PORTLAND GENERAL ELECTRIC CO /OR/
For the period ended Jun 30, 2026. Filed Jul 31, 2026.
View on SEC.govAbout this filing
A company's report for each of its first three quarters. The financial statements are not audited. It shows how the business has moved since the last annual report, and what management says changed.
Jun 30, 2026 · Filed Jul 31, 2026
What changed in Management’s Discussion and Analysis?
Read the current filingPrevious report: 10-Q
Period ended 2026-03-31; filed 2026-05-01.
0001193125-26-197978
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsCurrent report: 10-Q
Period ended 2026-06-30; filed 2026-07-31.
0001193125-26-326379
Item 2. Management’s Discussion and Analysis of Financial Condition and Results of OperationsThe baseline is this issuer’s latest earlier reporting period of the same form that was filed before the current report. A previous 10-Q is a different quarter, not a year-over-year comparison. Amendments are excluded.
Compared 265 previous paragraphs and 275 current paragraphs.
145 unchanged; 106 reworded; 21 added; 7 removed; 7 previous and 3 current paragraphs rearranged.
Tables are not compared: 20 previous and 20 current tables excluded. Dates, whitespace, punctuation and numbering changes are ignored; changes to financial figures remain significant.
A changed paragraph is not evidence that risk increased or decreased. An unchanged paragraph does not establish that risk stayed the same.
Added paragraphs (21)
Current report
The Resource Planning Process—PGE’s resource planning process includes preliminary and ongoing engagement with customers, stakeholders, regulators, and other interested parties to help inform the Company’s assessment of future energy needs and resource options. Through its Integrated Resource Plan (IRP) and Clean Energy Plan (CEP) processes, PGE evaluates multiple planning scenarios using forecasts, modeling, stakeholder input, surveys, and other available data.
Current report
PGE is continuing discussions with customers, stakeholders, and the OPUC regarding PGE’s path forward through the engagement process for the 2026 Clean Energy Plan and Integrated Resource Plan, which the company plans to file in the third quarter of 2026. PGE is continuing to refine its analysis, forecasts, resource needs, and preferred strategies to support continued progress toward emission targets while serving customers safely, reliably, equitably, and at the lowest reasonable cost.
Current report
As of the date of this filing, all milestones in the procedural schedule have occurred with briefing complete and the OPUC having conducted oral argument with PGE and parties on July 23, 2026. Based on the current procedural schedule, the OPUC is targeting an Order date of August 25, 2026. On July 23, 2026, FERC issued an order authorizing the reorganization into a holding company structure.
Current report
General Rate Case - In early August 2026, PGE intends to file with the OPUC a general rate case based on a fiscal July 2026 through June 2027 test year (2027 GRC). The Company's filing will request a $179 million increase in the annual revenue requirement related primarily to deployment of capital since PGE’s last rate case (UE 435) to strengthen and safeguard the grid to meet growing customer demand and bolster reliability. The 2027 GRC, as requested, would result in an approximate 4.8% overall increase relative to currently approved prices. This increase excludes the effects of lower net variable power costs expected in 2027 as reflected in the Annual Power Cost Update Tariff, filed separately, with the OPUC in February 2026 (OPUC Docket UE 465). Based on a recently filed forecast of net variable power costs, customer prices would be expected to fall 2.4% on January 1, 2027, partially offsetting the proposed GRC increase.
Current report
The proposed GRC increase in annual revenue requirement is based upon:
Current report
• a capital structure of 50% debt and 50% equity;
Current report
• a return on equity of 9.75%;
Current report
• a cost of capital of 7.464%; and
Current report
• a rate base of $8.6 billion.
Current report
Another key item in the filing includes a request for a Bridge Framework to operate between the conclusion of this GRC and the establishment of PGE’s first multi-year rate plan in 2029 pursuant to HB 3179 and OPUC rulemakings in AR 676 and AR 677. Regulatory review of the 2027 GRC is expected throughout 2026 and 2027. The Company cannot predict the ultimate outcome of the regulatory process. We expect a final order to be issued by the OPUC by the end of June 2027. New customer prices are expected to become effective July 1, 2027. The 2027 GRC filing, including copies of direct testimony and exhibits, is expected to be made available on the OPUC website at www.oregon.gov/puc.
Current report
Portland Harbor Environmental Remediation Account (PHERA) mechanism—PGE has been identified by the EPA as a Potentially Responsible Party (PRP) for the Portland Harbor Superfund Site, however, significant uncertainties remain regarding the scope of remediation, cost allocation among PRPs, and PGE’s potential share of costs. The impact of such costs on the Company's results of operations is mitigated by the OPUC-approved PHERA mechanism, which allows for recovery of eligible costs through third-party proceeds and customer prices, subject to prudency reviews and earnings-test limitations. For further information regarding the PHERA mechanism as well as PGEs current estimated range of potential liability, see "Regulatory Assets and Liabilities" in Note 3, Balance Sheet Components, and “EPA Investigation of Portland Harbor” in Note 8, Contingencies in the Notes to Condensed Consolidated Financial Statements in Item 1.—“Financial Statements.”
Current report
On June 3, 2026, the Company submitted Advice filing 26-24 to the OPUC, which proposed to create a new tariff for Data Center Standard Service, update base rates and power costs, update DSP Alternative Recovery prices as agreed to via a stipulation adopted by the OPUC in Order No. 26-074 in Docket UE 459, and update the Energy Efficiency Funding Adjustment as directed in Order No. 26-154.
Current report
At a public meeting on July 7, 2026, the OPUC approved Advice 26-24, allowing new prices to become effective July 8, 2026. Collectively, the overall price changes result in an average rate decrease of 1.3% for residential customers, a 2.1% average rate decrease for commercial customers, an average rate decrease of 1.4% for industrial customers who do not qualify for PGE's new data center rate, and an average rate increase of 29.7% for data center customers.
Current report
System Operator Labor Negotiations—PGE is engaged in contract negotiations with approximately 30 System Operators who voted in 2024 to join the International Brotherhood of Electrical Workers (IBEW) Local 125 Bargaining Unit 1. On July 1, 2026, representatives of this bargaining unit provided notice of their intent to initiate a strike beginning August 2, 2026, if the parties are unable to reach agreement on a collective bargaining arrangement. PGE continues to engage in negotiations with the bargaining unit and is implementing contingency plans designed to maintain safe and reliable service to customers in the event of a work stoppage.
