Item 1A. Risk Factors

Current report: 10-K

Period ended 2026-06-30; filed 2026-09-17.

0001193125-26-394541

Item 1A. Risk Factors

The baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.

Compared 328 previous paragraphs and 326 current paragraphs.

132 unchanged; 111 reworded; 81 added; 84 removed; 1 previous and 2 current paragraphs rearranged.

Tables are not compared: 0 previous and 0 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.

A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.

Added paragraphs (81)

Current report

Our near-term business plan depends on obtaining additional capital to support, among other things, continued SSF activities, FEL-3 engineering, wellfield optimization, customer qualification and commercial development activities, permitting modifications, infrastructure planning, technical studies, corporate overhead and other operating costs. If we are unable to obtain sufficient capital on acceptable terms and on the timeline required, we may be required to delay, reduce the scope of, suspend or eliminate some or all of these activities, which could delay development of the Project, adversely affect our ability to obtain financing for the proposed Commercial-Scale Facility and materially adversely affect our business, liquidity, financial condition and ability to continue as a going concern.

Current report

The PFS included a capital estimate for Phase 1 of the proposed Commercial-Scale Facility, and the amount of capital ultimately required to complete development may be materially higher than the amounts currently estimated. Actual capital requirements will depend on, among other things, FEL-3 engineering, final feasibility work, wellfield design, procurement strategy, long-lead equipment costs, construction and labor costs, energy infrastructure, inflation, tariffs, contingency, owner’s costs, financing costs, permitting requirements, schedule changes and other factors. The size of the capital required to develop Phase 1 is substantial relative to our current market capitalization and available liquidity, which may make financing more difficult, expensive, dilutive or unavailable.

Current report

Any financing we pursue may be subject to extensive third-party diligence and conditions, including review of the PFS and updated technical report summary, FEL-3 engineering, wellfield design and performance, recovery rates, customer qualification, non-binding commercial arrangements and potential offtake support, permitting status, market studies, commodity price assumptions, environmental matters, title and other technical, legal, financial and commercial matters. Financing sources may not be satisfied with the results of such diligence or may require additional work, commitments or conditions before providing financing, which could delay, reduce, increase the cost of or prevent financing.

Current report

Our inability to continue to operate the SSF, complete FEL-3 and further technical and economic studies, or successfully validate and optimize our wellfield design may have a material adverse impact on the Project.

Current report

In particular, our ultimate wellfield design, use of horizontal wells, injection and recovery configurations, permeability assumptions, solution chemistry, recovery rates, operating methods and scale-up assumptions remain subject to technical uncertainty. Results from the SSF, vertical wells, horizontal wells, step-rate testing or other technical work may not be representative of commercial-scale operations or may require us to modify the mine plan, wellfield design, processing facilities, costs, schedule or expected recoveries.

Current report

If we are unable to operate the SSF or complete FEL-3 and related technical and economic studies in a timely and cost-effective manner, or if such work results in changes to the expected economics, design, schedule or recoveries for the Project, our ability to develop the Project could be materially adversely affected.

Current report

We have invested significant capital in the Project, including resource drilling, monitoring wells, metallurgical test work, well injection testing, permitting activities, construction and operation of the SSF, pilot-scale test work, FEL-2 engineering and preparation of the PFS. Subject to availability of adequate capital, we expect to continue to invest significant capital in the Project, including FEL-3 engineering, additional technical and economic studies, wellfield optimization, commercial development, permitting modifications, long-lead procurement, development planning and potential construction of the proposed Commercial-Scale Facility.

Current report

The Project may require more capital than currently expected, including, without limitation, because of changes in design, scope, permitting requirements, capital costs, operating costs, inflation, tariffs, supply-chain conditions, energy infrastructure, construction labor, equipment costs, financing terms, schedule, contingency, owner’s costs, wellfield performance, recovery rates or other factors. If the Project does not proceed as planned, or if we are unable to finance or complete the Project, some or all of our prior and future investments may not be recovered, and we may be required to record impairments or other charges.

Current report

Our strategy may depend in part on our ability to develop, protect, obtain or acquire intellectual property and know-how related to in-situ extraction, closed-loop processing, wellfield design, recovery, processing, reinjection, product specifications, impurity management, co-product processing and advanced boron materials. During fiscal year 2026, we filed a provisional patent application with the United States Patent and Trademark Office (“USPTO”) relating to the production process for meta boric acid. Also during fiscal year 2026, we filed an omnibus provisional patent application with the USPTO covering our proprietary closed-loop in-situ leach mining and production process, including claims relating to boric acid, gypsum, sodium chloride and management of metal impurities. We have also filed provisional patents with the USPTO specifically related to our production process for boric acid, our gypsum production process, and the different modes of operation and controls based on the composition of our feed stream. We may file additional patent applications or seek other forms of intellectual property protection in the future.

Current report

There can be no assurance that any patent applications will result in issued patents, that any issued patents will provide meaningful protection, that our claims will be broad enough to prevent competitors from developing competing technologies, that our intellectual property will not be challenged, designed around, invalidated or circumvented, or that we will be able to enforce our rights cost-effectively. We also may rely on trade secrets, know-how, confidentiality obligations and other non-patent protections that may be difficult to protect or enforce. If we are unable to develop, obtain, protect or enforce intellectual property or proprietary know-how that is important to our business, our competitive position, commercialization strategy, ability to partner with customers or strategic parties and long-term prospects could be adversely affected.

Current report

Mineral resources are not mineral reserves and have not demonstrated economic viability. Measured and indicated mineral resources may never be converted into mineral reserves, and inferred mineral resources have a lower level of geological confidence and may not be considered in assessing economic viability under Regulation S-K 1300. Mineral reserves depend on numerous modifying factors, including pricing, recovery, costs, permitting, infrastructure, market demand, taxes, royalties, inflation, financing, metallurgical performance, wellfield design, environmental requirements and other assumptions, any of which may prove inaccurate or change over time.

Current report

Future FEL-3 work, technical studies, market studies, updated reserve or resource estimates, permitting requirements, financing requirements or other work could result in materially different project economics, higher costs, longer timelines, reduced reserves or resources, impairment of assets or a decision not to proceed with some or all of the Project as currently contemplated.

Current report

The PFS and any updated technical report summary are not final feasibility studies and remain subject to further engineering, design refinement, technical validation, permitting, financing, market studies, cost estimation and commercial development work and we may incur higher costs and lower economic returns than estimated. The PFS, updated technical report summary, mine plan, reserves, capital costs, operating costs, production profile, recoveries, pricing assumptions, co-product assumptions, schedule and other assumptions may change as FEL-3 engineering and related work progresses.

Current report

Estimates relating to the development of the Project and mine plan are uncertain, including estimates related to capital expenditures, operating costs, wellfield design, horizontal wells, injection and recovery configurations, recovery rates, processing requirements, energy infrastructure, natural gas supply, evaporation ponds, co-products, labor, logistics, permitting, financing costs and the timing of commercial production. We are now targeting initial commercial production in 2030, but this target may not be achieved and is contingent upon progressing through FEED engineering by January 2027 and securing the necessary financing to commence construction in January 2028. Delays may result from financing, engineering, permitting, procurement, construction, commissioning, technical validation, customer qualification, offtake, market conditions, supply-chain constraints, labor availability, litigation, regulatory changes or other factors.

Current report

In addition, the Project is based on in-situ leaching and chemical processing at a scale that we have not previously achieved. The ultimate commercial wellfield design, use of horizontal wells, recovery rates, solution chemistry, scaling, impurity management, acid consumption, evaporation and crystallization performance and commercial-scale processing results may differ materially from our current expectations, including those based on the SSF, historical pilot operations, step-rate testing, customer samples or other technical work. If our assumptions prove inaccurate, or if future technical studies or commercial-scale operations produce results that differ from expectations, we may be required to redesign portions of the Project, incur additional costs, delay development, reduce expected production, revise reserve or resource estimates or determine not to proceed with the Project as currently contemplated.

Current report

Further, because the PFS capital estimate and Project economics depend on assumptions that may change, investors should not place undue reliance on such estimates as guarantees of future results. Actual costs, revenues, cash flows, returns, production volumes, recoveries, mine life and schedule could differ materially from current estimates and could adversely affect our business, financial condition and prospects.

Current report

changes in tonnage, grades, metallurgical characteristics, recovery rates, solution chemistry or other technical assumptions;

Current report

adverse geological, geotechnical, hydrological, wellfield, processing or operating conditions;

Current report

inflation, tariffs, taxes, royalties, interest rates, trade policies, regulatory changes or changes in financing availability or terms;

Current report

delays in obtaining environmental, land-use or other government permits, approvals, amendments or authorizations;

Current report

health and safety issues, pandemics or infectious diseases;

Current report

Our growth depends upon demand for borates, lithium, calcium chloride, gypsum and related products in the markets we seek to serve, and such demand may not develop as we expect.

