NIOCORP DEVELOPMENTS LTD

For the period ended Sep 30, 2026. Filed Nov 5, 2026.

View on SEC.gov

About this filing

A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.

Sep 30, 2026 · Filed Nov 5, 2026

NB$2.90+7.2%Stored close · as of Nov 6, 2026

What changed in Management’s Discussion and Analysis?

Read the current filing

Previous report: 10-Q

Period ended 2026-03-31; filed 2026-05-14.

0001193125-26-223959

ITEM 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATION

Current report: 10-Q

Period ended 2026-09-30; filed 2026-11-05.

0001193125-26-449936

ITEM 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 98 previous paragraphs and 100 current paragraphs.

34 unchanged; 31 reworded; 32 added; 33 removed; 0 previous and 3 current paragraphs rearranged.

Tables are not compared: 3 previous and 2 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (32)

Current report

NioCorp, through Elk Creek Resources Corp. (“ECRC”), an indirect majority-owned subsidiary of the Company, is developing the Elk Creek Project, a critical minerals project that, if and when developed, is expected to produce niobium, scandium, titanium, and several rare earth products, including neodymium-praseodymium oxide, dysprosium oxide, terbium oxide, samarium-europium-gadolinium (“SEG”) carbonate, and heavy rare earth carbonate, as contemplated by the 2026 Elk Creek Study (as defined below). The Elk Creek Project is located near Elk Creek, Nebraska, in the southeast portion of the state.

Current report

Rare earth elements are critical minerals that are needed in virtually all U.S. defense systems and across the electronics, manufacturing, high-technology, transportation, and energy sectors. Magnetic rare earths, such as neodymium, praseodymium, terbium, and dysprosium are critical to the making of neodymium-iron-boron magnets, which are used in critical defense systems, electric vehicles, advanced automation, and robotics.

Current report

On October 13, 2026, ECRC entered into a binding offtake agreement (the “Traxys Agreement”) with Traxys North America LLC (“Traxys”). Under the Traxys Agreement, and subject to certain exclusions, Traxys will purchase, on a take-or-pay basis, 50% of the Elk Creek Project’s planned ferroniobium production over the first 15 years of production. The Traxys Agreement supersedes and replaces the Company’s prior ferroniobium and scandium offtake arrangements with Traxys. The Company’s existing offtake agreement with ThyssenKrupp Metallurgical Products GmbH, covering the remaining 50% of planned ferroniobium production over the first 10 years of production, is unchanged. The Traxys Agreement also grants Traxys the exclusive right, but not the obligation, to purchase the Company’s planned products other than ferroniobium, including scandium, titanium and rare earth products, and appoints Traxys as the Company’s exclusive global marketing and sales partner.

Current report

On August 10, 2026, the Company announced the results of a pre-feasibility study prepared by qualified persons for the Elk Creek Project (the “2026 Elk Creek Study”), which is summarized in a technical report summary for the Elk Creek Project that has been prepared in accordance with the requirements of S-K 1300, with an effective date of June 30, 2026, filed as Exhibit 96.1 to the Annual Report on Form 10-K (the “2026 S-K 1300 Elk Creek Technical Report Summary”). The 2026 Elk Creek Study was filed under the Company’s SEDAR+ as a technical report titled “NI 43-101 Technical

Current report

Report Feasibility Study Elk Creek Project, Nebraska” with an effective date of August 10, 2026.

Current report

The 2026 Elk Creek Study qualifies as a pre-feasibility study under S-K 1300 and as a feasibility study under Canada’s National Instrument 43-101, and includes an estimated total upfront capital expenditure for the Elk Creek Project of approximately $1,849 million, including a contingency of 14%. The reason that the 2026 Elk Creek Study does not qualify as a feasibility study under S-K 1300 is because additional work with respect to the engineering of and procurement for the planned surface plant is required to allow the qualified person to reduce the overall contingency range attributed to the initial capital expenditure estimate for the Elk Creek Project from the current 14% to less than or equal to 10%. Even as additional work is completed and the contingency range is reduced, accordingly, there can be no assurance that the actual initial capital expenditure requirements will not materially exceed estimates. The Company believes that the completion of the 2026 Elk Creek Study satisfies a key EXIM due diligence requirement reflected in the PPL (as defined below), and the Company now expects to advance to the next steps of the process relating to detailed engineering, procurement and construction contracting. See “—Liquidity and Capital Resources—Proposed Project Financing from EXIM” below for the Company’s discussion of the EXIM Financing (as defined below).

Current report

During the three months ended September 30, 2026, the Company continued construction of the Portal Project. The Portal Project has an overall budget of $44.6 million, and through September 30, 2026, the Company has incurred approximately $12 million in construction costs. In addition, road improvements adjacent to the Elk Creek Project site, funded from the escrow held with Johnson County, Nebraska, continued during the quarter.

Current report

Securing the remaining project financing is a condition to the Company making a final investment decision to proceed with full construction of the Elk Creek Project. Upon obtaining such financing, we expect to undertake the following activities:

Current report

Initiation of initial construction work at the project site.

Current report

General and administrative expenditures increased for the three-month period in 2026 as compared to 2025, reflecting an overall increase in corporate compliance, governance, financing, and other Elk Creek Project advancement activities. This includes increased expenses for growth in employee headcount, consulting expenses, and professional fees to support financing initiatives and Elk Creek Project advancement.

Current report

We expect our cash balance as of September 30, 2026, together with the proceeds from the exercise of Warrants and Options, if any, and the reimbursement payments to which ECRC is entitled pursuant to the DoW Agreement, to be sufficient to fund our planned cash outflows for at least the next twelve months from the date of this Quarterly Report on Form 10-Q. That expectation relates to the activities described above and does not extend to the capital required to construct the Elk Creek Project and achieve commercial production, which the Company must finance separately as described under “Long-Term Liquidity Requirements” below. If project financing is delayed, the Company has the ability to defer or reduce a substantial portion of its planned expenditures until such financing is in place.

Current report

Our long-term liquidity requirements consist principally of the capital required to construct the Elk Creek Project and to fund the Company’s operations through the commencement of commercial production.

Current report

On August 10, 2026, the Company announced the results of the 2026 Elk Creek Study, which is summarized in the 2026 S-K 1300 Elk Creek Technical Report Summary filed as Exhibit 96.1 to the Annual Report on Form 10-K. The 2026 S-K 1300 Elk Creek Technical Report Summary includes an estimated total upfront capital expenditure for the Elk Creek Project of approximately $1,849 million, including a contingency of 14%, which is an increase of approximately $708 million compared to the estimated total upfront capital expenditure for the Elk Creek Project of approximately $1,141.0 million that was included in the previous technical report summary for the Elk Creek Project prepared in accordance with S-K 1300, with an effective date of June 30, 2022, originally filed as Exhibit 96.1 to the Company’s Annual Report on Form 10-K for the fiscal year ended June 30, 2022. The increase reflects, among other things, a substantially redesigned processing plant and mining operation that is intended to produce eight critical mineral products, from the previous plan to produce three critical mineral products, as well as significant inflationary impacts since the previous feasibility study.

Current report

The total amount of financing the Company will require is greater than the estimated total upfront capital expenditure for the Elk Creek Project, because the Company must also fund costs that are not included in that estimate, including financing fees and transaction costs; interest accruing during the development period; working capital required at start-up; reclamation and other financial assurance obligations; corporate overhead costs through the commencement of commercial production; and any cost escalation or cost overruns in excess of the contingency included in the 2026 S-K 1300 Elk Creek Technical Report Summary. The Company would therefore require additional financing to fund that estimated capital expenditure alone, before giving effect to the additional costs described above. The Company does not expect to fund the development of the Elk Creek Project from any single source. Management currently anticipates that it would be provided by a combination of sources of financing, in the targeted proportions and from the categories of sources described below.

