Skip to main content

ZION OIL & GAS INC

For the period ended Sep 30, 2024. Filed Nov 7, 2024.

View on SEC.gov

About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Sep 30, 2024 · Filed Nov 7, 2024

ZNOGStored price and day change unavailable

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-Q

Period ended 2024-06-30; filed 2024-08-06.

0001213900-24-065697

Item 2. – Management’s Discussion and Analysis of Financial Condition and Results of Operations

Current report: 10-Q

Period ended 2024-09-30; filed 2024-11-07.

0001213900-24-095430

Item 2. – Management’s Discussion and Analysis of Financial Condition and Results of Operations

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 80 previous paragraphs and 84 current paragraphs.

53 unchanged; 21 reworded; 10 added; 6 removed; 0 previous and 0 current paragraphs rearranged.

Tables are not compared: 25 previous and 27 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (10)

Current report

The initial phase of our recompletion project consisted of a category three inspection of the drilling rig, rigging down from MJ-02 and moving and rigging up over the MJ-01 well.

Current report

Stage two of the operation involved drilling out both the steel plugs along with 625 meters (about 2,050 feet) of cement plugs and re-conditioning the wellbore to allow unhindered access to the selected zones for testing.

Current report

After six years of inactivity in a well over three miles deep, the MJ-01 wellbore presents a challenging environment. The crew appears to have experienced elastic and partial collapse of the casing in some areas. This led to the bottom hole assembly (“BHA”) becoming stuck over 4,000 meters from surface. Attempts to overpull the BHA were unsuccessful, and the crew completed a backoff operation which left over 500 meters of the BHA remaining downhole. This is not an uncommon occurrence with oil and gas drilling operations, but we do need to recover the fish to resume operations. The crew was unsuccessful in retrieving the remaining BHA with the tools that were on location and will require specialized tools and techniques to recover the entire fish. The specialized tools we need are not in Israel, but have been sourced, but not approved for mobilization due to the active conflict in Israel.

Current report

Another delay arose out of the logistical challenges we face. The ongoing conflict in the region has impacted shipping routes, the timely arrival of necessary equipment, and created travel difficulties for our rig crews. Our operations require specialized rig crews who are not available in Israel.

Current report

An even further delay has been created by many of our rig crew members reaching the limit of their work visas. This requires us to reset visas, which is not a simple process, and it adds another layer of delay and complexity. Moreover, the recent changes to visa eligibility have further complicated the process, as Israel, in just the last few months, has changed their 90-day visa renewals from resetting at the end of the year to resetting after six months after expiration. We are working with the Ministry of Interior on this issue. As a side note, the crew had to enter Israel under 90 day visas and not six month or 12 month visas in order to comply with the labor law requirements in place at the time the operation commenced.

Current report

In light of the combination of downhole, logistical, and crew challenges, as well as holidays, and the one-year remembrance of October 7, we have temporarily paused active operations. This is a necessary step to ensure the safety of our personnel and to ensure proper engineering and tools are brought to location to avoid lengthy delays waiting for additional tools should any be required once the job resumes. We anticipate that once we have the necessary tools and renewed visas for our crews, we can resume operations in Q4 2024 or Q1 2025. This is, of course, subject to the realities of the present geopolitical environment. The conflict in Israel, while not directly impacting our operations on a daily basis, creates uncertainties that could affect our schedule at any time.

Current report

While our MJ-01 re-completion project has faced a multitude of hurdles, including an active conflict, downhole issues and logistical challenges, we continue to move forward each time a safe opportunity permits continuation of operations. However, we will only move forward in coordination with Israeli authorities. We are actively monitoring the port situation to import the items needed to complete the current work program. We remain optimistic about making significant progress in the coming months.

Current report

Immediately after the October 7, 2023 Hamas attack on Israel, the terrorist organization Hezbollah in Lebanon began launching daily rockets into Israel. Over the course of the next several months, both Hezbollah and Israel traded rocket fire into the other country, but without engaging in a full war. During Q3 2024, both sides increased the frequency and number of missiles fired. In September 2024, Israel began a ground invasion into Lebanon and both sides are war today. As a result of the wars in Israel, most airlines are not flying in and out of Israel, and the ports in Haifa and Ashdod remain closed.