Current report

Demand for our potential products could be affected by numerous external factors, including customer specifications, substitution by alternative materials, technological changes, government regulations and incentives, trade policies, customer adoption, capital investment cycles, macroeconomic conditions, end-market growth rates, competitive pricing, geopolitical conditions and the ability of incumbent producers to respond to new supply.

Current report

Because we have not yet begun commercial-scale production of mineral products, we currently do not have any fully binding long-term supply or offtake agreements with customers. We have, and may continue to enter into heads of agreement, letters of intent, memoranda of understanding, purchase orders, trial shipment arrangements, qualification arrangements or other commercial arrangements with potential customers, but these arrangements may be non-binding, conditional or otherwise subject to further negotiation and may not result in definitive offtake agreements, revenue, pricing, margins, minimum volumes or financing support.

Current report

We expect certain commercial heads of agreement to include important commercial terms, including potential products, volumes, specifications, pricing mechanisms, delivery periods and other matters, but they are expected to be subject to conditions, including achieving project financing. These arrangements may also be subject to further negotiation, modification or replacement, including based on lender, underwriter, strategic investor or other financing-source feedback. If the terms of such arrangements are not viewed as bankable or otherwise sufficient to support financing, we may need to renegotiate such terms, seek different commercial arrangements or pursue other financing strategies, any of which could delay or adversely affect our business plan.

Current report

Customer qualification is an important step toward commercialization, but successful qualification of boric acid or other products produced from the SSF does not guarantee that any customer will enter into a binding offtake agreement, purchase product in commercial quantities, accept commercial-scale production, agree to favorable pricing or provide financing support. Customers may require additional testing, validation or requalification of products produced at commercial scale, even if they have qualified SSF-produced products, and such additional qualification may delay or reduce expected sales.

Current report

Potential definitive offtake agreements may contain fixed pricing, formula-based pricing, index-linked pricing, inflation-adjusted pricing, price collars, floors, ceilings, volume commitments, quality specifications, delivery obligations, termination rights, force majeure provisions, penalties, financing conditions or other terms that could reduce expected economics, increase operational risk or limit our flexibility. If we are unable to enter into definitive offtake agreements on acceptable terms, or if we are unable to deliver product under such agreements after they are executed, our business, results of operations, ability to obtain financing and financial condition could be materially and adversely affected.

Current report

If the estimates and assumptions we use to determine market demand, market size and pricing are inaccurate, our future growth rate and Project economics may not be accurate or may be adversely affected.

Current report

Boric acid and many borate products are not exchange-traded commodities, and third-party published pricing indices and market studies may not fully reflect realized pricing, contract-specific terms, customer specifications, regional dynamics, freight, logistics, product quality, price floors or ceilings, inflation adjustments, customer concentration or long-term market conditions. If the price, demand, market size, growth trajectory or marketability of boric acid, calcium chloride, gypsum, lithium or other potential products differs from our expectations, our ability to obtain financing, enter into offtake agreements, support reserves, achieve expected Project economics or develop our business could be adversely affected.

Current report

The Phase 1 plan currently contemplates a natural gas combined heat and power or cogeneration facility rather than reliance on a Southern California Edison interconnection for commercial-scale power. If we proceed with such a facility, we will be dependent on natural gas supply, pipeline connection, construction, permitting, equipment procurement, commissioning, emissions compliance, operating performance and long-term energy costs. Growing demand for on-site power generation driven by the rapid expansion of artificial intelligence and other data center activity could significantly increase the cost and reduce the availability of the cogeneration equipment we anticipate procuring for such a facility. Any inability to secure reliable and cost-effective energy, complete required energy infrastructure, operate the cogeneration facility as expected, or manage energy-related permitting or emissions obligations could delay or increase the cost of developing and operating the Project.

Current report

Although we believe the major permits and approvals required for the Project are currently in place, Phase 1 development and commercial-scale operations may require additional permits, permit amendments, modifications, renewals, authorizations, bonding or agency approvals, including modifications to our EPA permit to address different wellfield designs and the permitted term or period of operations. Regulators may disagree with our interpretation of the scope, timing or nature of required permit modifications or may impose conditions that increase costs or delay development. Any failure to obtain, maintain or comply with such permits, permit modifications or approvals could adversely affect our ability to develop or operate the Project.

Current report

Our ability to develop, construct and operate the Project will depend on the availability, timing, cost, quality and performance of equipment, materials and services, including long-lead or specialized equipment such as crystallizers, cogeneration equipment, pumps, wellfield materials, electrical components, processing equipment, steel, acid and reagents, construction materials and engineering and construction services. Shortages, delays, quality issues, cost increases, vendor failures, logistics constraints, tariffs, geopolitical events or other supply-chain disruptions could increase costs, delay FEL-3, construction or commissioning, require design changes, or otherwise adversely affect our business. In particular, growing demand for on-site power generation driven by the rapid expansion of artificial intelligence and other data center activity could significantly increase the cost, and reduce the availability, of the cogeneration equipment we anticipate procuring for the Project, which could materially increase our capital costs or delay the development and construction of the Project.

Current report

The borates industry is concentrated and includes large, established and well-funded competitors. Competitors may have substantially greater financial, technical, operational, customer, logistical, marketing and other resources than we do. Existing producers may respond to our development plans or new supply by adjusting prices, increasing output, expanding capacity, changing contract terms, leveraging customer relationships or otherwise competing in ways that make it more difficult for us to obtain financing, enter into offtake agreements, achieve expected pricing or operate the Project economically.

Current report

If current or future competitors increase production, lower prices, secure long-term customer commitments, develop substitute products, improve processing technology or otherwise satisfy demand that we expect to serve, our ability to develop the Project, obtain financing, execute offtake agreements, sell product or achieve expected economics could be materially adversely affected.

Current report

We are subject to evolving and potentially diverging sustainability and climate-related disclosure views and expectations from regulators, investors, customers and other stakeholders. Although federal climate disclosure requirements remain subject to change, we operate in California and may be affected by state-level requirements, customer requirements, investor expectations and broader market practices. Compliance with new or evolving requirements may require additional controls, data collection, third-party support, disclosure processes and management attention, and any failure to meet or timely meet applicable requirements or stakeholder expectations could result in increased costs, litigation, enforcement, reputational harm or other adverse effects. Moreover, if we are effective at addressing such matters, we may also attract negative attention from stakeholders and regulators with diverging views on ESG and sustainability.

Current report

Although major permits and approvals for the Project are in place, Phase 1 development and commercial-scale operations may require additional permits, permit amendments, modifications, renewals, authorizations and bonding, including modifications to the EPA permit to address different wellfield designs and the permitted term or period of operations, and approvals related to evaporation ponds, waste discharge requirements, air permits, construction and occupancy permits and other matters. We cannot assure you that required permits, amendments or approvals will be obtained or maintained on acceptable terms or in a timely manner, or that regulators will agree with our interpretation of the approvals required. Any delay, denial, modification, appeal, challenge or failure to comply with permits could delay, limit or prevent our development plans or operations and could materially adversely affect our business.

Current report

We may from time to time be subject to claims, litigation, arbitration, regulatory proceedings, governmental inspections, audits or investigations arising in the ordinary course of business, including matters relating to commercial disputes, vendors, contractors, employees, securities laws, permits, title, environmental matters, intellectual property or other matters. In addition, we may also be subject to class action lawsuits, including those alleging violations of the Fair Labor Standards Act and state and municipal wage and hour laws. Even if we ultimately prevail, such proceedings may require significant management attention and expense. An adverse ruling, settlement or other resolution could have a material adverse effect on our business, financial condition, cash flows or results of operations.

Current report

Compliance with ever-evolving federal and state laws and other requirements relating to the processing of information about individuals necessitates significant expenditure and resources, and any failure by us or our vendors to comply may result in significant liability, negative publicity, and/or an erosion of trust, which could materially adversely affect our business, results of operations, and financial condition.

Current report

In connection with running our business, we receive, store, use and otherwise process information that relates to individuals and/or constitutes “personal data,” “personal information,” “personally identifiable information,” or similar terms under applicable data privacy laws (collectively, “Personal Information”), including from and about actual and prospective customers, as well as our employees and business contacts. We also depend on third-party vendors in relation to the operation of our business, a number of which process Personal Information on our behalf.

Current report

We and our vendors are subject to a variety of federal and state data privacy laws, rules, regulations, industry standards and other requirements, including those that apply generally to the processing of Personal Information, and those that are specific to certain industries, sectors, contexts, or locations. These requirements, and their applications, interpretations and amendments, are constantly evolving. It is also possible that new laws, regulations and other requirements, or amendments to or changes in interpretations of existing laws, regulations and other requirements, may require us to incur significant costs, implement new processes, or change our processing of information and business operations, which could ultimately hinder our ability to grow our business by extracting value from our data assets.

Showing the first 40 of 81 passages. Open the source sections for the rest.