Current report

Management currently anticipates that it will fund the upfront capital expenditure amount for the Elk Creek Project through a combination of debt and equity financing, with approximately 65% of such amount being funded from the net proceeds of debt financing, including the amount of debt that would be represented by the EXIM Financing, if any. The balance, representing approximately 35% of such amount, is expected to be funded from the net proceeds of equity financing or other funding available to the Company. The debt component contemplated by this funding mix may exceed the EXIM Financing, as described under “Proposed Project Financing from EXIM” below. In addition to the EXIM Financing, the Company may also seek to fund a portion of the debt component from other export credit agencies and from commercial lenders. The ultimate composition of the debt component has not been determined and may or may not include lenders other than EXIM. The Company has not obtained a commitment for any portion of the debt financing required to construct the Elk Creek Project, and there can be no assurance that debt financing will be available in the amount, or on the terms, that management currently anticipates, or at all. Management is actively pursuing additional sources of debt and equity financing to meet its long-term funding requirements, and while it has been successful in doing so in the past, there is no assurance that we will be able to obtain any such additional financing on acceptable terms, if at all. See Part I, Item 1A, “Risk Factors” in the Annual Report on Form 10-K.

Current report

Because the funding mix that management currently anticipates contemplates that approximately 35% of the upfront capital expenditure for the Elk Creek Project would be funded with equity or other funding available to the Company, and because the Company’s cash on hand as of September 30, 2026 represents less than 35% of the estimated total upfront capital expenditure for the Elk Creek Project, the Company expects that it may be required to raise additional equity capital in order to fund this portion of the Elk Creek Project’s upfront capitalization. The amount of equity capital the Company will be required to raise will depend on, among other things, the final upfront capital cost of the Elk Creek Project, the amount and terms of the debt financing the Company is able to obtain, and the minimum equity contribution, leverage limitations and coverage ratios that prospective lenders require. See Part I, Item 1A, “Risk Factors” in the Annual Report on Form 10-K.

Current report

The amount of the EXIM Financing, if any, will be determined by EXIM. As described above, the PPL provided that the amount of the EXIM Financing that could be made available for the Elk Creek Project will be scaled based on the number of U.S. jobs supported, both during construction and over the life of EXIM’s financing, subject to certain expectations regarding the ratio of debt-to-equity financing for the Elk Creek Project. That determination will be made by EXIM on the basis of its own analysis and its own application of its underwriting criteria and internal policies. The Company does not control that analysis, is not able to predict its outcome, and accordingly is unable to estimate the amount of the EXIM Financing that may ultimately be made available to it, if any.

Current report

The Company believes that the completion of the 2026 Elk Creek Study satisfies a key EXIM due diligence requirement reflected in the PPL, and the Company expects to advance to the next steps of the process relating to detailed engineering, procurement, and construction contracting. The Company further believes that the 2026 Elk Creek Study, with its updated economic model, mineral resource and mineral reserve estimates and increased job creation projections, demonstrates that the Elk Creek Project satisfies the criteria for increased financing as contemplated by the PPL.

Current report

In addition to the EXIM Financing, the Company has pursued other government-supported sources of capital for the Elk Creek Project. For example, on August 4, 2025, ECRC entered into the DoW Agreement, a Project Sub-Agreement with Advanced Technology International, an entity acting on behalf of the Defense Industrial Base Consortium under the authority of the DoW, pursuant to which ECRC is entitled to receive up to an aggregate of approximately $10.0 million of reimbursement payments from the DoW upon the achievement of certain project milestones. The DoW Agreement has an initial term through December 30, 2028. As of September 30, 2026, approximately $8.9 million of such reimbursement payments had been billed and approximately $1.1 million remained available upon the achievement of the remaining milestones. In addition, we are seeking other alternative sources of debt financing, which may include loans or loan guarantees from commercial or government-supported sources. The Company can provide no assurance as to the timing or outcome of any additional debt financing arrangements, or that any other loans or loan guarantees will ultimately be obtained. See Part I, Item 1A, “Risk Factors” in the Annual Report on Form 10-K.

Current report

In March 2015, the Company obtained in-principle eligibility approval for a loan guarantee to be provided by the Federal Republic of Germany under its untied loan guarantee program, which supports financing for projects that contribute to securing supplies of strategic raw materials in the economic interest of Germany. That approval was based on the Company’s offtake agreement with ThyssenKrupp Metallurgical Products GmbH for the purchase of approximately 50% of planned ferroniobium production from the Elk Creek Project, and constituted the first of the approvals required under the program. The Company received a reiteration of in-principle eligibility in 2017 following completion of the then-current feasibility study for the Elk Creek Project, and received a further reiteration of in-principle eligibility in June 2026. No subsequent approvals under the program have been obtained, and the amount of loan guarantees, if any, that may be made available has not been determined. Any such guarantee would be coordinated with the EXIM Financing and with any other debt financing obtained for the Elk Creek Project. The Company can provide no assurance as to the timing or outcome of any further review under the program, or that any loan guarantee will ultimately be provided.

Current report

On May 16, 2025, UK Export Finance issued to the Company an expression of interest with respect to a potential debt guarantee of up to $200 million in support of the Elk Creek Project, which is non-binding and is conditioned upon, among other things, the execution of an offtake agreement for one or more of NioCorp’s planned products with UK-based companies that in turn can be shown to support UK exports. A debt guarantee issued by UK Export Finance, if any, would be coordinated with the EXIM Financing and with any loan guarantee provided under the German program described above.

Current report

The DoW Agreement does not provide funding for the construction of the Elk Creek Project, and neither the UK Export Finance expression of interest nor the in-principle eligibility approval from the Federal Republic of Germany represents a financing commitment.

Current report

The Company remains open to financing and strategic opportunities that support its overall financing and development objectives for the Elk Creek Project, which may include the issuance of additional equity; corporate or project-level debt; government and export credit agency financing; offtake, prepayment, royalty or streaming arrangements; and joint venture, strategic investment or other strategic transactions. In evaluating any such opportunity, management intends to consider, among other factors, the total cost of capital, the certainty and timing of funding, the effect on the Company’s ability to construct and operate the Elk Creek Project on its anticipated schedule, and the value delivered to the Company’s shareholders.

Current report

As defined under S-K 1300, we are a development stage issuer, and we have incurred losses since our inception. The Company will require additional capital to construct the Elk Creek Project and to meet its long-term operating requirements. Based on its current liquidity position and planned expenditures, management believes the Company has sufficient resources to meet its obligations as they become due within one year from the issuance date of the condensed consolidated financial statements included in this Quarterly Report on Form 10-Q, which have been prepared on a going concern basis. Management expects that future capital requirements will be met through a combination of debt financing, equity financing and other funding sources.

Current report

Financing outflows totaled $0.17 million during the three-month period ended September 30, 2026 (2025: $158.0 million inflow). The cash used in financing activities for the three months ended September 30, 2026, primarily represents expenditures on loan financing costs. Financing activities for the three months ended September 30, 2025 consisted of gross receipts of $155.0 million from equity offerings and $15.3 million from Warrant exercises, offset by $12.3 million of share issuance costs.
Removed paragraphs (33)

Previous report

On February 25, 2026, the Company issued and sold (a) 17,400,000 Common Shares at an offering price of $5.00 per Common Share and (b) 2,600,000 pre-funded Warrants (the “February Pre-Funded Warrants”) to purchase up to an additional 2,600,000 Common Shares at an offering price of $4.9999 per February Pre-Funded Warrant in a registered offering (the “February 2026 Offering”) under the Company's registration statement on Form S-3 (Registration No. 333-290837), pursuant to the Placement Agency Agreement between the Company and Maxim, dated February 24, 2026. On February 25, 2026 and March 4, 2026, the Company issued a total of 2,599,951 Common Shares in connection with the cashless exercise of all of the outstanding February Pre-Funded Warrants. The Company received net proceeds from the February 2026 Offering, after deducting placement agent fees and other offering expenses payable by the Company, of approximately $93,406.