Current report

Similar uncertainties are posed by the Israel-Hamas war, as well as the Israel-Hezbollah war. The duration of both wars and its impact on the region and world is not fully known at this point in time. As stated previously in this report, our operations are paused, and our rig crew workers are safely out of Israel and at home.
Removed paragraphs (6)

Previous report

Field operations remain on schedule, and our rig is now positioned over the MJ-01 wellbore. Repairs and maintenance, as well as the inspection of the rig, have all been completed successfully. All necessary wireline equipment for the project has been mobilized with additional essential items from India, China, Romania and Greece currently in transit for the final stages of operation.

Previous report

The initial phase of the MJ-01 recompletion project involves drilling out the plugs and nearly 625 meters (approximately 2,050 feet) of cement in the well. Following the drilling out of the cement plugs, we will next run a series of wireline tests and casing integrity tests to ensure that the wellbore has withstood the past six years of high temperatures.

Previous report

The next phase of the MJ-01 recompletion project, provided all goes as expected from the initial phase, involves perforating, stimulating and well testing previously identified zones of interest.

Previous report

For the three and six months ended June 30, 2024, approximately $985,000 and $985,000 were recorded under the Company’s Statement of Changes in Stockholders’ Equity as Subscriptions Receivables.

Previous report

There is uncertainty as to how long the war inside the Gaza strip will last and whether the war will expand to other hostile parties in the region. While we acknowledge that uncertainty and its potential adverse effects on Zion’s business, the Company is moving forward with its re-completion activities at the MJ-01 wellsite. It is important to note that Zion’s license area is not located near any current combat zones.

Previous report

Similar uncertainties are posed by the Israel Hamas war and its duration and whether the war expands regionally to include other hostile parties. It is important to note that Zion’s license area is not located near any current combat zone.
Reworded paragraphs (21)

Previous wording

On February 21, 2024, members of the Supervisory Committee visited our rig site. During this visit, they interacted with staff from Zion Oil & Gas, and our consultants and potential service providers. Some of these interactions occurred at Kibbutz Sde Eliyahu, while others were conducted through video conferencing with participants from the United States, Europe and the Middle East. Following these discussions, the Committee has officially accepted our work plan for the MJ-01 project. This acceptance allows us to sign agreements and secure mobilization dates with our service providers required to commence and complete the project.

Current wording

On February 21, 2024, members of the Supervisory Committee visited our rig site. During this visit, they interacted with staff from Zion Oil & Gas, our consultants and potential service providers. Some of these interactions occurred at Kibbutz Sde Eliyahu, while others were conducted through video conferencing with participants from the United States, Europe and the Middle East. Following these discussions, the Committee officially accepted our work plan for the MJ-01 re-completion project. This acceptance allowed us to sign agreements and secure mobilization dates with our service providers to commence and complete the project.

Previous wording

For the three and six months ended June 30, 2024, approximately $5,896,000 and $9,453,000 were raised under the DSPP program, respectively. The $5,896,000 and $9,453,000 figures were reduced by $947,000 and $1,763,000, respectively, in equity issuance costs to an outside party resulting in net cash provided of $4,949,000 and $7,690,000, respectively.

Current wording

For the three and nine months ended September 30, 2024, approximately $3,692,000 and $12,160,000 were raised under the DSPP program, respectively. The $3,692,000 and $12,160,000 figures were reduced by $536,000 and $2,299,000, respectively, in equity issuance costs to an outside party resulting in net cash provided of $3,156,000 and $9,861,000, respectively.

Previous wording

For the three and six months ended June 30, 2023, approximately $1,761,000, and $2,553,000 were raised under the DSPP program, respectively. The $2,553,000 figure is net of $173,000 in equity issuance costs to an outside party.

