What changed in Risk Factors?

Read the current filing

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 17 previous paragraphs and 17 current paragraphs.

15 unchanged; 2 reworded; 0 added; 0 removed; 0 previous and 0 current paragraphs rearranged.

Tables are not compared: 0 previous and 0 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Reworded paragraphs (2)

Previous wording

Even if the EPA ultimately approves the Class VI permit application, the approval process may take significantly longer than we currently anticipate. We currently expect the Project to be completed and operational in the first quarter of 2027, subject to EPA approval of our Class VI permit, at which time CO 2 injections are expected to begin. Although we drilled a stratigraphic injection well at the El Dorado site in June 2025 to gather data supporting the EPA’s technical review, our application remains subject to further review. The timing of EPA approval is largely outside of our control and could be affected by, among other things, the EPA’s internal review procedures and resource constraints, requests for additional information, legal or administrative challenges to the permit or changes in applicable regulatory policy.

Current wording

Even if the EPA ultimately approves the Class VI permit application, the approval process may take significantly longer than we currently anticipate. Although we drilled a stratigraphic injection well at the El Dorado site in June 2025 to gather data supporting the EPA’s technical review, our application remains subject to further review. The current published EPA Underground Injection Control Class VI Permit Tracker reflects a potential operational date in the second half of 2027, subject to EPA approval of our Class VI permit, at which time CO 2 injections are expected to begin. We intend to work with the EPA to potentially accelerate this timeline, but the timing of EPA approval is largely outside of our control and could be affected by, among other things, the EPA’s internal review procedures and resource constraints, requests for additional information, legal or administrative challenges to the permit or changes in applicable regulatory policy.

Previous wording

A failure to obtain necessary EPA approvals would prevent us from realizing the anticipated benefits of the Project, including our ability to produce low carbon ammonia and upgraded products, such as the sale of low carbon ammonium nitrate under our existing supply agreement with Freeport Minerals Corporation, and our eligibility for tax credits under Section 45Q of the Internal Revenue Code (the “Code”). In addition, a significant delay in receiving the Class VI permit approval could increase the costs of completing the Project, require us to incur additional capital expenditures and postpone the commencement of CO 2 injections and our production of low carbon ammonium nitrate. Any such failure or delay could have a material adverse effect on our business, financial condition, results of operations and cash flows.

Current wording

A failure to obtain necessary EPA approvals would prevent us from realizing the anticipated benefits of the Project, including our ability to produce low carbon ammonia and upgraded products, such as the sale of low carbon ammonium nitrate under our existing supply agreement with Freeport Minerals Corporation, and our eligibility for tax credits under Section 45Q of the Internal Revenue Code. In addition, a significant delay in receiving the Class VI permit approval could increase the costs of completing the Project, require us to incur additional capital expenditures and postpone the commencement of CO 2 injections and our production of low carbon ammonium nitrate. Any such failure or delay could have a material adverse effect on our business, financial condition, results of operations and cash flows.