Current report
While PGE believes it has plans in place to continue providing safe and reliable electric service, if a strike were to occur, the Company could incur increased operating and labor-related costs, including costs associated with contingency staffing, contractor support, training, and other operational measures. PGE cannot predict the outcome of the negotiations or impact of a strike, if any. The ultimate operational or financial impacts of any work stoppage will depend on factors including its duration, number of individuals ultimately involved in the strike, the availability and effectiveness of contingency resources, and the outcome of ongoing negotiations. Accordingly, PGE is unable at this time to determine the potential impacts on its financial position, results of operations, or cash flows, however, such impacts could be material.
Current report
Net income for the six months ended June 30, 2026 was down $49 million, or 30%, from the same period of 2025. Total revenues declined as a decrease in Wholesale revenues more than offset the increase in Retail revenues that resulted from the combination of OPUC approved recovery of several regulatory deferrals in customer prices during 2026 along with a nearly 2% increase in retail deliveries. The slight reduction in Purchased power and fuel reflects largely offsetting impacts of the RCE deferrals in 2025 that were not repeated in 2026 along with changes in average variable power costs and system loads. The increase in Depreciation and amortization expense was driven by higher depreciable asset balances. The increase in Taxes other than income taxes reflects higher property and payroll taxes. Interest expense, net, was higher due to increased debt balances. Income tax expense was down due to lower pretax income.
Current report
For the six months ended June 30, 2026, Wholesale revenues decreased $86 million, or 46%, from the six months ended June 30, 2025 as the Company experienced a $64 million reduction from a decline in the quantity of MWhs sold, which was down 34% from the prior year and a $7 million reduction due to lower prices. In addition, the sale of environmental credits produced $15 million less revenue in 2026 than during the same period of 2025.
Current report
In the six months ended June 30, 2026, Other operating revenues were up $8 million compared to the same period of 2025, due to a combination of factors, the largest of which being revenue deferrals recorded as a result of HB 3179, sale of excess fuel oil, and joint pole revenue.
Current report
Generation, transmission and distribution decreased as follows for the three and six months ended June 30, 2026 compared to the same periods in 2025 (in millions):
Current report
Administrative and other changed as follows for the three and six months ended June 30, 2026 compared to the same periods in 2025 (in millions):
Current report
Other income, net increased $7 million and $4 million in the three and six months ended June 30, 2026, respectively, compared to the same periods in 2025. The increase was primarily driven by regulatory asset interest income. Included in expense for the six months ended June 30, 2026 is $1 million related regulatory disallowances.
Removed paragraphs (7)
Previous report
The actions summarized in the CEP/IRP Update will also serve as an important tool in furthering conversations with all stakeholders, and the OPUC, on PGE’s path forward to making continued progress towards emission targets while continuing to serve customers safely, reliably, and at the lowest cost possible.
Previous report
Notes to Condensed Consolidated Financial Statements in Item 1.—“Financial Statements” for information regarding legal proceedings related to Colstrip.
Previous report
As of the date of this filing, the OPUC proceeding remains in the evidentiary phase. Written testimony has been submitted, and the OPUC is continuing to compile additional filings and public input. Based on the current procedural schedule, a hearing is set for June 2026 and the OPUC is targeting an Order date of August 25, 2026.
Previous report
Portland Harbor Environmental Remediation Account (PHERA) mechanism—The EPA has listed PGE as one of over one hundred Potentially Responsible Parties (PRPs) related to the remediation of the Portland Harbor Superfund site. As of March 31, 2026, significant uncertainties still remained concerning the precise boundaries for clean-up, the assignment of responsibility for clean-up costs, the final selection of a proposed remedy by the EPA, and the allocation of costs amongst PRPs. It is probable that PGE will share in a portion of these costs. In a Record of Decision (ROD) issued in 2017, the EPA outlined its selected remediation plan for clean-up of the Portland Harbor site, which had an estimated total cost of $1.7 billion. Stakeholders have raised concerns that EPA’s cost estimates are understated, and PGE estimates undiscounted total remediation costs for Portland Harbor per the ROD could range from $1.9 billion to $3.5 billion. The Company does not currently have sufficient information to reasonably estimate the amount, or range, of its potential costs for investigation or remediation of Portland Harbor. However, the Company may obtain sufficient information, prior to the final determination of allocation percentages among PRPs, to develop a reasonable estimate, or range, of its potential liability that would require recording an estimate, or low end of the range. The Company’s liability related to the cost of remediating Portland Harbor could be material to PGE’s financial position. The impact of such costs to the Company’s results of operations is mitigated by the PHERA mechanism. As approved by the OPUC, the recovery mechanism allows the Company to defer and recover estimated liabilities and incurred legal and technical analysis expenditures related to the Portland Harbor Superfund Site through a combination of third-party proceeds, including, but not limited to, insurance recoveries, and customer prices, as necessary. The mechanism established annual prudency reviews of environmental expenditures and third-party proceeds, and annual expenditures in excess of $6 million, excluding contingent liabilities, are subject to an annual earnings test. PGE’s results of operations may be impacted to the extent such expenditures were to be deemed imprudent by the OPUC or disallowed per the prescribed earnings test. PGE received settlement proceeds related to Portland Harbor Superfund insurance coverage settlement agreements during 2025, which were deferred into the PHERA mechanism. PGE is continuing insurance recovery activity with additional insurers. For further information regarding the PHERA mechanism, see “EPA Investigation of Portland Harbor” in Note 8, Contingencies in the Notes to Condensed Consolidated Financial Statements in Item 1.—“Financial Statements.”
Previous report
Generation, transmission and distribution remained materially unchanged for the three months ended March 31, 2026 compared to the same period in 2025 (in millions):
Previous report
Administrative and other increased $10 million or 10% for the three months ended March 31, 2026 compared to the same period in 2025 (in millions):
Previous report
Other income, net decreased $3 million or 30% for the three months ended March 31, 2026 compared to the same period in 2025. The decrease was primarily driven by lower AFUDC on construction work in progress balances and $1 million in expense related to regulatory disallowances.
