HECLA MINING CO/DE/
For the period ended Sep 30, 2026. Filed Nov 4, 2026.
View on SEC.govAbout this filing
A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.
Sep 30, 2026 · Filed Nov 4, 2026
What changed in Risk Factors?
Read the current filingPrevious report: 10-Q
Period ended 2026-06-30; filed 2026-08-04.
0001193125-26-333090
Item 1A. Risk FactorsMine Safety DisclosuresOther InformationCurrent report: 10-Q
Period ended 2026-09-30; filed 2026-11-04.
0001193125-26-445748
Item 1A. Risk FactorsMine Safety DisclosuresOther InformationThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 17 previous paragraphs and 20 current paragraphs.
17 unchanged; 0 reworded; 3 added; 0 removed; 0 previous and 0 current paragraphs rearranged.
Tables are not compared: 0 previous and 0 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (3)
Current report
Item 1A. – Risk Factors of our 2025 Form 10-K set forth information relating to important risks and uncertainties that could materially adversely affect our business, financial condition, or operating results. Except as set forth below, there have been no material changes to those risk factors. The risk factors below, which include a new risk factor relating to Keno Hill, should be read in conjunction with those risk factors.
Current report
Production at Keno Hill will decline beginning in the fourth quarter of 2026 and could be further curtailed or suspended until permit amendments are obtained and related infrastructure is built.
Current report
Keno Hill’s mill has recently operated near its permitted maximum annual average of 440 tons per day, but our current quartz mining license and water license do not provide the tailings storage, waste rock and water treatment capacity needed to sustain that rate. As a result, milled tons are expected to decline in the fourth quarter of 2026 to approximately 300 tons per day, and are expected to decline further beginning in January 2027 to levels significantly below third quarter 2026 throughput. We expect throughput to remain at reduced levels until amended licenses are obtained, which we currently estimate could occur by approximately mid-2029 following review by the Yukon Environmental and Socio-economic Assessment Board of a project proposal we intend to submit by year-end 2026, and until the related infrastructure is constructed. We expect this period to be one of lower revenue and higher costs at Keno Hill. Even at the reduced rate, our capacity to manage tailings, waste rock and production water may be even further constrained and may be exhausted if the next phase of our dry-stack tailings facility is not permitted and constructed during the 2029 construction season or if the license amendments are not received in 2029. The review and licensing process involves multiple sequential steps outside our control, including the Yukon Government’s consultation with the First Nation of Na-Cho Nyäk Dun (“FNNND”), which has indicated an interest in revisiting our Comprehensive Cooperation and Benefits Agreement, including its unresolved wealth-sharing provisions; any resolution of those provisions is likely to require ongoing payments to the FNNND. Delays at any step, restrictions on temporary waste rock stockpiling, or reduced power supply from Yukon Energy could require further curtailment or a halt to production. If permits or infrastructure are delayed, or if silver prices decline materially, we could place Keno Hill on care and maintenance and could be required to record an impairment of its long-lived assets, which could be material. See also the risk factors in Part I, Item 1A of our 2025 Form 10-K, “We are required to obtain governmental permits and other approvals in order to conduct mining operations,” “Certain of our mines and exploration properties are located on land that is or may become subject to, competing title claims and/or claims of cultural significance,” and“We may not realize all of the anticipated benefits from our acquisitions, including our 2022 acquisition of Alexco.”