Removed paragraphs (84)

Previous report

Obtaining additional funding will be subject to various additional factors, including investor acceptance of our business plan, the status of our development program and ongoing results from our exploration and development efforts. If we are not able to secure adequate additional funding when needed, we will need to re-evaluate our operating plan and may be forced to make significant reductions in spending, extend payment terms with suppliers, liquidate assets where possible, limit, suspend or curtail planned development programs and cease operations entirely. Having insufficient funds may also require us to relinquish rights to assets and technology that we would otherwise prefer to develop ourselves, or on less favorable terms than we would otherwise choose. The foregoing actions and circumstances could materially adversely impact our business, liquidity, results of operations and future prospects.

Previous report

Any such required financing may not be available in amounts or on terms acceptable to us or at all, and the failure to procure such required financing could have a material and adverse effect on our business, financial condition and results of operations, or threaten our ability to continue as a going concern. In addition, if we are unsuccessful in raising the required funds, we may need to modify our operational plans to continue as a going concern, and we may have to delay, reduce the scope of or eliminate some or all of our planned development activities or proposed exploration and development programs at the Project. In the event additional capital resources are unavailable, we may also be forced to sell some or all of our properties in an untimely fashion or on less than favorable terms. Any of these factors could harm our operating results.

Previous report

Until successful commercial production is achieved from the Project, allowing for the generation of sufficient revenue to fund our continuing operations, we will continue to incur operating and investing net cash outflows associated with, among other things, developing the Project, maintaining our properties and undertaking ongoing exploration and optimization activities. As a result, we rely on access to capital markets as a source of funding for our capital and operating requirements. We require additional capital to fund our ongoing operations, including the operation of our Small-scale Facility (the “SSF”), progress engineering for our proposed commercial-scale facility, testing and analysis to further de-risk our wellfield design and bring the Project into production, which will require funds for construction and working capital. We cannot assure you that such additional funding will be available to us on satisfactory terms, or at all, or that we will be successful in commencing and maintaining commercial borates or byproduct extraction, production of advanced boron materials, or that our sales projections for these and other products will be realized.

Previous report

Depending on the type and the terms of any financing we pursue, shareholders’ rights and the value of their investment in our common stock, par value $0.01, (“Common Stock”) and CHESS Depositary Interests (“CDIs”) could be reduced. Any additional equity financing will dilute stockholdings, and new or additional debt financing, if available, may involve restrictions on financing and operating activities. In addition, if we issue secured debt securities, the holders of the debt would have a claim to our assets that would be prior to the rights of shareholders until the debt is paid. Interest on such debt securities would increase costs and negatively impact operating results. If the issuance of new securities results in diminished rights to holders of our Common Stock and CDIs, the market price of our Common Stock and CDIs could be negatively impacted. Any sale of securities will also need to comply with the applicable rules of the stock exchanges on which our securities are listed or quoted for trading. Further, strategic collaboration or royalty agreements may provide us with non-dilutive or minimally dilutive financing but adversely impact our future results of operations or capital resources. There is no guarantee that we will be able to secure any additional funding or be able to secure funding which will provide us with sufficient funds to meet our objectives, which may adversely affect our business and financial position.

Previous report

If we do not obtain additional financing and maintain sufficient funds to continue our ongoing development and proposed operations, our proposed business may be at risk or the execution of our business plan may be delayed.

Previous report

We have limited assets upon which to develop and commence our business operations and to rely otherwise. As of June 30, 2025 and June 30, 2024, we had cash and cash equivalents of $3.8 million and $4.9 million, respectively. We have had recurring net losses from operations and an accumulated deficit of $231.6 million as of June 30, 2025 and $200.0 million as of June 30, 2024. Given our net losses and with only these funds, we will need to seek significant additional funds in the future through equity or debt financings, or strategic alliances with third parties, either alone or in combination with debt or equity financings to fund our business plan and to complete our mining exploration initiative. Our business plan, which includes the development of the Project, has required and will continue to require substantial capital expenditures. We will require financing to fund our planned pre-production activities and are required to raise additional capital in respect of continuing our proposed mining exploration program, pre-production activities, legal, operational set-up, general and administrative, marketing, employee salaries and other related expenses.

Previous report

The scope of our current business plan for the next 12 months includes, among other things: operation of the SSF to provide the necessary data for our commercial-scale facility, progress our customer qualification program and validate our wellfield design and operational plans; progress FEL-3 and the related detailed engineering and vendor testing; optimize well-field design and operating plan in an effort to reduce future mining capital and operational expenditures through various drilling techniques such as directional, horizontal, and radial drilling; pursue and optimize infrastructure capital expenditures for our larger-scale facility which could include expansion of non-potable water resources, upgrading shore power, connection to a natural gas network, preparing certain lands for the construction of the proposed commercial-scale facility, and constructing new access roads into and out of the location for our proposed commercial-scale facility; and further define our advanced boron materials strategy with consideration to engineering and repurposing our SSF once sufficient data has been obtained for flow sheet optimization and the production of product for customer qualification. It will be necessary for us to obtain additional financing during the next 12 months for us to fund and achieve the full scope of our current business plan. Further, we have incurred net losses and negative operating cash flows in each quarter since our inception and expect to incur significant losses in future periods as we continue to increase our expenses to pursue the development of our business.

Previous report

Additional development work will be required beyond the scope of our current 12-month business plan in order to optimize, design and engineer operational processes at our proposed commercial-scale facility at the Project, which we expect will assist in our technical and economic analysis of the Project. Such additional development work may include additional drilling and detailed engineering work, continued operation of the SSF to provide the necessary data for our commercial-scale facility, tests of our wellfield design and operational plans, and progression of our customer qualification program, among others. We expect to source the capital needed for such additional development work from additional capital raises or other financing activities.

Previous report

Our ability to raise additional funds may also be adversely impacted by an economic slowdown, higher inflation, increased interest rates, supply chain issues, diminished liquidity and credit availability, declines in consumer confidence, declines in economic growth, increases in unemployment rates, uncertainty about economic stability and uncertainty about economic policy, including tariffs. If the equity and credit markets deteriorate, it may make any necessary debt or equity financing more difficult, more costly and more dilutive.

Previous report

Certain market disruptions may increase our cost of borrowing or affect our ability to access one or more financial markets. Such market disruptions could result from:

Previous report

adverse economic conditions;

Previous report

adverse general capital market conditions;

Previous report

poor performance or cyclical decline of the borates, or mining industries in general;

Previous report

bankruptcy or financial distress of unrelated companies or marketers engaged in the borates industry;

Previous report

significant decrease in demand for borates; or

Previous report

adverse regulatory actions that affect our development and construction plans or the use of borates generally.

Previous report

Our previous development plans were focused on boron and SOP extraction and developing a commercial-scale complex without first developing a smaller scale pilot facility, such as the SSF. During 2023, we updated our business plan with three phases of scaled production which represented a change in project scope compared to previous business plans. Our business plan now includes:

Previous report

a focus on boron (as opposed to boron and SOP under our previous plans) and calcium-based co-products.

Previous report

Phase 1 targets production of 130,000 short tons per annum of boric acid with calcium byproducts of calcium chloride and gypsum, with targeted initial commercial production in the second half of calendar year 2028.

Previous report

Expansion phases of additional tonnage of borates and calcium based co-products, advanced boron materials, and economically accretive byproducts.

Previous report

In addition, the capital expenditures related to our proposed commercial-scale facility continue to be subject to change as our technical and economic analysis progresses. Such changes could also be material, including without limitation as a result of potential future price increases for major equipment or labor, and future operating data from our SSF which may result in changes in the design and engineering of our proposed commercial-scale facility. The foregoing factors may lead to materially higher costs, delays or the inability to complete our proposed commercial-scale facility as planned or on commercially reasonable terms or at all. Furthermore, future operating data from the SSF during FEL-3 engineering may provide reason for a change or changes to the engineering for our proposed commercial-scale facility, resulting in a difference in the expected total capital expenditures and ongoing required operating expenditures related thereto. As a result, depending on the timing, nature, quality and specificity of the data we receive from the ongoing operation of the SSF, we may require significant additional capital before we can progress the development of our proposed commercial-scale facility. Such additional capital may be needed to fund further detailed engineering work, including engineering work to define, with a reasonable degree of certainty, the capital expenditures required for our proposed commercial-scale facility and in particular related to equipment and drilling. We may also need additional capital for continued operation of the SSF to prepare boric acid for our customer qualification program, continued testing and analysis of our wellfield to finalize its commercial-scale design, and to evaluate data and design to complete detailed engineering work for the proposed commercial-scale facility. As a result, we can provide no assurance that we will be able to meet our expected timelines, capital expenditure and costs estimates with respect to either the ongoing operation of our SSF or proposed commercial-scale facility and we may need significant additional capital to pursue our operating plans, which capital may not be available to us on commercially reasonable terms or at all. Our inability to obtain any such required additional capital on commercially reasonable terms would have a material adverse impact on our business, operations, liquidity and financial position.

Previous report

Our inability to continue to operate the SSF, and our inability to complete further technical and economic studies with respect to the Project, may have a material adverse impact on the Project.