Previous report

On November 21, 2025, the Company adopted a limited-duration shareholder rights plan (the "Rights Plan") pursuant to a Shareholder Rights Plan Agreement dated November 21, 2025 (the "Original Rights Plan Agreement"), between the Company and Computershare Investor Services Inc., as rights agent (the "Rights Agent"). One right (a "Right") was issued for each Common Share outstanding as of December 4, 2025, and a Right automatically attaches to each Common Share subsequently issued until the expiration of the Rights Plan. The Rights generally become exercisable only if a person or group acquires, or announces the current intention of commencing a take-over bid to acquire, beneficial ownership of 20% or more of the Company's outstanding Common Shares, other than through a permitted bid made in compliance with applicable Canadian take-over bid rules. If the Rights become exercisable, each holder of a Right, other than the acquiring person, would be entitled to purchase additional Common Shares at a discount to the then-current market price. The Rights Plan was not adopted in response to any specific take-over proposal.

Previous report

Subsequent to the period end, on April 6, 2026, following approval by the Company's shareholders at the Company's annual general meeting, the Company and the Rights Agent entered into an Amended and Restated Shareholder Rights Plan Agreement (the "Amended Rights Plan Agreement"), which amended and restated the Original Rights Plan Agreement in its entirety. Under the Original Rights Plan Agreement, the Rights Plan would have expired on May 21, 2026. Under the Amended Rights Plan Agreement, the Rights Plan now expires at 5:00 p.m. (Toronto time) on the date of the Company's annual general meeting of shareholders to be held in 2027, or earlier upon the redemption of the Rights or, provided that a triggering event has not occurred, at such earlier date or time as the Board of Directors may determine in its sole discretion.

Previous report

Neither the adoption of the Original Rights Plan Agreement nor the subsequent entry into the Amended Rights Plan Agreement had an impact on the Company's consolidated financial statements for the period ended March 31, 2026.

Previous report

On February 26, 2026, the Company announced that construction of the main access to the underground portion (the "Portal Project") of the Company’s Elk Creek Critical Minerals Project (the “Elk Creek Project”) in southeastern Nebraska had begun. The construction of the Elk Creek Project mine’s main entrance, known as a “portal,” will serve as the primary access point for personnel, equipment, and materials, as well as to deliver ore from the underground mine to the surface production plant. The Company also filed a formal “Notice of Commencement” with the Mine Safety and Health Administration (MSHA) in conjunction with this effort. The Portal Project has an overall budget of $44.6 million, and through March 31, 2026, the Company has incurred approximately $1.8 million in construction costs.

Previous report

In addition to the work plans noted above, as funds become available through the Company’s fundraising efforts, the Company expects to undertake the following activities to further advance the Elk Creek Project and the Company is assessing and prioritizing the timing of these efforts:

Previous report

Continued evaluation of the potential to produce rare earth products and sell such products under offtake agreements;

Previous report

Negotiation and completion of offtake agreements for the remaining uncommitted production of niobium, scandium, and titanium from the Elk Creek Project, as well as potential rare earth oxide production;

Previous report

Hiring of personnel to manage the Company’s responsibilities for construction and operations;

Previous report

Completion of the characterization and testing of waste materials to support tailings impoundment and paste backfill plant designs; and

Previous report

Initiation of road improvements near the junction of Nebraska state highways 50 and 62, which are intended to facilitate access to the Elk Creek Project site and manage prospective increased traffic in the project vicinity.

Previous report

Employee-related expenditures increased for the three-month period in 2026 as compared to 2025 primarily due to the timing of the amortization of costs associated with options to purchase Common Shares ("Options") issued to employees in 2026 and the hiring of additional corporate staffing.

Previous report

Professional fees increased for the three-month period in 2026 as compared to 2025 primarily due to higher professional service costs incurred in support of the Company's corporate governance, regulatory compliance, and project advancement activities.

Previous report

Exploration expenditures increased for the three-month period in 2026 as compared to 2025, primarily due to costs associated with the Company's efforts to update the Elk Creek Project feasibility study.

Previous report

Other operating expenses include costs related to investor relations, general office expenses, shareholder services and proxy related activities, board-related expenditures, and other miscellaneous items. These costs increased for the three-month period in 2026 as compared to 2025 primarily due the timing of the amortization of costs associated with Option grants issued to board members and advisors, as well as higher investor-facing service costs.

Previous report

Adjusted net loss increased slightly for the three-month period in 2026, as compared to 2025, primarily due to the increases in operating expenditures as noted above, partially offset by increased interest income. Adjusted net loss per share declined due to the impact of additional Common Share issuances subsequent to March 31, 2025.

Previous report

Nine-month period ended March 31, 2026 compared to the nine-month period ended March 31, 2025

Previous report

Except as noted below, the discussion of significant variances for the three-month period also explains the majority of changes for the nine-month period, including with respect to net loss and net loss per share for the nine-month period ended March 31, 2026:

Previous report

Change in fair value of earnout shares liability and change in fair value of warrant liabilities both increased for the nine-month period ended March 31, 2026 as compared to 2025, reflecting the effect of an increase in the Company’s Common Share price on the financial modeling results for each of these liabilities.

Previous report

Adjusted net loss increased for the nine-month period ended March 31, 2026, as compared to 2025, primarily due to the higher operating expenses as noted above, partially offset by an increase in interest income. Adjusted net loss per share remained steady due to an increase in Common Shares outstanding since March 31, 2025.

Previous report

We have no revenue generating operations from which we can internally generate funds. To date, our ongoing operations have been financed by the sale of our equity securities by way of public and private offerings, convertible securities issuances, the exercise of Options and Warrants, and related party loans. With respect to currently outstanding Options and Warrants, we believe that exercise of these instruments, and cash proceeds from such exercises, will not occur unless and until the market price for our Common Shares equals or exceeds the related exercise price of each instrument.

Previous report

As discussed above under “—Recent Corporate Events”, the Company closed the February 2026 Offering with net proceeds of approximately $93.4 million, after deducting placement agency fees and other offering expenses payable by the Company. In addition, during the three-month period ended March 31, 2026, the Company issued an aggregate of 4,553,142 Common Shares through the exercise of Warrants and Options by their holders and advances under the Yorkville Equity Facility Financing Agreement, for which the Company received proceeds totaling approximately $31.2 million. The Company expects to use these net proceeds for working capital and general corporate purposes, including to advance efforts to launch construction of the Elk Creek Project and move it to commercial operation.

Previous report

The Company will need to secure additional capital to finance construction and achieve commercial production to support its long-term business objectives. Until sufficient funding for construction is secured, the Company expects to continue advancement activities related to the Elk Creek Project, including incremental engineering and limited underground portal-related work, while maintaining project readiness efforts. The Company also intends to evaluate strategies and potential investment opportunities that could reduce overall project costs, capital requirements, or execution risk.

Previous report

As defined under S-K 1300, we are a development stage issuer and we have incurred losses since our inception. The Company will require additional capital to meet its long-term operating requirements. Uncertainty in capital markets, supply chain disruptions, increased interest rates and inflation, and the potential for geographic recessions have contributed to general global economic uncertainty. During the three-month period ended March 31, 2026, these events continued to create uncertainty with respect to overall project funding and timelines. The Company will need to secure additional capital to finance construction and achieve commercial production to support its long-term business objectives.

