufficient financial resources, and we may be unable to raise sufficient capital, to complete our projects timely or at all. Although we intend to use reputable third-party contractors with expertise in their fields to implement our projects, adverse conditions and events as well as delays in capital projects are not uncommon. Moreover, the projects’ interaction with existing processes may result in the degradation of other plant operations. For example, operation of our corn oil and high protein system at our Magic Valley facility previously resulted in inconsistent product quality and degraded other operations at the plant, including production rates. In the past, we have extended our expected completion dates for various projects and, as circumstances require, may have to do so again.

Previous wording

We can provide no assurances that our projects will be completed, or if completed, will be completed timely or within budget. We also can provide no assurances that our project assumptions will reflect prevailing future conditions or that our projects will achieve the results we expect, including as to projected additional EBITDA and Adjusted EBITDA. Failure to achieve our expected results may have a material adverse effect on our business, financial condition and results of operations.

Current wording

We can provide no assurances that our projects will be completed, or if completed, will be completed timely or within budget. We also can provide no assurances that our project assumptions will reflect prevailing future conditions or that our projects will achieve the results we expect. Failure to achieve our expected results may have a material adverse effect on our business, financial condition and results of operations.

Previous wording

The SAFE CCS Act was signed into law in Illinois in July 2024. We are pursuing at our Pekin Campus, located in Illinois, a CCS project that will require significant financial and personnel resources. Our CCS project is our most important ongoing capital improvement initiative. The SAFE CCS Act establishes stringent safety, financial and insurance requirements on CO 2 pipelines and imposes a moratorium on the construction of new CO 2 pipelines until the U.S. Department of Transportation’s Pipeline and Hazardous Materials Safety Administration finalizes its new safety rules or July 1, 2026, whichever occur sooner. The SAFE CCS Act will result in increased compliance and other requirements likely adding costs and potentially adding time to complete our CCS project. In January 2025, the U.S. Department of Transportation’s Pipeline and Hazardous Materials Safety Administration proposed new rules that impose stronger standards for CO 2 pipelines and establish new standards for transporting CO 2 in a gaseous state via pipeline, adding additional requirements and costs to the project.

Current wording

The SAFE CCS Act was signed into law in Illinois in July 2024. We are pursuing at our Pekin Campus, located in Illinois, a CCS project that will require significant financial and personnel resources. Our CCS project is our most important long-term capital improvement initiative. The SAFE CCS Act establishes stringent safety, financial and insurance requirements on CO 2 pipelines and imposes a moratorium on the construction of new CO 2 pipelines until the U.S. Department of Transportation’s Pipeline and Hazardous Materials Safety Administration finalizes its new safety rules or July 1, 2026, whichever occur sooner. If we continue with a pipeline solution, the SAFE CCS Act will result in increased compliance and other requirements likely adding costs and potentially adding time to complete our CCS project. In addition, in January 2025, the U.S. Department of Transportation’s Pipeline and Hazardous Materials Safety Administration proposed new rules that impose stronger standards for CO 2 pipelines and establish new standards for transporting CO 2 in a gaseous state via pipeline, adding additional requirements and costs to any CCS project using pipelines for CO 2 transportation and storage.

Previous wording

In February 2025, new legislation in Illinois (Senate Bill 1723), was proposed that amends the Illinois Environmental Protection Act to provide that carbon storage activity shall not be conducted within a storage facility that overlies, underlies or passes through a sole-source aquifer. This legislation, if passed, may have a material and adverse impact on our current CCS project plans and may necessitate a more costly, or less profitable, carbon capture and storage solution, such as carbon transportation via barge instead of through pipelines.

Current wording

On August 1, 2025, new legislation in Illinois (Senate Bill 1723), was signed into law that amends the Illinois Environmental Protection Act to provide that carbon storage activity shall not be conducted within a storage facility that overlies, underlies or passes through a sole-source aquifer. This legislation impacts our current CCS project plans and may necessitate a more costly, or less profitable, carbon capture and storage solution, such as carbon transportation via barge instead of through pipelines.

Previous wording

For the three months ended March 31, 2025 and 2024, we accrued and paid in cash an aggregate of $0.3 million in dividends on our Series B Cumulative Convertible Preferred Stock, or Series B Preferred Stock.

Current wording

For the three and six months ended June 30, 2025 and 2024, we accrued and paid in cash an aggregate of $0.3 million and $0.6 million, respectively, in dividends on our Series B Cumulative Convertible Preferred Stock, or Series B Preferred Stock.