Previous report

Our inability to continue to operate the SSF may delay or prevent the completion of further technical and economic studies. Our ability to complete further technical and economic studies could materially and adversely impact the ability to secure additional funding and thereby delay or otherwise have a material adverse impact on the Project. If additional technical and economic studies are undertaken, the outcomes may not be favorable, and we may be unable to maintain commercial viability. Any further technical studies may also indicate that substantial additional financing will be required to complete the Project. We cannot give any assurance that we will be successful in completing any such financing or that such financing will be available to us if and when required or on satisfactory terms, or at all.

Previous report

In total, we have spent in excess of $156 million on the Project thus far, including resource drilling, monitoring wells, metallurgical test works, well injection tests, permitting activities, construction and operation of the SSF, pilot-scale test works and engineering of the commercial-scale facility. For the year ended June 30, 2025, our capital expenditures per our statement of cash flows were $2.1 million.

Previous report

Our business is capital intensive. Specifically, the extraction and recovery of borates and other potential byproducts, the mining costs, the maintenance of machinery and equipment, and the compliance with applicable laws and regulations, each require substantial operating and capital expenditures. Subject to the availability of adequate capital, we plan to continue to invest significant capital over the next several years on the development of the Project to bring it into production and will have to continue to invest capital to maintain or increase the amount of mineral reserves we hold and our rates of production once commercialization of the Project has occurred. Mining exploration is highly speculative in nature, involves many risks and is frequently unsuccessful. Development and production activities may involve many uncertainties and operating risks that could prevent us from realizing profits, putting pressure on our consolidated balance sheet and credit rating. Unforeseen issues, including increasing the required amount of capital expenditure necessary to bring the Project into production, the impact of volatility in the borates market and its derivatives, calcium chloride, gypsum and other prices, our ability to enter into supply contracts with buyers, and obstacles or complexities that could arise in the environmental or permitting process may cause us not to proceed with any one or a combination of these activities. Moreover, once mineralization is discovered, it may take a number of years from the initial phases of drilling before production is possible, during which time the economic feasibility of production may change. We previously targeted reaching initial commercial production in fiscal year 2026. Given the permitting hurdles and time to obtain final EPA approval and resource constraints in fiscal year 2024, we are now targeting to reach initial commercial production in the second half of calendar year 2028. This target continues to be dependent on a number of factors and assumptions, including obtaining the requisite funding for, and the successful construction of, our proposed commercial-scale facility, in addition to obtaining and maintaining applicable permits, and there can be no assurance that we will be able to meet any such target on time, on budget, or at all due to many factors including our limited experience in successful construction of similar projects, the complexity of the project, supply chain issues, higher costs, construction delays, cost overruns, planned and unplanned shutdowns, turnarounds, outages and other delays and interruptions. If and when production begins, no assurance can be given that we will be able to maintain our production levels or generate sufficient cash flow, capitalize a sufficient amount of our net profit or have access to sufficient equity investments, bank loan or other debt financing alternatives to fund our capital expenditure at a level necessary to continue our exploration and exp…

Excerpt shortened here; the source contains the full paragraph.

Previous report

The amounts and timing of expenditures will depend on the progress of ongoing development, the results of consultants’ analyses and recommendations, the rate at which operating losses are incurred, and other factors, many of which are beyond our control. Whether the mineral deposits we have discovered will be successfully extracted depends on a number of factors, which include, without limitation, the particular attributes of the deposit, prices for the minerals and the volatility of their respective markets, and governmental regulations. If we cannot complete development activities and commence and maintain mining operations, we may never generate revenues and will never become profitable.

Previous report

The Project may be delayed, more costly than anticipated or unsuccessful for many reasons, including declines in borate prices and its derivatives, calcium chloride, gypsum, and lithium carbonate, cost overruns, project implementation schedule slippage, shortages of or delays in the delivery of equipment or purpose-built components from suppliers, escalation in capital costs estimates, mechanical or technical difficulties, increases in operating costs structures, possible shortages of construction or other personnel, other labor shortages or industrial action, pandemic or localized epidemic, environmental occurrences during construction that result in a failure to comply with environmental regulations or conditions on development, or delays and higher-than expected costs, unanticipated natural disasters, accidents, miscalculations, unanticipated financial events, political or other opposition, litigation, acts of terrorism, operational difficulties or other events associated with such construction that may result in the delay, suspension or termination of the Project, resulting in further costs, the total or partial loss of our investment and a material adverse effect on our results of operations, financial performance and prospects.

Previous report

A key element of our long-term business strategy is to develop high-performance, borates and advanced boron materials that support downstream applications in the areas of clean energy infrastructure, electric transportation, and high-grade fertilizers among other end uses. To implement this strategy successfully, we may need to license certain intellectual property related to these downstream processes and/or develop the ability, or collaborate with, purchase or form a joint venture with commercial partners. In addition, other licenses that may be necessary for some of these downstream processing steps have not yet been obtained. Any failure to establish or maintain collaborative, joint venture or licensing arrangements for the production of borates, calcium chloride, gypsum, lithium or other specialty products on favorable terms could adversely affect our business and prospects. No assurances can be given that we will be able to successfully license any such intellectual property, or that we will be able to do so on favorable terms. If we materially breach the obligations in any future licensing agreements, the licensor typically has the right to terminate the license and we may not be able to market products that are covered by the license, which could adversely affect our competitive business position and harm our business prospects. In addition, any claims brought against us by any future licensors could be costly and time-consuming and would divert the attention of our management and key personnel from our business operations.

Previous report

We are engaged in the business of exploring and developing mineral properties with the intention of locating economic deposits of minerals. Our property interests are at the pre-commercial-production stage. Accordingly, it is unlikely that we will realize profits in the short term, and we cannot assure you that we will realize profits in the medium to long term. Any profitability from our business in the future will be dependent upon development of an economic deposit of minerals and further exploration and development of other economic deposits of minerals, each of which is subject to numerous risks that are outside of our control.

Previous report

In addition, pre-production projects like the Project have no operating history upon which to base estimates of future operating costs and capital requirements. Project projections, such as any future estimates of reserves, mineral recoveries or cash operating costs will to a large extent be based upon the interpretation of geologic data, obtained from a limited number of mining data and other sampling techniques, and interpretation of market studies and estimates, which are subject to change. Actual operating costs and economic returns may materially differ from the costs and returns estimated, and accordingly, our financial condition, future results of operations, and cash flows may be negatively affected.

Previous report

changes in tonnage, grades and metallurgical characteristics of ore to be mined and processed;

Previous report

adverse geotechnical conditions;

Previous report

availability, supply and cost of water and power;

Previous report

fluctuations in inflation;

Previous report

availability and terms of financing;

Previous report

delays in obtaining environmental or other government permits or approvals or changes in the laws and regulations related to project development or operations;

Previous report

changes in tax laws, the laws and/or regulations around royalties and other taxes due to the local, state and federal governments and any royalty agreements;

Previous report

weather or severe climate impacts, including, without limitation, prolonged or unexpected precipitation, drought, wildfires and/or sub-zero and extreme temperatures;

Previous report

potential delays and restrictions in connection with health and safety issues, including pandemics and infectious diseases;

Previous report

potential challenges to mining activities or to permits or other approvals or delays in development and construction based on claims of disturbance of cultural resources or the inability to secure consent for such disturbance; and

Showing the first 40 of 84 passages. Open the source sections for the rest.

Reworded paragraphs (111)

Previous wording

Each of the risks described below should be carefully considered, together with all of the other information contained in this Annual Report on Form 10-K, before making an investment decision with respect to our securities. In the event of the occurrence, reoccurrence, continuation or increased severity of any of the risks described below, our business, financial condition or results of operations could be materially and adversely affected, and you may lose all or part of your investment. The risks included here are not exhaustive. Other sections of this Annual Report may include additional factors which could adversely affect our business and financial performance. New risks emerge from time to time and it is not possible for management to predict all such risks, nor can it assess the impact of all such risks on our business or the extent to which any risk, or combination of risks, may cause actual results to differ materially.

Current wording

Each of the risks described below should be carefully considered, together with all of the other information contained in this Annual Report, before making an investment decision with respect to our securities. In the event of the occurrence, reoccurrence, continuation or increased severity of any of the risks described below, our business, financial condition or results of operations could be materially and adversely affected, and you may lose all or part of your investment. The risks included here are not exhaustive. Other sections of this Annual Report may include additional factors which could adversely affect our business and financial performance. New risks emerge from time to time and it is not possible for management to predict all such risks, nor can it assess the impact of all such risks on our business or the extent to which any risk, or combination of risks, may cause actual results to differ materially.

Previous wording

There is substantial doubt regarding our ability to continue as a going concern. We will need to raise substantial additional funding, which may not be available on acceptable terms, if at all, to be able to continue as a going concern and advance our Project.

Current wording

There is substantial doubt regarding our ability to continue as a going concern. We will need to raise substantial additional funding, which may not be available on acceptable terms, if at all, to continue as a going concern and advance the Project.