Previous report

We have no exposure to any asset-backed commercial paper. Other than cash held by our subsidiaries for their immediate operating needs in Colorado and Nebraska, all of our cash reserves are on deposit with major U.S. and Canadian chartered banks. We do not believe that the credit, liquidity, or market risks with respect thereto have increased as a result of the current market conditions. However, in order to achieve greater security for the preservation of our capital, we have, of necessity, been required to accept lower rates of interest, which has also lowered our potential interest income.

Previous report

Financing inflows were $435.3 million during the nine-month period ended March 31, 2026 (2025: $5.2 million), with 2026 inflows reflecting the gross receipts of $405.2 million from the equity offerings and $60.8 million from Warrant and Option exercises and advances under the Yorkville Equity Facility Financing Agreement, offset by $30.1 million of share issuance costs.

Previous report

The fair value of the acquired technology was estimated using the multi-period excess earnings method. Significant inputs include estimated future cash flows attributable to the acquired technology, an appropriate discount rate, and assumptions regarding technological obsolescence. The intangible asset is amortized on a straight-line basis over an estimated useful life of ten years and is reviewed for impairment whenever events or changes in circumstances indicate that the carrying value may not be recoverable. Assumptions used in the model are subjective and require significant judgment.

Previous report

Goodwill is assessed for impairment annually, or more frequently upon the occurrence of a triggering event. The Company operates as a single reporting unit, as our scandium commercialization activities are not managed or reviewed as a discrete component by the CODM and no discrete financial information is prepared at that level. Accordingly, goodwill is tested at the consolidated reporting unit level. This determination will be reassessed as our scandium commercialization activities mature.

Previous report

The Company has included certain non-GAAP financial measures in this Quarterly Report on Form 10-Q such as adjusted net loss and adjusted net loss per share. Adjusted net loss for presentation purposes is our net loss attributable to the Company plus non-cash items plus (gain)/loss on non-recurring items. Adjusted net loss per share is the impact of these adjustments on the per share net losses incurred. These non-GAAP measures are intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with U.S. GAAP. Because these non-GAAP performance measures do not have any standardized meaning prescribed by U.S. GAAP, they may not be comparable to similar measures presented by other companies. The Company’s management believes that presenting adjusted net loss and adjusted net loss per share provides investors with additional insight into underlying operating performance by excluding the non-cash gains and losses noted above. Our presentation of certain non-GAAP financial measures should not be construed to imply that our future results will be unaffected by the types of items excluded from the calculations of non-GAAP measures. These non-GAAP measures are not presented in accordance with U.S. GAAP and the use of these terms vary from others in our industry.

Previous report

Reconciliations of net income (loss) attributable to the Company to adjusted net loss and net loss per share attributable to the Company to adjusted net loss per share are presented below:
Reworded paragraphs (31)

Previous wording

The following discussion and analysis should be read in conjunction with our historical interim condensed consolidated financial statements and related notes included elsewhere in this Quarterly Report on Form 10-Q and the Annual Report on Form 10-K filed with the Securities and Exchange Commission (the “SEC”) for the year ended June 30, 2025 filed on September 11, 2025 (the “Annual Report on Form 10-K”), which have been prepared in accordance with generally accepted accounting principles in the United States (“U.S. GAAP”). The Company uses certain non-GAAP financial measures. For a detailed description of each of the non-GAAP measures used herein, please refer to the discussion under “—Use of Non-GAAP Financial Measures and Reconciliations.”

Current wording

The following discussion and analysis should be read in conjunction with our historical interim condensed consolidated financial statements and related notes included elsewhere in this Quarterly Report on Form 10-Q and the Annual Report on Form 10-K filed with the Securities and Exchange Commission (the “SEC”) for the year ended June 30, 2026 filed on September 25, 2026 (the “Annual Report on Form 10-K”), which have been prepared in accordance with generally accepted accounting principles in the United States (“U.S. GAAP”).

Previous wording

This Quarterly Report on Form 10-Q and the exhibits attached hereto contain “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933, as amended (the “Securities Act”), and Section 21E of the Securities Exchange Act of 1934, as amended (the “Exchange Act”), and “forward-looking information” within the meaning of applicable Canadian securities legislation (collectively, “forward-looking statements”). Such forward-looking statements concern our anticipated results and developments in the operations of the Company in future periods, planned exploration activities, the adequacy of the Company’s financial resources, and other events or conditions that may occur in the future.

Current wording

This Quarterly Report on Form 10-Q and the exhibits attached hereto contain “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933, as amended (the “Securities Act”), and Section 21E of the Securities Exchange Act of 1934, as amended (the “Exchange Act”), and “forward-looking information” within the meaning of applicable Canadian securities legislation (collectively, “forward-looking statements”).

Previous wording

Forward-looking statements have been based upon our current business and operating plans, as approved by the Board, and may include statements regarding, among other matters, the financial and business performance of NioCorp; NioCorp’s anticipated results and developments in the operations of NioCorp in future periods; NioCorp’s planned exploration activities; the adequacy of NioCorp’s financial resources; NioCorp’s ability to secure sufficient project financing to complete construction and commence operation of the Company’s niobium, scandium, and titanium project (the “Elk Creek Project”) located in southeastern Nebraska; NioCorp’s ability to receive a final commitment of financing from the Export-Import Bank of the United States (“EXIM”); the estimated timing and capital costs of the Portal Project (as defined below); the estimated total upfront capital expenditure for the Elk Creek Project; NioCorp’s expectation and ability to produce niobium, scandium, and titanium and the potential to produce rare earth elements at the Elk Creek Project; NioCorp’s plans to produce and supply specific products and market demand for those products; NioCorp’s expectation that it will receive the full $10.0 million in reimbursement under the Project Sub-Agreement (the “DoD Agreement”) with Advanced Technology International, an entity acting on behalf of the Defense Industrial Base Consortium under the authority of the U.S. Department of Defense; the intended use of our cash balance as of March 31, 2026, the proceeds from the exercise of Common Share purchase warrants (“Warrants”) and the reimbursement payments pursuant to the DoD Agreement; the expected results of the previously announced drilling program at the Elk Creek Project (the "2025 Drilling Program"); the expectation that the results of the 2025 Drilling Program will be used to update the feasibility study for the Elk Creek Project; the Elk Creek Project’s ability to produce multiple critical metals; the Elk Creek Project’s projected ore production and mining operations over its expected mine life; the completion of technical and economic analyses on the potential addition of rare earth oxides to NioCorp’s planned product suite; statements with respect to the estimation of mineral resources and mineral reserves; the exercise of options to purchase additional land parcels; the execution of contracts with engineering, procurement and construction companies; the duration and anticipated benefits of the Rights Plan (as defined below); NioCorp’s ongoing evaluation of the impact of inflation, supply chain issues, tariffs, and geopolitical unrest on the Elk Creek Project’s economic model; and the creation of full-time and contract construction jobs over the construction period of the Elk Creek Project.