Current wording

For the three and nine months ended September 30, 2023, approximately $1,805,000, and $4,358,000 were raised under the DSPP program, respectively. The $4,358,000 figure is net of $610,000 in equity issuance costs to an outside party.

Previous wording

Due to Russia’s invasion of Ukraine, which began in February 2022, and the resulting sanctions and other actions against Russia and Belarus, there has been uncertainty and disruption in the global economy. Although the Russian war against Ukraine did not have a material adverse impact on the Company’s financial results for the year ended December 31, 2023, at this time the Company is unable to fully assess the aggregate impact the Russian war against Ukraine will have on its business due to various uncertainties, which include, but are not limited to, the duration of the war, the war’s effect on the global economy, future energy pricing, its impact to the businesses of the Company’s, and actions that may be taken by governmental authorities related to the war.

Current wording

Due to Russia’s invasion of Ukraine, which began in February 2022, and the resulting sanctions and other actions against Russia and Belarus, there has been uncertainty and disruption in the global economy. Although the Russian war against Ukraine did not have a material adverse impact on the Company’s financial results for the year ended December 31, 2023, at this time the Company is unable to fully assess the aggregate impact the Russian war against Ukraine will have on its business due to various uncertainties, which include, but are not limited to, the duration of the war, the war’s effect on the global economy, future energy pricing, its impact to the businesses of the Company and actions that may be taken by governmental authorities related to the war.

Previous wording

During the three months ended June 30, 2024, and 2023, respectively, the Company recorded $nil and $48,000 in post-impairment charges.

Current wording

During the three months ended September 30, 2024, and 2023, respectively, the Company recorded $nil and $36,000 in post-impairment charges.

Previous wording

During the six months ended June 30, 2024, and 2023, respectively, the Company recorded $nil and $93,000 post-impairment charges.

Current wording

During the nine months ended September 30, 2024, and 2023, respectively, the Company recorded $nil and $129,000 post-impairment charges.

Previous wording

The total net book value of our unproved oil and gas properties under the full cost method is $17,815,000 and $16,637,000 at June 30, 2024 and at December 31, 2023, respectively.

Current wording

The total net book value of our unproved oil and gas properties under the full cost method is $21,033,000 and $16,637,000 at September 30, 2024 and at December 31, 2023, respectively.

Previous wording

*Operating costs and expenses.*Operating costs and expenses for the three and six months ended June 30, 2024 were $2,083,000 and $3,857,000, respectively, compared to $2,335,000 and $4,466,000, respectively, for the three and six months ended June 30, 2023. Operating costs and expenses for the three months ended June 30, 2024 were $252,000 (10.8%) lower compared to the three months ended June 30, 2023. Operating costs for the six months ended June 30, 2024 were $609,000 (13.6%) lower compared to the six months ended June 30, 2023.

Current wording

*Operating costs and expenses.*Operating costs and expenses for the three and nine months ended September 30, 2024 were $1,775,000 and $5,632,000, respectively, compared to $1,747,000 and $6,213,000, respectively, for the three and nine months ended September 30, 2023. Operating costs and expenses for the three months ended September 30, 2024 were $28,000 (1.6%) higher compared to the three months ended September 30, 2023. Operating costs for the nine months ended September 30, 2024 were $581,000 (9.4%) lower compared to the nine months ended September 30, 2023.

Previous wording

*General and administrative expenses.*General and administrative expenses (“G&A expenses”) for the three and six months ended June 30, 2024 were $1,201,000 and $2,376,000, respectively, compared to $1,271,000 and $2,774,000, respectively, for the three and six months ended June 30, 2023. This expense grouping includes salaries, benefits, stock option expenses and professional fees. G&A expenses decreased $70,000, or 5.5%, during the most recent quarter versus the prior year primarily due to lower salaries expenses and expenses associated with stock option grants. G&A expenses decreased $398,000, or 14.3%, during the first six months of 2024 as compared to the six months of 2023, primarily due to lower expenses associated with stock option grants.