Previous wording

There is substantial doubt regarding our ability to continue as a going concern. Our existence in our current form is dependent upon our ability to obtain additional capital. Our cash and cash equivalents as of the date of this report will not be sufficient for us to continue as a going concern or to fund our long-term operations. Raising funds in the current economic environment is challenging and financing may not be available in sufficient amounts or on acceptable terms, if at all. The issuance of additional securities, whether equity or debt, or the possibility of such issuance, or the securing of financing that investors consider to be unfavorable to us, may cause the market price of our shares to decline. The sale of additional equity or debt securities may dilute the ownership of existing shareholders.

Current wording

There is substantial doubt regarding our ability to continue as a going concern. Our existence in our current form is dependent upon our ability to obtain additional capital. In addition, if the pending Acquisition of assets from SVM described elsewhere in this Annual Report is consummated, our capital requirements will increase, including the remaining cash consideration payable by us at the consummation of the Acquisition (the “Closing”), our transaction costs and our working capital and operating requirements of the acquired business. Our cash and cash equivalents, including liquidity improvement resulting from our February 2026 financing, as of the date of this Annual Report will not be sufficient for us to continue as a going concern or to fund our long-term operations and proposed development of the Project. Raising funds in the current economic environment has been and continues to be challenging, and financing may not be available in sufficient amounts or on acceptable terms, if at all. The issuance of additional securities, whether equity or debt, including pursuant to the Acquisition, or the possibility of such issuance, or the securing of financing that investors consider to be unfavorable to us, may cause the market price of our shares to decline. The sale of additional equity or debt securities would dilute the ownership of existing stockholders.

Previous wording

We will need to obtain additional financing to continue as a going concern and to continue our ongoing development and proposed operations.

Current wording

We will need to obtain substantial additional financing to continue as a going concern, advance FEL-3 and related technical work, and develop the proposed commercial-scale facility.

Previous wording

We have limited assets upon which to develop and commence our business operations and to rely otherwise. We will need to seek significant additional funds in the future through equity or debt financings, government funding or grants, private capital, royalty agreements or customer prepayments, or other strategic alliances with third parties, either alone or in combination to fund our business plan and to complete our mining exploration initiative. Our business plan, which includes the development of the Project, has required and will continue to require substantial capital expenditures. We will require financing to fund our engineering phases, development, construction, and initial commercial production activities and are required to raise additional capital in respect of continuing our proposed mining exploration program, pre-production activities, legal, operational set-up, general and administrative, marketing, employee salaries and other related expenses. For example, as previously disclosed, in September 2024, we received a non-binding letter of intent from the Export-Import Bank of the United States (“EXIM”) for a loan-backed guarantee on project debt financing of up to $285 million for our proposed commercial-scale facility. We have had continued engagement with representatives from EXIM on the loan package, but we cannot make any assurances that the loan package will be finalized on a timely basis, on the currently proposed terms, or at all.

Current wording

We have limited assets upon which to develop and commence our business operations and to rely otherwise. We will need to seek significant additional funds in the future through one or more equity financings, debt financings, strategic investments, government funding or grants, project-level financing, royalty arrangements, customer prepayments, offtake-linked financing, commercial arrangements or other strategic alliances with third parties, either alone or in combination. Our business plan, which includes the development of the Project, has required and will continue to require substantial capital expenditures. We will require financing to fund continued operation of our Small-Scale Facility (the “SSF”), FEL-3 engineering, additional technical and design work, customer qualification and commercial development activities, corporate overhead, construction, commissioning, initial commercial production and working capital requirements.

Previous wording

If we are unable to raise adequate funds, we may have to delay, reduce the scope of or eliminate some or all of our business plan expenditures, and the failure to procure such required financing could have a material and adverse effect on our business, liquidity, financial condition and results of operations as well as our ability to continue as a going concern. If we are unable to continue as a going concern, we might have to liquidate our assets and the values we receive for our assets in liquidation or dissolution could be significantly lower than the values reflected in our financial statements. The inclusion of the going concern explanatory paragraph by our auditors, our lack of cash resources and our potential inability to continue as a going concern may materially adversely affect our business, share price, and our ability to raise new capital or to enter into critical contractual relations with third parties due to concerns about our ability to meet our contractual obligations.

Current wording

If we are unable to raise adequate funds, we may have to delay, reduce the scope of or eliminate some or all of our business plan expenditures, including FEL-3, wellfield optimization, customer qualification, development of our proposed Commercial-Scale Facility or operation of the SSF, and the failure to procure such required financing could have a material and adverse effect on our business, liquidity, financial condition, results of operations and ability to continue as a going concern. If we are unable to continue as a going concern, we might have to liquidate our assets and the values we receive for our assets in liquidation or dissolution could be significantly lower than the values reflected in our financial statements.

Previous wording

We had an accumulated deficit of $231.6 million as of June 30, 2025, and we expect to incur significant discovery and development expenses in the foreseeable future related to the completion of development and commercialization of the Project. As a result, we expect we will continue to sustain substantial operating and net losses, and it is possible that we will never be able to sustain or develop the revenue levels necessary to attain profitability. If we are unable to raise sufficient capital when needed, our business, financial condition and results of operations could be materially and adversely affected, and we may need to modify our operational plans. In addition, if we were unable to raise sufficient capital in the future, it may be determined that we would be unable to continue as a going concern, which could have a further material adverse impact on our business and financial condition.

Current wording

We had an accumulated deficit of $274.5 million as of June 30, 2026, and we expect to incur significant development, engineering, operating and corporate expenses for the foreseeable future related to the completion of development and commercialization of the Project. As a result, we expect we will continue to sustain substantial operating and net losses, and it is possible that we will never be able to sustain or develop the revenue levels necessary to attain profitability. If we are unable to raise sufficient capital to continue operating and developing the Project, our business, financial condition and results of operations could be materially and adversely affected.

Previous wording

The SSF is our smaller scale boron facility which serves as a foundation for future design, engineering, and cost optimization for our proposed commercial-scale facility at the Project. We believe that the continued successful operation of the SSF is an important path to obtaining critical information that will help enable us to optimize the efficiency, output and economic profile of our proposed commercial-scale facility. While the SSF has been operational for more than a year, it continues to provide valuable data and information to enhance the detailed engineering of the proposed commercial-scale facility, operational processes and operating expenditures.

Current wording

The SSF is our smaller-scale boron facility and serves as a demonstration and validation facility for the design, engineering, customer qualification, operating assumptions and cost optimization for our proposed Commercial-Scale Facility at the Project. We believe the SSF has provided and may continue to provide valuable data and information to enhance detailed engineering, product qualification, wellfield design and operational processes for the proposed Commercial-Scale Facility.

Previous wording

The ongoing operation of the SSF, learnings, and data collection are being undertaken in parallel with the engineering process of the proposed commercial-scale facility. This approach has a higher risk of re-work of certain portions of the Project, as information and data we receive may cause us to revise or redesign portions of the proposed commercial-scale complex, causing potential delays and increased design costs. Further, additional technical and economic studies may be required to assist in determining the economic recoverability of mineral resources for the Project. An abbreviated process development approach may also lead to technical risk, and higher capital and operating expenditures. We cannot assure you that the proposed commercial-scale facility at the Project will be completed on schedule, within budget or at all, or achieve an adequate return on investment. We are also a newly formed company which makes it more difficult for you to evaluate our track record of meeting various milestones or target completion deadlines.

Current wording

The ongoing operation of the SSF, learnings and data collection are being undertaken in parallel with the engineering process for the proposed Commercial-Scale Facility. This approach has a higher risk of re-work of certain portions of the Project, as information and data we receive may cause us to revise or redesign portions of the proposed commercial-scale complex, causing potential delays and increased design costs. Additional technical and economic studies, including FEL-3 engineering, may be required to assist in determining the economic recoverability of mineral resources and reserves for the Project. An abbreviated process development approach may also lead to technical risk, and higher capital and operating expenditures. We cannot assure you that the proposed Commercial-Scale Facility at the Project will be completed on schedule, within budget or at all, or achieve an adequate return on investment. We are also a newly formed company which makes it more difficult for you to evaluate our track record of meeting various milestones or target completion deadlines.

Previous wording

Further, the ongoing operation of the SSF is maintenance intensive, requires us to incur operating costs including labor and raw materials, among others, and may require additional capital expenditures to replace existing equipment, to test proposed designs or processes or evaluate modifications to our processes. We cannot assure you that we will have access to sufficient capital to continue the operation of the SSF, or that such costs and expenditure will result in a positive economic outcome for the Project.