Current wording

Forward-looking statements have been based upon our current business and operating plans, as approved by the Board, and may include statements regarding, among other matters, the financial and business performance of NioCorp; NioCorp’s anticipated results and developments in the operations of NioCorp in future periods; NioCorp’s planned exploration and development activities; the adequacy of NioCorp’s financial resources; NioCorp’s ability to secure sufficient project financing to complete construction and commence operation of the Company’s niobium, scandium, titanium and rare earth project (the “Elk Creek Project”) located in southeastern Nebraska; NioCorp’s expectations on the form of future project financing; the necessity and impact of additional binding offtake agreements and the terms of such agreements, if any; NioCorp’s ability to receive a final commitment of financing from the Export-Import Bank of the United States (“EXIM”); future standards imposed by the U.S. federal government, if any; the estimated total upfront capital expenditure for the Elk Creek Project; NioCorp’s expectation and ability to produce niobium, scandium, titanium and the rare earth elements at the Elk Creek Project; NioCorp’s plans to produce and supply specific products and market demand for those products; NioCorp’s expectation that it will receive the full $10.0 million in reimbursement under the Department of War (“DoW”) Agreement; the intended use of our cash balance as of September 30, 2026, the proceeds from Warrant exercise issuances, and the reimbursement payments pursuant to the DoW Agreement; the Elk Creek Project’s ability to produce multiple critical metals; the Elk Creek Project’s projected ore production and mining operations over its expected mine life; statements with respect to the estimation of mineral resources and mineral reserves; statements with respect to projected product pricing, costs, and project economics; the exercise of options to purchase additional land parcels; the execution of contracts with engineering, procurement and construction companies; NioCorp’s possible future usage of artificial intelligence (“AI”) and the risks and challenges associated therewith; NioCorp’s ongoing evaluation of the impact of inflation, supply chain issues, tariffs, and geopolitical unrest on the Elk Creek Project’s economic model; construction of the main access to the underground portion (the “Portal Project”) of the Elk Creek Project; and the creation of full time and contract construction jobs over the construction period of the Elk Creek Project.

Previous wording

Forward-looking statements are frequently, but not always, identified by words such as “expects,” “anticipates,” “believes,” “intends,” “estimates,” “potential,” “possible,” and similar expressions, or statements that events, conditions, or results “will,” “may,” “could,” or “should” (or the negative and grammatical variations of any of these terms) occur or be achieved. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions, or future events or performance (often, but not always, using words or phrases such as “expects” or “does not expect,” “is expected,” “anticipates” or “does not anticipate,” “plans,” “estimates,” or “intends,” or stating that certain actions, events, or results “may,” “could,” “would,” “might,” or “will” be taken, occur or be achieved) are not statements of historical fact and may be forward-looking statements. Forward-looking statements reflect material expectations and assumptions, including, without limitation, expectations and assumptions relating to: NioCorp’s ability to receive sufficient project financing for the construction of the Elk Creek Project on acceptable terms, or at all; the future price of and demand for metals, including aluminum-scandium("Al-Sc") alloy; and the stability of the financial and capital markets. Such forward-looking statements reflect the Company’s current views with respect to future events and are subject to certain known and unknown risks, uncertainties, and assumptions. Many factors could cause actual results, performance, or achievements to be materially different from any future results, performance, or achievements that may be expressed or implied by such forward-looking statements, including, among others, risks related to the following: NioCorp’s requirement of significant additional capital; NioCorp’s ability to receive sufficient project financing for the construction of the Elk Creek Project on acceptable terms, or at all; NioCorp’s ability to achieve the required milestones and receive the full $10.0 million in reimbursement under the DoD Agreement; NioCorp’s ability to receive a final commitment of financing from EXIM or other debt financing or financial support on acceptable timelines, on acceptable terms, or at all; NioCorp’s ability to continue to meet Nasdaq listing standards; risks relating to the common shares, no par value, of the Company (“Common Shares”), including price volatility, lack of dividend payments and dilution or the perception of the likelihood of any of the foregoing; the extent to which NioCorp’s level of indebtedness and/or the terms contained in agreements governing NioCorp’s indebtedness, if any, or other agreements may impair NioCorp’s ability to obtain additional financing, on acceptable terms, or at all; covenants contained in agreements with NioCorp’s secured creditors that may affect its assets; NioCorp’s limited operating history; NioCorp’s history of loss…

Excerpt shortened here; the source contains the full paragraph.

Current wording

Forward-looking statements are frequently, but not always, identified by words such as “expects,” “anticipates,” “believes,” “intends,” “estimates,” “potential,” “possible,” and similar expressions, or statements that events, conditions, or results “will,” “may,” “could,” or “should” (or the negative and grammatical variations of any of these terms) occur or be achieved. Any statements that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions, or future events or performance (often, but not always, using words or phrases such as “expects” or “does not expect,” “is expected,” “anticipates” or “does not anticipate,” “plans,” “estimates,” or “intends,” or stating that certain actions, events, or results “may,” “could,” “would,” “might,” or “will” be taken, occur or be achieved) are not statements of historical fact and may be forward-looking statements. Forward-looking statements reflect material expectations and assumptions, including, without limitation, expectations and assumptions relating to: NioCorp’s ability to receive sufficient project financing for the construction of the Elk Creek Project on acceptable terms, or at all; the future price of and demand for metals, including Al-Sc alloy; the impact that Chinese restrictions have on pricing and demand including the existence of a bifurcated market between China and the rest of the world; and the stability of the financial and capital markets. Such forward-looking statements reflect the Company’s current views with respect to future events and are subject to certain known and unknown risks, uncertainties, and assumptions. Many factors could cause actual results, performance, or achievements to be materially different from any future results, performance, or achievements that may be expressed or implied by such forward-looking statements, including, among others, risks related to the following: NioCorp’s requirement of significant additional capital; NioCorp’s ability to receive sufficient project financing for the construction of the Elk Creek Project on acceptable terms, or at all; NioCorp’s ability to achieve the required milestones and receive the full $10.0 million in reimbursement under the DoW Agreement; NioCorp’s ability to receive a final commitment of financing from EXIM or other debt financing or financial support on acceptable timelines, on acceptable terms, or at all; NioCorp’s ability to continue to meet Nasdaq listing standards; risks relating to the Common Shares, including price volatility, lack of dividend payments and dilution or the perception of the likelihood of any of the foregoing; the extent to which NioCorp’s level of indebtedness and/or the terms contained in agreements governing NioCorp’s indebtedness, if any, or other agreements may impair NioCorp’s ability to obtain additional financing, on acceptable terms, or at all; NioCorp’s limited operating history; NioCorp’s history of losses; the mate…

Excerpt shortened here; the source contains the full paragraph.

Previous wording

All technical and scientific information that forms the basis for the Elk Creek Project disclosure included in this Quarterly Report on Form 10-Q has been reviewed and approved by Scott Honan, M.Sc., SME-RM, NioCorp’s Chief Operating Officer. Mr. Honan is a “Qualified Person” as such term is defined in National Instrument 43-101 – Standards of Disclosure for Mineral Projects and subpart 1300 of Regulation S-K.

Current wording

All technical and scientific information that forms the basis for the Elk Creek Project disclosure included in this Quarterly Report on Form 10-Q has been reviewed and approved by Scott Honan, M.Sc., SME-RM, NioCorp’s Chief Operating Officer. Mr. Honan is a “Qualified Person” as such term is defined in National Instrument 43-101 – Standards of Disclosure for Mineral Projects and subpart 1300 of Regulation S-K (“S-K 1300”).

Previous wording

NioCorp is developing the Elk Creek Project, located in southeastern Nebraska. The Elk Creek Project is a development-stage property that has disclosed niobium, scandium, and titanium reserves and resources and disclosed rare earth mineral resources. The Company is continuing technical and economic studies around the rare earths contained in the Elk Creek Project’s mineral resources in order to determine whether extraction of rare earth elements can be reasonably justified and economically viable after taking into account all relevant factors. Niobium has developing applications in the formulation of solid-state lithium-ion batteries, which may reduce charging times and increase battery safety. Niobium is used to produce various superalloys that are extensively used in high-performance aircraft and jet turbines. It also is used in High-Strength, Low-Alloy steel, a stronger steel used in automobiles, bridges, structural systems, buildings, pipelines, and other applications that generally increases strength and/or reduces weight, which can result in environmental benefits, including reduced fuel consumption and material usage and fewer air emissions. Scandium can be combined with aluminum to make high-performance alloys with increased strength and improved corrosion resistance. Scandium also is a critical component of advanced solid oxide fuel cells, an environmentally preferred technology for high-reliability, distributed electricity generation. Titanium is a component of various superalloys and other applications that are used for aerospace applications, weapons systems, protective armor, medical implants, and many others. It also is used in pigments for paper, paint, and plastics. Rare earths are critical to electrification and decarbonization initiatives and can be used to manufacture the strongest permanent magnets commercially available. In December 2025, the Company acquired certain manufacturing assets and intellectual property related to Al-Sc alloy production, which are intended to support a potential future domestic scandium supply chain, subject to financing and development.