Reworded paragraphs (106)
Previous wording
new or revised governmental policies, executive orders, legislative actions, and regulatory audits, investigations, and actions, including those of the Federal Energy Regulatory Commission (FERC), the Public Utility Commission of Oregon (OPUC), and the Internal Revenue Service, with respect to allowed rates of return, financings, electricity pricing and price structures, acquisition and disposal of facilities and other assets, construction and operation of plant facilities, transmission of electricity, recovery of power costs, operating expenses, deferrals, timely recovery of costs and capital investments, energy trading activities, tax credits, and current or prospective wholesale and retail competition;
Current wording
new or revised governmental policies, executive orders, legislative actions, and regulatory audits, investigations, and actions, including those of the Federal Energy Regulatory Commission (FERC), the Public Utility Commission of Oregon (OPUC), and the Internal Revenue Service (IRS), with respect to allowed rates of return, financings, electricity pricing and price structures, acquisition and disposal of facilities and other assets, construction and operation of plant facilities, transmission of electricity, recovery of power costs, operating expenses, deferrals, timely recovery of costs and capital investments, energy trading activities, tax credits, and current or prospective wholesale and retail competition;
Previous wording
uncertainties associated with increased energy demand or significant accelerated growth in demand due to new data centers, including the concentration of data centers, and the ability to obtain regulatory approvals, environmental, and other permits to construct new facilities in a timely manner;
Current wording
uncertainties associated with energy demand that differs from forecasts, including significant or accelerated load growth from new data centers and the concentration of data center load, and the ability to timely serve such growth due to regulatory, environmental, and other permitting requirements;
Previous wording
risks and uncertainties related to current or future All-Source Request for Proposals (RFP) projects, including, but not limited to regulatory processes, transmission capabilities, system interconnections, inflationary impacts, supply chain constraints, supply cost increases (including application of trade tariffs), permitting and construction delays, available tax credits, counterparty credit risk, and legislative uncertainty;
Current wording
risks and uncertainties related to the procurement of resources through current or future All-Source Request for Proposals (RFP) projects or other regulatory mechanisms, including, but not limited to regulatory processes, transmission capabilities, system interconnections, inflationary impacts, supply chain constraints, supply cost increases (including application of trade tariffs), permitting and construction delays, available tax credits, counterparty credit risk, and legislative uncertainty;
Previous wording
demand uncertainty and changing customer preferences and choices that may reduce demand for PGE's services or alter usage patterns, including variability in demand driven by weather variations, reduced consumption or load shifting resulting from energy efficiency measures or other changes in customer behavior, increased adoption of distributed and renewable generation, and an increased likelihood that customers procure electricity from alternative service providers such as registered Electricity Service Suppliers (ESSs) or through community choice aggregation programs;
Current wording
demand uncertainty and changing customer preferences and choices that may reduce demand for PGE's services or alter usage patterns, including variability in demand driven by weather variations, price increases, reduced consumption or load shifting resulting from energy efficiency measures or other changes in customer behavior, increased adoption of distributed and renewable generation, and an increased likelihood that customers procure electricity from alternative service providers such as registered Electricity Service Suppliers (ESSs) or through community choice aggregation programs;
Previous wording
volatility in wholesale power and natural gas prices, including but not limited to volatility caused by macroeconomic and international issues, such as the war involving the United States, Iran and Israel, that could require PGE to post additional collateral or issue additional letters of credit pursuant to power and natural gas purchase agreements;
Current wording
volatility in wholesale power and natural gas prices, including but not limited to volatility caused by macroeconomic and international issues, such as the escalation of US operations in the Middle East, that could require PGE to post additional collateral or issue additional letters of credit pursuant to power and natural gas purchase agreements;
Previous wording
changes in the availability and price of wholesale power and fuels, including natural gas and coal, and the impact of such changes, including the potential impact of trade tariffs and the war involving the United States, Iran and Israel, on the Company’s power costs;
Current wording
changes in the availability and price of wholesale power and fuels, including natural gas and coal, and the impact of such changes, including the potential impact of trade tariffs and the escalation of US operations in the Middle East, on the Company’s power costs;
Previous wording
cybersecurity attacks, data security breaches, physical attacks and security breaches, or other malicious acts, internally or to third parties, that cause damage to the Company’s generation, transmission, or distribution facilities, impact information technology systems, inhibit the capability of equipment or systems to function as designed or expected, or result in the release of confidential customer, vendor, employee, or Company information;
Current wording
cybersecurity attacks, data security breaches, physical attacks and security breaches, the use or misuse of artificial intelligence technologies, including AI-enabled cyberattacks, fraud, misinformation, unauthorized disclosure of sensitive information, operational errors, or other malicious acts, internally or to third parties, that cause damage to the Company’s generation, transmission, or distribution facilities, impact information technology or operational technology systems, inhibit the capability of equipment or systems to function as designed or expected, or result in the release of confidential customer, vendor, employee, or Company information;
Previous wording
employee workforce factors, including potential strikes, work stoppages, transitions in senior management, the ability to recruit and retain key employees and other talent, and turnover due to macroeconomic trends such as voluntary resignation of large numbers of employees;
Current wording
employee workforce factors, including labor strikes, work stoppages, collective bargaining negotiations that result in increased labor costs or other less favorable terms, the inability to obtain contracted workers at reasonable rates during a labor disruption, transitions in senior management, the ability to recruit and retain key employees and other talent, and turnover resulting from macroeconomic conditions such as elevated levels of voluntary resignations, any of which could increase costs and adversely affect operations and financial results;
Previous wording
Decarbonize Power—make progress toward customer-driven clean energy goals by continuing to add new renewable resources and products to the Company's energy mix;
Current wording
Decarbonize Power—make progress toward customer-driven clean energy goals by continuing to add new renewable and non-emitting resources and products to the Company's energy mix;
Previous wording
PGE intends to manage the Washington operations as a separate company through a newly created subsidiary to be regulated by the Washington Utilities and Transportation Commission. PGE intends to retain current Washington employees and honor existing labor agreements. PGE corporate functions are expected to provide shared support for both Washington and Oregon companies.
Current wording
PGE intends to manage the Washington operations as a separate company through a newly created subsidiary to be regulated by the Washington Utilities and Transportation Commission (WUTC). PGE intends to retain current Washington employees and honor existing labor agreements. PGE corporate functions are expected to provide shared support for both Washington and Oregon companies.
Previous wording
The Acquisition is designed with the goal that Washington and Oregon customers would not be impacted by costs associated with executing the acquisition and transaction financing. PGE expects the Acquisition and state and federal regulatory reviews to close in approximately twelve months following the submission of regulatory applications. Regulatory applications were submitted to the WUTC and the OPUC on March 30, 2026 and April 2, 2026, respectively.