Current wording

The SSF is maintenance intensive, requires us to incur operating costs including labor and raw materials, and may require additional capital expenditures to replace existing equipment, test proposed designs or processes or evaluate modifications to our processes. We cannot assure you that we will have access to sufficient capital to continue operation of the SSF, or that such costs and expenditures will result in a positive economic outcome for the Project. We also may not need to operate the SSF for an extended period if key technical, customer qualification or other objectives have been achieved, and we may elect or be required to curtail, idle, place on care and maintenance or decommission the SSF. Any such decision, or any other facts and circumstances indicating that the carrying value of the SSF or related assets is not recoverable, could result in impairment charges.

Previous wording

We have invested and, subject to availability of adequate capital, plan to continue to invest significant amounts of capital in the Project on exploration and development activities, which involve many uncertainties and future operating risks that could prevent us from realizing profits on expected timeframes or at all.

Current wording

We have invested and, subject to availability of adequate capital, plan to continue to invest significant amounts of capital in the Project.

Previous wording

We may be unable to develop or acquire certain intellectual property required to implement our business strategy successfully.

Current wording

We may be unable to develop, protect, obtain or acquire intellectual property required to implement our business strategy successfully.

Previous wording

Third parties may claim that we infringe on their proprietary intellectual property rights, and resulting litigation may be costly, result in diversion of management’s time and efforts, require us to pay damages or prevent us from marketing our future products.

Current wording

Third parties may claim that we infringe on their proprietary intellectual property rights, and resulting litigation may be costly and could prevent or delay our development activities.

Previous wording

Our commercial success will depend in part on not infringing, misappropriating or violating the intellectual property rights of others. From time to time, we may be subject to legal proceedings and claims, including claims of alleged infringement of trademarks, copyrights, patents and other intellectual property rights held by third parties. In the future, third parties may sue us for alleged infringement of their proprietary or intellectual property rights. We may not be aware of whether our products do or will infringe existing or future patents or the intellectual property rights of others. Any litigation in this regard, regardless of outcome or merit, could result in substantial costs and diversion of management and technical resources as well as harm to our brand, any of which could adversely affect our business, financial condition and results of operations. If the party claiming infringement were to prevail, we could be forced to discontinue the use of the related technology or design and/or pay significant damages unless we enter into royalty or licensing arrangements with the prevailing party or are able to redesign our products or processes to avoid infringement. Any such license may not be available on reasonable terms, if at all, and there can be no assurance that we would be able to redesign our products or processes in a way that would not infringe the intellectual property rights of others. In addition, any payments we are required to make and any injunction we are required to comply with as a result of such infringement could harm our reputation and financial results.

Current wording

Our commercial success will depend in part on not infringing, misappropriating or violating the intellectual property rights of others. From time to time, we may be subject to legal proceedings and claims, including claims of alleged infringement of trademarks, copyrights, patents and other intellectual property rights held by third parties. In the future, third parties may sue us for alleged infringement of their proprietary or intellectual property rights. We may not be aware of whether our products do or will infringe existing or future patents or the intellectual property rights of others. Any litigation in this regard, regardless of outcome or merit, could result in substantial costs and diversion of management and technical resources as well as harm to our brand, any of which could adversely affect our business, financial condition and results of operations. If the party claiming infringement were to prevail, we could be forced to discontinue the use of the related technology or design and/or pay significant damages unless we enter into royalty or licensing arrangements with the prevailing party or are able to redesign our products or processes to avoid infringement. Any such license may not be available on reasonable terms, if at all, and there can be no assurance that we would be able to redesign our products or processes in a way that would not infringe the intellectual property rights of others. In addition, any payments we are required to make and any injunction we are required to comply with as a result of such infringement could harm our reputation and financial results. In addition, as we seek to protect and commercialize proprietary technologies, including in-situ extraction, closed-loop processing, wellfield designs, product processing and advanced boron materials, competitors or other third parties may assert that our processes, equipment, products, know-how or patent applications infringe or otherwise violate their intellectual property rights. Any such claims, whether or not meritorious, could require us to incur substantial legal costs, divert management attention, delay development, require changes to our processes or products, require licenses that may not be available on acceptable terms or at all, or otherwise adversely affect our business.

Previous wording

All of our operations are at the development stage and there is no guarantee that any such activity will result in commercial production. Although a certain amount of drilling has been conducted at the Project to date, the evaluation of the final mine plan is not yet complete, relies upon the ongoing operation of the SSF, horizontal wells, and we can provide no assurance that the evaluation of horizontal drilling will result in favorable outcomes that support that our proposed mine plans are feasible to develop the Project. Significant additional drilling and mine design activities could be required to develop the Project.

Current wording

All of our operations are at the development-stage and there is no guarantee that any such activity will result in commercial production. Although a certain amount of drilling has been conducted at the Project to date, the evaluation of the final mine plan is not yet complete. Significant additional drilling and mine design activities could be required to develop the Project.

Previous wording

During August 2025, we advanced our Project from the exploration stage by filing a Preliminary Feasibility Study, resulting in the conversion of certain measured and indicated resources into proven and probable reserves. Despite this advancement, there remains considerable uncertainty in our resource and reserve estimates due to the inherent risks and subjective judgments involved in such assessments. Investors should not assume that the mineral reserve and resource estimates described under “Properties–Mineral Resource Estimate” and “Properties–Mineral Reserve Estimate” will be fully or economically extracted. Although certain mining and processing activities have been completed at the Project to date, additional drilling activities may be necessary to validate our wellfield design and operational plan for the commercial-scale facility, which serve as the basis for our estimates of mineral resources and reserves in our Preliminary Feasibility Study, and additional drilling will be necessary to construct the wellfield that will supply the commercial-scale facility. Each of these activities may result in changes to our estimates of mineral resources and reserves.

Current wording

During August 2025, we advanced our Project from the exploration stage by filing a Preliminary Feasibility Study, resulting in the conversion of certain measured and indicated resources into proven and probable reserves for boric acid. An updated PFS and technical report summary is included as an exhibit to this Annual Report. Despite this advancement, there remains considerable uncertainty in our resource and reserve estimates due to the inherent risks and subjective judgments involved in such assessments. Investors should not assume that the mineral reserve and resource estimates described under “Properties–Mineral Resource Estimate” and “Properties–Mineral Reserve Estimate” will be fully or economically extracted.

Previous wording

The Project deposit has had a significant amount of prior drilling and is the subject of at least four separate historic mineral resource estimates, including a 2018 initial feasibility study prepared for ABR prepared according to the Joint Ore Reserves Committee (the “JORC Code”), a second feasibility study originally released in April 2020 and updated further in February 2021 also prepared for ABR in accordance with the JORC Code, an amended initial assessment report released by us in May 2023 and further revised in February 2024, and a Preliminary Feasibility Study released by us in August 2025. None of the prior ABR mineral resource estimates were Regulation S-K 1300 compliant, and each report resulted in a different amount of mineral resource estimates. The Preliminary Feasibility Study released in August 2025, contains a combined 5.3 million short tons of proven and probable reserves of H 3 BO 3, using a 2.0% cut-off grade for B 2 O 3. Additional time and expenditures are required to commercially mine and to construct, complete and install mining and processing facilities in those properties that are actually mined and developed. Any expenditure that we may make in the development of any refined borates and advanced boron materials may not result in the discovery of any commercially exploitable mineral deposits or such advanced boron materials.

Current wording

The Project deposit has had a significant amount of prior drilling and has been the subject of multiple prior mineral resource estimates, including a 2018 initial feasibility study prepared for ABR according to the Joint Ore Reserves Committee (the “JORC Code”), a second feasibility study originally released in April 2020 and updated further in February 2021 also prepared for ABR in accordance with the JORC Code, and an amended initial assessment report released by us in May 2023 and further revised in February 2024. None of the prior ABR mineral resource estimates were Regulation S-K 1300 compliant, and such prior estimates resulted in different mineral resource estimates. Investors should not rely on such historic estimates as current estimates under Regulation S-K 1300. Our current Regulation S-K 1300 disclosure is based on the PFS released by us in August 2025 and the updated PFS and technical report summary, with an effective date of June 30, 2026, included as Exhibit 96.1 to this Annual Report. Additional time and expenditures are required to commercially mine and to construct, complete and install mining and processing facilities for properties that are actually mined and developed. Any expenditure that we may make in the development of refined borates and advanced boron materials may not result in the discovery of commercially exploitable mineral deposits or such advanced boron materials.