Current wording

Niobium is used to produce various superalloys that are extensively used in high performance aircraft and jet turbines. It also is used in high-strength, low-alloy steel, a stronger steel used in automobiles, bridges, structural systems, buildings, pipelines, and other applications that generally enables those applications to be stronger and lighter in mass. This “lightweighting” benefit often results in environmental benefits, including reduced fuel consumption and material usage, which can result in fewer air emissions.

Previous wording

Our primary business strategy is to advance our Elk Creek Project to commercial production. We are focused on carrying out our near-term planned work programs associated with securing the project financing package necessary to complete mine development and construction of the Elk Creek Project.

Current wording

Our primary business strategy is to advance our Elk Creek Project to commercial production. We are focused on securing project financing sufficient to cover initial capital costs and other related expenses necessary for the commencement and completion of construction, and carrying out our near-term planned work programs necessary to complete detailed design, development, and construction of the Elk Creek Project, as well as the commencement of early elements of project construction.

Previous wording

The Company continues to execute a work plan to further advance the development of the Elk Creek Project. In addition to the expected updates to Mineral Resources and Mineral Reserves, noted above, the Company expects to finalize engineering and costing of its new and more efficient production process which incorporates the potential addition of rare earth products and the planned production of titanium in the form of titanium tetrachloride. In addition, the Company is advancing engineering to modify the design of the mine to incorporate a twin ramp for access along with a Railveyor system for material movement instead of utilizing vertical mining shafts. The updated mine design will also incorporate updated costing. This work is expected to be summarized in an updated feasibility study for the Elk Creek Project.

Current wording

The Company continues to execute a work plan to further advance the development of the Elk Creek Project. Using cash on hand, the Company expects to undertake the following activities:

Previous wording

Continuation of the Company’s efforts to secure additional federal, state, and local operating permits, as needed;

Current wording

Continuation of the Company’s efforts to secure federal, state, and local operating permits;

Previous wording

Completion of the final detailed engineering for surface project facilities;

Current wording

Continuation and completion of the final detailed engineering for surface project facilities;

Previous wording

Completion of water supply agreements and related infrastructure to deliver fresh water to the Elk Creek Project site;

Current wording

Completion of water supply agreements and related infrastructure to deliver fresh water to the project site; and

Previous wording

Completion of mine groundwater investigation and control activities;

Current wording

Continuation of revised mine groundwater investigation and control activities.

Previous wording

Construction of natural gas and electrical infrastructure to serve the Elk Creek Project site;

Current wording

Construction of natural gas and electrical infrastructure under existing agreements to serve the Elk Creek Project site;

Current wording

Initiation of long-lead equipment procurement activities; and

Previous wording

Exploration expenditures increased for the nine-month period ended March 31, 2026 as compared to 2025, primarily due to field-based costs associated with the 2025 Drilling Program, which was substantially completed by September 30, 2025, as well as expenses related to the Company’s ongoing efforts to update the Elk Creek Project feasibility study.

Current wording

Exploration expenditures decreased for the three-month period in 2026 as compared to 2025, primarily due to field-based costs associated with the previously announced drilling program at the Elk Creek Project, which was substantially completed by September 30, 2025, partially offset by increased project advancement costs incurred during the three-month period ended September 30, 2026.

Previous wording

Change in fair value of earnout shares liability represents the impact of changes in fair value related to shares of Class B common stock of ECRC, the rights of the holders of which to exchange such shares into Common Shares are subject to certain vesting conditions (such shares of ECRC Class B common stock, the "Earnout Shares"). The decline in fair value for the three-month period in 2026 as compared to 2025 primarily reflect the decrease in the Company’s Common Share price in the financial modeling used to determine the period end fair value.

Current wording

Change in fair value of earnout shares liability represents the impact of changes in fair value related to valuation of the shares of Class B common stock of ECRC, the rights of the holders of which to exchange such shares into Common Shares are subject to certain vesting conditions (such shares of ECRC Class B common stock, the “Earnout Shares”). The decrease in fair value for the three-month period in 2026, compared to an increase for the same period in 2025, primarily reflects the decrease in the Company’s Common Share price in the financial modeling used to determine the period end fair value.

Previous wording

Change in fair value of warrant liabilities represents the impact of changes in fair value of Warrants recorded as liabilities in the condensed consolidated balance sheet. The declines in fair value for the three-month period in 2026 as compared to 2025 primarily reflect decreases in the Company’s Common Share price used in the Black-Scholes valuation of outstanding Warrant liabilities. In addition, the 2026 decline was partially offset by additional fair value expense recognized in connection with Warrants exercised during the period.

Current wording

Change in fair value of warrant liabilities represents the impact of changes in fair value of Warrants recorded as liabilities in the Condensed Consolidated Balance Sheets. The decrease in fair value for the three-month period in 2026, compared to an increase for the same period in 2025, primarily reflects decreases in the Company’s Common Share price used in the Black-Scholes valuation of outstanding Warrant liabilities.

Previous wording

Interest income represents earnings from the investment of excess cash balances in a commercial money market account. The increase for the three-month period in 2026 as compared to 2025 is attributable to our higher cash balance resulting from our successful financing efforts subsequent to March 31, 2025.

Current wording

Interest income represents earnings from the investment of excess cash balances in a commercial money market account. The increase for the three-month period in 2026 as compared to 2025 is attributable to higher cash balances resulting from timing of our financing efforts.

Previous wording

Loss attributable to noncontrolling interest represents the portion of net loss in ECRC not owned by the Company. The increase in loss for the three-month period in 2026 as compared to 2025 is related to the increased exploration expenditures, as noted above, incurred by ECRC.

Current wording

Loss attributable to redeemable noncontrolling interest represents the portion of net loss in ECRC attributable to the Vested Shares, which are not owned by the Company. The decrease in loss for the three-month period in 2026 as compared to 2025 is related to the decreased exploration expenditures, as noted above, incurred by ECRC.

Previous wording

As of March 31, 2026, the Company had cash of $419.2 million and working capital of $409.9 million, compared to cash of $25.6 million and working capital of $24.8 million on June 30, 2025.

Current wording

As of September 30, 2026, the Company had cash and cash equivalents of $403.4 million and working capital of $394.0 million, compared to cash and cash equivalents of $415.0 million and working capital of $402.3 million as of June 30, 2026. The overall decline in both cash and working capital reflects the funding of operations and capital expenditures during the period. The Company has no outstanding long-term debt.

Previous wording

We expect that the Company will operate at a loss for the foreseeable future. The Company’s current planned cash outflows are approximately $65.0 million to $75.0 million for the next twelve months. These planned cash outflows are expected to consist of expenditures relating to limited, incremental activities to advance certain aspects of the Elk Creek Project by ECRC, corporate overhead costs, and estimated costs related to securing financing necessary for advancement of the Elk Creek Project. These planned expenditures include expenditures relating to the anticipated completion of an updated resource and reserve estimate and associated mine plan and an updated capital cost estimate in connection with the EXIM application process, infrastructure development, ongoing engineering and metallurgical test work, environmental and permitting activities, community and stakeholder engagement programs, corporate and administrative overhead, and advisory costs related to securing project financing.