Current wording
The Acquisition is designed with the goal that Washington and Oregon customers would not be impacted by costs associated with executing the acquisition and transaction financing. PGE expects the Acquisition and state and federal regulatory reviews to close in approximately twelve months following the submission of regulatory applications. Regulatory applications were submitted to the WUTC and the OPUC on March 30, 2026 and April 2, 2026, respectively. On July 15, 2026, the Company, jointly with other parties, submitted an application to the FERC seeking approval of the transaction, requesting a decision by December 15, 2026.
Previous wording
Central to this Acquisition is PGE’s plan to enter into a joint venture with Manulife Infrastructure Fund III, L.P. and its affiliates, including John Hancock Life Insurance Company (U.S.A.), which will collectively be a minority owner of the
Current wording
Central to this Acquisition is PGE’s plan to enter into a joint venture with Manulife Infrastructure Fund III, L.P. and its affiliates, including John Hancock Life Insurance Company (U.S.A.), which will collectively be a minority owner of the Washington utility business. PGE would remain majority owner and sole operator.
Previous wording
Empowering customers and communities—PGE’s customers have a desire for purchasing clean energy, as over 217 thousand residential and small commercial customers voluntarily participate in PGE’s Green Future Program, the largest renewable power program by participation in the nation. In 2017, Oregon’s most populous city, Portland, and most populous county, Multnomah, each passed resolutions to achieve 100% clean and renewable electricity by 2035 and 100% economy-wide clean and renewable energy by 2050. Other jurisdictions in PGE’s service area have similar goals and continue to consider similar goals for the future.
Current wording
Empowering customers and communities—PGE’s customers have a desire for purchasing clean energy, as over 213 thousand residential and small commercial customers voluntarily participate in PGE’s Green Future Program, the largest renewable power program by participation in the nation. In 2017, Oregon’s most populous city, Portland, and most populous county, Multnomah, each passed resolutions to achieve 100% clean and renewable electricity by 2035 and 100% economy-wide clean and renewable energy by 2050. Other jurisdictions in PGE’s service area have similar goals and continue to consider similar goals for the future.
Previous wording
The Resource Planning Process—PGE’s resource planning process includes working with customers, stakeholders, and regulators to chart the course toward a clean, affordable, and reliable energy future. With the passage of HB 2021, PGE created a Clean Energy Plan (CEP), which articulates the Company’s strategy to make continued progress towards the 2030, 2035, and 2040 emission reduction targets through an equitable transition to a decarbonized grid. The CEP is based on, and was submitted to the OPUC in connection with, the Company’s 2023 Integrated Resource Plan (IRP) in March
Current wording
With the passage of HB 2021, PGE created a CEP which articulates the Company’s strategy to make continued progress toward the 2030, 2035, and 2040 emission reduction targets through an equitable transition to a decarbonized grid. The CEP is based on, and was submitted to the OPUC in connection with, the Company’s 2023 Integrated Resource Plan (IRP) in March 2023, the first combined IRP and CEP. That filing projected PGE’s resource and capacity needs over the next 20 years and proposed an Action Plan to meet near-term needs, subject to HB 2021 emissions reduction requirements.
Previous wording
On June 18, 2025, PGE submitted a CEP/IRP Update to the OPUC. The CEP/IRP Update identified a new Preferred Portfolio as a result of the refreshed analysis. PGE did not propose any changes to the Action Plan that was acknowledged within the 2023 CEP/IRP, which supports the Company's progress toward emissions targets and Preferred Portfolio resource need procurement through the 2025 All-Source RFP. This approach represents the best combination of cost, risk, community benefit, and decarbonization.
Current wording
In June 2025, PGE submitted a CEP/IRP Update to the OPUC. The CEP/IRP Update refreshed forecasts and planning assumptions used in the 2023 CEP/IRP and identified a new Preferred Portfolio as a result of the updated analysis. PGE did not propose changes to the Action Plan acknowledged in the 2023 CEP/IRP, which supports the Company's progress toward emissions targets and Preferred Portfolio resource procurement needs through the 2025 All-Source RFP. Based on the information available at the time, PGE concluded that this approach represented the best combination of cost, risk, community benefit, and decarbonization objectives.
Previous wording
To better distinguish resource needs, the CEP/IRP Update reports the capacity from hybrid solar and battery storage resources by individual technology. The capacity need is 3,500 to 4,500 MW of renewable energy and non-emitting capacity, inclusive of 2023 and 2025 RFP projects.
Current wording
To better distinguish resource needs, the CEP/IRP Update reports capacity from hybrid solar and battery storage resources by individual technology. The Update identified a need for approximately 3,500 to 4,500 MW of renewable energy and non-emitting capacity, inclusive of 2023 and 2025 RFP projects, or any other additional resource procurement activities outside of the RFP. These estimates are based on planning assumptions and forecasts that may change as market conditions, customer needs, stakeholder input, and regulatory requirements continue to evolve.
Previous wording
PGE filed notice with the OPUC in November 2024 that an RFP in 2025 was needed to procure resources to meet a forecasted 2029 capacity shortfall and to make continued progress toward decarbonization targets under HB 2021. These actions were consistent with the 2023 IRP Action Plan and CEP Update. PGE filed the draft 2025 All-Source RFP on
Current wording
PGE filed notice with the OPUC in November 2024 that an RFP in 2025 was needed to procure resources to meet a forecasted 2029 capacity shortfall and to make continued progress toward decarbonization targets under HB 2021. These actions were consistent with the 2023 IRP Action Plan and CEP Update. PGE filed the draft 2025 All-Source RFP in April 2025 and regulatory approval was granted on July 22, 2025. The Company issued the RFP to market on July 31, 2025, seeking bids for resources that can provide non-emitting dispatchable capacity and renewable generation.
Previous wording
PGE is proceeding to commercial negotiations with projects on the final shortlist, prioritizing those that include renewable generation and that have a viable pathway to achieve commercial operations earlier in the 2028 - 2030 eligibility period. The ultimate outcome of the RFP process may involve the selection of multiple projects for both renewable and non-emitting dispatchable capacity resources, which PGE expects will be approximately 2,500 MWs in total.
Current wording
PGE is proceeding to commercial negotiations with projects on the final shortlist, prioritizing those that include renewable generation and that have a viable pathway to achieve commercial operations earlier in the 2028 - 2030 eligibility period. The ultimate outcome of the RFP process, or any other additional resource procurement activities outside of the RFP, may involve the selection of multiple projects for both renewable and non-emitting dispatchable capacity resources, which PGE expects will be approximately 2,500 MWs in total.