Previous wording

The mineral reserve estimates stated in this filing and extracted from the Preliminary Feasibility Study represent the amount of boric acid that the QP in that report estimated could be economically and legally extracted or produced at the time of the mineral reserve determination. There can be no assurance that our disclosed mineral reserve estimates can be recovered and any material reductions in the quantity of mineral reserves or the related grades or increase in cost of production could have a material adverse effect on our business, financial condition or prospects. Estimates of resources and reserves are subject to considerable uncertainty, and the estimation of mineral resources and reserves are a subjective process. Such estimates are expressions of judgment based on knowledge, experience and industry practice at the time of the estimation and will be, to a large extent, based on the interpretations, which may be imprecise or which may later prove to be inaccurate, of geologic data obtained from drill holes and other exploration techniques and which may not necessarily be indicative of future results. Estimates made at a given time may change significantly in the future when new information becomes available. We expect that the estimates of resources and reserves will change to reflect such updated information. Resource and reserve estimates may be revised upward or downward based on the results of current and future drilling, testing or production levels, significantly lower borate prices as a result of a decrease in commodity prices, increases in operating costs, reductions in metallurgical recovery or other modifying factors, and this could result in material write-downs of our investment in mining properties and increased amortization, reclamation and closure charges. Such revisions may also render previously disclosed estimates of mineral resources and reserves uneconomical. We cannot assure you that any particular level of recovery of borates or other minerals from discovered mineralization will in fact be commercially realized. Actual operating and capital cost and economic returns on projects may differ significantly from original estimates. Further, it may take many years to commence production, during which time, the economic feasibility of production may change. The exploration and development of mineral deposits involve a high degree of financial risk over a significant period of time which a combination of careful evaluation, experience and knowledge of management may not eliminate.

Current wording

The mineral reserve estimates stated in this filing and extracted from the PFS or updated technical report summary represent the amount of boric acid that the qualified persons in that report estimated could be economically and legally extracted or produced at the time of the mineral reserve determination. Such estimates and related PFS assumptions are based on qualified-person judgments and are not guarantees of actual production, recoveries, mine life, profitability, commercial feasibility or economic extraction. Any material reductions in the quantity of mineral reserves or resources, related grades, recovery rates, prices, market assumptions or increases in cost of production could have a material adverse effect on our business, financial condition or prospects.

Previous wording

Estimates relating to the development of the Project and mine plan are uncertain and we may incur higher costs and lower economic returns than estimated.

Current wording

Estimates relating to the development of the Project, the PFS, the updated technical report summary and the mine plan are uncertain and we may incur higher costs and lower economic returns than estimated.

Previous wording

Mine development projects such as the Project typically require a number of years and significant expenditures during the development phase before production is possible. These projects could experience unexpected problems and delays during development, construction and mine start-up. Our decisions concerning the development of the Project deposit have been based on the results of multiple studies performed under the JORC Code and S-K 1300, which have estimated the anticipated economic returns of the Project. The actual profitability or economic feasibility of the Project may differ from our estimates as a result of any of the following risks normally encountered in the mining industry, such as:

Current wording

The actual profitability or economic feasibility of the Project may differ from our estimates as a result of any of the following risks normally encountered in the mining industry, such as:

Previous wording

changes in input commodity and labor costs;

Current wording

changes in input commodity, labor, equipment, water, power, natural gas, reagent, construction, logistics or financing costs;

Previous wording

the quality of the data on which engineering assumptions are made;

Current wording

the quality of the data on which engineering, mine plan, processing, recovery, wellfield and economic assumptions are made;

Previous wording

availability of adequate and skilled labor force, adequate machinery and equipment;

Current wording

availability of adequate and skilled labor, machinery, equipment, long-lead items, infrastructure, water, power and natural gas;

Previous wording

accidental fires, floods, earthquakes or other natural disasters;

Current wording

weather, severe climate impacts, accidental fires, floods, drought, wildfires, earthquakes or other natural disasters;

Previous wording

liability for pollution, other environmental damage, or harm to plants or animals, including endangered or protected species;

Current wording

water management, pollution, environmental damage or harm to plants or animals, including endangered or protected species;

Previous wording

potential delays relating to social and community issues, including, without limitation, issues resulting in labor disputes, protests, road blockages or work stoppages;

Current wording

social and community issues, labor disputes, protests, road blockages, work stoppages or challenges to permits or mining activities;

Previous wording

uncertainties regarding our ability to successfully implement downstream processing and reach full revenue potential;

Current wording

uncertainties regarding our ability to successfully implement downstream processing and reach full revenue potential; and

Previous wording

other known and unknown risks involved in the conduct of exploration, development and the operation of mines.

Current wording

other known and unknown risks involved in the conduct of exploration, development, construction and operation of mines.

Previous wording

Our growth is dependent upon the continued adoption and demand by consumers of end use applications, such as solar and wind energy infrastructure, neodymium-ferro-boron magnets, lithium-ion batteries, and future facing applications, including the semi-conductor, aerospace, military, and automotive markets, which currently require borates, lithium, and related minerals and compounds we expect to produce. If the market for such applications does not develop as we expect, develops more slowly than we expect, and/or current boron producers fulfill all or a portion of the market’s anticipated boron needs, our business, prospects, financial condition and results of operations will be affected. The market for such end use applications is relatively new, rapidly evolving, and could be affected by numerous external factors such as:

Current wording

Our growth is dependent upon the development of demand for borates, advanced boron materials, lithium, calcium chloride, gypsum and related products across diverse end markets, including industrial, specialty glass, insulation, agriculture, defense, energy, infrastructure, technology, automotive and other markets. If the market for such applications does not develop as we expect, develops more slowly than we expect, or current boron producers or other competitors fulfill all or a portion of the market’s anticipated needs, our business, prospects, financial condition and results of operations may be adversely affected.

Previous wording

Our long-term success will depend on our ability to enter into and deliver product under supply agreements.

Current wording

Our long-term success will depend on our ability to convert customer qualification and non-binding commercial arrangements into definitive, bankable offtake agreements and to deliver product under those agreements.

Previous wording

Our estimate of the annual total addressable market for our proposed products is based on a number of internal and third-party estimates, which are based on a number of factors, including, without limitation, historical and current global demand and pricing, the number and geographic location of global and regional suppliers and their current capacity capabilities, and the growing number of end-use applications and demand for such applications. Market estimates and growth forecasts are subject to significant uncertainty and are based on assumptions and estimates that may prove to be inaccurate. Even if the market in which we compete meets our size estimates and forecasted growth, our business could fail to grow at similar rates, if at all. Our market opportunity is also based on the assumption that our existing and future offerings will be more attractive to our customers and potential customers than competing products and services. If these assumptions prove inaccurate, our business, financial condition and results of operations could be adversely affected.

Current wording

Our estimate of the annual total addressable market and long-term pricing for our proposed products is based on internal and third-party estimates, which are based on factors including historical and current global demand and pricing, the number and geographic location of suppliers, supplier capacity, customer specifications, end-use applications, published pricing indices, market studies and assumptions regarding future demand growth. Market estimates and growth forecasts are subject to significant uncertainty and are based on assumptions and estimates that may prove to be inaccurate.

Previous wording

We depend on a single mining project.

Current wording

We currently depend on a single mining project.

Previous wording

The Project accounts for all of our mineral resources and reserves and the current potential for the future generation of revenue. Any adverse development affecting the Project will have a material adverse effect on our business, prospects, profitability, financial performance and results of operations. These developments include, but are not limited to, the inability to obtain necessary permits or financing to develop the Project, changes in technical parameters of project development, changes in costs or anticipated costs which may make it uneconomic to develop and/or operate the Project, unusual and unexpected geologic formations, seismic activity, rock bursts, flooding, drought, and other conditions involved in the drilling and removal of material, any of which could result in damage to, or destruction of, property, and which could hinder the development and future operation of the Project. If the Project is completed to management’s contemplated target production capacity of up to 450,000 tons per year of boric acid, it will exceed the limits of our existing permits, which would require us to seek modifications to the permits. There can be no assurance that we could obtain any required permit modifications. Based on the Preliminary Feasibility Report, and assuming we reach economically viable production, the Project, by its nature, will have a defined production life (the period during which extraction will remain viable). Ultimately, we will be required to replace and expand our resources and any established reserves if we are to maintain operating revenues. In the absence of additional mineral projects, we will be solely dependent on the Project for our revenue and profits, if any. Our ability to maintain or increase our annual production will be dependent, in significant part, on our ability to expand the Project, bring new projects into production and to complete acquisitions.

Current wording

The Project currently accounts for all of our mineral resources and reserves and, without the Assets expected to be acquired from SVM, the current potential for the future generation of revenue. Any adverse development affecting the Project will have a material adverse effect on our business, prospects, profitability, financial performance and results of operations. These developments include, but are not limited to, the inability to obtain necessary permits or financing to develop the Project, changes in technical parameters of project development, changes in costs or anticipated costs which may make it uneconomic to develop and/or operate the Project, unusual and unexpected geologic formations, seismic activity, rock bursts, flooding, drought, and other conditions involved in the drilling and removal of material, any of which could result in damage to, or destruction of, property, and which could hinder the development and future operation of the Project. If the Project is completed to management’s contemplated target production capacity of up to 450,000 tons per year of boric acid, it will exceed the limits of our existing permits, which would require us to seek modifications to the permits. There can be no assurance that we could obtain any required permit modifications. Based on the Preliminary Feasibility Report, and assuming we reach economically viable production, the Project, by its nature, will have a defined production life (the period during which extraction will remain viable). Ultimately, we will be required to replace and expand our resources and any established reserves if we are to maintain operating revenues. In the absence of additional mineral projects, we will be solely dependent on the Project for our revenue and profits, if any. Our ability to maintain or increase our annual production will be dependent, in significant part, on our ability to expand the Project, bring new projects into production and to complete acquisitions.