Current wording

*General and administrative expenses.*General and administrative expenses (“G&A expenses”) for the three and nine months ended September 30, 2024 were $1,143,000 and $3,519,000, respectively, compared to $1,332,000 and $4,106,000, respectively, for the three and nine months ended September 30, 2023. This expense grouping includes salaries, benefits, stock option expenses and professional fees. G&A expenses were lower by $189,000, or 14.2%, during the most recent quarter versus the prior year primarily due to lower salaries expenses and expenses associated with stock option grants. G&A expenses were lower by $587,000, or 14.3%, during the first nine months of 2024 as compared to the nine months of 2023, primarily due to lower expenses associated with stock option grants.

Previous wording

*Other expense.*Other expenses during the three and six months ended June 30, 2024 were $882,000 and $1,481,000, respectively, compared to $1,016,000 and $1,599,000, respectively, for the three and six months ended June 30, 2023. Other general and administrative expenses are comprised of non-compensation and non-professional expenses incurred. Other expenses decreased by $134,000, or about 13.2%, and by $118,000, or about 7.4%, for the three and six months ended June 30, 2024, respectively. Zion incurred lower annual meeting and insurance premium expenses, but this was partially offset by higher marketing and investor relations expenses.

Current wording

*Other expense.*Other expenses during the three and nine months ended September 30, 2024 were $632,000 and $2,113,000, respectively, compared to $379,000 and $1,978,000, respectively, for the three and nine months ended September 30, 2023. Other general and administrative expenses are comprised of non-compensation and non-professional expenses incurred. Other expenses increased by $253,000, or about 66.8%, and by $135,000, or about 6.8%, for the three and nine months ended September 30, 2024, respectively. Zion incurred lower annual meeting and insurance premium expenses, but this was partially offset by higher marketing and investor relations expenses.

Previous wording

*Impairment of unproved oil and gas properties.*Impairment of unproved oil and gas properties expenses during the three and six months ended June 30, 2024 were $nil and $nil compared to $48,000 and $93,000 for the three and six months ended June 30, 2024. The expenses recorded in 2023 are post impairment charges to the impairment recorded during 2023 related to the MJ-2 well.

Current wording

*Impairment of unproved oil and gas properties.*Impairment of unproved oil and gas properties expenses during the three and nine months ended September 30, 2024 were $nil and $nil compared to $36,000 and $129,000 for the three and nine months ended September 30, 2023. The expenses recorded in 2023 are post impairment charges to the impairment recorded during 2023 related to the MJ-2 well.

Previous wording

Other expense (income), net. Other expenses (income) during the three and six months ended June 30, 2024 were ($19,000) and ($31,000), respectively, compared to ($1,000) and $7,000, respectively, for the three and six months ended June 30, 2023. The expenses in this category are comprised of foreign currency exchange costs, primarily the New Israeli Shekel (NIS) to the US dollar, and the financial expenses/income.

Current wording

Other expense (income), net. Other expenses (income) during the three and nine months ended September 30, 2024 were $16,000 and ($15,000), respectively, compared to ($4,000) and $3,000, respectively, for the three and nine months ended September 30, 2023. The expenses in this category are comprised of foreign currency exchange costs, primarily the New Israeli Shekel (NIS) to the US dollar, and the financial expenses/income.

Previous wording

Net Loss. Net loss for the three and six months ended June 30, 2024 were $2,064,000 and $3,826,000 compared to $2,334,000 and $4,473,000 for the three and six months ended June 30, 2023.

Current wording

Net Loss. Net loss for the three and nine months ended September 30, 2024 were $1,791,000 and $5,617,000 compared to $1,743,000 and $6,216,000 for the three and nine months ended September 30, 2023.