Previous wording
PGE anticipates the OPUC to consider acknowledgement of the RFP final shortlist in May 2026. Additional details of the 2025 RFP (OPUC Docket UM 2371) are available on the OPUC website at www.oregon.gov/puc.
Current wording
On May 26, 2026 the OPUC acknowledged the 2025 RFP final shortlist. Additional details of the 2025 RFP (OPUC Docket UM 2371) are available on the OPUC website at www.oregon.gov/puc.
Previous wording
In May 2024, PGE signed a non-binding memorandum of understanding in the development of the North Plains Connector, an approximately 415-mile, high-voltage direct-current (HVDC) transmission line to be constructed with endpoints near Bismarck, North Dakota and Colstrip, Montana. The parties entered negotiations with the United States Department of Energy (U.S. DOE) to finalize the project objectives, terms, and conditions, including the Company’s participation, which is expected to involve a 20% ownership share of the approximately $3.2 billion total investment of the project. In August 2024, the project was awarded a $700 million grant from the U.S. DOE’s Grid Resilience and Innovation Partnerships (GRIP) program to further support its development and would reduce the overall total investment of the project. A portion of the GRIP funding is also allocated to assess upgrades to the Colstrip Transmission System.
Current wording
In May 2024, PGE signed a non-binding memorandum of understanding in the development of the North Plains Connector, an approximately 415-mile, high-voltage direct-current (HVDC) transmission line to be constructed with endpoints near Bismarck, North Dakota and Colstrip, Montana. The parties entered negotiations with the United States Department of Energy (U.S. DOE) to finalize the project objectives, terms, and conditions, including the Company’s participation, which is expected to involve a 20% ownership share of the approximately $3.2 billion total investment of the project. In August 2024, the project was awarded a $700 million grant from the U.S. DOE’s Grid Resilience and Innovation Partnerships (GRIP) program to further support its development and would reduce the overall total investment of the project. A portion of the GRIP funding is also allocated to assess upgrades to the Colstrip Transmission System. See “Federal Grants” in the Laws and Regulations section of this Overview for further discussion over the impacts of Federal grants and effect of Presidential executive orders.
Previous wording
The North Plains Connector would be the nation’s first HVDC transmission connection among three regional U.S. electric energy markets, providing additional flexibility and the sharing of resources across multiple time zones. PGE's resource planning process indicates the need for transmission to provide additional transfer capacity, access to diverse energy resources and enhanced wholesale markets, and ease congestion on the existing western transmission system. PGE continues to explore the North Plains Connector as a resource to meet those load-service needs.
Current wording
The North Plains Connector would be the nation’s first HVDC transmission connection among three regional U.S. electric energy markets, providing additional flexibility and the sharing of resources across multiple time zones. PGE's resource planning process indicates the need for transmission to provide additional transfer capacity, access to diverse energy resources and enhanced wholesale markets, and ease congestion on the existing western transmission system. PGE continues to explore the North Plains Connector as a resource to help meet those load-service needs.
Previous wording
The U.S. DOE selected the Confederated Tribes of Warm Springs (CTWS), with PGE as a subrecipient under the grant, for a $250 million grant to upgrade the existing 230 kV Bethel-Round Butte Transmission line to 500 kV. The project (Warm Springs Power Pathway) will accelerate the development of transmission capacity, enabling new generation in Central and Eastern Oregon to reach customer demand loads in Western Oregon. The added capacity and associated upgrades will also increase resiliency of the transmission system as well as resiliency of the CTWS communities by increasing resources available to the CTWS to support economic growth opportunities. See“Federal Grants” the Laws and Regulations section of this Overview for further discussion over the impacts of Federal grants.
Current wording
The U.S. DOE selected the Confederated Tribes of Warm Springs (CTWS), with PGE as a subrecipient under the grant, for a $250 million grant to upgrade the existing 230 kV Bethel-Round Butte Transmission line to 500 kV. The project (Warm Springs Power Pathway) will accelerate the development of transmission capacity, enabling new generation in Central and Eastern Oregon to reach customer demand loads in Western Oregon. The added capacity and associated upgrades will also increase resiliency of the transmission system as well as resiliency of the CTWS communities by increasing resources available to the CTWS to support economic growth opportunities. See“Federal Grants” in the Laws and Regulations section of this Overview for further discussion over the impacts of Federal grants.
Previous wording
Wildfire Mitigation—PGE has a Wildfire Mitigation Program under which an annual Wildfire Mitigation Plan (WMP) is developed and submitted to the OPUC, as required by State law, to coordinate activities across the Company and with State-wide stakeholders. On December 31, 2025, PGE filed its 2026-2028 Wildfire Mitigation Plan, which forecasts $47 to $50 million annually in operations and maintenance costs and an additional $70 to $84 million annually in capital investments, for the 2026-2028 period, to continue system hardening efforts, expand situational awareness capabilities, implement specific inspection and maintenance along with vegetation management, raise community and customer awareness, and take operational actions within high fire risk zones. PGE strives to improve regional safety by mitigating the risk that PGE’s electric utility infrastructure could cause a wildfire, while limiting the impacts of PSPS events and other mitigation activities on customers and increasing the resiliency of PGE assets to wildfire damage. In the three months ended March 31, 2026, PGE invested $14 million in capital projects related to wildfire mitigation and resiliency and utility asset management.
Current wording
Wildfire Mitigation—PGE has a Wildfire Mitigation Program under which an annual Wildfire Mitigation Plan (WMP) is developed and submitted to the OPUC, as required by State law, to coordinate activities across the Company and with State-wide stakeholders. In December 2025, PGE filed its 2026-2028 Wildfire Mitigation Plan, which forecasts $47 to $50 million annually in operations and maintenance costs and an additional $70 to $84 million annually in capital investments, for the 2026-2028 period, to continue system hardening efforts, expand situational awareness capabilities, implement specific inspection and maintenance along with vegetation management, raise community and customer awareness, and take operational actions within high fire risk zones. PGE strives to improve regional safety by mitigating the risk that PGE’s electric utility infrastructure could cause a wildfire, while limiting the impacts of PSPS events and other mitigation activities on customers and increasing the resiliency of PGE assets to wildfire damage. In the six months ended June 30, 2026, PGE invested $38 million in capital projects related to wildfire mitigation and resiliency and utility asset management.