Previous wording

The cost and availability of electricity and natural gas are subject to volatile market conditions.

Current wording

The cost and availability of electricity, natural gas and other energy resources are subject to volatile market conditions and infrastructure constraints.

Previous wording

Mining development projects and operations consume large amounts of raw materials and energy. We may rely on third parties for the supply of energy we consume and will consume in our development and mining activities. The prices for and availability of electricity, natural gas, oil and other energy resources are all also subject to worldwide supply and demand, volatile market conditions, often affected by weather conditions, as well as political and economic factors beyond our control. Variations in the cost of raw materials, and of energy, which primarily reflects market prices for oil and natural gas, may significantly affect our operating results from period to period. Even if we choose to supply the Project with electricity from a cogeneration facility that we own and/or operate, we will be dependent on a supply of natural gas from a third party for the operation of the facility. We must have dependable delivery of energy in order to develop and ultimately operate our facilities. Accordingly, we are at risk in the event of an energy disruption. Prolonged black-outs or brown-outs or disruptions caused by natural disasters, or other means, would substantially disrupt our production. Moreover, we expect much of our finished borate products to be delivered by truck. Unforeseen fluctuations in the price of fuel attributable to fluctuations in crude oil prices would also have a negative impact on our costs or on the costs of many of our future customers. In addition, changes in certain environmental regulations in the U.S., including those that may impose output limitations or higher costs associated with climate change or greenhouse gas emissions legislation or regulation, could substantially increase the cost of inputs to our operations, such as energy, to us and other borate producers.

Current wording

Mining development projects and operations consume large amounts of raw materials and energy. We may rely on third parties for the supply of energy we consume and will consume in our development and mining activities. The prices for and availability of electricity, natural gas, oil and other energy resources are subject to worldwide supply and demand, volatile market conditions, weather conditions, geopolitical events, regulatory actions and other factors beyond our control. Variations in the cost or availability of raw materials and energy may significantly affect our operating results and Project economics.

Previous wording

Any potential commercial production at the Project will depend on adequate infrastructure. In particular, reliable power sources, water supply, transportation and surface facilities are all necessary to develop and operate mines. Failure to adequately meet these infrastructure requirements or changes in the cost of such inputs could affect our ability to develop or commence production at the Project and could have a material adverse effect on our business, financial condition, results of operations, cash flows or prospects.

Current wording

Any potential commercial production at the Project will depend on adequate infrastructure. In particular, reliable power sources, natural gas supply, water supply, transportation, surface facilities, evaporation ponds, communications, security, construction staging, logistics and other infrastructure are necessary to develop and operate the Project. Failure to adequately meet these infrastructure requirements or changes in the cost, availability, design or schedule of such inputs could affect our ability to develop or commence production at the Project and could have a material adverse effect on our business, financial condition, results of operations, cash flows or prospects.

Previous wording

Our financial results are tied to global economic conditions and their impact on levels of consumer confidence and consumer spending. Global consumer markets can be impacted by significant U.S. and international economic downturns and inflation, such as the economic contraction caused by the coronavirus pandemic of 2020 and the global credit crunch experienced in 2008. High levels of inflation, recession or a weak recovery, due to factors that include, but are not limited to, disruptions in financial markets, federal budget, tax, tariff or trade policy issues in the United States, political upheavals, war or unrest, economic sanctions against trading nations, and demonetization, could cause us to experience significant cost increases and revenue declines due to deteriorated consumer confidence and spending, and a decrease in the availability of credit or on commercially acceptable terms, which could have a material adverse effect on our business prospects or financial condition.

Current wording

Our financial results are tied to global economic conditions and their impact on levels of consumer confidence and consumer spending. Global consumer markets can be impacted by significant U.S. and international economic downturns and inflation, such as the economic contraction caused by the coronavirus pandemic of 2020 and the global credit crunch experienced in 2008, as well as global hostilities and conflict, including in Ukraine and Russia, as well as the Middle East. High levels of inflation, recession or a weak recovery, due to factors that include, but are not limited to, disruptions in financial markets, federal budget, tax, tariff or trade policy issues in the United States, political upheavals, war or unrest, economic sanctions against trading nations, and demonetization, could cause us to experience significant cost increases and revenue declines due to deteriorated consumer confidence and spending, and a decrease in the availability of credit or on commercially acceptable terms, which could have a material adverse effect on our business prospects or financial condition.

Previous wording

Our operations and performance depend significantly on global and regional economic conditions. Macroeconomic conditions, including inflation, slower growth or recession, changes to fiscal and monetary policy, tighter credit, higher interest rates, high unemployment and currency fluctuations can materially adversely affect demand for our products and services. In addition, confidence and spending can be materially and adversely affected in response to financial market volatility, negative financial news, declines in income or asset values, energy shortages and cost increases, labor and healthcare costs and other economic factors. An adverse impact on demand for our products, uncertainty about, or a decline in, global or regional economic conditions can have a significant impact on our suppliers and other partners. Potential effects include financial instability; inability to obtain credit to finance operations and purchases of our products; and insolvency. We cannot predict the timing or scale of these various macroeconomic conditions, but they could have a material adverse effect on our business, results of operations and financial condition.

Current wording

Our operations and performance depend significantly on global and regional economic conditions. Macroeconomic conditions, including inflation, slower growth or recession, changes to fiscal and monetary policy, tighter credit, higher interest rates, high unemployment and currency fluctuations can materially adversely affect demand for our products. In addition, confidence and spending can be materially and adversely affected in response to financial market volatility, negative financial news, declines in income or asset values, energy shortages and cost increases, labor and healthcare costs and other economic factors. An adverse impact on demand for our products, uncertainty about, or a decline in, global or regional economic conditions can have a significant impact on our suppliers and other partners. Potential effects include financial instability; inability to obtain credit to finance operations and purchases of our products; and insolvency. We cannot predict the timing or scale of these various macroeconomic conditions, but they could have a material adverse effect on our business, results of operations and financial condition.

Previous wording

Government efforts to combat inflation, along with other interest rate pressures arising from a recently inflationary economic environment, could lead to higher financing and Project completion costs.

Current wording

Government efforts to combat inflation, along with other interest rate pressures, may lead to increased financing costs and Project completion costs.

Previous wording

We are continuing to implement policies and procedures designed to ensure compliance by us and our directors, officers, employees, representatives, consultants and agents with the FCPA, OFAC restrictions and other export control, anti-corruption, anti-money-laundering and anti-terrorism laws and regulations. We cannot assure you, however, that our policies and procedures are or will be sufficient or that directors, officers, employees, representatives, consultants and agents have not engaged and will not engage in conduct for which we may be held responsible, nor can we assure you that our business partners have not engaged and will not engage in conduct that could materially affect their ability to perform their contractual obligations to us or even result in our being held liable for such conduct. Violations of the FCPA, OFAC restrictions or other export control, anti-corruption, anti-money laundering and anti-terrorism laws or regulations may result in severe criminal or civil sanctions, and we may be subject to other liabilities, which could have a material adverse effect on our business, financial condition and results of operations.

Current wording

We are continuing to implement policies and procedures designed to facilitate compliance by us and our directors, officers, employees, representatives, consultants and agents with the FCPA, OFAC restrictions and other export control, anti-corruption, anti-money-laundering and anti-terrorism laws and regulations. We cannot assure you, however, that our policies and procedures are or will be sufficient or that directors, officers, employees, representatives, consultants and agents have not engaged and will not engage in conduct for which we may be held responsible, nor can we assure you that our business partners have not engaged and will not engage in conduct that could materially affect their ability to perform their contractual obligations to us or even result in our being held liable for such conduct. Violations of the FCPA, OFAC restrictions or other export control, anti-corruption, anti-money laundering and anti-terrorism laws or regulations may result in severe criminal or civil sanctions, and we may be subject to other liabilities, which could have a material adverse effect on our business, financial condition and results of operations.

Showing the first 40 of 111 pairs. Open the source sections for the rest.

Rearranged current paragraphs (2)

Current report — wording carried from elsewhere

As previously disclosed, in September 2024, we received a non-binding letter of interest from the Export-Import Bank of the United States (“EXIM”) for a loan-backed guarantee on project debt financing of up to $285 million for our proposed Commercial-Scale Facility. We have had continued engagement with representatives from EXIM on the loan package, but we cannot make any assurances that the loan package will be finalized on a timely basis, or at all.

Current report — wording carried from elsewhere

The inclusion of the going concern explanatory paragraph by our auditors, our lack of revenue, our development-stage status, our current market capitalization, our limited trading liquidity and our potential inability to continue as a going concern may materially adversely affect our business, share price, and ability to raise new capital or to enter into critical contractual relations with third parties due to concerns about our ability to meet our contractual obligations.
Rearranged previous paragraphs (1)

Previous report — wording carried elsewhere

controlling water and other similar mining hazards;