Current wording

We expect that the Company will operate at a loss for the foreseeable future. The Company’s current planned cash outflows are approximately $85 million to $95 million for the next twelve months. In addition to the settlement of outstanding accounts payable and other short-term liabilities, our planned cash outflows over the next twelve months are expected to consist of expenditures relating to the advancement of the Elk Creek Project by NioCorp’s majority-owned subsidiary, ECRC, corporate overhead costs, and estimated costs related to securing the financing necessary for construction of the Elk Creek Project.

Previous wording

The planned corporate overhead costs over the next twelve months are approximately $11.6 million and the settlement of outstanding accounts payable as of March 31, 2026.

Current wording

The planned expenditures relating to the advancement of the Elk Creek Project over the next twelve months include, but are not limited to, continued construction of the Portal Project; detailed engineering; procurement and construction contracting activities; planning and deposits for long-lead equipment; metallurgical test work; environmental and permitting activities; community and stakeholder engagement programs; and advisory costs relating to securing project financing. The planned corporate overhead costs over the next twelve months are approximately $20 million, including Elk Creek property lease commitments, and the settlement of outstanding accounts payable as of September 30, 2026.

Previous wording

We expect our cash balance as of March 31, 2026, as well as the proceeds from Warrant and Option Exercises, if any, and the reimbursement payments pursuant to the DoD Agreement, to be sufficient to fund our planned expenditures for the next twelve months. However, additional work is required in order to advance the Elk Creek Project to construction, requiring additional financing. The technical report summary for the Elk Creek Project prepared in accordance with subpart 1300 of Regulation S-K (“S-K 1300”) and filed as Exhibit 96.1 to the Company’s Annual Report on Form 10-K for the fiscal year ended June 30, 2025, includes an estimated total upfront capital expenditure for the Elk Creek Project of approximately $1,141.0 million. The actual amount of capital expenditure required to successfully achieve commercial production at the Elk Creek Project is subject to, among other factors, the timing and actual cost of further exploration, preparing feasibility studies, permitting, engineering and the construction of infrastructure, mining and processing facilities. In addition, to the extent that EXIM requests further project activities to be undertaken in connection with the diligence process, the Company would require additional funding to complete such activities. As noted above, the Company’s ability to continue operations, fund our current work plan, and construct and operate the Elk Creek Project is dependent on management’s ability to secure additional financing.

Current wording

The actual amount of capital expenditure required to successfully achieve commercial production at the Elk Creek Project is subject to, among other factors, the timing and actual cost of detailed engineering, procurement, construction contracting, permitting and the construction of infrastructure, mining and processing facilities, as well as prevailing interest rates and the terms on which financing is available to the Company. In addition, to the extent that EXIM or any other prospective lender requests further project activities to be undertaken in connection with its diligence process, the Company would require additional funding to complete such activities. The Company’s ability to construct and operate the Elk Creek Project is dependent on management’s ability to secure such financing.

Previous wording

The estimated financing costs associated with the Elk Creek Project over the next twelve months include, but are not limited to, costs relating to the EXIM application process, the scope of which remains under discussion with EXIM. On June 6, 2023, the Company announced that it had submitted an application to EXIM for up to $800 million in debt financing (the “EXIM Financing”) to fund the project costs for the Elk Creek Project, under EXIM’s “Make More in America” initiative. The EXIM Financing is subject to, among other matters, the satisfactory completion of due diligence, the negotiation and settlement of final terms, and the negotiation of definitive documentation. The Company was informed that its application received approval by the first of three reviews by the EXIM Transaction Review Committee (the “TRC”) on October 2, 2023. In April 2024, EXIM provided the Company with a preliminary, non-binding indicative term sheet as part of a Preliminary Project Letter (the “PPL”), which also conveyed EXIM’s initial due diligence findings on the Company’s application for the EXIM Financing. The PPL identified additional project activities to be undertaken by the Company as part of EXIM’s due diligence process. These included, among other things, an updated mine plan and updated Elk Creek Project capital costs on a final or close-to-final basis reflecting updated process flows. The 2025 Drilling Program, which started in April 2025 and completed in September 2025, was designed to help meet mineral resource and mineral reserve classification requirements necessary to complete certain of the additional project activities identified by the PPL. In addition, as previously disclosed, the Company took an additional step in the process by executing a professional services agreement with SLR Consulting to conduct an independent environmental and social review as part of EXIM’s ongoing project due diligence.

Current wording

The estimated financing costs associated with the Elk Creek Project over the next twelve months include, but are not limited to, costs relating to the EXIM application process, the scope of which remains under discussion with EXIM. On June 6, 2023, the Company announced that it had submitted an application to EXIM for debt financing, which may include a loan or loan guarantee, to fund a portion of the project costs for the Elk Creek Project, under EXIM’s “Make More in America” initiative (the “EXIM Financing”). The Company was informed that its application received approval by the first of three reviews by the EXIM Transaction Review Committee (“TRC”) on October 2, 2023. In April 2024, EXIM provided the Company with a Preliminary Project Letter (“PPL”), which also conveyed EXIM’s initial due diligence findings on the Company’s application. The PPL did not state a total amount of the EXIM Financing. Instead, the PPL provided that the amount of the EXIM Financing that could be made available for the Elk Creek Project will be scaled based on the number of U.S. jobs supported, both during construction and over the life of EXIM’s financing, and subject to certain expectations regarding the ratio of debt-to-equity financing for the Elk Creek Project. The PPL also identified additional project activities to be undertaken by the Company as part of EXIM’s due diligence process, including, among other things, an updated mine plan and updated Elk Creek Project capital costs on a final or close-to-final basis reflecting updated process flows. On February 4, 2025, EXIM advanced the Company’s application to the next stage of the TRC’s reviews and selected RPMGlobal USA, Inc., whose mining advisory business has since been acquired by SLR Consulting, to conduct an independent technical review of the Elk Creek Project, and in October 2025 the Company executed a professional services agreement with SLR Consulting to conduct an independent environmental and social review as part of EXIM’s ongoing due diligence. The Company’s application remains at the next stage of the TRC’s review process. If the application is approved and supported by EXIM staff, it would be subject to a final decision by EXIM’s Board of Directors.

Previous wording

The Company continues to meet with EXIM, provide responses to requests for additional information from EXIM and to the consultants that are conducting due diligence on the Company’s application on behalf of EXIM, and take steps to complete the additional project activities identified by the PPL. There can be no assurance as to what further project activities or matters EXIM may request in connection with the application process. We are currently unable to estimate how long the application process may take, and there can be no assurances that we will be able to successfully negotiate a final commitment of debt financing from EXIM.

Current wording

The EXIM Financing remains subject to, among other matters, the satisfactory completion of EXIM’s due diligence, the completion of EXIM’s internal review and approval process, the negotiation and settlement of final terms, and the negotiation and execution of definitive documentation. Neither the letter of interest the Company received from EXIM in March 2023 nor the PPL represents a financing commitment from EXIM. Certain of these conditions, including the timing and sequencing of EXIM’s internal review and approval process, are outside the Company’s control, and the conditions to which any commitment would be subject are customary for financings of a similar nature by U.S. Government or other public lending institutions. The Company continues to meet with EXIM, to respond to requests for additional information from EXIM and from the consultants conducting due diligence on the Company’s application on behalf of EXIM, and to take steps to complete the additional project activities identified by the PPL. There can be no assurance as to what further project activities or matters EXIM may request in connection with the application process. Accordingly, the Company is currently unable to estimate the total amount of the EXIM Financing, if any, or how long the application process may take, and there can be no assurances that the Company will be able to successfully negotiate a final commitment of debt financing from EXIM, on acceptable terms, or at all.