Previous wording
Virtual Power Plant (VPP)—PGE’s VPP is comprised of Distributed Energy Resources and flexible loads that are managed through technology platforms to provide grid and power operations services. PGE’s customer offerings related to flexible load programs, rooftop solar, battery storage, and electric vehicle (EV) charging solutions support grid reliability and increase portfolio flexibility and resource diversity. When coordinated through the Company’s Distributed Energy Resources Management Systems, Distributed Energy Resource and flexible loads support cost-effective decarbonization, advance customer and community energy resiliency, promote customer engagement with the energy system, and unlock additional grid services that enhance PGE’s operation of a dynamic two-way system. As customer participation in PGE’s VPP grows, their actions provide increasing benefit and help avoid customer service interruptions and reduce exposure to scarcity pricing in energy markets.
Current wording
Virtual Power Plant (VPP)—PGE’s VPP is comprised of Distributed Energy Resources and flexible loads that are managed through technology platforms to provide grid and power operations services. PGE’s customer offerings related to flexible load programs, rooftop solar, battery storage, and electric vehicle (EV) charging solutions support grid reliability and increase portfolio flexibility and resource diversity. When coordinated through the Company’s Distributed Energy Resources Management Systems, Distributed Energy Resource and flexible loads support cost-effective decarbonization, advance customer and community energy resiliency, promote customer engagement with the energy system, and unlock additional grid services that enhance PGE’s operation of a dynamic two-way system. As participation in PGE’s VPP grows, customer actions provide increasing benefit and help avoid customer service interruptions and reduce exposure to scarcity pricing in energy markets.
Previous wording
Distribution System Plan (DSP)—In 2021 and 2022, PGE filed its inaugural DSP in two parts, which were accepted by the OPUC in March 2022 and February 2023, respectively. The OPUC Staff finalized their review of modifications to the current DSP guidelines in the fourth quarter of 2024 and PGE filed its next DSP in December 2024, fully compliant with the updated requirement. The DSP outlines distribution system assets, describes how the Company plans for new load, including distributed resources such as EVs and rooftop solar installations, and presents the vision for modernizing the grid to enable accelerated decarbonization and customer participation in demonstrating continual progress towards PGE’s clean energy goals. For further information on recovery of costs related to the DSP, see“Distribution System Plan recovery mechanism”in the Regulatory Matters section of this Overview.
Current wording
Distribution System Plan (DSP)—In 2021 and 2022, PGE filed its inaugural DSP in two parts, which were accepted by the OPUC in 2022 and 2023, respectively. The OPUC Staff finalized their review of modifications to the current DSP guidelines in the fourth quarter of 2024 and PGE filed its next DSP in December 2024, fully compliant with the updated requirement. The DSP outlines distribution system assets, describes how the Company plans for new load, including distributed resources such as EVs and rooftop solar installations, and presents the vision for modernizing the grid to enable accelerated decarbonization and customer participation in demonstrating continual progress towards PGE’s clean energy goals. For further information on recovery of costs related to the DSP, see“DSP recovery mechanism”in the Regulatory Matters section of this Overview.
Previous wording
On December 9, 2025, the OPUC accepted PGE's 2026-2028 TE Plan. The plan considers current and planned activities, along with forecasted EV loads for the 2026-2028 period, with expected capital expenditures to be approximately $11 million.
Current wording
In December 2025, the OPUC accepted PGE's 2026-2028 TE Plan. The plan considers current and planned activities, along with forecasted EV loads for the 2026-2028 period, with expected capital expenditures to be approximately $11 million.
Previous wording
Trade Tariffs—Recently, the trade landscape shifted following a Supreme Court ruling that struck down broad executive-ordered tariffs, leading the administration to pivot toward targeted actions under Section 122 of the Trade Act of 1974 and Section 232 of the Trade Expansion Act of 1962. While some universal tariffs were rolled back, significant duties have been imposed on steel, aluminum, and copper derivatives, with a temporary rate reduction for specific electrical grid equipment through 2027. These evolving measures continue to drive potential increases in the cost of raw materials and equipment, disrupt global supply chains, and contribute to the volatility of capital and credit markets. The cost of steel utility poles, meters, transformers, and specialized electrical equipment, among other items, may increase materials and supplies balances and elevate the cost of capital projects. Similarly, prices may rise and lead times may lengthen for necessary components in resources considered for acquisition in PGE’s All-Source RFPs. For further information on the Company’s RFPs, see “The Resource Planning Process” in the Investing in a Clean Energy Future section of this Overview. While PGE’s Canadian natural gas imports are not expected to be impacted by the current state of trade tariffs due to the imports being U.S.-Mexico-Canada Agreement compliant, the future of trade tariff impacts on such imports is uncertain. The Company is unable to reasonably estimate the effects of the rapidly evolving trade tariff landscape, as those effects could include project delays and cost increases, and present obstacles to PGE’s strategic plan execution. PGE is closely monitoring the impacts of trade tariffs and the potential effect they may have on the Company’s financial position, results of operations, or cash flows.
Current wording
Trade Tariffs—U.S. trade policy and tariff measures continue to evolve through a combination of existing and newly implemented tariff programs, ongoing litigation, and potential future trade actions. These evolving measures may increase the cost of raw materials and equipment, disrupt global supply chains, and contribute to volatility in commodity, capital, and credit markets. The cost of steel utility poles, meters, transformers, and specialized electrical equipment, among other items, may increase, which could affect materials and supplies balances and increase capital projects costs. Similarly, procurement costs may rise and lead times may lengthen for necessary components in resources considered for acquisition in PGE’s All-Source RFPs. For further information on the Company’s RFPs, see “The Resource Planning Process” in the Investing in a Clean Energy Future section of this Overview. Although PGE does not expect a material impact on its Canadian natural gas imports from recent Canada-related actions, future trade actions involving Canada could affect commodity markets, supply chains, or procurement costs. Recent tariff actions affecting particular countries and product categories, as well as the possibility of additional trade measures, have increased uncertainty regarding future equipment costs and supply availability. The Company is unable to reasonably estimate the effects of the rapidly evolving trade tariff landscape, as those effects could include project delays and cost increases, and present obstacles to PGE’s strategic plan execution. PGE is closely monitoring the impacts of trade tariffs and the potential effect they may have on the Company’s financial position, results of operations, or cash flows.