Previous wording

Liquidity is a measure of a company’s ability to meet potential cash requirements. As discussed above, we have historically met our capital requirements through the issuance of common stock as well as proceeds from the exercise of warrants and options to purchase common shares. As disclosed on our Balance Sheet, the company has 1,200,000,000 shares of authorized common stock and 818,873,764 shares issued as of June 30, 2024. We are considering increasing our authorized shares during the next proxy season in 2025. However, we are presently engaged on our MJ-01 re-entry project and, pending the discovery of hydrocarbons later this year, may decide to forego increasing authorized shares if our ZNOG share price increases sufficiently so as to reduce the monthly issuance of common shares. In the event of a hydrocarbon discovery, the company would consider raising capital outside of our DSPP program.

Current wording

Liquidity is a measure of a company’s ability to meet potential cash requirements. As discussed above, we have historically met our capital requirements through the issuance of common stock as well as proceeds from the exercise of warrants and options to purchase common shares. As disclosed on our Balance Sheet, the company has 1,200,000,000 shares of authorized common stock and 880,562,128 shares issued as of September 30, 2024. We are considering increasing our authorized shares during the next proxy season in 2025.

Previous wording

Our ability to continue as a going concern is dependent upon obtaining the necessary financing to complete further exploration and development activities and generate profitable operations from our oil and natural gas interests in the future. Our current operations are dependent upon the adequacy of our current assets to meet our current expenditure requirements and the accuracy of management’s estimates of those requirements. Should those estimates be materially incorrect, our ability to continue as a going concern will be impaired. Our financial statements for the six months ended June 30, 2024 have been prepared on a going concern basis, which contemplates the realization of assets and the settlement of liabilities and commitments in the normal course of business. We have incurred a history of operating losses and negative cash flows from operations. Therefore, there is substantial doubt about our ability to continue as a going concern for one year from the date the financials were issued.

Current wording

Our ability to continue as a going concern is dependent upon obtaining the necessary financing to complete further exploration and development activities and generate profitable operations from our oil and natural gas interests in the future. Our current operations are dependent upon the adequacy of our current assets to meet our current expenditure requirements and the accuracy of management’s estimates of those requirements. Should those estimates be materially incorrect, our ability to continue as a going concern will be impaired. Our financial statements for the nine months ended September 30, 2024 have been prepared on a going concern basis, which contemplates the realization of assets and the settlement of liabilities and commitments in the normal course of business. We have incurred a history of operating losses and negative cash flows from operations. Therefore, there is substantial doubt about our ability to continue as a going concern for one year from the date the financials were issued.

Previous wording

At June 30, 2024, we had approximately $2,461,000 in cash and cash equivalents compared to $615,000 at December 31, 2023, which does not include any restricted funds. Our working capital (current assets minus current liabilities) was $2,000,000 at June 30, 2024 and ($349,000) at December 31, 2023.

Current wording

At September 30, 2024, we had approximately $779,000 in cash and cash equivalents compared to $615,000 at December 31, 2023, which does not include any restricted funds. Our working capital (current assets minus current liabilities) was $337,000 at September 30, 2024 and ($349,000) at December 31, 2023.

Previous wording

As of June 30, 2024, we provided bank guarantees to various governmental bodies (approximately $970,000) and others (approximately $89,000) in respect of our drilling operation in the aggregate amount of approximately $1,059,000. The (cash) funds backing these guarantees are held in restricted interest-bearing accounts in Israel and are reported on the Company’s balance sheets as fixed short-term bank deposits restricted.

Current wording

As of September 30, 2024, we provided bank guarantees to various governmental bodies (approximately $971,000) and others (approximately $91,000) in respect of our drilling operation in the aggregate amount of approximately $1,062,000. The (cash) funds backing these guarantees are held in restricted interest-bearing accounts in Israel and are reported on the Company’s balance sheets as fixed short-term bank deposits restricted.

Previous wording

During the six months ended June 30, 2024, cash used in operating activities totaled $3,775,000. Cash provided by financing activities during the six months ended June 30, 2024 was $6,547,000 and is primarily attributable to proceeds received from the Dividend Reinvestment and Stock Purchase Plan (the “DSPP” or the “Plan”). Net cash used in investing activities such as unproved oil and gas properties, equipment and spare parts was $882,000 for the six months ended June 30, 2024.