Previous wording

Except for the potential exercise of Options and Warrants, we currently have no further funding commitments or arrangements for additional financing at this time. Management currently anticipates that it will fund the upfront capital expenditure amount for the Elk Creek Project through a combination of debt and equity financing, with approximately two-thirds of such amount being funded from the net proceeds of debt financing, including the amount of debt that would be represented by the EXIM Financing, if any. Management is actively pursuing additional sources of debt and equity financing to meet its long-term funding requirements, and while it has been successful in doing so in the past, there is no assurance that we will be able to obtain any such additional financing on acceptable terms, if at all. Pursuant to the Exchange Agreement, dated as of March 17, 2023 (as amended, supplemented or otherwise modified, the “Exchange Agreement”), by and among NioCorp, ECRC and GX Sponsor II LLC, NioCorp is restricted from issuing equity or equity-linked securities (other than Common Shares) or any preferred equity or non-voting equity if such issuance would adversely impact the rights of the holders of the shares of Class B common stock of ECRC, without the consent of the holders of a majority of the shares of Class B common stock of ECRC. Notwithstanding the restrictions set forth in the Exchange Agreement, there is significant uncertainty that we would be able to secure any additional financing in the current equity or debt markets. The quantity of funds to be raised and the terms of any proposed equity or debt financing that may be undertaken will be negotiated by management as opportunities to raise funds arise. Management may pursue funding sources of both debt and equity financing, including but not limited to the issuance of equity securities in the form of Common Shares, Warrants, subscription receipts, or any combination thereof in units of the Company pursuant to private placements to accredited investors or pursuant to public offerings in the form of underwritten/brokered offerings, registered direct offerings, or other forms of equity financing and public or private issuances of debt securities, including secured and unsecured convertible debt instruments, or secured debt project financing. Management does not currently know the terms pursuant to which such financings may be completed in the future, but any such financings will be negotiated at arm’s-length. Future financings involving the issuance of equity securities or derivatives thereof will likely be completed at a discount to the then-current market price of the Company’s securities and will likely be dilutive to current shareholders. In addition, we could raise funds through the sale of interests in our mineral properties, although current market conditions and other recent worldwide events have substantially reduced the number of potential buyers/acquirers of any such interests. Howev…

Excerpt shortened here; the source contains the full paragraph.

Current wording

Except for the potential funding from the exercise of Options and Warrants and the reimbursement payments available to ECRC under the DoW Agreement, we currently have no further funding commitments or arrangements for additional financing as of the date of this Quarterly Report on Form 10-Q. Pursuant to the exchange agreement, dated as of March 17, 2023, by and among NioCorp, ECRC, and GX Sponsor II LLC (the “Exchange Agreement”), NioCorp is restricted from issuing equity or equity-linked securities (other than Common Shares) or any preferred equity or non-voting equity if such issuance would adversely impact the rights of the holders of the shares of Class B common stock of ECRC, without the consent of the holders of a majority of the shares of Class B common stock of ECRC. Notwithstanding the restrictions set forth in the Exchange Agreement, there can be no assurance that we will be able to secure additional financing on acceptable terms, or at all. The quantity of funds to be raised and the terms of any proposed equity or debt financing that may be undertaken will be negotiated by management as opportunities to raise funds arise. Management may pursue funding sources of both debt and equity financing, including but not limited to the issuance of equity securities in the form of Common Shares, Warrants, subscription receipts, or any combination thereof in units of the Company pursuant to private placements to accredited investors or pursuant to public offerings in the form of underwritten/brokered offerings, registered direct offerings, or other forms of equity financing and public or private issuances of debt securities, including secured and unsecured convertible debt instruments, or secured debt project financing.

Previous wording

During the nine-month period ended March 31, 2026, the Company’s operating activities consumed $11.9 million of cash (2025: $5.9 million). The cash used in operating activities for the nine-month period ended March 31, 2026, reflects the Company’s funding of losses of $44.4 million, primarily resulting from increased fair value related to the Earnout Shares and Warrant liabilities, share-based compensation, and other non-cash transactions. Overall, operational outflows during the nine-month period ended March 31, 2026, increased from the corresponding period of 2025 due to costs and expenditures incurred in connection with the 2025 Drilling Program and the Company's current efforts to update the Elk Creek Project feasibility study. Going forward, the Company’s working capital requirements are expected to increase substantially in connection with the development of the Elk Creek Project.

Current wording

During the three-month period ended September 30, 2026, the Company’s operating activities consumed $6.2 million of cash (2025: $6.7 million). The Company reported net income of $3.8 million for the period, primarily due to non-cash gains of $8.5 million from decreases in the fair value of the Earnout Shares and Warrant liabilities, driven by the decline in the Company’s share price. After adjusting for these gains and other non-cash items, including $1.7 million of share-based compensation, the remaining operating cash outflows were used to fund operations. Going forward, the Company’s working capital requirements are expected to increase substantially in connection with the development of the Elk Creek Project.

Previous wording

During the nine-month period ended March 31, 2026, the Company’s investing activities consumed $27.7 million of cash (2025: $—). The cash used in investing activities for the nine months ended March 31, 2026, reflects the acquisition of additional land and mineral rights for the Elk Creek Project as well as costs incurred related to the construction of the Portal Project, and the acquisition of the manufacturing assets and intellectual property of FEA Materials LLC.

Current wording

During the three-month period ended September 30, 2026, the Company’s investing activities consumed $5.6 million of cash (2025: $14.0 million). The cash used in investing activities for the three months ended September 30, 2026, primarily represents additional expenditures associated with ongoing construction of the Portal Project. Investing activities for the three months ended September 30, 2025 consisted of land and mineral rights purchases.

Previous wording

There have been no material changes in our critical accounting estimates discussed in “Management’s Discussion and Analysis of Financial Condition and Results of Operations” under the heading “Critical Accounting Estimates and Recent Accounting Pronouncements” as of June 30, 2025, in the Annual Report on Form 10-K, except as noted below.

Current wording

There have been no material changes in our critical accounting estimates discussed in “Management’s Discussion and Analysis of Financial Condition and Results of Operations” under the heading “Critical Accounting Estimates and Recent Accounting Pronouncements” as of June 30, 2026, in the Annual Report on Form 10-K.

Previous wording

The Company has one class of shares, being Common Shares. A summary of outstanding Common Shares, Options, and Warrants as of May 14, 2026, is set out below, on a fully diluted basis.

Current wording

The Company has one class of shares, being Common Shares. A summary of outstanding Common Shares, Vested Shares, Options, and Warrants as of November 5, 2026, is set out below, on a fully diluted basis.

Previous wording

Includes 15,666,526 NioCorp Assumed Warrants that are each exercisable into 1.11829212 Common Shares and 3,175,586 Warrants that are each exercisable into one Common Share.

Current wording

Includes 15,666,526 NioCorp Assumed Warrants that are each exercisable into 1.11829212 Common Shares and 2,406,845 Warrants that are each exercisable into one Common Share.
Rearranged current paragraphs (3)

Current report — wording carried from elsewhere

Scandium can be combined with aluminum to make super-high-performance alloys with increased strength and improved corrosion resistance. Scandium also is a critical component of advanced solid oxide fuel cells, which are increasingly being deployed to provide reliable, on-site power for energy-intensive artificial intelligence data centers.

Current report — wording carried from elsewhere

Titanium is a component of various superalloys and other applications that are used for aerospace applications, weapons systems, protective armor, medical implants and many others. It also is used in pigments for paper, paint, and plastics.

Current report — wording carried from elsewhere

Management does not currently know the terms pursuant to which such financings may be completed in the future, but any such financings will be negotiated at arm’s-length. Future financings involving the issuance of equity securities or derivatives thereof may be completed at a discount to the then-current market price of the Company’s securities and would be dilutive to current shareholders. In addition, we could raise funds through the sale of interests in our mineral properties. However, we cannot provide any assurances that we will be able to be successful in raising such funds.