Previous wording
On October 2, 2025, PGE received notice from the U.S. DOE of the termination of four federal grants that originally planned to provide $61 million in federal reimbursement over the life of the grants. PGE has incurred an immaterial amount of costs associated with the terminated grants and does not expect the termination process to result in a material impact on the Company’s financial position and results of operations.
Current wording
In October 2025, PGE received notice from the U.S. DOE of the termination of four federal grants that originally planned to provide $61 million in federal reimbursement over the life of the grants. PGE has incurred an immaterial amount of costs for projects associated with the terminated grants and does not expect the termination process to result in a material impact on the Company’s financial position and results of operations.
Previous wording
PGE has been awarded five additional grants totaling approximately $252 million, either as a direct recipient or subrecipient. These grants remain in various stages of execution, with the largest being the Warm Springs Power Pathway. PGE continues to monitor these grants for potential modification or termination but has not received any formal notice of termination. To date, PGE has incurred only immaterial costs related to these grants. See“Transmission Upgrades” in the Investing in a Clean Energy Future section of this Overview for further discussion on the Warm Springs Power Pathway grant. The Company cannot predict the ultimate timing and success of securing funding from federal programs or predict the outcome of existing grants.
Current wording
PGE has been awarded, either as a direct recipient or subrecipient, five additional grants totaling approximately $252 million. These grants remain in various stages of execution, with the largest being the Warm Springs Power Pathway. PGE continues to monitor these grants for potential modification or termination but has not received any formal notice of termination. To date, PGE has incurred only immaterial costs related to these grants. See“Transmission Upgrades” in the Investing in a Clean Energy Future section of this Overview for further discussion on the Warm Springs Power Pathway grant. The Company cannot predict the ultimate timing and success of securing funding from federal programs or predict the outcome of existing grants.
Previous wording
Inflation Reduction Act of 2022 (IRA)—The IRA was signed into law in August 2022. The United States Treasury and the Internal Revenue Service released extensive rules addressing credit transfer eligibility and application, including but not limited to, required registration, filing, and documentation for transferors and transferees to elect and claim a credit transfer.
Current wording
Inflation Reduction Act of 2022 (IRA)—The IRA was signed into law in 2022. The United States Treasury and the IRS released extensive rules addressing credit transfer eligibility and application, including but not limited to, required registration, filing, and documentation for transferors and transferees to elect and claim a credit transfer.
Previous wording
On April 17, 2024, PGE received approval from the OPUC to transfer 2024 and 2025 PTCs and record any difference between the full value and the discounted value in a property balancing account. On April 15, 2026, PGE received approval from the OPUC to transfer 2026 and 2027 PTCs and record any difference between the full value and the discounted value in a property balancing account.
Current wording
In 2024, PGE received approval from the OPUC to transfer PTCs generated in 2024 and 2025 and to record any difference between the full value and the discounted value in a property balancing account. On April 15, 2026, PGE received approval from the OPUC to transfer PTCs generated in 2026 and 2027 and to record any difference between the full value and the discounted value in a property balancing account.
Previous wording
PGE has entered into agreements to transfer 2024 through 2025 tax credits and transferred $3 million, net of discounts, for cash proceeds in both the first three months of 2026 and 2025. PGE transferred tax credits, net of discounts, of $179 million in 2025. The Company has also entered into agreements to transfer 2026 through 2027 tax credits and forecasts the generation and transfer of approximately $32 million in additional tax credits, net of discounts, in 2026.
Current wording
PGE has entered into agreements to transfer tax credits and transferred $12 million and $13 million, net of discounts, for cash proceeds in the first six months of 2026 and 2025, respectively. PGE transferred tax credits, net of discounts, of $179 million in 2025. For the remainder of 2026, the Company expects to generate and transfer approximately $25 million of additional tax credits, net of discounts.
Previous wording
The One Big Beautiful Bill Act—The OBBB significantly amended or repealed several renewable-energy tax incentives originally enacted under the IRA. Projects previously placed in service that met applicable tax credit qualification requirements received PTC or ITC benefits, which are reflected in the Company’s consolidated financial statements. The transferability of tax credits, as provided under the IRA, also remains in effect. In August 2025, the U.S. Treasury issued a notice for establishing the beginning of construction for wind and solar projects. The notice required large projects to satisfy a physical-work test after September 2, 2025, eliminated certain inventory-procurement safe harbors, and accelerated the placed in service deadline to December 31, 2027.
Current wording
The One Big Beautiful Bill Act (OBBBA)—The OBBBA significantly amended or repealed several renewable-energy tax incentives originally enacted under the IRA. Projects previously placed in service that met applicable tax credit qualification requirements received PTC or ITC benefits, which are reflected in the Company’s condensed consolidated financial statements. The transferability of tax credits, as provided under the IRA, also remains in effect. In August 2025, the U.S. Treasury issued a notice for establishing the beginning of construction for wind and solar projects. The notice required large projects to satisfy a physical-work test after September 2, 2025, eliminated certain inventory-procurement safe harbors, and accelerated the placed in service deadline to December 31, 2027. A subsequent court ruling invalidated the August 2025 notice, although debate continues as to the repercussions. Since the effect of the court ruling on the Company remains unclear, PGE has not changed its method of determining qualifying projects, treating them as if the notice remains in effect.
Previous wording
These changes, together with the repeal of the permanent ten percent ITC, as outlined in the OBBB, are expected to reduce or eliminate the availability of renewable energy tax incentives on future projects.
Current wording
These changes, together with the repeal of the permanent ten percent ITC, as outlined in the OBBBA, are expected to reduce or eliminate the availability of renewable energy tax incentives on future projects.
Previous wording
See“The Resource Planning Process” in the Investing in a Clean Energy Future section of this Overview for information regarding the impact of the OBBB on the RFP process.
Current wording
See“The Resource Planning Process” in the Investing in a Clean Energy Future section of this Overview for information regarding the impact of the OBBBA on the RFP process.
Previous wording
RPS standards and related laws—In 2016, Oregon Senate Bill (SB) 1547 increased the 2007 benchmarks for the percentage of electricity that must come from renewable sources by dates certain and required the elimination of coal as a fuel for generation of electricity used to serve Oregon utility customers on or before January 1, 2030, although an exception in the law may extend this date five years for the output of Colstrip.
Current wording
RPS standards and related laws—In 2016, Oregon Senate Bill (SB) 1547 increased the 2007 benchmarks for the percentage of electricity that must come from renewable sources by dates certain and required the elimination of coal as a fuel for generation of electricity used to serve Oregon utility customers on or before January 1, 2030, although an exception in the law may extend this date five years for the output of Colstrip Units 3 and 4 coal-fired generating plant (Colstrip).