Current wording

During the nine months ended September 30, 2024, cash used in operating activities totaled $5,102,000. Cash provided by financing activities during the nine months ended September 30, 2024 was $9,703,000 and is primarily attributable to proceeds received from the Dividend Reinvestment and Stock Purchase Plan (the “DSPP” or the “Plan”). Net cash used in investing activities such as unproved oil and gas properties, equipment and spare parts was $4,389,000 for the nine months ended September 30, 2024.

Previous wording

During the six months ended June 30, 2023, cash used in operating activities totaled $2,392,000. Cash provided by financing activities during the six months ended June 30, 2023 was $2,565,000 and is primarily attributable to proceeds received from the Dividend Reinvestment and Stock Purchase Plan (the “DSPP” or the “Plan”). Net cash used in investing activities such as unproved oil and gas properties, equipment and spare parts was $1,729,000 for the six months ended June 30, 2023.

Current wording

During the nine months ended September 30, 2023, cash used in operating activities totaled $3,909,000. Cash provided by financing activities during the nine months ended September 30, 2023 was $4,370,000 and is primarily attributable to proceeds received from the Dividend Reinvestment and Stock Purchase Plan (the “DSPP” or the “Plan”). Net cash used in investing activities such as unproved oil and gas properties, equipment and spare parts was $2,045,000 for the nine months ended September 30, 2023.

Previous wording

Accounting standards require management to evaluate our ability to continue as a going concern for a period of one year subsequent to the date of the filing of this Form 10-Q. We expect to incur additional significant expenditures to further our exploration and development programs. While we raised approximately $1,797,000 during the period July 1, 2024 through August 6, 2024, we will need to raise additional funds in order to continue our exploration and development activities in our license area. Of this amount, approximately $1,122,000 represents cash received for receivables on our books at June 30, 2024. The difference of $675,000 represents new investments during July and August 2024. Additionally, we estimate that, when we are not actively drilling a well, our expenditures are approximately $600,000 per month excluding exploratory operational activities. However, when we are actively drilling a well, we estimate an additional minimum expenditure of approximately $2,500,000 per month. The above estimates are subject to change. Subject to the qualifications specified below, management believes that our existing cash balance, coupled with anticipated proceeds under the DSPP, will be sufficient to finance our plan of operations through October 2024.

Current wording

Accounting standards require management to evaluate our ability to continue as a going concern for a period of one year subsequent to the date of the filing of this Form 10-Q. We expect to incur additional significant expenditures to further our exploration and development programs. While we raised approximately $1,319,000 during the period October 1, 2024 through November 6, 2024, we will need to raise additional funds in order to continue our exploration and development activities in our license area. Additionally, we estimate that, when we are not actively drilling a well, our expenditures are approximately $600,000 per month excluding exploratory operational activities. However, when we are actively drilling a well, we estimate an additional minimum expenditure of approximately $2,500,000 per month. The above estimates are subject to change. Subject to the qualifications specified below, management believes that our existing cash balance, coupled with anticipated proceeds under the DSPP, will be sufficient to finance our plan of operations through December 2024.

Previous wording

Even if we raise the needed funds, there are factors that can nevertheless adversely impact our ability to fund our operating needs, including (without limitation), the potential impact of the Israel-Hamas war, the potential actions of other hostile parties in the region, unexpected or unforeseen cost overruns in planned non-drilling exploratory work in existing license areas, the costs associated with extended delays in undertaking the required exploratory work, and plugging and abandonment activities which is typical of what we have experienced in the past.

Current wording

Even if we raise the needed funds, there are factors that can nevertheless adversely impact our ability to fund our operating needs, including (without limitation), the potential impact of the Israel-Hamas war, the Israel-Hezbollah war, the potential actions of other hostile parties in the region, unexpected or unforeseen cost overruns in planned non-drilling exploratory work in existing license areas, the costs associated with extended delays in undertaking the required exploratory work, and plugging and abandonment activities which is typical of what we have experienced in the past.