Previous wording
The Company has a 20% ownership share in Colstrip and has fully depreciated it as of December 31, 2025. Any capital spending after 2025 is expected to be fully depreciated within the year of spending. The forecasted annual revenue requirement for Colstrip, including depreciation, is updated annually in a separate, supplemental tariff and recovery of power cost related items is sought annually under the AUT. In order to meet PGE’s regulatory, legislative, and reliability requirements, the Company continues to evaluate its ongoing ownership in Colstrip. See Note 8, Contingencies, in the
Current wording
The Company has a 20% ownership share in Colstrip and has fully depreciated the facility as of December 31, 2025. Any capital spending after 2025 is expected to be fully depreciated within the year of spending. The forecasted annual revenue requirement for Colstrip, including depreciation, is updated annually in a separate, supplemental tariff and recovery of power cost related items is sought annually under the AUT. In order to meet PGE’s regulatory, legislative, and reliability requirements, the Company continues to evaluate its ongoing ownership interest in Colstrip.
Previous wording
limit the life of renewable energy credits (RECs) generated from facilities that become operational after 2022 to five years, but continue unlimited lifespan for all existing RECs and allow for the generation of additional unlimited RECs for a period of five years for projects online before December 31, 2022; and
Current wording
limited the life of renewable energy credits (RECs) generated from facilities that become operational after 2022 to five years, but continue unlimited lifespan for all existing RECs and allow for the generation of additional unlimited RECs for a period of five years for projects online before December 31, 2022; and
Previous wording
provide opportunity to pursue recovery of energy storage costs related to renewable energy in the Company’s RAC filings.
Current wording
provided opportunity to pursue recovery of energy storage costs related to renewable energy in the Company’s RAC filings.
Previous wording
PGE believes it met the RPS threshold for 2025 and is on track to meet the threshold during 2026. The Company plans to submit its RPS report for 2025 by June 1, 2026.
Current wording
During the second quarter of 2026, the Company submitted its RPS report for 2025, which indicated that the Company met the threshold for 2025. The report remains subject to final review by the Oregon Department of Energy. PGE believes it is on track to meet the RPS threshold for 2026.
Showing the first 40 of 106 pairs. Open the source sections for the rest.
Rearranged current paragraphs (3)
Current report — wording carried from elsewhere
HB 3179—In response to increasing utility bills and concerns about affordability, the Oregon Legislature in 2025 passed HB 3179. Under the provisions of the legislation, the OPUC shall balance the interests of the utility investor and the consumer by considering the cumulative economic impact of the proposed price or schedule of prices on the electric or natural gas company’s residential customers. Electric or natural gas companies are required to file a multi-year rate plan (MRP) on a regular interval that is no less than three and no more than seven years long. The OPUC issued Order 26-191 on May 26, 2026, that began formal rulemaking in docket AR 677. In the proposed rules identified in Order 26-191, the OPUC is seeking to establish an initial filing schedule for MRPs, which calls for PGE to file its first MRP no earlier than May 1, 2029 and no later than July 31, 2029. The OPUC has also opened a docket, AR 676, as a multi-phased rulemaking to establish the MRP framework with a target to complete the framework in early 2027.
Current report — wording carried from elsewhere
Reliability Contingency Event (RCE)—Under the RCE mechanism, originally authorized by the OPUC to be effective through 2025, PGE was allowed to pursue recovery of 80% of costs for RCEs above amounts forecasted in the Company’s AUT, without application of an earnings test, with the remaining 20% flowing through operating expenses and subject to the existing PCAM. Results of the PCAM are filed annually with the OPUC no later than July 1, initiating a regulatory review process that typically results in a final determination and order from the OPUC by the end of the year of filing, with any resulting refund or collection impacting customer prices effective in the following year. RCE costs incurred and deferred are included in each years' respective PCAM filing.
Current report — wording carried from elsewhere
For the six months ended June 30, 2026, the $44 million decrease related to the change in average variable power cost per MWh was driven by a 19% decrease in the average cost of purchased power and a 35% increase in the average cost for the Company’s own generation. The $16 million increase related to total system load was comprised of a 17% increase of energy obtained from purchased power, offset by a 27% decrease in the Company’s own generation.
Rearranged previous paragraphs (7)
Previous report — wording carried elsewhere
Washington utility business. PGE would remain majority owner and sole operator.
Previous report — wording carried elsewhere
2023, the first combined IRP and CEP. That filing projected PGE’s resource and capacity needs over the next 20 years and proposed an Action Plan to meet near-term needs, subject to HB 2021 emissions reduction requirements.
Previous report — wording carried elsewhere
April 17, 2025, and regulatory approval was granted on July 22, 2025. The Company issued the RFP to market on July 31, 2025, seeking bids for resources that can provide non-emitting dispatchable capacity and renewable generation.
Previous report — wording carried elsewhere
See “Federal Grants” in the Laws and Regulations section of this Overview for further discussion over the impacts of Federal grants and effect of Presidential executive orders.
Previous report — wording carried elsewhere
As approved by the OPUC in PGE’s 2024 GRC, through 2025 the RCE mechanism allows PGE to pursue recovery of 80% of costs for RCEs above amounts forecasted in the Company’s AUT, with the remaining 20% flowing through operating expenses and subject to the existing PCAM. For more on the RCE, see“Reliability contingency events”in the Regulatory Assets and Liabilities section of Note 3, Balance Sheet Components in the Notes to Condensed Consolidated Financial Statements in Item 1.—“Financial Statements.”
Previous report — wording carried elsewhere
Additionally, PGE has incurred incremental accounting, legal, and consulting costs related to its submission of a regulatory application for approval of a holding company reorganization. For more on the holding company application and pending acquisition, see “Corporate Structure” in the Regulatory Matters section, and"Pending Acquisition" in the Company Strategy section of this Overview.
Previous report — wording carried elsewhere
The pending Acquisition to acquire select portions of PacifiCorp’s Washington state regulated utility retail business will require financing of $1.9 billion. Upon execution of the Agreement, the acquisition was supported by a fully committed bridge facility with Barclays Bank PLC and JPMorgan Chase Bank, N.A. for $1.9 billion. On March 23, 2026, the bridge facility was amended to an amount of approximately $1.3 billion and at the same time, the Company entered into a Delay